Tenders
S.No. Project Name ERPOC
Tender
Number (CPPP)
Estimated Project Cost (Cr) Executing Agency Project Type Mode of Execution Bid Issue Date Bid Due Date
1 Improvement and upgradation to two lane with paved shoulder configuration from existing km. 55.00 to km.90.000 (Design length 34.760) of NH-227A (Near Chhapia Village to near Sikriganj) in the state of Uttar Pradesh o Engineering, Procurement and Construction (EPC) mode Contract.

2021_MoRTH_653581_1 211.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/10/2021
Time 15:0Hrs
02/12/2021
Time 15:0Hrs
2 Widening and Strengthening from km. 15.000 to km. 58.600 (Bhadewara to Dramandganj section) of NH 135C in the state of Uttar Pradesh on EPC mode

2021_MoRTH_653306_1 204.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 16:50Hrs
02/12/2021
Time 11:0Hrs
3 Construction of four laning Green field Road connecting North & south Industrial Cluster of Khandaleru creek near Krishnapatnam port at Thamminapatnam to Mollur near Muthukur Ch0.000 to Ch16.046 and extension of Dedicated port road on NH67 from Km 18.000 to 19.300 in the State of Andhra Pradesh on EPC mode under Bharatmala Pariyojana

2021_NHAI_83798_1 391.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:0Hrs
25/11/2021
Time 11:0Hrs
4 Construction of upgradation of carriageway Km 180.200 to 188.700 of Raebareli- Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC mode.

2021-NHAI-90823-1 68.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
23/11/2021
Time 15:0Hrs
5 Construction of flyover at Rau circle at Km 12600 from design km 11700 to Km 12920 in Indore Dewas stretch in the state of Madhya Pradesh on EPC mode

2021_NHAI_90754_1 34.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 14:0Hrs
22/11/2021
Time 11:0Hrs
6 CONSTRUCTION OF 220 MTR (55 MTR X 4) MAJOR PERMANENT BRIDGES AT KM 186.55 (55 MTR X 2), KM 194.00 (55 MTR X 1), KM 199.00 (55 MTR X 1) AND CONSTRUTION OF 110 MTR (55 MTR X 2) MAJOR PERMANENT BRIDGES AT KM 236.27 (55 MTR X 1) AND KM 247.40 (55 MTR X 1), INCLUDING APPROACHES ON D-S-DBO ROAD UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2021_BRO_480089_1 49.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2021
Time 18:0Hrs
20/11/2021
Time 12:0Hrs
7 Construction of Twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No. KA-38 Rly Km. 165-21-165-23 between Chondrakona Road and Garbeta Stations in Kadamdiha at km 159.448 of NH-60 in the state of West Bengal. Job No.NH-60-WB-3-15-16-025-SandR-B.

2021_MoRTH_639625_1 81.175 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2021
Time 18:0Hrs
18/11/2021
Time 11:0Hrs
8 Widening to Two Lane with Paved shoulders including strengthening of existing pavement from km 0.00 to km 24.800 of NH 28B New NH 727 on EPC mode in the state of Bihar for the year 2021 22 Length 24.800 Km

2021_MoRTH_650270_1 87.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 15:0Hrs
17/11/2021
Time 11:0Hrs
9 Six Laning of Paravoor (Design Ch. 417.000) – Kottunkulangara (Design Ch.454.500) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana

2021_NHAI_67645_1 1,310.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 17:0Hrs
17/11/2021
Time 11:0Hrs
10 Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode

NHAI/Raj/2021/GKJ/ Structure 276.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
16/11/2021
Time 11:0Hrs
11 Four Lanning of Karwar (Km. 281.980 of NH 62 Nagaur road) to Dangiyavas section Package-II (design length 30.093 km) of Jodhpur ring road in Rajasthan on EPC Mode under NHDP Phase-VII

2021_NHAI_87332_1 514.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 18:30Hrs
16/11/2021
Time 11:0Hrs
12 CONSTRUCTION AND UPGRADATION OF ROAD MANALI-SARCHU-LEH TO NHDL SPECIFICATIONS FROM DESIGN CHAINAGE KM 266.000 TO KM 293.866 UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 27.886 KM)

2021_BRO_478053_1 171.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 16:30Hrs
15/11/2021
Time 12:0Hrs
13 Construction of Four Lane Bypasses for Jagatpur, Babuganj, Unchahar, Alapur Bypass, Link Road and Sai river bridge of Raebareli – Prayagraj section of NH-30 (Old NH-24B) under Bharatmala Pariyojna in the State of Uttar Pradesh on EPC mode

2021_NHAI_86077_1 701.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2021
Time 15:0Hrs
10/11/2021
Time 11:0Hrs
14 Additional Works on Six Lane Jaipur Kishangarh Ajmer Beawar section of NH 48 NH 448 and NH-58 (Old NH-8) in the states of Rajasthan on EPC Mode

2021_NHAI_83755_1 232.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:0Hrs
10/11/2021
Time 11:0Hrs
15 Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode

2021_NHAI_85354_1 101.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2021
Time 16:0Hrs
10/11/2021
Time 11:0Hrs
16 Laying of Paver Blocks and construction of open/covered drains on internal village roads in Sevapuri block District Varanasi, UP. PKG-I.

2021_MoRTH_635866_1 52.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/06/2021
Time 15:0Hrs
08/11/2021
Time 17:0Hrs
17 Laying of Paver Blocks and construction of open/covered drains on internal village roads in Sevapuri block District Varanasi. PKG-II.

2021_MoRTH_635877_1 52.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/06/2021
Time 15:0Hrs
08/11/2021
Time 17:0Hrs
18 Laying of Paver Blocks and construction of open/covered drains on internal village roads in Sevapuri block District Varanasi. PKG-III

2021_MoRTH_635881_1 56.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/06/2021
Time 15:0Hrs
08/11/2021
Time 17:0Hrs
19 Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28 500 to Km 73 744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana Package2

2021 NHAI 86770 1 1,724.670 NHAI Normal Highway Project HAM 11/10/2021
Time 11:30Hrs
08/11/2021
Time 11:0Hrs
20 Periodic Renewal of Abohar Fazilka road from Km.24.560 to 42.560 of NH-07 under NH Division, Abohar in the State of Punjab for the year 2021-22 (18km) on EPC mode

01/EE/NH/ABH 10.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2021
Time 14:0Hrs
08/11/2021
Time 11:0Hrs
21 Construction of 6-lanning of Kanpur Lucknow Expressway (NE-6), starting from Lucknow Ring Road near Shaheed Path at km. 10.980 to km. 28.500 of NH-27 including spur in the state of Uttar Pradesh (length 17.52 km) on Hybrid Annuity Mode. Package-1

2021_NHAI_86765_1 1,675.180 NHAI Normal Highway Project HAM 01/09/2021
Time 15:0Hrs
08/11/2021
Time 11:0Hrs
22 Strengthening from km153/000 - 160/000 & from Km.161/400-163/000 of NH 208 (New NH 744) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_646744_1 10.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:30Hrs
08/11/2021
Time 11:0Hrs
23 Balance Works of Four Laning of Udhampur- Ramban Section of NH-1A (now NH-44) from Km 67.00 to Km 89.00, Km 130.00 to Km 151.00 on Engineering Procurement & Construction (EPC) Mode in the Union Territory of Jammu & Kashmir under NHDP Phase-II

NHAI/Balance Work of U-R/J&K/EPC/2021 550.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 19:0Hrs
08/11/2021
Time 11:0Hrs
24 Construction of Six lane flyover at Start of Batala Bypass at km 63.320 on Amritsar Pathankot section of NH-15 (new NH-54) in the State of Punjab on EPC mode.

2021_NHAI_77339_1 40.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2021
Time 16:0Hrs
08/11/2021
Time 11:0Hrs
25 FOUR LANING OF HARIDWAR – NAGINA SECTION OF EUP MITIGATION MEASURES ON NH-74 IN THE STATE OF UTTARAKHAND UNDER NHDP PHASE-IV ON EPC MODE (FROM DESIGN CHAINAGE LME FROM KM 13.829 TO KM 17.110 & KM 26.077 TO KM 27.508 AND DESIGN CHAINAGE RME FROM KM 13.839 TO KM 17.120 & KM 26.078 TO KM 27.509)

2021_NHAI_87525_1 139.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2021
Time 13:0Hrs
02/11/2021
Time 11:0Hrs
26 Construction of two no. of new RCC minor Bridge 3x18.84 m and 3x5x4 and 3 nos of new box culverts 2 nos 1x3x3 and 1 no 3x3x3 in place of old bridge and culvert at various chainage in NH 33 old nh 110 on epc mode in the State of Bihar

2021_MoRTH_648739_1 11.114 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 15:0Hrs
01/11/2021
Time 15:0Hrs
27 Four laning of existing Beas – Baba Bakala - Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417.700) and terminating at Kartarpur Sahib Corridor (Km. 0.000 of NH-354B and Km. 153.800 of NH.354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-II –from start of Batala Bypass (Design Chainage Km 31.300) till intersection with Ajnala Gurdaspur Highway (NH 354) near Dera Baba Nanak (Design Chainage Km 69.100 ) on EPC mode in the State of Punjab

2021_NHAI_88527_1 452.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2021
Time 15:0Hrs
01/11/2021
Time 15:0Hrs
28 Construction of Tunnels Viaducts at identified sliding slip zones in Design Ch. 130.550 to Ch. 130.750 Ch. 131.170 to Ch. 131.763, Ch. 132.560 to Ch. 133.168, Ch. 133.590 to Ch. 133.743 and Ch. 147.877 to 148.715 in Udhampur Ramban section of NH 44 in the UT of J&K under residual NHDP on EPC Mode 2nd Call

NHAI/Part of U-R/JK/EPC/2021 325.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/10/2021
Time 15:0Hrs
01/11/2021
Time 11:0Hrs
29 CONSTRUCTION OF FOOT TRACK INCLUDING EARTHWORK, SURFACING WORKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

CE (P) VTK/NIB-07/2021-22 42.710 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/09/2021
Time 15:0Hrs
29/10/2021
Time 15:0Hrs
30 PERIODICAL RENEWAL OF BATHINDA-DABWALI ROAD NH-64 EXTN.(NEW NH-54) FROM KM 0.00 TO 5.710, KM 6.170 TO 7.147 AND KM 8.620 TO 10.820 NEW KM 287.215 TO 292.925, KM 293.385 TO 294.362 AND KM 295.835 TO 298.035

CWD No.1 /BTI-NH/05 10.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 11:0Hrs
29/10/2021
Time 11:0Hrs
31 Strengthening of Bathinda-Muktsar road from Km.0.000 to 16.490 of NH-754 under NH Division No. 1, Bathinda in the State of Punjab for the year 2021-22 (16.49km) on EPC mode.(Job No. NH-No.754PB-2021-22/2663/NH

CWD No.1 /BTI-NH/04 19.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 11:0Hrs
29/10/2021
Time 11:0Hrs
32 Four laning of Sangrur Internal Bypass of City Portion of Sangrur Dirba section of old NH-71 from Sangrur Bypass to Mehlan Chowk under CRIF Scheme

2021_MoRTH_651662_1 10.390 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 10:0Hrs
27/10/2021
Time 11:0Hrs
33 CONSTRUCTION/IMPROVEMENT ON EPC MODE OF EXISTING ROAD TO NHDL SPECIFICATION WITH PAVED SHOULDER FROM EXISTING KM 67.000(MANGAN) TO KM 95.000 (CHUNGTHANG) OF TOTAL DESIGN LENGTH 27.476 KM (EXCEPT PERPETUAL LAND SLIDES/SINKING ZONE AT RAFONG KHOLA LANGTHA KHOLA, MANUAL AND RITCHU) ON ROAD GANGTOK-MANGAN-CHUNGTHANG IN THE STATE OF SIKKIM UNDER PROJECT SWASTIK OF BRO

2021_BRO_650103_1 290.360 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 9:0Hrs
26/10/2021
Time 17:0Hrs
34 Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan Near Rajpur at Km 52 000 design to Gojariya at Km 128 940 design a length of 76 940 km Package II of NH68 in the State of Gujarat under NHO on EPC Mode

NHAI/Guj/Patan-Gojaria/2021 875.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 15:0Hrs
26/10/2021
Time 11:0Hrs
35 Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km 515 to Km 555 017 of NH48 in the state of Karnataka on EPC Mode under Bharatmala Pariyojana Package I

2021_NHAI_85137_1 1,295.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
25/10/2021
Time 11:0Hrs
36 Construction of 6 laning from Sankeshwar Bypass to MH KNT Border from Km 555 017 to Km 592 853 of NH 48 in the state of Karnataka on EPC Mode under Bharatmala Pariyojana Package II

2021_NHAI_85144_1 1,223.200 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
25/10/2021
Time 11:0Hrs
37 Permanent Rectification of Blackspot KA 02 373 by Constructing VUP with RE Wall Approaches at Chainage 319.960 and Service Road Chainage Km.319.560 Km. 320.840 on NH 66 at Ambalpaddy in the State of Karnataka under EPC mode

NIT No.30 NHAI RO BNG Road safety Tender 2021 22 dated 22.09.2021 24.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
38 Permanent Rectification of Blackspot KA 02 345 by Constructing Vehicular Overpass VOP with Retaining wall at Chainage Km.374.200 and Service Road Chainage Km.374.000 Km. 375.600 on NH 66 at KPT junction in the State of Karnataka under EPC mode

NIT No.31 NHAI RO BNG Road Safety Tender 2021 22 dated 22.09.2021 30.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
39 Permanent Rectification of Blackspot KA 02 304 by Constructing VOP with Retaining wall Approaches at Chainage Km.314.092 and Service Road Chainage Km. 313.650 Km. 314.720 on NH 66 at Santhekatte in the State of Karnataka under EPC Mode

NIT No.32 NHAI RO BNG Road Safety Tender 2021 22 dated 22.09.2021 24.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
40 Four laning of existing Beas – Baba Bakala - Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417.700) and terminating at Kartarpur Sahib Corridor (Km. 0.000 of NH-354B & Km. 153.800 of NH-354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-I – from intersection with Jalandhar-Amritsar Highway (NH 3) near Beas till Start of Batala Bypass near Village Acchhal (Km 0.000 to Km 31.300) on EPC mode in State of Punjab

2021_NHAI_84049_1 527.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 17:0Hrs
21/10/2021
Time 11:0Hrs
41 Construction of VOP at Vaddahalli junction Ch. 226.715 KA 02 420 under road safety for rectification of blackspots in the stretch of Mulbagal AP KNT Border Section of NH 75 old No. NH 4 from Km. 216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.25 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 16.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 15:0Hrs
20/10/2021
Time 15:0Hrs
42 Construction of VOP at Narasimhatheertha Ch.233.300 KA 02 416 in the stretch of Mulbagal AP KNT Border Section of NH 75 old No.NH 4 from Km.216.912 to Km.239.100 Realignment the crossroads at Mulbagal junction Ch.1.050 KA 02 415 in the stretch of Banglore Hoskote Mulbagal Section from Km.237.700 to Km.318.000 of NH75 Old NH 4 under road safety for rectification of blackspots in the State of Karnataka under EPC mode

NIT No.26 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 35.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 15:0Hrs
20/10/2021
Time 15:0Hrs
43 Construction of Single Flyover on LHS at Bellur Bridge Ch.45.100 and Provision of VUP at Narasapura Industrial Area Cross Ch.44.800 KA 02 063 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 old No.NH4 from Km.237.700 to Km.318 in the State of Karnataka under EPC mode

NIT No.27 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 34.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
44 Construction of LVUP at Nangali cross CH.220.770 and provision of PUP Ch.220.380 in the approach portion of Black spot KA 02 186 under road safety for rectification of blackspots in the stretch of Mulbagal AP KNT Border Section of NH 75 old No.NH 4 from Km.216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.24 NHAI RO-BNG 11019 Tender 2021 22 dated 15.09.2021 21.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
45 Construction of Single Flyover on LHS at Narasapura CH.41.774 KA 02 231 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH75 old No. NH 4 from Km.237.700 to Km.318 in the State of Karnataka under EPC mode

NIT No.28 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 18.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
46 Construction of Single Flyover on RHS at Katamanallur Ch.71.885 KA 02 290 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 old No. NH 4 from Km. 237.700 to Km. 318.0 in the State of Karnataka under EPC mode

NIT No.29 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 16.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
47 Up gradation of Ghanauli Nalagarh road to HP Border as concrete road from Km 0.00 to Km. 3.00 MDR 59 Under CRIF Scheme

2021_MORTH_650403_1 8.760 MoRTH Normal Highway Project OTHERS 28/09/2021
Time 15:25Hrs
20/10/2021
Time 11:0Hrs
48 Construction of cement concrete pavements from Km. 224.830 to Km. 229.630 of NH-330 (4.8 km) in the state of Uttar Pradesh under EPC Mode. (Job No. NH(O)330/UP/2021-22/595,dated-03.08.2021)

2021_MoRTH_646303_1 20.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2021
Time 9:0Hrs
16/10/2021
Time 15:0Hrs
49 Six Laning of Thuravoor (Design Ch. 378.612) - Paravoor (Design Ch. 417.000) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana

2021_NHAI_77012_1 1,248.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2021
Time 15:0Hrs
13/10/2021
Time 11:0Hrs
50 The consultancy work for suggesting long term permanent measures for Removal of 07 Nos Black Spots

2021_MORTH_651264_1 0.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2021
Time 17:0Hrs
13/10/2021
Time 10:0Hrs
51 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode

2021_NHAI_84956_1 607.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 11:0Hrs
11/10/2021
Time 11:0Hrs
52 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from 209.827 to km. 249.525 (PKG-II) in the State of Bihar under Bharatmala

2021_NHAI_84962_1 759.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 11:0Hrs
11/10/2021
Time 11:0Hrs
53 Periodic Renewal work from km. 0.00 to 2.00, 8.00 to 13.00 and 13.00 to 25.00 of NH-330D under N.H. Division, PWD, Kanpur in the State of Uttar Pradesh on Engineering, Procurement, Construction (EPC) basis.

2021_MoRTH_649532_1 5.290 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/09/2021
Time 15:0Hrs
07/10/2021
Time 15:0Hrs
54 Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode on EPC mode

2021_NHAI_84062_1 621.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 18:0Hrs
07/10/2021
Time 11:0Hrs
55 Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode

2021_MoRTH_646802_1 142.420 MoRTH Normal Highway Project OTHERS 06/09/2021
Time 17:0Hrs
05/10/2021
Time 15:0Hrs
56 CONS AND UPGRAD TO NHSL SPEC FM KM 60.562 SALSA LA PASS TO KM 96.577 CHUMAR DESIGN CHAINAGE KM 60 562 TO 96 577 KM 60 562 RECKONED AT SALSA LA PASS AND KM 96 577 RECKONED AT CHUMAR OF ROAD HANLE-CHUMAR UNDER (P) HMK IN LADAKH UT ON EPC MODE LENGTH 36.015

2021_BRO_464554_1 299.400 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:20Hrs
05/10/2021
Time 12:0Hrs
57 Strenthening of Hussainiwala-Ferozzepur Cantt-Malwal road from Km 0.00 to 17.97 section of NH-05 excluding portion of ROB at LC No. A-54 E alongwith appraoches and the proposed VUP from Km. 9.243 to Km 10.246 in the State of Punjab on EPC mode

2021_MoRTH_645559_1 20.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2021
Time 9:0Hrs
04/10/2021
Time 14:0Hrs
58 Balance work of Four Laning from Ramban Km 151.00 to Banihal Km 187.00 of NH-1A (Now NH-44) with value addition at critical location on engineering Procurement and Construction mode (EPC mode) in the union territory of Jammu and Kashmir under NHDP Phase II

NHAI/Balance Work of R-B/J&K/EPC/2021 750.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:0Hrs
30/09/2021
Time 11:0Hrs
59 Construction of minor bridge in Km. 152 on NH-330 in the state of Uttar Pradesh on EPC Mode.

2021_MoRTH_643846_1 6.465 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2021
Time 15:0Hrs
29/09/2021
Time 15:0Hrs
60 Improvement Construction of existing Class 5 Road to NH Intermediate Lane Specification with Hard Shoulder from existing Km 76pt340 to Km 134pt940 Design chainage from Km 76pt300 to Km 133pt000 Total Length 56pt700 km of NH 505 Sumdo Kaza Gramphoo Road on EPC mode in the state of Himachal Pradesh Package I

2021-BRO-634242-1 243.650 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2021
Time 14:0Hrs
29/09/2021
Time 12:0Hrs
61 Construction of Tunnels Viaducts at identified sliding slip zones in Design Ch 130.550 to Ch. 130.750 Ch. 131.170 to Ch. 131.763 Ch. 132.560 to Ch. 133.168 Ch. 133.590 to Ch. 133.743 and Ch. 147.877 to 148.715 in Udhampur Ramban section of NH 44 in the UT of J&K under residual NHDP on EPC Mode

2021_NHAI_82218_1 325.440 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 11:0Hrs
29/09/2021
Time 11:0Hrs
62 Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with six laning of approaches from section Ch Km 146.172 to Km 162.620 on Guwahati Bypass (NH-37) in the state of Assam under Bharatmala Pariyojna on EPC Basis

2021_NHAI_84978_1 356.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2021
Time 9:0Hrs
28/09/2021
Time 11:0Hrs
63 Construction of 4 Lane Connector from Delhi Meerut Expressway (Km 50.00 of Package IV) to Km 8.520 of NH235 in the State of Uttar Pradesh on EPC mode

2021_NHAI_73017_1 534.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2021
Time 15:0Hrs
28/09/2021
Time 11:0Hrs
64 Up gradation 2/4 lane NH connectivity under Sagarmala Scheme SH2 Haveri Yekambi (54 Km), SH69 Yekambi Kumta/Belekere under State of Karnataka (Sirsi to Haveri road) (Package No NHAI/PC/SM/04)

NHAI_NHAI_83147_1 222.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/07/2021
Time 15:0Hrs
27/09/2021
Time 11:0Hrs
65 DESIGN AND CONSTRUCTION/IMPROVEMENT OF DIRANG BYPASS TO NHDL SPECIFICATIONS (FORMATION, PERMANENT AND SURFACING WORKS) WITH TAKE OFF POINT AT KM 173.240 AND TERMINATION POINT AT KM 183.000 (NET APPX LENGTH 13.495 KMS) ON BALIPARA – CHARDUAR – TAWANG ROAD IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH UNDER PROJECT VARTAK

CE (P) VTK/NIB-18/2021-22 74.590 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2021
Time 18:55Hrs
23/09/2021
Time 12:0Hrs
66 Strengthening Major Maintenance work of Chhindwara-Soaner Section & Chhindwara ring road (133.222 km) Chhindwara-Amarwara-Narsinghpur Section (113.000 km) Chhindwara-Multai & Sonakhar - Seoni section (136.877 km) of NH – 347 & NH- 547 in the state of Madhya Pradesh & Maharashtra on EPC mode.

2021_NHAI_82214_1 412.490 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 15:0Hrs
21/09/2021
Time 15:0Hrs
67 Construction of VUP including approaches and Service Roads at Shedgaon Junction at Existing Ch. 59.455 (Design Ch. 59.437) of NH-44 on Nagpur Hyderabad Section in the State of Maharashtra on EPC mode

2021_NHAI_84065_1 39.510 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 18:0Hrs
20/09/2021
Time 11:0Hrs
68 CO RW Thrie Beam, Crash Barriers, Signages from Katori Bangla to Chamba Km 39 0 to 106 0 including rectification of identified black spots 7 Nos of NH 154 A in the state of HP

2021_MoRTH_641998_1 22.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/08/2021
Time 18:0Hrs
20/09/2021
Time 11:0Hrs
69 Periodic renewal work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode

2021_MoRTH_646661_1 8.050 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 11:0Hrs
18/09/2021
Time 15:0Hrs
70 Construction of flyover at Nowgam Junction including its Approaches, Km 290.725 to Km 291.575 of four lane with paved shoulders of NH-44 at Srinagar in the UT of Jammu and Kashmir on Engineering, Procurement & Construction (EPC) mode

PCD-RnB-32 of 2021-2022 Dated:-18 /08/2021 44.800 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/08/2021
Time 15:0Hrs
17/09/2021
Time 16:0Hrs
71 Strengthening in Km 19/8 - 21/700, 22/700 - 36/0 of NH 49 Extn. (Madurai - Cochin Road) (New NH- 85) in the state of Tamil Nadu on Engineering, Procurement and Construction (EPC) Basis contract.

2021_MoRTH_641471_1 31.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
17/09/2021
Time 15:0Hrs
72 Strengthening in Km 93/6 -111/4 of NH 230 (New NH 85) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_641244_1 17.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 16:0Hrs
17/09/2021
Time 11:0Hrs
73 Construction of flyover at Bemina Junction including its Approaches, Km 299.145 to Km 300.027 Length 0.882 Kms of four lane with paved shoulders of NH-44 at Srinagar in the UT of JnK

PCD-RnB-31-of 2021-2022 30.920 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 23/08/2021
Time 15:0Hrs
15/09/2021
Time 15:0Hrs
74 Construction of Truck Parking at Bijakhaman of Bolangir town from km 79/700 to km 80/000 adjacent to NH - 26 in the state of Odisha on EPC mode.Bid Ref No.- 07 CE NH of 2021-22

2021_MoRTH_639609_1 9.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2021
Time 9:0Hrs
14/09/2021
Time 12:0Hrs
75 Improvement of Dharuhera- Bhiwadi link road (NH-919, Old NH-71B) to 4-Lane with Service Road, starting from NH-48 (km 67.820) upto km 22.400 of NH-919 (4.3 km length) in the State of Haryana

2021_NHAI_81048_1 117.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2021
Time 11:0Hrs
14/09/2021
Time 11:0Hrs
76 Construction of 4 Lane Elevated Highway and at grade improvements at Gopalganj Town from Design Ch. 384 000 to Design Ch. 386 750 on NH 28 in the state of Bihar on EPC mode

2021_NHAI_82191_1 243.190 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 17:0Hrs
14/09/2021
Time 11:0Hrs
77 Widening to Two Lane with Paved shoulders including strengthening work from km 14.500 to km 30.000 of NH101 New NH 331 on EPC mode in the state of Bihar for the year 2021 22 Length 15.50 Km

2021_MoRTH_640915_1 76.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
13/09/2021
Time 15:0Hrs
78 Improvement of road safety from Km 200 00 to 219 350 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh on EPC mode of contract

2021_MoRTH_640966_1 8.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2021
Time 18:0Hrs
13/09/2021
Time 11:0Hrs
79 Widening to two lane including road safety works on Paonta Sahib Rajban Shillai Meenus Hatkoti Road from Km. 149/00 to 161/715 on NH-72B (New NH-707)

2021_MoRTH_640800_1 73.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 18:0Hrs
13/09/2021
Time 11:0Hrs
80 Rehabilitation and up-gradation to 2 lane with paved shoulder from Existing Chainage Km 134.950 to Km 166.100 (Design Chainage Km 116.980 to Km 146.700) (Package - VI) under 31 BRTF on Akhnoor-Poonch Road (NH-144A) under Project Sampark in the UT of Jammu & Kashmir under project Sampark, Border Roads Organization (BRO) on EPC Mode

SPK/PKG-6/A-P RD/2021-22-01 295.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 17:0Hrs
13/09/2021
Time 11:0Hrs
81 Widening and Strengthening to 2 lane with Paved Shoulders from Intermediate lane of NH- 516E from Km 16/000 to Km 28/000 (except Km 18/400 to Km 20/000) of Rajamahendravaram to Rampachodavaram in the state of Andhra Pradesh on EPC mode

SENHVJA/34/2020-21, Dated.05.07.2021. 54.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:0Hrs
09/09/2021
Time 15:0Hrs
82 PR work from Km 189/100 to Km 192/0 of Kurnool – Ranipet road New NH-40 in the State of Andhra Pradeshon through EPC mode(2nd call).

32/SE,NH,ATP/EPC/AEE1/2021-22,Dt: 02.08.2021 2.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
83 PR work from Km 23/0 to 23/4, from Km 31/8 to 32/3, from Km 33/2 to 33/4, Km 39/0-6, Km 40/0-4 from km 43/4-8, Km 49/0-2,in Km 57/0 to 57/5, Km 74/6-8, In Km 75/4-6 and from Km 76/0 to 79/0 of Kurnool – Guntur road of NH340C in Kurnool District on EPC Mode.(2nd call)

2021_MoRTH_642127_1 2.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
84 Periodic Renewal Work from Km. 91.075 to Km. 98.475 (Except 200m from Km 92.125 to Km 92.325) of NH-727H under EPC Mode in the State of Uttar Pradesh.

2021_MoRTH_643836_1 4.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
85 Rehabilitation and Up-gradation of Amboli Junction to Ajara Section and Section of Ajara to Sankeshwar in the state of Maharashtra on EPC Mode.

2021_MoRTH_637340_1 468.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 17:0Hrs
03/09/2021
Time 15:0Hrs
86 Widening the Existing Two Lane to Four Lane of Puducherry-Villupuram Road (NH-45A, New NH-32) from km 25/600 – km 37/420 including Strengthening and Construction of a new High Level Bridge across Sankarabarani River at Ariyapalayam in Puducherry Region on Engineering Procurement and Construction (EPC) Basis

2021_MoRTH_639345_1 70.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
03/09/2021
Time 11:0Hrs
87 Widening of existing 2 lane bridge into 4 lane across Malatar at Ch.47/570 of NH45A in Puducherry

2021_MoRTH_639371_1 4.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
03/09/2021
Time 11:0Hrs
88 Widening to two lane with paved shoulder and strengthening of Bhanjanagar to Aska road (NH-157) from km 119/000 to km 159/500 (Design chainage km 117/000 to km 157/500) in the state of Odisha on EPC mode. Bid ref no.- 06 CE NH of 2021-22

2021_MoRTH_639606_1 68.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2021
Time 9:0Hrs
02/09/2021
Time 12:0Hrs
89 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727Gunder EPC Mode in the State of Uttar Pradesh

2021_MoRTH_643356_1 8.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 15:0Hrs
01/09/2021
Time 15:0Hrs
90 Permanent measures for Black Spot (ID.TN-02-316) at Km 198/300 - 199/2 of NH 209 (New No.NH 948)

2021_MoRTH_640807_1 4.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 15:0Hrs
31/08/2021
Time 15:0Hrs
91 Permanent Measures to the BlackSpot (ID.TN-(02)-435) (Near SRP Mills) from Km 166/4 - 167/850 of NH 209 (Dindigul - Bangalore road) including Widening of CD Works

2021_MoRTH_640826_1 4.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 10:0Hrs
31/08/2021
Time 15:0Hrs
92 P/R to NH-326 from Km 192/450 to 192/797,194/000 to 198/000,199/150 to 202/150 & 202/790 to 212/700 in the state of Odisha on EPC mode (Bid Ref No.- 08 CE NH of 2021-22)

2021_MoRTH_642769_1 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2021
Time 18:55Hrs
31/08/2021
Time 12:0Hrs
93 Construction of LVUP near Dakoha railway crossing at Jalandhar City on old NH 01 (New NH 44) at Km 370.100 including entry/exit and other related works in State of Punjab on EPC mode

2021_NHAI_82079_1 12.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2021
Time 16:0Hrs
31/08/2021
Time 11:0Hrs
94 Construction of Four Lane LVUP alongwith approaches between existing Km 172.500 to km 174.000 on Barnala-Bathinda section of old NH-64 (New NH-07) in the State of Punjab on EPC Mode

2021_NHAI_82356_1 14.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/07/2021
Time 9:10Hrs
31/08/2021
Time 11:0Hrs
95 Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode

2021_NHAI_80186_1 53.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 6:45Hrs
26/08/2021
Time 11:0Hrs
96 Improvement Construction of existing Class 5 Road to NHIL Spec with Hard Shoulder from existing Km 134pt940 to Km 169pt970 Design chainage from Km 133 to Km 166 Total Length 33 of NH 505 Sumdo-Kaza-Gramphoo Road on EPC mode in HP Package II

2021-BRO-63499-1 186.890 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 17:55Hrs
24/08/2021
Time 12:0Hrs
97 Construction of VUP at Tayalur cross CH 237.080 and provision of SVUP Ch.237.370 KGF cross in the approach portion of Black spot KA 02 486 Construction of LVUP at Virupakshi junction Ch.238.250 KA 02 417 under road safety for rectification of blackspot in the stretch of Mulbagal AP KNT Border Section of NH 75 old No. NH 4 from Km. 216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.15 NHAI RO BNG 11019 Tender 2021 22 dated 22.07.2021 52.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2021
Time 15:0Hrs
19/08/2021
Time 15:0Hrs
98 Rehabilitation and Upgradation of NH-565 from Km 86.057 to 132.920 Nagarjuna Sagar Dam to Davulapally section to two lane with paved shoulder in the State of Andhra Pradesh through EPC mode

RW/NH-12014/66/2020-AP/Z-III Dt21-06-2021 313.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/07/2021
Time 15:0Hrs
18/08/2021
Time 17:0Hrs
99 Construction of Railway over Bridge at Km 60/200 of NH-316 (Km 3.2 of Old NH-203E) at Matiapada on Puri Konark Road, (KP-42 of Khurdha-Puri-Rail Line) in the state of Odisha on EPC Mode. (Bid Ref No.- 04 CE NH of 2021-22).

2021_MoRTH_636093_1 49.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 16:0Hrs
18/08/2021
Time 12:0Hrs
100 Construction of 5 HL Bridges at 379/000 km (Pangam), 439/400 km (Potteru),444/237km(Kongurukonda), 457/075 km(MV-90), 468/150 km (MV-96), of NH-326 at on Malkangiri-Motu road in the state of Odisha on EPC mode.(Bid Ref No. - (05 CE NH of 2021-22)

2021_MoRTH_636090_1 103.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 16:0Hrs
18/08/2021
Time 12:0Hrs
101 Rehabilitation and Up gradation of NH-167B from Km 143/320 (Malakonda) to 189/050 (Singarayakonda) (on NH16) to two lane with paved shoulders in Andhra Pradesh on EPC mode

2021_MoRTH_634782_1 301.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2021
Time 17:0Hrs
16/08/2021
Time 17:0Hrs
102 Construction of LVUPs at Km 153 600 at Adhegaon Junction and at Km 217 565 at Mohol Junction on NH 65 and four laning of Tembhurni town portion from Old Chainage Km 153 050 to Km 159 280 (Not a part of NH 65) with Design Length 6 230 Km in Pune Solapur section of NH 09 (New NH 65) in the state of Maharashtra

2021 NHAI 80200 1 82.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2021
Time 15:0Hrs
16/08/2021
Time 11:0Hrs
103 CONSTRUCTION OF TWO NOS OF 40 M SINGLE SPAN TWO LANE PERMANENT BRIDGES OF LOAD CLASS 70R AT KM 0PT50 AND KM 2PT10 ON HANLE CHUMAR ROAD UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE

2021_BRO_455156_1 8.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2021
Time 19:0Hrs
12/08/2021
Time 12:0Hrs
104 Strengthening and Improvement of existing 2/4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.

2021_NHAI_80461_1 24.810 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2021
Time 17:5Hrs
09/08/2021
Time 11:0Hrs
105 Periodic Renewal Work in Km. 160 to 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_637283_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2021
Time 17:0Hrs
05/08/2021
Time 17:0Hrs
106 Rehabilitation and Up gradation of existing road to two Lane with paved shoulder configuration from Design Chainage Km. 36/400 to Km. 107/224 of NH-167BG from Duttaluru (at NH-565 Junction) to Kavali (Joining on NH-16) in the State of Andhra Pradesh on EPC mode

2021_MoRTH_633942_1 362.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2021
Time 17:0Hrs
05/08/2021
Time 15:0Hrs
107 Work of Strengthening of NH-727B from Sikandarpur to Ballia (km. 102.000 to km. 136.900) in the State of Uttar Pradesh under EPC mode

2021_MoRTH_637681_1 35.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2021
Time 15:0Hrs
05/08/2021
Time 15:0Hrs
108 Development of Four Lane Road Connectivity from existing East break water upto Convent Junction from Phase 1 of the project start from Km. 0.312 [End of Visakhapatnam Port Trust (VPT) (under construction) and Ends at Km. 3.800 [VCTPL Exit Gate having a total length of 3.488 Km] in Andhra Pradesh on EPC mode under Bharatmala Pariyojana.

67725 50.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 11:0Hrs
05/08/2021
Time 11:0Hrs
109 Periodical Renewals from Km 194.00 (Murgundi) to 282.475 (Gotur) of NH-548B) MH Border-Vijayapur-Sankeshwar section in the State of Karnataka. (Job No.NH-548B-KNT-PR-2020-21-31).

2021_MoRTH_625561_1 20.280 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
04/08/2021
Time 17:0Hrs
110 Construction of Bypass on NH-59 from km 336.350 to 349.910 km (13.560 km) near Berhampur including four lane ROB in the state of Odisha on EPC Mode. (Bid Ref No.- 01 CE NH of 2021-22)

2021_MoRTH_634960_1 153.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 18:55Hrs
04/08/2021
Time 12:0Hrs
111 Reconstruction of H.L.Bridge over Kantyialli Nallah at 47/200 Km. of N.H.-153B in the state of Odisha on EPC mode (Bid Ref No.- 02 CE NH of 2021-22)

2021_MoRTH_634982_1 7.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 18:55Hrs
04/08/2021
Time 12:0Hrs
112 Widening to Two Lane with Paved Shoulder from Km 105.00 to 110.838 of NH 544DD Anantpur- Molkalmuru section in the State of Karnataka on Engineering, Procurement and Construction (EPC). Basis Contract. (Job no. NH-544DD-KNT-2020-21-922)

2021_MoRTH_634543_1 29.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2021
Time 13:0Hrs
03/08/2021
Time 15:0Hrs
113 Four laning of Miraj city portion Length in Miraj Solapur section of NH 166 from Km 189 300 to Km 200 100 Design Length 10 800 Km in the state of Maharashtra on EPC mode

2021 NHAI 80212 1 23.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2021
Time 15:0Hrs
29/07/2021
Time 11:0Hrs
114 Construction of Four Laning of Pinjore (End of Pinjore Bypass) – Nalagarh Section from Km 4.200 to Km 35.395 on NH- 105 (old NH-21A) in the State of Haryana and Himachal Pradesh under Bharatmala Pariyojna

2021_NHAI_78322_1 731.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2021
Time 11:0Hrs
28/07/2021
Time 11:0Hrs
115 Widening of existing 2-lane pavement to 4-lane divided carriageway with paved shoulders from 24.700 km to 25.700 km strengthening-stage-strengthening from 14.400 km to 24.700 km construction of two minor bridges at 17.036 km and 18.736 km widening reconstruction of culverts construction of retaining wall and permanent rectification of 13 black spots Sarat Colony WB-02-570-Birati WB-02-469-Gouripur Kalibari WB-02-569-Bankra More WB-02-568-Michaelnagar WB-02-470-B.T. College WB-02-468-Doltala More WB-02-196-Madhyamgram Chowmatha WB-02-127-Narayani Hospital WB-02-465-Dakbanglow More WB-02-562-Colony More WB-02-640-Helabattala More WB-02-687 and Airport Gate no. 3 WB-02-349 on NH-34 New NH-12 under NH Division-V in the State of West Bengal on EPC mode

2021_MoRTH_618135_1 77.072 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2021
Time 18:0Hrs
28/07/2021
Time 11:0Hrs
116 Construction of 2 Lane, Class –A Loading Steel Girder RCC deck composite Bridge of 15m Span at Km. 11 (0-2) and RCC Bridge of 13.5m Span bridge at K. 11 (8-10), 36m Span Steel Girder RCC Deck composite Bridge at Km. 31 (2-4) and 9.32 m Span RCC Bridge at km 33 (4-6) on NH-87Ext. (New NH-109) in the state of Uttarakhand.

2021_MoRTH_635797_1 12.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/06/2021
Time 14:0Hrs
24/07/2021
Time 17:0Hrs
117 Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh On EPC mode

2021-MoRTH-633104_1 24.097 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2021
Time 18:0Hrs
23/07/2021
Time 11:30Hrs
118 Construction of bypass for providing inter-connectivity amongst National Highways (NHs) around the Pratapgarh city (Pratapgarh Bypass)on EPC mode in the state of Uttar Pradesh (Job No. Pratapgarh Bypass- UP-2021-22-593 Dt. 12-04-2021

2021_MoRTH_633457_1 240.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2021
Time 15:0Hrs
23/07/2021
Time 11:0Hrs
119 Re construction of 6 bridges on NH 21A New NH 105 Pinjore Swarghat in the State of Himachal Pradesh.

2021-MoRTH-632201-1 36.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/06/2021
Time 18:0Hrs
23/07/2021
Time 11:0Hrs
120 Formation of Bypass to Mudigubba on NH42 from Km 130/400 to 137/500 Total Length 7.749 Km in the state of Andhra Pradesh on EPC mode

2021_MoRTH_629971_1 94.942 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2021
Time 15:0Hrs
22/07/2021
Time 15:0Hrs
121 Construction and Upgradation of road to NHSL specification from Sumna i.e chainage km 0.0 to Km 22.050 (Design chainage km 0.0 to km 22.050)(Lapthal) of road Sumna-Lapthal-Topidunga (SLT) , in 21 BRTF area under Project Shivalik in Uttarakhand State on EPC mode (Length 22.050 Km)

2021_BRO_448014_1 226.770 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2021
Time 15:0Hrs
22/07/2021
Time 12:0Hrs
122 Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.154.210 to Ch.158.650 (North Bound) and from Ch.155.940 to Ch.160.260 (South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_74088_1 1,245.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
20/07/2021
Time 11:0Hrs
123 Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.158.650 to Ch.164.660 (North Bound) and Ch.160.260 to Ch.163.406 (South Bound connecting with Existing Tunnel-T4) excluding Ch.161.350 to Ch.164.100 (North Bound) including construction of twin tube tunnel (Package-II) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_74096_1 1,030.440 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
20/07/2021
Time 11:0Hrs
124 Construction of Four Laning of Ramban to Banihal Section of NH-IA (Now NH-44), from Ch 165.092 to Ch 171.855 (North Bound) and from Ch 166.895 to Ch 173.638 (South Bound) (Makarkot- Ramsu-Nachlana - upto end of 3km Viaduct) excluding section from Ch 166.610 to Ch 167.150 (North Bound) Ch 168.425 to Ch 168.935 (South Bound) and Section from Ch 167.960 to Ch. 168.168(North Bound), Ch 169.745 to Ch 169.951 (South Bound) (Package-III) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_73875_1 665.590 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/03/2021
Time 17:0Hrs
20/07/2021
Time 11:0Hrs
125 Construction of Six lane Elevated highway between km 414.000 at Beas to km 438.850 at Jandiyala including VUP at km 432.300 at Chouhan and flyover at km 425.880 at Khilchanon on Amritsar Jalandhar section from km 413.100 to km. 439.990 of old NH01 in the State of Punjab on EPC mode

2021_NHAI_75493_1 164.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/04/2021
Time 15:0Hrs
19/07/2021
Time 11:0Hrs
126 Construction of New High Level RCC Major Bridge at existing location of Old Bridge Across Chir River in KM 199 on NH-333A & its approaches having an aggregate length of 700m (350m on both side) in district banka in the State of Bihar on EPC Mode.

2021_MoRTH_632140_1 40.049 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 12:0Hrs
16/07/2021
Time 15:0Hrs
127 Reconstruction of badly damaged sunken stretches and overlay in balance stretches (in bits) in Km 336-337, Km 343-347, Km 348-351, Km 373-375 and Km 380-381 of NH-544D in the State of Andhra Pradesh on EPC Basis.

2021_MoRTH_631601_1 14.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 17:0Hrs
15/07/2021
Time 17:0Hrs
128 Upgradation of port connectivity NH configuration from existing 2- lane to 4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of Andhra Pradesh on EPC Mode under Bharatmala Scheme

67542 130.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 11:0Hrs
15/07/2021
Time 11:0Hrs
129 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727G under EPC Mode in the State of Uttar Pradesh. (Job No. CE-RO/LKO/NH-727G/ PR/16/2020-21, dated- 09.03.2021)

2021_MoRTH_635473_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 24/06/2021
Time 14:30Hrs
14/07/2021
Time 15:0Hrs
130 Four laning of Honnavar Port Connectivity road from Km 0.00 (Kasarkod side of Honnavar Port) to Km 2.58 (towards NH-66) connecting Honnavar Port with NH-66 at Km 196.00 and to improve NH-66 from Km 195.00 to Km 197.00 to integrate port connectivity road on EPC mode under Bharatmala Phase-I in the State of Karnataka

NHAI/11011/PC/Kasarkod-Honnavar Port 111.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
14/07/2021
Time 11:0Hrs
131 P/R to NH-326 from Km 40/000 to 69/200 (Except from KM 50/000 to 51/000 and 52/000 to 53/000) in the state of Odisha on EPC mode(Bid Ref No.- 03 CE NH of 2021-22)

2021_MoRTH_635194_2 6.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2021
Time 18:55Hrs
13/07/2021
Time 12:0Hrs
132 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis Contract

2021_MoRTH_634017_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2021
Time 14:0Hrs
13/07/2021
Time 11:0Hrs
133 UP-GRADATION OF DHORAJI – JAMKANDORANA – KALAVAD – SECTION OF NH-927D FROM DESIGN CHAINAGE KM 0/00 TO KM 58/115 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF GUJARAT

2021_MoRTH_611716_2 148.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2021
Time 12:0Hrs
12/07/2021
Time 16:0Hrs
134 Reconstruction and Strengthening of Deverapalli to Jeelugumilli (NH 516D) from Km 20.500 to 29.630 and from Km 33.130 to 56.230 (Package-2) in the State of Andhra Pradesh on EPC Basis.

2021_MoRTH_631234_1 76.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2021
Time 15:0Hrs
12/07/2021
Time 15:0Hrs
135 Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in the state of Uttarakhand on EPC Mode.

2021_NHAI_78122_1 167.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 18:40Hrs
12/07/2021
Time 11:0Hrs
136 6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna

66236 1,245.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 11:0Hrs
12/07/2021
Time 11:0Hrs
137 Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode(Job No. NH-24A-UP-2020-21-592)

2021_MoRTH_631198_1 138.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2021
Time 15:0Hrs
10/07/2021
Time 15:0Hrs
138 Rehabilitation and Up gradation on Barnala Mansa Sardulgarh NH 703 Road in the state of Pb

CWD No.1 /BTI-NH/08 71.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2021
Time 15:0Hrs
10/07/2021
Time 11:0Hrs
139 Widening of existing road to 4 lane with service road between km 329/600 to 334/100 (Tharadcity)on NH 68 in the state of Gujarat under EPC mode of contract

2021_MoRTH_629225_1 33.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2021
Time 15:0Hrs
09/07/2021
Time 17:15Hrs
140 PR work from Km 203/0 to 209/100 on Ananthapuramu Guntur road of NH544D in Prakasam District in the state of Andhra Pradesh on EPC mode

2021_MoRTH_630515_1 1.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
141 PR work from Km 209/0 to 210/0, From Km 211/0 to 213/0, From Km 228/0 to 232/0 and from Km 262/2 to 263/0 of Hyderabad-Srisailam-Tokapalli road of NH765 in Prakasham District of Andhra Pradesh on EPC mode

2021_MoRTH_630520_1 1.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
142 PR work from Km 23/0 to 23/4, From Km 31/8 to 32/3, From Km 33/2 to 33/4, Km 39/0 6, Km 40/0 4,From Km 43/4 8, Km 49/0 2, In Km 50/0 4, Km 57/0 to 57/5, Km 74/6 8, in Km 75/4 6 and From Km 76/0 to 79/0 of Kurnool Guntur Road of NH340C in Kurnool Dist

2021_MoRTH_630516_1 2.594 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
143 PR work from Km 133/6 to 157/6 and from Km 168/6 to 175/6 Atmakur Nandyal section of NH 167K in Kurnool District of Andhra Pradesh on EPC mode

2021_MoRTH_630517_1 15.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
144 Periodic Renewal to link roads connecting NH 544DD to NH 544DD from Km 23.750 to Km 27.960 (Atmakur village limits), Km 42.788 to Km 45.267 (Golla village limits) and Km 47.910 to Km 50.282 (Borampalli village limits) of Aanantapuramu Kalyandurg Rayadurg Road in the state of Andhra Pradesh on EPC Mode.

2021_MoRTH_630675_1 2.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
145 PR work from Km 14/0 to 21/0 and Km 60/0 to 68/0 of Ananthapuramu Tadipatri Bhogasamudram road of NH544D (4L) in Ananthapuramu district in the state of Andhra Pradesh on EPC mode

2021_MoRTH_630386_1 8.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
146 PR work from Km 26/0 to Km 53/0 of Madanapalli Naidupeta road of NH71 in the state of Andhra Pradesh through EPC mode

2021_MoRTH_629735_1 11.152 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
147 Construction of Eight Lane access-controlled expressway starting from MP-Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village in Dahod district (Ch. 696.920 to 729.755) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg26 1,417.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2020
Time 15:0Hrs
07/07/2021
Time 11:0Hrs
148 Widening to Two lane with paved shoulders/ Four lane from Km. 455.845 (SH chainage) (NH km.24.125) to Km.489.845 (SH chainage) (NH Km.58.125) of Belur to Hassan section of NH - 373 on EPC mode in the State of Karnataka (Job No.NH-373-KNT-2020-21-923)

2021_MoRTH_629336_1 178.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 17:30Hrs
06/07/2021
Time 17:30Hrs
149 Widening and Strengthening from km 0.000 to 35.000 (Mohanganj to Autarpur) of National Highway No. 731A to two lane with paved shoulder in the state of Uttar Pradesh on Engineering, Procurement Construction (EPC) Mode.

2021_MoRTH_625106_1 185.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
06/07/2021
Time 11:0Hrs
150 Periodic Renewal Work from Km. 91.075 to Km. 98.475 (Except 200m from Km 92.125 to Km 92.325) of NH-727H under EPC Mode in the State of Uttar Pradesh.

2021_MoRTH_631901_1 4.830 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 15:0Hrs
02/07/2021
Time 15:0Hrs
151 PR work from Km 572/2 to 577/0 and 583/0 to 588/0 of Hubli Krishnapatnam road NH-67 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629732_1 7.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
152 PR work from Km 189/100 to 192/0 of Kurnool Ranipet Road New NH40 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629810_1 2.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
153 PR work from Km 72/0 to Km 75/2, Km 80/0 to Km 85/0 and Km 87/0 to Km 91/0 of Madanapalli Naidupeta road of NH71 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629805_1 5.578 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
154 Improvement of Road Safety on NH-70 from Km 58 400 to Km 114 0 by Providing and fixing Thrie Metal Beam Crash Barrier Construction of Retaining wall Breast wall Construction of U-Shape drain with edge wall and Providing and fixing of Sign

2021_MoRTH_629183_1 27.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
155 Improvement of Road Safety on NH-503 20A between Km. 39 0 to 91 0 Ranital-Mubarikpur Providing and Fixing Thrie single side Metal Beam Crash Barrier etc in the State of Himachal Pradesh on EPC mode

2021_MoRTH_629192_1 20.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
156 Improvement of Road Safety on NH-205 between Km. 111 0 to 118 0 by Providing and Fixing Thrie single side Metal Beam Co R wall Extn. of RCC slab culvert in the State of Himachal Pradesh on EPC mode

2021_MoRTH_629198_1 11.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
157 Construction of 2 lane service road alongwith Retaining Wall at Patiala-Sanaur Junction existing VUP km 54.702 on Patiala Bypass section of NH64 New NH 07 in the State of Punjab in EPC Mode

2021_NHAI_76965_1 12.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 17:30Hrs
29/06/2021
Time 11:0Hrs
158 SANGRAMA FLYOVER

CE (P) BCN/29/2020-21 26.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2021
Time 15:0Hrs
26/06/2021
Time 11:0Hrs
159 Widening and Strengthening from KM 93/400 to 95/410 of Madanapalle -Naidupeta road of NH-71 to two lane with paved shoulder in the State of Andhra Pradesh on EPC mode

2021_MoRTH_629402_1 10.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
160 WIDENING and STRENGTHENING OF 2/4 LANE TO 4 LANE CARRIAGEWAY FROM KM 6/0 TO 15/0 OF KURNOOL GUNTUR ROAD (NH-340C) IN KURNOOL DISTRICT (KURNOOL MUNICIPAL CORPORATION LIMITS) IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE OF CONTRACT UNDER NH(O).

2021_MoRTH_629396_1 84.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
161 Construction of 4- Lane ROB at Km 510/8 of NH- 565, Near yerpedu in Lieu of L.C No. 36 in the state of Andhra Pradesh on EPC mode

2021_MoRTH_629406_1 79.590 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
162 Widening and Upgradation to four lane configuration from km 34.900 (Bhadohi) to Km 73.134 (Jaunpur) of NH-135A in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) mode.

2021_MoRTH_626267_1 244.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2021
Time 16:0Hrs
23/06/2021
Time 18:0Hrs
163 Periodic Renewal work from Km. 160 to km. 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_631125_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 17:0Hrs
23/06/2021
Time 11:0Hrs
164 Strengthening of Existing road between km. 407/700 to 426/500 on NH 68 in the state of Gujarat on EPC mode of Contract

2021_MoRTH_629216_1 14.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 15:0Hrs
21/06/2021
Time 17:0Hrs
165 Strengthening of existing road between km 33/600 to Km 55/400 [excluding km 39/320 to km 40/190] (Thavar- Zerda Section) on NH-168A in the State of Gujarat under EPC mode of Contract

2021_MoRTH_629203_1 13.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
166 Widening and Strengthening in Km 64/0 -70/0 of NH 49 Extn (New NH No - 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_629044_1 18.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2021
Time 16:0Hrs
21/06/2021
Time 15:0Hrs
167 work of strengthening of existing road from Km. 109.300 to Km. 131.625 of NH-330D (Between Bilgram and Kannauj) in the State of Uttar Pradesh under EPC Mode

2021_MoRTH_629912_1 13.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
168 Upgradation to 4 Lane Bameetha to Khajuraho section of NH-339B from Km 0/000 to Km 10/150 on EPC mode in the state of Madhya Pradesh

2021_MoRTH_629197_1 56.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
169 IMPROVEMENT OF JUNCTION AT I SAINWALA Km 54 0, II NAHAN DOSARKA Km 60 0, III KOLAR JUNCTION Km 79 0 AND IV MAJRA JUNCTION Km 88 700 ON KALA AMB PAONTA DEHRADUN ROAD ON NH 07 BETWEEN Km 46 0 TO 103 0 IN THE STATE OF HIMACHAL PRADESH.

2021_MoRTH_629309_1 5.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 18:0Hrs
21/06/2021
Time 11:0Hrs
170 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727Gunder EPC Mode in the State of Uttar Pradesh

2021_MoRTH_630653_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/05/2021
Time 18:0Hrs
19/06/2021
Time 15:0Hrs
171 Widening and Strengthening to Urban Link of NH-42 from Km 0/000 to Km 9/200 in Anantapur Town in the state of Andhra Pradesh through EPC mode of Contract under NH(O).

2021_MoRTH_628737_1 272.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/05/2021
Time 15:0Hrs
17/06/2021
Time 15:0Hrs
172 Construction of Retaining wall, Thrie Beam, Crash Barriers, Signages from Katori Bangla to Chamba Km 39/0 to 106/0 including rectification of identified black spots (7 Nos) of NH 154-A in the state of Himachal Pradesh.

2021_MoRTH_627691_1 22.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2021
Time 18:0Hrs
15/06/2021
Time 11:0Hrs
173 Construction of flyover at existing km 6.000 at Bharat Nagar Junction with 4 lane flyover towards ISBT from km 5.302 and 2 lane Ramp towards railway station from km 5.240 (back Chainage) including resurfacing/ construction of existing Service Road of old NH95 (New NH05) (Section Passing through Ludhiana City) in the State of Punjab on EPC Mode

PD-LDH/ELEVT-CORR/SMRL-CHK/(EPC)/RFP 59.410 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2021
Time 15:0Hrs
14/06/2021
Time 11:0Hrs
174 Rehabilitation of Major Bridge at Km 186/621-187/091 of NH45A (Viluppuram -Pudhucherry-Cuddalore-Chidambaram-Sirgazhi-Nagapattinam Road) on Engineering Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu.

2021_MoRTH_614033_1 0.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2021
Time 15:0Hrs
08/06/2021
Time 15:0Hrs
175 Strengthening in Km 5/2 - 5/6 and Km 10/2 - 14/6 of NH 49 Extn. (Madurai - Cochin Road) New No. NH - 85 on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_619170_1 0.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/03/2021
Time 15:0Hrs
08/06/2021
Time 15:0Hrs
176 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand.

657/13Yata-NH-10/2021 dated 10.02.2021 188.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2021
Time 15:0Hrs
08/06/2021
Time 11:0Hrs
177 The work of Construction of 4-Laned Single Span Steel Bridge on Sirhind Canal at RD 86.900 in Ropar City Portion of NH-344A in the State of Punjab on EPC Mode

03 70.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2021
Time 17:0Hrs
08/06/2021
Time 10:0Hrs
178 Improvement to 2 lane with PS of stretch from Bikramganj Dawath Maleyabagh Nawanagar Dumraon of NH 120 CH 201.665 to 240.200 excluding Dawath Bypass on EPC mode

2021_MoRTH_621661_1 148.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2021
Time 15:0Hrs
07/06/2021
Time 11:0Hrs
179 Rectification of 2 number Black Spots Package 4 Maheshwar (65.338 to 65.746,66.175 to 66.885) and km 70.684 to 71.310 km (Chichi Mata) i.e.1.744 Km section District Samba in the union territory of Jammu and Kashmir

2021_NHAI_76191_1 18.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2021
Time 9:0Hrs
07/06/2021
Time 11:0Hrs
180 Periodic Renewal Work from Km.95.000 to Km.97.000, Km.101.000 to Km.102.000, Km. 103.000 to Km.107, Km.108.000 to Km.111.000, Km.120.000 to Km.124.000, Km.132.000 to Km.151.000 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_618390_1 8.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/02/2021
Time 15:0Hrs
03/06/2021
Time 15:0Hrs
181 Periodic renewal (PR) Work from Km. 10.000 to Km. 29.990 and From Km. 71.450 to Km. 72.080 of NH-727H on EPC Mode in the State of Uttar Pradesh

2021_MoRTH_618408_1 4.990 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/02/2021
Time 18:0Hrs
03/06/2021
Time 15:0Hrs
182 Periodic Renewal (PR) Work in the stretch from km 13.000 to km 21.000 and km 34.000 to km 56.800 on NH-328A in the State of Uttar Pradesh on EPC mode

2021_MoRTH_618558_1 8.130 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/02/2021
Time 15:0Hrs
03/06/2021
Time 15:0Hrs
183 P/R to NH-326 from Km 192/450 to 192/797,194/000 to 198/000,199/150 to 202/150 & 202/790 to 212/700 for the year 2020-21 (Bid Ref No.- 16 CE NH of 2020-21)

2021_MoRTH_619981_2 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2021
Time 18:55Hrs
03/06/2021
Time 12:0Hrs
184 Development of six lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 0.000(Aksardham NH-9 (old NH 24)) to Design Chainage 14.750 (Delhi/UP Border) in the state of Delhi (Package 1) on EPC mode

NHAI/BM/EC/Delhi-Saharanpur/Akshardham-EPE/PKG-1/2019 1,264.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
185 Strengthening work from km. 128.00 to 158.00 and km. 164.00 to 189.00 on NH-121(309) in the State of Uttarakhand on EPC mode

2021_MoRTH_629018_1 26.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
186 “Protection Work From Km 30.00 To Km 40.00 On NH-534(119) In The State Of Uttarakhand Under Road Safety On EPC Mode

2021_MoRTH_629052_1 5.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
187 Development of 6 lane Urban Extension Road UER 2 NH344 M Package 1 from NH 1 to Karala Kanjhawala road Km 0.700 to 15.000 in the State of Delhi

2019_NHAI_38962_1 1,579.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
188 Development of 6 lane Urban Extension Road II UER II NH 344 M Package 2 From Karala Kanjhawala Road Km 15.000 to Nangloi Najafgarh Road Km 28.450 in the state of Delhi.

2019_NHAI_38969_1 1,132.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
189 Development of 6 lane Urban Extension Road II UER II NH 344 M Package 3 From Nangloi Najafgarh Road Km 28.450 to Dwarka Sector 24 Road Km 38.111 in the state of Delhi on EPC mode.

2019_NHAI_38956_1 685.310 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
190 Development of 4 lane Road Link from Km 0.000 to 7.269 7.3km NH 344 N starting from NH 344 M Delhi at Km 26.135 of NH 344M or UER II till Bahadurgarh bypass of NH 10 near Bahadurgarh in Haryana as spur of NH 344M Urban Extension Road II Package V under National Corridor Route under Bharatmala Pariyojana Phase I in the state of Delhi and Haryana

2019_NHAI_38968_1 324.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
191 Construction of 4 lane NH 344P Package 4 from Km 0.000 to 29.600 29.6 kms starting from Bawana Industrial Area Delhi at Km 7.750 of NH 344M till Sonipat bypass of NH 352A at Village Barwasani Sonipat in Haryana as spur of NH 344M in the state of Delhi and Haryana

2019_NHAI_38959_1 741.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
192 Stage strengthening work from km 374.00 to km 401.00 of NH-60 (new NH-14) including rectification of 5 identified black spots [WB-(02)-013-Mansuba More, WB-(02)- 198-Tejhati, WB-(02)-199-Lotus Press More, WB-(02)-262-Mollarpur, WB-(02)-352- Majhkhanda More] under NH Division No. XII, P.W. (Roads) Directorate in the District of Birbhum, West Bengal

2021_MoRTH_618280_1 39.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2021
Time 19:0Hrs
02/06/2021
Time 13:0Hrs
193 Strengthening work from Km 104.00 to Km 125.00 & km 132.00 to km139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode

2021_MoRTH_626795_1 22.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/04/2021
Time 15:0Hrs
01/06/2021
Time 11:0Hrs
194 Construction of ROB and its approaches in replacement of existing level crossings at LC no. 50/B/E at km 298.000 on NH-75E in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_628545_1 22.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2021
Time 15:0Hrs
31/05/2021
Time 15:0Hrs
195 [Strengthening work from Chainage Km. 68.570 to Km. 75.000 on NH 107 under Annual Plan of NH(O) 2020-21 in the state of Uttarakhand

2021_MoRTH_628664_1 6.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2021
Time 15:0Hrs
31/05/2021
Time 12:0Hrs
196 Rectification of Black Spot Package 5 from km 67.180 to km 69.030 (Samba) i.e.1.85 Km section in Union Territory of Jammu and Kashmir on EPC Mode

2021_NHAI_75909_1 92.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 16:0Hrs
31/05/2021
Time 11:0Hrs
197 Rectification of Black Spot Mansar Morh from km 69.780 to km 70.690 (Mansar Morh) i.e. 0.91 Km section district Samba in union territory of Jammu and Kashmir on EPC Mode

2021_NHAI_75924_1 21.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 16:30Hrs
31/05/2021
Time 11:0Hrs
198 Strengthening Work from Km 16.000 to 19.860 and 38.060 to 40.000 of NH 219 on EPC mode in the state of Bihar

2021_MoRTH_626840_1 17.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2021
Time 15:0Hrs
27/05/2021
Time 15:0Hrs
199 Construction of of 4-Lane Road in Km 226.200 to Km 228.200 (Geeta nagar chowk to Chandrabhaga Bridge) and Construction of Both side shoulders by Interlocking Tiles from Km 218.200 to Km 228.200 on NH 58 in the state of Uttarakhand ( Under EPC mode)

1355/13yata-nh-10/2021 dated 25.03.2021 10.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2021
Time 15:0Hrs
27/05/2021
Time 11:0Hrs
200 Periodical Renewal between KM 169/900 to 222/000 (Dholavira- Balasar section )of NH- 754K in State of Gujarat under EPC mode

2021_MoRTH_611168_1 15.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 15:0Hrs
25/05/2021
Time 17:0Hrs
201 Development of six lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in the state of Uttar Pradesh on EPC Mode (Package-II)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-II/2020 693.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
24/05/2021
Time 11:0Hrs
202 Development of of six lane access control greenfield highway of Delhi Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 56.500 (Vill Karaunda Mahajan) to Design Chainage 82.000 (Vill Khyawari) in the state of Uttar Pradesh on EPC Mode (Package III)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-III/2020 633.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
24/05/2021
Time 11:0Hrs
203 Road Safety of Jalandhar Hoshiarpur Manali Road NH 70 New NH 03 from Km 49.200 to 58.85 in the State of Punjab on EPC mode

2021_MoRTH_628461_1 4.940 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/04/2021
Time 15:0Hrs
17/05/2021
Time 17:0Hrs
204 Rectification of Black Spot by means of construction of VUP on NH-05 Km 236.845 to Km 237.654 (0.80 Km) Section Black Spot location at Tax Barrier Zirakpur-Ambala Road in the State of Punjab on EPC Mode.

2021_MoRTH_627019_1 9.530 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 17/04/2021
Time 15:0Hrs
17/05/2021
Time 15:0Hrs
205 Periodic Renewal work from Km. 160 to km. 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_625168_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
15/05/2021
Time 11:0Hrs
206 Construction of Road Side Covered Drain in Km 213(P) to 215(P) in Bihra Bazar of NH-327E for the year 2020-21 on EPC Mode (Job No. 327E-BR-2020-21-29)

2021_MoRTH_626409_1 5.506 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/04/2021
Time 15:0Hrs
13/05/2021
Time 11:0Hrs
207 widening of 2-lane to 4 - lane in ch 155.100 to 160.700 from i.s.b.t to railway crossing of nh -72 (new no-7) in distt - dehradun in state of uttrakhand epc mode

1371/13yata-nh-10/2021 33.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2021
Time 15:0Hrs
11/05/2021
Time 12:0Hrs
208 Strengthening of Stretches from Km140/6 to 153/6 of Renigunta - Kadapa- Muddanur road NH 716 in the state of AndhraPradesh on EPC mode

2021_MoRTH_622947_1 15.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
10/05/2021
Time 15:0Hrs
209 Rectification measures for black spot in the State of Punjab (1) black spot location at bus stand Shutrana on NH-52, km. 224.200 to 224.700 and (2) black spot location at bus stand Dhabi Gujjran on NH-52, km. 236.330 to km. 236.700 in the State of Punjab on EPC Mode

2021_MoRTH_626787_1 14.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 15:0Hrs
05/05/2021
Time 10:0Hrs
210 Improvement/Up-gradation of road from KM 41st to Km 67th (Domail to Bhamla) and Providing Retaining wall, B/walls, Signages, Crash Barriers, 02 Nos 1Mtr Span RCC Culvert, 02Nos 6 Mtr Span RCC Culvert & Const. of 01No Minor Bridges etc in the selected reaches of NH-1C (New NH-144) in the UT of Jammu and Kashmir through an Engineering, Procurement and Construction (EPC) Contract

Bid/Package no. NH-144/44 of 2020-21 Dated 13.03.2021 30.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2021
Time 9:0Hrs
30/04/2021
Time 17:0Hrs
211 Providing Retaining wall, B/walls, Minor Bridges, Signages, Crash Barriers & Slope protection in the selected reaches of NH-1C (New NH-144) from Km 24 to Km 41 in the UT of Jammu & Kashmir on EPC Mode

Bid/Package no. NH-144/39 of 2020-21 Dated 19.02.2021 47.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2021
Time 9:0Hrs
30/04/2021
Time 17:0Hrs
212 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727G under EPC Mode in the State of Uttar Pradesh

2021_MoRTH_625007_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 9:0Hrs
30/04/2021
Time 15:0Hrs
213 Strengthening of NH-501 from Km. 49.50 to 63.50 (Length 14.00 K.M) Pahalgam-Chandanwari in the UT of Jammu and Kashmir on EPC mode Complete job

PCD-RnB-79of 2020-21 18.868 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 14:0Hrs
28/04/2021
Time 16:0Hrs
214 The work for Construction of 4 Lane Single Span Steel Truss Bridge on Phagwara-Banga-Nawanshahar-Ropar road at RD 82.400 on Bist Doab Canal of NH-344A including approaches Ropar City in the State of Punjab

02 13.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2021
Time 15:0Hrs
26/04/2021
Time 10:0Hrs
215 Construction of Protective works from Km 472/0 - 474/0 and Km 480/0 - 485/0 (Gudalur Town) including construction of CC drain and CD works of NH67 in the State of Tamil Nadu-EPC Basis

2021_MoRTH_619175_1 18.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2021
Time 10:0Hrs
22/04/2021
Time 11:0Hrs
216 Construction of Six lane Elevated highway including LVUP/VUP at Junction of Amritsar Tanda section of NH-503A with Amritsar Jalandhar section of NH-01 (New NH-03) from km 451.120 to km. 452.810 of NH-01.

2021_NHAI_72802_1 48.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2021
Time 9:0Hrs
22/04/2021
Time 11:0Hrs
217 RECONSTRUCTION /REHABILITATION OF DAMAGED ROAD SURFACE BY WMM/DBM/BC FROM KM 100.00 TO KM 128.00 ON NH-121 (NEW NH-309) in the State of Uttarakhand.

1165/13Yata-RaMa-10/2021 17.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2021
Time 15:0Hrs
20/04/2021
Time 11:0Hrs
218 Up-gradation to two lane with paved shoulder configuration of NH-354 section Arifke-Ferozepur-Mukatsar-Malout from Km. 201.500 to km. 212.500 and km. 229.690 to km 269.960 and strengthing of Existing pavement from km. 212.500 to km 229.690 (Excluding km 218.500 to 223.690) of NH-354 on EPC Mode in the state of Punjab

2020_MoRTH_594868_1 208.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/11/2020
Time 9:0Hrs
19/04/2021
Time 16:30Hrs
219 Providing Additional Street Light Facility at various Black Spot locations on the Project Highway under Road safety in the stretch of Bengaluru Hoskote Mulbagal Section from Km 237 700 to Km 318 000 of NH-4 in the State of Karnataka to be taken up under EPC mode

NIT No 57 NHAI RO-BNG 11019 Tender 2020 21 dated 30 03 2021 7.400 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/03/2021
Time 17:0Hrs
19/04/2021
Time 15:0Hrs
220 Improvement of road safety from Km 200 00 to 219 350 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh

2021_MoRTH_620238_1 8.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2021
Time 18:0Hrs
17/04/2021
Time 11:0Hrs
221 Construction of 4 lane Vehicular Underpass at Aler Jeedikal Cross Road at Km 72/010 along with Slip/Service Roads on Hyderabad Warangal section of NH 163 in the state of Telangana on EPC mode

NHAI/Tech/TS/Aler-Jeedikal/2021 35.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2021
Time 15:0Hrs
15/04/2021
Time 15:0Hrs
222 CONSTRUCTION OF ROAD SIDE COVERED DRAIN IN KM 213(P) TO 215(P) IN BIHRA BAZAR OF NH-327E FOR THE YEAR 2020-21 ON EPC MODE (JOB NO. 327E-BR-2020-21-29)

2021_MoRTH_622180_1 5.506 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2021
Time 10:0Hrs
08/04/2021
Time 11:0Hrs
223 Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase-I existing Km 72.000 to Km 107.620 Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand

RO/UK/BRO/NH-09/Askot-Lipulekh 406.630 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
07/04/2021
Time 11:0Hrs
224 Construction of 6 lane Flyover at km 417.374 and 6 lane VUP at km 416.700 including construction of new service road at location of flyover and VUP on Jalandhar-Amritsar section of NH-01 New NH-03 for rectification of Blackspots in State of Punjab on EPC mode

2021_NHAI_70541_1 43.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2021
Time 9:0Hrs
05/04/2021
Time 11:0Hrs
225 Construction of six lane flyover at existing km 430.625 near Tangra town and six lane VUP at existing km 435.170 near Mallian town including construction of new service road at location of flyover and VUP on Jalandhar Amritsar section of NH 01 New NH 03 in the State of Punjab on EPC Mode

2021_NHAI_69391_1 53.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 1:50Hrs
05/04/2021
Time 11:0Hrs
226 Flood Damage Repair work in km 77.000 to 105.100 of NH-135C during 2020-21 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh.

2021_MoRTH_623679_1 0.790 MoRTH Normal Highway Project OTHERS 22/03/2021
Time 17:30Hrs
31/03/2021
Time 15:0Hrs
227 Strengthening work in km 38.850Tarwara More Siwan to km 97.050 Ambedkar Chowk Dumerson Golumber of NH 227A under EPC mode in state of Bihar.

2021_MoRTH_608335_1 66.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2021
Time 15:0Hrs
31/03/2021
Time 11:0Hrs
228 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM JUNCTION OF EPE (NEAR KHEKRA) DESIGN CHAINAGE 0.000 TO DESIGN CHAINAGE 27.000 (VILL.-LOHADDA) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-I).

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-I/2020 750.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
30/03/2021
Time 11:0Hrs
229 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 82.000 (VILL-KHYAWARI) TO DESIGN CHAINAGE 119.790 (VILL-LATIFPUR AT SAHARANPUR BYPASS) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-IV)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-IV/2020 835.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
30/03/2021
Time 11:0Hrs
230 Construction of rob and their approaches at km 103/4 near Ettivady in lieu of existing level crossing no.86/A-3/E @ Railway km 107/000-100 of NH-234 (Mangalore – Villupuram road) including land acquisition on EPC mode in the state of Tamilnadu

2021_MoRTH_615370_1 48.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2021
Time 16:0Hrs
29/03/2021
Time 11:0Hrs
231 Construction of VOP at Basaveshwara Circle CH 330 275 on Ilkal Bypass Black spot ID KA 02 199 in Hungund Hospet Section of NH 13 New NH 50 in the State of Karnataka through EPC mode

NIT No 53 NHAI RO BNG 17016 Tender 2020 21 dated 05 03 2021 32.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2021
Time 17:0Hrs
25/03/2021
Time 15:0Hrs
232 Long Term Remedial Measures at 1 Muguru Km 251 450 2 Dodda Aladamara to Kumar Farm Km 217 450 and 3 Tirumala Tower to SVP Nagar Km 215 900 on Kerala Border to Kollegala section on NH 766 Old NH 212 in the State of Karnataka under EPC mode

NIT No 54 NHAI RO BNG Road Safety Tender 2020 21 dated 05 03 2021 16.360 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2021
Time 17:0Hrs
25/03/2021
Time 15:0Hrs
233 Construction of ROB and its approaches in replacement of existing level crossings at LC no. 50/B/E at km 298.000 on NH-75E in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_614693_1 22.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 18:0Hrs
22/03/2021
Time 15:0Hrs
234 Work of Strengthening of NH-727B from Sikandarpur to Ballia (km. 102.000 to km. 136.900) in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_614725_1 35.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 18:0Hrs
22/03/2021
Time 15:0Hrs
235 Improvement of NH-76 35 from Km. 278.00 to Km. 284.00 Bedipuliya to Karvi Station under road safety in the State of Uttar Pradesh under EPC Mode.

2021_MoRTH_617437_1 9.580 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/02/2021
Time 15:0Hrs
20/03/2021
Time 15:0Hrs
236 Flood damage Repair work in Km. 77.000 to 105.100 of NH-135C during 2020-2021 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh

2021_MoRTH_618570_1 0.790 MoRTH Normal Highway Project OTHERS 24/02/2021
Time 17:0Hrs
19/03/2021
Time 17:0Hrs
237 Construction of VOP at Kantharaja Circle at Black Spot location KA 02 106 in the stretch of Bengaluru Hoskote Mulbagal Section from Km 237 700 to Km 318 000 of NH 4 in the State of Karnataka under standalone mode to be taken up under EPC mode

NIT No.51/NHAI/RO-BNG/11019/Tender/2020-21 dated 25.02.2021 24.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/02/2021
Time 17:0Hrs
18/03/2021
Time 15:0Hrs
238 Permanent rectification of black spot by means of construction of VUP on NH.05 Km 9.243 to Km 10.426 Old Km 201.895 to 203.078 section Ferozepur to Indo Pak Border in the State of Punjab on EPC Mode

2020_MoRTH_586331_1 23.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/09/2020
Time 15:0Hrs
18/03/2021
Time 15:0Hrs
239 Reconstruction of narrow and distressed major bridge over Lalpool at km 119.207 and Dashmile at km 128.344 of NH-117 in the district of South 24 Pgs. WB on EPC mode. Job No. 117-WB-2020-21-467

2021_MoRTH_616660_1 27.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2021
Time 18:0Hrs
18/03/2021
Time 11:0Hrs
240 Construction of 4-Laning of Puruliya Bypass section from Km 84.030 to Km. 94.345 of NH-32 (length 10.315 km.) in the state of West Bengal on EPC Mode.

2021_NHAI_68580_1 235.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 17:0Hrs
15/03/2021
Time 11:0Hrs
241 Two / Four laning of Raebareli - Jagdishpur Section of NH-330A from Km.0.000 to Km. 47.800 (Design Length – 46.020 km) including Jagdishpur Bypass and Excluding 4.1 Km overlapping Length of Jagdishpur Bypass with NH-731(Old NH-56) in the State of Uttar Pradesh on EPC mode under NH(O).

2021_NHAI_67809_1 518.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2021
Time 11:0Hrs
12/03/2021
Time 11:0Hrs
242 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 27.000 (VILL-LOHADA) TO DESIGN CHAINAGE 56.500 (VILL-KARAUNDA MAHAJAN) IN THE STATE OF UTTAR PRADESH (PACKAGE-II)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-II/2020 723.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
11/03/2021
Time 17:15Hrs
243 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 56.500 (VILL-KARAUNDA MAHAJAN) TO DESIGN CHAINAGE 82.000 (VILL-KHYAWARI) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-III)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-III/2020 641.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
11/03/2021
Time 17:15Hrs
244 Development of Memmadpur (Ambala) - Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode

2021_NHAI_67163_1 789.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2021
Time 15:0Hrs
11/03/2021
Time 11:0Hrs
245 Four Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka

67513 407.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 11:0Hrs
10/03/2021
Time 11:30Hrs
246 4-laning of Sagar-Mohari section of NH-934 from Design Chainage 8.000 to 50.300 (Length = 42.300 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor category) on EPC mode in the State of Madhya Pradesh.

2021_NHAI_68213_1 491.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:45Hrs
10/03/2021
Time 11:0Hrs
247 Construction of Two lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

2021_NHAI_68220_1 397.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:30Hrs
10/03/2021
Time 11:0Hrs
248 Construction of 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.

2021_NHAI_68216_1 241.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:0Hrs
10/03/2021
Time 11:0Hrs
249 Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from MDR Junction at ch. 40.900 Dhunda Village to Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70.950 (km 40.900 to km 70.950 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

NHAI/BM/DAKExpressway/2020/Pkg.Spur-II 1,180.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
09/03/2021
Time 15:0Hrs
250 Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70.950 to Junction with NH354 Ajanala road near Harsh china village chainage 99.020 (km 70.950 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

NHAI/BM/DAKExpressway/2020/Pkg.Spur-III 1,041.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
251 Construction of Two laning with Paved Shoulder of Khatima bypass of Sitarganj-Tanakpur section on NH-125 from Km. 24.720 to Km. 32.975 in the State of Uttarakhand under NHDP Phase-IV on EPC mode.

NHAI/Khatima bypass/2021 46.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2021
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
252 UPGRADATION OF HIGHWAY STARTING FROM JUNCTION WITH NH-44 AT PANIPAT CONNECTING KAIRANA, SHAMLI, MUZAFFARNAGAR, MIRANPUR, BIJNOR AND TERMINATING AT ITS JUNCTION WITH NH-74 AT KOTAWALI TO TWO/FOUR LANE WITH PAVED SHOULDER CONFIGURATION - BIJNOR TO KOTAWALI, PKG.-IV OF NH-709AD.

NHAI/UP/2018-19/709AD/Pkg-IV 234.050 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
253 Construction of four-lane Greenfield Delhi – Amritsar - Katra Expressway from Junction with Jalandhar – Kapurthala road (NH-703A) near Khojewal village to Junction with Amritsar - Mehta - Sri Hargobindpur - Tanda road (NH-503A) near Sri Hargobindpur (Km 319.400 to km 362.420) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_63229_1 1,437.200 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/11/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
254 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Amritsar-Mehta-SriHargobindpur-Tanda road (NH-503A) near Sri Hargobindpur to Junction with Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km 362.420 to km 397.700) under Bharatmala Pariyojna in the state of Punjab on EPC mode

2020_NHAI_63233_1 978.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/11/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
255 Strengthening of road from km 0/0 to 35/00 (Mohana- Malwa) section of NH-326A in the State of Odisha on EPC basis. (Bid Ref No.- 12 CE NH of 2020-21)

2021_MoRTH_614779_1 18.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 15:0Hrs
08/03/2021
Time 15:0Hrs
256 Construction of 40.00m span P.S.C. Bridge over Hadvaha Nala at km. 29.00 of Purkaji-Laksar-Haridwar NH-334A in Distt. Haridwar in the State of Uttarakhand

546/13yata-NH-10/2021 dated 04.02.2021 6.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 15:0Hrs
08/03/2021
Time 15:0Hrs
257 Strengthening of road from km 35/350 to 58/000 (Angabira to Naktideul) of NH-153B in the State of Odisha on EPC basis. (Bid Ref No.- 13 CE NH of 2020-21)

2021_MoRTH_614788_1 11.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 15:0Hrs
08/03/2021
Time 12:0Hrs
258 IMPROVEMENT AND UP-GRADATION OF NATIONAL HIGHWAY-709AD PKG-III FROM MUZAFFARNAGAR-MIRANPUR IN THE STATE OF UP

NHAI/UP/2018-19/709AD/MM/Pkg-III 636.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
08/03/2021
Time 11:0Hrs
259 DESIGN AND CONSTRUCTION OF ROAD AS PART OF ICBR WORKS FROM SURVANSAMBA TO KANAKSPUR FROM CHAINAGE KM 0.000 TO KM 6.550 (NET LENGTH 6.550 KM) THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION WORKS, PERMANENT WORKS, MINOR BRIDGES & SURFACING WORKS IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

CE (P) VTK/NIB-33/2020-21 101.860 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2021
Time 16:0Hrs
05/03/2021
Time 12:0Hrs
260 Periodical Renewal at Km 52/800-55/900, Km 56/800-57/0, Km 57/8-110/942 excluding the stretches Km 59/4-61/235, Km 63/800-65/300 of NH 532

2021_MoRTH_613462_1 40.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2021
Time 18:48Hrs
04/03/2021
Time 11:0Hrs
261 Strengthening work from Chainage Km 200.000 to Km. 232.000 on NH-119(New 534) under NH(O) 2020-21 in the state of Uttarakhand on EPC mode

444/13yata-NH-10/2021 dated 30.01.2021 63.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2021
Time 15:0Hrs
04/03/2021
Time 11:0Hrs
262 Construction of four lane ring road/bypass around Srinagar city from km 0.000 to km 42.100 (Phase-I) on Engineering, Procurement and Construction (EPC) Mode under NHDP Phase VII in the Union Territory of Jammu and Kashmir under Bharatmala Pariyojana

2020_NHAI_65474_1 1,446.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 18:0Hrs
04/03/2021
Time 11:0Hrs
263 Periodical renewal work from Km 153 to 177 on Kalka Shimla Wangtoo road of NH 22 New NH 05 under Annual Renewal Program ARP for year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_613162_1 9.100 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/01/2021
Time 15:0Hrs
01/03/2021
Time 15:0Hrs
264 Periodical Renewal Work from km.0 to 20 of Nahan Kumarhatti Road of NH 907A under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612844_1 6.820 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
265 Periodical Renewal work from Km 83 to 96 of Kala Amb Paonta Sahib Dehradun road of NH 07 under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612904_1 6.060 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
266 Periodical Renewal Work from Km.269 to 284 of Kalka Shimla Wangatoo Road on NH 05 Under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612875_1 5.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
267 Periodic Renewal of existing road from km 96.600 to km 132.850 (Mahewa Ghat to Chitrakoot section) of National Highway No. 731A in the state of Uttar Pradesh on Engineering, Procurement Construction (EPC) Mode.

2021_MoRTH_613156_1 12.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2021
Time 15:45Hrs
01/03/2021
Time 11:0Hrs
268 Construction of 6 lane elevated structure in Rayya at km. 419.690 on Jalandhar Amritsar section of NH I New NH 03 with service road on both sides including approaches for rectification of blackspots in the State of Punjab on EPC mode

2020_NHAI_65784_1 69.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2020
Time 15:0Hrs
01/03/2021
Time 11:0Hrs
269 Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode

2021_NHAI_66903_1 430.110 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2021
Time 17:45Hrs
01/03/2021
Time 11:0Hrs
270 Six laning of existing TaranTaran flyover to Golden Gate stretch of Jalandhar Amritsar Section of NH 1 New NH 03 including Construction of 6 lane flyover at Km 446.590 in front of best price and Km. 448.100 in front of the Daboorja Road and construction of VUP at Km 448.590 and reconstruction of Major bridge at Km. 445.957 New construction on LHS and widening on RHS for rectification of Blackspots in the State of Punjab on EPC basis

2020_NHAI_65521_1 93.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2020
Time 15:0Hrs
01/03/2021
Time 11:0Hrs
271 Four Laning of Amritsar Bypass (Greenfield Alignment) from New Tarn Taran Road to Ajnala Road from Design km 0.750 to Design km 43.750 (Design Length- 43.00 kms) and Upgradation of existing Amritsar - Khemkaran Road (NH- 354) to Four Lane Configuration from Design km 71.496 to Design km 78.440 (Design Length- 6.944 kms) (Total Design Length- 49.944 kms) in the State of Punjab on EPC mode under Bharatmala Pariyojana

2021_NHAI_65900_1 731.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2021
Time 12:30Hrs
25/02/2021
Time 11:0Hrs
272 Construction of ROB at km 75/8 (Railway km 72/6-7) of NH 49 Extn in lieu of existing LC - 68 Madurai - Cochin road, between Aundipatti - Theni Railway station Under Sethubharatham Project on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_608577_1 63.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
24/02/2021
Time 15:0Hrs
273 SUB SOIL INVESTIGATION, DESIGN, DRAWING AND CONSTRUCTION OF 135 MTR SPAN MAJOR PERMANENT PINJOLI BRIDGE OVER PINJOLI NALLAH INCLUDING APPROACH ROADS AT KM 49.750 ON ROAD BALIPARA-CHARDUAR-TAWANG UNDER 1441 BCC/14 BRTF/PROJECT VARTAK IN ARUNACHAL PRADESH

CE (P) VTK/NIB-23/2020-21 22.410 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 16:0Hrs
23/02/2021
Time 12:0Hrs
274 Construction of ROB at km 93/4 (Railway km 89/6-7) of NH 49 Extn (New NH No 85) in lieu of LC - 85 Madurai - Cochin Road, between Theni - Bodi railway stations under Sethubharatham project on EPC Mode.

2021_MoRTH_611651_1 27.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
22/02/2021
Time 15:0Hrs
275 Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 30.000 to km 49.150 (design chainage km 30.000 to km 46.450) including design and construction of kandi tunnel (total length of tunnel 260mt) incl approaches (Pkg-I) under 13 TF on Akhnoor - Poonch road (NH-144A) in the UT of J and K under Project Sampark, BRO on EPC mode (2nd CALL)

2020_BRO_605970 231.580 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2020
Time 15:0Hrs
22/02/2021
Time 15:0Hrs
276 Strengthening to NH-53 from Km 314/130 to 321/000 Km for the year 2020-21 in the State of Odisha on EPC basis. (Bid Ref No.- 09 CE NH of 2020-21)

2021_MoRTH_611654_1 5.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 18:55Hrs
22/02/2021
Time 12:0Hrs
277 Strengthening work in Km 36 to 68 of NH 110 on EPC Mode for the year 2020 21

2021_MoRTH_612700_1 29.617 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 10:0Hrs
22/02/2021
Time 11:0Hrs
278 Repair/ Rehabilitation including repainting of Pamban Bridge in Km 157/4- 159/8 of NH-49 (New NH No.87) in the State of Tamil Nadu on EPC mode.

2021_MoRTH_612996_1 13.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 19:0Hrs
22/02/2021
Time 11:0Hrs
279 Construction of New Six Lane Major Bridge including Approaches from Km.172.895 to Km.173.670 of NH-215 (New NH -520) in Rimuli – Koida Section in the State of Odisha under NHDP Phase III on Engineering, Procurement & Construction (EPC) Mode.

2020_NHAI_64710_1 94.010 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/12/2020
Time 18:30Hrs
22/02/2021
Time 11:0Hrs
280 Construction of Hard shoulders from km. 161.00 to 164.00 on NH-72(07) on EPC mode in the State of Uttarakhand

257/13yata-NH-10/2020 dated 19.01.2021 5.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 15:0Hrs
22/02/2021
Time 11:0Hrs
281 Balance work of Construction of two/four lane with paved shoulder from Km. 422.00 to Km. 523.600 (Chitradurga to Shivamogga section) of NH 13 in the state of Karnataka on EPC mode

RW/BNG/NH-13/KM 422-528/94/2019 439.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 15:0Hrs
20/02/2021
Time 11:0Hrs
282 Strengthening of road from km 277/461 to 280/249 Km, 281/400 to 286/725 Km, 287/883 Km to 289/454 km, 304/720 km to 341/741 km & Km 346/000 to 360/391 km of NH-55 in the state of Odisha on EPC basis. (Bid Ref No.- 07 CE NH of 2020-21)

2021_MoRTH_610828_1 18.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 15:0Hrs
18/02/2021
Time 15:0Hrs
283 Strengthening of road from Km 174/570 to 186/094 Km, 210/570 to 234/751 & Km 235/748 to 243/648 km of NH-20 in the State of Odisha on EPC basis. (Bid Ref No.- 08 CE NH of 2020-21)

2021_MoRTH_610839_1 14.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 12:15Hrs
18/02/2021
Time 12:0Hrs
284 Periodical Renewal from Km 218/900 - 225/0 & 234/4 - 236/0 of Nagapattinam - Gudalore - Mysore road -NH 67 (New NH 81) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_608582_1 8.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
16/02/2021
Time 15:0Hrs
285 Flood Damage Repair work in km 77.000 to 105.100 of NH-135C during 2020-21 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh.

2021_MoRTH_613263_1 0.790 MoRTH Normal Highway Project OTHERS 01/02/2021
Time 15:0Hrs
15/02/2021
Time 17:0Hrs
286 STRENGTHENING WORK FROM KM 10.000 TO 25.000 AND KM 48.000 TO 77.100 OF NH-309 B UNDER ANNUAL PLAN 2020-2021 ON EPC MODE IN THE STATE OF UTTARAKHAND.

2021_MoRTH_609922_1 38.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2021
Time 16:0Hrs
15/02/2021
Time 11:0Hrs
287 Balance 11.96 km. stretch between Km.66.000 to Km.77.960 on NH-12(New NH-45) in Nauradehi Wildlife Sanctuary in the State of Madhya Pradesh on EPC Mode Basis.

65432 161.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 16:0Hrs
12/02/2021
Time 11:0Hrs
288 Construction of Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode

2020_NHAI_63764_1 462.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2020
Time 18:20Hrs
12/02/2021
Time 11:0Hrs
289 4-laning of Balwara to Dhangaon section of NH-347BG & 753L (Indore to Boregaon- Pkg III) Design Ch. 42.260/Existing Ch. 45.000 to Design Ch. 82.810/ Existing Ch. 86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on EPC mode.

2020_NHAI_64695_1 770.480 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2020
Time 15:0Hrs
11/02/2021
Time 11:0Hrs
290 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ludhiana-Moga road (NH-5) near Mullanpur Dakha to Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village (Km 260.860 to km 303.900) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62421_1 1,404.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
11/02/2021
Time 11:0Hrs
291 Construction of ROB and their Approaches at Km 81/800 (Near Kannamangalam) in Lieu of existing LC No.109A/3T at Railway Km 130/23-25 of NH-234 Mangalore-Villupuram Road including Land Acquisition” on Engineering, Procurement & Construction (EPC) Basis Contract

2020_MoRTH_604294_1 63.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 17:30Hrs
09/02/2021
Time 11:0Hrs
292 Construction of Service road 5.5m width along NH-44 bypass both sides From Ch. 1.900 to 4.500 and Ch. 11.900 to 17.800 except km 13.145 to km 14.027 Bemina flyover length 15.236 kms and renewal coat on main existing 4-lane carriageway from Ch. 4

PCD-RnB-63of 2020-21 34.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 15:0Hrs
08/02/2021
Time 16:0Hrs
293 Permanent measures to improve the Black Spot (ID No. TN - (02) - 647) at Old Ayakudi Market from km 48/400 - 51/0 of NH 209 (New NH No. 83) (Dindigul - Coimbatore - Annur - Sathiyamangalam - Mysore - Bengaluru road) in the state of Tamil Nadu.

2021_MoRTH_607783_1 9.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 15:0Hrs
08/02/2021
Time 15:0Hrs
294 Widening and strengthening of existing carriageway to two lane configuration in the stretch from Km. 0.000 to Km.13.000 (excluding rigid pavement portion from Km. 3.100 to 5.100) & Construction of Major Bridge at river Aami on NH-328A in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme

2020_MoRTH_580532_1 37.308 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2020
Time 15:0Hrs
08/02/2021
Time 15:0Hrs
295 Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode

2020_NHAI_61035_1 805.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/10/2020
Time 16:0Hrs
08/02/2021
Time 11:0Hrs
296 Construction Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH 65 near Patas -Vasunde Phata – Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra on EPC Mode

2020_NHAI_62809_1 702.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2020
Time 16:40Hrs
08/02/2021
Time 11:0Hrs
297 6-laning of Nashik Phata to Khed Pkg-II (from Design Ch.24.230 km at Indrayani river to Ch.42.000 km at village Chandoli/Khed) total length 17.770 km, on Pune-Nashik section of NH-60 (Old NH-50) in the state of Maharashtra on EPC Mode

2020_NHAI_63437_1 648.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2020
Time 15:0Hrs
08/02/2021
Time 11:0Hrs
298 Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500 (Indapur), Design Length 42.131 km and One time improvement of selected stretches (Package–II) in the State of Maharashtra under Bharatmala Pariyojna on EPC Mode

2020_NHAI_64279_1 806.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2020
Time 18:15Hrs
08/02/2021
Time 11:0Hrs
299 Four Lanning of NH-965G from km 83.500 (Indapur) to km 130.202 (Tondale), Design Length 46.702 km and One time improvement of selected stretches (Package–III) in the State of Maharashtra under Bharatmala Pariyojna on EPC mode

2020_NHAI_64281_1 853.360 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2020
Time 18:15Hrs
08/02/2021
Time 11:0Hrs
300 2-lane with Paved shoulder of Ujjain – Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 =133.575 km section of NH-552G in the state of Madhya Pradesh on EPC mode.

64179 454.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2020
Time 15:0Hrs
08/02/2021
Time 11:0Hrs
301 Construction of Grade Seperator at Kochadai Junction at km 5/10 of NH 49 Extn (New NH No.85) on Engineering, Procurement and Construction (EPC) Basis contract.

2020_MoRTH_603278_1 31.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2020
Time 14:0Hrs
04/02/2021
Time 15:0Hrs
302 Permanent measures for Blackspot (ID No. TN(02)-316) from km 198/300-199/200 of NH-209 ( New NH 948) in the State of Tamil Nadu on (EPC) Basis Contract

2020_MoRTH_604741_1 4.181 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 17:0Hrs
04/02/2021
Time 15:0Hrs
303 Permanent measures to improve the Blackspot (ID No. TN(02) 435) (Near SRP Mills) from km 166/4 - 167/850 of NH 209 (Dindugul – Bangalore road) including Widening of CD Works in the State of Tamil Nadu on (EPC) Basis Contract

2020_MoRTH_604753_1 4.045 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 18:0Hrs
04/02/2021
Time 15:0Hrs
304 Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Junction with Patiala Samana Patran road SH10 near Ghagga village to Junction with Patiala Bathinda road NH7 near Bhawanigarh Km 157.920 to Km 188.830 on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62412_1 850.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 18:0Hrs
04/02/2021
Time 11:0Hrs
305 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303.900 to km 319.400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0.000 to km 24.000 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62498_1 1,230.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
306 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village (Km 188.830 to km 225.770) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62419_1 983.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
307 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village to Junction with Ludhiana-Moga road (NH-5) near Mullanpur Dakha (Km 225.770 to km 260.860) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62414_1 1,129.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
308 Permanent Measures for Black spots at Km 87/6 - 90/2 of NH 49 Extn New NH No -85.(Black Spot ID - TN -02-199) in the state of Tamil Nadu

2020_MoRTH_603339_1 5.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2020
Time 15:0Hrs
01/02/2021
Time 15:0Hrs
309 Four laning of Bangalore Mangalore Section from km 270.270 (Periya Shanthi) to km 318.755 (Bantwal) including 6 lane Flyover at Kalladka Town in km. 311 – km. 314 on NH-75 on EPC Basis in Karnataka

64966 1,480.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 11:0Hrs
01/02/2021
Time 11:0Hrs
310 Periodic renewal Major maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka on EPC mode under risk and cost of Concessionaire

NIT No.49 NHAI RO-BNG 11019 Tender 2020-21 dated 08.01.2021 73.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
30/01/2021
Time 15:0Hrs
311 CONSTRUCTION/IMPROVEMENT ON EPC MODE OF EXISTING ROAD TO NHDL SPECIFICATION WITH PAVED SHOULDER FROM EXISTING KM 67.000(MANGAN) TO KM 95.000 (CHUNGTHANG) OF TOTAL DESIGN LENGTH 27.476 KM (EXCEPT PERPETUAL LAND SLIDES/SINKING ZONE AT RAFONG KHOLA LANGTHA KHOLA, MANUAL AND RITCHU) ON ROAD GANGTOK-MANGAN-CHUNGTHANG IN THE STATE OF SIKKIM UNDER PROJECT SWASTIK OF BRO

2020_BRO_604307_1 290.360 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
25/01/2021
Time 15:0Hrs
312 i Re-constn of Bow String Girder type Minor Bridge at km 16.567 of NH35 including its approaches ii extn of existing arch culvert by providing a box culvert adjacent to it at km 3.780 of NH35 iii rehab of existing steel bridge over river Ichamati at km 53.53 of NH35 iv repair and rehab of bridge over Bidyadhari Canal at km 13.872 of NH35 and v repair and rehab of Bridge over river Nouvasan Thakur Haridas Setu at km 56.06 of NH35 in the dist of North 24 Pgs. WB. Job No. 035-WB-2019-20-461

2020_MoRTH_605529_1 20.511 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 18:0Hrs
23/01/2021
Time 11:0Hrs
313 Permanent Rectification of Black Spot (TN-02-588) at KNR Bend from Km 401/2-402/4 of NH 67 in the State of Tamil Nadu on EPC Basis Contract

2020_MoRTH_604379_1 721.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2020
Time 15:0Hrs
22/01/2021
Time 15:0Hrs
314 Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(9)/15-16/013-S&R(B)

2020_MoRTH_598001 123.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/11/2020
Time 14:0Hrs
21/01/2021
Time 13:0Hrs
315 Permanent Measures to improve Black Spot ID. TN-(02)-717 at from Km 59/460 – 61/235 of NH 532 (Cuddalore – Vridhachalam – Salem Road)

2020_MoRTH_604818_1 4.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 18:15Hrs
21/01/2021
Time 11:0Hrs
316 4-Laning of existing 2-laning stretch from Dharmapuri at km. 117.000 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode

2020_NHAI_60480_1 798.430 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 11:0Hrs
18/01/2021
Time 11:0Hrs
317 Improvement of road safety from Km 200 to 219 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh

2020_MoRTH_600776_1 8.040 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/12/2020
Time 18:0Hrs
18/01/2021
Time 11:0Hrs
318 Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from Design Chainage km ASR 100.835 to Design Chainage km 139.965 for Length of 39.130 km into Four-Lane under Bharatmala scheme in the State of Punjab (Package-IV) under EPC Mode

2020_NHAI_59773_1 329.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/10/2020
Time 18:0Hrs
14/01/2021
Time 11:0Hrs
319 RFP for Development of six lane access controlled highway from design chainage 0 000 (Ganespur) to design chainage 8 130 (near Mohand) of Ganeshpur – Dehradun section of NH-72A in the state of Uttar Pradesh under bharatmala pariyojana (Package-1) on EPC mode.

NHAI/BM/Ganeshpur Dehradun/Pkg1/ 707.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/10/2020
Time 15:0Hrs
11/01/2021
Time 11:0Hrs
320 Development of Six lane access controlled highway from Design Chainage 8 130 near Mohand to 16 380 Daat kali Tunnel of Ganeshpur Dehradun section of NH72A in the state of Uttar Pradesh and Uttarakhand under Bharatmala Pariyojana on EPC mode Package 2

NHAI/BM/Ganeshpur Dehradun/Pkg2/2020 838.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/10/2020
Time 15:0Hrs
11/01/2021
Time 11:0Hrs
321 4-laning of existing two lane section of Malout-Mandi Dabwali section of NH- 09 from Danewala at km 7.000 (Design Ch. Km 7.00) to Mandi Dabwali at km 29.500 (Design Ch. 29.500) having design length of 22.5 km under Bharatmala Pariyojana in the state of Punjab (Package-1)

2020_NHAI_60218_1 298.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2020
Time 18:30Hrs
04/01/2021
Time 11:0Hrs
322 Periodical Renewal Between Km. 387.700 to 407.700 of NH 68 Old NH- 15 Bet Km.82.00 to 100.00 Bhabhar Radhanpur in the state of Gujarat. Using HIPR Technology.

MoRTH_601473_1 7.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/12/2020
Time 14:25Hrs
28/12/2020
Time 17:0Hrs
323 Four laning with paved shoulder of Madhavpur to Porbandar section of NH 8E Ext old NH 51 new from km 338 400 Design Chainage km 338 400 to km 379 100 Design Chainage km 379 100 in the State of Gujarat through on EPC mode

NHAI/Guj/Madhavpur Porbandar/EPC/2020 132.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/11/2020
Time 15:0Hrs
28/12/2020
Time 15:0Hrs
324 Construction of 2lane ROB and its approaches in replacement of existing level crossing No T 50SPL at km 91 on NH 28B in the State of Bihar.

2020_MoRTH_599384_1 39.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
28/12/2020
Time 11:0Hrs
325 Construction of ROB and its approaches in lieu of existing level crossing LC No 55C/2E at km 94 on NH 28B in the State of Bihar.

2020_MoRTH_599472_1 49.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
28/12/2020
Time 11:0Hrs
326 Four laning with paved side shoulders of the road section from Km 4 96 to Km 12 00 Section Jalandhar Nakoder Shahkot Moga Road of NH 71 703 in the state of Punjab

2020_MoRTH_550134_1 48.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2020
Time 12:0Hrs
24/12/2020
Time 11:0Hrs
327 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 129.31 TO KM 152.810 AND EXISTING CHAINAGE FROM KM 142.020 TO KM 167.100) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575956_1 281.850 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2020
Time 18:0Hrs
22/12/2020
Time 11:0Hrs
328 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 152.810 TO KM 173.340 AND EXISTING CHAINAGE FROM KM 167.100 TO KM 189.100) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_577230_1 256.130 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2020
Time 18:0Hrs
22/12/2020
Time 11:0Hrs
329 Work of stage strengthening of existing road from Km. 79.350 to Km. 107.000 (excluding Km. 99.00 to Km.104.00) of NH-731K in the State of Uttar Pradesh under EPC mode

2183/1-Tender cashier(Bareilly)-28/20 Dated 30.09.2020 11.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/10/2010
Time 12:0Hrs
21/12/2020
Time 15:0Hrs
330 Construction of Protective work in Km 0/8 - 1/6 including widening of culvert at Km 1/8, 4/6, Construction of Retaining wall and truck lay bay in Ariyalur Bye Pass of NH 226 Extn (New NH No 136) in Tamil Nadu on Engineering, Procurement & Construction (EPC) mode.

2020_MoRTH_594610_1 6.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2020
Time 15:0Hrs
21/12/2020
Time 15:0Hrs
331 construction of 3lane new rob including widening, construction of vup and ramps at lhs rhs and merging of alignment with pap flyover on panipat jalandhar section of nh44 (old nh01) in the state of punjab on epc basis

2020_NHAI_61667_1 28.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2020
Time 13:30Hrs
21/12/2020
Time 11:0Hrs
332 Construction and Up gradation of existing road to 2-lane NHDL specification from existing chainage km 0.0 to Km 18.530 (Design chainage km 0.0 to km 17.350) of road Kurkuti-Ghamsali-Niti (KGN), in 21 BRTF area under Project Shivalik in Uttarakhand State on EPC mode (Length 17.35 Km)

2020_BRO_591484_1 191.550 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2020
Time 15:0Hrs
12/12/2020
Time 12:0Hrs
333 Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(10)/15-16-020-S&R(B)

2020_MoRTH_589674_1 92.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2020
Time 9:0Hrs
08/12/2020
Time 13:0Hrs
334 Construction of Additional Structures in KeralaTamil Nadu Border Kanyakumari section (From Km 43.300 to Km 96.714) of NH 47 in the State of Tamil Nadu on EPC Mode

NHAI/11012/KL-TN-KAN/AddlStr/EPC/05/20 545.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 13:0Hrs
08/12/2020
Time 11:0Hrs
335 4-Laning of Pangare to Waranga Phata section from km 134.500 to km 174.645 (Design Chainage) of NH-161 including Bypasses at Kalamnuri and Akhada Balapur and additional lengths of 800 m from Waranga Junction to Nanded (NH-161) (existing Chainage 244.360) and 700 m road from Waranga Junction (NH-161) to Mahagaon (NH-361) (existing Chainage 253.700) in the State of Maharashtra on EPC mode

2020_NHAI_58837_1 746.390 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2020
Time 17:0Hrs
07/12/2020
Time 11:0Hrs
336 Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 (Design Chainage) in the state of Uttarakhand under Bharatmala Pariyojana on EPC mode (Package3)

NHAI/BM/Ganeshpur Dehradun/Package 3/2020 142.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
337 Construction of Eight Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village in Dahod district and ending at junction with SH-152 near Matariya Vadi village in Panchmahal district (Ch.729.700 to 756.052) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg27 874.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
338 Construction of Eight Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi village and ending at junction with NH-47 near Bhamaiya village in Panchmahal district (Ch. 756.052 to 781.282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg28 803.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
339 Construction of 6 lane access controlled Greenfield highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat under Bharatmala Pariyojana Phase I AJ RGBS Package 3 on EPC Mode

2020_NHAI_57423_1 595.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
26/11/2020
Time 15:0Hrs
340 4-Laning From km 100.757 To km 107.350 Section OF Gwalior-Shivpuri (NH-03) Passing Through Madhav National Park in the State of Madhya Pradesh on EPC Mode.

2020_NHAI_58547_1 162.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/09/2020
Time 18:5Hrs
24/11/2020
Time 11:0Hrs
341 Construction of VUP, widening of existing Minor Bridge including construction of new Service Road at Loharaka crossing at Km 462.339 on Amritsar Wagha Border Section of NH-03 (old NH-01) in the State of Punjab

NHAI/RO/CHD/11011/PD-JAL/ ASR-WAG/NH-1/EPC/RFP 22.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2020
Time 10:30Hrs
23/11/2020
Time 11:0Hrs
342 Work of construction of a minor bridge over Kaimua Nala in Km 24 on newly declared NH-731 K on Shahjahanpur- Bisalpur road in the state of Uttar Pradesh under EPC mode

2184/1-Tender cashier(Bareilly)-28/20 Dated 30.09.2020 5.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2020
Time 12:0Hrs
18/11/2020
Time 15:0Hrs
343 Periodical Renewal (PR) between Km. 387/700 to 407/700 of NH-68 (Old NH-15 Bet Km.82/00 to 100/00) [Bhabhar – Radhanpur] in State of Gujarat under EPC mode

2020_Morth_588554_1 7.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2020
Time 15:0Hrs
10/11/2020
Time 17:0Hrs
344 Periodic Renewal between Km 174/000 to 243/650 (Using HIPR Technology) on NH- 41 in the state of Gujarat under EPC mode (Naliay –Narayan Sarovar Road)

2020_MoRTH_584266_1 14.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2020
Time 17:30Hrs
10/11/2020
Time 17:0Hrs
345 Strengthening the existing carriageway in km.11/0 – 19/0 including Geometrical Improvements, Widening of Minor bridges at km.12/2 & km.18/2, Construction of Drains, Construction of Brest Wall, Widening and Reconstruction of culverts, Construction of Retaining walls in Krishnagiri – Kuppam Road NH -219 (New NH-42)

2020_MoRTH_583421_1 15.422 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
06/11/2020
Time 15:0Hrs
346 Maintenance of Existing Two lane Carriageway of Hospet Bellary Karnataka Ap Border from 280.080 Design Ch. to Km. 375.450 Design Ch. Design Length 95.370, NH 63 New NH-67 in the State of Karnataka at the risk and cost of the EPC Contractor

NIT No.36 NHAI RO-BNG 17017 Tender 2020 21 dated 22.10.2020 8.010 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 15:0Hrs
05/11/2020
Time 15:0Hrs
347 Construction of Flyover at Mandi Gobindgarh at Design km 0.350 (existing km 260.800) including resurfacing of existing Service Road at location of flyover at km 260.800 on Jalandhar Panipat Section of NH 44 (old NH 01) in the State of Punjab on EPC basis

2020_NHAI_56523_1 22.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 17:30Hrs
05/11/2020
Time 11:0Hrs
348 Periodical renewal work on selected stretches from Km 17/350 to 18/380, 23/750 to 24/980, 30/400 to 30/480, 31/800 to 37/400, 38/800 to 41/350 of Theog Hakoti road NH-705 under Annual Renewal Program(ARP) for year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_585411_1 4.750 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 21/09/2020
Time 15:0Hrs
04/11/2020
Time 15:0Hrs
349 Construction of Six Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Chainage km 368.356 Existing Chainage Km 368.356 to Design Chainage km 369.132 Existing Chainage Km 369.132 on NH66 on EPC mode in the state of Karnataka

56743 61.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 17:0Hrs
04/11/2020
Time 11:0Hrs
350 Stage Strengthening work from km 99.50 to km 104.20 including road furniture’s in NH – 512 under NH Division –VII, P.W.(Roads) Directorate in the District of Dakshin Dinajpur, West Bengal on EPC Mode (Job No. 512-WB-2019-20/468)

2020_MoRTH_583090_1 5.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/09/2020
Time 18:0Hrs
02/11/2020
Time 13:0Hrs
351 Development of six lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH9 Old NH 24 Junction to Delhi UP border (Ch.0.00 to Ch. 14.750) in the State of Delhi on EPC mode under Economic Corridor in phase 1 of Bharatmala Pariyojana

NHAI/BM/EC/Delhi Saharanpur/Akshardham EPE/PKG1/2019 1,264.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2019
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
352 Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in the State of Uttar Pradesh on EPC mode under Economic Corridor in phase 1 of Bharatmala Pariyojana.

NHAI/BM/EC/Delhi-Saharanpur/Akshardham-EPE/PKG-II/2019 1,654.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2019
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
353 Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh.

2020_NHAI_56526_1 258.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
354 Construction of ROB at km 22/2 of NH 49 Extn (New NH No 85) (Madurai - Cochin Road) & Railway chainage in km 19/2-3 in lieu of LC-17 between Vadapalanji & Usilampatti Railway Stations under Sethubharatham project on Engineering, Procurement and Construction (EPC) Basis contract.

2020_MoRTH_583287_1 42.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
31/10/2020
Time 15:0Hrs
355 DESIGN AND CONSTRUCTION OF CL-9 ROAD AS PART OF ICBR WORKS FROM BANGA JANGA GOMPA (BJG) TO NAGA GG (NGG) BETWEEN CHAINAGE KM 20.00 TO KM 54.00 (NET LENGTH 36.694 KM) THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION, PERMANENT & SURFACING WORKS IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_583430_1 135.140 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2020
Time 10:0Hrs
28/10/2020
Time 12:30Hrs
356 Strengthening work from chainage 0.00 to chainage 36.000 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the State of Uttarakhand

3145/13yata-NH-10/2020 dated 24.09.2020 20.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2020
Time 15:0Hrs
28/10/2020
Time 11:0Hrs
357 Construction of ROB with Approaches in lieu of LC no.165 , of Ahmadabad- Palanpur (IR Ch-650/2-3) between Rly station – Karjoda and Palanpur NH-58 in the State of Gujarat on EPC mode under NH(O) through an Engineering, Procurement and Construction (EPC) Contract

2020_MoRTH_581300_1 123.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 15:0Hrs
27/10/2020
Time 12:0Hrs
358 IRQP WORK OF NH-327E ROAD FROM KM CH. 225.05 (BANGAOU) TO KM CH. 232.55 (MAHESHI, TARAPEETH) FOR THE YEAR 2019-20(JOB NO. 327E-BR-2020-21/27)

2020_MoRTH_583193_1 5.029 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/09/2020
Time 15:0Hrs
22/10/2020
Time 17:0Hrs
359 Periodical Renewal (PR) between Km.102/200 to 119/500 on N.H. 51 in the State of Gujarat under EPC mode of Contract (Using Hot In Place Recycling Technology)(Job No.TA/051/GJ/2019-20/667)

2020_MoRTH_585662_1 5.772 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 18:0Hrs
22/10/2020
Time 15:0Hrs
360 Periodical Renewal (PR) between Km.229/700 to 233/390 & 237/590 to 255/890 on N.H. 51 in the State of Gujarat under EPC mode (Using Hot In Place Recycling Technology)(Job No.TA/051/GJ/2019-20/669).

2020_MoRTH_585715_1 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 18:0Hrs
22/10/2020
Time 12:0Hrs
361 CONSTRUCTION AND UPGRADATION OF TATO MENCHUKA ROAD DESIGN CHAINAGE KM 23PT800 TO KM 33PT100 AND EXISTING CHAINAGE KM 24PT800 TO KM 36PT000 TO 2LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_575115_1 101.070 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 1:0Hrs
21/10/2020
Time 11:0Hrs
362 CONSTRUCTION AND UPGRADATION OF TATO-MENCHUKA ROAD (DESIGN CHAINAGE KM 33.100 TO KM 41.275 AND EXISTING CHAINAGE KM 36.000 TO KM 45.410) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_574045_1 86.080 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 18:55Hrs
21/10/2020
Time 11:0Hrs
363 CONSTRUCTION AND UPGRADATION OF TATO-MENCHUKA ROAD (DESIGN CHAINAGE FROM KM 0.0 TO KM 23.80 AND EXISTING CHAINAGE FROM KM 0.0 TO KM 24.80) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_574573_1 234.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2020
Time 17:30Hrs
21/10/2020
Time 11:0Hrs
364 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 85.657 TO KM 104.530 AND EXISTING CHAINAGE FROM KM 92.250 TO KM 113.650) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575334_1 174.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 18:0Hrs
21/10/2020
Time 11:0Hrs
365 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 104.530 TO KM 129.310 AND EXISTING CHAINAGE FROM KM 113.650 TO KM 142.020) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575390_1 301.460 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 18:0Hrs
21/10/2020
Time 11:0Hrs
366 Construction of Additional Structures in KeralaTamil Nadu Border Kanyakumari section (From Km 43.300 to Km 96.714) of NH-47 in the State of Tamil Nadu on EPC Mode

NHAI/11012/KL-TN-KAN/AddlStr/EPC/05/20 533.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2019
Time 15:0Hrs
20/10/2020
Time 11:0Hrs
367 Construction of RCC HL Bridge at Km 111.675 of NH-333 in the State of Bihar

2020_MoRTH_581905_1 20.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 16:44Hrs
19/10/2020
Time 11:0Hrs
368 Widening and Stage Strengthening work in stretch from Km. 579.500 to 598.500 of NH-730 in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme

2020_MoRTH_579330_1 53.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2020
Time 9:0Hrs
15/10/2020
Time 15:0Hrs
369 Widening and Stage Strengthening (by raising) work in stretch from Km. 95, 100, 101, 103, 108 and km. 112 to 115 of NH-227A in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme.

2020_MoRTH_579356_1 28.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2020
Time 9:0Hrs
15/10/2020
Time 15:0Hrs
370 Four laning/ widening of road Patiala-Sangrur-Barnala road section RD 106.990 to 116.000 under CRIF Scheme

02 20.910 MoRTH Normal Highway Project OTHERS 26/09/2020
Time 10:0Hrs
15/10/2020
Time 15:0Hrs
371 Construction of 4-Lane Bypass for Bhiwani town from Bhiwani-Dadri road to Bhiwani -Loharu road NH-709 (Extn.) on EPC Mode in the state of Haryana

2020_MoRTH_580744_1 14.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 14:0Hrs
15/10/2020
Time 11:0Hrs
372 Construction of six lane Flyover at km. 315.200 and Construction of entry/exit ramp from km. 320.300 to km. 321.200 including FOB at km. 320.840 and Construction of Additional Two Lane ROB on Both sides of Existing Four Lane ROB at km. 311.865 along with approaches and Construction of VUP at km. 311.770 alongwith Improvement of Sherpur Chowk on Panipat Jalandhar section of NH 44 (Old NH 1) in the State of Punjab

2020_NHAI_55635_1 115.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 16:45Hrs
14/10/2020
Time 11:0Hrs
373 “Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length - 95.00 Km] in the state of Nagaland for the FY 2020-21”

2020_NHIDC_583503_1 83.030 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/09/2020
Time 11:0Hrs
12/10/2020
Time 15:0Hrs
374 Construction of integrated 6-lane grade-separator at km 36.530 with a LVUP at km 36.894 accommodated within the Hazaribagh side approach of grade-separator in Barhi-Hazaribagh Section (Hazaribagh Bypass) of NH-33 in the state of Jharkhand on EPC mode.

2020_NHAI_53770_1 49.070 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/07/2020
Time 11:0Hrs
12/10/2020
Time 11:0Hrs
375 Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode

NHAI/Guj/Jet-Gondal-Rajkot/DPR/2020 92.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2020
Time 15:0Hrs
08/10/2020
Time 15:0Hrs
376 Stage strengthening work from Ch 10 km to 30 km of NH-35 under Barasat NH Sub Divin-II of NH Division V P.W. Rds Directt in the Dist of North 24 Pgs WB during the year 2020-21 on EPC mode. Job No. 035-WB-2020-21-469

2020_MoRTH_569367_1 12.294 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2020
Time 18:0Hrs
07/10/2020
Time 11:0Hrs
377 Construction of Left out work of four Laning of Mahuva to Kagavadar Section of NH-8E from Km. 100.100 to Km 139.915 (Design Chainage from Km 100.450 to km 140.470) (Package-III) in the State of Gujarat on Single Percentage Item Rate Contract.

NHAI/11012/Proc./NH-8E/Balance/Mahu-Kagvadar/2020 559.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 11:0Hrs
06/10/2020
Time 15:0Hrs
378 Left Out Work of Four laning of Talaja – Mahuva Section of NH – 8E from km 53.585 to km. 100.100 (design chainage from km. 54.990 to km. 100.450) (Package – II) in the state of Gujarat on single percentage item rate Contract

NHAI/11012/Proc./NH-8E/Balance/Tal-Mahu/2020 646.610 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 15:0Hrs
06/10/2020
Time 11:0Hrs
379 Providing permanent restoration to valley side slips occurred during monsoon of 2019-20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 (Charmadi ghat) of NH73(old NH234), Mangalore Tumkur section (Job No NH 73 KNT 2019 20 904)

2020_MoRTH_555594_3 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 18:0Hrs
05/10/2020
Time 17:0Hrs
380 Providing permanent restoration to valley side slips occurred during monsoon of 2018-19 from Km.237.000 to 263.000 (ShiradiGhat) of NH-75, Bangalore - Mangalore section on EPC mode

2020_MoRTH_546015_3 32.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 18:0Hrs
05/10/2020
Time 17:0Hrs
381 “Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length - 63.00 Km] in the state of Nagaland for the FY 2020-21”

2020_NHIDC_581868_1 53.590 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 11:0Hrs
05/10/2020
Time 15:0Hrs
382 Construction of road from Km 0/0 to 72/0 Km of NH-26 such as 4 Lane from Km 0/0 to 21/0 Km (Bargarh to Barpali) and Widening & Strengthening of double lane with paved shoulder from Km 21/0 to 72/0 Km (Barpali to Bolangir) in the State of Odisha on EPC mode. (Bid Ref No 06 CENH of 2020-21)

2020_MoRTH_578297_1 290.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2020
Time 15:0Hrs
05/10/2020
Time 15:0Hrs
383 Permanent measures to Black Spot (Id.No. TN-(02)-060) by Construction of Grade Separator at km 22/800 of NH532 (Cuddalore-Vridhachalam-Salem Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_580390_1 18.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2020
Time 18:0Hrs
05/10/2020
Time 11:0Hrs
384 P.R. work from km 114.975 to km 133 except from km 118.707 to km 119.707 for Lalpole Bridge and from km 127.844 to km 128.844 for Dashmile Bridge of NH-117 under NH Divn-I in the dist. of South 24 Pgs. WB on EPC mode including change of scope from HIPR to conventional PR. Job No. 117-WB-2018-19-792

2020_MoRTH_576030_1 8.264 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 18:0Hrs
05/10/2020
Time 11:0Hrs
385 Construction of 90 M. span P.S.C. Bridge over Panod Stream at Km 44.00 of NH-121-309 on stretch Ramnagar to Buwakhal Motor Road Ramnagar Distt Nainital in the state of Uttarakhand

2020_MoRTH_585602_1 6.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
386 Construction of 150 M. Span PSC Box Bridge over Dhangadi Nala Ramnagar to Buwakhal Motor Road Near Km stone No. 46 NH-309 Ramnagar, Distt Nainital

2020_MoRTH_585610_1 7.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
387 Improvement/Augmentation of Two lane with paved shoulders from Km. 1.600 to Km. 16.690 & Km. 29.850 to Km. 80.133 of Nagapattinam – Thanjavur section of NH-67 (Old) (New NH-83) (Total Design Length 65.373 Km) in the State of Tamil Nadu on EPC Mode

NHAI/11012/Nag-Pat/2019 358.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
388 Strengthening of Pathankot - Banikhet road upto Katori Bangla (Himachal Pradesh Boundary) from Km 0.000 to 39.360 of NH-154A in the State of Punjab on EPC Mode.

2020_MoRTH_577550_1 29.800 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/08/2020
Time 16:20Hrs
03/10/2020
Time 17:0Hrs
389 Periodical Renewal between KM 5/560 to 14/535 of NH- 141 in State of Gujarat under EPC mode

EPC/09 PR OF 202021 5.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 17:15Hrs
03/10/2020
Time 17:0Hrs
390 Periodical Renewal (PR) between KM 122/000 to 138/600 on NH- 41 in State of Gujarat under EPC mode

EPC/10 PR of 2020-21 7.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2020
Time 13:0Hrs
03/10/2020
Time 17:0Hrs
391 PR 2019-20 to Km 33/500 to 56/620 OF NH-58 (Section Mathasur to Antarsuba ) in the State of Gujarat under ARP 2020-21 on EPC mode.

2020_MoRTH_581316_1 6.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 15:0Hrs
03/10/2020
Time 15:0Hrs
392 Construction of 4 Lane ROB and its approaches in lieu of existing Level Crossing No 43B at Km 2.400 on NH121 New 309 in the State of Uttarakhand

2020MoRTH5818641 56.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 15:30Hrs
03/10/2020
Time 14:0Hrs
393 Four laning from End of Pinjore Bypass to Haryana/Himachal Pradesh Border (Km- 4.200 to Km 18.000) section of NH-21A in the State of Haryana on EPC Mode.

2020_NHAI_41792_1 255.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/01/2020
Time 15:0Hrs
28/09/2020
Time 11:0Hrs
394 Improvements in km 96/0 - 99/0, Construction of Retaining wall and Breast wall in selected locations, Improvements to Hair Pin Bends (17 nos) in km 99/0 - 119/0 Bodimettu Ghat section), Geometric Improvements in km 52/2 and providing bus bay in km 61/6 of NH 49 Extn (New NH -85) of Madurai - Cochin Road in the state of Tamil Nadu on Engineering, Procurement Construction (EPC) Basis.

2020_MoRTH_575971_1 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 15:0Hrs
23/09/2020
Time 15:0Hrs
395 Periodical Renewal Work from km 74 0 to 94 830 of Sainj Luhari Jalori Banjar Aut NH 305 under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2020_MoRTH_578882_1 5.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/08/2020
Time 15:45Hrs
22/09/2020
Time 11:0Hrs
396 Formation of bypass road to Kadiri town from design ch. 0/0 to 11/078 and 0/0 to 1/500 (existing ch 159/250 to ch. 168/450) on NH-42 of two lane with paved shoulder road in the state of Andhra Pradesh on EPC Mode

NIT NO 10/2020-21 126.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2020
Time 15:0Hrs
21/09/2020
Time 15:0Hrs
397 Widening of existing single/ intermediate lane road to 2 lane road from Km 101.00 to Km 125.00 on NH-61 in the State of Nagaland

2020_MoRTH_575918_1 173.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 18:0Hrs
21/09/2020
Time 12:0Hrs
398 Permanent measures to Black Spot (Id.No. TN-(02)-023) from Km 114/640-115/100 & 116/280-116/780 of NH45A (Villupuram-Pondicherry-Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578537_1 8.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
399 Permanent measures to Black Spot (ID.No. TN-(02)-129) from Km 95/4-Km 96/8 of NH45A (Villupuram-Pondicherry - Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578558_1 6.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
400 Permanent measures to Black Spot (Id.No. TN-(02)-379) from Km 103/7-105/0 of NH45A (Villupuram-Pondicherry-Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578564_1 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
401 Widening and Strengthening from km 100.40 to km 107.80 From Lakhipur to Faijullahpur of NH 227A under EPC mode in state of Bihar.

2020_MoRTH_579410_1 22.969 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2020
Time 11:0Hrs
21/09/2020
Time 11:0Hrs
402 Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 64.535 to km 85.385 (design chainage km 55.800 to km 74.350) (package - iii) under 13 TF on Akhnoor-Poonch road (NH-144A) in UT of J and K under Project Sampark, BRO

2020_BRO_564955_1 106.300 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2020
Time 14:0Hrs
21/09/2020
Time 11:0Hrs
403 Package I Improvement to 2 lane with paved shoulder of NH40 section from Km 81740 to Km 93490 design Km 0000 to Km 10670 and Improvement to 4 lane section of NH44 from design Km 0000 to Km 0930 total length 11600 Km in the state of Meghalaya on EPC mode under JICA Loan Assistance

2020NHIDCL5641401 125.010 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
404 Package II Improvement to 2 lane with paved shoulder of NH40 section from Km 93490 to Km 123800 design Km 10670 to Km 37550 design length 2655 km in the State of Meghalaya on EPC Mode under JICA Loan Assistance

2020NHIDC5641511 280.480 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
405 Package IV Improvement to 2 Lane with paved shoulder of NH40 section from Km 131820 to Km 151330 design Km 45760 to Km 63530 design length 1777 km in the State of Meghalaya on EPC Mode under JICA loan Assistance

2020NHIDC5641581 122.500 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
406 Package V Improvement to 2 Lane with paved shoulder 4 lane of NH40 section from Km 151330 to Km 163400 design Km 63530 to Km 71520 design length 799 Km in the State of Meghalaya on EPC Mode under JICA loan Assistance

2020NHIDC5641631 176.420 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
407 Widening existing 2 lane to 4 lane with paved shoulder including strengthening carriageway from km 80/0 – km 125/0 of Salem - Tirupathur – Vaniyambadi Road of NH-179A

2020_MoRTH_580129_1 223.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 17:0Hrs
14/09/2020
Time 11:0Hrs
408 Strengthening work in Km 36.00 to 68.00 of NH-110 in the State of Bihar on EPC mode for the year 2020-21.

2020_MoRTH_578329_1 31.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2020
Time 11:0Hrs
14/09/2020
Time 11:0Hrs
409 Construction of Service Road and covered drain with Footpath along with other facilities from Km.336.240 to Km.338.100 of Kundapur to Surathkal section of NH 66 Total design length 1.86km in the State of Karnataka on EPC mode

NIT No.20 NHAI RO-BNG 15017 Tender 2020 dated 28.07.2020 10.650 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 15:0Hrs
10/09/2020
Time 15:0Hrs
410 Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_572728_1 41.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2020
Time 15:0Hrs
10/09/2020
Time 11:0Hrs
411 Widening and strengthening to two lane with paved shoulders from km 296.500 to km 336.500 (Mundamarai to Ratanpur Section) of NH-59 in the state of odisha on EPC mode.

2020_Morth_573785_1 86.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2020
Time 17:0Hrs
09/09/2020
Time 12:0Hrs
412 Construction of new bridge over river Kumatia(Br.No.397/1) including subway bridge and approaches on NH-52 (New NH No-15) under Nagaon NH Division,Nagaon in the state of Assam(Job No.015/AS/2020-21/211)

2020_MoRTH_575942_1 39.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 15:0Hrs
08/09/2020
Time 15:0Hrs
413 Stage Strengthening from km 411/000 to 419/900 and from km 420.00 to 437.00(L=25.90km) of NH-52 (New NH-15) under Annual Plan for the year 2019-2020 on EPC Mode in the State of Assam, Job no 052/AS/2020-21/210

2020_MoRTH_575870_1 17.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 16:0Hrs
08/09/2020
Time 14:0Hrs
414 Construction of Service road on RHS of NH-66 from Km.370.200 to Km.370.600 including construction of Box culvert, Rataining wall, shifting of median opening and providing signages for permanent Rectification of Black Spot location Kottara Chowki BS ID KA-086 at Chainage 370.600 of National Highways No.66 on Engineering Procurement and Construction basis EPC in the State of Karnataka

NIT No.19 NHAI RO-BNG Road Safety-Black Spot 2020 dated 28.07.2020 11.130 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 15:0Hrs
07/09/2020
Time 15:0Hrs
415 IRQP Work of Umgon- Basopatti- Kaluhai Road in KM.0.00 to 20.50 of NH.-227L for the year 2020-21 under NH- Division Jaynagar in EPC Mode.Job No (227L-BR-2020-21/25)

NH/JAINAGAR/EPC/03/2020-21 28.910 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/08/2020
Time 10:0Hrs
05/09/2020
Time 15:0Hrs
416 Periodical Renewal Work from km 00 to 20/0 of Nahan Kumarhatti Road of NH 907A under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2020_MoRTH_573203_1 6.820 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
417 Periodical Renewal work from Km 83/0 to 96/0 of Kala Amb Paonta Sahib Dehradun road of NH-07 under Annual Renewal Program (ARP) for the year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_573186_1 6.060 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
418 Periodical Renewal Work from Km 269/0 to 284/0 of Kalka- Shimla-Wangtoo Road NH-05 Under Annual Renewal Program (ARP) for the year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_573213_1 5.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
419 Periodical renewal work on selected stretches from Km 17/350 to 18/380, 23/750 to 24/980, 30/400 to 30/480, 31/800 to 37/400, 38/800 to 41/350 of Theog Hakoti road NH-705 under Annual Renewal Program(ARP) for year 2020-21 in the State of Himachal Pra

2020_MoRTH_570022_1 4.750 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/07/2020
Time 15:0Hrs
03/09/2020
Time 11:0Hrs
420 Restoration/ Rehabilitation of Ukhrul to Nagaland Border via Jessami road for km 63.00 to Km 126.00 (Length 63km) NH-150 in the State of Manipur on EPC mode-3rd Call

2020_NHIDC_576368_1 16.640 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 15:0Hrs
01/09/2020
Time 15:0Hrs
421 Construction of proposed ROB and its approaches on NH60 at 193.800 in lieu of LC Gate No 39 A 3E in the state of West Bengal Job No 060 WB 2019 20 472

2020_MoRTH_570792_1 53.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2020
Time 10:0Hrs
31/08/2020
Time 13:0Hrs
422 Strengthening Work in Km 68 to 89 of NH 110 on EPC Mode in the State of Bihar

2020_MoRTH_575463_1 32.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2020
Time 11:0Hrs
31/08/2020
Time 11:0Hrs
423 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)

2020_NHIDC_576188_1 191.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 11:0Hrs
28/08/2020
Time 11:0Hrs
424 Construction of 2-lane ROB and its approaches in lieu of existing level crossing No. KB/1B at km 49 (railway chainage 1.8) on NH-131A in the State of Bihar (on EPC mode)

2020_MoRTH_574413_1 38.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2020
Time 9:0Hrs
27/08/2020
Time 15:0Hrs
425 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis ContractEPC) Basis Contract

2020_MORTH_556016_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/08/2020
Time 11:0Hrs
24/08/2020
Time 17:0Hrs
426 6 laning of Kanhauli Ramnagar section of SH 78 from design Ch. Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana

2020_NHAI_51025_1 823.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/08/2020
Time 16:0Hrs
24/08/2020
Time 11:0Hrs
427 Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_570025_1 183.950 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2020
Time 18:15Hrs
24/08/2020
Time 11:0Hrs
428 Construction of Eight Lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch. 419.000 – 427.300) section of Delhi - Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg15 1,237.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
24/08/2020
Time 11:0Hrs
429 FOUR LANING OF ARRAH TO PARARIA SECTION OF NH 319 OLD NH 30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I.

2020_NHAI_44539_1 690.480 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 16:16Hrs
24/08/2020
Time 11:0Hrs
430 FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH319 OLD NH30 FROM KM 54.530 TO KM 11.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PAHSE-I ON EPC MODE PACKAGE II

2020_NHAI_44535_1 727.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 16:20Hrs
24/08/2020
Time 11:0Hrs
431 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis ContractEPC) Basis Contract

2020_MORTH_556016_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2020
Time 15:0Hrs
24/08/2020
Time 5:0Hrs
432 Strengthening with paved shoulders from Km 0.00 t Km 12.00 (L=12.00 Km) of NH 427 under PWD, Rangia NH Division, Rangia in the state of Assam(Job No.427/AS/2019-20/209)

2020_MoRTH_573118_1 39.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 14:0Hrs
21/08/2020
Time 14:0Hrs
433 Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. Job No. NH-2B/(WB)/(18)/15-16-018-S&R(B)

2020_MoRTH_566040_1 138.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2020
Time 15:0Hrs
20/08/2020
Time 13:0Hrs
434 Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH-2B/(WB)/(17)/15-16-014-S&R(B)

2020_MoRTH_566078_1 157.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2020
Time 15:0Hrs
20/08/2020
Time 13:0Hrs
435 Rehabilitation including river training works of Bridge No. 427/1 on NH-52(New NH No.15) over River Gai under Annual Plan for the year 2019-20 under PWD Nagaon NH Division in the state of Assam.(Job No.-015/AS/2019-20/205)

2020_MoRTH_572429_1 22.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2020
Time 17:0Hrs
19/08/2020
Time 14:0Hrs
436 Construction of Grade Separator at Km 144/2 of NH - 234 (at Junction with Tindivanam – Krishnagiri Road New NH -77) on Engineering, Procurement & Construction (EPC) Mode.

2020_MoRTH_575183_1 16.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 9:0Hrs
19/08/2020
Time 11:0Hrs
437 Construction of ROB with approaches on NH 848B at Karambeli Railway crossing L C No 77 at km 0/0 0/600 on EPC mode under NH O in the State of Gujarat

2020_MoRTH_561283_1 86.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2020
Time 18:30Hrs
19/08/2020
Time 11:0Hrs
438 Up gradation to 2 lanes with paved shoulders on Sagartola to Kabir Chabutra Road of NH 45 Ext., Length 44.970 Km (Excluding Gadasarai, Madhopur, Roosa and Barnai Bypasses),in the State of Madhya Pradesh on EPC mode

2020_MoRTH_545416_1 170.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2020
Time 15:0Hrs
17/08/2020
Time 17:30Hrs
439 Strengthening from Km. 211.200 to 220.00, 221.00 to 222.00, 224.00 to 225.00, 247.00 to 249.00,254.00 to 263.535 and 298.00 to 302.478 of NH 75E (New NH No. 39) length 26.813 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_571295_1 22.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2020
Time 18:0Hrs
17/08/2020
Time 15:0Hrs
440 Rehabilitation and upgradation for 4-Lanning of Saha to Sahabad Section from Km. 14.840 to Km 31.760 of NH-444A (Total Length-16.920 km) under Bharatmala Pariyojna in the State of Haryana on EPC Basis

2020_NHAI_40645_1 163.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 18:30Hrs
17/08/2020
Time 11:0Hrs
441 Stage strengthening from km. 0.140 to 2.000, 4.000 to 6.000, 9.000 to 10.000, 11.000 to 12.000, 13.000 to 16.000, 67.300 to 73.200, 75.200 to 79.200, 83.200 to 87.200 and 89.800 to 96.000 of NH-731A in Uttar Pradesh on EPC mode.

2020_MoRTH_571562_1 31.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/07/2020
Time 11:0Hrs
14/08/2020
Time 11:0Hrs
442 Balance work under Phase-II for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches of Kalamb bypass (km 68.576 to km 72.390), Linear length of Bhatkalwadi (km 89.550 to km 90.400) and Alephata bypass (km 92.030 to km 96.000) (Total length- 8.634 Km) of Pune District in the State of Maharashtra on EPC Mode

2020_NHAI_41588_1 119.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 17:40Hrs
13/08/2020
Time 11:0Hrs
443 Stage Strengthening Work from km 57.00 to km 77.00 of N.H 55 in the District of Darjeeling under NH Division IX, West Bengal, during the year 2020-21

2020_MoRTH_567967_1 18.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2020
Time 18:55Hrs
10/08/2020
Time 17:0Hrs
444 Reconstruction of minor bridges over Bamni Jhora at km 190.729 Dakuwa Jhora at km 190.872 of NH-31C, in the district of Alipurduar, West Bengal on EPC mode (Job No. 31C-WB-2019-20/463)

2020_MoRTH_563224_1 15.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 18:55Hrs
10/08/2020
Time 17:0Hrs
445 Construction of Six Lane Grade Separated structures along with slip roads at Km 210.780, Km 260.400 & Km 263.558 and  Service Roads from Km 204.800 to Km 205.800 (Both Sides) from Km 213.500 to Km 215.500 (RHS), Km 260.940 to Km 261.460 (Both Sides) and Km 261.950 to Km 262.850 on NH-44 (old NH-07) in the State of Andhra Pradesh on EPC mode.

NHAI/Tech/AP/NH-44/VUP 107.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/06/2020
Time 9:0Hrs
06/08/2020
Time 15:0Hrs
446 Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode

2020_NHAI_45974_1 66.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2020
Time 16:0Hrs
06/08/2020
Time 11:0Hrs
447 Upgradation of Kullu Manali section of NH 21 now NH 3 from Km 272 00 to Km 309 345 designed chainage on EPC Mode in the State of Himachal Pradesh under NHDP phase IVB Regarding Maintenance of Bypassed sections of National Highways

2020_MoRTH_569210_1 4.870 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/07/2020
Time 18:0Hrs
05/08/2020
Time 11:0Hrs
448 Construction of balance works as part 2 (two numbers of interchanges) of Jaipur Ring Road (NH-148C) from Tonk Road (NH-52) to Ajmer Road Section (NH-48) in the State of Rajasthan on EPC mode.

2020_NHAI_45237_1 128.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 15:0Hrs
05/08/2020
Time 11:0Hrs
449 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)

2020_NHIDC_560357_1 191.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2020
Time 11:0Hrs
05/08/2020
Time 11:0Hrs
450 Widening from two lane with paved shoulder to Four Lane from Km 51/4 – 52/8, 55/9 – 56/8 & 57/0 – 57/8 including Construction of Centre Median at selected stretches of NH - 532 in the State of Tamil Nadu on Engineering Procurement & Construction (EPC) Mode

2020_MoRTH_565650_1 9.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2020
Time 9:0Hrs
05/08/2020
Time 11:0Hrs
451 Widening existing Two lane to Two lane with paved shoulder from Km 195/600 to Km 218/050 km (Odisha-Chhattisgarh to Baldhiamal Chhak) of NH-130C on EPC basis in the state of Odisha.” (Bid Ref No.- 03 CE NH of 2020-21)

2020_MoRTH_562778_1 77.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2020
Time 15:0Hrs
04/08/2020
Time 12:0Hrs
452 PR Work of Bindeshwar Asthan Jhanjharpur Madhepur Bheja Road in KM 28 to 59 of NH 527A for the year 2020 21 under NH Division Jaynagar in EPC Mode.

2020_MoRTH_568126_1 9.676 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/07/2020
Time 10:0Hrs
03/08/2020
Time 15:0Hrs
453 Widening from 10m to 12m and strengthening the existing carriageway from km 0/0-6/0 & 8/0-14/0 and widening to multi-lane with strengthening in built-up area from km 7/0-8/0 & 14/0-16/0 including geometrical improvements, Construction of drain, Reconstruction of CD works, Junction improvements & Bus bays and retaining walls and rectification to Black spot at km 9/4-9/8 in Sharjapur – Bagalur -Hosur road NH 207(New NH 648)

2020_MoRTH_565633_1 51.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2020
Time 10:0Hrs
03/08/2020
Time 11:0Hrs
454 Construction of Seawall at Arichalmunai Roundana in Km 192/700, widening the approaches of the Pamban Bridge in Km 156/500 – 157/277 and 159/622 – 160/0, widening in Km 169/0 - 170/0 & 188/2 - 192/700, Construction of drain in Km 171/6 - 172/8 and Providing Wayside amenities in Km 166/0 - 192/7 (Near Dr.APJ Abdul Kalam National Memorial, Rameswaram and Dhanushkodi) in New NH 87 (Old NH No.49) on EPC mode

2020_MoRTH_565490 18.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/06/2020
Time 15:0Hrs
31/07/2020
Time 11:0Hrs
455 Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP

2020_NHIDC_565278_1 189.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2020
Time 11:0Hrs
30/07/2020
Time 11:0Hrs
456 Construction of Eight Lane access-controlled expressway from junction with SH175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803.420 to 824.920, design Ch. 351.000 to Ch. 372.500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM / Delhi-Vadodara/2018/Pkg30 836.098 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2020
Time 15:0Hrs
30/07/2020
Time 11:0Hrs
457 Stage-strengthening of NH 151 from Km 0/000 to Km 14/064 under Annual Plan 2019-20 (Total Length 14.064 Km) in the state of Assam. (Job No. 151/AS/2019-20/200)

2020_MoRTH_565672_1 13.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2020
Time 11:0Hrs
28/07/2020
Time 14:0Hrs
458 Construction of 2-lane ROBs with approaches at Km 103.717 and Km 120.850 (existing chainage) on NH-730 under EPC mode in the state of Uttar Pradesh. through an Engineering, Procurement and Construction (EPC) Contract

2020_MoRTH_547623_1 75.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/02/2020
Time 15:30Hrs
27/07/2020
Time 15:0Hrs
459 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 15:0Hrs
27/07/2020
Time 15:0Hrs
460 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21.

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 17:0Hrs
27/07/2020
Time 15:0Hrs
461 Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand

1928/13yata-NH-10/2020 dated 26.06.2020 9.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2020
Time 11:0Hrs
27/07/2020
Time 12:0Hrs
462 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III)

2020_NHIDC_561284_1 113.520 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2020
Time 11:0Hrs
27/07/2020
Time 11:0Hrs
463 Stage strengthening work on the road stretch btn km 80 to km 94.5 of NH 117 during the year 2019-20 under NH Divn-I in the Dist of South 24 Pgs WB on EPC Mode. Job No. 117-WB-2019-20-465

2020_MoRTH_564115_1 12.248 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2020
Time 18:0Hrs
27/07/2020
Time 11:0Hrs
464 Rectification of black spots at km 119.3 Amtala km 119.745 Hosenabad km 121.25 Dharma and km 125.5 Keranichoti of NH 60 under NH div-II in the dist of Paschim Medinipur during the year 2019-20 on EPC mode Job No 060-WB-2019-20-466

2020_MoRTH_564124_1 6.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2020
Time 18:0Hrs
27/07/2020
Time 11:0Hrs
465 Strengthening of the road from KM 0.00 to Km 24.00 (Domail to Bhamla) and Providing Retaining wall, B/walls, Signages, & Crash Barriers in the selected reaches of NH-1C (New NH-144) in the UT of Jammu and Kashmir

NH-144/01 of 2020-21 Dated01.06.2020 57.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2020
Time 15:0Hrs
22/07/2020
Time 17:0Hrs
466 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 15:0Hrs
22/07/2020
Time 15:0Hrs
467 TN.No.03/HDO/NH/2020-21/Dt.05.06.2020(1)

2020_MoRTH_563352_1 8.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 15:0Hrs
22/07/2020
Time 15:0Hrs
468 TN.No.03/HDO/NH/2020-21/Dt.05.06.2020(2)

2020_MoRTH_563365_1 37.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 10:0Hrs
22/07/2020
Time 11:0Hrs
469 Construction of Grade Separator at Km 51/2 of NH - 532 (Cuddalore – Vridhachalam – Salem road) in the State of Tamil Nadu on Engineering Procurement & Construction (EPC) Mode.

2020_MoRTH_563373_1 27.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2020
Time 17:0Hrs
22/07/2020
Time 11:0Hrs
470 Construction of VUP with RE Wall Approaches Design Chainage Km 43.050 Existing Chainage Km 43.070 and Service Road Design Chainage Km 42.650 to Km 43.450 BHS of BarBilaraJodhpur Road Project of NH25 Old NH112 in the State of Rajasthan

1234 16.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/06/2020
Time 18:0Hrs
17/07/2020
Time 18:0Hrs
471 Up-Gradation to Intermediate lane of NH-301 Kargil-Zanskar Road from Km 148.320 to Km. 196.250 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_538898_1 243.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2020
Time 11:0Hrs
09/07/2020
Time 17:0Hrs
472 Upgradation to Intermediate lane of NH 301 Kargil Zanskar Road from Km 117.180 to Km 148-320 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_533814_1 199.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2020
Time 15:0Hrs
09/07/2020
Time 17:0Hrs
473 Widening and Strengthening of kottampatti - Thiruppathur section from km 1/500 - 30/350 of NH 383Extn in the state of Tamil Nadu (EPC mode)

2020_MoRTH_560705_1 84.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 17:0Hrs
08/07/2020
Time 15:0Hrs
474 Widening & Strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC Mode.

503M/13M-NHCK/19 dated 21.04.2020 181.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2020
Time 15:0Hrs
08/07/2020
Time 11:0Hrs
475 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I)

2020_NHIDC_560357_1 162.890 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/05/2020
Time 11:0Hrs
08/07/2020
Time 11:0Hrs
476 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV)

2020_NHIDC_559587_1 143.714 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2020
Time 11:0Hrs
08/07/2020
Time 11:0Hrs
477 Construction of New Six lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh

2019_MoRTH_528953_1 1,156.290 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 19/12/2019
Time 15:0Hrs
07/07/2020
Time 17:0Hrs
478 Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Package-I).

NHAI/GUJ/Ahmedabad-Dholera/Pkg-I/2020/ 774.530 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 15:0Hrs
479 Construction of Four Lane Expressway from Sindhrej Village to Vejalka village of Ahmedabad District from km 22.000 to km 48.520 of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat (Package-II)

NHAI/Guj/Ahmedabad-Dholera/Pkg-II/2020/ 913.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 15:0Hrs
480 Construction of Four lane expressway from start of DSIR zone of Ahmedabad district to Adhelai village of Bhavnagar district (ch. 71.00 to ch. 109.019) section of Ahmedabad- Dholera Greenfield alignment (NH-751) on EPC mode under Bharatmalapriyojana in the state of Gujarat (Package-IV)

NHAI/GUJ/Ahmedabad-Dholera/Pkg-IV/2020 932.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 12:0Hrs
481 Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujarat (Package-III).

NHAI/GUJ/Ahmedabad-Dholera/Pkg-III/2020 746.550 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 11:30Hrs
482 Work of Up gradation of NH-703 (Newly NH declared) Sirsa to Sardulgarh road upto Punjab Border from Km. 21.50 to 25.13 ( Road ID 5795) in Sirsa in the state of Haryana on Engineering, Procurement & Construction (EPC) Mode

2020_MoRTH_560724_1 5.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2020
Time 15:0Hrs
06/07/2020
Time 17:0Hrs
483 Sample Project

Samp777 126.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/10/2019
Time 15:0Hrs
06/07/2020
Time 15:0Hrs
484 4 laning of Channarayanapatna Bypass from km. 140/449 to km 149/596 and Hassan Bypass from km 175/935 to km 185/684 and providing Grade Separator Structures, Service Road and other safety measures in Devihalli km 108/486 to Hassan (km. 185/684) section of NH-75 old NH-48 on EPC basis in the state of Karnataka

2020_NHAI_40058_1 595.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
06/07/2020
Time 11:0Hrs
485 Construction of Flyover at Km 362/790 - 364/555 of (Nagapattinam - Gudalur-Mysore Road) Periyanaickenpalyam Junction- Coimbatore Outskirt in the state of Tamilnadu on EPC mode

2020_MoRTH_566008_1 74.061 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2020
Time 10:0Hrs
06/07/2020
Time 11:0Hrs
486 Design and Construction Improvement of Road Rajouri-Thanamandi-Surankot on EPC mode from Existing Km 3.900 to Km 56.951 (Design Km 3.900 to Km 59.420) [Design Length – 55.520 km] from Existing IW CL-9 Specifications to NHDL Specifications under Project Sampark in Jammu and Kashmir (UT)

2020_BRO_546760_1 330.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 17:0Hrs
06/07/2020
Time 11:0Hrs
487 Construction of 4 Four Minor Bridges at km 21.717 km 23.150 km 88.300 km 92.100 on NH 4 in the Union Territory of Andaman Nicobar Islands on EPC basis

2020_NHIDC_557580_1 24.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2020
Time 15:0Hrs
03/07/2020
Time 15:0Hrs
488 Construction of Balance work of Two lane with paved shoulder of Joram Koloriang Road NH 713 on EPC Basis from existing Km 50.050 to km 70.000 Design Km44.989 to Km 61.547 Design length 16.558 Km in the State of Arunachal Pradesh under SARDP NE.

2020_NHIDC_558068_1 117.890 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
489 Construction of Balance work of two Lane with paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 70.000 to Km 88.700 Design Km. 61.547 to Km. 78.724 Design Length 17.177 Km in the state of Arunachal Pradesh under SARDP NE

2020_NHIDC_558072_1 183.640 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
490 Construction of Balance work of two Lane with paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 88.700 to Km 104.850 Design Km. 78.724 to Km. 93.724 Design Length 15 Km in the state of Arunachal Pradesh under SARDP NE

2020_NHIDC_557857_1 140.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
491 Construction of New Link NH 133B from Km 0.200 (Km 200.700 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Km 25.240 of NH 131A) including Ganga Bridge and Construction of Manihari Bypass from Km 0.000 (Km 25.240 of NH 131A) to Km 5.500 (Km 34.100 of NH 131A near Narenpur) and widening of NH 131A from Km 5.500 (Km 34.100 of NH 131A) to Km 6.000 (Km 34.600 of NH 131A) in the state of Bihar to 4 lane Standards on EPC Mode

2020_NHAI_40014_1 2,124.170 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
01/07/2020
Time 11:0Hrs
492 Widening & strengthening to two lane with paved shoulder from km 0/000 to km 35/840 km of NH-220 (Tiring to Rairangapur section) on EPC basis in the state of Odisha. (BID No. 01 CENH of 2020-21)

2020_MoRTH_557230_1 66.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 10:0Hrs
30/06/2020
Time 12:0Hrs
493 Construction of Balance work of Two lane Paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 104.850 to km 122.600 Design km 92.724 to km 108.724 Design length 15.000 km in the State of Arunachal Pradesh under SARDP NE

2020_NHIDC_557798_1 122.980 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 15:0Hrs
29/06/2020
Time 15:0Hrs
494 Construction of Balance work of Two lane Paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 122.600 to km 138.000 Design km 108.724 to km 123.714Design length 14.99 km in the State of Arunachal Pradesh under SARDP NE

2020_NHIDC_557828_1 119.050 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 15:0Hrs
29/06/2020
Time 15:0Hrs
495 Widening to Double Lane with Paved Shoulder from Km. 294/280 to km. 319/280 (Nabarangpur to Borigumma) of NH-26 for the year 2019-20 in the State of Odisha on EPC mode. (Bid Ref No.- 02 CE NH of 2020-21)

2020_MoRTH_559629_1 70.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 16:55Hrs
29/06/2020
Time 12:0Hrs
496 Widening to 2 lane with paved shoulder from Km 181.465 to 201.665 of N.H-120 (Nasariganj to Bikramganj) in the State of Bihar on EPC mode

2020_MoRTH_559675_1 70.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2020
Time 9:0Hrs
24/06/2020
Time 15:0Hrs
497 Strengthening work from chainage 0.00 to chainage 36.000 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the State of Uttarakhand

1361/13Yata-NH-10/2020 dated 19.05.2020 20.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 15:0Hrs
22/06/2020
Time 12:0Hrs
498 Strengthening work of the road on National Highway 109(old NH-87 Ext.) Panduwakhal to Karanprayag, from km 171.000 to km 200.00, km 218.00 to km 235.00 and construction of damaged scuppers and protection work between km 171.00 to km 200.00 in the state of Uttarakhand

1361/13Yata-NH-10/2020 dated 19.05.2020 27.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 15:0Hrs
22/06/2020
Time 12:0Hrs
499 IRQP Work of Umgon- Basopatti- Kaluhai Road in KM.0.00 to 20.50 of NH.-227L for the year 2020-21 under NH- Division Jaynagar in EPC Mode

NH/Jainagar/EPC/01/2020-21 28.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/05/2020
Time 15:0Hrs
18/06/2020
Time 15:0Hrs
500 PR Work of Bindeshwar Asthan- Jhanjharpur- Madhepur- Bheja Road in KM.28.00 to 59.00 of NH.-527A for the year 2020-21 under NH- Division Jaynagar in EPC Mode

NH/Jainagar/EPC/01/2020-21 9.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/05/2020
Time 15:0Hrs
18/06/2020
Time 15:0Hrs
501 Strengthening work from km 89.00to 101.00 and 108.500 to 120.00 including road safety work on NH 87 ext. (New 109)inthe state ofUttarakhand.

2020_MoRTH_559901 11.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 12:0Hrs
16/06/2020
Time 15:0Hrs
502 Strengthening work from km. 125.00 to km. 132.00 and reconstruction of damaged drain and Protection work from km. 104.00 to km. 139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode

camp33/13yata-NH-10/2020 dated 29.04.2020 8.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 15:0Hrs
16/06/2020
Time 12:0Hrs
503 Strengthening work from km. 13.00 to km. 24.00 and construction of damaged retaining wall from km. 18.00 to 44.00 with drain improvement of sinking portion in km. 26.00 and Protection of sliding zone at km. 38.00 on NH-123(507) in the State of Uttarakhand under EPC mode

camp33/13yata-NH-10/2020 dated 29.04.2020 6.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 15:0Hrs
16/06/2020
Time 12:0Hrs
504 Construction of VUP alongwith additional exit entry ramp at Shastri Colony Ambala Cantt. at km. 198.300 on NH44 (old NH1) in the State of Haryana on EPC mode

2020_NHAI_47556_1 13.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2020
Time 15:0Hrs
16/06/2020
Time 11:0Hrs
505 Balance work of Bridges on Theog Kotkhai Hatkoti road NH 705 KM 0 to 69 on EPC mode in the state of HP EPC 17

2020_MoRTH_552414_1 34.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:40Hrs
15/06/2020
Time 11:0Hrs
506 Balance work of Road work culvert protection work and additional road safety work on Theog Kotkhai Hatkoti road on NH 705 from km 00 to 69 in the state of HP EPC 16

2020_MoRTH_552374_1 39.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:10Hrs
15/06/2020
Time 11:0Hrs
507 Improvement of existing single / Intermediate lane of NH-44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504 (Ex. Ch.-260/109) to Km 263/191 (Ex. Ch.261/761) and Km 272/241 (Ex. Ch. 271/000) to Km 284/033 (Ex. Ch. 284/053) (Total Length=30.28Km) under SARDP-NE (Phase-A) in the State of Assam (Job No.-SARDP-NE/NH-44/AS/PWD/2010-11/182)

2020_MoRTH_557758_1 140.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 16:0Hrs
12/06/2020
Time 14:0Hrs
508 Construction of LVUPs at Vadaguru (Km.256.500) & Tambahalli (Km.250.460) including Service road & Drain of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 (New NH-48) in the State of Karnataka on EPC mode

NIT No. 02/NHAI/RO-BNG/11019/Tender/2020-21 dated 12.05.2020 44.633 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2020
Time 15:0Hrs
10/06/2020
Time 15:0Hrs
509 Construction of grade separator at km 218/6 of NH 67 (Nagappatinam – Guddalore – Mysore Road (New NH - 81). in the State of Tamil Nadu (EPC mode)

2020_MoRTH_560903_1 22.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2020
Time 9:0Hrs
10/06/2020
Time 15:0Hrs
510 Periodical Renewal (Re-carpeting) in the length of 15.275 km of NH-05 in selected stretches in the UT Chandigarh under EPC mode

2020_MoRTH_558680_1 10.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2020
Time 18:30Hrs
10/06/2020
Time 11:0Hrs
511 Construction of new Bridge over river Dhansiri (Br. No.82/1) on NH-15 (Old NH- 52) under Annual Plan for the year 2019-20 in the state of Assam under EPC mode. Job No. 015/AS/2019-20/202

2020_MoRTH_556776_1 35.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
512 Construction of Guide Bund and Bridge protection works of Bridge No. 338/1 over river Ranganadi and Re-construction of superstructure of Bridge over river Haijan (Br. No. 342/1) on NH -15 under Nagaon NH Division under in the state of Assam. Job No. 015/AS/2019-20/208.

2020_MoRTH_556803_1 17.257 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
513 Periodical Renewal of NH-154 from km. 3/500 to Km 18/800 and from Km. 26/000 to Km 35/400 on existing two-lane with paved shoulder for the year 2019-20 in the state of Assam.Job No.TA/154/AS/2019-20/253

2020_MoRTH_556685_1 14.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
514 Periodical Renewal for the year 2019-20 from Km 365/00 to Km 373/00 (Total Length 8.00 km) on NH-15 under Nagaon NH Division on EPC mode in the state of Assam, Job TA/015/AS/2019-20/254

2020_MoRTH_556773_1 5.976 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
515 Periodical Renewal for the year 2019-20 from 373/000 to km. 396/425 (Total Length=23.425 Km) on NH-15 under Nagaon NH Division on EPC mode in the state of Assam, JobTA/015/AS/2019- 20/252

2020_MoRTH_556774_1 14.947 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
516 Restoration/Rehablitation of Churachandpur-Tipaimukh Road (NH-150) Km 9.00 to Km 70.00 (Total Length-61 km) in the state of Manipur.

NHIDCL/RO-Imphal/SR/C-T/Km9.00-Km70.00/2020-21 16.930 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 15/05/2020
Time 18:0Hrs
05/06/2020
Time 11:0Hrs
517 Renewal of existing road from km 162.56 to km 178.00 (approx. length 15.440 km) of the Jhansi-Banda-Allahabad section of National Highway No. 76 in the state of Uttar Pradesh by bituminous concrete in wearing course on Engineering, Procurement, Construction (“EPC”) basis.

558M/13M-NHCK/19 dated 18.05.2020 6.459 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 15:0Hrs
04/06/2020
Time 15:0Hrs
518 Renewal of existing road from km. 43.000 to Km. 61.000 (approx. length 18.00 km) of the Etawah-Bela-Kannauj section of National Highway No 91A in the State of Uttar Pradesh by bituminous concrete in wearing course on Engineering, Procurement, Construction (EPC) basis.

556M/13M-NHCK/19 dated 18.05.2020 7.287 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 15:0Hrs
04/06/2020
Time 15:0Hrs
519 Strengthening the existing B.T. carriageway from Km 338/450 to 351/113 of NH-59 inside Berhampur city in the state of Odisha. (Bid Ref No 12 CENH of 2019-20)

2020_MoRTH_546228_2 15.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2020
Time 15:0Hrs
03/06/2020
Time 12:0Hrs
520 Periodical Renewal under Annual Renewal programme (ARP) for the year 2019-20 in Km 11th, Km12th, from km 16th to km 19th, km 50th, 81st & Km 95th (from Ch.94.570 to ch.94.93) (Total length= 8.360 km) on Nh-15 under Rangia NH division , Rangia in the state of assam (Job No. TA/015/As/2019-20/251)

2020_MoRTH_556775_1 6.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
02/06/2020
Time 14:0Hrs
521 The work for Strengthening of Phagwara-Nawanshahar-Ropar road from Km. 81.900 to 88.00 in Ropar City of NH-344A in the State of Punjab on EPC Mode.

2020_MoRTH_556240_1 4.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/04/2020
Time 16:0Hrs
01/06/2020
Time 16:0Hrs
522 Widening to two lane with geometric improvement from km 205.00 to km 210.00 (Kirshal-Chaura) of NH-121 in the state of Uttarakhand under Annual Plan 2019-20

camp33/13yata-NH-10/2020 dated 29.04.2020 8.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 15:0Hrs
01/06/2020
Time 15:0Hrs
523 Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand

camp33/13yata-NH-10/2020 dated 29.04.2020 9.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 15:0Hrs
01/06/2020
Time 15:0Hrs
524 Widening and Strengthening from km. 0.000 to km. 15.000 (Rampur-Bhadewara section) of NH 135C in the state of Uttar Pradesh on EPC mode

2020_MoRTH_555704_1 49.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2020
Time 15:0Hrs
29/05/2020
Time 11:0Hrs
525 Widening from Double with Paved Shoulder upto drain in km 3/2 - 5/0 (Built up area of Madurai city) of NH 49 (New NH No. 87) including way side amenities, Construction of Drain cum Footpath and Junction Improvement in the state of Tamil Nadu on EPC mode.

2020_MoRTH_555207_1 13.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 15:0Hrs
27/05/2020
Time 15:0Hrs
526 Providing Paved Shoulders on both sides from Km 0/0 - 4/0, widening from Two lane to Four lane with paved shoulder from Km 4/0 - 10/0 including drains, culverts and construction of service road from Km 0/2 - 1/2 on LHS in NH 210 (New No NH 336) in Tamil Nadu on EPC mode.

2020_MoRTH_555215_1 48.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 15:0Hrs
27/05/2020
Time 15:0Hrs
527 Widening of minor bridge at Km407/970 and Reconstruction of slab culvert at Km.408/650 including widening pipe culvert at km 403/950 and 408/220 construction of protective works at Km403/8,403/10,408/2,408/8 of NH67 (New NH 181) in the state of Tamil Nadu on EPC basis

2020_MoRTH_555245_1 5.823 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 10:0Hrs
27/05/2020
Time 15:0Hrs
528 Construction of 1.New Jersey Barrier at the Center of median from Silk Board Junction Km 8.765 to Attibele KR TN Border Km 33.130, 2. Construction of Street Light facilities from Veerasandra Junction Km 19.000 to Attibele KR TN Border Km 33.130, 3.Construction of Foot Over Bridge FOB at Km 19.700 Near SFS College, 4.Construction of Speed Table and Automatic Traffic Red Led Blinkers for Black spots Silk Board Junction Km 8.765 to Attibele KR TN Border Km 33.130, 5.Construction of Junction Improvements Km 9.790 between P3 and P4 and Km 10.350 P20 and P21, 6. Construction of Bus-bay Km 19.000 to Km 33.130 in Silk Board to Attibele section of NH44 Old NH7 in the state of Karnataka on Engineering Procurement and Construction EPC Mode

NIT No.21 NHAI RO BNG 22018 Tender 2019 20 dated 20.03.2020 43.925 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 20/03/2020
Time 17:0Hrs
26/05/2020
Time 15:0Hrs
529 Maintenance of Existing Two lane carriageway from Addahole Near Gundya of Existing Chainage Km.263.000 Design Chainage Km.255.703 To Bantwal Cross of Exiting km.328.000 Design Chainage Km.318.755 Section of NH-75 old NH-48 in the State of Karnataka on EPC mode

NIT No.18/NHAI/RO-BNG/15032/Tender/2019-20 dated 13.03.2020 19.980 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:0Hrs
26/05/2020
Time 15:0Hrs
530 Construction of proposed 2-lane ROB and its approaches in replacement of existing Level Crossing No 88 at Km 113.00 Railway ch 56/522 of NH 228 New NH 64 in the State of Gujarat

2020_MoRTH_549217_1 18.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2020
Time 15:0Hrs
26/05/2020
Time 11:0Hrs
531 Construction of proposed ROB and its approaches in replacement of existing Level Crossing No. 3X at Km 88.565 of NH 64 District Anand in the State of Gujarat

2020_MoRTH_549270_1 62.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2020
Time 16:30Hrs
26/05/2020
Time 11:0Hrs
532 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 13.000 to Km. 25.600 on EPC basis under SARDP-NE Phase A in the State of West Bengal (Package-IV B)

2020_NHIDC_549516_1 226.090 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2020
Time 18:0Hrs
25/05/2020
Time 17:0Hrs
533 Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from Km 76.350 to Km 96.538 of NH-717A (End of Alagarah Bypass to Reshi Border) under SARDP-NE Phase A on EPC basis in the state of West Bengal- Package VB

2020_NHIDC_548728_1 269.510 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 18:0Hrs
25/05/2020
Time 17:0Hrs
534 Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of West Bengal (Package-V A)- Retender

2020_NHIDC_554362_1 235.290 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2020
Time 18:30Hrs
25/05/2020
Time 17:0Hrs
535 Rehabilitation and up-gradation of NH-544E from Km 56/803 to Km 99/179 of Madakasira to Sira section (till AP/Knt border) to two lane with paved shoulder in the State of Andhra Pradesh under NH(O) on EPC mode

NIT No 28/2019-20 140.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
536 Rehabilitation and Upgradation of NH544D from Two Lane to Four Lane from Km 0/000 To 5/400 of Ananthapuramu to Guntur road in the state of Andhra Pradesh on EPC mode

SE NH ATP NIT 29/2019-20 68.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
537 Strengthening the road from Km 20/0 to 23/0, Km 33/4 to 34/850, 49/2 to 50/0, 51/0 to 57/0, 58/0 to 61/0, 71/6 to 74/0, 79/0 to 91/0, 93/0 to 94/6, 94/6 to 98/0 and in Selected reaches from Km 107/0 to 128/0 excluding length approved under ARP 2019 20 of Kurnool Dornala Road of NH 340C in the State of Andhra Pradesh on EPC mode (2nd call)

SE NH ATP NIT 34/2019-20 22.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/03/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
538 PR WORK FROM KM.74/427 TO 95/380, KM.121/200 TO 132/100 & KM. 146/0 TO 154/330 OF ANANTAPUR – GUNTUR ROAD OF NH544D IN KURNOOL DISTRICT IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE

SE NH ATP NIT NO 26 2019 20 7.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
539 Construction of 2-lane ROB and its approaches in lieu of existing level crossing No.KB/1B at km. 49 (railway chainage 1.8) on NH-131A in the State of Bihar(on EPC mode)

2020_MoRTH_555810_1 38.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2020
Time 18:0Hrs
19/05/2020
Time 15:0Hrs
540 Strengthening Work from Km 53.000 to Km 89.000 (Length 36.000 Km) of NH-33 (New) (Km 0.000 to Km 36.000 of NH-110 old) for the year 2019-20 on EPC Mode

RE NIT NO 13 NH 33/ 2019-20 31.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 15:15Hrs
18/05/2020
Time 11:0Hrs
541 Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode

2020_NHIDC_545813_1 30.750 NHIDCL Special Project EPC (Lump Sum/Item Rate Contract) 18/02/2020
Time 15:0Hrs
15/05/2020
Time 15:0Hrs
542 Widening to Two lanes with earthen shoulder and Geometric improvement from Km 45.00 to 55.560 (Kakrighat to Quarab)

2020_MoRTH_552791_1 59.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/04/2020
Time 15:0Hrs
13/05/2020
Time 11:0Hrs
543 Strengthing and Road Safety Work from Km. 0.00 to 10.00 Km. and Km. 26 to 48.00 Km. and Road Safety Work from Km. 22.00 to 26.00 Km. on N H 309 B ( Almora- Panar - Ghat Motor Road ) in the State of Uttarakhand Under Annual Plan 2019-20.

2020_MoRTH_555404_1 21.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2020
Time 17:0Hrs
13/05/2020
Time 11:0Hrs
544 Construction of High-Level Bridge 4 span 20 mtr. each including dismantling of existing bridge, construction of diversion road and approaches in place of existing old/narrow bridge at RD 234.100 of road from Tohana (In Haryana) Punjab/Haryana Border to Moonak Budhlada Bhikhi road National Highway 148-B

08 8.275 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 10:0Hrs
12/05/2020
Time 17:0Hrs
545 Providing Periodical Renewal on Chandigarh-Ropar-Road from km 22.600-28.600 (New NH-205, Old NH-21) and Chandigarh-Ludhiana Road (New NH-05, Old NH-21) Section Zirakpur to UT Boundary from Old km No. 0.871-1.68 and New km 236.845-237.657 on EPC Mode

2020_MoRTH_551612_1 0.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 15:0Hrs
11/05/2020
Time 17:0Hrs
546 Reconstruction of Major Bridge with approaches at Km 224.800 on Barnala Mansa Sardulgarh

2020_MoRTH_549092_1 16.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2020
Time 15:0Hrs
11/05/2020
Time 15:0Hrs
547 Providing and laying 50mm thick DBM and 30mm thick BC on Moga Ramgarh Barnala Road section of NH-71 new 703 RD 136.360 to 140.145 and 141.340 to 144.795 and Barnala Handiaya Mansa road section of NH-703 RD 140.950 to 144.450 on EPC mode

2019_MoRTH_529469_1 8.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2019
Time 10:0Hrs
11/05/2020
Time 9:0Hrs
548 PR Work from Km. 226.370 to 236.600, Km. 239.400 to 241.500 and Km. 243.300 to 244.750 road section of Tohana in Haryana Border to Moonak-Jakhal-Budhlada of NH-148-B on EPC mode in the state of Punjab

2019_MoRTH_529495_1 5.177 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2019
Time 10:0Hrs
11/05/2020
Time 9:0Hrs
549 Improvements to riding quality programme in Km.474/0 - 476/0 and 487/875 - 504/4 of NH67 (New NH No181) in the State of Tamil Nadu

2020_MoRTH_554095_1 13.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2020
Time 15:0Hrs
05/05/2020
Time 15:0Hrs
550 Construction of additional High Level Bridge at Km 59/8-10 of NH-45A (Villupuram – Pondicherry – Nagapattinam Road) across Thenpennai River in the State of Tamil Nadu on EPC Mode.

2020_MoRTH_555434_1 20.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2020
Time 18:0Hrs
29/04/2020
Time 11:0Hrs
551 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the Union Territory of Jammu and Kashmir to be executed on EPC basis.

2020_NHIDC_552087_1 221.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2020
Time 15:0Hrs
27/04/2020
Time 15:0Hrs
552 Periodical Renewal to NH 326 from 429/700 to 475/900 km for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No.- 15 CE NH of 2019-20)

2020_MoRTH_549011_1 14.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
553 Periodical Renewal from Km. 142/620 to 159/280 Km. of NH-26 for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No.- 16 CE NH of 2019-20)

2020_MoRTH_549021_1 6.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
554 Periodic Renewal to NH-59 from km 12/400 to km 44/000km, 51/200 to 57/000 & 57/290 to 68/290km (actual length 48.69 km) for the year 2019-20 in the state of Odisha on EPC basis. (Bid Ref No. 14 CENH of 2019-20)

2020_MoRTH_548127_1 12.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
555 Improvement of byepassed sections from km 17 760 to km 19 00 Gohir Byepassed section km 21 460 to km 22 098 and from km 25 340 to km 26 715 Nakodar byepassed section from km 36 050 to km 37 075 Malsian byepassed section from km 39 640 to km 43605 Shahkot byepassed section of NH 71 New NH 703 Jalandhar Barnala Road in District Jalandhar in the State of Punjab on EPC Mode

2020_MoRTH_539129_1 5.494 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2020
Time 14:0Hrs
27/04/2020
Time 11:0Hrs
556 Restoration of stretch at Km, 84/225 to Km. 84/675 down stream side of Dharoi Dam of NH-58 Khokhara Gujarat Border-Vijaynagar-Mathuasar- Dhori-Satlasna-Kheralu-Palanpur Road in the state of Gujarat (on EPC made). (Job No. 058/GJ/2019-20/ 623)

12 of 2019-2020 9.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 18:0Hrs
16/04/2020
Time 12:0Hrs
557 Widening of existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the state of Gujarat under EPC made). (Job No. 058/GJ/2019-20/ 628)

11 of 2019-2020 16.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 16:0Hrs
16/04/2020
Time 11:0Hrs
558 Construction of Hnathial bypass (Package-2) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_540211_1 71.480 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 18:30Hrs
15/04/2020
Time 11:0Hrs
559 Balance work of Construction of Two/Four lane with paved shoulder from Km 54.370 to Km 101.400 (Bidar to Humnabad Section) of NH-50 in the state of Karnataka on EPC mode

2020_MoRTH_546610_1 300.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2020
Time 18:40Hrs
07/04/2020
Time 11:0Hrs
560 Stage-strengthening of NH 151 from Km 0/000 to Km 14/064 under Annual Plan 2019-20 (Total Length- 14.064 Km) in the state of Assam. (Job No. 151/AS/2019-20/200)

2020_MoRTH_550397_1 13.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 11:0Hrs
04/04/2020
Time 14:0Hrs
561 Stage strengthening from Km.29.200 to 38.000 (Total Length-8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/201920/197).

2020_MoRTH_550379_1 5.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 11:0Hrs
04/04/2020
Time 11:0Hrs
562 Design and Construction of 4 Nos Stand alone structureson Vadape Gonde section of NH848

2019_NHAI_32158_2 78.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2020
Time 19:0Hrs
03/04/2020
Time 15:0Hrs
563 IRQP IN kM 114TH TO 128TH OF NH 80 UNDER NH DIVISION BHAGALPUR FOR THE YEAR 2019-20

2020_MoRTH_544723_1 8.895 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 16:0Hrs
03/04/2020
Time 15:0Hrs
564 Widening and Strengthening to two lane with Paved shoulders including Geometrical Improvements from Km 491.000 to 525.200 of Raipur Visakhapatnam section of NH26 in the State of Andhra Pradesh on EPC mode

2020_MoRTH_543376_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:0Hrs
26/03/2020
Time 17:0Hrs
565 Construction of High Level Bridge across Jamni River on Tikamgarh-Jhansi road at km. 74/6 (NH-539) in the State of Madhya Pradesh. (Total Length 840m) on EPC mode

2020_MoRTH_542813_1 35.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 18:30Hrs
24/03/2020
Time 17:30Hrs
566 Construction of High Level Bridge across Betwa River on Orchha-Tikamgarh road at km. 81/2 (NH-539) in the State of Madhya Pradesh on EPC Mode.

2020_MoRTH_542843_1 20.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 15:0Hrs
24/03/2020
Time 15:0Hrs
567 Construction of Flyover at Km 362/790 - 364/555 of (Nagapattinam - Gudalur-Mysore Road) Periyanaickenpalyam Junction- Coimbatore Outskirt in the state of Tamilnadu on EPC mode

2020_MoRTH_542649_1 74.061 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/02/2020
Time 15:0Hrs
23/03/2020
Time 15:0Hrs
568 Strengthening the Existing B.T. carriageway from Km338/450 to Km351/100 of NH-59 in side Berhampur City on EPC Basis in the State of Odisha for the year 2019-20(Bid Ref No.- 12 CE NH of 2019-20)

2020_MoRTH_546228_1 15.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2020
Time 18:45Hrs
19/03/2020
Time 12:0Hrs
569 Strengthening of NH-26 From Km.351.480 to Km 367/480 and Km 376/480 to Km 434/767 (Koraput to Sunki Ghat) on EPC Basis in the State of Odisha for the year 2019-20 (Bid Ref No.- 13 CE NH of 2019-20)

2020_MoRTH_546248_1 46.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2020
Time 18:45Hrs
19/03/2020
Time 12:0Hrs
570 Periodical renewal in km 0/260-6/5(Sirkali bypass),km 136/330-152/580 of NH45A (New No NH 32) in the state of Tamil Nadu (EPC mode)

2020_MoRTH_544850_1 9.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 16:0Hrs
18/03/2020
Time 15:0Hrs
571 Strengthening between Km.418/305 to 421/205,Km 429/405 to 441/00,Km 443/00 to 444/00,Km 445/00 to 449/00,Km 452/00 to 454/405 section Bodeli-Naswadi Road of N H 56 in the State of Gujarat.

2020_MoRTH_548250_1 15.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2020
Time 13:30Hrs
18/03/2020
Time 11:0Hrs
572 Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad - Bidar Section of NH-161A under Bharatmala Pariyojna in the state of Karnataka on EPC mode

2020_NHAI_40633_1 336.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 17:45Hrs
18/03/2020
Time 11:0Hrs
573 NHIDCL/West Bengal/Civil Work/Kafer-lava More/VA/2019

2019_NHIDC_529336_1 177.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2019
Time 15:0Hrs
18/03/2020
Time 11:0Hrs
574 Periodical Renewals from km 473.287 to 483.00 and km 546.00 to 552.00 of Raipur Visakhapatnam of NH 26 in the state of Andhra Pradesh

2020_MoRTH_543275_1 6.481 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
575 Periodical Renewals from km 26.800 to 28.400 km 39.500 to 40.700 Kakinada Bypass and Km107.800 to 122.800 Razole Bypass of Kathipudi Ongole road of NH 216 in the state of Andhra Pradesh

2020_MoRTH_543323_1 6.985 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
576 Strengthening of the reach from Km 525.200 to Km 537.600 of Raipur Visakhapatnam section of NH26 in the state of Andhra Pradesh on EPC mode

2020_MoRTH_543356_1 16.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
577 Periodic Renewal and Reconstruction of Jetpur-Somnath Section of NH-8D between Km. 0.000 to Km.123.454 (New NH-151) in the State of Gujarat excluding existing junagadh bypass from Km.20.600 to Km. 42.900

NHAI/Guj/Jet-Somn/ Resurfacing/2020 114.690 NHAI Maintenance Project OTHERS 30/01/2020
Time 17:0Hrs
17/03/2020
Time 15:0Hrs
578 Periodical Renewal in Km.72/7 – 89/500 of NH 45A in the state of TamilNadu on EPC mode.

2020_MoRTH_544791_1 11.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:0Hrs
17/03/2020
Time 11:0Hrs
579 Periodical Renewal in Km.105/400 – 112/280- NH 45A in the state of TamilNadu on EPC mode.

2020_MoRTH_544831_1 6.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:15Hrs
17/03/2020
Time 11:0Hrs
580 Construction of 4 lane from Bameetha to Khajuraho section of NH 339B from km 0/000 to km 10/000 under NH(O) in the state of Madhya Pradesh on EPC mode

2019_MoRTH_518116_1 30.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
16/03/2020
Time 17:30Hrs
581 Strengthening from Km 8.310 to 69.000 of AP TS border to Vodarevu Narasaraopeta Piduguralla road of NH167A in the State of Andhra Pradesh on EPC mode under Annual Plan 2019 20

2020_MoRTH_544092_1 37.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 17:0Hrs
16/03/2020
Time 17:0Hrs
582 O&M and Routine maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis (Second Call)-reg.

17/NHAI/RO-BNG/11019 A/Tender/2019 dated.10.02.2020 16.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:0Hrs
16/03/2020
Time 17:0Hrs
583 Strengthening the selected stretches (31.20Km) from Km 153/6 to 168/100 & 171/0 to 187/7 of Renigunta – Kadaopa- Muddanur Road NH 716 in the state of Andhra Pradesh on EPC mode

2020_MORTH_534909_1 28.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
16/03/2020
Time 15:0Hrs
584 Strengthening to NH 326 from km 311.700 to 327.700 (Design Length 18.255 km instead of 16 km) (Jeypore to Mahuli) for the year 2019-20 on EPC Basis in the State of Odisha. (Bid Ref No.- 10 CE NH of 2019-20)

2020_MoRTH_544865_1 10.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:55Hrs
16/03/2020
Time 12:0Hrs
585 Strengthening to NH 326 from km 413.700 to 429.700 for the year 2019-20 on EPC Basis in the State of Odisha. (Bid Ref No.- 11 CE NH of 2019-20)

2020_MoRTH_544885_1 13.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:55Hrs
16/03/2020
Time 12:0Hrs
586 Deposit work of M s SJVN Limited for Re-alignment toward upper safer level of NH-05 for 1.360 Km. length near Nirth Village due to submergence of the existing NH-05 from Km. 255.250 to 256.610 owing to upcoming construction of the Dam for Luhri Hydro Electric Project-Stage I by M.s Satluj Jal Vidyut Nigam SJVN-A JV of Gol and GoHP in the state of Himachal Pradesh on EPC mode Package No EPC 15.2020.

2020_MoRTH_540797_1 30.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 17:30Hrs
16/03/2020
Time 11:0Hrs
587 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package IV)

2020_NHIDC_540277_1 242.340 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
16/03/2020
Time 11:0Hrs
588 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) in Nagaland Under Bharatmala Pariyojna on EPC Mode Package V

2020_NHIDC_540285_1 244.140 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
16/03/2020
Time 11:0Hrs
589 Rehabilitation and upgradation of NH-165 from Km 0/000 to Km 64/020 (Pamarru to Akiveedu section) to two lane with paved shoulders on EPC mode in the State of Andhra Pradesh

2020_MoRTH_540163_1 353.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 17:0Hrs
13/03/2020
Time 17:0Hrs
590 Strengthening of selected stretches (13.148 Km) from Km 22/2 to km 23/2, 24/4 to 30/4,32/2 to 33/0,52/0 to 53/0, 54/6 to 55/9, 56/5 to 58/0, 59/1 to 60/0 and 60/6 to 61/4 Renigunta - Kadapa Road NH-716 in the state of Andhra Pradesh on EPC mode

SE r and B NIT No 15/19-20 12.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 13:0Hrs
12/03/2020
Time 15:0Hrs
591 PR work from Km 0/0 to 13/0, Km 13/0 to 16/0 and Km 18/0 to 26/0 of Madanapalli- Naidupeta Section of NH – 71 in the state of Andhra Pradesh through EPC mode

SE NH ATP NIT NO 27/2019-20 5.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 13:15Hrs
12/03/2020
Time 15:0Hrs
592 Strengthening the road from Km 20.0 to 23.0 Km 33.4 to 34.850 49.2 to 50.0 51.0 to 57.0 58.0 to 61.0 71.6 to 74.0 79.0 to 91.0 93.0 to 94.6 94.6 to 98.0 and in Selected reaches from Km 107.0 to 128.0 excluding length approved under ARP 2019 20 of Kurnool Dornala Road of NH 340C in the State of Andhra Pradesh on EPC mode

SE NH ATP NIT NO 16 2019 20 22.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
12/03/2020
Time 15:0Hrs
593 Strengthening to road from Km 206.0 to 207.0 Km 213.0 to 219.0 Km232.0 to 246.0 of Hyderabad Srisailam Tokapalli road of NH765 in the state of Andhra Pradesh on EPC Mode

SE NH ATP NIT NO 17 2019 20 9.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
12/03/2020
Time 15:0Hrs
594 P.R to NH 20 from km.195.570 to 210.570,250.948 to 262.948 and 272.168 to 274.738 km. For the year 2019-20.

2019_MoRTH_530267_1 8.020 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
595 P.R to NH 316 from Km.8.500 to 28.500 Puri-Satapada Link and Km.61.900 to 81.900 Km Puri Konark Link for the year 2019 20 in the state of Odisha on EPC mode.

2019_MoRTH_530303_1 13.140 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
596 P.R to NH 53 from Km.211.109 to 246.109 Km. For the year 2019 20

2019_MoRTH_530348_1 11.180 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
597 Strengthening work from Km. 121.700 to Km 129.450 (Champawat Aabadi portion), Km136.320 to km.142.00 (Lohaghat Aabadi Portion) and km.197.150 to km. 202.00 (Pithoragarh Aabadi Portion) on NH-125 (new NH-09) in the state of Uttarakhand under EPC mode

2020_MoRTH_542595_1 28.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 14:0Hrs
12/03/2020
Time 11:0Hrs
598 Strengthening work from km. 28.00 to km. 34.00 & km 44.00 to km 58.00 and Protection work from km.23.00 to km. 78.00 on NH-119 (New NH-534) in the State of Uttarakhand under EPC mode

521/13Yata-NH-10/2020 13.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2020
Time 15:0Hrs
11/03/2020
Time 15:0Hrs
599 Strengthening to NH-153B from Km 0/00 to 24/329 Km for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No. 06 CENH of 2019-20)

2019_MoRTH_531175_1 15.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
11/03/2020
Time 12:0Hrs
600 Strengthening work from km 41.00 to 60.00 on NH-123(new no. 507) in the state of UttarakhandonEPC mode under Annual Plan 2019-20

672/13yata-NH-10/2020 dated 10.02.2020 17.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 14:0Hrs
11/03/2020
Time 11:0Hrs
601 Improvement of Road Barmer-Chohtan-Kelnor from Km 8.150 to Km 72.500 (Barmer to Bijdiar Net Length 64.00 Km) from existing IW/Cl-9 specifications to NHDL specification in 45 BRTF area under Project Chetak in Rajasthan State

2019_BRO_530115_1 126.330 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 16:0Hrs
11/03/2020
Time 11:0Hrs
602 Balance work under Phase-I for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches Khed Bypass (km 42.000 to km 46.981), Peth (km 56.100 to km 56.780), Manchar bypass and linear length of Eklahre from km 60.100 to km 68.576 (Total Length -14.137 km) of Pune District in the State of Maharashtra on EPC mode

2020_NHAI_40466_1 216.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2020
Time 16:0Hrs
09/03/2020
Time 11:0Hrs
603 Rehabilitation and Up gradation of Polekuru - Komaragiri section from Km 59/800 to Km 70/400 (Design Cjhainage from Km 63/540 to Km 74/165) of NH-216 )(Old NH-214) to two lanes with paved shoulders on EPC mode under NHDP Phase IV in the State of Andhra Pradesh.

2020_MoRTH_538383_1 65.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2020
Time 17:0Hrs
06/03/2020
Time 15:0Hrs
604 Rehabilitation and upgradation of road from km 0.000 to km 16.290 (Total length 16.29 km) of Manu- Lalchara section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis(Package-I)

2020_NHIDC_537628_1 167.750 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2020
Time 18:0Hrs
05/03/2020
Time 15:0Hrs
605 Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-III)

2020_NHIDC_537643_1 235.700 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2020
Time 18:0Hrs
05/03/2020
Time 15:0Hrs
606 4 Laning with paved shoulders from Km 0.900 to Km 11.650 missing Link Project Budhel Junction to Nari circle including Flyover at Nari and its approaches section of NH 51 in the state of Gujarat on EPC Mode

2020_NHAI_39505_1 112.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2020
Time 15:0Hrs
05/03/2020
Time 15:0Hrs
607 Strengthening including improvement of road safety SH Co Rwall Parapets W beam crash barriers and edge walls road signages in Km 337 000 to Km 356 455 Km 360 890 to 368 000 on NH22 New NH 05 in the state of Himachal Pradesh.

2020_MoRTH_542374_1 22.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 13:0Hrs
05/03/2020
Time 11:0Hrs
608 Strengthening from km 440/0 – 449/700 of NH 67 (New NH 181)

2020_MoRTH_534504_1 8.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
609 Widening to Two lane with paved shoulders and strengthening in km 434/4 - 440/0 of NH 67 including construction of Retaining wall, Breast wall and CD works in Ooty – Gudalur Ghat section (New NH 181)

2020_MoRTH_534505_1 24.866 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
610 Widening to Two Lane with paved shoulders and Strengthening from km 449/700 - 456/0 of NH67 including CD works and Protective works in Ooty to Gudalur Ghat section (New NH 181)

2020_MoRTH_534506_1 13.917 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
611 Widening to Two Lane with paved shoulders from Km 414/4-428/0 and Strengthening from Km 422/0-425/0 of NH 67 including CD works, construction of Retaining wall / Breast wall

2019_MoRTH_523488_1 27.854 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
04/03/2020
Time 15:0Hrs
612 Strengthening work from km 8.40 to km 20.7 (12.3 km) By Using Waste plastic material on NH-69 on EPC mode under NH division Bhopal in the state of Madhya Pradesh(2ND CALL)

2020_MoRTH_542079_1 5.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:30Hrs
04/03/2020
Time 15:0Hrs
613 Strengthening work Total 40.400 KM on NH-12A Extn. EPC Mode under NH Division Sagar in the state of Madhya Pradesh(2nd Call)

2020_MoRTH_542858_1 15.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
04/03/2020
Time 15:0Hrs
614 Construction of approaches to the existing 2Lane ROB in lieu of L.C. No. RV 324 at Km.436.12 13 between Komatipalli and Gajapathimagaram station at km 515.200 NH26 in the state of Andhra Pradesh on EPC mode

2019_MoRTH_527304_1 23.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 17:0Hrs
03/03/2020
Time 17:0Hrs
615 Construction of Bypass to Salur Town from Km 486.831 to Km491.420 of Raipur to Visakhapatnam section of NH26 in the state of A.P

2019_MoRTH_527296_1 33.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 17:0Hrs
03/03/2020
Time 17:0Hrs
616 Strengthening of Churabari-Agartala section with paved shoulder of NH-08 74.856km in the State of Tripura on Engineering, Procurement & Construction EPC mode

2020_NHIDC_535228_1 198.980 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/01/2020
Time 9:0Hrs
03/03/2020
Time 15:0Hrs
617 Stage Strengthening work from km 22.76 to km 34 of NH117 in the dist of South 24 Pgs WB under NHDivI during the year 2019-20 on EPC mode Job No 117-WB-2019-20-455

2020_MoRTH_541322_1 9.477 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 18:0Hrs
03/03/2020
Time 11:0Hrs
618 Strengthening of existing carriageway from km 32 to km 35 km 40 to km 41 and km 64.7 to km 82.32 of NH116B under NHDivII in the dist. of Purba Medinipur WB on EPC Mode. Job No. 116B-WB-2019-20-458

2020_MoRTH_541332_1 31.693 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 18:0Hrs
03/03/2020
Time 11:0Hrs
619 Improvements to Accident prone stretch at Km 255/650 – 259/225 of NH 67 Vellakovil – Muthur road Junction

2020_MoRTH_540964_1 12.898 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2020
Time 15:0Hrs
03/03/2020
Time 11:0Hrs
620 StStrengthening work in Km 38.84 to 59.00 of NH-333 on EPC mode in State of Bihar

2020_MoRTH_532742_1 24.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2020
Time 9:0Hrs
02/03/2020
Time 13:0Hrs
621 Strengthening to NH-326(A) from km (70/000-102/900) in the state of Odisha for the year 2019-20 (07 CENH of 2019-20)

2020_MoRTH_532267_1 20.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
02/03/2020
Time 12:0Hrs
622 Strengthening to NH-20 from Km 0/00 to 14/000 Km (Champua to Rimuli) and link road to NH-20 from 14/00 to 14/690 Km(at Parsala) and connecting road from Rimuli square at 14/0 to 1/430 km of NH-520 for the year-2019-20 (09CENH of 2019-20)

2020_MoRTH_532238_1 12.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
02/03/2020
Time 12:0Hrs
623 Construction of 6 lane access controlled Greenfield highway from km 4.888 to km 35.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 1

2019_NHAI_34095_1 516.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
624 Construction of 6 lane access controlled Greenfield highway from km 35.000 to km 67.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 2

2019_NHAI_34096_1 566.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
625 Construction of 6 lane access controlled Greenfield highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 3

2019_NHAI_34101_1 595.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
626 Construction of 6-lane access controlled Greenfield highway from km 99.000 to km 130.073 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 4

2019_NHAI_34104_1 619.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
627 PR Work from Km 136 to138 (Reevelganj Bazar) of NH- 19 in the State of Bihar on EPC Mode for the year 2019-20.

2020_MoRTH_545602_1 0.849 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2020
Time 15:0Hrs
29/02/2020
Time 17:0Hrs
628 Widening and Strengthening work from Km. 58.600 to 59.00 & 59.00 to 77.00 of New NH-135C length 18.400 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_533748_1 30.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 18:55Hrs
27/02/2020
Time 15:0Hrs
629 Strengthening from Km. 220.00 to 221.00, 222.00 to 224.00, 225.00 to 247.00, 249.00 to 254.00 & 263.535 to 298.00 of NH 75E (New NH No. 39) length 64.465 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_533680_1 44.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 17:40Hrs
27/02/2020
Time 15:0Hrs
630 Four laning of Honnavar Port Connectivity road from Km 0/00 (Kasarkod side of Honnavar Port) to Km 2/58 (towards NH-66) connecting Honnavar Port with NH-66 at Km 195/90 and to improve NH-66 from Km 195/00 to Km 197/00 to integrate port connectivity road under Bharatmala Phase-I on EPC mode in the State of Karnataka

NHAI/PC/BM P1/Kasarkod-NH-66/2019 111.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 18:0Hrs
27/02/2020
Time 11:0Hrs
631 4 laning with paved shoulder from Meerut to after bridge over river Yamuna Haryana via Shamli from km 0.000 to 88.476 of NH 709A 0 at Meerut on ch. 67.550 of NH 58 in the State of Uttar Pradesh re-invitation

2020_NHAI_41604_1 586.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 6:15Hrs
27/02/2020
Time 11:0Hrs
632 Construction of 4 lane ROB and its approaches at km 14/800 (Jerai) on NH 26A in lieu of existing level crossing No. 19 on Katni Bina section Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar Dist in the state of Madhya Pradesh on EPC Mode

2020_MoRTH_533730_1 65.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 15:0Hrs
26/02/2020
Time 17:30Hrs
633 Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A Katni-Bina Railway line on Sagar to Bina road of Sagar District in the state of Madhya Pradesh on EPC Mode under Setu Bharatam.

2020_MoRTH_533374_1 56.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2020
Time 17:30Hrs
26/02/2020
Time 17:30Hrs
634 Repair and Rehabilitation work for the bridges at km 32/4 (Marudhayar), 51/10 (Kollidam) & 62/8 (Vettar) of NH 226 Extn (New NH 136) in the state of Tamil Nadu. (EPC mode)

2020_MoRTH_534661_1 4.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 13:0Hrs
25/02/2020
Time 15:0Hrs
635 Stage Strengthening Work from Ch 30 to 59.6 Km of NH35 under Bongaon NH Sub Div of NH Div No-V-P.W. Rds Dte in the Dist of North 24 Pgs WB during the year 2019-20 in EPC Mode. Job No. 35-WB-2019-20-454

2020_MoRTH_539444_1 26.854 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2020
Time 18:0Hrs
25/02/2020
Time 11:0Hrs
636 Up-Gradation to Intermediate lane of NH-301 Kargil-Zanskar Road from Km 98.524 to Km 117.180 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_532347_1 141.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 11:0Hrs
24/02/2020
Time 17:0Hrs
637 Strengthening work from Km. 68.70 to Km. 77.00 on NH-309Ain the state of Uttrakhand under EPC mode

2020_MoRTH_537789 6.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2020
Time 14:0Hrs
24/02/2020
Time 11:0Hrs
638 Widening of minor bridge at Km 185/4,196/4 and 218/2 and Reconstruction of minor bridge at Km 172/8,179/10,182/4,186/6,195/2(i) (ii),199/8,209/10 and Reconstruction of culvert and retaining wall at Km 154/10,156/2,156/10,159/8,159/10,161/8,164/10,174/2,174/4,174/8,180/6 and 190/6 and Widening of culvert at Km 173/8 and Construction of drain at Km 155/4-155/8 and Km 157/100-157/600 of NH 208 and Construction of bus lay bay at Km 187/8-188/2 of NH 208 (New NH no 744) in the state of Tamilnadu on EPC mode

2020_MoRTH_534524_1 1,584.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
24/02/2020
Time 11:0Hrs
639 Strengthening from Km 91/0-93/7,95/0-101/6,114/0-119/560,126/4-127/4,129/0-130/0,131/0-132/0,136/8-137/0,139/0-153/0 including Reconstruction of Minor bridge at Km 136/2,147/2(i),Widening of Minor bridge at Km 142/4,145/6(ii) and Improvement of Junction,Construction of Cover slab in existing drainage at Km 115/10 of Kollam-Thirumangalam Road NH 208 on EPC mode

2020_MoRTH_534567_1 41.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
24/02/2020
Time 11:0Hrs
640 4 – Laning of Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH-161 including Bypasses at Patur and Medshi in the state of Maharashtra on EPC mode

2019_NHAI_39190_1 687.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 15:0Hrs
24/02/2020
Time 11:0Hrs
641 Strengthening of damaged road surface from km 147.00 to 157.00 on NH-94(new no. 134) in the state of Uttarakhandon EPC mode under Annual Plan 2019-20

370/13Yata-NH-10/2020 550.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2020
Time 15:0Hrs
22/02/2020
Time 15:0Hrs
642 Up-gradation to Intermediate lane of NH-301 Kargil- Zanskar Road from Km 87.000 to Km. 98.524 in the UT Ladakh (Formerly State of JnK)on EPC mode (under NH(O))

2019_MoRTH_530832_1 64.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 11:0Hrs
20/02/2020
Time 17:0Hrs
643 Rehabilitation and up-gradation of road from design km 19-300 to km 31-300 Total length 12 km of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531706_1 78.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 17:40Hrs
20/02/2020
Time 15:0Hrs
644 Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length-14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531689_1 96.250 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 17:26Hrs
20/02/2020
Time 15:0Hrs
645 Four Laning of Banihal Bypass from Km 187.000 to Km 189.350 section of NH 1A in Jammu and Kashmir on EPC Mode.

2020_NHAI_39627_1 257.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 15:0Hrs
20/02/2020
Time 15:0Hrs
646 Stage Strengthening from km 758.250 to km 768.945 of NH-31 (Falakata - Pundibari section) in the district of Cooch Behar, West Bengal under NH Division-X during the year 2019-20 on EPC mode. [Job No. 031-WB-2019-20/453]

2020_MoRTH_537998_1 13.346 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/01/2020
Time 15:0Hrs
20/02/2020
Time 15:0Hrs
647 Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode

2019_NHIDC_531190_1 168.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
19/02/2020
Time 15:0Hrs
648 Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531396_1 92.990 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 18:23Hrs
18/02/2020
Time 15:0Hrs
649 Strengthening to NH-326 From Km253/700 to Km 281/700 (Laxmipur To Kakriguma) for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No. 05 CENH of 2019-20)

2019_MoRTH_531149_1 18.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
18/02/2020
Time 12:0Hrs
650 Strengthening work from Km. 13.00 to km. 26.00 on NH-121 (New NH-309) in the state of Uttrakhand under EPC mode

2020_MoRTH_536653 12.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2020
Time 17:25Hrs
17/02/2020
Time 11:0Hrs
651 Construction of Eight Lane access controlled Expressway starting near Junction with SH 37A to Junction with NH-76 (Ch. 359.170 to 388.420) section of Delhi Vadodara Green field Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/2018/Pkg13 940.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2018
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
652 Construction of Eight Lane access controlled Expressway from Hardeoganj village near Indergarh to Major Bridge on Mej river (Ch. 319.400 – Ch. 331.030) section of Delhi - Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg11 986.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
653 Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030 - 359.170) section of Delhi – Vadodara Access Controlled Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg12 1,052.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
654 Construction of Eight Lane Carriageway starting near Junction with NH-76 to Junction with NH-12 near village Ummedpura (Ch. 388.420 to Ch. 419.000) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg14 794.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
655 Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan/MP Border (Ch. 427.300 to Ch. 452.425) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg16 650.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
656 Construction of Eight Lane Carriageway start at the end approach of interchange on NH-116 at village Mui and end at Hardevganj village near Indergarh (Ch. 292.950- 319.400) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg10 916.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
657 Strengthening work from Km149.00 TO Km171.00 on NH-87 Extn.(New NH-109) in the state of Uttarakhand

2020_MoRTH_536921 17.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 14:0Hrs
15/02/2020
Time 11:0Hrs
658 Periodic Renewal work in Km 13 to 18 & 22 to 39 of newly declared NH-731K under EPC mode in the state of Uttar Pradesh

2020_MoRTH_538763_1 5.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2020
Time 15:0Hrs
14/02/2020
Time 15:0Hrs
659 STRENGTHEING WORK FROM KM 99.00 TO 101.00 and KM 166.00 to KM185.00 ON NH 309A IN THE STATE OF UTTRAKHAND UNDER EPC MODE

2020_MoRTH_536356 13.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:0Hrs
14/02/2020
Time 11:0Hrs
660 Strengthening work from Km55.550 to Km89.000 on NH-87 Extn.(New NH-109) in the state of Uttarakhand

2020_MoRTH_536307 31.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:0Hrs
14/02/2020
Time 11:0Hrs
661 CONSTRUCTION OF TWO LANE WITH HARD SHOULDER OF KOHIMA-JESSAMI ROAD ON NH-29 (OLD NH-150) FROM EXISTING KM 53.220 (NEAR KIKRUMA VILLAGE) TO EXISTING KM 76.320 (NEAR MESULUMI VILLAGE) [ DESIGN KM 51.5 TO DESIGN KM 74.2] [DESIGN LENGTH - 22.7 KM] IN THE STATE OF NAGALAND UNDER BHARATMALA PARIYOJNA ON EPC MODE (PACKAGE III)

2019_NHIDC_530428_1 243.040 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 16:0Hrs
14/02/2020
Time 11:0Hrs
662 Widening and Strengthening for improvement and up-gradation of NH709A Garhmukteshwar (Chainage-83.200 of NH24) to Meerut (Chainage 9.860 of NH-235) including connector to NH-119 Package XII in Uttar Pradesh

2018_NHAI_19202_1 940.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2018
Time 15:0Hrs
13/02/2020
Time 11:0Hrs
663 Stage Strengthening of the existing carriageway from 115.25 Kmp to 126 kmp and from km 140 to km 148 of NH-60 under Salboni NH Sub Division of National Highway Division No-II of N.H.C.-I during the year 2019-20 in the district of Paschim Medinipur, WB in EPC Mode. Job No. 60-WB-2019-20/448

2020_MoRTH_536060_1 20.982 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2020
Time 18:0Hrs
13/02/2020
Time 11:0Hrs
664 Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531733_1 91.950 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 18:36Hrs
13/02/2020
Time 11:0Hrs
665 Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 Total length 13.450 km of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II

2019_NHIDC_531976_1 96.260 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/12/2019
Time 16:0Hrs
13/02/2020
Time 11:0Hrs
666 Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 Total length 11.210 km of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-III

2019_NHIDC_532096_1 73.610 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/12/2019
Time 16:0Hrs
13/02/2020
Time 11:0Hrs
667 RESTORATION/ REHABILITATION OF UKHRUL TO NAGALAND BORDER VIA JESSAMI ROAD FOR KM 63.00 TO KM 126.00 (LENGTH 63KM) NH-150 IN THE STATE OF MANIPUR ON EPC MODE

2019_NHIDC_531157_1 16.640 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
12/02/2020
Time 15:0Hrs
668 DESIGN AND CONSTRUCTION OF 450 MTR LONG “NECHIPHU” TUNNEL INCLUDING GEOLOGICAL INVESTIGATION AND STUDIES, DESIGN OF TUNNEL AND CONSTRUCTION OF TUNNEL PROPER INCLUDING CIVIL AS WELL AS ELECTRICAL/MECHANICAL WORKS ALONG WITH APPROACHES BETWEEN KM 81.840 AND KM 87.040 ON BALIPARA-CHARDUAR TAWANG ROAD UNDER PROJECT VARTAK IN ARUNACHAL PRADESH STATE

CE VTK 26 of 2019-20 81.820 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 15:0Hrs
12/02/2020
Time 15:0Hrs
669 Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode

2019_NHIDC_531192_1 154.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
12/02/2020
Time 15:0Hrs
670 Periodical Renewal from Km. 41.90 to 54.43, 54.50 to 69.90 of NH-766C Ranebennur -Byndoor section in the state of Karnataka under EPC mode in the State of Karnataka

2020_MoRTH_540343_1 7.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
12/02/2020
Time 11:0Hrs
671 Periodical Renewal from Km. 245.000 to 256.000, Km. 259.000 to 278.000 of NH-206 Tumkur –Honnavara section in the state of Karnataka under EPC mode in the State of Karnataka

2020_MoRTH_540301_1 10.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 18:0Hrs
12/02/2020
Time 11:0Hrs
672 Strengthening work from km. 92.00 to km. 106.00 on NH-87 (New NH-109) in the state of Uttrakhand under EPC mode.

2020_MoRTH_536406 9.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:30Hrs
11/02/2020
Time 11:0Hrs
673 Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode

NHIDCL/Assam/NH-37/ Dergaon Town/2019/Tender 130.340 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2019
Time 15:50Hrs
11/02/2020
Time 11:0Hrs
674 Improvement and Widening to two laning with paved shoulder of Khayerpur –Amtali (Agartala Bypass) Section from km 0-00 to km 12-900 of NH-8 in the State of Tripura on EPC basis

2019_NHIDC_530806_1 114.230 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
675 Widening to Two Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 118.850 to Km 130.000 (Package-4A) in the State of Manipur on Engineering Procurement and Construction EPC mode

2019_NHIDC_531265_1 134.290 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
676 Widening to Two Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130.00 to Km 141.029 (Package-4B) in the State of Manipur on EPC mode

2019_NHIDC_531188_1 116.820 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
677 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 13.747 to Km 32.835 (Package 1B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode” under Bharatmala.

2019_NHIDC_531239_1 155.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
678 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 32.835 to Km 48.587 (Package-2A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531246_1 151.630 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
679 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531255_1 240.010 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
680 Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length = 2.52 Km) on NH-39 near Indo-Myanmar border in the State of Manipur on EPC mode

2019_NHIDC_531188_1 29.880 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
681 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 0.000 to Km 13.747 (Package 1A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531234_1 105.330 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
682 STRENGTHENING WORK IN CH 123.000 TO 142.000 OF NH-333A ON EPC MODE IN THE STATE OF BIHAR FOR THE YEAR 2019-20 (JOB NO. NH-333A-BR-2019-20/21)

STRENGTHENING WORK IN CH 123.000 TO 142.000 OF NH-333A ON EPC MODE IN THE STATE OF BIHAR FOR THE YEAR 2019-20 (JOB NO. NH-333A-BR-2019-20/21) 18.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 9:0Hrs
10/02/2020
Time 15:0Hrs
683 Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors.

2019_NHIDC_530975_1 148.510 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 11:0Hrs
684 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Seling-Keifang section (Economic Corridor) of NH-6 from Existing chainage Km 0.000 to Km 15.000 (Design Chainage 00.000 to Km 13.510) (Package-I) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531173_1 153.320 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
685 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Keifang section (Economic Corridor) of NH-6 from Existing chainage Km 15.000 (Keifang) to Km 30.050 (Keifang) (Design Chainage Km 13.510 to Km 27.400) (Package-II) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531181_1 159.540 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
686 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Keifang-Rulchawm section (Economic Corridor) of NH-6 from Existing chainage Km 30.050 (Keifang) to Km 50.360 (Rulchawm) (Design Chainage Km 27.400 to Km 45.040) (Pack-III) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531185_1 230.880 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
687 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Rulchawm-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 50.360 (Rulchawm) to Km 69.015 (Dulte) (Design Chainage Km 45.040 to Km 62.200) (Pack-IV) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531186_1 211.850 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
688 Balance works of 4 - laning of Fagne to Mah - Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 (design length 140.794 km) to be executed on Engineering Procurement and Construction (EPC) Mode under Bharatmala Pariyojna

2019_NHAI_38111_1 1,198.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2019
Time 17:35Hrs
10/02/2020
Time 11:0Hrs
689 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [ Design Km 7.88 to design Km 29.6] [Design Length - 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package-I)

2019_NHIDC_530401_1 220.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 15:0Hrs
07/02/2020
Time 11:0Hrs
690 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length - 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)

2019_NHIDC_530419_1 248.830 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 15:0Hrs
07/02/2020
Time 11:0Hrs
691 Reconstruction of Existing ROB at Km 113/4 and Construction of Grade Separator at Km 113/8 of NH 4 (Chennai – Chittoor – Bangalore Road)

2019_MoRTH_523542_1 27.247 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 9:8Hrs
07/02/2020
Time 11:0Hrs
692 Widening Strengthening to Two laning with hard shoulder of Pallel Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement and Construction Mode

2019_NHIDC_528135_1 80.080 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 15:0Hrs
06/02/2020
Time 15:0Hrs
693 Strengthening of road from km72/000 to 130/280 km of NH-26 in the state of Odisha for the year 2019-20 (08CENH of 2019-20)

2020_MoRTH_532250_1 32.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
06/02/2020
Time 12:0Hrs
694 Stage strengthening work from km 25.50 to km 32.00 and km 35.00 to km 40.00 of NH -116B under NH Div-II in the District of Purba Medinipur, State of West Bengal during the year 2019-2020 on EPC mode. (Job No. 116B-WB-2019-20/457)

2020_MoRTH_534276_1 10.804 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2020
Time 18:0Hrs
06/02/2020
Time 11:0Hrs
695 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 26.100 to Km. 40.000 on EPC basis under SARDP-NE Phase ‘Á’ in the State of West Bengal (Package-IV D).

2019_NHIDC_528238_1 188.380 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 18:30Hrs
06/02/2020
Time 11:0Hrs
696 REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM. 71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD NH-94) IN THE STATE OF UTTARAKHAND ON EPC MODE UNDER IMPROVEMENT TO NH CONNECTIVITY TO CHARDHAM IN THE STATE OF UTTARAKHAND

2019_MoRTH_452855_1 391.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2019
Time 15:0Hrs
05/02/2020
Time 11:0Hrs
697 Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP

2019_NHAI_31748_1 219.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2019
Time 6:5Hrs
04/02/2020
Time 11:0Hrs
698 Rehabilitation and up gradation of road from km 0 to km 18-600 Total length 18-600 km of KumarghatKaiashahar section on NH 208 to two lane with paved shoulder in the State of Tripura on Engineering Procurement and Construction EPC Mode

2019_NHIDC_529029_1 136.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2019
Time 18:0Hrs
04/02/2020
Time 11:0Hrs
699 O&M and Routine maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis- Through EPC mode

09 /NHAI/RO-BNG/11019 A /Tender/2019 dated 12.12.2019 16.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 15:0Hrs
03/02/2020
Time 15:0Hrs
700 Construction of Foot Over Bridges in Gurgaon – Kotputli – Jaipur section of NH-8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode

2019_NHAI_38535_1 42.980 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 19/12/2019
Time 15:0Hrs
03/02/2020
Time 15:0Hrs
701 One Time Improvement and Maintenance of 4 lane old NH-709B from Km 10.500 to Km 18.050 in the State of Uttar Pradesh on EPC Mode

2020_NHAI_39444_1 20.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
702 Strengthening work in Km 0.00 to 34.00 of N.H 333A for the year 2019-20 on EPC Mode on EPC Mode.

10 NH333A/2019 34.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
703 Strengthening work in Km 35.00 to 64(P) of N.H 333A for the year 2019-20 on EPC Mode

11 NH333A/2019 29.867 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
704 Strengthening of km 0 to km 36 50 of NH 227A on EPC Mode in the state of Bihar

2019_MoRTH_526945_1 38.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 11:0Hrs
31/01/2020
Time 17:0Hrs
705 Stage strengthening work from km 133.00 to km 137.684 of NH-117 in the Dist. of South 24 Parganas, W.B, during the year 2019-20 on EPC mode. Job No. 117-WB-2019-20/449

2020_MoRTH_532524_1 4.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 18:0Hrs
31/01/2020
Time 11:0Hrs
706 Construction of Bidirectional Tunnel at Km 83 of Length 495 m along with approach road of 664 m and a Major Bridge of 110 m between Km 82675 to Km 82925 on NH 244 in Union Territory Jammu Kashmir on EPC mode under NH O

2019_NHIDC_526933_1 76.650 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
31/01/2020
Time 11:0Hrs
707 Reconstruction of Minor bridge at Km 239/6, 240/8 and 241/2 of NH 209

2019_MoRTH_523466_1 6.739 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
30/01/2020
Time 15:0Hrs
708 Widening and Strengthening work in stretch from Km. 71.000 to 96.800 of NH-328 in the state of Uttar Pradesh

2019_MoRTH_527101_1 71.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2019
Time 15:0Hrs
29/01/2020
Time 15:0Hrs
709 Widening and Strengthening work from Ch 0.000 to 17.300 , 46.900 to 48.600 and 49.900 to 68.000 of NH-727-G (Harraiya - Babhnan- Mankapur- Darjikuan marg ) under EPC mode in state of Uttar Pradesh)

2019_MoRTH_528847_1 57.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 10:0Hrs
29/01/2020
Time 15:0Hrs
710 Widening and Strengthening work from Ch 29.990 to Ch 46.220 and Ch. 99.275 to Ch 110.750 of NH 727H in State of Uttar Pradesh on EPC Mode

2019_MoRTH_528853_1 49.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 10:0Hrs
29/01/2020
Time 15:0Hrs
711 Strengthening work from Chakia NH28 to Lalachhapra chowk via Kesariya from km 118.040 to km 142.756 of NH227A on EPC Mode in the State of Bihar

2020_MoRTH_535238_1 22.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
29/01/2020
Time 11:0Hrs
712 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village (near Shivgarh) of Ratlam district (Ch.602.420 to 627.420, design Ch.150.000 to Ch.175.000) section of Delhi- Vadodara Greenfield Alignment (NH 148N) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

NHAI/BM/Delhi-Vadodara/2018/Pkg22 1,022.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2019
Time 15:0Hrs
29/01/2020
Time 11:0Hrs
713 Stage Strengthening from km 8.200 to km 15.500 of NH-31C in the district of Darjeeling, West Bengal on EPC mode. Job No. 31C-WB-2019-20/442

2019_MoRTH_525875_1 6.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
28/01/2020
Time 17:0Hrs
714 Stage Strengthening work from km 641.00 to km 651.690 of NH-31 in the District of Darjeeling, West Bengal, during the year 2019-20. (Job No. 031-WB-2019-20/443)

2019_MoRTH_526029_1 9.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
28/01/2020
Time 15:0Hrs
715 Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode

NHIDCL/Tripura/NH-108A/ Jola-Belo/2019/Tender 149.140 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2019
Time 17:40Hrs
27/01/2020
Time 15:0Hrs
716 Stage strengthening from km. 0.000 to km. 43.750 (Mohanganj to Lalgopalganj section), and km. 52.200 to km. 96.600 (Muratganj to Mahewaghat section) of NH-731A in Uttar Pradesh on EPC mode.

2019_MoRTH_524369_1 47.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2019
Time 17:0Hrs
27/01/2020
Time 14:0Hrs
717 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km 0.000 to Km 18.779] (Design Length – 18.779 Km) in the state of Nagaland under NH (O) Plan

2019_NHIDC_526134_1 218.660 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 17:0Hrs
27/01/2020
Time 11:0Hrs
718 Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km 18.779 to Km 33.428] (Design Length –14.649 Km) in the state of Nagaland under NH (O) Plan

2019_NHIDC_526150_1 159.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 17:0Hrs
27/01/2020
Time 11:0Hrs
719 Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode-Package-1

NHIDCL/Assam/ NH-37/Nag-Tel/2019 97.990 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 14:0Hrs
27/01/2020
Time 11:0Hrs
720 Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode- Package-2

NHIDCL/Assam/NH-37/Tel-Rang/2019 73.540 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 13:5Hrs
27/01/2020
Time 11:0Hrs
721 Strengthening from Km 65/0 - 67/170, Km 71/360 - 72/260, Km 72/560 -80/400 & Km 80/500 - 81/0 and including widening in Km71/360 - 72/260, Km 75/290 - 75/505, Km 77/250-78/0, 78/130-78/970 & Km 79/160 - 79/390 of NH 234 (Mangalore -Villupuram Road)

2019_MoRTH_523540_1 20.424 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
24/01/2020
Time 15:0Hrs
722 Reconstruction of culverts at km 397/8, 398/6, 399/2, 403/6, 403/10 (i) (ii), 404/2 (i) (iii) (iii), 404/6, 405/6, 406/4 of NH 67 including construction of retaining wall

2019_MoRTH_523496_1 4.251 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
24/01/2020
Time 11:0Hrs
723 Stage strengthening work from km 156 to km 162 and km. 162 to km. 173 of NH-60 in the dist. of Paschim Medinipur, WB during the year 2019-20. (Job No. 060-WB-2019-20/450)

2019_MoRTH_530273_1 17.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 18:0Hrs
22/01/2020
Time 11:0Hrs
724 Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD

2018_NHAI_19205_1 557.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2018
Time 15:0Hrs
21/01/2020
Time 15:0Hrs
725 Widening and Strengthening 2 Lane to 2 lane with pave shoulders in Km 7/4 – 10/0 & 11/0 – 13/0 of NH 45A (Villupuram – Pondicherry – Nagapattinam Road)

2019_MoRTH_523545_1 7.685 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 9:36Hrs
21/01/2020
Time 11:0Hrs
726 Providing Way Side Amenities at Km 630/200 (Parvathipuram) and Km 639/100 of (Aashramam) and Construction of Foot Over Bridge at Km 628/10 of NH 47 (Sungankadai)

2019_MoRTH_523580_1 5.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
20/01/2020
Time 11:0Hrs
727 Providing Paved Shoulders in Km 183/2-188/2including improvements of NH 49 (New NH no 87)

10/2019-20 4.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
20/01/2020
Time 11:0Hrs
728 Construction of Eight Lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village in Panchmahal district (Ch. 780.920 to 803.420 and design Ch. 328.500 to Ch. 351.000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC MODE under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg29 781.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
729 Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803.420 to 824.920 and design Ch. 351.000 to Ch. 372.500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

NHAI/BM/ Delhi-Vadodara/2018/Pkg30 826.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
730 Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara District (Ch. 824.920 to Ch. 844.382 and Design Ch. 372.500 to Ch. 391.962) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

NHAI/BM/ Delhi-Vadodara/2018/Pkg31 801.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
731 Stage strengthening work from km 56 to km 64 of NH-117 under NH Div-I in the Dist of South 24 Pgs, WB, during the year 2019-20. Job No. 117-WB-2019-20/444.

2019_MoRTH_528131_1 7.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 18:0Hrs
15/01/2020
Time 11:0Hrs
732 Four laning of Katni-Bypass of National Highway – 7 (old) from km 359.500 to km 378.500 (length 20 km) in the State of Madhya Pradesh on EPC Mode

2019_NHAI_34197_1 213.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2019
Time 18:0Hrs
14/01/2020
Time 11:0Hrs
733 Stage strengthening work from 260.00 kmp to 266.00 kmp and 271.00 kmp to 275.00 kmp (except 273.05 km to 273.85 km) of NH-60 under NH Div No III in the district of Bankura & Paschim Bardhaman, West Bengal during the year 2019-20 on EPC Mode

2019_MoRTH_525735_1 10.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 9:0Hrs
10/01/2020
Time 13:0Hrs
734 Stage Strengthening of the existing pavement from 0.00 Kmp to 49.00 kmp of NH- 2B under National Highway Division No-III of N.H.C.-II during the year 2019-20 in the district of Purba Bardhaman & Birbhum ,West Bengal in EPC mode

2019_MoRTH_525071_1 54.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 10:0Hrs
10/01/2020
Time 13:0Hrs
735 Construction of 1x15 M Span Bridge at km 125.493, 1x20 M Span Bridges at Km. 125.852 and 1x10 M Span Bridge at Km. 129.445 including its approaches on NH-301, Kargil-Zanskar Road in the State of Jammu and Kashmir EPC Mode.

2019_MoRTH_525851_1 17.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
736 Construction of 1x45 M Span Bridge including its approaches at Km 130.230 on NH-301,Kargil-Zanskar Road in the State of Jammu and Kashmir on EPC Mode of Construction Under Prime Minister’s Development Package (PMDP)

2019_MoRTH_525851_2 10.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
737 Construction of 1x25 M Span Bridge at km.165.296, km 174.425 and 185.509 Including its approaches on NH-301, Kargil-Zanskar Road in the State of Jammu and Kashmir on EPC Mode under Prime Minister’s Development Package (PMDP)

2019_MoRTH_525851_3 16.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
738 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2019_NHIDC_521252_1 134.380 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/11/2019
Time 15:0Hrs
07/01/2020
Time 15:0Hrs
739 Design Engineering Procurement Supply and Construction for CONSTRUCTION OF FOUR LANE BRIDGE INCLUDING APPROACHES OVER RIVER BRAHMAPUTRA BETWEEN DHUBRI ON NORTH BANK AND PHULBARI ON SOUTH BANK IN THE STATE OF ASSAM MEGHALAYA ON NH 127B LENGTH 20km

NHIDCL Assam E 170377 DP Bridge NH 127 B 2019 3,548.500 NHIDCL Special Project EPC (Lump Sum/Item Rate Contract) 20/11/2019
Time 15:0Hrs
07/01/2020
Time 11:0Hrs
740 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.000 TO KM 339.000 AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-7) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE.

2019_NHIDC_525276_1 497.710 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2019
Time 18:2Hrs
06/01/2020
Time 11:0Hrs
741 Construction of 6 lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 4

2018_NHAI_16052_1 437.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
742 Construction of 6 lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 5

2018_NHAI_16045_1 433.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
743 Construction of 6 lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 6

2018_NHAI_16051_1 675.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
744 Construction of 6 lane access controlled Greenfield highway from km 150.000 to km 180.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 7

2018_NHAI_16053_1 501.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
745 Construction of 6 lane access controlled Greenfield highway from km 180.000 to km 207.100 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 8

2018_NHAI_16054_1 599.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2019
Time 15:0Hrs
31/12/2019
Time 11:0Hrs
746 Strengthening Work from Km 0.00 (Paswan chowk) to 58.450 (Mushrigharari) of NH-103 (New no-322) on EPC Mode in state of Bihar for the year 2019-20].

2019_MoRTH_517730_1 68.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2019
Time 11:0Hrs
24/12/2019
Time 17:0Hrs
747 Periodic Renewal work from Km. 0.000 to 30.470 of NH-931A (Salon-Jais-Jagdishpur Road) under EPC mode in the State of Uttar Pradesh

2019_MoRTH_524901_1 7.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/12/2019
Time 18:0Hrs
21/12/2019
Time 15:0Hrs
748 Periodic renewal work from Km. 0.000 to 68.300 of NH-931 (Pratapgarh-Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 & 53)

2019_MoRTH_523136_1 20.560 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/11/2019
Time 15:30Hrs
16/12/2019
Time 15:0Hrs
749 Periodical Renewal (PR) work from km 130.400 to km 135.000 and km 154.000 to km 168.000 of NH 28B ( New NH -727 ) on EPC mode in the State of Uttar Pradesh.

2019_MoRTH_513488_1 9.088 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/10/2019
Time 15:0Hrs
16/12/2019
Time 15:0Hrs
750 Construction of Eight Lane access controlled Expressway starting near Start of RoB near junction with NH-11A to Junction with MDR-1 (Baonli-Jhalai road) (Ch. 214.260 - 247.310) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg8 903.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2018
Time 15:0Hrs
16/12/2019
Time 11:0Hrs
751 Construction of Eight Lane Carriageway start near Junction with MDR-1 (Baonli-Jhalai road) to end of interchange on NH-166 near village Mui (Ch. 247.310 – 292.950) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 1,198.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2019
Time 15:0Hrs
16/12/2019
Time 11:0Hrs
752 BID For Balance work of Construciton of Ring Road for Raebareli City on eastern side of NH-24B(Phase-I) in the state of Uttar Pradesh on EPC Basis.

2019_MoRTH_513748_1 114.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/10/2019
Time 15:0Hrs
09/12/2019
Time 15:0Hrs
753 Four Laning of Rohtak-Jind Section from Km 307.000 to Km 347.800 of NH-71 and connecting link from Km 347.800 of NH-71 to Km 9.400 of NH-71A balance work on EPC Mode under Bharatmala left out in NHDP in the State of Haryana

2019_NHAI_32431_1 472.960 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2019
Time 13:30Hrs
02/12/2019
Time 11:0Hrs
754 Rehabilitation and up-gradation to 2 lane with paved shoulder from design km 74.350 to km 90.150 (Package - IV) under 13 TF on Akhnoor - Poonch road (NH-144A) in the State of Jammu and Kashmir under BRO on EPC mode

2019_BRO_511094_1 79.440 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2019
Time 15:0Hrs
29/11/2019
Time 15:0Hrs
755 Construction Of 6 Lane Flyover at Km 5 680 of Chandikhole Jagatpur Bhubaneshwar Section from Km.414.000 to Km 419.000 and from Km 0.000 to Km 62.000 of NH5 in the state of Odisha under NHDP Phase V On EPC Mode

2019_NHAI_33358_1 24.630 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 03/10/2019
Time 17:28Hrs
26/11/2019
Time 11:0Hrs
756 Construction of Eight Lane access-controlled Expressway from Rajasthan/MP Border to Jodmi village of Mandsaur district (Ch. 452.420 to 484.420 and design Ch. 0.000 to Ch. 32.000) section of Delhi Vadodara Greenfield Alignment (NH 148N) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg17 888.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2019
Time 11:0Hrs
25/11/2019
Time 11:0Hrs
757 Construction of Eight Lane access controlled Expressway from Bani Village to Bardawadi village of Mandsaur district (Ch. from Km. 517.420 to Km. 546.920 and design Ch. from Km. 65.000 to Km. 94.500) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojna in the State of Madhya Pradesh

NHAI/BM/Delhi-Vadodara/2018/Pkg19 880.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2019
Time 11:0Hrs
25/11/2019
Time 11:0Hrs
758 Periodic Renewal from Km110.750 to Km126.970 of NH-727H under EPC mode in the state of Uttar Pradesh in year 2019-20 (Barabanki- Devasharif- Fatehpur- Mahmoodabad-Biswan –Laharpur-Lakhimpur)

2019_MoRTH_507703_1 4.590 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
14/11/2019
Time 15:0Hrs
759 Periodic renewal work from Km. 0.000 to 68.300 of NH¬931 (Pratapgarh-Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 & 53)

2019_MoRTH_507263_1 20.560 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/09/2019
Time 15:0Hrs
08/11/2019
Time 15:0Hrs
760 Periiodic RRenewaal workk from Km. 0..000 too 30.470 of NNH-93 1A (Saalon-Ja is-Jagddishpurr Road)) underr EPC mmode iin the SState off Uttar Pradessh

2019_MoRTH_507255_1 7.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/09/2019
Time 15:0Hrs
08/11/2019
Time 15:0Hrs
761 Improvements to Koppal city limits from km 245.600 to 248.300 & 255.160 to 255.900 of NH-63 Ankola-Gooty Section delink portion in Koppal Taluka & Koppal District

29/ NHAI/RO-BNG/14035/Tender/2019 1.520 NHAI OTHERS 27/02/2019
Time 9:0Hrs
20/03/2019
Time 15:0Hrs
762 Routine Maintenance and special repair of NH-207 from Km. 58.300 to Km. 138.320

27 NHAI RO-BNG 11036C 1 Tender 2019 9.990 NHAI EPC (Lump Sum/Item Rate Contract) 22/02/2019
Time 14:15Hrs
15/03/2019
Time 15:0Hrs
763 Periodic Renewal by resurfacing and other safety devices of Development of adequate road connectivity to New Mangalore Port for length 25.472Km of stretches at Km.358.000 to Km.375.300 on NH-66 and Km.328.000 to Km.338.000 on LHS and Km.345.000 to Km.346.000-on Bypass (From Padil Junction towards Maroli), Km.0.000 to Km.2.172-on Bypass (From Nanthoor Junction towards Padil) of Development of Adequate Port Road Connectivity to New Mangalore Port in the State of Karnataka on EPC mode

NIT No. 25 NHAI RO BNG 15016 e tender 2019 dated 01.02.2019 23.960 NHAI EPC (Lump Sum/Item Rate Contract) 04/02/2019
Time 14:0Hrs
11/03/2019
Time 17:0Hrs
764 Stabilization of landslide at Hatipahar including construction & upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 489.350 to Km 491.600 (Design chainage Km 471.400 to Km 473.675) (Shingdhar Bridge to Vishnuprayag Bridge) of NH-07, (Old NH-58) on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand (Design length 2.275 Km).

2019_BRO_429041_1 112.550 BRO EPC (Lump Sum/Item Rate Contract) 10/01/2019
Time 11:0Hrs
07/03/2019
Time 15:0Hrs
765 Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (design chainage from Km 473.675 to Km 486.060) of NH-58, (new NH 7) (Vishnuprayag bridge to Lambagarh) excluding Govindghat-II landslide location (design chainage Km 479.925 to Km 480.075 and existing chainage Km 498.000 to 498.150) and Govindghat-III landslide location (design chainage Km 481.788 to Km 481.938 and existing chainage Km 499.988 to Km 500.138) in EPC mode under Chardham Programme in the State of Uttarakhand (length 12.085 kms)

2019_BRO_427531_1 105.760 BRO EPC (Lump Sum/Item Rate Contract) 07/01/2019
Time 11:10Hrs
06/03/2019
Time 15:0Hrs
766 Construction and upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 509.725 to Km 528.000 (design chainage Km 490.550 to Km 507.850) of NH-58 (new NH-07) (Benakuli bend to Mana Village) in EPC mode under Chardham Programme in the State of Uttarakhand (length = 17.30 Kms)

2019_BRO_427142_1 159.330 BRO EPC (Lump Sum/Item Rate Contract) 05/01/2019
Time 11:55Hrs
06/03/2019
Time 13:0Hrs
767 WIDENING TO 2 LANE WITH PAVED SHOULDER AND STRENGTHENING FROM KM 45.00 TO KM 65.140 of NH 101 NEW NH 331 LENGTH 18.990 KM ON EPC MODE IN THE STATE OF BIHAR

2019_MoRTH_441172_1 71.930 MoRTH EPC (Lump Sum/Item Rate Contract) 11/02/2019
Time 11:0Hrs
25/02/2019
Time 17:0Hrs
768 Construction of 4-lane Bridge over Irang River on Imphal- Jiribam road section (95.500km) NH-37 (Old NH-53) in the State of Manipur on EPC Mode

2018_NHIDC_418296_1 30.750 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:0Hrs
21/02/2019
Time 15:0Hrs
769 Construction of Eight Lane access controlled Expressway carriageway from Miyati Village to MP-Gujarat Border Ch.221.700 to 244.500 design Ch.674.420 to 697.220 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg25 966.430 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
20/02/2019
Time 11:0Hrs
770 Improvement and provisioning of additional safety measures for Gangotri-Dharasu (NH-108) from Km 110.860 to Km 123.080 (design chainage from Km 97.400 to Km 109.458) on EPC mode under improvement to NH connectivity to Chardham in the State of Uttarakhand

2018_BRO_422435_1 22.530 BRO EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 11:30Hrs
18/02/2019
Time 15:0Hrs
771 Construction of Flyover at Karanja (Gh.)Town from Km.73.280 to Km.74.180 section of NH-53 in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Mode

NHAI/RO-NAG/2018-19/28 34.950 NHAI EPC (Lump Sum/Item Rate Contract) 04/01/2019
Time 9:30Hrs
18/02/2019
Time 11:0Hrs
772 Construction of Eight Lane access controlled Expressway carriageway from Jodmi village to Bani village of Mandsaur district Ch.484.420 to 517.420 design Ch.32.000 to Ch. 65.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg18 973.780 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
773 Construction of Eight Lane access controlled Expressway carriageway from Bardawadi village of Mandsaur district to Kamliya village of Ratlam district Ch.546.920 to 572.220 design Ch.94.500 to Ch.119.800 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg20 736.670 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
774 Construction of Eight Lane access-controlled Expressway carriageway from Kamliya village to Kandarwasa village of Ratlam district Ch.572.220 to 602.420 design Ch.119.800toCh.150.000 section of Delhi-Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg21 919.630 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
775 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village Near Shivgarh of Ratlam district Ch.602.420 to 627.420 design Ch.150.000 to Ch.175.000 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg22 1,037.530 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
776 Construction of Eight Lane access controlled Expressway carriageway from Bawadi village Near Shivgarh of Ratlam district to Ranni Village of Jhabua district Ch.627.420 to 652.720 design Ch.175.000 to 200.300 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg23 1,139.890 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
777 Construction of Eight Lane access controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua district Ch.652.720 to 674.420 design Ch.200.300 to 221.700 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg24 921.630 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
778 Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg13 940.950 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
779 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 352 Jind Gohana near Julana to Junction with NH 9 Rohtak Jind section near Kharkara Ch. 108.000 to 131.000, length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg5 621.410 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
780 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 9 Rohtak Jind section near Kharkara to Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri Ch. 131.000 to 165.000, length 34 km on EPC mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg6 653.850 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
781 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri to Junction with Rewari Kanina road SH 24 near Kanina Ch. 165.0 to 200.0, length 35 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg7 732.570 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
782 Construction of Six Lane access controlled highway NH 152D starting from Junction with Rewari Kanina road SH 24 near Kanina to Narnaul Ch. 200.000 to 227.020, length 27.20 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg8 607.270 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
783 Construction of Two Lane Chisopani Traffic Tunnel of Length 250 m including approaches from Km 67.080 to Km 67.500 on NH10 in East District of Sikkim State on EPC mode

2018_NHIDC_423249_1 30.180 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 19:30Hrs
07/02/2019
Time 15:0Hrs
784 Construction of 48m Bridge over Chuba Khola from Km 75.300 to Km 75.800 on NH 10 in the State of Sikkim on EPC Basis

2018_NHIDC_423217_1 7.590 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:30Hrs
07/02/2019
Time 15:0Hrs
785 Strengthening of existing carriageway from km 126.00 to km 140.00 of NH-60 under Salboni NH Sub-division of NH Division No. II, P. W. (Roads) Directorate, in the District of Paschim Medinipur, West Bengal, during the year 2018-19 on EPC mode

2018_MoRTH_423214_1 21.480 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:30Hrs
07/02/2019
Time 14:0Hrs
786 Construction of Service Road at 1. Ilakal Service Road Ch. 330.816 to 333.386 Including Major Bridge on both sides at Ch.331.048 2. Kerahali Service Road Ch. 401.800 to 402.723 3. Kukanapalli Service Road Ch. 394.900 to 395.869 4. Hitnal Service Road Ch. 407.002 to 407.800 in Hunugund to Hospet Section of NH 13 New NH 50 in the state of Karnataka through Engineering Procurement Construction on EPC Mode

NIT No.24 NHAI RO BNG 17016 Tender 2018 dated 14.11.2018 49.860 NHAI EPC (Lump Sum/Item Rate Contract) 19/12/2018
Time 20:3Hrs
06/02/2019
Time 15:0Hrs
787 Improvement/widening to Two-laning with earthen shoulder from Ranikor to Nongjri Design Length 33.250Km in the State of Meghalaya under SARDP-NE Phase-A on EPC mode

2018_NHIDC_423242_1 306.280 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:0Hrs
05/02/2019
Time 18:0Hrs
788 Widening & Strengthening to 2-lane with paved shoulder from km 53.00 to km 89.00 of NH 33

07RFP/2018-19 149.790 MoRTH EPC (Lump Sum/Item Rate Contract) 14/01/2019
Time 15:0Hrs
05/02/2019
Time 15:30Hrs
789 Improvement of NH 60 from Km 330.00 to Km 374.00 except the stretch from Km 337.703 to Km 339.046 (for Suri ROB) by way of Strengthening of Existing Carriageway from km 330.000 to km 355.000 & km 360.000 to km 374.000 and Laying of Wearing Course from Km 355.000 to Km 360.000 in the district of Birbhum, West Bengal under EPC Mode

2018_MoRTH_422492_1 52.610 MoRTH EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 12:0Hrs
05/02/2019
Time 13:0Hrs
790 Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP

2018_NHIDC_421277_1 350.060 NHIDCL EPC (Lump Sum/Item Rate Contract) 19/12/2018
Time 15:0Hrs
01/02/2019
Time 17:30Hrs
791 Construction of 3 NO Minor Bridge

03EPC/NH-Gaya/2018-19 13.170 MoRTH EPC (Lump Sum/Item Rate Contract) 14/01/2019
Time 15:0Hrs
31/01/2019
Time 15:0Hrs
792 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845

NHIDCL/Tripura/NH-44A/Manu-Sim/Pkg-III/2018 316.540 NHIDCL EPC (Lump Sum/Item Rate Contract) 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
793 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package I starting near Manu at km 0.000 and ending near Lalchera at km 16.290

NHIDCL/Tripura/NH-44A/Manu- Simlung/Pkg-I/2018 167.860 NHIDCL EPC (Lump Sum/Item Rate Contract) 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
794 Improvement of NH-53 passing through Jalgaon City to four lane along with construction of VUPs & PUP in the State of Maharashtra on EPC Mode

NHAI/RO-NAG/2018-19/26 69.260 NHAI EPC (Lump Sum/Item Rate Contract) 20/12/2018
Time 9:0Hrs
31/01/2019
Time 11:0Hrs
795 Construction of Flyover from Km. 697.580 to Km.698.560 at Dumri Junction with slip, Service road on Nagpur Bypass section of NH-44 in the state of Maharashtra on Engineering, Procurement and Construction Mode -3rd call

NHAI/RO-NAG/2018-19/25 20.150 NHAI EPC (Lump Sum/Item Rate Contract) 17/12/2018
Time 9:30Hrs
30/01/2019
Time 11:0Hrs
796 Rehabilitation and Up gradation of NH516D from Ch.0.00 to 29.50 (Devarapalli to Jangareddigudem section) to two lane with paved shoulders in the State of Andhra Pradesh on EPC mode under Annual Plan 2018-19] through an Engineering, Procurement and Construction (EPC) Contract

SE(R&B)/NH/VJA/10/2018-19 dt. 10.12.2018 135.320 MoRTH EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 16:0Hrs
29/01/2019
Time 17:0Hrs
797 UPGRADATION TO 2 LANE / 4 LANE FROM KM 92/400 TO KM 127/350 NH-248-A (ALWAR NUH SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE

2018_MoRTH_424120_1 122.540 MoRTH EPC (Lump Sum/Item Rate Contract) 28/12/2018
Time 9:0Hrs
29/01/2019
Time 11:0Hrs
798 Widening Strengthening to standard intermediate lane on Mubarkpur, Dehra Gopipur, Ranital, Kangra, Mataur-Dharamshala-Macleodganj road NH-503 Mataur-Dharamshala-Macleodganj section Km. 00 to 23-105

2018_MoRTH_418748_1 34.570 MoRTH EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
29/01/2019
Time 11:0Hrs
799 Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH 150 length 262 Km in the State of Manipur Package I Km 0.00 to Km 185.00.

2018_NHIDC_418742_1 35.150 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2018
Time 13:0Hrs
28/01/2019
Time 17:30Hrs
800 CONSTRUCTION OF MOREH BYPASS FROM KM 421.950 TO KM 425.411 OF NH-39 (LENGTH = 2.52 KM) NEAR INDO-MYANMAR BORDER IN THE STATE OF MANIPUR ON EPC MODE

2018_NHIDC_419318_1 29.880 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 15:0Hrs
28/01/2019
Time 17:0Hrs
801 Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim

2018_NHIDC_419254_1 160.320 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 17:0Hrs
28/01/2019
Time 15:0Hrs
802 Construction of proposed 4 Lane ROB at Km 12.4 LC No. 14 near Bandapalli village in Chittoor Division of NH40 in the state of Andhra Pradesh on EPC Mode

SE NH ATP NIT NO 34 2018 19 54.050 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:15Hrs
28/01/2019
Time 15:0Hrs
803 REHABILITATION AND UP GRADATION OF NH 544E FROM KM 57.700 TO KM 103.200 MADAKASIRA TO A.P KARNATAKA BORDER TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH THROUGH ENGINEERING PROCUREMENT and CONSTRUCTION EPC BASIS CONTRACT

SE NH ATP NIT NO 33 2018 19 157.700 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 13:0Hrs
28/01/2019
Time 15:0Hrs
804 Strengthening of selected stretches 35.40 Kms from Km 85.0 to 95.0 Km 107.0 to 131.8 and 137.0 to 137.6 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode

SE NH ATP NIT NO 31 2018 19 31.570 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
805 Improvement the selected stretches 21.20 Km to the road from Km.0.0 to 40.2 of Puttur Uthukottai Road NH716A in the state of Andhra Pradesh on EPC Mode under Annual Plan 2018 19.

SE NH ATP NIT NO 32 2018 19 38.540 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
806 Strengthening from Km 0.0 to 4.0 16.6 to 22.2 23.2 to 24.4 30.4 to 32.2 33.0 to 35.0 53.0 to 54.8 55.9 to 56.5 58.0 to 59.0 60.0 to 60.6 and 61.4 to 63.9 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode.

SE NH ATP NIT NO 35 2018 19 23.550 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
807 Widening and strengthening of Una- Basoli- Barsar- Bhota Road to Two lane Intermediate lane including raising From Km. 20 to 35-750 on NH-503A Section Una to Bihroo in the State of HP

2018_MoRTH_418398_1 42.730 MoRTH EPC (Lump Sum/Item Rate Contract) 13/12/2018
Time 18:0Hrs
28/01/2019
Time 11:0Hrs
808 Balance work of Khed Ghat Realignment (Km 46.981 – Km 51.400) & Narayangaon Bypass (Km 76.300 - Km 81.200), Total length – 9.31 Km on Khed - Sinnar section of NH – 60 (Old NH – 50) on EPC Mode in the State of Maharashtra

NHAI/RO/MUM/NSK/KS/2018-19/15 89.110 NHAI EPC (Lump Sum/Item Rate Contract) 22/11/2018
Time 9:0Hrs
28/01/2019
Time 11:0Hrs
809 Construction of Eight Lane access controlled Expressway starting near Junction with MDR-1 (Baonli-Jhalai road) to Start of RoB near village Itawa (Ch. 247.310 - 279.840) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 808.110 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
810 Construction of Eight Lane access controlled Expressway starting near Junction with NH-11 to Start of RoB near junction with NH-11A (Ch. 183.000 - 214.260) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg7 955.560 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
811 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 0.00 to Design Km 14.00 (Design Length 14.00) in the State of Nagaland under SARDP-NE (Pkg-I)

2018_NHIDC_417952_1 530.550 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:19Hrs
24/01/2019
Time 11:0Hrs
812 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 14.00 to Design Km 29.00 (Design Length 15.00) in the State of Nagaland under SARDP-NE (Pkg-II)

2018_NHIDC_418092_1 542.470 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:52Hrs
24/01/2019
Time 11:0Hrs
813 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 29.00 to Design Km 44.525 (Design Length 15.525) in the State of Nagaland under SARDP-NE (Pkg-III)

2018_NHIDC_418081_1 482.350 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:35Hrs
24/01/2019
Time 11:0Hrs
814 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 Design Km. 0.000 to Km. 20.751 Design Length 20.751 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418134_1 359.830 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:30Hrs
24/01/2019
Time 11:0Hrs
815 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 16.592 to Km 29.530 Design Km. 20.751 to Km. 35.461 Design Length 14.710 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418159_1 164.060 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:40Hrs
24/01/2019
Time 11:0Hrs
816 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-IV starting near Bamanchara at km 68.500 (design chainage 63.700) and ending at Srirampur at km 81.130 (design chainage 75.700)

2018_NHIDC_419273_1 174.000 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
817 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-VI starting near Singhichara at km 105.300 (Design Chainage 97.319) and ending near Teliamura at km 139.453 (Design Chainage 127.319)

2018_NHIDC_419285_1 404.400 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
818 Widening from Two lane to Four lane on NH 72 New NH 07 on Kala Amb-Paonta Sahib -Dehradun road from km 46 to 103 SH P L 50 mm thick BM, and 65 mm DBM and 30mm thick BC, Road side Furniture, Trapezoidal drain, Con. Median, Con. PCC Rwall, Bwall, Con. Footpath, and utility shifting in km 96 to km 103 i.e. in the State of Himachal Pradesh

2018_MoRTH_417164_1 20.990 MoRTH EPC (Lump Sum/Item Rate Contract) 10/12/2018
Time 18:30Hrs
23/01/2019
Time 11:0Hrs
819 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase „Á‟ in the State of West Bengal (Package-IV A).

2018_NHIDC_416435_1 249.930 NHIDCL EPC (Lump Sum/Item Rate Contract) 07/12/2018
Time 18:0Hrs
22/01/2019
Time 15:0Hrs
820 Construction of Flyover at Morampudi Junction (Km. 910.774) on NH-216 A (OldNH-5) at Rajahmundry City in the State of Andhra Pradesh on EPC Mode (2nd Call)

NHAI/RO-VJA/12029/Bid-Morampudi/2018/ 20.980 NHAI EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 20:0Hrs
22/01/2019
Time 11:0Hrs
821 PR Work from Km 10.80 to 16.00 of NH-219 in the State of Bihar for the year 2017-18 on EPC mode

2019_MoRTH_426077_1 1.660 MoRTH EPC (Lump Sum/Item Rate Contract) 02/01/2019
Time 11:0Hrs
21/01/2019
Time 17:0Hrs
822 Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis

2018_NHIDC_418237_1 21.130 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 17:0Hrs
21/01/2019
Time 15:0Hrs
823 New construction of road along Canal Kasur Branch lower khem karan Distributory from Village Jaura Orginating from MDR 62 Tarn Taran Patti Road to Village Mehmodpura in Distt. Tarn Taran in the State of Punjab under economic importance scheme in the year of 2018 2019 falling in the state of Punjab through EPC Contract.

Bid No. 16 Dated 6.12.2018 45.380 MoRTH EPC (Lump Sum/Item Rate Contract) 06/12/2018
Time 18:55Hrs
18/01/2019
Time 17:0Hrs
824 Construction of 6-lane access controlled Greenfield highway from km -1.142 to km 21.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-1)

2018_NHAI_16042_1 444.890 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
825 Construction of 6-lane access controlled Greenfield highway from km 21.000 to km 48.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-2)

2018_NHAI_16047_1 440.570 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
826 Construction of 6-lane access controlled Greenfield highway from km 48.000 to km 72.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-3)

2018_NHAI_16050_1 468.030 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
827 Four Laning from existing 10.0m carriageway width from km.5.550 to km.11.975 of NH-154(Old NH-20) Pathankot- Nurpur Section in the State of Punjab on EPC Mode( Project civil cost 29.68)

17 dated 12.11.2018 29.680 MoRTH EPC (Lump Sum/Item Rate Contract) 12/11/2018
Time 15:0Hrs
16/01/2019
Time 16:0Hrs
828 Construction of 6-lane access controlled Greenfield highway from km 1.900 to km 30.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-1)

2018_NHAI_16018_1 446.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
829 Construction of 6-lane access controlled Greenfield highway from km 30.000 to km 60.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-2)

2018_NHAI_16024_1 535.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
830 Construction of 6-lane access controlled Greenfield highway from km 60.000 to km 90.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-3)

2018_NHAI_16027_1 541.520 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
831 Construction of 6-lane access controlled Greenfield highway from km 90.000 to km 120.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-4)

2018_NHAI_16031_1 429.890 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
832 Construction of 6-lane access controlled Greenfield highway from km 120.000 to km 148.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-5)

2018_NHAI_16033_1 456.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
833 Construction of 6-lane access controlled Greenfield highway from km 148.000 to km 177.658 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-6)

2018_NHAI_16037_1 464.590 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
834 Stregthening work on NH-158 Ras-Beawar-Badnore-Asind-Mandal Road Km 119/0 to 139/0 in the state of Rajasthan

2018_MoRTH_423340_1 9.967 MoRTH EPC (Lump Sum/Item Rate Contract) 26/12/2018
Time 9:0Hrs
15/01/2019
Time 18:0Hrs
835 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the state of Jammu and Kashmir to be executed on EPC basis.

2018_NHIDC_416527_1 221.940 NHIDCL EPC (Lump Sum/Item Rate Contract) 07/12/2018
Time 19:0Hrs
15/01/2019
Time 11:0Hrs
836 Construction of 6-lane access controlled Greenfield highway from km -0.300 to km 28.700 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-1)

2018_NHAI_15991_1 520.010 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 13:0Hrs
15/01/2019
Time 11:0Hrs
837 Construction of 6-lane access controlled Greenfield highway from km 28.700 to km 53.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2)

2018_NHAI_15994_1 528.230 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
838 Construction of 6-lane access controlled Greenfield highway from km 53.000 to km 88.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3)

2018_NHAI_16014_1 510.370 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
839 Construction of 6-lane access controlled Greenfield highway from km 88000 to km 115000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-4)

2018_NHAI_16020_1 382.760 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
840 Construction of 6-lane access controlled Greenfield highway from km 115.000 to km 140.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-5)

2018_NHAI_16025_1 362.980 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
841 Construction of 6-lane access controlled Greenfield highway from km 140.000 to km 170.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-6)

2018_NHAI_16028_1 433.410 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
842 Construction of 6-lane access controlled Greenfield highway from km 170.000 to km 200.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-7)

2018_NHAI_16034_1 406.670 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
843 Construction of 6-lane access controlled Greenfield highway from km 200.000 to km 225.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8)

2018_NHAI_16040_1 458.120 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
844 Construction of 6-lane access controlled Greenfield highway from km 225.000 to km 252.500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-9)

2018_NHAI_15992_1 484.090 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
845 Up-gradation Construction to Two Lane with paved shoulders with Flexible Pavement on Kurwai Mungaoli Chanderi Road (NH-346) Design Length 79.700 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392296_1 245.410 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
846 Up-gradation and Construction to Two lane with paved shoulders with flexible pavement on Jirapura Pachore Road (NH-752C), Length 52.310 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392348_1 195.610 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
847 Construction of 2-lane ROB and its approaches at km 147/10 (Harda) on NH-59A in lieu of level crossing No. 204 SPL on Khandwa-Jhasni Railway line on Railway chainage 669/1-3 on Indore Betul road of Harda District in the state of Madhya Pradesh on EPC

2018_MoRTH_392384_1 30.311 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
848 Development to four lanes with paved side shoulders of Jalandhar Hoshiarpur section of NH 03 (Old name NH 70) from design Ch 7.830 (Existing Km 8.000) at village Jandu Singha to Design Ch 11.400 (Existing Km 11.570) at village Madar District Jalandhar (Project Length 3.570 Km) in the State of Punjab on Engineering Procurement and Construction (EPC) Mode.

8 11.480 MoRTH EPC (Lump Sum/Item Rate Contract) 14/11/2018
Time 16:30Hrs
09/01/2019
Time 12:30Hrs
849 Up-gradation and Construction to Two Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road (NH-347C) Design Length-79.59 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392333_1 217.400 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
05/01/2019
Time 17:30Hrs
850 Construction of Dwarka Expressway from Road under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana border (Km 5.300 To Km 9.500) Package 2 in state of Delhi on EPC mode

2018_NHAI_18151_1 1,469.080 NHAI EPC (Lump Sum/Item Rate Contract) 19/11/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
851 Construction of Elevated Structure including approaches in Phagwara City from Km. 352.675 to Km 354.430 and VUP at Km 355.400 including approaches on NH 44 Old NH 1 in the State of Punjab on EPC mode as Standalone project

13987 147.290 NHAI EPC (Lump Sum/Item Rate Contract) 10/08/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
852 Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH11 Km 151.840 to Km 183.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojan in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg6 858.570 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
853 Construction of Eight Lane Carriageway starting near Junction at SH44 to Junction with Keshopura Road Km 115.700 to Km 151.840 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg5 925.130 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
854 Construction of Eight Lane Carriageway starting at Haryana Rajasthan border and ends at Junction with SH44 Km 78.800 to Km 115.700 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg4 958.820 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
855 Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 47.000 near Khanpur Ghati Km 18.500 to Km 47.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg2 1,017.680 NHAI EPC (Lump Sum/Item Rate Contract) 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
856 Construction of Eight Lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan Border Km 47.000 to Km 78.800 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg3 798.550 NHAI EPC (Lump Sum/Item Rate Contract) 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
857 Construction of Eight Lane divided carriageway starting at Sohna Gurugram Road (NH 248A) near Alipur village and ends at Ch. 18.461 before KMP Expressway (Ch. 0.000 to Ch. 18.461) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg1 1,144.000 NHAI EPC (Lump Sum/Item Rate Contract) 17/09/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
858 IRQP work in km 0.00 to 4.5 of NH-727A (Near U.P. Border) in the state of Bihar on EPC mode.

2018_MoRTH_422096_1 1.503 MoRTH EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
859 Construction of Four-Lane divided Highway from Melur (Design km. 0.000/Existing km. 99.920 of NH-38) to Karaikudi (Design km 45.860 /Existing km. 12.900 of NH-383 Ext.) (Design Length- 45.860 km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC mode

2018_NHAI_10794_1 750.520 NHAI EPC (Lump Sum/Item Rate Contract) 16/05/2018
Time 18:40Hrs
27/12/2018
Time 11:0Hrs
860 Construction of Missing Links in Lakhpat – Gaduli - Hajipir - Odma – Khavda - Dholavira - Mauvana-Gadkabet - Santalpur road (Newly declared National Highway No.754K) in the state of Gujarat. On EPC Mode

4EPC of 2018-19 337.970 MoRTH EPC (Lump Sum/Item Rate Contract) 10/10/2018
Time 14:0Hrs
26/12/2018
Time 17:0Hrs
861 Construction of 2-lane ROB at NH Km.72/000 of NH-26A on Katni Bina Railway Line at L/C no. 1B on Sagar to Bina Road near Bina Town of Sagar Distt in the state of Madhya Pradesh on EPC Mode

2018_MoRTH_392367_1 24.545 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
26/12/2018
Time 17:0Hrs
862 Reconstruction of minor bridges at Chainage 181.868 Km of NH 60 in the district of Bankura WB under EPC mode Job No 060 WB 2018 19 430

2018_MoRTH_402642_1 11.810 MoRTH EPC (Lump Sum/Item Rate Contract) 01/11/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
863 PR work from Km 36.00 to Km 80.00 except Km 67.6 to 68.6 in the district of Dakshin Dinajpur in the State of West Bengal (EPC Mode) Job No. (ARP)/WB/2017-18/788

2018_MoRTH_402020_1 15.680 MoRTH EPC (Lump Sum/Item Rate Contract) 31/10/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
864 Rehabilitation of 9 (Nine) damaged Bridges/ROB along NH-60 during the year of 2018-19 in the district of Birbhum, West Bengal on EPC mode. Job No. 060-WB-2018-19-429

2018_MoRTH_386715 6.170 MoRTH EPC (Lump Sum/Item Rate Contract) 21/09/2018
Time 16:0Hrs
26/12/2018
Time 13:0Hrs
865 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 NHIDCL EPC (Lump Sum/Item Rate Contract) 08/10/2018
Time 17:0Hrs
20/12/2018
Time 11:0Hrs
866 P/R Work from Km. 0.000 to Km. 31.820 of NH 122A for the year 2017-18 in the State of Bihar

2018_MoRTH_409261_1 6.960 MoRTH EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 10:0Hrs
19/12/2018
Time 17:0Hrs
867 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2018_NHIDC_384329_1 98.070 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:15Hrs
18/12/2018
Time 15:0Hrs
868 Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V)

2018_NHIDC_384220_1 24.460 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
869 Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode (Package-VI)

2018_NHIDC_384290_1 40.770 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
870 Four Lane divided carriageway from Vadipatti (Design Chainage 0.000) to Thamaraipatti (Design Chainage 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu

NHAI_11012_MR_EPC_7_2018 555.520 NHAI EPC (Lump Sum/Item Rate Contract) 08/06/2018
Time 15:0Hrs
13/12/2018
Time 11:0Hrs
871 4-laning of Delhi-Saharanpur NH-709B from km 92.200(near Shamli) to km 155.025 (near Saharanpur), (length 62.772 km) in Uttar Pradesh (Pkg-II) on EPC mode under Bharatmala Pariyojana

2018_NHAI_12646_1 612.890 NHAI EPC (Lump Sum/Item Rate Contract) 09/07/2018
Time 17:30Hrs
11/12/2018
Time 11:0Hrs
872 Construction of one VUP of Six lane at design chainage Km 120.275 on four laning of Surat Hazira Port Section of NH 6 in the State of Gujarat under NHDP Phase III through EPC Contract mode

101 32.630 NHAI EPC (Lump Sum/Item Rate Contract) 09/08/2018
Time 11:0Hrs
27/11/2018
Time 11:0Hrs
873 Six Lanning of Sriperumbudur to Karaipettai Section of NH-4 (New NH-48) from Km 37.000 (Existing Km 37/000) to Km 71.015 (Existing Km 71/000) on EPC Mode in the state of Tamil Nadu under NHDP Phase-V.

2018_NHAI_15715_1 649.250 NHAI EPC (Lump Sum/Item Rate Contract) 25/09/2018
Time 18:0Hrs
19/11/2018
Time 11:0Hrs
874 Six laning of existing 4-lane road from Gundugolanu (Design km 1023.280) to Kalaparru (Design km 1050.680) of NH-5 (New NH-16) (Design length = 27.400 km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode

2018_NHAI_7515_1 505.400 NHAI EPC (Lump Sum/Item Rate Contract) 22/10/2018
Time 15:59Hrs
19/11/2018
Time 11:0Hrs
875 Six-Laning of existing 4-lane road from Kalaparru (Design km 1050.680) to Chinna Avutupalli (Design km 1076.480) of NH-5 (New NH-16) including 6 lane Hanuman Junction bypass from (Existing Km 1055.680 to km 1060.800)(Design Ch. 0.000 to Ch.6.720), (Total Design Length – 27.400km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC mode

2018_NHAI_7435_1 589.950 NHAI EPC (Lump Sum/Item Rate Contract) 22/10/2018
Time 16:55Hrs
19/11/2018
Time 11:0Hrs