Tenders
S.No. Project Name ERPOC
Tender
Number
Project Cost (Cr) Project
Duration
(Yrs)
Agency Project Type Bid Issue Date Bid Due Date
1 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase „Á‟ in the State of West Bengal (Package-IV A).

2018_NHIDC_416435_1 249.930 2.5 NHIDCL EPC 07/12/2018
Time 18:0Hrs
22/01/2019
Time 15:0Hrs
2 Construction of 6-lane access controlled Greenfield highway from km -1.142 to km 21.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-1)

2018_NHAI_16042_1 444.890 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
3 Construction of 6-lane access controlled Greenfield highway from km 21.000 to km 48.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-2)

2018_NHAI_16047_1 440.570 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
4 Construction of 6-lane access controlled Greenfield highway from km 48.000 to km 72.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-3)

2018_NHAI_16050_1 468.030 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
5 Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-4)

2018_NHAI_16052_1 422.540 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
6 Construction of 6-lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-5)

2018_NHAI_16045_1 409.660 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
7 Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-6)

2018_NHAI_16051_1 668.480 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
8 Construction of 6-lane access controlled Greenfield highway from km 150.000 to km 180.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-7)

2018_NHAI_16053_1 483.590 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
9 Construction of 6-lane access controlled Greenfield highway from km 180.000 to km 207.100 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-8)

2018_NHAI_16054_1 543.440 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
10 Construction of 6-lane access controlled Greenfield highway from km 1.900 to km 30.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-1)

2018_NHAI_16018_1 446.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
11 Construction of 6-lane access controlled Greenfield highway from km 30.000 to km 60.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-2)

2018_NHAI_16024_1 535.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
12 Construction of 6-lane access controlled Greenfield highway from km 60.000 to km 90.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-3)

2018_NHAI_16027_1 541.520 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
13 Construction of 6-lane access controlled Greenfield highway from km 90.000 to km 120.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-4)

2018_NHAI_16031_1 429.890 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
14 Construction of 6-lane access controlled Greenfield highway from km 120.000 to km 148.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-5)

2018_NHAI_16033_1 456.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
15 Construction of 6-lane access controlled Greenfield highway from km 148.000 to km 177.658 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-6)

2018_NHAI_16037_1 464.590 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
16 Construction of 6-lane access controlled Greenfield highway from km -0.300 to km 28.700 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-1)

2018_NHAI_15991_1 520.010 3 NHAI EPC 05/10/2018
Time 13:0Hrs
15/01/2019
Time 11:0Hrs
17 Construction of 6-lane access controlled Greenfield highway from km 28.700 to km 53.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2)

2018_NHAI_15994_1 528.230 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
18 Construction of 6-lane access controlled Greenfield highway from km 53.000 to km 88.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3)

2018_NHAI_16014_1 510.370 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
19 Construction of 6-lane access controlled Greenfield highway from km 88000 to km 115000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-4)

2018_NHAI_16020_1 382.760 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
20 Construction of 6-lane access controlled Greenfield highway from km 115.000 to km 140.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-5)

2018_NHAI_16025_1 362.980 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
21 Construction of 6-lane access controlled Greenfield highway from km 140.000 to km 170.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-6)

2018_NHAI_16028_1 433.410 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
22 Construction of 6-lane access controlled Greenfield highway from km 170.000 to km 200.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-7)

2018_NHAI_16034_1 406.670 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
23 Construction of 6-lane access controlled Greenfield highway from km 200.000 to km 225.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8)

2018_NHAI_16040_1 458.120 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
24 Construction of 6-lane access controlled Greenfield highway from km 225.000 to km 252.500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-9)

2018_NHAI_15992_1 484.090 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
25 Construction of Six Lane access controlled highway NH 152D starting from Ismailabad on NH 152 to Junction with Karnal Pehowa road SH 9 near Dhand Ch. 0.000 to Ch. 23.000 length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg1 598.970 2 NHAI EPC 20/11/2018
Time 17:0Hrs
14/01/2019
Time 11:0Hrs
26 Construction of Six Lane access controlled highway NH 152D starting from Junction with Karnal Pehowa road SH 9 near Dhand village to Junction with Kaithal Safidon SH 11 road near Rajound Ch. 23.000 to 56.000, length 33 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg2 724.970 2 NHAI EPC 20/11/2018
Time 17:0Hrs
14/01/2019
Time 11:0Hrs
27 Construction of Six Lane access controlled highway NH 152D starting from Junction with Kaithal-Safidon road SH 11 near Rajound to Junction with Jind Safidon road SH 14 near Kheri village Ch. 56.000 to 80.000, length 24 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg3 509.160 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
28 Construction of Six Lane access controlled highway NH 152D starting from Junction with Jind Safidon road SH 14 near Kheri village to Junction with NH 352 Jind Gohana section near Julana Ch. 80.000 to 108.000, length 28 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg4 651.070 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
29 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 352 Jind Gohana near Julana to Junction with NH 9 Rohtak Jind section near Kharkara Ch. 108.000 to 131.000, length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg5 621.410 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
30 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 9 Rohtak Jind section near Kharkara to Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri Ch. 131.000 to 165.000, length 34 km on EPC mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg6 653.850 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
31 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri to Junction with Rewari Kanina road SH 24 near Kanina Ch. 165.0 to 200.0, length 35 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg7 732.570 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
32 Construction of Six Lane access controlled highway NH 152D starting from Junction with Rewari Kanina road SH 24 near Kanina to Narnaul Ch. 200.000 to 227.020, length 27.20 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg8 607.270 2 NHAI EPC 20/11/2018
Time 17:30Hrs
14/01/2019
Time 11:0Hrs
33 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the state of Jammu and Kashmir to be executed on EPC basis.

2018_NHIDC_416527_1 221.940 2 NHIDCL EPC 07/12/2018
Time 19:0Hrs
08/01/2019
Time 11:0Hrs
34 Construction of Dwarka Expressway from Road under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana border (Km 5.300 To Km 9.500) Package 2 in state of Delhi on EPC mode

2018_NHAI_18151_1 1,469.080 2 NHAI EPC 19/11/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
35 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 2.5 NHIDCL EPC 08/10/2018
Time 17:0Hrs
20/12/2018
Time 11:0Hrs
36 Four Lane divided carriageway from Vadipatti (Design Chainage 0.000) to Thamaraipatti (Design Chainage 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu

NHAI_11012_MR_EPC_7_2018 555.520 2 NHAI EPC 08/06/2018
Time 15:0Hrs
13/12/2018
Time 11:0Hrs
37 Up-gradation Construction to Two Lane with paved shoulders with Flexible Pavement on Kurwai Mungaoli Chanderi Road (NH-346) Design Length 79.700 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392296_1 245.410 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
38 Up-gradation and Construction to Two Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road (NH-347C) Design Length-79.59 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392333_1 217.400 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
39 Up-gradation and Construction to Two lane with paved shoulders with flexible pavement on Jirapura Pachore Road (NH-752C), Length 52.310 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392348_1 195.610 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
40 Construction of 2-lane ROB and its approaches at km 147/10 (Harda) on NH-59A in lieu of level crossing No. 204 SPL on Khandwa-Jhasni Railway line on Railway chainage 669/1-3 on Indore Betul road of Harda District in the state of Madhya Pradesh on EPC

2018_MoRTH_392384_1 30.311 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
41 Construction of 4-lane ROB and its approaches at km 14/800 (Jerai) on NH-26A in lieu of existing level crossing No. 19 on Katni-Binasection Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar District in the state of MPon EPC Mode

2018_MoRTH_392399_1 42.510 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
42 Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A in lieu of existing level crossing No. 11 on Katni-Bina Railway line on Railway chainage 1011/6-7 on Sagar Khurai Bina road of Sagar District in the state of MP on EPC Mode

2018_MoRTH_392412_1 39.852 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
43 Construction of 2-lane ROB at NH Km.72/000 of NH-26A on Katni Bina Railway Line at L/C no. 1B on Sagar to Bina Road near Bina Town of Sagar Distt in the state of Madhya Pradesh on EPC Mode

2018_MoRTH_392367_1 24.545 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
12/12/2018
Time 17:0Hrs
44 4-laning of Delhi-Saharanpur NH-709B from km 92.200(near Shamli) to km 155.025 (near Saharanpur), (length 62.772 km) in Uttar Pradesh (Pkg-II) on EPC mode under Bharatmala Pariyojana

2018_NHAI_12646_1 612.890 2 NHAI EPC 09/07/2018
Time 17:30Hrs
11/12/2018
Time 11:0Hrs
45 Construction of Missing Links in Lakhpat – Gaduli - Hajipir - Odma – Khavda - Dholavira - Mauvana-Gadkabet - Santalpur road (Newly declared National Highway No.754K) in the state of Gujarat. On EPC Mode

4EPC of 2018-19 337.970 1.5 MoRTH EPC 10/10/2018
Time 14:0Hrs
10/12/2018
Time 17:0Hrs
46 Construction of Four-Lane divided Highway from Melur (Design km. 0.000/Existing km. 99.920 of NH-38) to Karaikudi (Design km 45.860 /Existing km. 12.900 of NH-383 Ext.) (Design Length- 45.860 km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC mode

2018_NHAI_10794_1 750.520 2 NHAI EPC 16/05/2018
Time 18:40Hrs
06/12/2018
Time 11:0Hrs
47 Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH11 Km 151.840 to Km 183.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojan in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg6 858.570 2 NHAI EPC 20/08/2018
Time 17:0Hrs
05/12/2018
Time 11:0Hrs
48 Construction of Eight Lane Carriageway starting near Junction at SH44 to Junction with Keshopura Road Km 115.700 to Km 151.840 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg5 925.130 2 NHAI EPC 20/08/2018
Time 17:0Hrs
05/12/2018
Time 11:0Hrs
49 Construction of Eight Lane Carriageway starting at Haryana Rajasthan border and ends at Junction with SH44 Km 78.800 to Km 115.700 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg4 958.820 2 NHAI EPC 20/08/2018
Time 17:0Hrs
05/12/2018
Time 11:0Hrs
50 Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 47.000 near Khanpur Ghati Km 18.500 to Km 47.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg2 1,017.680 2 NHAI EPC 23/08/2018
Time 17:0Hrs
05/12/2018
Time 11:0Hrs
51 Construction of Eight Lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan Border Km 47.000 to Km 78.800 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg3 798.550 2 NHAI EPC 23/08/2018
Time 17:0Hrs
05/12/2018
Time 11:0Hrs
52 Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH 71 and connecting link from Km 347.800 of NH 71 to Km 9.400 of NH 71A balance work on EPC Mode under Bharatmala left out in NHDP in the State of Haryana

11089 414.390 1.5 NHAI EPC 24/05/2018
Time 15:0Hrs
04/12/2018
Time 11:0Hrs
53 Construction of Elevated Structure including approaches in Phagwara City from Km. 352.675 to Km 354.430 and VUP at Km 355.400 including approaches on NH 44 Old NH 1 in the State of Punjab on EPC mode as Standalone project

13987 147.290 1 NHAI EPC 10/08/2018
Time 15:0Hrs
04/12/2018
Time 11:0Hrs
54 Construction of Eight Lane access-controlled Expressway carriageway from Kamliya village to Kandarwasa village of Ratlam district Ch.572.220 to 602.420 design Ch.119.800toCh.150.000 section of Delhi-Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg21 919.630 2 NHAI EPC 12/10/2018
Time 11:0Hrs
04/12/2018
Time 11:0Hrs
55 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village Near Shivgarh of Ratlam district Ch.602.420 to 627.420 design Ch.150.000 to Ch.175.000 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg22 1,037.530 2 NHAI EPC 12/10/2018
Time 11:0Hrs
04/12/2018
Time 11:0Hrs
56 Construction of Eight Lane access controlled Expressway carriageway from Bawadi village Near Shivgarh of Ratlam district to Ranni Village of Jhabua district Ch.627.420 to 652.720 design Ch.175.000 to 200.300 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg23 1,139.890 2 NHAI EPC 12/10/2018
Time 11:0Hrs
04/12/2018
Time 11:0Hrs
57 Construction of Eight Lane access controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua district Ch.652.720 to 674.420 design Ch.200.300 to 221.700 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg24 921.630 2 NHAI EPC 12/10/2018
Time 11:0Hrs
04/12/2018
Time 11:0Hrs
58 Construction of Eight Lane access controlled Expressway carriageway from Miyati Village to MP-Gujarat Border Ch.221.700 to 244.500 design Ch.674.420 to 697.220 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg25 966.430 2 NHAI EPC 12/10/2018
Time 11:0Hrs
04/12/2018
Time 11:0Hrs
59 Rehabilitation of 9 (Nine) damaged Bridges/ROB along NH-60 during the year of 2018-19 in the district of Birbhum, West Bengal on EPC mode. Job No. 060-WB-2018-19-429

2018_MoRTH_386715 6.170 1 MoRTH EPC 21/09/2018
Time 16:0Hrs
30/11/2018
Time 13:0Hrs
60 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2018_NHIDC_384329_1 98.070 2 NHIDCL EPC 14/09/2018
Time 18:15Hrs
29/11/2018
Time 15:0Hrs
61 Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V)

2018_NHIDC_384220_1 24.460 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
28/11/2018
Time 15:0Hrs
62 Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode (Package-VI)

2018_NHIDC_384290_1 40.770 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
28/11/2018
Time 15:0Hrs
63 Construction of one VUP of Six lane at design chainage Km 120.275 on four laning of Surat Hazira Port Section of NH 6 in the State of Gujarat under NHDP Phase III through EPC Contract mode

101 32.630 1.5 NHAI EPC 09/08/2018
Time 11:0Hrs
27/11/2018
Time 11:0Hrs
64 Construction of Eight Lane access controlled Expressway starting near Start of RoB near junction with NH11A to Junction with MDR1 Baonli Jhalai road Ch.214.260 to 247.310 section of Delhi Vadodara Green field Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg8 903.420 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
65 Construction of Eight Lane access controlled Expressway from Junction with NH 12 to Start of Bridge near Manoharpur from Ch. 417.000 to 425.990 section of Delhi Vadodara Green field Alignment NH 148N including construction of tunnel in Mukundra Hills Darrah on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg15 909.840 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
66 Construction of Eight Lane access controlled Expressway from Start of Bridge near Manoharpur to Rajasthan MP Border Ch. 425.990 to 452.420 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg16 709.700 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
67 Construction of Eight Lane access controlled Expressway from Rajasthan MP Border to Jodmi village of Mandsaur district Ch. 452.420 to 484.420 design Ch. 0.000 to Ch. 32.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg17 888.420 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
68 Construction of Eight Lane access controlled Expressway carriageway from Jodmi village to Bani village of Mandsaur district Ch.484.420 to 517.420 design Ch.32.000 to Ch. 65.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg18 973.780 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
69 Construction of Eight Lane access controlled Expressway carriageway from Bani village to Bardawadi village of Mandsaur district Ch. 517.420 to 546.920 design Ch. 65.000 to Ch. 94.500 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg19 880.620 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
70 Construction of Eight Lane access controlled Expressway carriageway from Bardawadi village of Mandsaur district to Kamliya village of Ratlam district Ch.546.920 to 572.220 design Ch.94.500 to Ch.119.800 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg20 736.670 2 NHAI EPC 05/10/2018
Time 11:0Hrs
26/11/2018
Time 11:0Hrs
71 Construction of Eight Lane access controlled Expressway starting near Major Bridge on Chakan River to Major Bridge on Mej River (Ch. 309.001 - 331.030) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg11 884.950 2 NHAI EPC 01/10/2018
Time 11:0Hrs
19/11/2018
Time 15:0Hrs
72 Construction of Eight Lane access controlled Expressway starting near Start of RoB near village Itawa to Major Bridge on Chakan river (Ch. 279.840 - 309.001) section of Delhi - Vadodara Green field Alignment NH-148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg10 758.080 2 NHAI EPC 01/10/2018
Time 11:40Hrs
19/11/2018
Time 11:0Hrs
73 Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg13 940.950 2 NHAI EPC 01/10/2018
Time 11:0Hrs
19/11/2018
Time 11:0Hrs
74 Construction of Eight Lane access controlled Expressway starting near Junction with MDR-1 (Baonli-Jhalai road) to Start of RoB near village Itawa (Ch. 247.310 - 279.840) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 808.110 2 NHAI EPC 01/10/2018
Time 11:0Hrs
19/11/2018
Time 11:0Hrs
75 Construction of Eight Lane access controlled Expressway starting near Junction with NH-76 to Junction with NH-12 (Ch. 388.420 - 417.000) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg14 703.880 2 NHAI EPC 01/10/2018
Time 11:0Hrs
19/11/2018
Time 11:0Hrs
76 Construction of Eight Lane access controlled Expressway starting near Junction with NH-11 to Start of RoB near junction with NH-11A (Ch. 183.000 - 214.260) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg7 955.560 2 NHAI EPC 01/10/2018
Time 11:0Hrs
19/11/2018
Time 11:0Hrs
77 Six Lanning of Sriperumbudur to Karaipettai Section of NH-4 (New NH-48) from Km 37.000 (Existing Km 37/000) to Km 71.015 (Existing Km 71/000) on EPC Mode in the state of Tamil Nadu under NHDP Phase-V.

2018_NHAI_15715_1 649.250 2 NHAI EPC 25/09/2018
Time 18:0Hrs
19/11/2018
Time 11:0Hrs
78 Construction of Eight Lane access controlled Expressway starting near Major Bridge on Mej River to Junction with SH 37A Ch. 331.030 to 359.170 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/2018/Pkg12 886.360 2 NHAI EPC 28/09/2018
Time 11:0Hrs
19/11/2018
Time 11:0Hrs
79 Six laning of existing 4-lane road from Gundugolanu (Design km 1023.280) to Kalaparru (Design km 1050.680) of NH-5 (New NH-16) (Design length = 27.400 km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode

2018_NHAI_7515_1 505.400 1.5 NHAI EPC 22/10/2018
Time 15:59Hrs
19/11/2018
Time 11:0Hrs
80 Six-Laning of existing 4-lane road from Kalaparru (Design km 1050.680) to Chinna Avutupalli (Design km 1076.480) of NH-5 (New NH-16) including 6 lane Hanuman Junction bypass from (Existing Km 1055.680 to km 1060.800)(Design Ch. 0.000 to Ch.6.720), (Total Design Length – 27.400km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC mode

2018_NHAI_7435_1 589.950 1.5 NHAI EPC 22/10/2018
Time 16:55Hrs
19/11/2018
Time 11:0Hrs
81 Construction of Eight Lane divided carriageway starting at Sohna Gurugram Road (NH 248A) near Alipur village and ends at Ch. 18.461 before KMP Expressway (Ch. 0.000 to Ch. 18.461) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg1 1,144.000 2 NHAI EPC 17/09/2018
Time 11:0Hrs
15/11/2018
Time 11:0Hrs
82 Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. Job No. NH-2B/(WB)/(18)/15-16-018-S&R(B)

2018_MoRTH_369804_1 103.980 2 MoRTH EPC 14/08/2018
Time 18:0Hrs
14/11/2018
Time 13:0Hrs
83 Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH-2B/(WB)/(17)/15-16-014-S&R(B)

2018_MoRTH_369909_1 85.060 2 MoRTH EPC 14/08/2018
Time 18:0Hrs
14/11/2018
Time 13:0Hrs
84 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 2.5 NHIDCL EPC 08/10/2018
Time 19:5Hrs
12/11/2018
Time 11:0Hrs
85 Rehabilitation of Km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 25.00 km) on EPC Mode” (Package-VII)

2018_NHIDC_384308_1 54.750 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
09/11/2018
Time 15:0Hrs
86 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Km. 379.100 to Km. 380.275 of Gholteer Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.( Design Length = 1.175 Km)

2018_NHIDC_384349_1 89.270 1 NHIDCL EPC 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
87 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length = 0.600 km)

2018_NHIDC_384359_1 45.370 1 NHIDCL EPC 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
88 Upgradation of new NH-341 to two-lane with paved side shoulder configuration between design chainage from Km 65.478 to Km 162.209 including geometric improvement and reconstruction of old/weak structures. (Bhuj Airport Jn.- Khavada - India bridge to Dharmshala section) in the State of Gujarat on EPC Mode.

EPC/5 of 2017-18 ( 2nd Attempt) 261.100 2 MoRTH EPC 21/08/2018
Time 15:0Hrs
20/10/2018
Time 18:0Hrs
89 Construction of Major Bridge at Km 180.865 across River Krishna on NH-167 Hagari – Jadercela Section in the State of Karnataka

2018_MoRTH_381296_1 124.710 2.5 MoRTH EPC 01/10/2018
Time 14:0Hrs
20/10/2018
Time 17:0Hrs
90 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis

2018_NHIDC_369922_1 260.770 2.5 NHIDCL EPC 08/08/2018
Time 10:0Hrs
12/10/2018
Time 11:0Hrs
91 Construction of 4 lane elevated corridor in Dessa Town between km 565.850 to km 569.600 Length 3.750km on East West Corridor of NH-27 (Old NH-14) in Gujarat on EPC Mode

2018_NHAI_13698_1 222.750 2 NHAI EPC 03/08/2018
Time 17:57Hrs
19/09/2018
Time 11:0Hrs
92 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_362363_1 230.340 2.5 NHIDCL EPC 19/07/2018
Time 17:0Hrs
17/09/2018
Time 11:0Hrs
93 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.000 TO KM 65.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-1) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275446_1 678.060 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
04/09/2018
Time 15:0Hrs
94 test project 1

NHIDCL/UK/NH134/Silkyara Tunnel/2017_ test 1,119.690 4 MoRTH EPC 24/08/2018
Time 15:0Hrs
28/08/2018
Time 15:0Hrs
95 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 65.000 TO KM 125.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-2) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_282985_1 469.230 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
96 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.000 TO KM 166.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-3) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283016_1 464.380 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
97 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.000 TO KM 208.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-4) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275447_1 471.350 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
98 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.000 TO KM 250.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-5) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283024_1 399.370 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
99 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.000 TO KM 298.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-6) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283003_1 501.740 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
100 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.000 TO KM 339.000 AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-7) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275448_1 497.710 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
101 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.000 TO KM 380.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-8) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275449_1 487.850 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
102 Construction of Two VUPs at Km 223.950 and Km 226.200 and one side storage Lane in Bharuch-Surat Section of NH-8 in the State of Gujarat on EPC Mode

2018_NHAI_13023_1 20.170 1.5 NHAI EPC 18/07/2018
Time 17:10Hrs
27/08/2018
Time 11:0Hrs
103 Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode

2018_NHAI_12488_1 87.530 1.5 NHAI EPC 04/07/2018
Time 17:57Hrs
27/08/2018
Time 11:0Hrs
104 Six Lanning of Sriperumbudur to Karaipettai Section of NH4 (New NH48) from Km 37.000 (Existing Km 37.000) to Km 71.015 (Existing Km 71.000) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11044_1 649.250 2 NHAI EPC 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs
105 Six Lanning of Karaipettai to Walajapet Section of NH4 (New NH48) from Km71.015 (Existing Km 71.000) to Km 107.091 (Existing Km 107.068) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11045_1 590.390 2 NHAI EPC 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs