Tenders
S.No. Project Name ERPOC
Tender
Number
Project Cost (Cr) Project
Duration
(Yrs)
Agency Project Type Bid Issue Date Bid Due Date
1 Stabilization of landslide at Hatipahar including construction & upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 489.350 to Km 491.600 (Design chainage Km 471.400 to Km 473.675) (Shingdhar Bridge to Vishnuprayag Bridge) of NH-07, (Old NH-58) on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand (Design length 2.275 Km).

2019_BRO_429041_1 112.550 2 BRO EPC 10/01/2019
Time 11:0Hrs
25/02/2019
Time 15:0Hrs
2 Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (design chainage from Km 473.675 to Km 486.060) of NH-58, (new NH 7) (Vishnuprayag bridge to Lambagarh) excluding Govindghat-II landslide location (design chainage Km 479.925 to Km 480.075 and existing chainage Km 498.000 to 498.150) and Govindghat-III landslide location (design chainage Km 481.788 to Km 481.938 and existing chainage Km 499.988 to Km 500.138) in EPC mode under Chardham Programme in the State of Uttarakhand (length 12.085 kms)

2019_BRO_427531_1 105.760 2 BRO EPC 07/01/2019
Time 11:10Hrs
21/02/2019
Time 15:0Hrs
3 Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (design chainage from Km 473.675 to Km 486.060) of NH-58, (new NH 7) (Vishnuprayag bridge to Lambagarh) excluding Govindghat-II landslide location (design chainage Km 479.925 to Km 480.075 and existing chainage Km 498.000 to 498.150) and Govindghat-III landslide location (design chainage Km 481.788 to Km 481.938 and existing chainage Km 499.988 to Km 500.138) in EPC mode under Chardham Programme in the State of Uttarakhand (length 12.085 kms)

2018_BRO_427531_1 105.760 2 BRO EPC 07/01/2019
Time 11:10Hrs
21/02/2019
Time 15:0Hrs
4 Construction and upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 509.725 to Km 528.000 (design chainage Km 490.550 to Km 507.850) of NH-58 (new NH-07) (Benakuli bend to Mana Village) in EPC mode under Chardham Programme in the State of Uttarakhand (length = 17.30 Kms)

2019_BRO_427142_1 159.330 2 BRO EPC 05/01/2019
Time 11:55Hrs
20/02/2019
Time 13:0Hrs
5 Construction of Flyover at Karanja (Gh.)Town from Km.73.280 to Km.74.180 section of NH-53 in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Mode

NHAI/RO-NAG/2018-19/28 34.950 1.5 NHAI EPC 04/01/2019
Time 9:30Hrs
18/02/2019
Time 11:0Hrs
6 Construction of Eight Lane access controlled Expressway starting near Major Bridge on Chakan River to Major Bridge on Mej River (Ch. 309.001 - 331.030) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg11 884.950 2 NHAI EPC 01/10/2018
Time 11:0Hrs
14/02/2019
Time 15:0Hrs
7 Construction of Eight Lane access controlled Expressway starting near Start of RoB near village Itawa to Major Bridge on Chakan river (Ch. 279.840 - 309.001) section of Delhi - Vadodara Green field Alignment NH-148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg10 758.080 2 NHAI EPC 01/10/2018
Time 11:40Hrs
14/02/2019
Time 11:0Hrs
8 Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg13 940.950 2 NHAI EPC 01/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
9 Construction of Eight Lane access controlled Expressway from Junction with NH 12 to Start of Bridge near Manoharpur from Ch. 417.000 to 425.990 section of Delhi Vadodara Green field Alignment NH 148N including construction of tunnel in Mukundra Hills Darrah on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg15 909.840 2 NHAI EPC 05/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
10 Construction of Eight Lane access controlled Expressway from Start of Bridge near Manoharpur to Rajasthan MP Border Ch. 425.990 to 452.420 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg16 709.700 2 NHAI EPC 05/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
11 Construction of Eight Lane access controlled Expressway starting near Junction with NH-76 to Junction with NH-12 (Ch. 388.420 - 417.000) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg14 703.880 2 NHAI EPC 01/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
12 Construction of Eight Lane access controlled Expressway starting near Major Bridge on Mej River to Junction with SH 37A Ch. 331.030 to 359.170 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/2018/Pkg12 886.360 2 NHAI EPC 28/09/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
13 Construction of 48m Bridge over Chuba Khola from Km 75.300 to Km 75.800 on NH 10 in the State of Sikkim on EPC Basis

2018_NHIDC_423217_1 7.590 2 NHIDCL EPC 24/12/2018
Time 18:30Hrs
07/02/2019
Time 15:0Hrs
14 Construction of Two Lane Chisopani Traffic Tunnel of Length 250 m including approaches from Km 67.080 to Km 67.500 on NH10 in East District of Sikkim State on EPC mode

2018_NHIDC_423249_1 30.180 2 NHIDCL EPC 24/12/2018
Time 19:30Hrs
07/02/2019
Time 15:0Hrs
15 Strengthening of existing carriageway from km 126.00 to km 140.00 of NH-60 under Salboni NH Sub-division of NH Division No. II, P. W. (Roads) Directorate, in the District of Paschim Medinipur, West Bengal, during the year 2018-19 on EPC mode

2018_MoRTH_423214_1 21.480 0.795 MoRTH EPC 24/12/2018
Time 18:30Hrs
07/02/2019
Time 14:0Hrs
16 Improvement/widening to Two-laning with earthen shoulder from Ranikor to Nongjri Design Length 33.250Km in the State of Meghalaya under SARDP-NE Phase-A on EPC mode

2018_NHIDC_423242_1 306.280 2.5 NHIDCL EPC 24/12/2018
Time 18:0Hrs
05/02/2019
Time 18:0Hrs
17 Improvement and up-gradation to two lane with paved shoulder configuration from existing km. 55.00 to km.90.000 (design length 34.760) of NH-227A (Near Chhapia Village to Near Sikriganj) in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) mode Contract

2018_MoRTH_409677_1 189.270 1.5 MoRTH EPC 16/11/2018
Time 10:0Hrs
05/02/2019
Time 17:0Hrs
18 Widening & Strengthening to 2-lane with paved shoulder from km 53.00 to km 89.00 of NH 33

07RFP/2018-19 149.790 1.5 MoRTH EPC 14/01/2019
Time 15:0Hrs
05/02/2019
Time 15:30Hrs
19 Improvement of NH 60 from Km 330.00 to Km 374.00 except the stretch from Km 337.703 to Km 339.046 (for Suri ROB) by way of Strengthening of Existing Carriageway from km 330.000 to km 355.000 & km 360.000 to km 374.000 and Laying of Wearing Course from Km 355.000 to Km 360.000 in the district of Birbhum, West Bengal under EPC Mode

2018_MoRTH_422492_1 52.610 1 MoRTH EPC 22/12/2018
Time 12:0Hrs
05/02/2019
Time 13:0Hrs
20 Improvement and provisioning of additional safety measures for Gangotri-Dharasu (NH-108) from Km 110.860 to Km 123.080 (design chainage from Km 97.400 to Km 109.458) on EPC mode under improvement to NH connectivity to Chardham in the State of Uttarakhand

2018_BRO_422435_1 22.530 1 BRO EPC 22/12/2018
Time 11:30Hrs
04/02/2019
Time 15:0Hrs
21 Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP

2018_NHIDC_421277_1 350.060 3 NHIDCL EPC 19/12/2018
Time 15:0Hrs
01/02/2019
Time 17:30Hrs
22 Construction of 3 NO Minor Bridge

03EPC/NH-Gaya/2018-19 13.170 1.5 MoRTH EPC 14/01/2019
Time 15:0Hrs
31/01/2019
Time 15:0Hrs
23 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845

NHIDCL/Tripura/NH-44A/Manu-Sim/Pkg-III/2018 316.540 2 NHIDCL EPC 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
24 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package I starting near Manu at km 0.000 and ending near Lalchera at km 16.290

NHIDCL/Tripura/NH-44A/Manu- Simlung/Pkg-I/2018 167.860 2 NHIDCL EPC 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
25 Improvement of NH-53 passing through Jalgaon City to four lane along with construction of VUPs & PUP in the State of Maharashtra on EPC Mode

NHAI/RO-NAG/2018-19/26 69.260 1.5 NHAI EPC 20/12/2018
Time 9:0Hrs
31/01/2019
Time 11:0Hrs
26 Construction of 4-lane Bridge over Irang River on Imphal- Jiribam road section (95.500km) NH-37 (Old NH-53) in the State of Manipur on EPC Mode

2018_NHIDC_418296_1 30.750 1.79 NHIDCL EPC 12/12/2018
Time 15:0Hrs
30/01/2019
Time 15:0Hrs
27 Construction of Flyover from Km. 697.580 to Km.698.560 at Dumri Junction with slip, Service road on Nagpur Bypass section of NH-44 in the state of Maharashtra on Engineering, Procurement and Construction Mode -3rd call

NHAI/RO-NAG/2018-19/25 20.150 1.5 NHAI EPC 17/12/2018
Time 9:30Hrs
30/01/2019
Time 11:0Hrs
28 Construction of Six Lane access controlled highway NH 152D starting from Ismailabad on NH 152 to Junction with Karnal Pehowa road SH 9 near Dhand Ch. 0.000 to Ch. 23.000 length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg1 598.970 2 NHAI EPC 20/11/2018
Time 17:0Hrs
30/01/2019
Time 11:0Hrs
29 Construction of Six Lane access controlled highway NH 152D starting from Junction with Karnal Pehowa road SH 9 near Dhand village to Junction with Kaithal Safidon SH 11 road near Rajound Ch. 23.000 to 56.000, length 33 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg2 724.970 2 NHAI EPC 20/11/2018
Time 17:0Hrs
30/01/2019
Time 11:0Hrs
30 Construction of Six Lane access controlled highway NH 152D starting from Junction with Kaithal-Safidon road SH 11 near Rajound to Junction with Jind Safidon road SH 14 near Kheri village Ch. 56.000 to 80.000, length 24 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg3 509.160 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
31 Construction of Six Lane access controlled highway NH 152D starting from Junction with Jind Safidon road SH 14 near Kheri village to Junction with NH 352 Jind Gohana section near Julana Ch. 80.000 to 108.000, length 28 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg4 651.070 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
32 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 352 Jind Gohana near Julana to Junction with NH 9 Rohtak Jind section near Kharkara Ch. 108.000 to 131.000, length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg5 621.410 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
33 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 9 Rohtak Jind section near Kharkara to Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri Ch. 131.000 to 165.000, length 34 km on EPC mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg6 653.850 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
34 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri to Junction with Rewari Kanina road SH 24 near Kanina Ch. 165.0 to 200.0, length 35 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg7 732.570 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
35 Construction of Six Lane access controlled highway NH 152D starting from Junction with Rewari Kanina road SH 24 near Kanina to Narnaul Ch. 200.000 to 227.020, length 27.20 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg8 607.270 2 NHAI EPC 20/11/2018
Time 17:30Hrs
30/01/2019
Time 11:0Hrs
36 Rehabilitation and Up gradation of NH516D from Ch.0.00 to 29.50 (Devarapalli to Jangareddigudem section) to two lane with paved shoulders in the State of Andhra Pradesh on EPC mode under Annual Plan 2018-19] through an Engineering, Procurement and Construction (EPC) Contract

SE(R&B)/NH/VJA/10/2018-19 dt. 10.12.2018 135.320 1.5 MoRTH EPC 14/12/2018
Time 16:0Hrs
29/01/2019
Time 17:0Hrs
37 Construction of Service Road at 1. Ilakal Service Road Ch. 330.816 to 333.386 Including Major Bridge on both sides at Ch.331.048 2. Kerahali Service Road Ch. 401.800 to 402.723 3. Kukanapalli Service Road Ch. 394.900 to 395.869 4. Hitnal Service Road Ch. 407.002 to 407.800 in Hunugund to Hospet Section of NH 13 New NH 50 in the state of Karnataka through Engineering Procurement Construction on EPC Mode

NIT No.24 NHAI RO BNG 17016 Tender 2018 dated 14.11.2018 49.860 1.5 NHAI EPC 19/12/2018
Time 20:3Hrs
29/01/2019
Time 15:0Hrs
38 Widening Strengthening to standard intermediate lane on Mubarkpur, Dehra Gopipur, Ranital, Kangra, Mataur-Dharamshala-Macleodganj road NH-503 Mataur-Dharamshala-Macleodganj section Km. 00 to 23-105

2018_MoRTH_418748_1 34.570 2 MoRTH EPC 14/12/2018
Time 18:0Hrs
29/01/2019
Time 11:0Hrs
39 UPGRADATION TO 2 LANE / 4 LANE FROM KM 92/400 TO KM 127/350 NH-248-A (ALWAR NUH SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE

2018_MoRTH_424120_1 122.540 1.5 MoRTH EPC 28/12/2018
Time 9:0Hrs
29/01/2019
Time 11:0Hrs
40 Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH 150 length 262 Km in the State of Manipur Package I Km 0.00 to Km 185.00.

2018_NHIDC_418742_1 35.150 1.5 NHIDCL EPC 20/12/2018
Time 13:0Hrs
28/01/2019
Time 17:30Hrs
41 CONSTRUCTION OF MOREH BYPASS FROM KM 421.950 TO KM 425.411 OF NH-39 (LENGTH = 2.52 KM) NEAR INDO-MYANMAR BORDER IN THE STATE OF MANIPUR ON EPC MODE

2018_NHIDC_419318_1 29.880 1.5 NHIDCL EPC 14/12/2018
Time 15:0Hrs
28/01/2019
Time 17:0Hrs
42 Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim

2018_NHIDC_419254_1 160.320 2.5 NHIDCL EPC 14/12/2018
Time 17:0Hrs
28/01/2019
Time 15:0Hrs
43 Construction of proposed 4 Lane ROB at Km 12.4 LC No. 14 near Bandapalli village in Chittoor Division of NH40 in the state of Andhra Pradesh on EPC Mode

SE NH ATP NIT NO 34 2018 19 54.050 1.5 MoRTH EPC 24/12/2018
Time 18:15Hrs
28/01/2019
Time 15:0Hrs
44 REHABILITATION AND UP GRADATION OF NH 544E FROM KM 57.700 TO KM 103.200 MADAKASIRA TO A.P KARNATAKA BORDER TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH THROUGH ENGINEERING PROCUREMENT and CONSTRUCTION EPC BASIS CONTRACT

SE NH ATP NIT NO 33 2018 19 157.700 1.5 MoRTH EPC 24/12/2018
Time 13:0Hrs
28/01/2019
Time 15:0Hrs
45 Strengthening of selected stretches 35.40 Kms from Km 85.0 to 95.0 Km 107.0 to 131.8 and 137.0 to 137.6 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode

SE NH ATP NIT NO 31 2018 19 31.570 0.75 MoRTH EPC 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
46 Improvement the selected stretches 21.20 Km to the road from Km.0.0 to 40.2 of Puttur Uthukottai Road NH716A in the state of Andhra Pradesh on EPC Mode under Annual Plan 2018 19.

SE NH ATP NIT NO 32 2018 19 38.540 0.75 MoRTH EPC 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
47 Strengthening from Km 0.0 to 4.0 16.6 to 22.2 23.2 to 24.4 30.4 to 32.2 33.0 to 35.0 53.0 to 54.8 55.9 to 56.5 58.0 to 59.0 60.0 to 60.6 and 61.4 to 63.9 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode.

SE NH ATP NIT NO 35 2018 19 23.550 0.75 MoRTH EPC 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
48 Widening and strengthening of Una- Basoli- Barsar- Bhota Road to Two lane Intermediate lane including raising From Km. 20 to 35-750 on NH-503A Section Una to Bihroo in the State of HP

2018_MoRTH_418398_1 42.730 2 MoRTH EPC 13/12/2018
Time 18:0Hrs
28/01/2019
Time 11:0Hrs
49 Balance work of Khed Ghat Realignment (Km 46.981 – Km 51.400) & Narayangaon Bypass (Km 76.300 - Km 81.200), Total length – 9.31 Km on Khed - Sinnar section of NH – 60 (Old NH – 50) on EPC Mode in the State of Maharashtra

NHAI/RO/MUM/NSK/KS/2018-19/15 89.110 0.75 NHAI EPC 22/11/2018
Time 9:0Hrs
28/01/2019
Time 11:0Hrs
50 Construction of Eight Lane access controlled Expressway starting near Junction with NH-11 to Start of RoB near junction with NH-11A (Ch. 183.000 - 214.260) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg7 955.560 2 NHAI EPC 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
51 Construction of Eight Lane access controlled Expressway from Rajasthan MP Border to Jodmi village of Mandsaur district Ch. 452.420 to 484.420 design Ch. 0.000 to Ch. 32.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg17 888.420 2 NHAI EPC 05/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
52 Construction of Eight Lane access controlled Expressway carriageway from Jodmi village to Bani village of Mandsaur district Ch.484.420 to 517.420 design Ch.32.000 to Ch. 65.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg18 973.780 2 NHAI EPC 05/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
53 Construction of Eight Lane access controlled Expressway carriageway from Bani village to Bardawadi village of Mandsaur district Ch. 517.420 to 546.920 design Ch. 65.000 to Ch. 94.500 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg19 880.620 2 NHAI EPC 05/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
54 Construction of Eight Lane access controlled Expressway carriageway from Bardawadi village of Mandsaur district to Kamliya village of Ratlam district Ch.546.920 to 572.220 design Ch.94.500 to Ch.119.800 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg20 736.670 2 NHAI EPC 05/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
55 Construction of Eight Lane access-controlled Expressway carriageway from Kamliya village to Kandarwasa village of Ratlam district Ch.572.220 to 602.420 design Ch.119.800toCh.150.000 section of Delhi-Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg21 919.630 2 NHAI EPC 12/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
56 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village Near Shivgarh of Ratlam district Ch.602.420 to 627.420 design Ch.150.000 to Ch.175.000 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg22 1,037.530 2 NHAI EPC 12/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
57 Construction of Eight Lane access controlled Expressway carriageway from Bawadi village Near Shivgarh of Ratlam district to Ranni Village of Jhabua district Ch.627.420 to 652.720 design Ch.175.000 to 200.300 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg23 1,139.890 2 NHAI EPC 12/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
58 Construction of Eight Lane access controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua district Ch.652.720 to 674.420 design Ch.200.300 to 221.700 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg24 921.630 2 NHAI EPC 12/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
59 Construction of Eight Lane access controlled Expressway carriageway from Miyati Village to MP-Gujarat Border Ch.221.700 to 244.500 design Ch.674.420 to 697.220 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg25 966.430 2 NHAI EPC 12/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
60 Construction of Eight Lane access controlled Expressway starting near Start of RoB near junction with NH11A to Junction with MDR1 Baonli Jhalai road Ch.214.260 to 247.310 section of Delhi Vadodara Green field Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg8 903.420 2 NHAI EPC 05/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
61 Construction of Eight Lane access controlled Expressway starting near Junction with MDR-1 (Baonli-Jhalai road) to Start of RoB near village Itawa (Ch. 247.310 - 279.840) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 808.110 2 NHAI EPC 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
62 Construction of four lane flyover including RE wall, service lane,at grade road and improvement of junctions at Km. 2.500 on NH-24A in the state of Uttar Pradesh on EPC MODE

2018_MoRTH_421846_1 82.990 1.5 MoRTH EPC 20/12/2018
Time 19:46Hrs
24/01/2019
Time 17:0Hrs
63 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-IV starting near Bamanchara at km 68.500 (design chainage 63.700) and ending at Srirampur at km 81.130 (design chainage 75.700)

2018_NHIDC_419273_1 174.000 2.5 NHIDCL EPC 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
64 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-VI starting near Singhichara at km 105.300 (Design Chainage 97.319) and ending near Teliamura at km 139.453 (Design Chainage 127.319)

2018_NHIDC_419285_1 404.400 2.5 NHIDCL EPC 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
65 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 0.00 to Design Km 14.00 (Design Length 14.00) in the State of Nagaland under SARDP-NE (Pkg-I)

2018_NHIDC_417952_1 530.550 3 NHIDCL EPC 12/12/2018
Time 13:19Hrs
24/01/2019
Time 11:0Hrs
66 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 14.00 to Design Km 29.00 (Design Length 15.00) in the State of Nagaland under SARDP-NE (Pkg-II)

2018_NHIDC_418092_1 542.470 3 NHIDCL EPC 12/12/2018
Time 13:52Hrs
24/01/2019
Time 11:0Hrs
67 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 29.00 to Design Km 44.525 (Design Length 15.525) in the State of Nagaland under SARDP-NE (Pkg-III)

2018_NHIDC_418081_1 482.350 3 NHIDCL EPC 12/12/2018
Time 13:35Hrs
24/01/2019
Time 11:0Hrs
68 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 Design Km. 0.000 to Km. 20.751 Design Length 20.751 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418134_1 359.830 3 NHIDCL EPC 12/12/2018
Time 15:30Hrs
24/01/2019
Time 11:0Hrs
69 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 16.592 to Km 29.530 Design Km. 20.751 to Km. 35.461 Design Length 14.710 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418159_1 164.060 3 NHIDCL EPC 12/12/2018
Time 15:40Hrs
24/01/2019
Time 11:0Hrs
70 Widening from Two lane to Four lane on NH 72 New NH 07 on Kala Amb-Paonta Sahib -Dehradun road from km 46 to 103 SH P L 50 mm thick BM, and 65 mm DBM and 30mm thick BC, Road side Furniture, Trapezoidal drain, Con. Median, Con. PCC Rwall, Bwall, Con. Footpath, and utility shifting in km 96 to km 103 i.e. in the State of Himachal Pradesh

2018_MoRTH_417164_1 20.990 1.5 MoRTH EPC 10/12/2018
Time 18:30Hrs
23/01/2019
Time 11:0Hrs
71 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase „Á‟ in the State of West Bengal (Package-IV A).

2018_NHIDC_416435_1 249.930 2.5 NHIDCL EPC 07/12/2018
Time 18:0Hrs
22/01/2019
Time 15:0Hrs
72 Construction of Flyover at Morampudi Junction (Km. 910.774) on NH-216 A (OldNH-5) at Rajahmundry City in the State of Andhra Pradesh on EPC Mode (2nd Call)

NHAI/RO-VJA/12029/Bid-Morampudi/2018/ 20.980 1.5 NHAI EPC 14/12/2018
Time 20:0Hrs
22/01/2019
Time 11:0Hrs
73 PR Work from Km 10.80 to 16.00 of NH-219 in the State of Bihar for the year 2017-18 on EPC mode

2019_MoRTH_426077_1 1.660 0.25 MoRTH EPC 02/01/2019
Time 11:0Hrs
21/01/2019
Time 17:0Hrs
74 Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis

2018_NHIDC_418237_1 21.130 1 NHIDCL EPC 12/12/2018
Time 17:0Hrs
21/01/2019
Time 15:0Hrs
75 Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. Job No. NH-2B/(WB)/(18)/15-16-018-S&R(B)

2018_MoRTH_411689_1 103.980 2 MoRTH EPC 06/12/2018
Time 18:30Hrs
21/01/2019
Time 13:0Hrs
76 Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH-2B/(WB)/(17)/15-16-014-S&R(B)

2018_MoRTH_411858_1 85.060 2 MoRTH EPC 06/12/2018
Time 18:30Hrs
21/01/2019
Time 13:0Hrs
77 New construction of road along Canal Kasur Branch lower khem karan Distributory from Village Jaura Orginating from MDR 62 Tarn Taran Patti Road to Village Mehmodpura in Distt. Tarn Taran in the State of Punjab under economic importance scheme in the year of 2018 2019 falling in the state of Punjab through EPC Contract.

Bid No. 16 Dated 6.12.2018 45.380 1.6 MoRTH EPC 06/12/2018
Time 18:55Hrs
18/01/2019
Time 17:0Hrs
78 Construction of 6-lane access controlled Greenfield highway from km -1.142 to km 21.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-1)

2018_NHAI_16042_1 444.890 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
79 Construction of 6-lane access controlled Greenfield highway from km 21.000 to km 48.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-2)

2018_NHAI_16047_1 440.570 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
80 Construction of 6-lane access controlled Greenfield highway from km 48.000 to km 72.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-3)

2018_NHAI_16050_1 468.030 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
81 Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-4)

2018_NHAI_16052_1 422.540 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
82 Construction of 6-lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-5)

2018_NHAI_16045_1 409.660 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
83 Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-6)

2018_NHAI_16051_1 668.480 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
84 Construction of 6-lane access controlled Greenfield highway from km 150.000 to km 180.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-7)

2018_NHAI_16053_1 483.590 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
85 Construction of 6-lane access controlled Greenfield highway from km 180.000 to km 207.100 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-8)

2018_NHAI_16054_1 543.440 2 NHAI EPC 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
86 Four Laning from existing 10.0m carriageway width from km.5.550 to km.11.975 of NH-154(Old NH-20) Pathankot- Nurpur Section in the State of Punjab on EPC Mode( Project civil cost 29.68)

17 dated 12.11.2018 29.680 1 MoRTH EPC 12/11/2018
Time 15:0Hrs
16/01/2019
Time 16:0Hrs
87 Construction of 6-lane access controlled Greenfield highway from km 1.900 to km 30.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-1)

2018_NHAI_16018_1 446.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
88 Construction of 6-lane access controlled Greenfield highway from km 30.000 to km 60.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-2)

2018_NHAI_16024_1 535.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
89 Construction of 6-lane access controlled Greenfield highway from km 60.000 to km 90.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-3)

2018_NHAI_16027_1 541.520 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
90 Construction of 6-lane access controlled Greenfield highway from km 90.000 to km 120.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-4)

2018_NHAI_16031_1 429.890 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
91 Construction of 6-lane access controlled Greenfield highway from km 120.000 to km 148.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-5)

2018_NHAI_16033_1 456.630 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
92 Construction of 6-lane access controlled Greenfield highway from km 148.000 to km 177.658 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-6)

2018_NHAI_16037_1 464.590 2 NHAI EPC 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
93 Stregthening work on NH-158 Ras-Beawar-Badnore-Asind-Mandal Road Km 119/0 to 139/0 in the state of Rajasthan

2018_MoRTH_423340_1 9.967 0.583 MoRTH EPC 26/12/2018
Time 9:0Hrs
15/01/2019
Time 18:0Hrs
94 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the state of Jammu and Kashmir to be executed on EPC basis.

2018_NHIDC_416527_1 221.940 2 NHIDCL EPC 07/12/2018
Time 19:0Hrs
15/01/2019
Time 11:0Hrs
95 Construction of 6-lane access controlled Greenfield highway from km -0.300 to km 28.700 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-1)

2018_NHAI_15991_1 520.010 3 NHAI EPC 05/10/2018
Time 13:0Hrs
15/01/2019
Time 11:0Hrs
96 Construction of 6-lane access controlled Greenfield highway from km 28.700 to km 53.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2)

2018_NHAI_15994_1 528.230 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
97 Construction of 6-lane access controlled Greenfield highway from km 53.000 to km 88.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3)

2018_NHAI_16014_1 510.370 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
98 Construction of 6-lane access controlled Greenfield highway from km 88000 to km 115000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-4)

2018_NHAI_16020_1 382.760 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
99 Construction of 6-lane access controlled Greenfield highway from km 115.000 to km 140.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-5)

2018_NHAI_16025_1 362.980 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
100 Construction of 6-lane access controlled Greenfield highway from km 140.000 to km 170.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-6)

2018_NHAI_16028_1 433.410 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
101 Construction of 6-lane access controlled Greenfield highway from km 170.000 to km 200.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-7)

2018_NHAI_16034_1 406.670 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
102 Construction of 6-lane access controlled Greenfield highway from km 200.000 to km 225.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8)

2018_NHAI_16040_1 458.120 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
103 Construction of 6-lane access controlled Greenfield highway from km 225.000 to km 252.500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-9)

2018_NHAI_15992_1 484.090 2 NHAI EPC 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
104 Up-gradation and Construction to Two lane with paved shoulders with flexible pavement on Jirapura Pachore Road (NH-752C), Length 52.310 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392348_1 195.610 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
105 Construction of 2-lane ROB and its approaches at km 147/10 (Harda) on NH-59A in lieu of level crossing No. 204 SPL on Khandwa-Jhasni Railway line on Railway chainage 669/1-3 on Indore Betul road of Harda District in the state of Madhya Pradesh on EPC

2018_MoRTH_392384_1 30.311 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
106 Construction of 4-lane ROB and its approaches at km 14/800 (Jerai) on NH-26A in lieu of existing level crossing No. 19 on Katni-Binasection Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar District in the state of MPon EPC Mode

2018_MoRTH_392399_1 42.510 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
107 Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A in lieu of existing level crossing No. 11 on Katni-Bina Railway line on Railway chainage 1011/6-7 on Sagar Khurai Bina road of Sagar District in the state of MP on EPC Mode

2018_MoRTH_392412_1 39.852 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
108 Up-gradation Construction to Two Lane with paved shoulders with Flexible Pavement on Kurwai Mungaoli Chanderi Road (NH-346) Design Length 79.700 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392296_1 245.410 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
109 Rehabilitation and up-gradation of khutar lakhimpur section (km 82.000 to km 140.000) of nh 730 to two lanes with paved shoulder under epc mode in the state of uttar pradesh

2018_MoRTH_409605_1 213.090 2 MoRTH EPC 12/11/2018
Time 10:0Hrs
11/01/2019
Time 17:0Hrs
110 Improvement and up-gradation of existing carriageway to two lane with paved shoulder from km. 0.00 (Chhawani) to km.55.000 (Near Chhapia village) of NH-227A in the state of Uttar Pradesh on EPC mode

2018_MoRTH_409643_1 232.160 2 MoRTH EPC 16/11/2018
Time 10:0Hrs
11/01/2019
Time 17:0Hrs
111 Development to four lanes with paved side shoulders of Jalandhar Hoshiarpur section of NH 03 (Old name NH 70) from design Ch 7.830 (Existing Km 8.000) at village Jandu Singha to Design Ch 11.400 (Existing Km 11.570) at village Madar District Jalandhar (Project Length 3.570 Km) in the State of Punjab on Engineering Procurement and Construction (EPC) Mode.

8 11.480 0.67 MoRTH EPC 14/11/2018
Time 16:30Hrs
09/01/2019
Time 12:30Hrs
112 Up-gradation and Construction to Two Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road (NH-347C) Design Length-79.59 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392333_1 217.400 1.5 MoRTH EPC 06/10/2018
Time 12:30Hrs
05/01/2019
Time 17:30Hrs
113 Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH 71 and connecting link from Km 347.800 of NH 71 to Km 9.400 of NH 71A balance work on EPC Mode under Bharatmala left out in NHDP in the State of Haryana

11089 414.390 1.5 NHAI EPC 24/05/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
114 Construction of Elevated Structure including approaches in Phagwara City from Km. 352.675 to Km 354.430 and VUP at Km 355.400 including approaches on NH 44 Old NH 1 in the State of Punjab on EPC mode as Standalone project

13987 147.290 1 NHAI EPC 10/08/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
115 Construction of Dwarka Expressway from Road under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana border (Km 5.300 To Km 9.500) Package 2 in state of Delhi on EPC mode

2018_NHAI_18151_1 1,469.080 2 NHAI EPC 19/11/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
116 Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH11 Km 151.840 to Km 183.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojan in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg6 858.570 2 NHAI EPC 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
117 Construction of Eight Lane Carriageway starting near Junction at SH44 to Junction with Keshopura Road Km 115.700 to Km 151.840 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg5 925.130 2 NHAI EPC 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
118 Construction of Eight Lane Carriageway starting at Haryana Rajasthan border and ends at Junction with SH44 Km 78.800 to Km 115.700 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg4 958.820 2 NHAI EPC 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
119 Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 47.000 near Khanpur Ghati Km 18.500 to Km 47.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg2 1,017.680 2 NHAI EPC 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
120 Construction of Eight Lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan Border Km 47.000 to Km 78.800 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg3 798.550 2 NHAI EPC 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
121 Construction of Eight Lane divided carriageway starting at Sohna Gurugram Road (NH 248A) near Alipur village and ends at Ch. 18.461 before KMP Expressway (Ch. 0.000 to Ch. 18.461) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg1 1,144.000 2 NHAI EPC 17/09/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
122 IRQP work in km 0.00 to 4.5 of NH-727A (Near U.P. Border) in the state of Bihar on EPC mode.

2018_MoRTH_422096_1 1.503 0.167 MoRTH EPC 22/12/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
123 Construction of Four-Lane divided Highway from Melur (Design km. 0.000/Existing km. 99.920 of NH-38) to Karaikudi (Design km 45.860 /Existing km. 12.900 of NH-383 Ext.) (Design Length- 45.860 km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC mode

2018_NHAI_10794_1 750.520 2 NHAI EPC 16/05/2018
Time 18:40Hrs
27/12/2018
Time 11:0Hrs
124 Construction of Missing Links in Lakhpat – Gaduli - Hajipir - Odma – Khavda - Dholavira - Mauvana-Gadkabet - Santalpur road (Newly declared National Highway No.754K) in the state of Gujarat. On EPC Mode

4EPC of 2018-19 337.970 1.5 MoRTH EPC 10/10/2018
Time 14:0Hrs
26/12/2018
Time 17:0Hrs
125 Construction of 2-lane ROB at NH Km.72/000 of NH-26A on Katni Bina Railway Line at L/C no. 1B on Sagar to Bina Road near Bina Town of Sagar Distt in the state of Madhya Pradesh on EPC Mode

2018_MoRTH_392367_1 24.545 2 MoRTH EPC 06/10/2018
Time 12:30Hrs
26/12/2018
Time 17:0Hrs
126 Reconstruction of minor bridges at Chainage 181.868 Km of NH 60 in the district of Bankura WB under EPC mode Job No 060 WB 2018 19 430

2018_MoRTH_402642_1 11.810 1 MoRTH EPC 01/11/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
127 PR work from Km 36.00 to Km 80.00 except Km 67.6 to 68.6 in the district of Dakshin Dinajpur in the State of West Bengal (EPC Mode) Job No. (ARP)/WB/2017-18/788

2018_MoRTH_402020_1 15.680 0.616 MoRTH EPC 31/10/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
128 Rehabilitation of 9 (Nine) damaged Bridges/ROB along NH-60 during the year of 2018-19 in the district of Birbhum, West Bengal on EPC mode. Job No. 060-WB-2018-19-429

2018_MoRTH_386715 6.170 1 MoRTH EPC 21/09/2018
Time 16:0Hrs
26/12/2018
Time 13:0Hrs
129 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 2.5 NHIDCL EPC 08/10/2018
Time 17:0Hrs
20/12/2018
Time 11:0Hrs
130 P/R Work from Km. 0.000 to Km. 31.820 of NH 122A for the year 2017-18 in the State of Bihar

2018_MoRTH_409261_1 6.960 0.75 MoRTH EPC 20/11/2018
Time 10:0Hrs
19/12/2018
Time 17:0Hrs
131 Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V)

2018_NHIDC_384220_1 24.460 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
132 Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode (Package-VI)

2018_NHIDC_384290_1 40.770 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
133 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2018_NHIDC_384329_1 98.070 2 NHIDCL EPC 14/09/2018
Time 18:15Hrs
18/12/2018
Time 15:0Hrs
134 Four Lane divided carriageway from Vadipatti (Design Chainage 0.000) to Thamaraipatti (Design Chainage 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu

NHAI_11012_MR_EPC_7_2018 555.520 2 NHAI EPC 08/06/2018
Time 15:0Hrs
13/12/2018
Time 11:0Hrs
135 4-laning of Delhi-Saharanpur NH-709B from km 92.200(near Shamli) to km 155.025 (near Saharanpur), (length 62.772 km) in Uttar Pradesh (Pkg-II) on EPC mode under Bharatmala Pariyojana

2018_NHAI_12646_1 612.890 2 NHAI EPC 09/07/2018
Time 17:30Hrs
11/12/2018
Time 11:0Hrs
136 Construction of one VUP of Six lane at design chainage Km 120.275 on four laning of Surat Hazira Port Section of NH 6 in the State of Gujarat under NHDP Phase III through EPC Contract mode

101 32.630 1.5 NHAI EPC 09/08/2018
Time 11:0Hrs
27/11/2018
Time 11:0Hrs
137 Six Lanning of Sriperumbudur to Karaipettai Section of NH-4 (New NH-48) from Km 37.000 (Existing Km 37/000) to Km 71.015 (Existing Km 71/000) on EPC Mode in the state of Tamil Nadu under NHDP Phase-V.

2018_NHAI_15715_1 649.250 2 NHAI EPC 25/09/2018
Time 18:0Hrs
19/11/2018
Time 11:0Hrs
138 Six laning of existing 4-lane road from Gundugolanu (Design km 1023.280) to Kalaparru (Design km 1050.680) of NH-5 (New NH-16) (Design length = 27.400 km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode

2018_NHAI_7515_1 505.400 1.5 NHAI EPC 22/10/2018
Time 15:59Hrs
19/11/2018
Time 11:0Hrs
139 Six-Laning of existing 4-lane road from Kalaparru (Design km 1050.680) to Chinna Avutupalli (Design km 1076.480) of NH-5 (New NH-16) including 6 lane Hanuman Junction bypass from (Existing Km 1055.680 to km 1060.800)(Design Ch. 0.000 to Ch.6.720), (Total Design Length – 27.400km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC mode

2018_NHAI_7435_1 589.950 1.5 NHAI EPC 22/10/2018
Time 16:55Hrs
19/11/2018
Time 11:0Hrs
140 Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. Job No. NH-2B/(WB)/(18)/15-16-018-S&R(B)

2018_MoRTH_369804_1 103.980 2 MoRTH EPC 14/08/2018
Time 18:0Hrs
14/11/2018
Time 13:0Hrs
141 Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH-2B/(WB)/(17)/15-16-014-S&R(B)

2018_MoRTH_369909_1 85.060 2 MoRTH EPC 14/08/2018
Time 18:0Hrs
14/11/2018
Time 13:0Hrs
142 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 2.5 NHIDCL EPC 08/10/2018
Time 19:5Hrs
12/11/2018
Time 11:0Hrs
143 Rehabilitation of Km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 25.00 km) on EPC Mode” (Package-VII)

2018_NHIDC_384308_1 54.750 1 NHIDCL EPC 14/09/2018
Time 18:0Hrs
09/11/2018
Time 15:0Hrs
144 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Km. 379.100 to Km. 380.275 of Gholteer Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.( Design Length = 1.175 Km)

2018_NHIDC_384349_1 89.270 1 NHIDCL EPC 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
145 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length = 0.600 km)

2018_NHIDC_384359_1 45.370 1 NHIDCL EPC 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
146 Upgradation of new NH-341 to two-lane with paved side shoulder configuration between design chainage from Km 65.478 to Km 162.209 including geometric improvement and reconstruction of old/weak structures. (Bhuj Airport Jn.- Khavada - India bridge to Dharmshala section) in the State of Gujarat on EPC Mode.

EPC/5 of 2017-18 ( 2nd Attempt) 261.100 2 MoRTH EPC 21/08/2018
Time 15:0Hrs
20/10/2018
Time 18:0Hrs
147 Construction of Major Bridge at Km 180.865 across River Krishna on NH-167 Hagari – Jadercela Section in the State of Karnataka

2018_MoRTH_381296_1 124.710 2.5 MoRTH EPC 01/10/2018
Time 14:0Hrs
20/10/2018
Time 17:0Hrs
148 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis

2018_NHIDC_369922_1 260.770 2.5 NHIDCL EPC 08/08/2018
Time 10:0Hrs
12/10/2018
Time 11:0Hrs
149 Construction of 4 lane elevated corridor in Dessa Town between km 565.850 to km 569.600 Length 3.750km on East West Corridor of NH-27 (Old NH-14) in Gujarat on EPC Mode

2018_NHAI_13698_1 222.750 2 NHAI EPC 03/08/2018
Time 17:57Hrs
19/09/2018
Time 11:0Hrs
150 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_362363_1 230.340 2.5 NHIDCL EPC 19/07/2018
Time 17:0Hrs
17/09/2018
Time 11:0Hrs
151 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.000 TO KM 65.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-1) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275446_1 678.060 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
04/09/2018
Time 15:0Hrs
152 test project 1

NHIDCL/UK/NH134/Silkyara Tunnel/2017_ test 1,119.690 4 MoRTH EPC 24/08/2018
Time 15:0Hrs
28/08/2018
Time 15:0Hrs
153 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 65.000 TO KM 125.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-2) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_282985_1 469.230 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
154 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.000 TO KM 166.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-3) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283016_1 464.380 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
155 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.000 TO KM 208.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-4) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275447_1 471.350 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
156 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.000 TO KM 250.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-5) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283024_1 399.370 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
157 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.000 TO KM 298.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-6) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283003_1 501.740 3.5 NHIDCL EPC 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
158 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.000 TO KM 339.000 AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-7) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275448_1 497.710 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
159 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.000 TO KM 380.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-8) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275449_1 487.850 3.5 NHIDCL EPC 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
160 Construction of Two VUPs at Km 223.950 and Km 226.200 and one side storage Lane in Bharuch-Surat Section of NH-8 in the State of Gujarat on EPC Mode

2018_NHAI_13023_1 20.170 1.5 NHAI EPC 18/07/2018
Time 17:10Hrs
27/08/2018
Time 11:0Hrs
161 Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode

2018_NHAI_12488_1 87.530 1.5 NHAI EPC 04/07/2018
Time 17:57Hrs
27/08/2018
Time 11:0Hrs
162 Six Lanning of Sriperumbudur to Karaipettai Section of NH4 (New NH48) from Km 37.000 (Existing Km 37.000) to Km 71.015 (Existing Km 71.000) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11044_1 649.250 2 NHAI EPC 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs
163 Six Lanning of Karaipettai to Walajapet Section of NH4 (New NH48) from Km71.015 (Existing Km 71.000) to Km 107.091 (Existing Km 107.068) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11045_1 590.390 2 NHAI EPC 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs