Tenders
S.No. Project Name ERPOC
Tender
Number (CPPP)
Estimated Project Cost (Cr) Executing Agency Project Type Mode of Execution Bid Issue Date Bid Due Date
1 RFP for the Rehabilitation and Upgradation of Pratapgarh - Sultanpur Road section of NH-330, from design Chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of Uttar Pradesh on EPC mode.

2023_MoRTH_774157_1 518.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 18:55Hrs
15/04/2025
Time 11:0Hrs
2 Short Term Maintenance at Chainage 52.180 to 61.750, km 70.750 to 72.900 and km 79.360 to km 83.00 on NH-707A

2024_MoRTH_800722_1 3.710 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
3 Short Term Maintenance works from Km 197 to Km 200 on NH-119(New 534)

2024_MoRTH_800795_1 1.960 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
4 Short Term Maintenance works from Km 233 to Km 242 on NH-119(New 534)

2024_MoRTH_800810_1 2.430 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
5 Short Term Maintenance works from Km 251 to Km 262 on NH-119(New 534)

2024_MoRTH_800858_1 2.430 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
6 Short Term Maintenance works from Km 263 to Km 276 on NH-119(New 534)

2024_MoRTH_800911_1 2.350 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
7 Construction of CC Shoulder Culvert, Drain and Damage R/wall and B/wall from km 68.750 to km 75.00 on NH-107(old 109) under Annual Plan of NH(O) 2023-24 in the State of Uttarakhand under EPC Mode.

2024_MoRTH_800915_1 5.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 15:0Hrs
27/06/2024
Time 12:0Hrs
8 Treatment of 7 Nos of landslide location on NH 107 and 107A in the State of Uttarakhand under EPC Mode in NH(O) Annual Plan 2023-24

2024_MoRTH_799503_1 43.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 15:0Hrs
27/06/2024
Time 12:0Hrs
9 Balance work of Widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (Actual chainage as per site km. 59.700 to km. 64.525 on NH-507 in the State of Uttarakhand under EPC Mode in NH(O) the year 2023-24

2024_MoRTH_799468_1 28.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
27/06/2024
Time 12:0Hrs
10 Treatment of 05 nos. of Landslide location (Location Ch. 333.65 km to 333.750 km, Location Ch. 337.940 km to 338.165 km, Location Ch. 350.480 km to 350.680 km, Location Ch. 351.500 km to 351.650 km and Location Ch. 356.250 km to 356.750 km) on NH 58

2024_MoRTH_799496_1 70.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
20/06/2024
Time 12:0Hrs
11 Land slide treatment work on NH 58(New 07) at Chainage 238.750 to 238.920 (170 m length), Chainage 246.790 to 246.850 (60 m length), Chainage 247.340 to 247.440 (100 m length), Chainage 254.340 to 254.410 (70 m length),Chainage 279.400 to 279.600

2024_MoRTH_800379_1 45.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 12:0Hrs
20/06/2024
Time 12:0Hrs
12 Construction of Four lane Elevated Corridor and At grade Improvements from km 4/0 to 7/0 of NH45 B (New No 38) on Trichy - Madurai section including Construction of Flyover on Trichy Bypass of NH 67 (New No 81) crossing NH 45B ( New No 38) at km 5/200 under NH (O) on EPC mode

2023-NHAI-179646-1 331.830 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 11:0Hrs
13/06/2024
Time 11:0Hrs
13 Construction of 2LPS Bypass for Kothamangalam Town from Design Ch-0.000 to Ch-3.800 (Existing Km -49.40 to Km 43.58) on Kochi-Munnar section of NH-85 in the State of Kerala on EPC mode under NH-O Scheme

NHAI/Kerala/Kothamangalam Bypass/EPC/2023 55.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 11:0Hrs
11/06/2024
Time 11:0Hrs
14 Construction of 2LPS Bypass for Muvattupuzha Town from Design Ch-0.000 to Ch-4.300 (Existing Km-38.20 to Km- 33.97) on Kochi-Munnar section of NH-85 in the State of Kerala on EPC mode under NH-O Scheme on EPC mode

NHAI/Kerala/ Muvattupuzha Bypass/EPC/2023 81.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 11:0Hrs
11/06/2024
Time 11:0Hrs
15 Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand

2023_MoRTH_786620_1 70.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
10/06/2024
Time 12:0Hrs
16 Rehabilitation and Upgradation from 2 lane to Four lane of Muddanur to B. Kothapalli section of NH 716G from Km. 0.000 to Km. 56.500 Km in the State of Andhra Pradesh on EPC mode.

2023_MoRTH_779245_1 850.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/11/2023
Time 17:30Hrs
07/06/2024
Time 17:0Hrs
17 One Time Improvement And Maintenance of old Gt Road from Junction of Delhi Meerut Expressway Lal Kuan Ghaziabad to Gyani Border Delhi Up Border in the State Of Uttar Pradesh on EPC Mode

2023_NHAI_178936_1 371.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
31/05/2024
Time 11:0Hrs
18 Development of 4 lane Economic Corridor from Kharagpur to Chandrakona- Ghatal Road Crossing section Km 0.000 to Km 41.000 of NH 116A (Package-I) in the state of West Bengal under HAM Mode

2023_NHAI_166641_1 984.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 11:0Hrs
28/05/2024
Time 11:0Hrs
19 DEVELOPMENT OF 4 LANE ECONOMIC CORRIDOR FROM CHANDRAKONA-GHATAL ROAD CROSSING TO BOWAICHANDI SECTION KM 41.000 TO KM 89.814 OF NH 116A (PACKAGE-2) IN THE STATE OF WEST BENGAL UNDER HAM MODE

2023_NHAI_166636_1 1,503.290 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
28/05/2024
Time 11:0Hrs
20 Development of 4 lane Economic Corridor from Bowaichandi to Guskara-Katwa Road Section Km 89.814 to Km 133.000 of NH 116A (Package-3) in the state of West Bengal under Hybrid Annuity Mode

2023_NHAI_166878_1 1,231.320 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
28/05/2024
Time 11:0Hrs
21 Development of 4 lane Economic Corridor from Guskara- Katwa Road to Mayurakshi Bridge Approach section Km 133.000 to Km 180.000 of NH 116A (Pkg-IV) in the state of West Bengal under Hybrid Annuity Mode

2023_NHAI_166914_1 1,039.260 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
28/05/2024
Time 11:0Hrs
22 Development of 4 lane Economic Corridor from before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal

2023_NHAI_166611_1 1,226.910 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
28/05/2024
Time 11:0Hrs
23 Strengthening the selected stretches from Km 58/700 to Km 68/900 of NH-381A (Vellakovil – Sankari road) on EPC mode in Tamil Nadu

2024_MoRTH_794485_1 14.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2024
Time 10:0Hrs
22/05/2024
Time 15:0Hrs
24 Strengthening selected stretches from Km 1/2 to Km 23/6 (9.50 Km) of NH-81 and Strengthening selected stretches from Km 6/0 to Km 23/0 (1.8Km) of NH-181 including junctions improvement at Km 6/0 to Km 6/4 of NH-181 on EPC mode in the Tamil Nadu

2024_MoRTH_799391_1 35.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
22/05/2024
Time 15:0Hrs
25 Upgradation of Pendurthi to Bowdara section of NH 516B to 2 4 lane with paved shoulders configuration from its junction with NH 16 near Pendurthi Kothavalasa S. Kota and terminating at its junction with NH 516E near Bowdara in the state of AP

2023_MoRTH_779962_1 782.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2023
Time 17:0Hrs
21/05/2024
Time 17:0Hrs
26 Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on EPC Basis

2023_MoRTH_775191_1 963.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
20/05/2024
Time 15:0Hrs
27 Rehabilitation and Upgradation to 2/4 lane with paved shoulders from Km 79/300 to Km 87/360 & Km 88/437 to Km 93/819 of NH-167K (Bridge Approaches of Iconic Bridge across river Krishna) in the State of Telangana and Andhra Pradesh on EPC Basis

2023_MoRTH_775185_1 340.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
20/05/2024
Time 15:0Hrs
28 CONSTRUCTION OF DONG-JACHEP ROAD (GREEN-FIELD ALIGNMENT) TO NHSL SPECIFICATIONS FROM KM 8.OOO TO KM 15.OOO (PART-I) {NET LENGTH 7.OOO KM) AND KM 15.OOO TO KM 45.OOO (PART-II) (NET LENGTH 3O.OOOKM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE UNDER EPC MODE

CE(P)/UDK/NIB/01/2024-25 265.980 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2024
Time 11:0Hrs
17/05/2024
Time 11:0Hrs
29 Rehabilit Shoulders from Km 178.500 tation and Up-gradation of Nehru Nagar to Kothagudem Section to Two Lane/Four Lane with Pavedo Km 230.580 of NH-930P in the State of Telangana on EPC Basis

2023_MoRTH_775194_1 962.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
16/05/2024
Time 15:0Hrs
30 Rehabilitation and Up gradation of Thorrur to Nehru Nagar Section to Two Lane with Paved Shoulders from Km 109.420 to Km 178.500 of NH 930P in the State of Telangana

2023_MoRTH_768186_1 548.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 16:0Hrs
15/05/2024
Time 15:0Hrs
31 Short Term maintenance between ch. km 361/620 to 364/220 Kasbapar-Navsari Road ch. km 368/520 to 370/620 Vejalpore-Eru Road of NH64 in Navsari District in the state of Gujarat under STMC M and R scheme.

2024_MoRTH_801231_1 1.260 MoRTH Normal Highway Project OTHERS 16/03/2024
Time 13:45Hrs
15/05/2024
Time 12:0Hrs
32 Construction of Slope Protection Work at Various Locations on the Hillside between Km 106 139 to Km 129 050 of the Solan Kaithlighat section of NH 22 now NH 5 on EPC mode in the State of Himachal Pradesh

2024 NHAI 190196 1 160.350 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 15:0Hrs
15/05/2024
Time 11:0Hrs
33 Treatment for critical land slide prone spots posing significant threat by taking Slope Protection Measures from Km 144.800 to Km145.000, Km148.00 to Km 148.350, Km150.920 to Km 151.020 And Km 155.800 to Km 156.000 in Kashedi Ghat and Km 200.317 to Km 200.932, Km 200.932 to Km 201.487 in Parshuram Ghat on Panvel-Mahad-Panji Road NH-66 on EPC mode in the state of Maharashtra

2024_MoRTH_798878_1 59.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2024
Time 14:0Hrs
13/05/2024
Time 17:30Hrs
34 Widening of Chilakaluripet Nekarikallu Section Design Chainage 47.000 to 85.080 of NH 167A Package II to 4 Lane with paved shoulder Configuration in the State of Andhra Pradesh under Annual Plan 2022 23

2024_MoRTH_800745_1 476.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 17:55Hrs
13/05/2024
Time 17:0Hrs
35 Construction of Bypass to Narsapuram town on NH 216 of 2 Lane with paved shoulder configuration starting from Existing Ch. Km 126.100 of NH 216 old NH 214A and ending at Km 10.814 existing chainage of NH 216 in the State of Andhra Pradesh

2023_MoRTH_768943_1 419.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 12:0Hrs
09/05/2024
Time 17:0Hrs
36 Road Protection work in Hill side and Valley side at km. 171 (ch. 170.750 to 170.930) and at km 172 (Ch. 171.700 to 171.900) on NH-707 in the State of Uttarakhand under Road Safety Plan 2023-24 on EPC Mode.

2024_MoRTH_800173_1 6.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 15:0Hrs
09/05/2024
Time 12:0Hrs
37 Landslide treatment work of 12 location on NH-58 from Km 235.420 (Shivpuri) to km 266.130 (Kodiyata) under EPC mode in the State of Uttarakhand on EPC Mode

2024_MoRTH_800365_1 54.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 12:0Hrs
09/05/2024
Time 12:0Hrs
38 Treatment of 07 no. of landslide location on NH-134 from Dharasu to Yamnotri in the State of Uttarakhand under Annual Plan 2023-24 on EPC Mode.

2024_MoRTH_799487_1 42.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
09/05/2024
Time 12:0Hrs
39 Strengthening from km 6/000 to 10/320 and Km 16/274 to 19/200 including CD works on NH 136 Thanjavur –Perambalure – Atthur road on Engineering, Procurement and Construction (EPC) Basis Contract under Annual Plan 2023-24 in the State of Tamil Nadu

2024_MoRTH_799251_1 8.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 15:0Hrs
08/05/2024
Time 15:0Hrs
40 Improvement and widening to Two Laning with Paved Shoulder of National Highway 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 31.500 in the state of Meghalaya (package-1) on EPC basis under North East Road Network Connectivity Improvement through Japan International Cooperation Agency (JICA) ODA Loan Phase-VII ( Package-1)

2024_WBRTH_800782_1 366.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 18:55Hrs
06/05/2024
Time 16:0Hrs
41 Improvement and widening to two Laning with Paved Shoulder of National Highway 127B from Km 31.500 to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis under North East Road Network Connectivity Improvement) through Japan International Cooperation Agency (JICA) ODA Loan Phase-VII ( Package-2)

2024_WBRTH_800794_1 315.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 18:55Hrs
06/05/2024
Time 16:0Hrs
42 Reconstruction of 3 nos. of damaged bridges of NH-326 at Toyaput Nallah at Ch. Km 261/060, Khudipadar Nallah at Ch. 268/780 km and Debagarh river at Ch. 270/260 km on NH-326 in the State of Odisha. (Bid Ref No. 59 CE NH of 2023-24)

2024_MoRTH_802149_1 37.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2024
Time 15:0Hrs
06/05/2024
Time 12:0Hrs
43 Widening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from Km 67/400 to Km 70/400 of NH-353 (Khariar Road town portion) in the State of Odisha on EPC Mode.BID Ref. No.-60 CE NH of 2023-24

2024_MoRTH_802151_1 43.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2024
Time 18:0Hrs
06/05/2024
Time 12:0Hrs
44 Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35.550 Design Chainage 0.000 to 42.800 Design Chainage 8.153 on NH 503A including Cable Stayed Bridge 0.860 Km on Back Water of Govind Sagar

2024_MoRTH_795482_1 613.680 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 18:0Hrs
06/05/2024
Time 11:0Hrs
45 Rehabilitation and upgradation two lane with pave shoulder configuration of NH752G from Sakri to Pimpalner section 0.000 to 21.411 in the state of Maharashtra on EPC Mode.

2024_MoRTH_798855_1 166.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2024
Time 15:0Hrs
03/05/2024
Time 15:0Hrs
46 Permanent repair work to protect abutment of Major Bridge on NH-160H towards Takarkheda side at Ch. 111/300 of Malegaon-Kusumba Dondaicha-Shahada in the state of Maharashtra on EPC Mode.

2024_MoRTH_795632_1 9.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2024
Time 15:0Hrs
02/05/2024
Time 17:30Hrs
47 Maintenance works and activities on section from Seer to Pahalgam (km. 19.050 to km 47.000) of NH No.501 in the UT of JK (Total length 27.95 Kms)

NIT 02 29.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/04/2024
Time 15:0Hrs
02/05/2024
Time 15:0Hrs
48 Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design length 19.20 Km in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM)

2024_MoRTH_796127_1 434.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2024
Time 15:0Hrs
01/05/2024
Time 17:30Hrs
49 Up-Gradation to Two / Four lane with paved shoulder configuration of NH 652 from Tuljapur - Naldurge - Akkalkot road ( Chainage from Km 00.000 to Km 30.982) in the state of Maharashtra on EPC Mode ( Length - 30.982Km)

2024_MoRTH_796822_1 136.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2024
Time 10:0Hrs
30/04/2024
Time 17:0Hrs
50 Beautification in stretch of Panvel-Mahad-Panji Road NH 66 Passing in sindhudurg District (Talgaon to Patradevi section) Km 367/200 to Km 471/300 in the State of Maharashtra on EPC mode

2024_MoRTH_799819_1 7.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2024
Time 10:0Hrs
29/04/2024
Time 17:30Hrs
51 Rehabilitation and up-gradation for Talere .Gaganbawada . kolhapur Road NH 166G stretch start from km. 0.00 to Km. 06.00 and km. 13.00 to km 19.440 of NH.166G, length 12.440 km in the State of Maharashtra

2024_MoRTH_799263_1 116.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
29/04/2024
Time 17:30Hrs
52 Talere Gaganbawada Road NH 166G Km. 23.250 to 28.320 Treatment for Five critical land slide prone spots posing significant threat to the safety of travellours is Karul Ghat section in the State of Maharashtra.

2024_MoRTH_798676_1 6.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2024
Time 15:0Hrs
29/04/2024
Time 17:30Hrs
53 Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.590 km to 2 Lane with paved shoulder configuration along with OTI in 5.88 km length in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_798392_1 255.200 MoRTH Normal Highway Project HAM 01/03/2024
Time 17:30Hrs
29/04/2024
Time 17:30Hrs
54 Upgradation of Multai to MP/MH Boarder section of NH-347A from 0.00 to 23.94 to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_798453_1 240.420 MoRTH Normal Highway Project HAM 01/03/2024
Time 17:30Hrs
29/04/2024
Time 17:30Hrs
55 Widening and Strengthening of existing S/L, I/L,& D/L to 2 Lane with PS from Km 256/455 to 256/503, 256/820 to 256/960, 265/760 to 266/010, 266/010 to 266/800, 268/610 to 268/710, 270/975 to 271/055, 276/460 to 276/560, 276/560 to 276/700, 276/700 to 277/480, 285/780 to 288/290, 288/290 to 291/050 and Construction of 3 Nos. of Bypass from Km 266/800 to 267/300, 270/025to 270/975, & 284/700 to 285/780 onNH-53 inthe State of Odisha under EPC mode. (BID Ref. No.-58 CE NH of 2023-24)

2024_MoRTH_800929_1 73.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 18:55Hrs
29/04/2024
Time 12:0Hrs
56 Work of Widening of Road from 5.5m to 10 m carriageway between ch. km 370/620 to 386/020 except km 377/420 to 380/020 of NH-64 in navsari District in the state of Gujrat Eru Matvad Dandi Section

2024_MoRTH_800809_1 48.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 9:0Hrs
29/04/2024
Time 12:0Hrs
57 Widening and Strength. to 2 lane with P.S/4 Lane with PS config. from km.61.500 of NH727B near Nawalpur(km178.500 of Sonauli Balia Marg,Old SH01)i.e.end point of Salempur Bypass to km.106.495 of NH727B near Sikanderpur under EPC Mode in the state of UP

2023_MoRTH_769456_1 963.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 9:0Hrs
29/04/2024
Time 11:0Hrs
58 UP-GRADATION OF PICHHORE- DINARA SECTION OF NH-346, FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE

2024_MoRTH_795124_1 299.150 MoRTH Normal Highway Project HAM 13/02/2024
Time 10:30Hrs
26/04/2024
Time 17:30Hrs
59 Strengthening of NH 166A to two lane paved shoulder from Km 0.000 to Km 22.200 of Vadhkal Alibag road for design length 22.200 Km in Raigad district in the State of Maharashtra on EPC Mode

2024_MoRTH_800106_1 56.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 14:0Hrs
26/04/2024
Time 17:0Hrs
60 Rehabilitation and upgradation of NH 166A to two lane paved shoulder from km 2.320 to km 3.600 and Km 6.520 to km 8.610 and from Km 14.070 to km 14.470 of Vadhkal Alibag road (including construction of Major Bridge Flyover VUP) for design length 3.77 Km in Raigad district in the State of Maharashtra on EPC Mode

2024_MoRTH_800110_1 178.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 14:0Hrs
26/04/2024
Time 17:0Hrs
61 Strengthening at selected stretches from km 22/0 to km 78/2 of NH-38 (Mangalore-Villupuram Road) on EPC mode in Tamil Nadu

2024_MoRTH_799982_1 47.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 19:0Hrs
26/04/2024
Time 11:0Hrs
62 ONE TIME IMPROVEMENT FOR NANASA BYPASS, KHATEGAON BYPASS, SANDALPUR BYPASS and KHEDI,MAHADGOAN, DHARGOAN, DHSNORA, BHADUS, AT CHHIRAPATLA OF INDORE - BETUL ROAD NH - 47 IN THE STATE OF MADHYA PRADESH ON EPC MODE

2024_MoRTH_800265_1 66.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 13/03/2024
Time 17:30Hrs
25/04/2024
Time 17:30Hrs
63 One Time Improvement for Km. 1 to 23 and Black Spot Near Dudhiya Power House, smooth merging and diverging of junctions and repairs of old drains and RCC drain of Indore Betul Road NH-47 in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_799825_1 27.010 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 17:30Hrs
25/04/2024
Time 17:30Hrs
64 Widening from km 3/950 to km 4/300 (0.35 Km) and Strengthening selected stretches from Km 0/0 to Km 12/3 (4.92 Km) of NH-38 (Mangalore-Villupuram road) on EPC mode in Tamil Nadu

2024_MoRTH_799240_1 15.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2024
Time 15:0Hrs
25/04/2024
Time 11:0Hrs
65 Up-gradation of Shyampur to Sabalgarh Road section of NH-552Ext. from km 111.800 to 166.850 to Two Lane with Paved Shoulder configuration in the State of Madhya Pradesh on Hybrid Annuity Mode

2024_MoRTH_796278_1 629.940 MoRTH Normal Highway Project OTHERS 21/02/2024
Time 17:30Hrs
23/04/2024
Time 17:30Hrs
66 Reconstruction widening of Narrow Minor Bridges 4 Nos at Ch 71.920 74.064 74.856 and 75.690 in the section Murud Akola to Latur Airport Junction on Nh 63 in the state of Maharashtra on EPC mode

2023_MoRTH_797817_1 3.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 18:55Hrs
22/04/2024
Time 17:30Hrs
67 Construction of Shopian Bypass on NH-444 taking off from existing chainage Km 36.500 and re-joining at Km 47.588 of existing chainage (New Design Chainage from Km 28.000 to Km 36.925) as 2-lane with paved shoulder (Length 8.925 Km) in the UT of Jammu and Kashmir on EPC mode.

NIT 34 168.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 15:0Hrs
22/04/2024
Time 15:0Hrs
68 BALANCE WORK OF WIDENING OF 4 NOS EXISTING 2 LANE MAJOR BRIDGE OF SIX LANING OF KOZHIKODE BYPASS (CALICUT BYPASS) (I.E. VENGALAM JN. TO RAMANATTUKARA JN.) SECTION OF NH 66 FROM DESIGN CHAINAGE KM 230.400 TO DESIGN CHAINAGE KM 258.800 (TOTAL LENGTH 28.400 KM) IN THE STATE OF KERALA

2024_NHAI_188052_1 102.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 18:20Hrs
22/04/2024
Time 11:0Hrs
69 Special Repair on NH 05 Km 254 to 368 excluding Km 284 to 329 SH Restoration to Mettaling and Tarring work C o R Wall in PCC C o R wall and B wall in wire crate and Reconstruction of damaged W metal beam crash barrier in various reaches between km 254 to 284 and km 329 to 368 in the State of Himachal Pradesh

2024_MoRTH_799340_1 7.740 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 18:0Hrs
22/04/2024
Time 11:0Hrs
70 Special Repair on Theog Kotkhai-Hatkoti Road on NH 705 from Km 31 to 69 Construction of R wall in Wire crates R wall in PCC B walls in PCC Wire crates U Shape drain in PCC and Strengthening of damaged portion between Km 31 to 69 in the State of Himachal Pradesh

2024_MoRTH_799350_1 16.300 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 18:0Hrs
22/04/2024
Time 11:0Hrs
71 RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_750739_1 351.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 18:55Hrs
22/04/2024
Time 11:0Hrs
72 Construction of By-pass Road to Rayagada Town and J K Pur Town on NH 326 in the state of Odisha on EPC mode (Bid Ref No - 57 CE NH of 2023-24)

2024_MoRTH_799596_1 153.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 17:0Hrs
20/04/2024
Time 12:0Hrs
73 Upgradation of Shahdol- Sagartola Section of NH 543 from km 0/000 to km 69/400 to 2 lane with paved shoulders under Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh

2024_MoRTH_798673_1 515.180 MoRTH Normal Highway Project HAM 05/03/2024
Time 11:0Hrs
19/04/2024
Time 11:0Hrs
74 Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH-761 from Design Ch. Km 0.000 to KM 37.970 Design length 37.970 Km in the State of Maharashtra on EPC Mode

2024_MoRTH_796098_1 266.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/03/2024
Time 11:5Hrs
15/04/2024
Time 17:5Hrs
75 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 474.710 TO KM 474.850 & KM 475.565 TO KM 475.625 ON RISHIKESH – JOSHIMATH - MANA ROAD (NH-07) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 02 NOS) ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_642675_1 21.430 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 15:0Hrs
13/04/2024
Time 15:0Hrs
76 CONSTRUCTION IMPROVEMENT OF ROAD SINGTHAMDIKCHU FROM CL 9 TO NHDL SPECIFICATIONS THROUGH EPC MODE BETWEEN KM 10.00 (KM 0.00) TO KM 32.700 (EXISTING) (KM 32.110 PROPOSED) (NET DESIGN LENGTH22.110 KM) UNDER 87 RCC764 BRTF UNDER PROJECT SWASTIK IN SIKKIM STATE

1 212.350 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
13/04/2024
Time 15:0Hrs
77 Performance based Maintenance Contracts (PBMC) Estimate of Rehabilitation and up gradation of Nandgaon peth Morshi Warud MH MP border section of Nh353 K (Design km. 0.000 to 95.390 ) to Two Four Lane with Paved shoulders Configuration of NH353 K for 5 year Maintenance Period in the state of Maharashtra.

2024_MoRTH_798041_1 41.510 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 10:0Hrs
12/04/2024
Time 17:30Hrs
78 Realignment and curve improvement near Deulgaon Mahi town from design chainage Km. 105.300 to Km. 106.185 (length- 0.885 Km) near on NH 753A to Four lane with paved Shoulder configuration in the state of Maharashtra on EPC mode

2024_MoRTH_797415_1 10.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2024
Time 13:0Hrs
11/04/2024
Time 17:30Hrs
79 Rehabilitation and upgradation of Viaragarh (Mohadi) From Design Ch. 73.830 to Ch.76.00 (Length 2.17Km) in Chikhli Khamgaon section of NH 548CC to two lane with paved shoulder Configuration in the state of Maharashtra on EPC Mode.

2024_MoRTH_797418_1 16.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2024
Time 15:0Hrs
11/04/2024
Time 17:30Hrs
80 Construction of Interchange Loop with underpass at Beas on Amritsar- Jalandhar section of NH-03 in the State of Punjab on EPC Mode

2024_NHAI_191449_1 21.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 15:0Hrs
08/04/2024
Time 15:0Hrs
81 Widening and Strengthening to two lane with Paved Shoulder of NH 81 from Km 30.250 to 55.400 in the State of Bihar on EPC mode

2024_MoRTH_797354_1 87.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 15:0Hrs
06/04/2024
Time 15:0Hrs
82 Strengthening of Banda -Amboli Sankeshvar Road NH 548H fom Km 0.000 to 52/600 ( khambdev Naka to Sindhudurg -Kolhapur Border) in Sindhudurg District in the state of Maharashtra

2023_MoRTH_796578_1 36.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2024
Time 16:30Hrs
04/04/2024
Time 17:30Hrs
83 Widening and strengthening of Gangakhed to Kingaon section of NH 752K in jn 38.750 to 72.304 Flexible Pavement Length 33.554 km. to 2Lane configuration on EPC mode in the state of Maharashtra

2023_MoRTH_750386_1 117.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/04/2023
Time 10:0Hrs
03/04/2024
Time 17:30Hrs
84 Maintenance of Lokhandi Sawargaon to Renapur Latur highway from existing Km 32.225 to Km 66.688 of NH548B and Ambajogai Bypass from existing Km 0.000 to Km 3.820 2LPS 4L configuration road) in the State of Maharashtra under Performance Based Maintenance Contract PBMC

2024_MoRTH_798260_1 18.650 MoRTH Maintenance Project OTHERS 29/02/2024
Time 15:0Hrs
03/04/2024
Time 17:30Hrs
85 Rehabilitation and upgradation of Section of NH 361F from Shivaji Maharaj Chowk to Barshi Naka Ch.47.00 to 49.500 to 4 lane confifuration in Beed City on EPC Mode in the state of Maharashtra Length 2.5 km

2023_MoRTH_782378_1 37.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2023
Time 18:55Hrs
03/04/2024
Time 17:30Hrs
86 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 482.070 TO KM 482.170, , KM 493.970 TO KM 494.115, KM 494.450 TO KM 494.600, KM 495.320 TO KM 495.540 & KM 486.100 TO KM 486.170 ON RISHIKESH - JOSHIMATH - MANA ROAD (NH-07) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 05 NOS) ON ENGINEERING PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_641702_1 65.700 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2024
Time 18:0Hrs
03/04/2024
Time 11:0Hrs
87 Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54.000 to 82.300 and Design chainage km 54.000 to 82.120 Shikrapur to Nhavara Section to 2L.PS.4L Configuration in the State of Maharashtra on EPC mode

2024_MoRTH_796084_1 276.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2024
Time 10:5Hrs
01/04/2024
Time 15:0Hrs
88 RFP for [Balance work of Rehabilitation & Upgradation of Indapur to Veer (Wadpale) Section of NH-17 (New NH-66) from existing Km 84/000 to Km 108/400 [Design Ch. 84.000 to 110.750] to 4-lane with paved shoulder in the State of Maharashtra through EPC Mode under NHDP Phase-IV (PACKAGE-I) Project Length=26.75 km, Balance Length=12.35 Kmsection of NH-66 in the state ofMaharashtra on EPC mode]

2023_MoRTH_780259_1 556.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/11/2023
Time 16:0Hrs
28/03/2024
Time 17:0Hrs
89 Construction of Major Bridge on Wardha River at Ch 28/362.50 on Talegaon Warud Gonapur road section of NH 347A on EPC Mode in the state of Maharashtra

20/EENH/AMT/2023-24,Dt.05/01/2024 24.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
27/03/2024
Time 17:30Hrs
90 DEVELOPMENT OF 4 LANING OF BARASAT-BARAJAGULI SECTION OF NH-34 (NEW NH-12) FROM KM. 31.000 TO KM. 48.679 IN THE DISTRICT OF NORTH 24-PARGANAS IN THE STATE OF WEST BENGAL ON EPC MODE UNDER NH(O)

2024_NHAI_188060_1 275.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2024
Time 15:0Hrs
27/03/2024
Time 15:0Hrs
91 DEVELOPMENT TO FOUR LANING OF THE DESCOPED STRETCHES FROM KM. 115.342 TO KM. 191.700 OF NH-34 IN THE DISTRICT OF NADIA (3.962 KM.) & MURSHIDABAD (5.538) PERTAINING TO KRISHNAGAR – BEHRAMPORE SECTION OF NH-34 (NEW NH-12) SECTION IN THE STATE OF WEST BENGAL

2024_NHAI_188022_1 155.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2024
Time 11:0Hrs
27/03/2024
Time 11:30Hrs
92 Strengthening from km 110/2 to km 142/0 of NH-38 (length 31.8 km) (Mangalore-Villupuram Road0 on EPC mode in Tamil Nadu

2024_MoRTH_794400_1 33.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 9:0Hrs
27/03/2024
Time 11:30Hrs
93 Upgradation of Bramhapuri town section from design km 448/670 to km 451/370 (Length 2.70 km) of NH 543 Section of Gondia Amgaon Deori Korchi Kurkheda Wadsa Bramhapuri road in the state of Maharashtra on EPC Mode

2024_MoRTH_799810_1 40.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
27/03/2024
Time 10:0Hrs
94 Maintenance works and activities on section from Gangakhed to Kingaon section of NH-752K in km.38/750 to km.72/304 (Total Length- 33.55 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783435_1 3.920 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
26/03/2024
Time 17:30Hrs
95 Construction of 9 Nos. of Standalone Safety Structures/Works at different Locations on various NHs in the State of Maharashtra on EPC mode

2024_NHAI_191731_1 261.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:0Hrs
26/03/2024
Time 11:0Hrs
96 Construction of 11 Nos of Standalone safety structures/works (Package -III) at different locations on various NHs in the state of Maharashtra on EPC Mode (3rd Call).

2024_NHAI_191727_1 357.220 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:0Hrs
26/03/2024
Time 11:0Hrs
97 Construction of 07 Nos. of Standalone safety Structures/ works (Package V) at different locations on 4 different NHs (NH-44, 47, 53 & 353J) in the state of Maharashtra on EPC Mode. (3rd Call)

2024_NHAI_191737_1 194.553 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:10Hrs
26/03/2024
Time 11:0Hrs
98 BALANCE WORK OF REHABILITATION AND UPGRADATION TO 4-LANING OF NH-31D FROM KM 113.200 TO KM 154.854 (PKG-IIA) FALAKATASALSALABARI SECTION IN THE STATE OF WEST BENGAL ON EPC BASIS”

2023_NHAI_190199_1 766.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2024
Time 15:0Hrs
22/03/2024
Time 15:0Hrs
99 RECTIFICATION WORK OF ACCIDENT PRONE AREA AT GAYGHAT FROM CH. 211.500 TO 212.000 OF NH-730 IN THE STATE OF UTTAR PRADESH

2024_MoRTH_799481_1 1.060 MoRTH Maintenance Project OTHERS 07/03/2024
Time 18:55Hrs
21/03/2024
Time 17:0Hrs
100 Construction of additional two lane bow string ROB adjacent to the existing two lane Bow string ROB at Km 56/2 of NH234 (New.NH.75) (Mangalore-Villupuram Road) on EPC mode under Annual Plan 2022-23 in the State of TamilNadu

2024_MoRTH_793329_1 24.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 9:0Hrs
21/03/2024
Time 15:0Hrs
101 Construction of 4 Lane access controlled Greenfield Hisar Bypass starting from NH52 Barwala Hisar Rajgarh Design Km 0.000 and terminating at NH 9 Delhi Mandi Dabwali Design Km 7.236 Total Length 9.84 km alongwith development of Interchange at Dhandoor Junction of NH 52 and NH 9 in state of Haryana under NHO on EPC mode

2023_NHAI_176428_1 250.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2023
Time 15:0Hrs
20/03/2024
Time 11:0Hrs
102 Short Term Maintenance of Tohana (Punjab/Haryana Border) to Moonak-Jakhal-Budhlada Road section of NH-148B from km. 226.370 to 236.600, 239.400 to 241.500 and km. 243.300 to 244.750 (13.780 kms.) in the State of Punjab

2024_MoRTH_800198_1 0.710 MoRTH Maintenance Project OTHERS 12/03/2024
Time 15:0Hrs
19/03/2024
Time 15:0Hrs
103 CONSTR OF RD NIDDER KYUN TSO PUNGUK BET KM 0.00 TO KM 27.00 (NET LENGTH 27.00 KM) NHSL SPECS OF UNDER 93RCC 755BRTF PROJECT HIMANK ON EPC MODE

2024_BRO_637177_1 130.490 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 18:0Hrs
19/03/2024
Time 11:0Hrs
104 Construction of RCC Drains at various villages Towns location from Km 1 050 to Km 143 870 for length of 17 818 Km on NH-753 F Chh Sambhajinagar Aurangabad Jalgaon Road in the state of Maharashtra

2024_MoRTH_790098_2 21.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 15:0Hrs
18/03/2024
Time 17:30Hrs
105 Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 (total length is 51 km) on RKCTC NH(701) road Project Beacon in the UT of JK Border Roads Organization (BRO) on EPC mode.

2024_MoRTH_794554_1 743.970 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 15:0Hrs
18/03/2024
Time 15:0Hrs
106 REHABILITATION and UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH-161A (AKOLA AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.

2023_MoRTH_786760_2 50.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 10:0Hrs
14/03/2024
Time 17:30Hrs
107 New Construction of Damaged Major Bridge RCC T-Beam bridge and its approaches at Ch. 147.547 (LHS) on Yamuna Nagar-Saha -Barwala-Panchkula section of NH-73 (New NH-344) from Km. 115.400 to km. 157.192 (Package-2) in the State of Haryana

2024_NHAI_188047_1 5.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 19:0Hrs
14/03/2024
Time 11:0Hrs
108 Short Term Maintenance on Jalandhar Kapurthala Sultanpur Lodhi Road from RD 23 400 to 29 000 Km and from RD 36 250 to 37 680 Km of NH 703A

2024_MoRTH_795422_1 8,193,484.000 MoRTH Maintenance Project OTHERS 14/02/2024
Time 12:30Hrs
13/03/2024
Time 17:0Hrs
109 Construction of Flyover at Kawas Patiya at Km 14.400 and VUP at Reliance at Km 11.220 on NH 53 of Surat Hazira section in the state of Gujarat on EPC Mode

2024_NHAI_185819_1 122.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 18:0Hrs
13/03/2024
Time 11:0Hrs
110 Construction of 12 Nos. of Standalone safety Structures (Package I) on NH-3 in the state of Maharashtra on EPC Mode

2024_NHAI_188572_1 642.830 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 9:10Hrs
13/03/2024
Time 11:0Hrs
111 Design and Construction using Thin White Topping (TWT) including routine maintenance and balance works of Khed-Sinnar section from km.42.000 to km.177.000 on NH-60 in the state of Maharashtra as Standalone project on EPC Mode.

2024_NHAI_188567_1 430.640 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 9:0Hrs
13/03/2024
Time 11:0Hrs
112 Construction of Major Bridge on Chargad River at Ch.27.650 with approaches From Km. 27.427 to Km. 27.782 and Minor Bridge on Khar Nallah at Ch.47.020 with approaches From Km.46.905 to Km.47.101 on Nandgaonpeth. Morshi Road NH.353 K Tal. Morshi, Dist. Amravati on EPC mode in the state of Maharashtra.( 2nd Call)

2023_MoRTH_786773_2 13.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 10:0Hrs
12/03/2024
Time 17:30Hrs
113 Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km. 133.025 to Km. 133.875 on on Jalna- Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon, Dist. Washim on EPC mode in the state of Maharashtra (2nd Call)

2023_MoRTH_786778_2 30.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 10:0Hrs
12/03/2024
Time 17:30Hrs
114 Rehabilitation of 02 Nos. of existing Bridges at Km. 132 km (Saryu river) & Km. 133 (Gomati River) and IRQP work from Km. 130.00 to Km. 134.00 of NH 309A in the State of Uttarakhand

2024_MoRTH_798553_1 4.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2024
Time 15:0Hrs
11/03/2024
Time 15:0Hrs
115 Short Term Maintenance of Kiratpur Sahib- Anandpur Sahib -Nangal upto Himachal Pradesh Border section of NH-503 (Extn.) in the state of Punjab.

2024_MORTH_797369_1 1.980 MoRTH Maintenance Project OTHERS 24/02/2024
Time 1:55Hrs
11/03/2024
Time 12:0Hrs
116 Construction of bypass Road to Daspalla town from KM. 195/250 to K.m 200/635 of NH-57 in the State of Odisha on EPC Mode (Bid Ref. No. 24 CE NH of 2023-24)

2023_MoRTH_759732_1 94.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
11/03/2024
Time 12:0Hrs
117 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 18.450 TO KM 18.500 ON RISHIKESH - DHARASU ROAD (NH-94) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 01 NOS) ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_638741_1 4.040 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 10:0Hrs
08/03/2024
Time 11:0Hrs
118 Rehabilitation and Uppradation of Shewali Fata to Kalambhir Section i.e km 0.443 to km 4.500 & Nizampur to Chadwel section i.e.km 13.485 to 26.265 (Length=16.107km) (excluding 2 major Bridges with approaches km 13.735 to 14.095 & km 19.660 to 20.030) of NH-753B 2 Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode.

2024_MoRTH_788973_1 120.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
07/03/2024
Time 17:30Hrs
119 Construction of Vehicular Underpass (VUP) at Daman Ganga ( Ch. 368.850 km) including Service road, Culverts and Minor bridge between Daman Ganga river and Mohan Gam railway for rectification of blackspots id GJ-(02)-066 on Surat-Vapi section of nh-8 (new NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Damanganga/2023 31.140 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 18:55Hrs
07/03/2024
Time 15:0Hrs
120 Construction of Long Term Remedial Measures for Blackspot Locations at VOP at Yelachagere Bore gate Km 177.348, VUP at Kalale Gate Km 184.100, LVUP at Hoshalli Gate Km 185.510, VUP at Kadakola junction 198.210, VUP at APMC Gate Km 206.360 and 206.535 VUP at Sachidanada Ashrama Km 208.254 and VUP at Kempaiahnahundi Km. 232.493 along Kerala Border to Kollegal Section of NH766 and VUP at Bannikuppe Km 181.637 along Mysore to Madikeri section of NH275 in the State of Karnataka under EPC mode

2024_NHAI_188138_1 189.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
121 Permanent Rectification of Blackspots by i.Construction of VOP at Basaveshwara Circle at Ilkal Town ID No. KA-02-199 at Km.330.275 ii Construction of VOP at Metagal Cross ID KA-02-430 at Km.38.930 along with Slip road from Km.387.500 to Km.388.460 on both sides iii Flyover at Hulgi at Km.412.530 iv VUP At Hosahalli at Km.409.600 v LVUP at Shahapur Cross at Km.406.040 along with Slip road from Km.405.640 to Km.406.500 on both sides and SVUP at ROB Approach at Km. 407.130 along with Service road from Km.406.550 to Km.407.200 on both sides in Hungund to Hospet Section of NH50

2024_NHAI_188180_1 176.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
122 Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli Kota section in the State of Rajasthan on EPC Mode

2024_NHAI_188054_1 79.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 17:0Hrs
07/03/2024
Time 11:0Hrs
123 Construction of VUP (Talkere Hand Post-KA-(02)-057), LVUP (Agrahara Junction- KA (02) - 273) and VUP (Tippasandra Hand Post- KA (02) - 015) of MORT&H Identified Black Spots on Devihalli-Hassan section of NH-75 to be executed on Engineering Procurement and Construction (EPC) mode

2024_NHAI_187721_1 99.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
124 Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47 723 to Km 54 405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar

2024-NHAI-180689-1 180.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 9:0Hrs
07/03/2024
Time 11:0Hrs
125 Construction of 4 Nos of Standalone safety structures/works at different locations on various NHs in the State of Maharashtra on EPC Mode

2024_NHAI_188568_1 169.860 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2023
Time 15:0Hrs
06/03/2024
Time 15:0Hrs
126 Construction of new bridge over Sagada river at Ch-192.030 km on NH-26 including approaches in the state of Odisha on EPC mode. (Bid Ref No. 47 CE NH of 2023-24)

2024_MoRTH_791662_1 19.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 18:55Hrs
06/03/2024
Time 15:0Hrs
127 Construction of Vehicular Underpass (VUP) at Km. 487.324 (Black Spot No. TG-02-002 (Nandikandi outskirts)) and Construction of Flyover (Black Spot No.KA-02-323 (Chidri Bypass) for Four Laning of MH-KNT Border- Sangareddy from KM.348.800 to KM.493.000 in the State of Karnataka and Telangana of NH-09 (New NH-65) Under NHDP-III to be executed on EPC mode

2024_NHAI_181503_1 74.190 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
06/03/2024
Time 11:0Hrs
128 Short Term Maintenance Of Tarn Taran Kapurthala Road (NH-703AA) At Km 0.00 To 50.25 In Dist. Tarn Taran And Kapurthala.

2024_MoRTH_792248_2 3.630 MoRTH Maintenance Project OTHERS 27/02/2024
Time 12:50Hrs
06/03/2024
Time 11:0Hrs
129 Construction of balance work of four laning with paved shoulder of Bellary Bypass from Design Ch 254 750 to Junction at Ch 266 837 (Length 12 087 Kms) and 1 Km Stretch from Ch 277 690 to Ch 278 690 at D Hirehal Village of NH 150A of Bellary Byrapura Section in Karnataka on EPC Mode under NH(O)

2023_NHAI_179479_1 425.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 11:0Hrs
05/03/2024
Time 11:0Hrs
130 Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode.

2023_MoRTH_786505_1 608.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 18:55Hrs
04/03/2024
Time 17:0Hrs
131 Construction of Light Vehicular Underpass (LVUP) at Km. 112.917 (Blackspot location Nagathihalli KA-02-269) and Construction of FOB @ Dodderi Gate Blackspot location KA-(02)-223 with Median grill for 4 Lanning of Devihalli-Hassan km.110.00 to Km.189.500of NH-48 (New NH No. 75) in state of Karnataka to be executed on EPC mode

2024_NHAI_181509_1 25.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
04/03/2024
Time 15:0Hrs
132 Design and Construction of Vehicular Underpass as Long-term rectification work at MoRTH Blackspot Dongarbaba Temple MH 04 192 at Ch 425 510 on Pimpalgaon Nashik Gonde Section of NH 3 in the State of Maharashtra on EPC Mode

2024_NHAI_186081_1 50.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
04/03/2024
Time 11:0Hrs
133 Long term rectification work at 4 Nos of MoRTH Blackspots i Bhumkar Pull MH 04 27 ii Navale Bridge MH 04 26 iii Bavdhan MH 04 42 iv Wakad MH 04 41 and Design and Construction of FOB at Km 842 680 near NDA Chowk on Pune Satara Section of NH 48 on EPC Mode

2024_NHAI_186063_1 36.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
04/03/2024
Time 11:0Hrs
134 Construction of Two Lane with Paved Shoulder from Design Km 89.900 Near Roshni Village at (NH-347B SH-26 Existing Km 97.886) to Design Km 114.000 (347B SH-26 Existing Km 121.300) near Ashapur Village section of Betul to Khandwa Package 3 in the State of Madhya Pradesh on EPC Mode

179662 138.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 18:0Hrs
02/03/2024
Time 18:0Hrs
135 Construction of ROB at LC 115B (near Nastanpur) at Km 126/150 of Nandgaon-Chalisgaon section of NH 753J in the state of Maharashtra on EPC mode

2024_MoRTH_790693_1 79.310 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 16/01/2024
Time 17:0Hrs
01/03/2024
Time 17:30Hrs
136 Work of road safety Improvement by means of widening of Existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 Borbhatha Ankleshwar Section under Road Safety Annual Plan 2023-24 Total Length 4.4km

2024_MoRTH_793110_1 4.100 MoRTH Normal Highway Project OTHERS 31/01/2024
Time 18:15Hrs
01/03/2024
Time 12:0Hrs
137 Construction of Additional Structures including approaches in Vadodara Surat section of NH48 between existing Km 108.00 to Km 250.00 in the State of Gujarat on EPC mode

2023_NHAI_154237_1 639.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2023
Time 15:0Hrs
29/02/2024
Time 15:0Hrs
138 Widening and Strengthening of existing S/L, I/L,& D/L to 2 Lane with PS from Km 256/455 to 256/503, 256/820 to 256/960, 265/760 to 266/010, 266/010 to 266/800, 268/610 to 268/710, 270/975 to 271/055, 276/460 to 276/560, 276/560 to 276/700, 276/700 to 277/480, 285/780 to 288/290, 288/290 to 291/050 and Construction of 3 Nos. of Bypass from Km 266/800 to 267/300, 270/025to 270/975, & 284/700 to 285/780 onNH-53 inthe State of Odisha under EPC mode. (BID Ref. No.-46 CE NH of 2023-24)

2024_MoRTH_789771_1 73.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 18:55Hrs
29/02/2024
Time 12:0Hrs
139 Strengthening work of stretch of Khanapara to Jagiroad from Km. 163.400 to Km. 205.000 (Balance Portion of Guwahati Bypass, Package no. AS-03 & AS-20) of NH 37 in the State of Assam

2023_NHAI_178741_1 62.480 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/01/2024
Time 17:15Hrs
29/02/2024
Time 11:0Hrs
140 Maintenance works and activities on section (1.) NH-703A Section Gidderpindi to Makhukm 60.860 to 76.150 with slip Road, (2.) Railway Over Bridge at L.C. No. A-54/Eon NH-05 from km 13.170 to 14.520 (3.) Railway Over Bridge at L.C. No. C-57on NH-754 from km 72.597 to 73.680 at Jalalabad. in the State of Punjab.

2024_MoRTH_794897_1 22.680 MoRTH Maintenance Project OTHERS 09/02/2024
Time 18:30Hrs
29/02/2024
Time 11:0Hrs
141 Design and Construction of New Service Road from Km 835 780 to Km 836 600 Linear length km 1 605 including Minor Bridges And New Major Bridges on Both sides Service Road on Mutha River Ch 837 063 along with its approaches for NH-4 Pune Satara Section Km725 000 to Km 865 000 in the State of Maharashtra on EPC Mode

2024_NHAI_185668_1 36.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
142 Construction of Major Bridges Service Road Bridges at Krishna River including approaches for Rectification of Black Spot MH 04 218 on both sides at Km 756 395 Krishna River Bridge and Construction of Flyover including a LVUP and Approaches for Rectification of Black Spot MH 04 216 on both sides at Km 770 550 Vele Village of Pune Satara Section of NH 48 in the State of Maharashtra on EPC Mode

2024_NHAI_185556_1 56.940 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 14:0Hrs
29/02/2024
Time 11:0Hrs
143 Four Laning of existing road section of NH-30 (Old NH-24B) from km 162.000 (Lalgopalgunj) to km 179.500 (Nawabgunj) of Raebareli to Prayagraj Section in the state of Uttar Pradesh (Total length-17.500km) on EPC Mode

2023_NHAI_179435_1 112.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
144 Construction of 6 laning flyover at Km. 178.250 (Baba Bal Nath Samadhi Sthal) on Gurgaon Kotputli Jaipur section of NH 48 in the state of Rajasthan on EPC Mode

2024_NHAI_185547_1 45.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2024
Time 18:55Hrs
29/02/2024
Time 11:0Hrs
145 Rehabilitation and Up-gradation from design Km 0.000 to Km. 69.280 of NH-931 (Pratapgarh - Amethi - Gauriganj - Musafirkhana) to two lane with paved shoulder on Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2023_MoRTH_769274_1 582.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
146 Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K under the Short Term Maintenance Contract in the State of Uttar Pradesh

2024_MoRTH_796820_1 0.670 MoRTH Maintenance Project OTHERS 21/02/2024
Time 6:55Hrs
28/02/2024
Time 15:0Hrs
147 Construction of flyovers at (i) Major junction between NH-77 (NH-22) & SH-49 (Y-Junction) at Mahua Chowk & (ii) intersection between NH-77 (NH-22) & MDR (Lalganj to Muzaffarpur) (Y Junction) at Fakuli in 4 laning of Hajipur – Muzaffarpur Section of NH-22 (old NH-77) in the state of Bihar on EPC mode.

2024_NHAI_182663_1 93.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 15:0Hrs
28/02/2024
Time 11:30Hrs
148 Construction of Twin 2-Lane (4-Lane) ROB at Km 406 of NH-730 and approaches under EPC mode in the State of Uttar Pradesh.

2024_MoRTH_794207_1 79.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2024
Time 15:0Hrs
28/02/2024
Time 11:0Hrs
149 Balance works of Rehabilitation and Up-gradation of Digras - Darwha – Karanja Section in (km 0/00 to 74/351) NH 361C two lane with paved shoulder configuration in the state of Maharashtra.

2023_MoRTH_770839_1 114.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/09/2023
Time 18:30Hrs
27/02/2024
Time 17:30Hrs
150 Repair of rehabilitation and upgradation of Digras Darwha Karanja section in (km 0.000 to 74.351) NH 361C two lane with paved shoulder configuration in the state of Maharashtra.

NIT42/EENH/AKL/2023-24 2.400 MoRTH Normal Highway Project OTHERS 09/09/2023
Time 9:0Hrs
27/02/2024
Time 17:30Hrs
151 Construction of Descoped works like Construction of Service Road, new culverts, Drains, widening and repair of existing culverts, and Construction of Toll Plaza along with Toll Management System cum Toilet Blocks of 2 lane with paved shoulder from Km.195.100 to 418.000 of Bijapur Gulbarga Humnabad section of NH218 New NH50 in state of Karnataka

2024_NHAI_184633_1 49.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2024
Time 15:0Hrs
27/02/2024
Time 11:0Hrs
152 Rehabilitation & Up-Gradation to 2 -Lane with paved shoulder Configuration of Velapur -Mahud section of NH-965G Design Chainage from Km 10/500 to Km 32/300 in the state of Maharashtra on EPC Mode

2024_MoRTH_788316_1 84.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2024
Time 2:0Hrs
26/02/2024
Time 17:30Hrs
153 Permanent rectification of 4 Nos. of black spots on NH-27 (old NH-28) of Kotwa - Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) 4 nos. of black spot on NH-27 of Muzaffarpur- Darbhanga - Purnia section (km. 0.00 to km 148.550 and km. 159.357 to km. 287.860) (total length 277.053 km.) & Removal of 1 No of at-grade junction near Satanpur Junction in Satanpur Village on NH-122 in the State of Bihar on EPC Mode.

2024_NHAI_181445_1 295.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/01/2024
Time 15:0Hrs
26/02/2024
Time 15:0Hrs
154 Four laning of Dhrol Greenfield section from Km 0.000 (Ex Ch.53.151 of SH-25) to Km 3.286 and Widening to four lane from Km3.286-Km6.000 and Widening of Amran section to 4 lane from Km 42.180-Km48.580 of NH-151A under NH(O) in Gujarat on EPC mode

2023_NHAI_179003_1 415.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
26/02/2024
Time 15:0Hrs
155 Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod,Bhojlawa, Hadota, Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode

2023_NHAI_177214_1 255.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/12/2023
Time 15:0Hrs
26/02/2024
Time 14:0Hrs
156 Construction widening of Service Road and Installation of street Lights on Solapur Yedeshi Section of NH 52 on EPC Mode

2024_NHAI_180937_1 68.410 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2024
Time 11:0Hrs
26/02/2024
Time 11:0Hrs
157 RFP for the work of Rehabitation and Upgradation of NH931A from Design Ch. 0.000 to Design Ch.53.500. (Design length 53.50 Km) to 2L / 4L plus PS of Jagdishpur-Jais-Salon of NH931A on EPC Mode in the State of Uttar Pradesh.

2023_MoRTH_770297_1 461.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 18:55Hrs
26/02/2024
Time 11:0Hrs
158 KHAI BYEPASS SECTION KM 44.900 TO 47.270

2024_MoRTH_796236_1 1.680 MoRTH Maintenance Project OTHERS 20/02/2024
Time 16:0Hrs
24/02/2024
Time 15:0Hrs
159 Kangar Byepass 53.800 to 57.035

2024_MoRTH_796236_2 1.320 MoRTH Maintenance Project OTHERS 20/02/2024
Time 15:0Hrs
24/02/2024
Time 15:0Hrs
160 Short Term Maintenance (STMC) of the left over portion of NH-254 at Rampura Phul Bypass section from Km 72.935 to 82.270 (Length 9.335 KM) in the state of Punjab.

2024_MoRTH_796236_3 3.910 MoRTH Maintenance Project OTHERS 20/02/2024
Time 16:30Hrs
24/02/2024
Time 15:0Hrs
161 Short Term Maintenance (STMC) of the left over portion of NH-254 at Raman Bypass section from Km 138.500 to 143.400 (Length 4.90 KM) in the state of Punjab

2024_MoRTH_796236_4 3.900 MoRTH Maintenance Project OTHERS 20/02/2024
Time 15:0Hrs
24/02/2024
Time 15:0Hrs
162 Construction of 6-lane Flyover at Ainthapali junction and a 2-Lane ROB (LHS) on NH-53 (Earlier NH-6) in Sambalpur, on EPC mode in Odisha under NH(O)

2023-NHAI-151714-1 280.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2023
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
163 Construction of 2 lane 386 Mtr Long Extradosed bridge over river Siang at design Km 2plus908 and 63pt50 Mtr span major bridge at design Km 2plus590 in between Km 118pt8 junction of NH 513 with Yingkiong to Moying village junction at Km 93pt50 on Ditte Dimme Migging road under 761 BRTF of Project Brahmank in Arunachal Pradesh State on EPC Mode

2023_BRO_625932_1 dated 31 Oct 2023 139.650 BRO Special Project EPC (Lump Sum/Item Rate Contract) 03/02/2024
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
164 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) basis.

2023_MoRTH_749787_1 808.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
165 Construction of RCC Drains at various villages Towns location from Km 1 050 to Km 143 870 for Length of 17 818 Km on NH 753 F Chhatrapati Sambhajinagar Aurangabad Jalgaon Road in the state of Maharashtra

2024_MoRTH_790098_1 21.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 15:0Hrs
21/02/2024
Time 17:30Hrs
166 Rehabilitation and Up gradation to 2 lanes with paved shoulder 4 laning configuration of Rajur Chanegaon Chikhali section of NH 752H from Km 188 280 to Km 179 430 Design Chainage from Km 0 000 to Km 8 850 Length 8 850 km in the State of Maharashtra on EPC Mode

2024_MoRTH_790091_1 65.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 15:0Hrs
21/02/2024
Time 17:30Hrs
167 Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak - Patan - Karad section km 85.000 to 133.417 of NH -166 E in the State of Maharashtra on EPC mode

2024_MoRTH_789271_1 135.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2024
Time 14:0Hrs
21/02/2024
Time 17:0Hrs
168 Widening of existing road to two lane with paved shoulder configuration from Km 0.000 to Km 26.000 and Km 45.200 to Km 59.622 of NH 365BB in the state of Andhra Pradesh under Annual Plan 2023-24 through EPC mode

SENHVJA/19/2023-24 Dated.28.12.2023 293.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 17:0Hrs
21/02/2024
Time 17:0Hrs
169 Construction of 2-lane VOP at Basamba junction at Km 120.309 on Washim- Pangare section of NH-161 in the State of Maharashtra on EPC Mode

2024_NHAI_182809_1 14.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2024
Time 18:45Hrs
21/02/2024
Time 11:0Hrs
170 Construction of 2 lane paved shoulder in 4.122 Km Balance Length with rigid Pavement and ROB ON Karnataka Border Km 70/682 to Akkalkot Km 106/526 on NH 150E in the State of Maharashtra on EPC Mode.

2024_MoRTH_789099_1 72.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 15:0Hrs
20/02/2024
Time 17:30Hrs
171 Construction of RCC Drains at various villages towns location from km 28 000 to km 67 600 on Dhad Bhokardan road section of NH 753M in the state of Maharashtra on EPC Mode

EENH/Jalna/Tender/NIT No-01/17 10.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 20:0Hrs
20/02/2024
Time 17:30Hrs
172 Rehabilitation and Up gradation of Pathri Selu Deogaon Phata from Borgavhan to Selu Design Ch km 47 900 to km 62 800 and from Digras Phata to Deogaon Phata Design Ch km 68 700 to km 83 700 section of Injegaon Sonpeth Pathri Selu Deogaon Phata road NH 548B to 2 lane 4 lane with paved shoulder Rigid Pavement Configuration on EPC Mode in the State of Maharashtra Total Project Length 29.90 km

EENH/Jalna/Tender/NIT No-02/32 254.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 20:0Hrs
20/02/2024
Time 17:30Hrs
173 Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K under the Short Term Maintenance Contract in the State of Uttar Pradesh

2024_MoRTH_793363_1 0.670 MoRTH Maintenance Project OTHERS 02/02/2024
Time 9:0Hrs
20/02/2024
Time 15:0Hrs
174 Construction of Service road Foot Over Bridge Development of Junctions in the Meerut to Bulandshahr section of NH 235 (New NH 334) from km. 8.800 (Design Chainage.8.800) to km. 66.482 (Design Chainage.73.512) in the State of Uttar Pradesh on EPC mod

2023_NHAI_177750_1 9.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2023
Time 17:40Hrs
20/02/2024
Time 13:0Hrs
175 Maintenance of NH-727H in total length of 16.220 Km Under Short Term Maintenance Contract on percentage rate basis for the financial year 2023-24 in jurisdiction of NH Division Lakhimpur-Kheri in the state of Uttar Pradesh.

2024_MoRTH_793638_1 0.910 MoRTH Maintenance Project OTHERS 01/02/2024
Time 12:0Hrs
20/02/2024
Time 12:0Hrs
176 Improvement of Major Junction at ch. 152.000 (at Madhapur) on NH-57 in the state of Odisha on EPC mode”BID Ref. No.-48 CE NH of 2023-24

2024_MoRTH_791635_1 2.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 18:55Hrs
20/02/2024
Time 12:0Hrs
177 Construction of 4 lane Elevated corridor of Kalimandir Dimna Chowk Baliguma (Jamshedpur) Section of NH 33 (New NH 18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in the State of Jharkhand

2023_NHAI_179694_1 690.050 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 29/12/2023
Time 15:0Hrs
20/02/2024
Time 11:0Hrs
178 One Time Improvement of existing town portions of Rari, Lapwaha, Bichhondana, Morena, Lahar and Daboh on NH-552 Extn in the State of Madhya Pradesh on EPC mode

2024_MoRTH_789195_1 25.590 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 10:30Hrs
19/02/2024
Time 17:30Hrs
179 Improvement to Two lane with Paved Shoulder from Junction of NH-22 near Hajipur to Junction of NH-122 at Bachhwara via Mahnar and Mohiuddin Nagar from Km 0.00 to Km 29.730 of NH 122 B in the State of Bihar

2024_MoRTH_789247_1 203.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 17:0Hrs
19/02/2024
Time 17:0Hrs
180 Upgradation of Davualapally to Mallapalem Section Design Ch. Km 133.922 to Km 154.216 Existing Ch. Km 133.922 to Km 154.900 of NH 565 to 2 Lane with Paved shoulder in the State of Andhra Pradesh mode under Annual Plan 2023 24

2023_MoRTH_787815_1 312.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 17:50Hrs
19/02/2024
Time 17:0Hrs
181 One Time Improvement work with white topping in Km 90.970 to 99.775 length 8.805 km on Katni-Shahdol Road New NH-43 (Old NH-78) for Birsingpur Bypass in the State of Madhya Pradesh

2024_MoRTH_791028_1 17.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/01/2024
Time 15:0Hrs
19/02/2024
Time 15:0Hrs
182 Up-gradation and strengthning of chenanni to Nashri section of NH-244 from Km 0.00 to Km 39.100 in the UT of Jammu and Kashmir

2023_NHAI_178976_1 431.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 16:0Hrs
19/02/2024
Time 11:0Hrs
183 Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh

2023_MoRTH_771974_1 829.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
19/02/2024
Time 11:0Hrs
184 Construction of New 2Lane Bridge over Purna River at Ch. 18.100 (605.545) including approaches from 17.575 to 19.011 in Shegaon Deori fata section of NH548C in the Sate of Maharashtra on EPC mode

2023_MoRTH_784717_1 76.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 10:0Hrs
16/02/2024
Time 17:30Hrs
185 Constructing VUP With RE Wall Approaches at Chainage Km.319.960 and Service Road Chainage Km.319.560 Km.320.840 On NH 66 At Ambalpaddy For Rectification of Blackspot KA 02 373 In The State of Karnataka Under EPC Mode.

2023_NHAI_178884_1 33.506 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 17:0Hrs
16/02/2024
Time 11:0Hrs
186 Widening and strengthening to 2LPS of Balikuda Mulakani from Km 318.970 Start of Balikuda By Pass to Km 353.450 Mulakani of NH 55 in the State of Odisha on EPC mode

2024_MoRTH_788259_1 402.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2024
Time 15:0Hrs
15/02/2024
Time 15:0Hrs
187 Strengthening work of NH 01 from km 24.32 to Km 33.76 and 47.02 to Km 56.72 in under project Beacon in UT of J&K Through EPC Mode

2023_MoRTH_784861_1 30.820 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 15:0Hrs
15/02/2024
Time 12:0Hrs
188 Construction of 4 – lane Kotdwar Bypass of NH – 119 in the State of Uttar Pradesh and Uttarakhand on EPC Mode

2023_NHAI_170330_1 382.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/10/2023
Time 15:30Hrs
15/02/2024
Time 11:0Hrs
189 Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH 566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa

2023_NHAI_146949_1 367.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
15/02/2024
Time 11:0Hrs
190 One time improvement from km 26.350 to km 29.900 of NH-43 length 3.55 km in Badwara village on Katni-Shahdol section in the State of Madhya Pradesh under EPC mode

2024_MoRTH_790775_1 6.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/01/2024
Time 17:30Hrs
14/02/2024
Time 17:30Hrs
191 Rectification of MoRTH Identified Blackspot No. JK02023 SIDCO at KM 69.135 to KM 69.980 on NH44 by taking Longer Term Measures in the UT of Jammu and Kashmir

02023 33.860 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 15:0Hrs
14/02/2024
Time 15:0Hrs
192 6 Laning of Pune-Hyderabad section of NH-65 from km 493.000 to 524.000 from Sangareddy X roads to Madinaguda (excluding BHEL flyover from km 520.000 to 521.650) in the State of Telangana on EPC Basis

2023_MoRTH_775198_1 1,011.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
14/02/2024
Time 15:0Hrs
193 Widening of existing road to two lane with paved shoulder configuration from Km 0.000 to Km 26.000 and Km 45.200 to Km 59.622 of NH 365BB in the state of Andhra Pradesh under Annual Plan 2023-24 through EPC mode

SENHVJA/19/2023-24 Dated.28.12.2023 293.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 15:0Hrs
12/02/2024
Time 15:0Hrs
194 Landslide treatment work of 12 locations on NH 58 from Km. 235.420 (Shivpuri) to Km. 266.130 (Kodiyala) under EPC mode(As per DPR submitted by THDC) in the State Of Uttarakhand

2024_MoRTH_790373_1 71.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
12/02/2024
Time 12:0Hrs
195 Widening to 2-lane with hard shoulder configuration of Kalimandir (Chainage Km 133.078) and Lipulekh (Chainage Km 159.476) road of NH-09 under Bharatmala Pariyojna in the state of Uttarakhand on EPC mode

2023_MoRTH_764115_2 216.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 12:0Hrs
08/02/2024
Time 15:0Hrs
196 Construction of the 6-lane Flyover including approaches from existing PUP of Nandori Flyover (Kalode Square) at Km.74.745 to Hospital Square at Km.76.020 (Total Design Length- 1.275 km) Section of Nagpur – Hyderabad NH-44 in the state of Maharashtra on EPC mode

2023_NHAI_156635_1 101.590 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 16:30Hrs
08/02/2024
Time 11:0Hrs
197 Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo-Solan section of NH 22 (now NH 5) on EPC mode in the State of Himachal Pradesh (HP)

2023_NHAI_146839_1 121.750 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 15:0Hrs
08/02/2024
Time 11:0Hrs
198 CONSTRUCTION OF NEW MAJOR BRIDGE OVER BAGHMATI AND LAKHANDEI RIVER ALONG WITH APPROACHES FROM DESIGN KM. 16 500 TO KM 21 500 ON NH 527C IN THE STATE OF BIHAR ON EPC MODE

2023-NHAI-172896-1 362.150 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 15:0Hrs
07/02/2024
Time 17:0Hrs
199 Widening with 3 additional Lane abetting Existing two lane Chhapra Bypass Section of NH-19 from Km.143.200 to Km.159.255 on NH-19 (Total Length 16.055 Km) in the state of Bihar

2023_NHAI_171728_1 376.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2023
Time 15:0Hrs
07/02/2024
Time 15:0Hrs
200 One Time improvement of existing bypassed section of NH-52 in Bhojpur town in the state of Madhya Pradesh under EPC mode

2023_MoRTH_787917_1 4.010 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/01/2024
Time 17:30Hrs
06/02/2024
Time 17:30Hrs
201 OR DPP to AS Club Vaijapur Kopargaon Road Km. 00.000 to Km. 50.000 section of NH 752 I in the state of Maharashtra

2024_MoRTH_790475_1 4.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2024
Time 15:0Hrs
06/02/2024
Time 17:30Hrs
202 LONG TERM RECTIFICATION OF MORTH IDENTIFIED BLACKSPOTS (17 NOS) and REMOVAL OF 2 AT GRADE JUNCTIONS AND ALLIED WORKS ON EXISTING 4/6LANE HYDERABAD VIJAYAWADA SECTION OF NH65 FROM KM.40.000 TO KM.221.500 IN THE STATE OF TELANGANA

2023_NHAI_176416_1 325.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/12/2023
Time 16:0Hrs
06/02/2024
Time 11:0Hrs
203 Construction of Balance Works in descoped section in the Village Amboda, Hiwara Sangam, Lonbehal, Dattarampur & Kinhi in four laning of Mahagaon-Yavatmal section of NH-361 from Km 320.580 to Km 400.575 (design length 80.195 km) in the state of Maharashtra on EPC mode

2024_NHAI_180487_1 60.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2024
Time 19:0Hrs
05/02/2024
Time 11:0Hrs
204 Construction of Major Bridge on Chargad River at Ch. 27.650 with approaches From Km.27.427 to Km. 27.782 and Minor Bridge on Khar Nallah at Ch. 47.020 with approaches From Km.46.905 to Km.47.101 on Nandgaon peth Morshi Road NH53 K Tal. Morshi Dist. A

2023_MoRTH_786773_1 13.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 10:0Hrs
03/02/2024
Time 17:50Hrs
205 Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km.133.025 to Km.133.875 on on Jalna Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon Dist. Washim on EPC mode in the

2023_MoRTH_786778_1 30.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 10:0Hrs
03/02/2024
Time 17:50Hrs
206 REHABILITATION UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH161A (AKOLA AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.

2023_MoRTH_786760_1 50.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 15:0Hrs
03/02/2024
Time 17:50Hrs
207 Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar

2024_MoRTH_789177_1 234.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 15:0Hrs
03/02/2024
Time 17:0Hrs
208 Construction of proposed R.O.B and its Approaches in replacement of existing Level Crossing No.21X at Ch 107/500 in the State of Gujarat on EPC mode of NH-64 District Anand Job No. 64 GJ/2021 2022/673

2023_MoRTH_783833_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 11:35Hrs
01/02/2024
Time 11:0Hrs
209 Construction of 4 Lane LVUP at Sector-26 Panchkula Junction at Km. 170.335 of Yamunanagar - Panchkula Section of Old NH-73 (New NH-07) from Km. 169.700 to Km. 170.950 on EPC basis in the State of Haryana

2023_NHAI_174596_1 18.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2023
Time 15:0Hrs
01/02/2024
Time 11:0Hrs
210 New Construction of Major Bridge with approaches from km 0.000 to 1.200 (Madhopur-Badabanta section) of NH-20 in the state of Odisha. (Bid Ref No. 32 CE NH of 2023-24)

2023_MoRTH_773921_1 167.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2023
Time 18:55Hrs
31/01/2024
Time 12:0Hrs
211 Construction of Elevated Structure at Raniwara Circle Sanchore town of Gandhav – Sanchore Section of NH-68 in the state of Rajasthan on EPC mode under NH(O) Scheme

NHAI/Rajasthan/Sanchore Elevated/2023/ 270.210 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 15:0Hrs
30/01/2024
Time 11:0Hrs
212 STMC to NH 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160 Section Km 27.800 to 29.000 and repairing work of parapet retaining wall in 44.200 to 47.160 in the state of Maharashtra

2024_MoRTH_791582_1 1.280 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 11:5Hrs
29/01/2024
Time 17:0Hrs
213 Execution of Balance work for the work of Widening from existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the State of Gujarat under NH (O) on EPC mode

2024_MoRTH_789324_1 12.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
214 Construction of Baghamari By-pass on NH-57 from Km 281/700 to Km 285/330in the state of Odisha on EPC Mode (Bid Ref No.-44 CE NH of 2023-24)

2023_MoRTH_785528_1 41.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
215 Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode. (Bid Ref No.-45 CENH of 2023-24)

2023_MoRTH_785537_1 43.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
216 Construction of Approaches of RUB at LC-21 at Kokisare near Vaibhavwadi village on new alignment (design length 1.770 Km) on Talere - Gaganbawada - Kolhapur NH-166G in the State of Maharashtra on EPC mode

2023_MoRTH_783327_1 22.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2023
Time 10:0Hrs
25/01/2024
Time 17:30Hrs
217 RFP Strengthening And Widening of existing road to 2 lane bituminous road configuration from Owale to Rajewadi Fata (Upto Junction of NH-66) section of NH-965DD (Ch . 55.300 TO 75.100 ) in the state of Maharashtra on EPC Mode under NH (O)

2023_MoRTH_786283_1 58.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 10:0Hrs
24/01/2024
Time 17:30Hrs
218 Construction of Major Bridges at Ch 8 00 Ch 35 488 on Wadigodri Ambad Jalna section and Ch 3 300 of Jalna Bypass road section of NH 753H on EPC Mode in the State of Maharashtra

2023_MoRTH_783137_1 53.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2023
Time 6:55Hrs
24/01/2024
Time 17:30Hrs
219 RFP for Second Call for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 91.300 to km 96.800 (Mangaon City) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode.

2023_MoRTH_786079_2 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 10:0Hrs
24/01/2024
Time 17:0Hrs
220 RFP for Second Call for Construction of Vehicular underpass with Service road at Parshuram Ghat in Km 202.280 on National Highway No.66 under Annual Plan 23-24 in Ratnagiri District in the State of Maharashtra on EPC mode

2023_MoRTH_786109_2 19.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 10:0Hrs
24/01/2024
Time 17:0Hrs
221 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 148.00 to km 161.600 under Annual Plan in Raigad and Ratnagiri District in the State of Maharashtra on EPC mode

2024_MoRTH_788486_1 19.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2024
Time 13:0Hrs
24/01/2024
Time 17:0Hrs
222 Rectification of 4 Nos Blackspots/Accident Spots in Thiruvanthapuram Bypass section of NH-66 under Annual Road Safety Plan for 2023-24 in state of Kerala on EPC Mode

NHAI/Kerala/4Nos Blackspots (PIU Trivendrum)/EPC/2023 98.050 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 11:0Hrs
24/01/2024
Time 11:30Hrs
223 Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140.960 (Patranga) to Km 160.200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh

2023_MoRTH_769510_1 688.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
23/01/2024
Time 11:0Hrs
224 Improvement and up-gradation of newly declared National Highways NH-227B(84 Kosi Parikrama Marg)Package II Design Km29.000 (Sarpur) to Km47.878/47.800 (Gosaiganj)in the state of Uttar Pradesh on Engineering, Procurement and Construction(EPC) basis.

2023_MoRTH_758308_1 591.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 17:0Hrs
23/01/2024
Time 11:0Hrs
225 Rehabilitation and upgradation to two lane with paved shoulder of Barshi-Yedshi-Murud-Latur-Ashtamode-Udgir-Degloor road NH 63 in km. 118.600 to 125.000 section Kharola to Bamni project length-6.4 km with flexible pavement on EPC mode in the state of Maharshtra

2023_MoRTH_782440_1 26.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2023
Time 18:55Hrs
22/01/2024
Time 17:30Hrs
226 CONSTRUCTION OF BALANCE WORKS OF TWO NUMBER OF INTERCHANGES AT JAIPUR RING ROAD (NH-148C) FROM TONK ROAD (NH-52) TO AJMER ROAD SECTION (NH-48) IN THE STATE OF RAJASTHAN ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2023_NHAI_165778_1 135.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 15:0Hrs
22/01/2024
Time 15:0Hrs
227 Construction of Canal Bridge RCC Twin Box 2x 4.25m x 4.15m as a Deposit work at Canal Chainage Km 51.400 Main Canal of Pkg No 16 in Kaleshwaram Project by Box Pushing Method at NH Km 51.520 on Hyderabad Yadgiri Section of NH163

2023_NHAI_176929_1 3.770 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/12/2023
Time 18:55Hrs
22/01/2024
Time 11:0Hrs
228 CONSTRUCTION OF SIX LANE FLYOVER WITH APPROACHES AND SERVICE ROAD IC ACCELERATIONDECELERATION LANE AS PER MANUAL ON BAREILLY BYPASS OF NH24 MORADABADBAREILLY SECTION FROM KM259690 TO KM261105 IN THE STATE OF UTTAR PRADESH

2023_NHAI_176277_1 44.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/12/2023
Time 12:0Hrs
18/01/2024
Time 11:0Hrs
229 Upgradation of the section from Sironcha to Major Bridge across Godavari River from Design Chainage km 321.000 to Km322.700 and Km 323.500 to Km 327.00 (Length 5.20 Km) of NH-353C Section of Sakoli Wadsa Armori Gadchiroli Ashti Alapalli Sironcha Road

2023_MoRTH_787441_1 38.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2023
Time 17:0Hrs
17/01/2024
Time 17:55Hrs
230 Construction of Major Bridges at ch 8 00 35 488 on wadigodri Ambad Jalna section and ch 3 300 of Jalna Bypass road section of NH 753H on EPC Mode in the State of Maharashtra

EENH/Jalna/Tender/NIT No-01/1703 53.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
15/01/2024
Time 15:0Hrs
231 Short Term Maintenance Cost Estimate from Km. 154.00 to 172.230 of NH-28B and Km 566.650 to Km 579.500 of NH- 730 in the state of Uttar Pradesh

2023_MoRTH_784379_1 4.890 MoRTH Maintenance Project OTHERS 07/12/2023
Time 15:0Hrs
15/01/2024
Time 15:0Hrs
232 STMC for providing safety measures and repairs of Shegaon Sangrampur from km 55.00 to 88.00 on NH 161G in the state of Maharashtra.(2nd Call)

2023_MoRTH_783065_2 1.620 MoRTH Maintenance Project OTHERS 05/01/2024
Time 10:0Hrs
12/01/2024
Time 17:30Hrs
233 Short Term Maintenance from Km 154.000 to Km 173.600 on NH-72B(New NH-707)

2023_MoRTH_785655_1 3.900 MoRTH Maintenance Project OTHERS 15/12/2023
Time 15:0Hrs
11/01/2024
Time 15:0Hrs
234 Short Term Maintenance from Km 133.150 to Km 154.000 on NH-72B(New NH-707)

2023_MoRTH_785648_1 3.550 MoRTH Maintenance Project OTHERS 15/12/2023
Time 15:0Hrs
11/01/2024
Time 12:0Hrs
235 “Widening and strengthening to NH-26 from km 367/480 to 376/480 km in the State of Odisha under EPC mode (Bid Ref No- 43 CE NH of 2023-24)”

2023_MoRTH_785287_1 37.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 9:0Hrs
11/01/2024
Time 12:0Hrs
236 Construction of 175.60 M Span PSC Box Bridge Over Panod Nala Ramnagar to Buwakhal Motor Road Near Km Stone no. 44 NH 309 Ramnagar, Distt- Nainital under Annual Plan 2023-24

2023_MoRTH_777768_1 22.480 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/11/2023
Time 14:0Hrs
10/01/2024
Time 15:0Hrs
237 Improvement of Major Junction at ch. 152.000 (at Madhapur) on NH-57 in the state of Odisha on EPC mode”BID Ref. No.-40 CE NH of 2023-24

2023_MoRTH_782599_1 2.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2023
Time 18:55Hrs
08/01/2024
Time 15:0Hrs
238 Short Term Maintenance from km 60.00 to 65.00 and road property maintenance from km 41.00 to 111.00 on NH-123(507) in the state of Uttarakhand

2023_MoRTH_784959_1 3.750 MoRTH Maintenance Project OTHERS 13/12/2023
Time 15:0Hrs
08/01/2024
Time 15:0Hrs
239 Construction of new bridge over Ret river at Ch-149.753km on NH-26 including approaches in the state of Odisha on EPC mode.BID Ref. No.-41 CE NH of 2023-24

2023_MoRTH_782617_1 17.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2023
Time 18:55Hrs
08/01/2024
Time 12:0Hrs
240 “Construction of New Minor Bridge across Jeriguda Nallah at Km 297.520 (Design Chainage) of NH-326 including approaches in the state of Odisha on EPC Mode (Bid Ref No 42 CE NH of 2023-24)”

2023_MoRTH_784881_1 7.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 18:55Hrs
08/01/2024
Time 12:0Hrs
241 Strengthening work of NH 444 from km 186.61 to Km 220.70 under project Beacon in UT of J&K Through EPC Mode

2023_MoRTH_783281_1 33.630 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2023
Time 15:0Hrs
08/01/2024
Time 12:0Hrs
242 CONSTR OF RD MUDH TSAKA BETWEEN KM 0.00 TO KM 29.00 (NET LENGTH 29.00 KM) NHSL SPECS OF UNDER 112RCC 755BRTF PROJECT HIMANK ON EPC MODE

2023_BRO_627023_1 113.800 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2023
Time 18:0Hrs
06/01/2024
Time 11:0Hrs
243 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 91.300 to km 96.800 (Mangaon City) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode.

2023_MoRTH_786079_1 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
244 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 84.000 to km 87.00 (Indapur village) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode..

2023_MoRTH_786091_1 5.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
245 RFP for Construction of Vehicular underpass with Service road at Parshuram Ghat in Km 202.280 on National Highway No.66 under Annual Plan 23-24 in Ratnagiri District in the State of Maharashtra on EPC mode

2023_MoRTH_786109_1 19.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
246 Construction of Service Roads in stretches, pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332.200 to 406.030, on Panvel Mahad Panali Road NH.66 under Road Safety Annual Plan 2022.23 in the state of Maharashtra

2023_MoRTH_752283_2 14.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 10:0Hrs
04/01/2024
Time 17:30Hrs
247 Short Term Maintenance from 78.00 to Km 100.00 including Protection work (R/wall) on NH-309(Old No. 121)

2023_MoRTH_784945_1 3.710 MoRTH Maintenance Project OTHERS 12/12/2023
Time 15:0Hrs
04/01/2024
Time 15:0Hrs
248 “Construction of bypass to Titlagarh town from km 45.162 to km 52.678 including widening and strengthening from single lane/double lane to double lane with paved shoulder from km 44.000 to km 45.162 (missing link) of NH-59 in the state of Odisha on EPC mode (Bid Ref No.39 CE NH of 2023-24)”

2023_MoRTH_781638_1 92.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2023
Time 18:55Hrs
01/01/2024
Time 12:0Hrs
249 Strengthening to Pune Nashik Road NH 60 in km 201.350 to 202.080 and 203.080 to 208.649 section Nashik Road to Dwarka Junction in the State of Maharashtra State on EPC mode.

2023_MoRTH_779748_1 15.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 17:0Hrs
30/12/2023
Time 17:30Hrs
250 Strengthening to Kalyan Ahmednagar Pathardi Nanded Nirmal Road in Ch. 232.150 to km 255.280 in stretchs in 10.84 km length of NH61 the State of Maharashtra State on EPC mode.

2023_MoRTH_771018_1 13.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 17:30Hrs
30/12/2023
Time 17:30Hrs
251 Maintenance work and activities on section from Sinnar to Ghoti Km.0.00 to 0.500 and 8.500 to 54.00 of Sinnar Pandhurli Dhamangaon Ghoti Trimbakeshwar Road NH160A in the State of Maharashtra

2023_MoRTH_780393_1 3.820 MoRTH Maintenance Project OTHERS 09/11/2023
Time 17:0Hrs
30/12/2023
Time 17:30Hrs
252 Short Term Maintenance from Km 35 to Km 44 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782947_1 3.800 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
253 Short Term Maintenance from Km 59 to Km 72 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782950_1 3.500 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
254 Short Term Maintenance from Km 23 to Km 28 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782946_1 3.800 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
255 Short Term Maintenance from Km 73 to Km 80 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782951_1 2.970 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
256 Short Term Maintenance From Km 198.00 to Km 204.00 Including Road Property Maintenance From Km 195.00 to Km 217.425 of NH -94 (134).

2023_MoRTH_782892_1 3.850 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
257 Short Term Maintenance from Km 243 to Km 250 including Protection work (R/wall) on NH-534 (119)

2023_MoRTH_782939_1 2.340 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
258 Short Term Maintenance from 158.00 to Km 164.00 and km 210.00 to Km 218.00 including Protection work (Rwall) on NH-309(Old No. 121)

2023_MoRTH_782827_1 2.750 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
259 “Construction of Two Lane Bypass road at Rairangpur on Ranchi-Vijayawada Corridor of NH-220 in the state of Odisha on EPC mode. (Bid Ref No. 38 CE NH of 2023-24)”

2023_MoRTH_781225_1 59.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2023
Time 18:55Hrs
29/12/2023
Time 12:0Hrs
260 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 110/2 – 142/0 of NH 38 (Old NH 234)

2023_MoRTH_782048_1 3.140 MoRTH Maintenance Project OTHERS 22/11/2023
Time 15:0Hrs
28/12/2023
Time 15:0Hrs
261 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 0/00 – 65/00 of NH 38 (Old NH 234) Mangalore – Villupuram Road

2023_MoRTH_782044_1 3.890 MoRTH Maintenance Project OTHERS 24/11/2023
Time 15:0Hrs
28/12/2023
Time 15:0Hrs
262 Overlay or strengthening proposal for Pindwara Sawroopganj section, Pindwara Udaipur section, Pratapnagar Debari section, Balicha Kaya section of Existing Udaipur Bypass

2023_NHAI_164387_1 119.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/08/2023
Time 15:0Hrs
28/12/2023
Time 11:0Hrs
263 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.106/2- 133/200 of NH 136 Thanjavur – Thiruvaiyaru – Perambalore – Krishnapuram – Athur Road of NH 136 under (OR) under M&R during 2023-24

2023_MoRTH_782037_1 2.620 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
264 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.139/0 – Km.141/0, 143/0 – 154/875 of NH 181 (Coimbatore-Mettupalayam – Ooty-Gudaloor) under (OR) under M&R during 2023-24

2023_MoRTH_782038_1 1.220 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
265 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.1/2-3/0, 8/350-13/9, 17/2-18/350, 22/6-23/6, 56/2-57/0 & Km.57/6-58/7 of NH 81 (Coimbatore – Chidambaram road) and Km. 6/0-6/4, 21/6- 23/0, 25/7-26/350, 29/2- 29/790, 31/555-37/5 and Km.42/0-47/0 of NH-181 (Coimbatore – Gundlupet road) under (OR) M&R during 2023-24

2023_MoRTH_782039_1 2.900 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
266 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.303/8-329/4 of NH 948 Bangalore – Coimbatore Road

2023_MoRTH_782042_1 1.140 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
267 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.0/0-68/900 of NH 381A (Vellakovil to Sankagiri road)

2023_MoRTH_782043_1 3.870 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
268 RFP Balance Work for Rehabilitation and upgradation of Kashedi Ghat section of NH-17 [New NH No. 66] to four-lanes with paved shoulders from existing km 148/0 to km 161/600 including construction of twin-tube six-lane tunnel in the State of Maharashtra on Engineering, Procurement & Construction( EPC) Mode under NHDP- IV

2023_MoRTH_780261_1 79.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/11/2023
Time 16:0Hrs
23/12/2023
Time 17:0Hrs
269 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from km 1570 km160 5 161 884 169 484 km 190 550 195 050 of NH 87 km 156 5 160 0 161 4 169 0 188 2 192 7 of NH 49

2023_MoRTH_782010_1 2.460 MoRTH Maintenance Project OTHERS 21/11/2023
Time 18:0Hrs
22/12/2023
Time 15:0Hrs
270 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 65/00 – 110/200 of NH 38 (Old NH 234) Mangalore – Villupuram Road

05_2023_24_dt_22.11.23 3.900 MoRTH Maintenance Project OTHERS 22/11/2023
Time 9:0Hrs
22/12/2023
Time 15:0Hrs
271 Balance work of Widening of existing 2 lane to 4 lanes with service road between Km. 329/600 to 334/100 (Tharad City) on NH-68 in the state of Gujarat

2023_Morth_779388_1 32.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2023
Time 15:0Hrs
21/12/2023
Time 16:0Hrs
272 Short Term Maintenance Contract Ordinary Repairs on selected stretches from km 0/0 - km 3/2 of NH 87 and Km 276/400 -279/400, Km 209/0 -210/150 & Km 167/600 -187/600 of NH 85 (Old NH 49E) (Madurai-Cochin Road) and km 333/275 - 335/280 of NH 85 (Old NH 230) (Madurai - Thondi Road) in the State of Tamil Nadu

2023_MoRTH_781773_1 3.140 MoRTH Maintenance Project OTHERS 20/11/2023
Time 15:0Hrs
21/12/2023
Time 15:0Hrs
273 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km 78/2-Km.106/2 of NH 136 Thanjavur –Thiruvaiyaru –Perambalore -Krishnapuram –Athur Road of NH 136 under (OR) Under M&R during 2023-24

2023_MoRTH_781840_1 3.060 MoRTH Maintenance Project OTHERS 20/11/2023
Time 15:0Hrs
21/12/2023
Time 15:0Hrs
274 Short Term Maintenance Contract Ordinary Repairs from Km 33/610 –Km 44/010 of NH 336 (Old NH 210) Pudukottai –Tirchirappalli road

2023_MoRTH_781850_1 0.630 MoRTH Maintenance Project OTHERS 20/11/2023
Time 18:55Hrs
21/12/2023
Time 15:0Hrs
275 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km6/0 –Km 10/320 and Km 16/274-19/200 of Thanjavur –Thiruvaiyaru –Perambalore-Krishnapuram-Athur Road of NH 136 under (OR) under M&R during 2023-24

2023_MoRTH_781857_1 0.770 MoRTH Maintenance Project OTHERS 20/11/2023
Time 18:55Hrs
21/12/2023
Time 15:0Hrs
276 Rectification of 12Nos Blackspots Accident spots under Annual Road Safety plan for 2023 2024 in the stretch of Walayar Angamaly Section of NH 544 in the state of Kerala on EPC mode

NHAI/Kerala/12Nos Blackspots (PIU Palakkad)/EPC/2023 445.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2023
Time 15:0Hrs
21/12/2023
Time 11:0Hrs
277 Maintenance works and activities on section from Naldurg to Akkalkot KM 30.884 to 70.709 of NH 652 i.e.Tuljapur Naldurg Akkalkot Total Length 10.800 KM under Short Term Maintenance Contract STMC in the State of Maharashtra.

2023_MoRTH_780964_1 3.910 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
18/12/2023
Time 17:30Hrs
278 For Construction of 4 Lane ROB and its approaches at the level crossing LC No 29 B of Km 29 Ekangarsarai at NH110 New NH 33 and Railway Km 32.63 of Fatwa FUT Islampur IPR section with Utility Shifting in the state of Bihar on EPC mode.

2023_MoRTH_768403_1 109.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2023
Time 10:0Hrs
18/12/2023
Time 15:0Hrs
279 P.R work from Km. 134.00 to Km. 154.00, Km. 155.00 to Km. 159.00, Km. 161.00 to Km. 164.00, Km. 169.00 and Km. 172.00 to 175.00 (Yamuna Pull to Bataghat) on NH-707A in the State of Uttarakhand under Annual Plan 2023-24

2023_MoRTH_780251_1 12.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2023
Time 15:0Hrs
18/12/2023
Time 12:0Hrs
280 Widening to 2 lane with paved shoulder of Jareikela Jharkhand/Odisha Border Dhabaleswarsection from km 0.00 to km 25.450 of section of NH-320D in the state of Odisha on EPC Mode

2023_MoRTH_753089_1 163.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2023
Time 9:0Hrs
18/12/2023
Time 12:0Hrs
281 Strengthening and Improvement of Bareilly Sitapur section of NH 24 New NH 30 from Km 262000 to Km 419590 in the State of Uttar Pradesh on item rate contract Single percentage basis

2023_NHAI_174915_1 251.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2023
Time 15:0Hrs
18/12/2023
Time 11:0Hrs
282 STMC for maintenance of Buldhana Khamgaon section from ch 52.450 to 99.950 on NH753E in the state of Maharashtra.

2023_MoRTH_783160_1 0.470 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
283 STMC to Mahan Akola from Km 107.500 to Km 136.809 on NH 161A in State of Maharashtra .

2023_MoRTH_783151_1 1.080 MoRTH Maintenance Project OTHERS 30/11/2023
Time 13:0Hrs
16/12/2023
Time 17:0Hrs
284 STMC for providing railing and safety measures to Purna bridge on NH 161H in the state of Maharashtra.

2023_MoRTH_783159_1 0.800 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
285 STMC for providing safety measures and repairs of Sangrampur MP Border from km 88.00 to 118.00 on NH161G in the state of Maharashtra.

2023_MoRTH_783101_1 1.260 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
286 STMC for providing safety measures and repairs of Balapur Shegaon from km 37.980 to 53.340 on NH 161G in the state of Maharashtra.

2023_MoRTH_783133_1 0.740 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
287 STMC for providing safety measures and repairs of Patur Balapur from km 0.00 to 33.200 on NH 161G in the state of Maharashtra.

2023_MoRTH_783147_1 0.270 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
288 STMC for providing railing and safety measures to Purna bridge and repairs of its approaches on NH 548C in the state of Maharashtra.

2023_MoRTH_783154_1 0.150 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 15:0Hrs
289 Work of Reconstruction of Box Culvert and Other road safety measures on Baridpada Laskariya Ahwa Borkhal Section of NH953 from ch. Km 22/800 to 69/900 in the State of Gujarat under Road safety Annual Plan 2023 24

2023_MoRTH_779263_1 13.810 MoRTH Normal Highway Project OTHERS 02/11/2023
Time 17:45Hrs
16/12/2023
Time 12:0Hrs
290 Work of Construction of Protection work at ch. km 36/600 to 36/800 Bardipada Mahal Laskariya road of NH953 in Dang District in the state of Gujarat under Road Safety Annual Plan 2023 24

2023_MoRTH_779274_1 5.500 MoRTH Normal Highway Project OTHERS 02/11/2022
Time 15:0Hrs
16/12/2023
Time 12:0Hrs
291 Maintenance works and activities on section from Ganjur to Aashtamode section of NH-63 in km.132/800 to 133/800 (Total Length- 1.00 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783448_1 0.520 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
292 Maintenance works and activities on section from Gharola to Gharni section of NH-752K in km.102/700 to 104/700 (Total Length- 2.00 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783461_1 0.290 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
293 Maintenance works and activities on section from Kolgaon to Borgaonkale section of NH-63 in km.43/350 to km.61/800 (Total Length- 18.45 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783428_1 1.790 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
294 Repair and Rehabilitation of 11 Nos of Major and Minor Bridges identified on NH-56 at KM 357/905 to 434/805 ,Under road safety Annual Plan 2023-24 Under state of Gujarat Job No.Br/GJ/2023-24/707

2023_MoRTH_783854_1 10.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 12:0Hrs
15/12/2023
Time 11:0Hrs
295 Strengthing of Pune - Solapur Road NH 65 in km 8/800 to km 12/500 Section Ravidarshan , Hadapsar to Manjari stud farm Pune in the State of Maharashtra Under EPC Mode

2023_MoRTH_779367_1 16.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/11/2023
Time 6:50Hrs
14/12/2023
Time 17:0Hrs
296 Rehabilitation, Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane-2 Lane with Paved Shoulder of NH 965DD from Lonand –Shirval-Bhor –Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border from Km 33.550 to 92.550 (Design Ch 33.550 to 91.003) in the state of Maharashtra.

2023_MoRTH_736700_1 496.135 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 13:5Hrs
14/12/2023
Time 17:0Hrs
297 “Strengthening of the stretch from Rairangpur to Jashipur (35/840 to 71/120) except from 59/594 to 60/042 & 60/292 to 63/400 of NH-220 in the state of Odisha on EPC Mode. (BID Ref. No.-37 CE NH of 2023-24)”

2023_MoRTH_781205_1 52.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/11/2023
Time 18:55Hrs
14/12/2023
Time 12:0Hrs
298 Periodic Renewal of Six laned Pimpalgaon – Nashik – Gonde (Ch.380.00 to Ch. 439.038) in the State of Maharashtra using Thin White-topping (TWT) excluding EPC –II works & proposed EPC structures

2023_NHAI_169125_1 276.710 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 15:0Hrs
13/12/2023
Time 11:0Hrs
299 Work of road safety Improvement by means of widening of Existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 Borbhatha Ankleshwar Section under Road Safety Annual Plan 2023-24 Total Length 4.4km

2023_MoRTH_782637_1 4.100 MoRTH Normal Highway Project OTHERS 24/11/2023
Time 18:55Hrs
12/12/2023
Time 12:0Hrs
300 Periodical Renewal on NH 351K Bagasara Hamapur bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

779372 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2023
Time 16:0Hrs
12/12/2023
Time 12:0Hrs
301 Providing Service Road on PanvelMahadPanji Road NH 66 Km. 406/030 to 450/170, Road Safety Panvel MahadPanji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EPC mode (2nd Call)

2023_MoRTH_751367_2 3.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 15:0Hrs
11/12/2023
Time 15:30Hrs
302 Rectification of accident prone area with widening of curve & Re-alignment to the road of Jeypore ghat area at ch. 349/000 and ch. 347/800 of NH-26 in the State of Odisha” (BID Ref. No.-33 CE NH of 2023-24)

2023_MoRTH_778023_1 6.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 18:55Hrs
11/12/2023
Time 12:0Hrs
303 CONSTR OF RD CHUMATHANG CHUSUL BETWEEN KM 0.00 TO KM 25.00 (NET LENGTH 25.00 KM) NHSL SPECS OF UNDER 111RCC 753BRTF PROJECT HIMANK ON EPC MODE

2023_BRO_624938_1 90.690 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/10/2023
Time 18:0Hrs
08/12/2023
Time 11:0Hrs
304 STMC for maintenance of Buldhana Khamgaon section from ch 52.450 to 99.950 on NH753E in the state of Maharashtra.

2023_MoRTH_783160_1 0.470 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
07/12/2023
Time 17:30Hrs
305 Road Maintenance work to Helwak Karad Road NH166E in km 85/000 to 102/200 under Short Term Maintenance Contract

2023_MoRTH_ 782441_1 1.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 3:50Hrs
07/12/2023
Time 17:0Hrs
306 STMC to N H 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160.Section Km 29.000 to 65.000 in the state of Maharashtra

2023_MoRTH_782444_1 1.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 15:5Hrs
07/12/2023
Time 15:0Hrs
307 STMC to N H 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160. Section Km 65.000 to 107.100

2023_MoRTH_782450_1 3.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 15:0Hrs
07/12/2023
Time 15:0Hrs
308 Construction of balance works (VUP, Service Road, Drain, Junction development, Bus Bay and FOB) for four laning of Tuljapur - Ausa section of NH-361 from Km0.000 to Km 55.835 (including Tuljapur Bypass Km 0.000 to Km 11.593) under Bharatmala Pariyojna in the State of Maharashtra on EPC Mode

2023_NHAI_168860_1 46.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 16:30Hrs
07/12/2023
Time 11:0Hrs
309 Construction of 220.90 M. Span PSC Box Bridge over Dhangadi Nala Ramnagar to Buwakhal Motor Road Near Km stone No. 46 NH-309 Ramnagar, Distt Nainital, under Annual plan 2023-24

2023_MoRTH_777695_1 22.020 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/11/2023
Time 14:0Hrs
06/12/2023
Time 15:0Hrs
310 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_782725_1 3.120 MoRTH Normal Highway Project OTHERS 25/11/2023
Time 18:55Hrs
05/12/2023
Time 12:0Hrs
311 Balance works of 4 lane divided carriageway of Missing Link section of NH-39 (Rewa Bypass) from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH 9 (design length 13.100 km) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

2023_NHAI_169607_1 238.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 15:0Hrs
05/12/2023
Time 11:0Hrs
312 Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode

2023_NHAI_157666_1 449.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 17:55Hrs
01/12/2023
Time 11:0Hrs
313 Construction of additional major Bridge with 4-lane configuration of length 1.55 km on NH-60 (NH-14) over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4-lane configuration of length 0.900 km on NH-60 (NH-14) over River Shilabati from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode.

2023_MoRTH_776657_1 210.327 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 15:0Hrs
30/11/2023
Time 15:0Hrs
314 Construction of Jharsuguda Bypass on NH-49 from CH 258/636 km to CH 283/300 km design chainage from Km 258/636 to Km 289/876 in the state of Odisha under EPC mode

2023_MoRTH_755909_1 253.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
30/11/2023
Time 12:0Hrs
315 Construction of 2 flyovers of 4lanes at Chhatauni Chowk and Awadesh Chowk 2. Reconst of 3no. of gantry girder gates.3 Const. of Service Road and Drain near Piprakothi on NH27 (Under TOT) in the district of East Champaran in Bihar on EPC Mode

2023_NHAI_166441_1 63.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 11:0Hrs
30/11/2023
Time 11:0Hrs
316 Construction of Vehicular Underpass at km 229.500 including Widening of New Service road, Exit-Entry, Dismantling, Reconstruction of Drain and Relocating of Highway Lighting on Panipat-Jalandhar section of old NH-1 (new NH 44) in the State of Punjab on EPC Mode

2023_NHAI_170497_1 24.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 15:0Hrs
29/11/2023
Time 11:0Hrs
317 Repair and Rehabilitation of 11 Nos of Major and Minor Bridges identified on NH-56 at KM 357/905 to 434/805 ,Under road safety Annual Plan 2023-24 Under state of Gujarat Job No.Br/GJ/2023-24/707

2023_MoRTH_778939_1 10.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 13:10Hrs
29/11/2023
Time 11:0Hrs
318 2nd Attempt Widening of existing 2 lane road to 4 lane from km. 92/320 to 115/320 (Vav chokdi, Satlasana to Vrundavan chokdi, Kheralu) of NH58 in the state of Gujarat under EPC mode

2022_MoRTH_687248_2 122.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 17:0Hrs
28/11/2023
Time 12:0Hrs
319 Construction of Trumpet Interchange connecting Bangalore – Chennai Greenfield Express way from Km 261 to Km 262 with Maduravoyal to Wallajapet Section of NH48 near Sriperumbudur toll plaza at Km 35 in state of Tamil Nadu under Bharatmala on EPC Mode - 2nd call

2023-NHAI-172344-1 122.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2023
Time 11:0Hrs
28/11/2023
Time 11:30Hrs
320 Rehabilitation/Upgradation from Lagam to Alapalli section (km 199/400 to km 227/400) (Length = 28 km) to 2L-PS / 4 lane configuration section of NH-353 C (Sakoli - Wadsa - Armori - Gadchiroli - Ashti - Alapalli - Sironcha Road) in Gadchiroli District in the state of Maharashtra on EPC mode

2023_MoRTH_734259_1 324.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
24/11/2023
Time 17:0Hrs
321 Maintenance works and activities on section from Kuslamb to Yedashi ( KM 0.00 to 21.500) of NH 63 i.e.Barshi Yedshi Sagron ( Total Length 21.500 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_780920_1 0.460 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
23/11/2023
Time 17:30Hrs
322 Maintenance works and activities on section from Maharashtra Karnataka Border to Akkalkot km.73.600 to 73.880 77.100 to 78.600 83.508 to 83.610 84.300 to 85.800 86.300 to 86.550 87.790 to 87.890 88.620 to 88.660 and 98.050 to 98.500)of NH 150E under Short Term Maintenance Contract (STMC) in the State of Maharashtra

2023_MoRTH_780953_1 1.430 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
23/11/2023
Time 17:30Hrs
323 Work of Design, Procurement, Installation, Operation and Maintenance of Bridge Health Monitoring system on Narmada Bridge at Ch. 248.428 km of Vadodara-Mumbai expressway in the state of Gujarat

2023_NHAI_160065_2 9.150 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 19/09/2023
Time 18:15Hrs
23/11/2023
Time 16:0Hrs
324 Construction of by-pass road on NH-26 for Nabarangpur town in the state of Odisha on EPC Mode (Bid Ref No 21 CE NH of 2023-24

2023_MoRTH_759285_1 75.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2023
Time 18:55Hrs
22/11/2023
Time 12:0Hrs
325 Construction of proposed R.O.B and its Approaches in replacement of existing Level Crossing No.21X at Ch 107/500 in the State of Gujarat on EPC mode of NH-64 District Anand Job No. 64 GJ/2021 2022/673

2023_MoRTH_778849_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 12:0Hrs
22/11/2023
Time 11:0Hrs
326 Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode

2023_MoRTH_767971_1 334.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 15:0Hrs
20/11/2023
Time 17:30Hrs
327 Upgradation To Two Lane Four lane With Paved Shoulders of Newly Declared NH 440 Vempalli to Chagalamarri Via Yerraguntla and Proddatur Design Ch from Km 55.00 to Km 106.52 And Km 109.65 to Km.137.08 Design length 78.95 Km in the state of AP2022 23

2023_MoRTH_768131_1 1,059.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
20/11/2023
Time 17:0Hrs
328 Rehabilitation and Up gradation of Newly Declared National Highway Nandyala Kadapa Kurnool Border of Nh 167K to 2 lane with paved shoulders from Km 186.0 To Km 250.0 Design Ch.186.000 To Ch. 248.010 in Kurnool District in the State of Andhra Pradesh

2023_MoRTH_766050_1 514.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 10:0Hrs
20/11/2023
Time 17:0Hrs
329 RFP for Rehabilitation and Up-gradation from Km. 0.000 to Km. 51.600 of NH-321G (Agra (Junction on NH-509 at Tedhi Baghia) to Nuhkhas) to two lane with paved shoulder configuration in the state of Uttar Pradesh on (EPC) Basis Contract .

2023_MoRTH_740519_1 394.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
20/11/2023
Time 17:0Hrs
330 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_779393_1 3.120 MoRTH Normal Highway Project OTHERS 03/11/2023
Time 14:0Hrs
20/11/2023
Time 11:0Hrs
331 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_779399_1 8.500 MoRTH Normal Highway Project OTHERS 03/11/2023
Time 14:0Hrs
20/11/2023
Time 11:0Hrs
332 Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 in the state of Himachal Pradesh Sh Formation cutting from Km 347 250 to 347 520 C o R wall and edge wall with steel dowels from km 347 250 to 347 270 and 347 600 to 347 690 C o artificial tunnel from km 347 270 to 347 520 MT work and thrie beam crash barriers from km 347 250 to 347 690 and C o drain from km 347 250 to 347 720 in the state of Himachal Pradesh

2023_MoRTH_774551_1 36.070 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 18:0Hrs
20/11/2023
Time 11:0Hrs
333 DESIGN AND CONS OF UNI-DIRECTIONAL TWIN TUNNELS AT SHINKUN LA PASS OF LENGTH 4.1 KM (APPROX LENGTH) INCL CIVIL AND ELEC/ MECHANICAL WORK ALONG WITH APPROACHES CONNECTING DARCHA-PADAM HIGHWAY TO NHDL SPECS IN HIMACHAL PRADESH AND THE UT OF LADAKH

2023_BRO_619623_1 1,504.640 BRO Special Project EPC (Lump Sum/Item Rate Contract) 20/09/2023
Time 11:0Hrs
18/11/2023
Time 11:0Hrs
334 Providing & fixing/installation of Metal Beam Crash Barrier at high embankment location & also locations as per Engineer decision for Project Highway of Durg bypass from Km. 308.600 to Km. 323.600 of Old NH-6 (New NH-53) in the State of Chhattisgarh on EPC Mode.

2023_NHAI_167277_1 5.990 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 18:0Hrs
16/11/2023
Time 15:0Hrs
335 Major Maintenance of Chennai Bypass (NH-32) from km 0-000 to km 32-600 in the State of Tamil Nadu

2023-NHAI-169411-1 90.020 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/10/2023
Time 11:0Hrs
16/11/2023
Time 11:30Hrs
336 Strengthening/ improvement including regular maintenance work from the ch. Km 69.200 to 120.200 of the project Two Lane with paved shoulders configuration in Jowai-Meghalaya Assam Border Section of NH-44 from Km 69.200 to Km 173.200 (design Ch 171.455) in the state of Meghalaya

2023-NHAI-170507-1 77.810 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 15:0Hrs
16/11/2023
Time 11:0Hrs
337 “Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km. 39.000 (Design ch. 7.250 ) of NH-157 in the state of Odisha on EPC Mode (Bid Ref No - 20 CE NH of 2023-24)”.

2023_MoRTH_759284_1 123.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 18:55Hrs
15/11/2023
Time 12:0Hrs
338 Construction of Flyover at chainage Km 165.020 (Pastikudi) on NH-26 including approaches in the state of Odisha on EPC Mode.

2023_MoRTH_759698_1 26.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
15/11/2023
Time 12:0Hrs
339 Construction of HL Major Bridge across Dahuka River at Km. 226.377(Design Chainage) of NH-57 including approaches in the state of Odisha on EPC mode

2023_MoRTH_755528_1 23.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 12:0Hrs
15/11/2023
Time 12:0Hrs
340 Strengthening/ improvement including regular maintenance work from the ch. Km 120.200 to 171.455 of the project Two Lane with paved shoulders configuration in Jowai-Meghalaya Assam Border Section of NH-44 from Km 69.200 to Km 173.200 (design Ch 171.455) in the state of Meghalaya

2023-NHAI-170389-1 122.990 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 10/10/2023
Time 18:50Hrs
15/11/2023
Time 11:0Hrs
341 Widening and strengthening to 2 lane with paved shoulder from Existing Ch Km 56.720 to Km 100.820 and Design Ch From Km 62.600 to Km 106.360 (Total Length 43.760 Km) on SRINAGAR BARAMULA URI (NH01) in the UT of JK under Project BEACON on EPC Mode

2023_MoRTH_776733_1 449.140 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/10/2023
Time 15:0Hrs
15/11/2023
Time 11:0Hrs
342 Widening of Edamon Kollam section from Km 0000 to Km 52 200 Edamon to Kollam of NH 744 to 2 lane with paved shoulder in the state of Kerala on EPC mode

NHAI/Kerala/ Edamon-Kollam/EPC/2023 293.170 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 15:0Hrs
15/11/2023
Time 11:0Hrs
343 Construction of additional 2 lane Bow-String ROB adjacent to the existing 2 lane Bow string ROB at km 56/2 of NH-234 (new NH-75) (Mangalore-Villupuram Road) on EPC mode under Annual Plan 2022-23 in the State of Tamil Nadu.

2023_MoRTH_773380_1 24.970 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 25/09/2023
Time 15:0Hrs
10/11/2023
Time 15:0Hrs
344 One Time Improvement In Bhoura Town Portion, Shahpur Town Portion and Padhar Town Portion on NH 69 (Old) NH 46 (New) Itarsi Betul Road in the State of Madhya Pradesh on EPC mode

2023_MoRTH_770427_1 14.690 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/09/2023
Time 17:30Hrs
07/11/2023
Time 17:30Hrs
345 Construction of Vehicular Under pass with Service Road in Km 178.787 For Khed Railway Station , Gunde phata and construction of vehicular over pass at kashedi and nadgaon villages on National Highway No.66 in Ratnagiri District in the State of Maharashtra On EPC mode. ( IIIrd Call )

2023_MoRTH_749749_3 49.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2023
Time 17:0Hrs
07/11/2023
Time 17:0Hrs
346 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km 180-000 to km 209-827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode

2023_NHAI_163016_1 526.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 15:0Hrs
07/11/2023
Time 11:0Hrs
347 Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode. (Bid Ref No.- 31 CE NH of 2023-24)”

2023_MoRTH_772151_1 64.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2023
Time 18:55Hrs
06/11/2023
Time 12:0Hrs
348 Widening and Strengthing of Existing Highway 2L PS (10M) in Km 0/00 to 21/500 ( NH 548 C Kuslamb to Nh 52 Yedshi) section of NH 63 ie Barshi - Yedshi - Murud - Latur - Renapur - Udgir - Deglur - Sargoli ) in the state of Maharashtra through (EPC) Contract

2023_MORTH_772305_1 55.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/09/2023
Time 15:0Hrs
03/11/2023
Time 15:0Hrs
349 Rehabilitation and Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 and km.35.400toKm.52.345(Design len.-24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to Bihar Border and Bihar Border to Majhauli)on EPC mode in the State of UP

2023_MoRTH_771732_1 338.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
03/11/2023
Time 11:0Hrs
350 Repair & Maintenance at various locations from Km 0/00 to 39/700 on Mehkar-Chikhli Road Section of NH 548CC in Buldhana District in the state of Maharashtra.(At risk & cost of contractor)

2023_MoRTH_774491_1 5.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 9:0Hrs
02/11/2023
Time 17:30Hrs
351 Short term maintenance work btn km 1/084 to 119/0 Mahuva Savarkundla Amreli Bagasara road and Km 0/0 to 9/350 Savarkundla Bypass of NH351 in the state of Guajrat

2023_MoRTH_775901_1 4.460 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/10/2023
Time 13:0Hrs
02/11/2023
Time 12:0Hrs
352 Construction of Dharmagarh Bypass on NH-130C in the State of Odisha on EPC Mode

2023_MoRTH_758179_1 88.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 12:0Hrs
02/11/2023
Time 12:0Hrs
353 Upgradation of MP/RJ border-Sheopur-Goras road section of NH-552E from Design Chainage 0.000 to 48.400 Km (Total length 48.40 km) to two Lane with paved shoulder configuration along with OTI of 16.6 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768222_1 326.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
01/11/2023
Time 17:30Hrs
354 Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768349_1 308.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
01/11/2023
Time 17:30Hrs
355 Construction of Four Lane Deulgaon raja Bypass with CC Pavement on Malkapur-Chikhali-Jalna-Aurangabad road section of NH 753A of Buldhana district in the state of Maharashtra. (Risk and Cost of Contractor)

2023_MoRTH_774289_1 2.900 MoRTH Normal Highway Project OTHERS 03/10/2023
Time 9:0Hrs
01/11/2023
Time 16:0Hrs
356 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23 (5th Trial)

2023_MoRTH_777626_1 4.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 9:0Hrs
01/11/2023
Time 16:0Hrs
357 2nd Attempt Short Term Maintenance works and activities on section from Narol to Ujala Ch Km 0.000 to 12.000 Total length 12.00 KM of NH 47 Narol-Vishala-Juhapura-Sarkhej-Ujala 0.000 to 12.000 in the State of Gujarat

2023_MoRTH_773835_2 4.110 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/10/2023
Time 18:59Hrs
01/11/2023
Time 12:0Hrs
358 2nd Attempt Short Term Maintenance works and activities on section from Vrundavan chokdi Kheralu to Palanpur RTO junction (Ch. Km 115/320 to 160/320) Total length 45.00 KM of NH 58 Khokhara Gujarat Border Vijayanagar-Palanpur 0/000 to 160/320

2023_MoRTH_772620_2 3.930 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 12:0Hrs
01/11/2023
Time 12:0Hrs
359 Widening of 2L to 2LPS from Km.86/040 to 91.770 and 103/260 to 107/870Km. Of NH-0n EPC mode in the State of Odisha (Bid Ref. No. 28 CE NH of 2023-24

2023_MoRTH_763217_1 24.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
01/11/2023
Time 12:0Hrs
360 Construction of Balance 03 nos of Bridges at Km 327 545 Km 411 105 and Km 415 865 01 no of VUP at 416 685 and 2 lane Cross flyover at km 413 830 on existing 4 laning of Bareilly Sitapur of NH 24 on EPC basis in the state of Uttar Pradesh

Brly NH 24 2022 23 129 Structures E 151380 91.500 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 15:0Hrs
31/10/2023
Time 15:0Hrs
361 Repair and Rehabilitation of Mayurakshi Bridge at Sainthia at km 91.200 of NH 2B (New NH-114) in the district of Birbhum, West Bengal in the year 2023-24 in EPC Mode (Job No. 114/WB/2023-24/…..)

2023_MoRTH_769178_1 10.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/08/2023
Time 9:0Hrs
31/10/2023
Time 14:0Hrs
362 Balance Works of Four laning of Nerchowk- Pandoh section of NH-21 from Km 190.000 to Km 211.035 (Design Chainage) in the State of Himachal Pradesh under residual NHDP on EPC Mode

2022_NHAI_138129_1 404.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
31/10/2023
Time 11:0Hrs
363 REHABILITATION & UPGRADATION OF EXISTING ROAD BETWEEN KM 29.725 TO KM 60.550 (SURAITHOTA - MALARI) NHSL TO DOUBLE LANE SPECIFICATION ON JOSHIMATH – MALARI (NH-107B) ROAD ON EPC MODE IN THE STATE OF UTTARAKHAND (Length 30.825 Km).

2022_BRO_562362_2 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 18:0Hrs
30/10/2023
Time 11:0Hrs
364 Construction of Paderu bypass Km 0.000 to Km 13.000 of 2 lane with paved shoulder on NH 516E in the state of Andhra Pradesh under NH O on EPC mode.

2023_MoRTH_766895_1 179.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2023
Time 16:0Hrs
27/10/2023
Time 17:0Hrs
365 Construction of four-lane with paved shoulder of Darbhanga (Dilli More) – Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the state of Bihar.

2023_MoRTH_764394_1 285.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 12:30Hrs
27/10/2023
Time 15:0Hrs
366 Short Term maintenance of Existing road between Km Digas-Vadoli Kadrama Rd Section Scattred Length 27.40km,km Delad to Vasvari Rd Section,Between km Dindoli-Kharwasa Rd Section Between km Hojiwalakapletha Rd Sectionof NH64 in Bharuch Surat DistSoG

2023_MoRTH_777607_1 4.030 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 17:50Hrs
26/10/2023
Time 12:0Hrs
367 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_777411_1 3.120 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 7:0Hrs
26/10/2023
Time 11:0Hrs
368 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_777425_1 8.500 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 7:0Hrs
26/10/2023
Time 11:0Hrs
369 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_776286_1 4.280 MoRTH Maintenance Project OTHERS 13/10/2023
Time 15:0Hrs
23/10/2023
Time 17:0Hrs
370 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_776520_1 4.400 MoRTH Normal Highway Project OTHERS 14/10/2023
Time 17:50Hrs
20/10/2023
Time 12:0Hrs
371 Short Term maintenance of Existing road between Km Digas-Vadoli Kadrama Rd Section Scattred Length 27.40km,km Delad to Vasvari Rd Section,Between km Dindoli-Kharwasa Rd Section Between km Hojiwalakapletha Rd Sectionof NH64 in Bharuch Surat DistSoG

2023_MoRTH_775623_1 4.030 MoRTH Normal Highway Project OTHERS 10/10/2023
Time 16:45Hrs
18/10/2023
Time 12:0Hrs
372 Short Term maintenance of Km. 22/2 to 35/7 (Nanapondha - Kaprada Section) of N.H.- 848 and Km. 0/0 to 8/200 (Karambeli - Mohangam- Moti Daman Section) of NH-848B in the State of Gujarat.

2023_MoRTH_775660_1 6.730 MoRTH Normal Highway Project OTHERS 10/10/2023
Time 17:45Hrs
18/10/2023
Time 12:0Hrs
373 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

2023_MoRTH_775689_1 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 9:0Hrs
17/10/2023
Time 16:0Hrs
374 WIDENING IMPROVEMENT OF ROAD KAYING TATO FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS FROM KM 47.850 TO KM 66.600 (DESIGN CHAINGE KM 45.800 TO KM 62.850 TOTAL LENGTH 17.05 KM) UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG III

2023_bro_616900_1 144.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2023
Time 18:0Hrs
17/10/2023
Time 11:0Hrs
375 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

2023_MoRTH_775213_1 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 17:0Hrs
16/10/2023
Time 16:0Hrs
376 EPC MODE FOR WIDENING IMPROVEMENT OF KAYING TATO ROAD BETWEEN KM 66.600 TO KM 86.600 (DESIGN CHAINGE KM 62.850 TO KM 78.367 TOTAL LENGTH 15.517 KM) FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG-IV

2023_BRO_616781_1 99.580 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
16/10/2023
Time 15:0Hrs
377 Work of road safety Improvement bymeans of widening of Existingcarriageway from 3.0mt to 5.50mtbetween km 234/00 to 238/400Borbhatha Ankleshwar Section underRoad Safety Annual Plan 2023-24Total Length 4.4km

2023_MoRTH_772343_1 4.100 MoRTH Normal Highway Project OTHERS 19/09/2023
Time 18:0Hrs
16/10/2023
Time 12:0Hrs
378 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat.

2023_MoRTH_772480_1 3.120 MoRTH Normal Highway Project OTHERS 20/09/2023
Time 16:30Hrs
16/10/2023
Time 11:0Hrs
379 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_772526_1 8.500 MoRTH Normal Highway Project OTHERS 20/09/2023
Time 17:30Hrs
16/10/2023
Time 11:0Hrs
380 Construction of Four Lane at existing road section of NH-30 (Old NH-24B) from km 82.650 to 83.880 (length-1.150 km), 84.635 to 98.750 (length-14.290 km), 103.660 to 107.260 (length-3.6 km), 111.390 to 115.425 (length-4.025 km), 124.345 to 130.445 (length-6.050 km), 133.155 to 161.450 (length-27.9 km) and Link road from 161.450 to 641.350 (length-6.156 km) of NH-2 for Raebareli to Prayagraj section in the State of Uttar Pradesh (Total length - 63.171 km) on EPC mode.

2023_NHAI_143873_1 981.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
16/10/2023
Time 11:0Hrs
381 Construction of Six Lane Flyover at the Junction of Nilam Hotel (Ch. 261.500) ,Chalthan Chokdi (Ch. 263.400) and Service road at Palod (Ch. 235.600) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the state of Gujarat

NHAI/RO-GNR/NH-48/Blackspots/Nilam-Chalthan/2023 61.500 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 06/09/2023
Time 16:55Hrs
13/10/2023
Time 12:0Hrs
382 Development of 4 lane with paved shoulders for the road section Talwandi Sabo-Raman to Refinery Road Junction with Bathinda-Dabwali road of NH-254 from existing Km 131.600 to 155.650 (Design Km 131.600 to Km 152.600) in the State of Punjab under EPC

2023_MoRTH_762465_1 227.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 17:0Hrs
12/10/2023
Time 11:0Hrs
383 Rehabilitation and Up-gradation to 2 lane with paved shoulders of Patto Jawahar Singh Wala to Dina Village Kangar road section of NH-254 Design Ch. From Km 38.00 to 51.200 in the state of Punjab. (Package-III) (Length 13.200 Km).

2023_MoRTH_753556_1 72.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 18:30Hrs
12/10/2023
Time 11:0Hrs
384 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_774701_1 6.080 MoRTH Normal Highway Project OTHERS 04/10/2023
Time 18:55Hrs
11/10/2023
Time 12:0Hrs
385 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_774708_1 4.400 MoRTH Normal Highway Project OTHERS 04/10/2023
Time 18:55Hrs
11/10/2023
Time 12:0Hrs
386 Periodical Renewal Between Km 0 00 to 10 200 on NH351K Bagasara Hamapur road in the state of Gujarat under EPC mode for year 2022 23

774285 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2023
Time 18:30Hrs
09/10/2023
Time 16:0Hrs
387 Construction of ROB with approaches on NH 848 B at Udvada, Railway crossing LC No 87 at Km 181/18/20 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_770645_1 22.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 9:0Hrs
09/10/2023
Time 12:0Hrs
388 Construction of Borigumma Bypass on NH-26 from Km 317.400 to Km 320.700 design chainage 317.400 to Km 321.415 in the state of Odisha on EPC Mode

2023_MoRTH_753578_1 62.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2023
Time 9:0Hrs
07/10/2023
Time 12:0Hrs
389 Strengthening from Km. 44/700 to Km. 62/200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat for the year 2022-23 (Length = 17.50 Km.) based on SOR 2022-23. (Job No. 168G/GJ/2022-23/684)

2022_MoRTH_712216_1 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 14:0Hrs
06/10/2023
Time 12:0Hrs
390 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2023_MoRTH_769588_1 11.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 17:30Hrs
05/10/2023
Time 17:30Hrs
391 IRQP work from km 0.00 to 9.300 of NH 133 on EPC mode in state of Bihar (Job No.- NH-133/BR/2023-24/81)

2023_MoRTH_768081_1 9.557 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/08/2023
Time 17:0Hrs
05/10/2023
Time 17:0Hrs
392 short term maintenance work btn km 0/0 to 45/400 on NH151K Porbandar Bhanvad Tranpatiya section in the state of Gujarat under ordinary repair under MandR head during 2023/2024

2023_MoRTH_773796_1 2.200 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
393 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

2023_MoRTH_773775_1 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
394 Short term maintenance work btn km 0/0 to 66/0 on Khambhaliya Advana Porbandar of NH151AD in the state of Gujarat

2023_MoRTH_773783_1 3.970 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
395 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section Btn Km 0.0 to 21.5 and Km 27.9 to 30.9 and Km 46.8 to 61.5 under EPC mode in the state of Gujarat

771726 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2023
Time 18:55Hrs
04/10/2023
Time 12:0Hrs
396 Short Term maintenance work on section from Km. 629/400 to 642/400 of NH 56 Unai Vansda Section in the State of Gujarat under STMCM and R scheme

2023_MoRTH_771087_1 3.310 MoRTH Normal Highway Project OTHERS 11/09/2023
Time 18:55Hrs
04/10/2023
Time 12:0Hrs
397 RFP for the work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_765017_1 121.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/08/2023
Time 15:0Hrs
04/10/2023
Time 11:0Hrs
398 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_771496_1 4.280 MoRTH Maintenance Project OTHERS 13/09/2023
Time 15:0Hrs
03/10/2023
Time 17:0Hrs
399 Rectification of accident prone area with widening of curve & Re-alignment to the road of Govindpalli ghat area at ch.348/900 and ch.350/400 km of NH-326 in the State of Odisha for the year 2022-23 (BID Ref. No.-29 CE NH of 2023-24)

2023_MoRTH_767711_1 7.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2023
Time 18:55Hrs
03/10/2023
Time 12:0Hrs
400 Construction of Service Road between Aena & Palsana from km 48.950 to 53.550 (LHS), Vanesha from km 57.700 to 58.050 (BHS), Nandida Village BHS from km 59.300 to 60.470 and Mandal Village LHS from km 101.800 to 102.300 on Hazira Port- Surat- Gujarat Maharashtra Border Section of NH-53 (Old NH-06) in the State of Gujarat on EPC Mode

2023_NHAI_165846_1 7.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2023
Time 16:15Hrs
03/10/2023
Time 11:0Hrs
401 Construction of Balance work of 8 nos. of Elephant Underpasses (EUPs), 1 no. of Vehicular Underpass (VUP), 1 nos. of Light Vehicular Underpass (LVUP), 1 nos. of Pedestrian Underpass (PUP), 1 nos. of Foot Over Bridge (FOB) and A2 side approach of Jharpokharia Flyover at km.215.270 in Baharagora-Singhara Section of NH-49 in the state of Odisha.

2022_NHAI_138816_1 254.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 12:20Hrs
03/10/2023
Time 11:0Hrs
402 Construction of 6-lane flyover Size-40 Nos of 25m Span x 6m Height including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul- Sambalpur section of NH-42 (New NH-55) at Km. 202.533 on EPC Mode in the State of Odisha.

2022-NHAI-139953-1 116.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2022
Time 19:44Hrs
03/10/2023
Time 11:0Hrs
403 Construction of 4 lane Raniganj Bypass from km 273.000 of NH 60 (new NH 14) to km 478.18 of NH-2 (New NH 19) in Paschim Bardhaman, West Bengal in EPC Mode. (Job No. 014- WB-2022-23/514)

2023_MoRTH_745163_1 278.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 14:0Hrs
02/10/2023
Time 14:0Hrs
404 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

772936 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 13:0Hrs
29/09/2023
Time 16:0Hrs
405 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(3rd call)

Tender Notice No. 54/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 13:0Hrs
29/09/2023
Time 14:0Hrs
406 Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 Songadh Bardipada Section of NH 953 in the State of Gujarat

2023_MoRTH_773027_1 3.930 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
407 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_773035_1 6.080 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
408 Short Term maintenance work between Km. 535/500 to 566.900 of NH 56 Kelikuva Zankhwav Mandvi Section in the State of Gujarat

2023_MoRTH_773049_1 6.800 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
409 Short Term maintenance work between Km. 572.000 to 604.000 (Tarsada - Kanja - Vyara - Kapura Section) of N.H.-56 in the State of Gujarat.

2023_MoRTH_773055_1 6.790 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
410 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_773059_1 4.400 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
411 Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on EPC Mode

2023_NHAI_163935_1 640.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 15:0Hrs
27/09/2023
Time 15:0Hrs
412 Construction of Fly Over Including Junction Improvements @ km 348/6 – 349/8 of NH 67 (km 15/6 To 16/8 New NH 181) (Nagapattinam – Gudalur – Mysore Road) At Saibaba Colony Junction In Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_766679_1 46.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2023
Time 10:0Hrs
26/09/2023
Time 15:0Hrs
413 Short term maintenance work and activities on NH927D Jamnagar Dhoraji road Km 4/700 to 107/600 in the state of Gujarat under ordinary repairs under MandR head during 2023/2024

766501 25.730 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
414 Short term maintenance work btn km 0/0 to 66/0 on Khambhaliya Advana Porbandar of NH151AD in the state of Gujarat

766509 3.970 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
415 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

766507 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
416 short term maintenance work btn km 0/0 to 45/400 on NH151K Porbandar Bhanvad Tranpatiya section in the state of Gujarat under ordinary repair under MandR head during 2023/2024

766512 2.200 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 12:0Hrs
417 Design and Construction of 6 lane Standalone single span Grade Separated structure at Km. 532.552 on Gonde Vadape section of NH-3 New NH-848 in the state of Maharashtra balance work on EPC Mode

2023_NHAI_165326_1 49.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
26/09/2023
Time 11:0Hrs
418 Widening and strengthening of existing alignment from Km 64.70 to Km 72.119 and from Km 78.600 to Km 81.800 to 2L PS and construction of 2L PS Ramnagar By Pass from Km 72.119 to Km 78.600 of NH 116B in the District of Purba Medinipur in the State of West Bengal under Annual Plan 2022 23 in EPC Mode Job No 116B WB 2022 23 515

2023_MoRTH_745759_1 286.473 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:0Hrs
21/09/2023
Time 11:0Hrs
419 Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch. 0.000 to Garhani (at SH-12) at Ch 74.432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of Bihar on HAM Mode

2023_NHAI_163301_1 1,143.360 NHAI Normal Highway Project HAM 04/08/2023
Time 15:0Hrs
20/09/2023
Time 15:0Hrs
420 PR Btn Km 0/0 to 10/200 on NH351K Bagasara Hamapur road in the state of Gujarat under EPC mode for year 2022/2023

766494 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
20/09/2023
Time 12:0Hrs
421 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_770644_1 4.400 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 21:0Hrs
422 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_770638_1 6.080 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 15:0Hrs
18/09/2023
Time 15:0Hrs
423 Improivement/ Construction of 2-lane with hard shoulder of Askote-Lipulekh road from Tawaghat Village to Budhi Village (Design Km 56.935 to Km 95.748) and from end of tunnel portal to Kali Mandir (Design Km 113.828 to Km 133.078) (Total Design Length = 58.063 Km) under Project Hirak of BRO in the state of Uttarakhand under Bharatamala Pariyojna on EPC mode

2023_MoRTH_740109_2 274.960 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 11:0Hrs
18/09/2023
Time 15:0Hrs
424 Short Term maintenance work between Km. 535/500 to 566.900 of NH 56 Kelikuva Zankhwav Mandvi Section in the State of Gujarat

2023_MoRTH_770641_1 6.800 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
425 Short Term maintenance work between Km. 572.000 to 604.000 (Tarsada - Kanja - Vyara - Kapura Section) of N.H.-56 in the State of Gujarat.

2023_MoRTH_770643_1 6.790 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
426 Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 Songadh Bardipada Section of NH 953 in the State of Gujarat

2023_MoRTH_770633_1 3.300 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
427 Construction of FOB at 24 locations relating to six laning of Bangalore to Mysore Section from Km.18.000 to Km.135.304 of NH-275 in the State of Karnataka (Package-I &2) to be executed on EPC mode

NIT No.09/NHAI/RO-BNG/22016/Tender/2023-24 dated 16.08.2023 46.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2023
Time 15:0Hrs
18/09/2023
Time 11:0Hrs
428 Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800) (PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode

2023_MoRTH_767176_1 531.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/09/2023
Time 15:0Hrs
15/09/2023
Time 15:0Hrs
429 REHABILITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 (EXISTING CHAINAGE 136.00 TO KM 169.00) OF NH-309A IN THE STATE OF UTTARAKHAND.

2023_MoRTH_764734_1 349.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 18:35Hrs
15/09/2023
Time 11:0Hrs
430 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar.J0b No NH 327E BR 2022 23 67.

2023_MoRTH_766582_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 17:0Hrs
14/09/2023
Time 17:0Hrs
431 Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 of NH 309B (Almora-Panar-Ghat) Under Annual Plan 2020-21 in the State of Uttarakhand(Balance work)

2023_MoRTH_763260_1 21.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 15:0Hrs
14/09/2023
Time 15:0Hrs
432 Construction of new Four-lane Sambalpur Ring Road from Km. 0.000 to Km. 35.384 under Bharatmala Pariyojna on Hybrid Annuity Mode in the state of Odisha.

2022-NHAI-139947-1 947.310 NHAI Normal Highway Project HAM 29/12/2022
Time 18:44Hrs
14/09/2023
Time 11:0Hrs
433 DEVELOPMENT OF SIX LANE GREEN FIELD RING ROAD (PACKAGE-III) STARTS FROM DESIGN CH.51.200 TO DESIGN CH. 68.650 (LENGTH=17.450 KMS) AROUND KANPUR CITY AND CONSTRUCTION OF 4-LANE AIRPORT LINK ROAD (LENGTH = 1.45 KM) AT CHAINAGE 62.090 OF KANPUR RING ROAD IN THE STATE OF UTTAR PRADESH

2023_NHAI_142633_1 844.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 15:33Hrs
13/09/2023
Time 11:0Hrs
434 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode. 2ND CALL

2023_MoRTH_763783_1 10.640 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:30Hrs
11/09/2023
Time 17:30Hrs
435 Construction of Fly Over Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction in Coimbatore City and including Accident Prone Spot Near Bala Hospital (Km 337) & Jai Shanthi Theatre (Km 335/8 ) & Shanthi Petrol Bunk (Km 335/10) in Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_763746_1 110.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 10:0Hrs
11/09/2023
Time 15:0Hrs
436 Improvement of Lucknow Ayodhya Section of NH-28 New NH 27 from Existing km 8000 to km 68900 in the state of Uttar Pradesh on EPC ModePkgI

2023_NHAI_163075_1 237.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 14:0Hrs
11/09/2023
Time 15:0Hrs
437 Improvement & Rehabilitation of Lucknow Ayodhya Section of NH-28 New NH27 from Existing km 68900 to km 121600 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_163089_1 208.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
11/09/2023
Time 15:0Hrs
438 Treatment of 04 no. of Landslide Location (Location Ch. Km to 0.150 to km 0.310, Location Ch. Km 49.395 to km 49.535, Location Ch. 53.160 to km 53.500 and Location Ch. Km 66.860 to Ch. Km 67.020 on NH-134) from Dharasu to Yamnotri on NH-134 (Old NH-94)

2023_MoRTH_765806_1 43.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 15:0Hrs
11/09/2023
Time 12:0Hrs
439 Slope Stabilization Scheme at location of landslide at km 52.240 km of NH-110 (Old NH-55) at Tindharia, West Bengal & Permanent Restoration of damaged Road bench at km 42.80 of NH -110 (Old NH-55) under NH Division-IX in the district of Darjeeling West Bengal during the year 2022-2023. (Job No.110/WB/2022-23/ 517).

2023_MoRTH_748021_1 22.176 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/09/2023
Time 17:0Hrs
440 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_757254_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:0Hrs
07/09/2023
Time 15:0Hrs
441 Construction of Bypass to Madurai - Achambathu - Viratipathu in between km 6/850 to 10/382 of NH 49 Extn. (New NH 85) including Land Acquisition on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2023_MoRTH_762850_1 113.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2023
Time 15:0Hrs
05/09/2023
Time 15:0Hrs
442 Realignment from Km 227.770 to 227.970, Km 233.260 to 233.980 Km, Km 234.090 to 234.860 Km, Km 235.980 to 236.770 Km of NH-26(Missing section of Bhawanipatna- Koksara Stretch) on EPC mode in the state of Odisha(Bid Ref.No. 27CE of 2023-24).

2023_MoRTH_763207_1 16.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
05/09/2023
Time 12:0Hrs
443 Widening and Strengthening to four lane of Gorantla Hindupur section of NH 716G from km 120 300 Design Chainage to km 153 880 Design Chainage Package 03 under NH O under Annual Plan 2022 23 on EPC mode in the State of Andhra Pradesh A P 2022 23

2023_MoRTH_762341_1 540.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 10:0Hrs
04/09/2023
Time 17:0Hrs
444 Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locationsunder EPC mode.(Asper DPR submitted by THDC) under AnnualPlan2022-23in the State Of Uttarakhand

2023_MoRTH_763547_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
445 Treatment of sinking zone in Kaladhungi-I(69.880 to 69.980),Kaiadhungi- II (70.540 to 70.610) and Rampur (71.440 to 71.520) of NH-109(New NH-107) in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_765040_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
446 Rehabilitation Upgradation and reconstruction of existing intermediate lane to 2-lane with paved shoulders configuration Barna River to Ken River length 34.000 km on Gulganj-Amanganj-Pawai-Katni NH-43 Ext. in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751230_1 234.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 15:0Hrs
01/09/2023
Time 17:30Hrs
447 Rehabilitation and Upgradation of existing intermediate lane to 2 lane with paved shoulders from Km 0.600 Gulganj Bypass on NH-34 to Km 43.000 Barna River, length 42.400 Km on Gulganj- Amanganj- Pawai-Katni NH-43 Ext. in the State of Madhya Pradesh

2023_MoRTH_751224_1 190.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
01/09/2023
Time 17:30Hrs
448 Slope Protection and Landslide Mitigation at 5 Vulnerable Locations (km 6.20 to km 6.95 (Hill and Valley side), km 7.10 to km 7.25, km 21.40 to km 21.65, km 22.20 to km 22.300) within Sevoke-Rangpoo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (JobNo.010/WB/2022-23/519).

2023_MoRTH_748031_1 65.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 15:0Hrs
31/08/2023
Time 17:0Hrs
449 Slope Protection and Landslide Mitigation at 8 Vulnerable Locations (km 3.75 to km 3.90 km 8.21 to km 8.36, km 11.393 to km 11.628, km 33.35 to km 33.70, km 38.95 to 39.220, to km 44.903 to km 45.078, km 48.490 to km 48.560 and km 49.310 to km 49.570) within Sevoke-Rangpo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (Job No.010/WB/2022-23/520).

2023_MoRTH_748011_1 89.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 18:0Hrs
31/08/2023
Time 17:0Hrs
450 CONSTR OF RD HANLE ZURSAR IMISLA FROM KM 0.00 TO KM 48.002(ESISTING RD OF 20.800 KM AFTER KM 38.955 AND NEW RD OF 9.047 KM STARTS AFTER EXISING RD ON 20.800 KM) ESISTING TRACK TO NHSL SPECS OF EPC MODE (NET LENGTH 48.002 KMS)

2023_BRO_607681_1 162.200 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 18:0Hrs
31/08/2023
Time 11:0Hrs
451 2-lane with paved shoulder of Ashapur to Rudhy (Betul – Khandwa Pkg – IV) from Design CH. km 114.000 to km 149.000 in State of MP on EPC mode

2023_NHAI_159721_1 264.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
452 Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha

Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha 1,381.330 NHAI Normal Highway Project HAM 18/10/2022
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
453 IRQP work of NH131A from Km 1.900 to 29.120 Existing Portion for the year 2023 24 on EPC mode in the state of Bihar.

2023_MoRTH_760380_1 30.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
28/08/2023
Time 17:0Hrs
454 PR work from km 193 to 233 (41 km) and Provision of “THRIE” Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 EPC

2023_MoRTH_764275_1 19.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 15:0Hrs
28/08/2023
Time 12:0Hrs
455 RFP for the work of Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Package I, Design Km 228.920 (Jagarnathpur) to Km 235.960/0.000 (Makhauda Dham) to Km 29.000 (Sarpur) in the State of Uttar Pradesh

2023_MoRTH_764348_1 384.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2023
Time 15:0Hrs
28/08/2023
Time 11:0Hrs
456 Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC

157225 485.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 18:0Hrs
28/08/2023
Time 11:0Hrs
457 Construction of proposed ROB and its approaches in replacement of existing Level Crossing No 21X at Ch 107/500 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_760920_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2023
Time 10:0Hrs
28/08/2023
Time 11:0Hrs
458 Widening Carriageway width along with construction of footpath from km 69.00 to km 71.40, Permanent Restoration of depressed road bench at km 60.480 and Restoration of Valley side protection wall at km 60.950 in between km 60 to km 61 & Repair & Rehabilitation of Panchanai bridge at km 75.030 of NH-110 (Old NH-55) in the district of Darjeeling West Bengal during the year 2022-2023 (Job No.110/WB/2022-23/ 521) – 2nd call.

2023_MoRTH_763903_1 16.686 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:0Hrs
26/08/2023
Time 17:0Hrs
459 Short Term Maintenance Ordinary Repairs from km 396/2 – 404/7, km 428/0 – 430/8 & km 431/4 – 434/4 of NH 181 (old NH-67) under OR (DPP) 2022-23- in the State of Tamil Nadu

2023_MoRTH_763497_1 1.610 MoRTH Maintenance Project OTHERS 24/07/2023
Time 10:0Hrs
25/08/2023
Time 15:0Hrs
460 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode.

2022_NHAI_139085_1 972.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
461 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 (design length 14.980 km) (Package 3 under Phase I) in the state of UP on EPC mode under Bharatmala Pariyojna

2022_NHAI_139094_1 600.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
462 Widening to two lane with paved shoulder from Km 34/250 to Km 71/675 of Khammam-Kurvi section of NH365A in the State of Telangana

2023_MoRTH_757978_1 322.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
22/08/2023
Time 15:0Hrs
463 Widening to 4 Lane with paved shoulder Configuration of Vodarevu Chilakaluripet Section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh under Annual Plan 2022 23

2023_MoRTH_759123_1 825.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 17:0Hrs
21/08/2023
Time 17:0Hrs
464 Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 (Green Field Alignment) of NH-930P in the State of Telangana

2023_MoRTH_758290_1 405.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
465 Widening to 2 lane with paved shoulders from 0.00 to 32.970 of Adilabad-Bela section of NH-353B in the State of Telangana

2023_MoRTH_757888_1 360.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
466 Permanent Improvement of Black Spot (TN-(02)-635) at New Cinema junction @ Km 62/4-63/0 by Providing additional high level bridge @

2023_MoRTH_759739_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
21/08/2023
Time 11:0Hrs
467 Construction Of Six Lane Flyover at the Junction Of Kandari Chokdi (Ch. 149.440) And Luvara Patiya (Ch. 186.640) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Kandari-Luvara/2023 57.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2023
Time 18:55Hrs
19/08/2023
Time 17:0Hrs
468 RFP for the work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH-730S (Maharajganj , Nichloul , Thuthibari) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_744967_1 543.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 18:0Hrs
18/08/2023
Time 11:0Hrs
469 Widening from Two Lane Paved Shoulder to Four Lane with Paved Shoulder Km 81/300 - 86/630, Km 88/600 - 90/550, Km 90/550 - 90/850 (RHS) Km 90/850 - 96/300 & 97/600 - 110/700 of NH-81 (Old NH-67 - Km 221/600 - 234/700, Km 236/000 - 241/450, Km 241/450 - 241/750(LHS), Km 241/750 - 243/700 & Km 245/670 - 251/000) and Strengthening from Km 81/300 - 86/500 and Km 87/600 - 96/300 of NH-81 (Old NH-67 Km 236/000 - 244/700 and Km 245/800 - 251/000) of NH-81 (Coimbatore - Chidambaram Section) (Old NH- 67) (Nagappattinam-Guddalur-Mysore Road) on EPC mode in the State of Tamil Nadu

2023_MoRTH_762713_1 103.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2023
Time 15:0Hrs
17/08/2023
Time 15:0Hrs
470 Six Laning and Strengthening of km 340.000 to km 403.400 of Hubli Haveri section of NH 48 Old NH 4 in the State of Karnataka to executed on EPC Standard mode - Construction of LVUP at Kursapur Km.361.900, Service road at Varur Km.391.760 and Structure of VOP at Chabbi Km.392.600 on EPC mode.

7/NHAI/RO-BNG/14016/Tender/2023-24 dated 28.06.2023 24.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
16/08/2023
Time 11:0Hrs
471 Construction of I ROB with approaches at Bhaiyachowk and SR on Sangli Solapur II VUP at Yawali incl SVUP on Pune Solapur PkgII III VUP with street light work on SolapurYedshi IV SR and widening of Box culvert on Akkalkot Solapur in Maharashtra on EPC

2023_NHAI_158889_1 102.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 11:0Hrs
16/08/2023
Time 11:0Hrs
472 PR Work from ch.93.612 to ch.98.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760578_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
473 PR Work from Ch.98.00 to ch.112.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760579_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
474 CONSTR OF RD LUKUNG CHARTSE NEW TO NHSL SPECS INCDL LA FA WLC FM KM 0.000 TO KM 37.398 UNDER 51RCC 50TF PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 37.398 KM)

2023_BRO_601696_1 153.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 18:0Hrs
11/08/2023
Time 11:0Hrs
475 Construction of Dubrajpur Bypass with 4 lane configuration of length 5.676 km on NH 60 (new NH 14) from design chainage 0.00 (existing km 316.135 on NH 60) to design chainage 5.676 (existing km 320.980 on NH 60) in the district of Birbhum, West Bengal in EPC Mode.(JobNo014-WB-2022-23/518)

2023_MoRTH_747726_1 278.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 16:0Hrs
10/08/2023
Time 14:0Hrs
476 New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752381_1 199.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/05/2023
Time 17:30Hrs
09/08/2023
Time 17:30Hrs
477 Widening to two lane with paved shoulders of Sangameswaram Nallakaluva Velugodu Nandyal section from Km. 93.819 to 124.530 141.700 to 173.560 of NH 167K in the State of Andhra Pradesh under Annual Plan 2022 23 on EPC mode under NH O

2023_MoRTH_759155_1 550.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 11:55Hrs
09/08/2023
Time 17:0Hrs
478 One time Improvement of existing bypass road from Km 64/000 to 65/620 (Bhojpur) (Total length 1.62 Km) of NH 52 in the state of Madhya Pradesh under EPC mode under NH (O)

2022_MoRTH_726216_1 4.220 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 17:30Hrs
07/08/2023
Time 17:30Hrs
479 Widening of Kondamodu to Perecherla Section Design Ch. Km 0.00 to Km 49.917 of NH 167AG to 4 Lane with paved shoulder Configuration on EPC Mode in the state of Andhra Pradesh under AnnuaI Plan 2022 23

2023_MoRTH_757082_1 699.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 10:0Hrs
03/08/2023
Time 17:0Hrs
480 HILL SLOPE STABILIZATION AT KM 28.990, KM 29.500, KM 30.800,KM 31.900, KM 32.300, KM 32.500, KM 33.500, KM 34.400 & KM 35.600 ON MELYAL-PHARKIYAN GALI-DATT BRIDGE ROAD IN THE SECTOR OF 109 RCC32BRTF PROJECT BEACON IN J&K UT EPC MODE

CE (P) BCN/EPC/07/2023-24 26.770 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 17:30Hrs
03/08/2023
Time 12:0Hrs
481 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 0.00 TO KM 30.00 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.00 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT)

2023_BRO_604241_1 112.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
482 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 30.00 TO KM 60.540 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.540 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT) PACKAGE II

2023_BRO_604288_1 104.190 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
483 Long Term Rectification Construction Of Three Lane River Bridge At Bhukhi Khadhi Ch. 176.420 And Amravati Khadi Ch. 202.845 Additionally Construction Of Service Road From Chainage 114.470 To 116.180 Vadodara Bharuch And Chainage 186 885 To 190.675 Bharuch Surat For Blackspots On Vadodara - Surat Section Of Nh-8 New Nh-48 In The State Of Gujarat on EPC Mode

NHAI/RO-GNR/Bhukhi-Amravati/NH-48/June/2023 52.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:55Hrs
02/08/2023
Time 17:0Hrs
484 Short term maintenance under OR (DPP) works for Supplying of machineries as hire basis with drivers, cleaners staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along with Cutting of road side Jungle and clearance of drain & Blockage of Culverts from km 591.00 to km 598.00 of NH-31 (New NH-10 & 17) under NH Division - IX in the Districts of Darjeeling and Kalimpong - (Job No. TA/10-17/WB/2023-24/815).

2023_MoRTH_762403_1 0.670 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 13:45Hrs
01/08/2023
Time 17:0Hrs
485 Beautification works of Highway Stretch from Km 199.660 to 210.350 of Agra- Etawah (NH-19) on EPC Mode

2023_NHAI_162169_1 5.240 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 18:0Hrs
01/08/2023
Time 11:0Hrs
486 Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751238_1 299.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
31/07/2023
Time 17:30Hrs
487 Periodical renewal work in km 8/540 to 10/340 on NH-86 Extn. in the state of MP under EPC mode

2023_MoRTH_752483_1 4.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 17:30Hrs
28/07/2023
Time 17:30Hrs
488 Construction of an additional two lane bridge with approaches at km 249/6 of NH-948 (old NH-209) (Bangalore-Coimbatore section) on Engineering, Procurement & Construction (EPC) basis contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757443_1 7.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
489 Improvements to existing paver block carriageway from Km 429/2 – 430/8 and Km 433/2 (Selected Stretches), providing safety measures at vulnerable locations at Km 397/2, 397/4, 398/4, 398/6, 399/4, 399/6, 399/10, 400/2, 400/4 & 400/10 including CD works & protective works, Construction of Box Culverts at Km 428/003, 428/392, 432/284, 432/325 and improvements to Charring Cross Junction (Udhagamandalam) from Km 430/8 – 431/4 of NH 67 (New NH-181) on EPC Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757466_1 32.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
490 Short term maintenance under OR (DPP) works for supplying of machineries on hire basis with drivers, cleaners’ staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along road & cutting of road side Jungle and clearance of drain & blocked culverts from km 0.00 (Sevoke) to km 52.10 (Rangpoo) of N H -10 (Old NH 31A) under NH Division No. IX, P. W. (Roads) Directorate during the year 2022-2023 (Job No. TA/10/WB/2022-23/813) - (3rd call).

2023_MoRTH_760452_1 4.437 MoRTH Maintenance Project OTHERS 05/07/2023
Time 15:5Hrs
27/07/2023
Time 17:0Hrs
491 Shifting and Fixing of 24.00 M. Span Steel Girder Bailey Bridge in Km 220 Ch. 219.400 with Widening of Existing Road in Km. 219.200 To 219.600 and including Widening of Railway Crossing 1 - BRR at Shyampur Near Rishikesh on NH - 58 (New No.-34 ) in The State of Uttarakhand Under Annual Plan 2023-24

2023_MoRTH_761276_1 4.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2023
Time 15:0Hrs
27/07/2023
Time 12:0Hrs
492 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode - 2nd call

2023_NHAI_157520_1 620.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
27/07/2023
Time 11:0Hrs
493 HILL SLOPE STABILIZATION AT KM 32.500 KM 34.770 KM 35.090 AND KM 35.250 ON KASTWAR NILDORI LOKUT BUNGUS DRANGARI ROAD IN THE SECTOR OF 109 RCC 32 BRTF PROJECT BEACON IN J AND K UT EPC MODE

CE (P) BCN/EPC/08/2023-24 41.340 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 15:0Hrs
26/07/2023
Time 15:0Hrs
494 Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752770_1 272.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
25/07/2023
Time 17:30Hrs
495 Strengthening from km 0/000 to 1/500 & km 30/830 – 32/230 of NH 383 (Kottampatti – Thiruppathur Section) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_756828_1 9.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 15:0Hrs
25/07/2023
Time 15:0Hrs
496 Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode

2023_NHAI_148546_1 125.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:0Hrs
25/07/2023
Time 15:0Hrs
497 Construction of 4 Lane With PS Pattan Bypass From Existing Km 24.320 To Km 33.760 nd Dsgn Km 24.400 To Km 35.300 Length 10.900 Km On Road SBU NH01 in Ut JK Under Project Beacon Bro on EPC Mode

2023_MoRTH_756891_1 432.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 15:0Hrs
25/07/2023
Time 9:0Hrs
498 Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2023_MoRTH_751211_1 81.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
24/07/2023
Time 17:30Hrs
499 Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode

2023_MoRTH_756989_1 111.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 17:0Hrs
24/07/2023
Time 17:0Hrs
500 Rehabilitation and upgradation to 2 lane with paved shoulders from Design Ch. Km 248/010 to 269/900 i.e., Kurnool/Kadapa border Jammalamadugu. Section of NH167K in the state of Andhra Pradesh on EPC mode under Annual Plan

2023_MoRTH_755438_1 244.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 15:0Hrs
501 Construction of Baghamari By-pass on NH-57 from Km 281/700 to Km 285/330 in the state of Odisha on EPC Mode (Bid Ref No.-10 CE NH of 2023-24)

2023_MoRTH_756892_1 41.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 18:55Hrs
24/07/2023
Time 12:0Hrs
502 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_759010_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2023
Time 15:0Hrs
24/07/2023
Time 12:0Hrs
503 Construction of 37 50 mtr span Bridge at Karian RD 113 550 on NH 154A and Construction of 14 mtr span Bridge at Kalsuin RD 125 400 on NH 154A in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755491_1 12.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 11:0Hrs
504 Construction of two Lane RUB in lieu of existing railway level Crossing No 96 C 2 E at Railway Km 119 3 4 on NH 503A at Km 20 690 in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755545_1 14.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 18:0Hrs
24/07/2023
Time 11:0Hrs
505 Design and construction of crossing facility of VUP at 4 locations viz i Kikvi Village Km 801 080 ii Harischandri Km 806 020 iii Shivare km 817 360 iv Khedshivapur km 820 340 and FOB at 863 200 on Pune Satara Section of NH 4 from km 725 000 to 865 350 in the State of Maharashtra on EPC Mode

2023_NHAI_155058_1 52.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 9:0Hrs
24/07/2023
Time 11:0Hrs
506 Construction of 2-lane with paved shoulder configuration of Shujalpur Bypass, from Km 33/100 to 43/570, design length 10.47 Km section of NH-752C in the State of Madhya Pradesh under EPC mode

2023_MoRTH_752714_1 101.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
21/07/2023
Time 17:30Hrs
507 Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project BEACON BRO on EPC Mode

2023_MoRTH_756528_1 456.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 16:0Hrs
20/07/2023
Time 15:0Hrs
508 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_760041_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 15:0Hrs
19/07/2023
Time 14:0Hrs
509 Improvements to Riding Quality at km 32 000 33 400 km 35 640 37 000 km 47 000 57 400 km 59 200 64 400 km 68 800 77 200 km 83 600 84 000 km 84 400 95 000 km 95 400 96 200 Tuticorin Tiruchendur Kanyakumari section of NH 32

2023_MoRTH_758113_1 39.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 17:35Hrs
19/07/2023
Time 11:0Hrs
510 Maintenance of NH-76E Km.400.878 to 450.00 and NH-96 Km 153.330 to 154.010 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Prayagraj in the State of Uttar Pradesh

2023_MoRTH_761147_1 1.310 MoRTH Normal Highway Project OTHERS 10/07/2023
Time 17:0Hrs
18/07/2023
Time 17:0Hrs
511 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana (2nd call)

NHAI/Tech/BM/Pathankot Link Road/ 2nd Call/ 2023 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 11:0Hrs
18/07/2023
Time 11:0Hrs
512 Construction of 6-lane Flyover at Km.518.440 (Mouda Y-Junction) on Nagpur-Wainganga Bridge Section of NH-53 from Km.517.655 to Km.519.100 in the State of Maharashtra on EPC Mode

2022_NHAI_141737_1 62.590 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
18/07/2023
Time 11:0Hrs
513 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode

2023_MoRTH_751766_1 10.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2023
Time 17:30Hrs
17/07/2023
Time 17:30Hrs
514 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar

2023_MoRTH_756199_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 17:0Hrs
17/07/2023
Time 17:0Hrs
515 Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 from Km 0.000 to Km 15.972 (Total length 15.972 km) of NH 333C in the State of Bihar (Job No- NH-333C-BR-2022-2023-72)

2023_MoRTH_750242_1 101.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
17/07/2023
Time 15:0Hrs
516 Construction of Six Lane VUP at Karan (Ch. 263.350) [GJ-(02)-24] and Sarodhi (Ch. 330.500) (GJ-(02)-29) for Rectification of Blackspots on Surat- Dahisar Section of NH-8 (New NH- 48) in the State of Gujarat on EPC Basis

NHAI/RO-GNR/NH‐48/Blackspot/VUP/June-2023/ 55.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 11:30Hrs
14/07/2023
Time 12:0Hrs
517 Widening to Two lane with paved shoulders from Km 106/830 to 158/496 of Yellareddy-Rudrur Section of NH-765D in the State of Telangana on Engineering, Procurement and Construction (EPC) Basis

[2023_MoRTH_755359_1 402.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/05/2023
Time 15:0Hrs
13/07/2023
Time 15:0Hrs
518 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_756893_1 5.260 MoRTH Maintenance Project OTHERS 08/06/2023
Time 18:30Hrs
12/07/2023
Time 15:0Hrs
519 Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I- Package-VIII)

NHAI/BM/VME/2023/Pkg8 1,403.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
520 Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I-Package IX)

NHAI/BM/VME/2023/Pkg9 970.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
521 Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode.

2023_MoRTH_752196_1 474.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/05/2023
Time 17:0Hrs
10/07/2023
Time 17:0Hrs
522 Widening to 2 lane with paved shoulders from Km 62/920 to Km 106/830 of Medak - Yellareddy Section of NH-765D in the state of Telangana on Engineering, Procurement and Construction (EPC) Basis

2023_MoRTH_755197_1 307.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2023
Time 15:0Hrs
10/07/2023
Time 15:0Hrs
523 STRENGTHENING AND WIDENING OF NH-251 FROM KM 11.000 TO KM 22.770 IN DIU. (5th Call)

Tender Notice No. 19/RFPNH251DIUan/2023-24 73.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2023
Time 18:45Hrs
06/07/2023
Time 16:0Hrs
524 Construction of Tadipatri Bypass (Km 0/000 to Km 6/285) of 4 Lane on NH67 in Anantapuramu district of Andhra Pradesh state under NH(O).

2023_MoRTH_752843_1 122.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 15:40Hrs
06/07/2023
Time 15:0Hrs
525 Shifting & fixing of 24.00 M span Steel Girder Bailey Bridge in km 220 Ch. 219.400 with widening of existing road from km. 219.200 to 219.600 including widening of Railway Crossing 1- BRR at Shyampur new Rishikesh on NH-58 (New No. 34) in the State of Uttarakhand under Annual Plan 2023-24.

2023_MoRTH_758580_1 4.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/06/2023
Time 15:0Hrs
06/07/2023
Time 12:0Hrs
526 Balance work of rehabilitation and construction of Barela Mandla section of NH-30 from km 22/8 to 89/6 (length - 63.55 Km) two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2023_MoRTH_745062_1 53.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 17:30Hrs
05/07/2023
Time 17:30Hrs
527 Rehab and upgradation work for double lane with paved shoulder on Gangotri Dharasu road between Km 95.287 to Km 100.30 on NH 34

2023_BRO_583664_1 54.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
528 REHABILITATION & UP GRADATION OF EXISTING ROAD BETWEEN KM 86.120 TO KM 95.287 (DESIGN CHAINAGE KM 73.730 TO KM 81.800) SINGLE LANE TO DOUBLE LANE WITH PAVED SHOULDER SPECIFICATION ON GANGOTRI-UTTARKASHI-DHARASU ROAD (NH-34) ON EPC MODE IN THE STATE OF UTTARAKHAND (DESIGN LENGTH 8.07 KM)

2023_BRO_587942_1 134.440 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
529 Construction of Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH-26 in the state of Odisha on EPC mode

2023_MoRTH_753072_1 115.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 18:55Hrs
04/07/2023
Time 12:0Hrs
530 Upgradation/Strengthening of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch. 161.000 (Existing Km. 484.300) in Jitnagar Village in Nandod Taluka to Ch. 179.780 (Existing Km. 506.660) in Bitada/Movi Village in Netrang Taluka (Length 18.780 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode [Package IV (B)]

2023_NHAI_154362_1 971.850 NHAI Normal Highway Project HAM 17/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
531 Construction of Underpass at Sohal Town on Pathankot - Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode

2023_NAHI_153883_1 28.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
532 Providing Service Road on Panve lMahad Panji Road NH 66 Km. 406/030 to 450/170, Road Safety PanvelMahadPanji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EPC mode

2023_MoRTH_751367_1 3.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
533 Panvel-Mahad-Panji Road NH-66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Construction of vehicular underpass in km existing ch 466/650 at Khamdeo Naka in the village Insuli, Construction of vehicular underpass in km existing ch 450/370 at Zarap - Sawantwadi Junction, in Sindhudurg district in the State of Maharashtra on EPC Mode

2023_MoRTH_751635_1 67.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
534 Construction of Service Roads in stretches, pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332/200 to 406/030, on Panvel Mahad Panali Road NH-66 under Road Safety Annual Plan 2022-23 in the state of Maharashtra on EPC mode

2023_MoRTH_752283_1 14.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
535 Panvel-Mahad-Panji Road NH66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Whitetoping work in stretches from Km. 450/170 to Km. 52/000 and Km. 455/330 to Km. 460/000 and Service Road of 4.09 Km. in Sindhudurg istrict in the State of Maharashtra on EPC mode.

2023_MoRTH_751715_1 38.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
536 Widening to 2-lane with Paved shoulders of Dornala to Kunta Junction from Design Chainage Km 244.000 to Km 267.990 (Existing Km.244.000 to 268.700) section of NH-765 (Package-2) in the State of Andhra Pradesh on EPC mode for the year 2022-23

2023_MoRTH_750753_1 180.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2023
Time 15:0Hrs
03/07/2023
Time 15:0Hrs
537 Widening & strengthening to two lane with paved shoulder from Km 59/594 to 60/042 & Km 60/292 To 63/400 (Missing section of Rairangpur to Jashipur section) of NH-220 in the State of Odisha on EPC basis.(Bid Ref No 02 CE NH of 2023-24)

2023_MoRTH_752792_1 27.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 18:55Hrs
03/07/2023
Time 12:0Hrs
538 Const of 4L EC and atgrade improve from 0.0 to 19.87 of Danapur Bihta with connectivity to existing RoB 1.35 Km ramps and atgrade improvements to 4L and Upgrade of existing 2L-4L from 19.87-23.5 of Bihta Koilwar in Bihar on EPC (2nd Call)

2023_NHAI_153034_1 3,146.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:10Hrs
03/07/2023
Time 11:0Hrs
539 Rehabilitation -Upgradation of Karanja - Kherda - Murtizapur Section to 4 LPS from Design km 74.351 to km 102.331 (Excluding overlapping portion with Samruddhi Mahamarg from Design Km 76.380 to 78.280) section of NH 361C

2023_MoRTH_750199_1 594.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 15:0Hrs
30/06/2023
Time 17:0Hrs
540 Four Laning with paved shoulders from Km 29 00 to Km 36 25 Section of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu Road NH 703A 7 25 Kms under NH Division Jalandhar on EPC Mode in the State of Punjab for the year 2022 23

2023_MoRTH_745933_1 48.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 15:30Hrs
30/06/2023
Time 11:0Hrs
541 Short term maintenance under OR (DPP) works for removal of land slide materials and soft rock cutting etc in hilly region & cutting of road side Jungle and clearance of drain & blocked Culvert from km 0.00 to km 77.00 of NH 110(Old NH-55) under NH Division -IX during the year 2022-2023 (Job No. TA/110/WB/2022-23/814). (2nd Call).

2023_MoRTH_756527_1 2.292 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 9:5Hrs
28/06/2023
Time 17:0Hrs
542 Widening to two lane with paved shoulder of Chintoor to Motu section of NH326 from km 0 to Km 9.6 Design Chainage KM 0 to Km 8.345 in the state of AP on EPC mode under Annual Plan 2022-23

SENHVJA/27/2023-24 Dated.28.02.2023 84.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
28/06/2023
Time 15:0Hrs
543 Construction of Dadwindi realignment starting from existing Km 36 250 and terminating at existing Km 38 650 including 2 lane ROB on NH 703A on EPC mode in the State of Punjab

2023_MoRTH_748334_1 67.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 1:0Hrs
28/06/2023
Time 11:0Hrs
544 PR Work FROM K.M. 139 TO 157/6 ON NH-934 SAGAR-BINA ROAD (TOTAL LENGTH 17.320 KM) EXCEPTING 1.22 KM. ROB PORTION in the State of Madhya Pradesh on EPC Mod

2023_MoRTH_739573_1 13.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
545 P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode

2023_MoRTH_739570_1 7.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
546 Rehabilitation and upgradation of existing road between Km 29.725 to Km 60.55 Suraithota Malari NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_562362_1 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 17:0Hrs
26/06/2023
Time 18:0Hrs
547 HILL SLOPE STABILIZATION AT KM 14.00,17.50,17.700,76.00 & KM 76.300 ON ROAD BANDIPORA-GUREIZ UNDER PROJECT BEACON IN J&K (UT) (EPC MODE)

CE (P) BCN/05/2023-24 23.120 BRO Special Project EPC (Lump Sum/Item Rate Contract) 17/06/2023
Time 10:0Hrs
24/06/2023
Time 15:0Hrs
548 Construction of ROB at Railway in line of LC165B km 921.450 Between Chondi Basmat Bhendegaon Stations Chainage at 60.780 Length from Km 60.179 to 61.278 1.099 km in the State of Maharashtra on EPC Mode

2023_MoRTH_749558_1 44.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:0Hrs
23/06/2023
Time 17:30Hrs
549 Maintenance of NH NH 28B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758180_1 1.520 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
550 Maintenance of NH 227A, NH 727A and NH 727B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758190_1 1.900 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
551 Maintenance of NH 328 and NH 730S under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758197_1 1.960 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
552 Treatment of sinking zOne in Kaladhungi-I(69.880 to 69.980),Kaiadhungi-II (70.540 to 70.610) & Rampur(71.440 to 71.520) of NH-109(New NH-107)in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_753584_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
22/06/2023
Time 12:0Hrs
553 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from Design Ch 0/0 to 58/115 to two lane with paved shoulder configuration in the state of Gujarat total length 58/115 Km

754715 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2023
Time 16:0Hrs
22/06/2023
Time 12:0Hrs
554 One Time Improvement of existing carriageway in Deoli Town with white topping (Length 3.200 Km.) on Yavatmal to Wardha Section of NH-361 in the State of Maharashtra on EPC Mode

2023_NHAI_152877_1 24.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 13:0Hrs
20/06/2023
Time 11:0Hrs
555 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_751503_1 35.374 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2023
Time 18:15Hrs
20/06/2023
Time 11:0Hrs
556 Construction of Four Lane Greenfield National Highway in the State Of Bihar Starting From NH-30 Near Saristabad (Patna) To Nathupur (Project End Point of Patna-Gaya-Dobhi Section of NH-83) [2.8km] To Connect Missing Link of Patna-Gaya-Dhobi Corridor in the State of Bihar on EPC Mode

2023_NHAI_148546_1 124.180 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:55Hrs
19/06/2023
Time 17:0Hrs
557 providing Road safety and flood damage repair from Km 54 00 to 60 800 on Jalandhar Kapurthala Sultanpur Lodhi Dadwindi Lohian Makhu Road NH 703A in the state of Punjab on EPC Mode

2023_MoRTH_747129_1 13.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 12:30Hrs
19/06/2023
Time 11:0Hrs
558 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat

2023_MoRTH_754522_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 16:0Hrs
17/06/2023
Time 16:0Hrs
559 Strengthening of NH 68 from Km 297.100 to 307.515, 328.257 to 329.600, 346.700 to 369.700 and 387.700 to 407.700 Section Khoda border- Mesra road, Budhanpur-Tharad road, Vav-Suigam road and Uchosan-Bhabhar-Ujjanwada Road in the State of Gujarat.

2023_MoRTH_755199_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 15:0Hrs
17/06/2023
Time 15:0Hrs
560 MAINTENANCE OF SELECTED STRETCHES OF JALGAON – BHADGAON-CHALISGAON ROAD OF NH 753 J FROM KM 04/000 TO 103/000 WHERE LA IS DELAYED ON REALIGNMENT PORTIONS ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747066_1 8.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
16/06/2023
Time 17:30Hrs
561 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_749211_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
15/06/2023
Time 12:0Hrs
562 Rehabilitation & Upgradation of Risod Town to Four Lane with Paved Shoulders standards from Km. 36/845 to Km. 39/340 & Km. 41/520 to Km. 44/220 (Total Length = 5.2 KM) of NH 461B in the state of Maharashtra on EPC mode.

2023_MoRTH_749282_1 82.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:30Hrs
14/06/2023
Time 17:30Hrs
563 Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_143889_1 46.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 9:0Hrs
14/06/2023
Time 11:0Hrs
564 (2nd Attempt) Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH-47 in the State of Gujarat

2023_MoRTH_747875_2 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
13/06/2023
Time 12:0Hrs
565 Strengthening of existing 2-Lane road from Km 24.00 to 41.00 of NH-144 of Domail – Katra – Reasi – Bhambla road in District Reasi in UT of Jammu & Kashmir on EPC mode LENGTH 17.00 KMS.

Bid/Job No. NH-144-J&K-2022-23-116 dated 22.05.2023 23.185 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
566 Improvement of Riding Quality Programme IRQP of existing 2-Lane road from Km 41.000 to 67.500 of NH-144 of Domail – Katara – Reasi – Bhambla road in District Reasi in UT of Jammu Kashmir on EPC mode under Annual plan for the year 2022-23 LENGTH 26.50 KMS

Bid/Job No. NH-144-J&K-2022-23-117 dated 22.05.2023 26.218 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
567 Maintenance of NH 730B, NH 730A, NH 731K under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 in the State of Uttar Pradesh

2023_MoRTH_754356_1 1.580 MoRTH Maintenance Project OTHERS 22/05/2023
Time 15:0Hrs
12/06/2023
Time 15:0Hrs
568 Rehabilitation Upgradation to 4 lane with paved shoulder of Existing Section in Sillod Town with Design Ch. Km. 54.500 to Km. 60.679 Length 6.179 Km. Section of NH.753 F Aurangabad Jalgaon road on EPC Mode in the state of Maharashtra.

2023_MoRTH_748054_1 112.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/06/2023
Time 17:30Hrs
569 Rehabilitation of the distressed Bridge at Gandhigram across Purna river on Akola Akot Road NH 161 A in the state of Maharashtra

2023_MoRTH_748892_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2023
Time 10:30Hrs
08/06/2023
Time 17:30Hrs
570 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(2nd call)

Tender Notice No. 01/RFP848BDaman/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 12:0Hrs
08/06/2023
Time 14:0Hrs
571 Upgradation and widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(EPC MODE)

Tender Notice No.126/2022-23 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2023
Time 17:30Hrs
08/06/2023
Time 14:0Hrs
572 Balance works of Rampur-Kathgodam Section of NH-87 from km 42.791 (Design Chainage km 43.446) to km 88.00 (design Chainage km 93.226) (Package-II) in the State of Uttarakhand on EPC Mode

NHAI/Tech/UKD/BW/RK-II/2022 273.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 17:30Hrs
08/06/2023
Time 11:0Hrs
573 Construction of ROB with approaches from km 79.400 to 81.200 of Rampur - Kathgodam section of NH-87 [New NH No. 109 [Package-II] in the state of Uttarakhand under NHDP Phase-III on EPC Mode

NHAI/Tech/UKD/BW/RK-II/ROB/2023 58.320 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 18:0Hrs
08/06/2023
Time 11:0Hrs
574 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode

2023_NHAI_146145_1 621.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
08/06/2023
Time 11:0Hrs
575 Construction of Major Bridge on Painganga River at design chainage from Km. 52/685 to 52/785 on NH 548CC along with approaches of 1130m (Total Length = 1230m) of National Highway Mehkar-Chikhli-Khamgaon (Section Chikhli -Khamgaon) Road on EPC mode in the state of Maharashtra

2023_MoRTH_747294_2 26.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 10:30Hrs
07/06/2023
Time 17:30Hrs
576 CONSTR OF RD TANGTSE TO KELA TSO KM 0.000 TO KM 12.500 (TAKEN TANGTSE AS KM 0.000) TO NHDL SPECS INCDL MINOR BRS AND THEIR APPROACH UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 12.500 KM)

2023_BRO_590969_1 82.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/04/2023
Time 18:0Hrs
07/06/2023
Time 11:0Hrs
577 CONSTRUCTION OF 01 MAJOR BRIDGE & 05 MINOR BRIDGE ON MANGALWEDHA UMDAI SECTION ( FROM SC.96/00 TO 123/100) IN SANGALI DISTRICT IN THE STATE OF MAHARASHTRA ON EPC MODE

2023_MoRTH_749885_1 43.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 10:0Hrs
05/06/2023
Time 17:30Hrs
578 STRENGTHENING AND WIDENING TO SECTION KUSUMBA TO DONDAICHA OFNH-160H IN KM 42/00 TO 97/00 DESIGN CHAINAGE KM 43/375 TO 98/241 (LENGTH=54.866 KM) ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747115_1 92.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
579 STRENGTHENING TO MALEGAON KUSUMBA DONDAICHA TO JUNCTION OF NH 752G NEAR SHAHADA ROAD NH 160H IN KM. 98/00 TO 125/00 ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747138_1 29.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
580 Construction of New 2 lane Major bridge length 144 m. on Terna River at km. 227.311 design ch. 20.890 along with approaches on Mantha Latur Omerga Nagansur section of Nh 548B on EPC mode in the state of Maharashtra

2023_MoRTH_746703_1 26.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
581 Widening and Strengthening to Borgaon Kale to Murud Akola Section 1 from km. 61.800 to 72.900 length 11.10 km. section on NH 63 to 2 lane configuration and Latur Airport Junction to Mahila Polytechnic section 2 from km. 78.900 to 86.850 length 7.95 km. section of Nh 63 to 4 lane configuration total project length 19.05 km. in the state of Maharashtra

2023_MoRTH_746673_1 72.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
582 Rehabilitation and Upgradation of Kopra to Gharola km. 76.350 to 102.350 section of NH 752K Total project length 26.00 km. to 2Lane 4Lane configuration on EPC mode in the state of Maharashtra

2023_MoRTH_746653_1 105.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
583 Widening and Strengthening to Yedshi to Jawale section of NH 63 from km 20.350 to 24.350 length 4.00 km. to 2lane confifuration in the state of Maharashtra

2023_MoRTH_746804_1 8.004 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
584 DESIGN AND CONS OF UNI-DIRECTIONAL TWIN TUNNELS AT SHINKUN LA PASS OF LENGTH 4.1 KM (APPROX LENGTH) INCL CIVIL AND ELEC/ MECHANICAL WORK ALONG WITH APPROACHES CONNECTING DARCHA-PADAM HIGHWAY TO NHDL SPECS IN HIMACHAL PRADESH AND THE UT OF LADAKH

2023_BRO_582500_1 1,504.640 BRO Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 17:30Hrs
03/06/2023
Time 11:0Hrs
585 SLOPE REHABILITATION WORKS (SRW) AT KM 96.000 ON ROAD BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_590218_1 29.510 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 15:0Hrs
02/06/2023
Time 15:0Hrs
586 Providing and laying Crash Barrier for Road Safety in Nagrota Bagwan Ranital Mubarikpur road Km 5 to 18 of NH 20A New NH 303 in the State of H.P

2023_MoRTH_749523_1 6.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2023
Time 18:0Hrs
02/06/2023
Time 11:0Hrs
587 OR(DPP) to Pathri-Sonpeth-Injegaon Road NH-548 B from km.58/200 to 83/700 (Length 25.5km) in the State of Maharashtra. (Filling pot hole by MPM & OGC)

2023_MoRTH_753065_1 2.800 MoRTH Maintenance Project OTHERS 12/05/2023
Time 17:0Hrs
01/06/2023
Time 17:0Hrs
588 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh (3rd call)

2022_MoRTH_720387_3 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2023
Time 15:0Hrs
31/05/2023
Time 17:30Hrs
589 Maintenance of NH 730 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Division, PWD, Siddharthnagar in the State of Uttar Pradesh.

2023_MoRTH_753205_1 1.570 MoRTH Normal Highway Project OTHERS 15/05/2023
Time 15:0Hrs
31/05/2023
Time 15:0Hrs
590 Construction of LVUP Design Ch.117.920, LVUP and other related works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana on EPC Mode

2023_NHAI_151140_1 17.940 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 15:0Hrs
31/05/2023
Time 11:0Hrs
591 Repair/ Rehabilitation of 6 (Six) number Bridges i.e Leesh bridge, Gheesh bridge, Chell bridge, Mal bridge, Newra bridge, New Zarda bridge at km 607.151, km 611.920, km 614.775, km 628.720, km 630.895 & km 672.830 respectively on NH-17 (Old NH-31) under NH Division-IX in the district of Jalpaiguri West Bengal during the year 2022-2023. (Job No. 17/WB/2022-23/ 516).

2023_MoRTH_748126_1 12.119 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 10:0Hrs
30/05/2023
Time 17:0Hrs
592 4/6 Lane of Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from Km.70.830 to Km.115.400 – Treatment of 2 Nos. of Potential Blackspot locations (1) Karera Khurd, Yamunanagar at km.78.520 and (2) Thana Chapper, Yamunanagar at km.101.228 in the State of Haryana on EPC mode

2023_NHAI_150330_1 33.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
30/05/2023
Time 11:0Hrs
593 Construction of 2 new ROBs in parallel in lieu of LC-6 at Km 284/3-4 along with LA for approaches on Daund Manmad railway line (DD-MNR) Crossing at Ch 116/700 of NH-548D near Limpangaon on Talegaon Shikrapur Nhavara Shrigonda Jamkhed Road in Ahmednagar District in the State of Maharashtra on EPC Mode.

2023_MoRTH_743698_1 73.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
594 Construction of Major Bridge including construction of approach road & RCC gutter on Sina River at km 214.180 Kalyan Ahmednagar Pathardi road NH-61 (Old NH-222) in the State of Maharashtra

2023_MoRTH_748428_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
595 Construction of Mariahu bypass with four lane with paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_743986_1 210.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 18:30Hrs
27/05/2023
Time 15:0Hrs
596 SLOPE REHABILITATION WORKS (SRW) FROM KM 56.490 TO KM 56.600 ON ROAD ON BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_589058_1 34.060 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 9:0Hrs
26/05/2023
Time 12:0Hrs
597 CONSTRUCTION OF ROAD MANALI-SARCHU-LEH TO NHDL SPECIFICATIONS FROM DESIGN CHAINAGE KM 244.000 TO KM 268.670 ON NH-03 (TAKEN MANALI AS KM 0.000) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 24.670 KM)

2023_BRO_586320_1 346.400 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 18:0Hrs
26/05/2023
Time 11:0Hrs
598 Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH 2 from Km 215 to Km 230 and from Km 280 to 295 as per Crash Vulnerability Audit Report on EPC Mode

2022_NHAI_138534_1 95.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 9:0Hrs
24/05/2023
Time 11:0Hrs
599 Construction of 4laning of Kishanganj Bahadurganj rd sec starting from NH (NH31) near Uttar Rampur (Km. 0.000) and terminating at NH327E near Satal Istamarar Bahadurganj (Km. 22.719) under BMP in Bihar on HAM

2022_NHAI_122794_1 747.480 NHAI Special Project HAM 18/07/2022
Time 18:5Hrs
22/05/2023
Time 17:0Hrs
600 CONSTRUCTION OF 50 MTR CAVERN AND 21M APPROACH TUNNEL WITH PORTAL AT ONE END AT GENERAL AREA HANLE UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_589608_1 20.250 BRO Special Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 18:0Hrs
22/05/2023
Time 12:0Hrs
601 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat.

2023_MoRTH_752674_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 18:55Hrs
22/05/2023
Time 11:0Hrs
602 Construction of Balance Works (i) Pedestrian Underpass at Km.514.960 including approaches, both side service road, (ii) Bus lay bay, bus shelter, (iii) Drain from Km.514.660 to Km.515.087 on both sides and (iv) Junction at Km.514.960 on 4-laned Wardha - Butibori section of NH-361 [Km.465.500 to Km.524.690 in the state of Maharashtra on EPC Mode

2023_NHAI_150589_1 15.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 18:30Hrs
22/05/2023
Time 11:0Hrs
603 CONS OF ROAD K-N-S FROM EXISTING TRACK TO NHSL SPECS FROM DESIGN CHAINAGE KM 20.000 TO KM 38.765 (TAKEN KARZOK AS KM 0.000) INCL TWO MAJOR BRIDGES OF SPAN 400 MTR (50 MTR x 8) AND 275 MTR (55 MTR x 5) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 18.765 KM)

2023_BRO_588309_1 148.550 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 18:0Hrs
20/05/2023
Time 11:0Hrs
604 Construction of ROB and their Approaches at Km 99 4 LC Gate No 503 Spl A 3 E of NH 744 Old NH 208 of Kollam Thirumangalam Road

2023_MoRTH_747027_1 35.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:25Hrs
19/05/2023
Time 11:0Hrs
605 Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul- Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra on EPC Mode

2023_MoRTH_747270_1 14.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 15:0Hrs
17/05/2023
Time 17:0Hrs
606 Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode

2023_NHAI_143784_1 347.640 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
17/05/2023
Time 11:0Hrs
607 Road Safety work from Km 0.000 to Km 38.600 of NH-124C (Tarighat-Bara Road) on EPC Mode in the State of Uttar Pradesh under Road Safety 2022-2023(2nd Call)

2023_MoRTH_749250_1 4.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
608 Oridinary repairs from Km 158/0 -160/4 & Km 167/850 -168/785 of NH 209 (Dindugal – Bangalore Road ) under OR (DPP) in the state of Tamil Nadu

2023_MoRTH_748941_1 0.320 MoRTH Maintenance Project OTHERS 12/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
609 Periodical Renewal from Km 27/6 – 29/2 of NH 181 (Coimbatore to Gundlupet Road) under Annual Renewal Programme (ARP) for year 2022-23 in the State of Tamil Nadu

2023_MoRTH_747472_1 4.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
610 Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH No.47 in the state of Gujarat.

2023_MoRTH_747875_1 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 9:0Hrs
15/05/2023
Time 12:0Hrs
611 Protection of Embankment with Toe Wall and concrete drain in Nagzari Village portion from km 7.300 to 8.200 Length 900m on MehkarChikhali Road of NH 548 CC in the state of Maharashtra.

2023_MoRTH_747328_1 1.340 MoRTH Normal Highway Project OTHERS 29/03/2023
Time 10:30Hrs
12/05/2023
Time 17:30Hrs
612 Treatment of landslide zone 11 location from km 101.01 to km 191.365 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_747123_1 26.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 13:0Hrs
11/05/2023
Time 11:0Hrs
613 Stabilisation of 09 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_586685_1 61.600 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 18:0Hrs
10/05/2023
Time 18:0Hrs
614 Construction to Two laning with paved shoulder of Daudnagar Bypass Nasriganj Bypass and Dawath Bypass of NH 120 in the State of Bihar on EPC Mode.

2023_MoRTH_747561_1 47.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
10/05/2023
Time 15:0Hrs
615 Construction of Steel Truss Bridge at Km. 1.700, 2.450, 3.300 and 3.900 over Sidhwan Canal on 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.000 to Km 17.041 in the State of Punjab on EPC mode

2023_NHAI_150025_1 19.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 15:0Hrs
10/05/2023
Time 11:0Hrs
616 Construction Of Balance Works Of Four Laning Of Vijayawada – Machilipatnam Section of NH-65 And Overlay On Existing Bypassed Sections (Old NH-9) In The State Of AP On EPC Mode

NHAI/NH-65/ VIJ-Machilipatnam/Bal Works/2023 30.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2023
Time 11:0Hrs
09/05/2023
Time 11:0Hrs
617 Up-gradation to four lane- two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15.200 to Km 38.00 and from Km. 58.00 to Km 84.00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra.

2023_MoRTH_737532_1 625.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 14:0Hrs
08/05/2023
Time 17:0Hrs
618 RFP for the Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH- 76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of Uttar Pradesh

2023_MoRTH_742875_1 174.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:55Hrs
08/05/2023
Time 15:0Hrs
619 Construction to 2 lanes with Paved Shoulder of Jandaha Bypass of NH 103 NH 322 in CH 0.000 existing km 30 of NH 103 to CH 4.800 existing Km 35 of NH 103 in the State of Bihar for the Year 2022 23.

2023_MoRTH_746266_1 41.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2023
Time 17:0Hrs
04/05/2023
Time 17:0Hrs
620 Improvement of the stretch from km 597.00 to km 598.00 of NH-31 by providing Mastic Asphalt wearing course, Construction of New Five Numbers of Culverts including valley / hill side protective work & Restoration of rain damaged embankment by Construction of guard wall at km 598.900 under NH Division No-IX in the District of Kalimpong in the State of West Bengal during the year 2022-23 in EPC Mode (Job No.17/WB/2022-23/513).

2023_MoRTH_747286_1 7.196 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
04/05/2023
Time 17:0Hrs
621 Short term maintenance from Km 0/0 0/8, 60/200 60/450, 64/280 64/695 and 110/942 111/152 of Cuddalore Vridhachalam Salem Road (NH 532) under OR (DPP) in the state of Tamilnadu

2023_MoRTH_749382_1 2.000 MoRTH Maintenance Project OTHERS 17/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
622 Maintenance of NH 730B, NH 730A, NH 731K , NH 334DD , NH 730H, NH 727H under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Bareilly in the State of Uttar Pradesh

2023_MoRTH_749181_1 1.920 MoRTH Maintenance Project OTHERS 13/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
623 Geometric improvement of NH 327E at Bhargama and Sukela More including Provislon of Raniganj Bypass in the State of Bihar for the Year 2022 23.

2023_MoRTH_745855_1 60.254 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
03/05/2023
Time 17:0Hrs
624 Construction of Trumpet Interchange Connecting Bangalore Chennai Green Field Expressway from Km 261/705 to Km 263/010 with Maduravoyal to Wallajapet Section of NH48 near Sriperumbudur toll plaza at Km 35/700 in state of Tamil Nadu under Bharatmala on EPC Mode

147642 122.030 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/03/2023
Time 15:0Hrs
03/05/2023
Time 11:0Hrs
625 Design and Construction of Vehicular Underpass with approaches at Khodad Junction Km 78 600 and Ambikhalsa Junction Km 113 150 on Khed Sinnar section of NH 60 Old NH 50 in the State of Maharashtra as Standalone project on EPC Mode

2023_NHAI_148149_1 40.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/03/2023
Time 9:0Hrs
03/05/2023
Time 11:0Hrs
626 Construction of 3 Nos. of standalone structures at 3 nos. of locations (i.e. (i) Flyover at 10th Mile Junction at Ch. 401.730 (ii) VUP at DRDO at Ch. 403.600 (iii) VUP at Ambebahula Junction at Ch. 429.120) on Pimpalgaon-Nashik-Gonde (Km 380.000 - Km 440.000) section of NH-3 in the state of Maharashtra on EPC Mode

2023_NHAI_147395_1 161.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 18:0Hrs
03/05/2023
Time 11:0Hrs
627 Construction of bypass to Bagalur town branching from Km.3/0 (Kothapalli) and joining at km 9/350 (Jee Mangalam) including Shifting of Utilities of NH 207 (New NH 648) on Engineering, Procurement & Construction (EPC) Basis Contract in the state of Tamilnadu

2023_MoRTH_744221_1 47.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
628 Widening from two lane with paved shoulder to four lane with paved shoulder and improvements from km 26/5 - 34/2, Km 35/6 - 40/2, Km 42/2 - 53/2, Km 55/8 - 56/2, Km 58/7 - 61/2, Km 76/6 - 81/3 and widening from two lane with paved shoulder to four lane with paved shoulder from Km 40/2 - 42/2, Km 53/2 - 55/8, Km 61/2-66/7, Km 67/2 - 72/4, improvements from Km 34/2 – 35/6 including CD works of NH 81 (Coimbatore – Chidambaram) (Old NH-67) (Nagapattinam – Trichy -Coimbatore - Gudalur) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_744953_1 206.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
629 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat

2023_MoRTH_748110_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2023
Time 15:0Hrs
02/05/2023
Time 15:0Hrs
630 Strengthening work from Km. 37 to 70 on NH107(A) under Annual Plan of NH(O) 2022-2023 in the State of Uttarakhand

2023_MoRTH_748291_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
631 Slope Protection Measures (CH.7.590 Km to 7.690 Km Near Medanpur and CH.35.210 km to 35.265 km near Kund Barrage Along Rudraprayag - Gaurikund Road, NH-107) Under Annual Plan 2022-23 in the state of uttarakhand

2023_MoRTH_748300 20.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
632 Up-gradation to 4 lane configuration for the work of Peth Naka to Sangli Road (Km 0.000 to 41.250 Km) (Length = 41.250 km) section of NH-166H in the state of Maharashtra on EPC mode.

2023_MoRTH_735470_1 596.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
27/04/2023
Time 17:0Hrs
633 Repair and rehabilitation work of Major Bridge over Ghaghra River and its approaches in Km.- 56.000 and Km.57.000 and Major Bridge over Kuwano river in Km. 42.000 on NH 328A in Uttar Pradesh under Road Safety 2022 2023.

2023_MoRTH_748498_1 3.800 MoRTH Normal Highway Project OTHERS 07/04/2023
Time 14:0Hrs
27/04/2023
Time 12:0Hrs
634 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 593 on EPC mode under Bharatmala Pariyojana in the State of TamilNadu Package 1 Km 0 342 to Km 4 604

122527 987.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:35Hrs
26/04/2023
Time 11:0Hrs
635 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 2 Km 4 604 to Km 9 700 on EPC mode

122532 1,179.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:0Hrs
26/04/2023
Time 11:0Hrs
636 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 3 km 9.700 to Km 14.185

122540 946.370 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
637 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 4 km 14.185 to Km 20.223

122542 823.090 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
638 Strengthening of NH 68 Bet. Km 297/100 to 307/515, 328/257 to 329/600, 346/700 to 369/700 and 387/700 to 407/700

2022_MoRTH_719704_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 11:0Hrs
25/04/2023
Time 16:0Hrs
639 Improvement of existing alignment of Pandharpur Town (Part bypassed section) from Wakhari to Lord Vitthal Temple (Length – 8 km) in the State of Maharashtra on EPC Mode

NHAI/RO/MUM/PANDR/TOWN/OTI/26 114.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 11:0Hrs
25/04/2023
Time 11:0Hrs
640 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_745731_1 5.260 MoRTH Normal Highway Project OTHERS 17/03/2023
Time 15:0Hrs
24/04/2023
Time 15:0Hrs
641 Upgradation and strengthening to 2 lane PS from Km. 95.500 to km. 129.775 of NH 168G Idar Bhiloda Samlaji Section in the State of Gujarat Length 34.275 Km Job No. 168 GJ 2022 23 687

2022_MoRTH_732387_1 177.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 12:0Hrs
24/04/2023
Time 12:0Hrs
642 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_744572_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
643 Treatment of landslide zone 11 location from km 168.605 to km 191.970 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_744588_1 42.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
644 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_748247_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 17:30Hrs
24/04/2023
Time 11:0Hrs
645 Construction/Widening of Structures i.e., MJB, MNB, ROBs, LVUP etc. rectification of drainage and rain cuts and other works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.

2023_NHAI_148697_1 551.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
24/04/2023
Time 11:0Hrs
646 OR DPP Renapur - Ashtamode (NH - 361) - Udgir - Degluí (NH101) - Adampur phata (NH101) - khatgaon - Sagroli - Bodhan - Nizamabad (NH63) Telgana State Border Section from Raavi to Gojegaon of NH- 63 km 208/700 to km 221/700 in the State of Maharashtra. 3rd call.

2023_MoRTH_749201_1 1.450 MoRTH Maintenance Project OTHERS 13/04/2023
Time 9:0Hrs
22/04/2023
Time 17:30Hrs
647 WIDENING FROM TWO LANE WITH PAVED SHOULDER TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 0/8 – 17/6, 18/0 – 25/0, 25/500 – 27/900, 29/6 – 34/0 & KM 39/0 – 50/570 AND STRENGTHENING IN KM 17/6 – 18/0, 25/0 – 25/5, 27/9 – 29/6, AND WIDENING FROM FOUR LANE TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 34/0 – 39/0 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF STORM WATER DRAIN INCLUDING WIDENING AND RECONSTRUCTION OF CD WORKS AND ADDITIONAL BRIDGE AT KM 39/8 OF NH 532 (CUDDALORE – VRIDHACHALAM – SALEM ROAD) ON ENGINEERING, PROCUREMENT &CONSTRUCTION (EPC) BASIS CONTRACT IN THE STATE OF TAMIL NADU

2023_MoRTH_743817_1 206.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 19:15Hrs
19/04/2023
Time 15:0Hrs
648 CONSTRUCTION OF NELYA – PT 4340 – RING CONTOUR ROAD FROM KM 0.000 (STARTING POINT MANDIR TIKRI) TO KM 16.275 (RC POST) (APPROX NET LENGTH 16.275 KMS) AND ADDITIONAL LINK TO PT 4340 OF 0.950 KM TO NHSL SPECIFICATION UNDER 42 BRTF/PROJECT VARTAK IN ARUNACHAL PRADESH STATE IN EPC MODE

2023_BRO_584467_1 147.090 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 11:30Hrs
19/04/2023
Time 12:0Hrs
649 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Lambasingi to Paderu section (Km 205.000 to Km 253.010) of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode

2023_WBRTH_740575_1 282.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
650 Rehabilitation and Upgradation to 2-lane configuration of Karnohal-Kalwahn section (Km 181.000 to Km 208.950) of NH-70 in the State of Himachal Pradesh under GNHCP on EPC Mode

2023_WBRTH_740593_1 196.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
651 Stabilisation of 04 Nos land slides on Rishikesh Joshimath Mana road NH 107

2023_BRO_584359_1 50.380 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:30Hrs
17/04/2023
Time 18:0Hrs
652 Stabilisation of 08 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_583075_1 70.170 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
17/04/2023
Time 18:0Hrs
653 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_1 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 17:30Hrs
17/04/2023
Time 17:30Hrs
654 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/808).

2023_MoRTH_742772_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 16:0Hrs
17/04/2023
Time 14:0Hrs
655 CONSTRUCTION OF SEVEN FOBS BETWEEN KM. 307.700 AND KM. 364.000 ALONG WITH RCC CRASH BARRIER OF 600M LENGTH AT KM. 336.550 ON SURAT VAPI SECTION OF NH 48 IN THE STATE OF GUJARAT

2023_NHAI_141852_1 14.070 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 11:0Hrs
17/04/2023
Time 11:0Hrs
656 Periodic Renewal Work in km. 21.627 to km. 34.000 of NH-328A in the State of Uttar Pradesh on EPC Mode.

2023_MoRTH_746541_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2023
Time 17:0Hrs
11/04/2023
Time 12:0Hrs
657 IRQP to newly declared NH151K btn km 67.60 to 83.60 and km 88.60 to 112.8 and km 124.8 to 134.69 section Tran Patiya Jamjodhpur Kalavad road and road safety items btn km 45.4 to 134.69 in the state of Gujarat for the year 2022.23 total length 50.09 km

2023_MoRTH_745852_1 29.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 9:0Hrs
11/04/2023
Time 12:0Hrs
658 Construction of LVUP of size 12m x 4m for full width of ROW between two parcels of land allotted for IISER, Tirupati campus at km 504.850 in Penchalkona to Yerpedu section from km 425.400 to km. 509.400 of NH-565 in the State of Andhra Pradesh on EPC Mode

NHAI/RO-VJA/PIU-TPT/NH-565/P-Y/IISER/Works/2023 4.430 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2023
Time 19:0Hrs
11/04/2023
Time 11:0Hrs
659 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_2 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 17:30Hrs
10/04/2023
Time 17:30Hrs
660 RFP for the Construction of Gilaula bypass with two lane with paved shoulder configuration starts near km. 281.930 of NH-730 and ends near Km. 284.900 of NH-730 (Design length- 3.510 km) on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_742093_1 24.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 15:0Hrs
10/04/2023
Time 15:0Hrs
661 PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 20221-23 EPC Mode

2023_MoRTH_739775_1 23.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
662 Work of reconstruction of 2 no minor bridge in place of old weak narrow and minor bridge identified at km 69 900 and at km 130 521 of NH51 and construction of diversion road for major bridge at km 81 400 in the state of Gujarat under road safety annual plan 2022 23

739283 6.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
663 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER OF SARAIGARH ON NH 327A LALGANJ GANPATGANJ UPTO NH 106 NEW NH 131 FROM KM 0.000 TO KM 10.672 TOTAL LENGTH 10.672 KM OF NH 327AD ON EPC MODE IN THE STATE OF BIHAR

NIT NO 02EPC/NH-MADHEPURA/2022-23 NO 02EPC/NH-MADHEPURA/2022-23 83.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
10/04/2023
Time 11:0Hrs
664 Rehab existing road between Km 0 to Km 29.30 on Gangotri Dharasu road NH 34

2023_BRO_581993_1 235.080 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2023
Time 18:0Hrs
05/04/2023
Time 11:0Hrs
665 Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode

2023_MoRTH_744116_1 4.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:0Hrs
04/04/2023
Time 12:0Hrs
666 Widening to 2 Lane with Hard shoulder configuration of Mana Ch 0.00 to Mana Pass Ch 50.987 road on NH-07 under Bharatmala Pariyojana in the State of Uttarakhand Length 50.987 on EPC mode

2023_MoRTH_740815_1 423.610 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2023
Time 10:0Hrs
03/04/2023
Time 17:0Hrs
667 IRQP Work of NH 131A from km 1.900 to km 29.120 Existing Portion in the State of Bihar for the year 2022 23.

2023_MoRTH_733725_1 31.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
668 PR Work from ch.98.00 to ch.112.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733729_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
669 PR Work from ch.93.612 to ch.98.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733727_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
670 CONSTRUCTION OF ADVANCE LANDING GROUND AND ALLIED SERVICES FOR DEVELOPMENT OF BASIC INFRASTRUCTURE AT NYOMA LADAKH

2022_BRO_572375_1 214.090 BRO Special Project EPC (Lump Sum/Item Rate Contract) 31/12/2022
Time 18:0Hrs
31/03/2023
Time 12:0Hrs
671 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_736044_1 35.424 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2023
Time 18:0Hrs
30/03/2023
Time 11:0Hrs
672 Permanent rectification of 4 Nos of black spots on NH-27 (old NH-28) of Kotwa - Mehsi- Muzaffarpur Section from km 440 00 to km 520 00 (Total Length 80 Km) 4 nos of black spot on NH-27 of Muzaffarpur- Darbhanga - Purnia section (km 0 to km 148-550 and km 159-357 to km 287-860) (total length 277-053 km) & Removal of 1 No of at-grade junction near Satanpur Junction in Satanpur Village on NH-122 in the State of Bihar on EPC Mode

2023_NHAI_147142_1 295.293 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:5Hrs
29/03/2023
Time 11:0Hrs
673 Construction of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the State of Uttar Pradesh

2023_MoRTH_737151_1 286.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2023
Time 9:0Hrs
28/03/2023
Time 15:0Hrs
674 Improvement and Rehabilitation of Existing Ayodhya Bypass from Design km 121.600 to Design km 144.020 (Design Length 22.420 km) of NH28 (New NH27) on EPC Mode under Bharatmala Pariyojana in the State of Uttar Pradesh

2023_NHAI_144047_1 382.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
28/03/2023
Time 11:0Hrs
675 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
676 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
677 Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23

2023_MoRTH_743234_1 40.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
27/03/2023
Time 12:0Hrs
678 Construction of Pratapgarh Bypass (Extension) connecting NH-31 to NH-330 on EPC mode in the state of Uttar Pradesh

2023_MoRTH_736338_1 99.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
679 Construction of Amethi Bypass (Part-II) at km 30.050 of NH-931 (Design Length-8.178 km) on EPC mode in the state of Uttar Pradesh

2023_MoRTH_737658_1 126.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 19:0Hrs
24/03/2023
Time 15:0Hrs
680 Work of Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 (Km 42.0 to Km 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the state of Uttar Pradesh

2023_MoRTH_737668_1 205.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
681 Construction of four-lane Concrete Road from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on section from Kohmara- Goregaon- Police Headquarter (Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi- Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra. Total Length of the project 15.781 Km

2023_MoRTH_735288_1 230.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
23/03/2023
Time 17:0Hrs
682 Construction of 4 lane/2 lane Major/Minor bridges and 2 lane ROBs in the Stretch from km 251 (Golawali) to km 352.000(Rajapur) section of NH- 66(Erstwhile NH-17) in the State of Maharashtra under NHDP-IV on Package II (Balance Work).

2023_MoRTH_737918_1 11.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:30Hrs
21/03/2023
Time 15:30Hrs
683 Short Term Maintenance from Km 96 800 to 97 600 Km 113 000 to 113 440 and Km 119 000 to 131 400 of NH744

2023_MoRTH_741293_1 1.240 MoRTH Maintenance Project OTHERS 17/02/2023
Time 18:20Hrs
21/03/2023
Time 15:0Hrs
684 Improvement works of Agra Bypass section from km. 0.00 to km. 32.800 connecting km. 176.800 of NH-2 to km. 13.030 of NH-3 in Uttar Pradesh.

2023_NHAI_142808_1 125.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
21/03/2023
Time 11:0Hrs
685 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_2 7.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 17:30Hrs
20/03/2023
Time 17:30Hrs
686 Upgradation to two lane with paved shoulder configuration from km 0.0 to 47.0 of NH351 Mahuva to Badhada section in the state of Gujarat length 47 km

732154 153.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
20/03/2023
Time 17:0Hrs
687 Periodical Renewal between km. 0/00 to 17/600, km. 117/00 to 138/500 and 269/700 to 278/00 of NH-754K in the State of Gujarat.

2023_MoRTH_744504_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
20/03/2023
Time 16:0Hrs
688 Short Term Maintenance from Km 1/4 - 2/4, Km 10/350 – 15/6, Km 16/8 – 17/0, Km 20/860 – 21/6, Km 40/4 – 41/2 and Km 58/3 – 63/2 of NH-181 (Coimbatore to Gundlupet Road) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740683_1 1.020 MoRTH Maintenance Project OTHERS 15/02/2023
Time 10:0Hrs
20/03/2023
Time 15:0Hrs
689 Short Term Maintenance from km 212/0 – 223/8, 252/8 – 258/6 & 268/4 – 273/8 of NH 948 of Bangalore – Coimbatore Road (Km 256/0 – 267/8, 222/0 – 227/8 and 206/0 – 211/4 old NH-209) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740688_1 1.680 MoRTH Maintenance Project OTHERS 15/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
690 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2023_MoRTH_742794_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
691 Widening from 2lane to 4lane of km 92.935 start point of old NH82 to 99.685 km End Point of Gaya Bypass of NH83 of NH120 Total Length 6.750 km on EPC mode in the State of Bihar.

2022_MoRTH_730025_1 54.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2022
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
692 Hill side treatment of Lambagarh Land Slide Zone at km 504.371 to km 504.871 on NH-58 (New NH-07) under Annual Plan 2022-23 in the State of Uttarakhand

2023_MoRTH_737934_1 47.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
693 Land slide treatement work on NH-58 from Kodiyala km. 266.130 to Devprayag km. 296.925 (10 locations) based on DPR submitted by THDC India Ltd. in the State of Uttarakhand on EPC mode.

2023_MoRTH_739247_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
694 CONS OF 110 MTR MAJ PMT BRIDGE AT KM 1PT825 (55MTR X 2) AND MINOR PMT BRS AT KM 8PT625 (30 MTR) AND KM 16PT925 (30 MTR) ON SASER BRANGASA GAPSHAN RD (STARING POINT KM 0PT00 AT GAPSAN) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_581660_1 20.940 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 18:0Hrs
20/03/2023
Time 11:0Hrs
695 Construction of four laning with paved shoulder from Hassan to Adihalli EC-20 Ch. Km 00.000 Hassan to Ch. Km 37.000 Adihalli Village under Bharatmala Pariyojana on EPC Mode in the state of Karnataka (Package-I)

2022_NHAI_139398_1 899.540 NHAI Normal Highway Project HAM 23/12/2022
Time 11:0Hrs
20/03/2023
Time 11:0Hrs
696 Construction of Minor Bridge 1X30.00 mtr. at Km 214.704 on NH 730 under EPC mode in the state of Uttar Pradesh.

2023_MoRTH_737359_1 6.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 15:0Hrs
17/03/2023
Time 12:0Hrs
697 Construction of Six Lane Elevated Kona Expressway from Km 0.145 to Km 7.337 of NH-117 in the state of West Bengal on EPC mode

2023-NHAI-143743-1 839.460 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
17/03/2023
Time 11:0Hrs
698 Construction of flyover at Sanatnagar Junction including its Approaches Km 290.784 to Km 291.516 of four lane with paved shoulders of NH44 at Srinagar in the UT of Jammu and Kashmir on Engineering Procurement and Construction EPC mode.

NIT 131 41.820 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/02/2023
Time 11:0Hrs
16/03/2023
Time 16:0Hrs
699 Short Term Maintenance Contract of Khairipalli-Talbeda Section from Km 246/100 to 321/000 Km

2023_MoRTH_742553_1 3.230 MoRTH Maintenance Project OTHERS 28/02/2023
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
700 Construction of (i) RUB with service road at Km. 357.450 (Tukwada) (ii) PUP at Km. 362.864 (Chharwada) on Surat-Dahisar Section of NH-48 in the State of Gujarat.

2022_NHAI_105962_1 17.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2022
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
701 Strengthening work from Zero Point (junction of Lal Bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (ch. 160.00 to 161.50 km) in the section of NH-707A (Tyuni- Chakrata- Mussoorie- Dhanaulti- New Tehri) in the State of Uttrakhand under NH Division Doiwala

2023_MoRTH_741314_1 4.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
16/03/2023
Time 12:0Hrs
702 Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280/080 (Design Chainage) to Km 375/450 (Design Chainage) of NH 63 in the State of Karnataka on EPC Mode

2022_NHAI_138951_1 1,055.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
16/03/2023
Time 11:0Hrs
703 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 km 27.9 to 30.9 and km 46.8 to 61.5 under EPC mode in the state of Gujarat

743191 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 13:0Hrs
15/03/2023
Time 12:0Hrs
704 Construction of New Additional 4 lane Major Bridge besides Existing bridge over the Sabarmati River and its approaches at 5/400 Km of NH-8C (147), under NH Division Ahmedabad in the state of Gujarat.

2023_MoRTH_737656_1 59.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 18:0Hrs
15/03/2023
Time 12:0Hrs
705 OR-DPP to Akluj Velapur Mahud Sangola of NH 965G Km from 160.400 to 185.400 ( Part Mahud Sangola) in the state of Maharashtra

203MoRTH_742712_1 2.290 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
706 OR DPP to Deogon Phata Parali Latur Omerga Murum Mode Murum Alur Wagdari Akkalkot Indi Vijapur Road NH 548 B Km. 296/300 to 315/500 ( Section Wagdari to Akkalkot) and 337/700 to 340/700 ( Nagansur Tolanur) in the state of Maharashtra.

2023_ MoRTH_742705_1 1.350 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
707 Widening to four lane with paved shoulder from Design Km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_682564_1 367.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 17:0Hrs
14/03/2023
Time 17:0Hrs
708 Strengthening of Existing 2Lane4Lane NH501 Khanabal Pahalgam Road CH 0.000 To 19.050 and CH. 47.000 To 49.500 AlStop to Seer and Police Station Pahalgam To Sumo Stand after Crossing Pahalgam Bridge in the UT of Jammu Kashmir on Engineering Procurement and Construction EPC mode

NIT 128 39.120 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
14/03/2023
Time 16:0Hrs
709 Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413 700 and ends near ch. 419 000) under Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2022_MoRTH_728515_1 101.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
710 OR DPP to Tuljapur Naldurge Akkalkot road NH 652 KM 0.00 to 8.00 and 20.00 to 28.00 in the state of Maharashtra

2023_MoRTH_742708_1 0.500 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
711 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg III, Design Km 47 800 (Gosaiganj) to Km 73 300 (Bikapur)in the state of Uttar Pradesh on (EPC) basis in the State of Uttar Pradesh.

2022_MoRTH_705660_1 243.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
712 Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing Km 420.000 to Km 454.000(Design length Km 420.000 to Km 454.643, Design length 32.543 Km)of NH730(Shohratgarh to Uska Bazar)in the state of U.P. on(EPC)basis.

2022_MoRTH_680682_1 247.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 18:55Hrs
14/03/2023
Time 15:0Hrs
713 Strengthening work from km 37 to km 70 on NH 107(A) under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740377_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
714 Strengthening and improvement of NH-58(New NH-07) in Chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109(New NH-107) in Chainage km. 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740380_1 8.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
715 DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA – CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE

2023_BRO_577386_1 104.500 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 9:0Hrs
13/03/2023
Time 12:0Hrs
716 Design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length – 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode

2022_NHAI_139388_1 760.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/12/2022
Time 15:0Hrs
13/03/2023
Time 11:0Hrs
717 Rehabilitation Upgradation of Newly Declared National Highway Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 Design Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in Kurnool District in the State Of Andhra Pradesh on EPC Mode

2023_MoRTH_736785_1 505.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
10/03/2023
Time 17:0Hrs
718 Rehabilitation and Upgradation of Existing Road to 2 Lane with Paved Shoulder Configuration from Seetharamapuram to Duttaluru Section of NH-167 BG From Km. 0.000 To Km. 36400 36.400 Km in the State Of Andhra Pradesh

2023_MoRTH_736418_1 309.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2023
Time 15:0Hrs
10/03/2023
Time 17:0Hrs
719 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_741116_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
720 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_741139_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
721 Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 [Effective Length – 5.16 km] on EPC Mode in the state of Tamil Nadu on EPC mode

2022_NHAI_136793_1 164.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
10/03/2023
Time 11:0Hrs
722 REHABILITATION OF 2.5 KM LONG JAWAHAR TUNNEL (TWIN TUBE SINGLE LANE TUNNEL) ON NH-44 IN THE STATE OF JAMMU-KASHMIR NOW UT ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

CE (P) BCN/14/2022-23 76.000 BRO Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
09/03/2023
Time 15:0Hrs
723 CONS OF ROAD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEI FROM KM 0PT00 TO KM 56PT240 (INCDL MAJ BRIDGE OF 140 MTR SPAN AT KM 55PT800) FROM EX TRACK TO NHSL SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 56PT240 KM)

2023_BRO_576733_1 162.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
724 CONS OF RD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEIII FROM KM 82PT340 TO KM 128PT740 (INCDL TWO MINOR BRIDGES) FROM EXISTING TRACK TO NH SINGLE LANE SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 46PT40 KM)

2023_BRO_576745_1 161.540 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
725 Repair and Rehabilitation of Balisai Bridge Chaddyamile at Km 75.300 of NH-116B in the district of Purba Medinipur in the State of West Bengal during the year 2022-2023 in EPC Mode. Job No. 116B-WB-2022-23-503.

2023_MoRTH_735329_1 7.542 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:45Hrs
09/03/2023
Time 11:0Hrs
726 Construction of 4 lane Greenfield North - East side Gorakhpur bypass (26.616 kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode

2022_NHAI_139214_1 819.710 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 15:0Hrs
09/03/2023
Time 11:0Hrs
727 Four Laning of left over works including Additional Structures in Kerala Tamil Nadu Border Kanyakumari from Km 43.000 to Km 96.714 of NH 47 in the State of Tamil Nadu on EPC Mode

135473 1,141.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 17:5Hrs
09/03/2023
Time 11:0Hrs
728 Rehabilitation and Upgradation of Hoshiarpur to Una up to PB-HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage km 15.200 to Design Chainage km 30.348) & construction of 4 lane Hoshiarpur Bypass (from Design Chainage km 2.425 to Design Chainage km 15.200) (Total Length 27.923 Kms) in the State of Punjab (Package-IV) under NH(O) on EPC mode

2023_NHAI_141491_1 332.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2023
Time 11:0Hrs
06/03/2023
Time 11:0Hrs
729 Upgradation of existing 4 lane Ismailabad Ambala section of NH 152 - Km. 0.000 to Km 42.500 - Part of Ambala-Kotputli Corridor to 4-lane access controlled stretch by providing grade separated structures and service-Slip roads under Bharatmala Pariyojana–I in state of Haryana on EPC mode

2023_NHAI_140614_1 446.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2022
Time 15:0Hrs
06/03/2023
Time 11:0Hrs
730 Strengthening of Existing 2-Lane 4-Lane road with paved shoulders of NH-254 from KM 82.400 to 104.200 KM from Rampura to Maur in the State of Punjab (21.80 km) on EPC Mode.

2022_MoRTH_732296_1 30.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
731 Periodical repairs(PR) of NH-44 Srinagar Bypass 4 Lane from Km 0.00 to Km 0.950 , Km 2.400 to Km 4.50 and Km 11.500 to Km 17.80 in the UT of Jammu & Kashmir on Engineering, Procurement & Construction (EPC) mode

NIT 127 10.160 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
732 Construction of ROB at Km 202.992 of NH-76 including approaches in the state of Uttar Pradesh

2022_MoRTH_719462_1 38.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 16:0Hrs
01/03/2023
Time 15:0Hrs
733 Construction of Six Lane Ring road around Kanpur in the state of Uttar Pradesh under NHDP phase VII on EPC Mode (Package-I).

2022_NHAI_135667_1 846.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
01/03/2023
Time 11:0Hrs
734 Strengthening and widening of NH-251 from Km. 11.000 to Km.22.770 in Diu on EPC mode 3rd Call.

2023_MoRTH_740429_1 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 12:20Hrs
28/02/2023
Time 16:0Hrs
735 Construction of 4-Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road, Package-2) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode.

2022_NHAI_133516_1 633.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
736 Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH 4 from AP Tamil Nadu Border Km 134.890 to Nalagampalli village Km. 172.000 under EPC mode in the state of Andhra Pradesh

184.45 184.450 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/12/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
737 Balance Works of Four Laning of Udhampur- Ramban Section of NH-1A (now NH-44) from Km 67.00 to Km 89.00, Km 130.00 to Km 151.00 on Engineering Procurement & Construction (EPC) Mode in the Union Territory of Jammu & Kashmir under NHDP Phase-II

NHAI/Balance Work of U-R/J&K/EPC/2021 550.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 19:0Hrs
28/02/2023
Time 11:0Hrs
738 Balance work of Rehabilitation and Up gradation of existing carriageway to Two Lane with paved shoulder standard in Arvi to Talegaon section of NH347A in the state of Maharashtra on Engineering, Procurement and Construction mode. Total Length of the project 13.700 Km

2023_MoRTH_735025_1 99.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 15:0Hrs
27/02/2023
Time 15:0Hrs
739 Development of Six lane green field Ring Road (Package-IV) starts from Design Ch.68.650 to Design Ch. 93.209 (Length 24.559 kms) around Kanpur City in the state of Uttar Pradesh.

2022_NHAI_136422_1 734.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 17:0Hrs
27/02/2023
Time 11:0Hrs
740 Rehabilitation and upgradation of existing road between Km 0.00 to Km 29.725 Joshimath Suraithota NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_558726_1 213.040 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:40Hrs
27/02/2023
Time 11:0Hrs
741 Construction of Flyover/Underpass at Vizag Airport Junction to ensure Flow of container trailers to/from MMLP setup at NH-16 in the State of Andhra Pradesh on EPC mode

NHAI/PC/MMLP VIZAGAIRPORT/2022 44.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
27/02/2023
Time 11:0Hrs
742 Periodic renewal work of NH-121 (New-309) from Km.3.000 to Km. 13.000 & Km 27, 28 under Annual Plan 2022-23 in the state of Uttarakhand

2023_MoRTH_735321 4.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
21/02/2023
Time 15:0Hrs
743 Construction of 4-Laning of Kushner to Amjhar Road from km 75.480 to Km 98.950 (Jabalpur Ring Road, Pkg – 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_133148_1 418.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 15:0Hrs
21/02/2023
Time 11:0Hrs
744 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana

NHAI/Tech/BM/Pathankot Link Road/2021 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2022
Time 11:20Hrs
21/02/2023
Time 11:0Hrs
745 Road Safety work from Km. 77.000 to Km. 105.170 of NH-135C (Prayagraj - Koraon - Dramandganj - Halia - Awadhdham - Pipra - Manigadha - UP/MP Border) on EPC mode in the State of Uttar Pradesh in Year 2022-23

2023_MoRTH_733363_1 4.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 12:0Hrs
20/02/2023
Time 15:0Hrs
746 Treatment of landslide zone from location no. 01 to 28 (km 62.860 to km 152.750) on NH-125(09) in the state of Uttarakhand under EPC mode

2022_MoRTH_731620_1 147.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 17:0Hrs
20/02/2023
Time 11:0Hrs
747 Construction of VUP at Km 51.300 (Baghola) of Delhi-Agra Section from Km 20.500 to 200.000 of National Highway No.2 (New NH-19) in the state of Haryana on EPC mode

2023_NHAI_140161_1 26.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2023
Time 10:43Hrs
20/02/2023
Time 11:0Hrs
748 Construction of Katihar Bypass on NH 81 to four lanes with paved shoulders standard in State of Bihar Total length 4.7 Km through an Engineering Procurement and Construction EPC Contract.

2023_MoRTH_733995_1 169.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 15:0Hrs
20/02/2023
Time 11:0Hrs
749 Rehabilitation & Up- gradation for Talere – Gaganbawda– Kolhapur Road (NH- 166G) stretches start from Ch. 6.00 Km to Ch. 11.00 Km and Ch.19.300 Km (Start of Karul Ghat) to Ch. 35.300 Km (End of Gaganbawda) of NH- 166G, length 21.00 Km in the State of Maharashtra on EPC Mode

2022_MoRTH_727201_1 183.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
750 Rehabilitation & Up-Gradation To 2-Lanes with Paved Shoulder Configuration of Mahud-Sangola of NH-965G Chainage From km.159.400 to 161.900 & 162.400 to 183.960 km (Design Chainage from km 32.300 to km 34.800 & km35.300 to km56.860) In the State of Maharashtra on EPC Mode

2022_MoRTH_726627_1 189.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
751 Rehabilitation and Upgradation of Chorma – Bairgania section of National Highway No 227F to 2 lane with paved shoulders from Design Ch 0 000 to Ch 34 566 in the state of Bihar through Hybrid annuity mode (HAM) Basis

2022-NHAI-124214-1 391.610 NHAI Normal Highway Project HAM 30/07/2022
Time 15:0Hrs
15/02/2023
Time 17:0Hrs
752 Construction of Major Bridge on Shivani River at design chainage from km 122.080 to km 123.100 on NH353C along with approaches of 940m (Total Length 1020m) of National Highway Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Ashti Alapalli Sironcha Road on EPC mode in the state of Maharashtra

2023_MoRTH_732615_1 14.760 MoRTH Normal Highway Project BOT 04/01/2023
Time 12:0Hrs
15/02/2023
Time 17:0Hrs
753 Construction of seven minor bridges at design chainage km 2.400, km9.200, km14.200, km32.600, km34.200, km43.400 and km 46.400 on NH130D section (Total length of the project is 1.645 km with approaches) from Alapalli Bhamragad Narayanpur in Gadchiroli district on EPC mode in the state of Maharashtra

2023_MoRTH_732611_1 28.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
754 Widening and Strengthening Upgradation of 2 lane with PS from Existing Chainage km192 980 to km229 820(DC km162 800 to km198 180)(PackageVIII) under 31TF on AKHNOOR POONCH road (NH144A) in the UT of JK Under Project Sampark(BRO) on EPC

2022_MoRTH_731914_1 382.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
755 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode (3rd call)

2022_MoRTH_710564_3 6.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 15:0Hrs
14/02/2023
Time 15:0Hrs
756 Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under Bharatmala Pariyojana in the UT of J&K (Phase II-Package XVIII)

NHAI/BM/DAK Expressway/2022/Pkg XVIII 777.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
757 Rehabilitation and Up-gradation to Four Lane Road from km. 70.500 to km. 78.600 of NH-92 under EPC mode in the State of Uttar Pradesh

2022_MoRTH_667462_1 213.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
758 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_73756_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
13/02/2023
Time 16:0Hrs
759 Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh.

2022_NHAI_138409_1 152.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2022
Time 18:0Hrs
09/02/2023
Time 11:0Hrs
760 Rectification of MORTH Identified Black Spots JK .02.020 GOLE MELA and Construction of Service Road to existing VUP at SINGOOR on Jammu UDHAMPUR section of NH44 Km 14.200 in UDHAMPUR Jammu and Kashmir on EPC mode.

2022_NHAI_138938_1 44.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
08/02/2023
Time 15:0Hrs
761 Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode.

133905 765.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 18:0Hrs
01/02/2023
Time 11:0Hrs
762 Remaining work of periodic renewal (PR) work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode on Engineering Procurement Construction (EPC) basis.

2023_MoRTH_733300_1 6.050 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/01/2023
Time 15:0Hrs
31/01/2023
Time 15:0Hrs
763 Construction Of 4 Lane Rob At Level Crossing No. S-25/E-2 Old (A-25) On NH-15(54) At Km 0.800 In District Tarn Taran (Punjab)

2022_MoRTH_731522_1 68.230 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 14:0Hrs
30/01/2023
Time 15:0Hrs
764 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_2 6.540 MoRTH Maintenance Project OTHERS 07/01/2023
Time 16:0Hrs
30/01/2023
Time 12:0Hrs
765 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand- Package-III- Kashipur Bypass -Length-14.490 km Starts from Ch- 38.770 near UP-UK Border and ends at Ch- 53.260 -existing Ch-05.560 of NH 309

2022_NHAI_128979_1 392.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 15:0Hrs
30/01/2023
Time 11:0Hrs
766 Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77.100 to Km 170.580 Total length 93.48km to 2-lane with PS configuration along with OTI in 04 nos of bypasses in a total length of 7.23 km in the state of Madhya Pradesh

2022_MoRTH_691497_1 376.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
28/01/2023
Time 17:30Hrs
767 Slope Protection works for Treatment of Landslide zone near Khat Village from Ch. 54.750 to 54.950 (based on DPR submitted by THDC India Ltd.) and Strengthening of existing road from Ch. 53.425 to 55.335 on NH-107 (Old NH-109) in the State of Uttarakhand

2022_MoRTH_730786_1 33.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 14:0Hrs
27/01/2023
Time 12:0Hrs
768 Construction of 59 mtr Span PSC Segmental Box Girder bridge over Tirthan River at km 83 780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of Himachal Pradesh on EPC Mode.

2022_MoRTH_728833_1 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 18:0Hrs
27/01/2023
Time 11:0Hrs
769 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (3rd Call).

2022_MoRTH_730710_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 10:10Hrs
25/01/2023
Time 17:0Hrs
770 Strengthening from Km. 44.700 to Km. 62.200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat.(3rd Attempt)

2022_MoRTH_728211_2 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
25/01/2023
Time 15:0Hrs
771 Construction Of 2 Nos Of Major Bridge, 4 Nos. Minor Bridge And 8 Nos. Of Box Culverts Along With Road Safety Improvement Works Between Km 122.00 To Km 290.200 Of NH 41 In The State Of Gujarat.

2023_MoRTH_734111_1 40.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2023
Time 16:0Hrs
24/01/2023
Time 16:0Hrs
772 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2022_MoRTH_725679_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/11/2022
Time 15:0Hrs
24/01/2023
Time 15:0Hrs
773 Upgradation and widening of NH-848B From Ch. 8/180 to Ch. 12/000 and Ch. 14/100 to Ch. 20/300 at Daman

2022_MoRTH_731986_1 81.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 16:0Hrs
24/01/2023
Time 14:0Hrs
774 Construction of 4lane Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6lane elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojna in Odisha State on EPC Mode

NHAI/PC/BM/ Gopalpur PC /2022 165.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/09/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
775 Construction of Four-Laning of NH-45 to Kushner from km 38.400 to km 74.700 (Jabalpur Ring Road, Pkg – 3) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_127469_1 580.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
776 Improvement of 4 lane road to 6 lane road and 4 lane dedicated Port Roads for the Port connectivity road from Convent junction to Sheelanagar Junction in the State of Andhra Pradesh on EPC mode (2nd Call)

NHAI/PC/Convent-SheelaNagar/2021 506.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:15Hrs
24/01/2023
Time 11:0Hrs
777 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_733883_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
778 Rehabilitation and Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32 00 to km 79 650 Puttaparthi Koduru Section of NH342 in Sri Satyasai District in the State of AP on EPC Mode under Annual Plan 2022 23

2022_MoRTH_725788_1 909.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2022
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
779 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_733924_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 17:55Hrs
23/01/2023
Time 11:0Hrs
780 Design and Construction of standalone 6-lane Purmepada VUP Balance work at Km 282.800 in Dhule - Pimpalgaon section of NH-3 New NH-60 in the State of Maharashtra on EPC Mode

2022_NHAI_139705_1 42.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
19/01/2023
Time 15:0Hrs
781 Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli- Prayagraj section of NH- 30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd )

2022_NHAI_136309_1 70.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2022
Time 17:0Hrs
18/01/2023
Time 11:0Hrs
782 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_722759_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2022
Time 17:30Hrs
17/01/2023
Time 17:30Hrs
783 Periodic Renewal work from Km 198 to Km 217.425 (Paligad to Foolchatti) on NH 94(134) under NH Division Barkot in the state of Uttarakhand under Annual Plan 2022-23

2022_MoRTH_729860_1 4.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2022
Time 12:0Hrs
17/01/2023
Time 12:0Hrs
784 RFP for the work of Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_666965_1 330.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 9:0Hrs
16/01/2023
Time 17:0Hrs
785 Widening and StWidening to 2 lane with paved shoulders of Jareikela (Jharakhand/Odisha border)-Dhabaleswara section from km 0.000 to 36.000 km of NH-320D in the State of Odisha on EPC Mode

2022_MoRTH_706981_1 156.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 15:0Hrs
16/01/2023
Time 12:0Hrs
786 Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC

2022_MoRTH_683448_1 81.164 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 15:0Hrs
12/01/2023
Time 17:30Hrs
787 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_2 85.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 17:30Hrs
12/01/2023
Time 17:30Hrs
788 Widening of existing road of Kalinga Ghat in Valley Side for elimination of Black spot using innovative Reinforced Earth Composite Hybrid system from Km 86.330 to Km 86/615 including Reconstruction of Minor Bridge at 86.700 of N.H. 157 in the state of Odisha on EPC mode

2022_MoRTH_713461_2 27.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 13:30Hrs
10/01/2023
Time 12:0Hrs
789 Permanent rectification of 3 nos. of black spots in NH-27 of U.P border - Dewapur - Kotwa section from km. 360.915 to km. 440.000 (total length of 79.085 km) & 5 nos. of black spots of project Highway NH-27 of Kotwa - Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) in the State of Bihar

2022_NHAI_130142_1 276.650 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 26/09/2022
Time 18:0Hrs
10/01/2023
Time 11:0Hrs
790 Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-Dabwali section of old NH-10 (new NH-09) at Chainage-218.276 in the State of Haryana on EPC Mode

2022_NAHI_134967_1 17.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2022
Time 15:0Hrs
09/01/2023
Time 11:0Hrs
791 Construction of proposed Bypass at Reamal on NH -53 in the state of Odisha on EPC Mode. (Bid Ref No 26 CE NH of 2022-23)

2022_MoRTH_725530_1 17.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 18:55Hrs
07/01/2023
Time 12:0Hrs
792 Strengthening work of NH 107 (Old 109) (Kakdagad-Kund-Guptkashi) from Km. 33.130 to Km. 41.260 and Treatment of sinking zones in village Semi and Bhainsari from Kund to Guptkashi under Annual Plan 2022-23 in the state of Uttarakhand under EPC mode

2022_MoRTH_720508_1 71.427 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
06/01/2023
Time 12:0Hrs
793 Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH-19 Km 26.530) near Hinotiya Village to Design Km 75.700 (of existing SH-19 Km 74.820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode.

127462 392.810 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 18:0Hrs
05/01/2023
Time 11:0Hrs
794 Design and Construction of Standalone 4-lane Vehicular Underpass with approaches at Sangamner Bypass End Junction (Km.150.200) and Wavi Junction (Km.163.900) on Khed Sinnar section of NH-60 (Old NH-50) in the State of Maharashtra on EPC Mode

2022_NHAI_136814_1 41.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
795 Design and construction of crossing facility (VUP/VOP) at 4 locations viz. (i) Bhandgaon Jn (Km 47.920) (ii) Varkute Jn(Km 126.735) (iii) Indapur bypass Entry (km 135.675) (iv) Indapur Bypass Exit (Km 142.735) on Pune-Solapur (Pkg-I) (Km 40/000 to Km 144/400) section of NH-65 in the State of Maharashtra on EPC Mode

2022_NHAI_136845_1 139.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
796 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_728285_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
797 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2022_MoRTH_728321_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
798 Construction of 3 no of Bypasses at Sheikhpura Jamui Khaira alongwith 1 no of realignment at Sikandra with pre construction activity total length 13 472 Kmto two lane with PS standard along with U/S in N H 333A under EPC mode in State of Bihar

2022_MoRTH_721471_1 148.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 15:0Hrs
03/01/2023
Time 15:0Hrs
799 Six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun EC in Uttar Pradesh and Uttarakhand on EPC under BMP Phase- 1, Package 1- Saharanpur Bypass.

NHAI/BM/Delhi-Dehradun/Saharanpur-Ganeshpur-P1/2022 69.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 15:0Hrs
03/01/2023
Time 11:0Hrs
800 Upgradation and reconstruction of Jabalpur to Kundam Section of NH-45 from Km 40.500 (Design) to Km 68.100 (Design) including Kundam bypass Total length 27.60 km to Two lane with paved shoulder in the state of Madhya Pradesh

2022_MoRTH_720465_1 96.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
02/01/2023
Time 17:30Hrs
801 Upgradation and reconstruction of shahpura-Dindori section of NH 45 from Km 103.700 (Design) to Km 164.580 (Design) including 3 bypasses (Total length 60.88km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2022_MoRTH_682465_1 185.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
02/01/2023
Time 17:30Hrs
802 Strengthening from km 44.700 to 62.200 of NH168G NH168G under NH Division Ahmedabad in the state of Gujarat

728211 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
30/12/2022
Time 15:0Hrs
803 Widening from two lane to four lane with service roads from km 1.050 to km 3.470 of existing link road connecting NH-67 to NH-16 in Kovur town on EPC mode in the state of Andhra Pradesh

SENHVJA/22/2022-23 Dated.05.11.2022 50.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2022
Time 17:0Hrs
29/12/2022
Time 17:0Hrs
804 Strengthening of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

728194 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 13:0Hrs
29/12/2022
Time 16:0Hrs
805 Construction of proposed Half Clover Leaf interchanges cum ROB at Yerramanchi and Gudipalli villages across NH-44 at KM 416.005 in the state of Andhra Pradesh on EPC Mode.

2022_NHAI_122586_1 82.850 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:0Hrs
29/12/2022
Time 11:0Hrs
806 “Improvement of Road Budhal-Mahore-Gul from Km 0.000 to Km 22.72 (net length 21.00 km) (Pkg –I) to NHDL specification under Project Sampark in UT of J&K

CE(P)SPK/BMG/PKG-I/2022-23 210.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
28/12/2022
Time 15:0Hrs
807 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from design chainage km 0.0 to 58.115 to two lane with paved shoulder configuration under EPC mode in the state of Gujarat.

2022_MoRTH_720468_1 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 18:45Hrs
28/12/2022
Time 12:0Hrs
808 Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode

2022_NHAI_123842_1 4,994.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/07/2022
Time 18:0Hrs
27/12/2022
Time 11:0Hrs
809 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_1 6.540 MoRTH Maintenance Project OTHERS 28/10/2022
Time 10:55Hrs
26/12/2022
Time 12:0Hrs
810 Up-gradation to 4-lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under BMP on EPC Mode

2022_NHAI_134593_1 676.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 19:0Hrs
26/12/2022
Time 11:0Hrs
811 “Widening of Existing Road from Intermediate Lane/2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A (Rakholi-Khadoli-Velugam Section) in U.T. of Dadra & Nagar Haveli and Daman & Diu on EPC mode.”

E-Tender Notice No. 15 of 2022-23 172.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 13:0Hrs
24/12/2022
Time 12:0Hrs
812 Widening and strengthening to 4LPS 2LPS from km 0.000 to 35.800 Kuakhia Mangalpur Section of NH 20 in the State of Odisha on EPC mode. Bid Ref No.-01 ROBBSR 2022 23

2022_MoRTH_702919_1 341.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/07/2022
Time 15:0Hrs
22/12/2022
Time 12:0Hrs
813 Improvement from Km 94 0 96 0 96 2 96 8 97 6 101 0 102 0 103 0 138 0 139 3 142 0 151 4 including Protective works and CD works of Thirumangalam Kollam road NH 744 Old No 208 on EPC Basis

2022_MoRTH_721844_1 29.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:15Hrs
21/12/2022
Time 11:0Hrs
814 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_710564_2 6.310 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
815 One Time improvement of existing bypass road from Km 278 plus 650 to 281 plus 850 obedullaganj and Km 272 plus 200 To 269 plus 000 Goharganj Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_721813_1 5.070 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
816 One time improvement of existing bypass road from Km 161.700 to 163.100 ( Udaipura) Km 141.200 to 142.000 (Deori) and Km 181.200 to 184.900 (Khargone) Total length 5.09 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721814_1 4.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
817 Balance Work of Four laning of Panvel - Indapur section of NH-66 (Old NH-17) from km 0.000 (Panvel) to km 42.300 (Kasu) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode

2022_NHAI_133672_1 239.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 15:35Hrs
19/12/2022
Time 11:0Hrs
818 Periodic Renewal Work in Km. 0.000 to 39.000 of NH-730S in the State of Uttar Pradesh

2022_MoRTH_714209_1 16.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
16/12/2022
Time 15:0Hrs
819 Periodic Renewal Work in Km. 112.000 to 130.400 and 152.600 to 154.000 of NH-28B in the State of Uttar Pradesh on (EPC) basis

2022_MoRTH_714093_1 8.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
16/12/2022
Time 15:0Hrs
820 Construction of Six Lane VUP (Single box 12x5.5 m with approach) at Sachendi (Ch. 454.460) on Etawah-Chakeri (Kanpur) Section of NH-19 (Old NH-2) in the State of Uttar Pradesh on EPC Mode

2022_NHAI_132046_1 32.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 11:0Hrs
15/12/2022
Time 11:0Hrs
821 Construction of VUP at Km 1224.054 (Nagulauppalapadu/Growth centre) with Blackspot Id AP-(02)-038 and VUP at Km 291.646 of NH-16 (Rajupalem Junction) with Blackspot Id AP-(02)-033 on NH16 for rectification of Blackspots in the State of Andhra Pradesh

2022_NHAI_133564_1 70.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2022
Time 16:40Hrs
13/12/2022
Time 11:0Hrs
822 Construction of twin tube tunnels on Jammu Ring Road NH244A between Design Ch.50.600 to 51.700 and Design Ch. 53.535 to 55.700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase

NHAI/J&K/Jammu Ring Road/Tunnel/2022 698.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 15:0Hrs
13/12/2022
Time 11:0Hrs
823 strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand

2022_MoRTH_722210_1 6.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 16:30Hrs
07/12/2022
Time 12:0Hrs
824 4-Laning of Khandwa bypass from Rudhi to Deshgaon, Km 149.000 to Km 177.680 section of SH-71/NH-347B/NH-753L (Betul – Khandwa Pkg-V) in State of MP on EPC Mode

2022_NHAI_126175_1 356.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
07/12/2022
Time 11:0Hrs
825 Periodic Renewal Work in Km. 21.627 to Km. 34.000of NH-328A in the State of Uttar Pradesh on EPC Mode. Job No. CE-RO/LKO/PR/NH-328A/22-23/653 dt 20.09.2022

2022_MoRTH_723925_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 18:0Hrs
05/12/2022
Time 11:0Hrs
826 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 122.200 near Guddehosur at start of Kushalnagara Bypass to Ch. Km 144.900 at Near Hemming Village/ SH-21 Hassan - Periyapatna Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-II)

2022_NHAI_129471_1 694.870 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
827 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 144.900 Near Hemmige Village/ SH-21 Hassan - Periyapatna Road Junction to Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-III)

2022_NHAI_129444_1 666.970 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
828 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur to Ch. Km 195.550 at Yalachahalli Near SH-117 Yelawala – KR Nagara Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-IV)

2022_NHAI_129474_1 842.930 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
829 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 195.550 at Yalachahalli near SH-117 Yelawala – KR Nagara road junction to Ch. Km 214.535 joining (at ch. Km 131.180 approx) to Srirangapatna bypass near Paschima Vahini under NH (O) in the state of Karnataka (Package-V)

2022_NHAI_129475_1 735.270 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
830 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_1 7.846 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
03/12/2022
Time 17:30Hrs
831 Improvement of road Budhal-Mahore-Gul from Km 22.72 to Km 62.94 (net length 29.080 Km) (Package-II) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_527228_1 307.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
03/12/2022
Time 15:0Hrs
832 Rehabilitation and upgradation of existing road between Km 480.95 to Km 489.35 Joshimath Marwari on Joshimath - mana road

2022_BRO_558360_1 45.730 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2022
Time 15:0Hrs
01/12/2022
Time 11:0Hrs
833 Work of IRQP from Km 222/00 to Km.230/300 Derol Bharuch Section, and between Km 238/400 to 252/200 Ankleshwar- Modinagar- Sajod-Digas Section, Km. 182/00 to Km.184/150Amod-Nahiyer Section, Km 204/00 to Km.204/700Sudi Patiya to Samni Section of NH64

2022_MoRTH_718265_1 36.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 9:0Hrs
30/11/2022
Time 12:30Hrs
834 Construction of Rail Over Bridge in Lieu of Railway Crossing No. E/2 On Ferozepur- Fazilka Rail Section at Km. 2/4-5 &On NH-95 (New NH-05) Section Ferozepur to Indo Pak Border at Km 205.320 (Near Ferozepur City &Village Madhre) In the state of Punjab on EPC Mode (Job No. NH-95 (New NH-05)-PB- 2021-22/550 Dated 27.12.2021

2022_MoRTH_719231_1 33.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
835 Upgradation of Road Budhal-Mahore-Gul from km 65.880 to km 86.725 (net length 34.950 km) (Package-III) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_557550_1 249.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
836 4- Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode.

123351 468.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 18:0Hrs
29/11/2022
Time 11:0Hrs
837 Construction of 59 mtr. Span PSC Segmental Box Girder bridge over Tirthan River at km 83.780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of HP.

2022_MoRTH_717515 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
28/11/2022
Time 15:0Hrs
838 Strengthening & widening of NH-251 from Km. 11.000 to Km.22.770 in Diu (on EPC mode)

Tender Notice no.21/NH-251-Diu/2022-23 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 16:59Hrs
28/11/2022
Time 11:0Hrs
839 Development of existing 2 Lane NH1 from km 8.660 to km 33.775 Sumbal to Wayul to 4 lane dual carriageway NH standard as part of Srinagar Ring Road Phase II Design Ch 41907 to Ch 66609 under Bharatmala Pariyojna Phase I in the Union Territory of Jammu and Kashmir on EPC mode

2022_NHAI_127505_1 617.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 11:0Hrs
28/11/2022
Time 11:0Hrs
840 Rehabilitation and Upgradation of Parli to Sirsala section of NH 361F km 136.700 to 115.000 Length 21.70 km to Two Lanes with paved shoulder Four lane configurations on EPC in the state of Maharashtra

2022_MoRTH_710782_1 229.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
841 Rehabilitation and Upgradation of Shirapur Junction to Shivaji Chowk Design Chainage km. 130.00 to 144.500 section of NH 561 and Barshi Naka to Jarud Phata Design chainage km 49.500 to 59.500 section of NH 361F to Two lanes with paved shoulders Four lanes configuration on EPC Mode in the State of Maharashtra Total porject Length 24.5 km.

2022_MoRTH_711028_1 212.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
842 Widening to 4 lane in Km 40/510 to 41/450 and Strengthening from Km 15/600 to 19/800, km 36/000 to 54/500, km 55/375 to 57/400, km 58/600 to 59/600, km 60/200 to 61/900, km 62/600 to 64/000, km 74/000 to 75/126, km 76/373 to 76/450 & Km 77/600 to 90/275 including Geometrical Improvement at Km 37/400 & 46/800, Construction of Retaining wall & Breast wall, Construction of storm water drain, Reconstruction & Widening of culverts and Foot over bridge at km 78/900 of NH 85 (Old NH 49 Extn) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_717031_1 73.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/10/2022
Time 16:0Hrs
25/11/2022
Time 15:0Hrs
843 Periodical Renewal work from km 221.00 to km 225.00, IRQP from km 225.00 to km 232.00, PR from km 232.00 to km 260.00 & 266.00 to km 271.00 (Except km 247.066 to km 248.040, From km 269.067 to km 269.598, From km 258.226 to km 258.990 & From km 267.060 km to km 267.440 km) of NH-60 (new NH-14) under NH Division No- III in the District of Bankura, West Bengal during the year 2022-23. (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715219_1 41.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:55Hrs
24/11/2022
Time 14:0Hrs
844 Periodical Renewal work from km 181.00 to km 205.20 (Except km 181.636 to km 182.132, from km 193.25 to km 195.406 & From km 203.255 to km 203.45) of NH-60, under NH Div No - III in the District of Bankura, West Bengal during the year 2022-23 (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715356_1 22.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2022
Time 15:30Hrs
24/11/2022
Time 14:0Hrs
845 Widening and Strengthening to 2L with PS of Kandarpur- Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode

2022_MoRTH_699999_1 290.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
24/11/2022
Time 12:0Hrs
846 DESIGN AND CONSTR OF MULTISTORY BUILDING (G PLUS 2) WITH MI ROOM IN N AREA (PRESENT LOCATION OF HAD) BY 3D CONCRETE PRINTING TECHNOLOGY FOR ESTABLISHMENT OF AIR DISPATCH UNIT FOR PROJECT HIMANK AND VIJAYAK IN CHANDIGARH

2022_BRO_555867_1 33.130 BRO Special Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
847 Demolition and Re-construction of Deck Slab of Minor Bridge at km. 60.682 LHS on Patiala bypass Section of NH-07 on EPC Mode

2022_NAHI_131166_1 1.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
848 Four laning of Ottanchatram to Palani section from km 30/700 to km 55/000 of NH 209 (New NH-83) including footpath for pedestrian and way side amenities except from km 37/870 to 38/130, from km 39/200 to km 41/000, from km 43/400 to km 44/100, from km 47/400 to km 51/000 and from km 52/200 to km 52/965 on EPC mode under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_716364_1 127.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
23/11/2022
Time 15:0Hrs
849 Construction of HL bridges at CH 377/420 km, CH 423/800km , CH 433/750 km and CH 484/500 km in Malkangiri - Motu road on NH-326 in the state of Odisha on EPC mode

2022_MoRTH_701321_1 46.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2022
Time 18:55Hrs
23/11/2022
Time 12:0Hrs
850 Periodical renewal work from km. 0.165 to 17.756 on NH-11 Agra-Jaipur-Bikaner road Under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_718253_1 7.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 15:0Hrs
22/11/2022
Time 15:0Hrs
851 Periodical Renewal work on NH 503 Extn. in km.19.00 to 28.00 in the State of Himachal Pradesh on EPC mode.

2022_MoRTH_716413_1 4.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
852 PERIODICAL RENEWAL FOR KALA AMB PAONTA SAHIB DEHRADUN ROAD KM 52.00 TO 83.00 ON NH 07 IN THE STATE OF HIMACHAL PRADESH ON EPC MODE.

2022_MoRTH_716423_1 18.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
22/11/2022
Time 11:0Hrs
853 PERIODICAL RENEWAL WORK ON SELECTED STRETCHES KM 0/00 TO 69/00 (ON SELECTED STRETCHES FROM KM 0/0 TO 9/670, 9/800 TO 17/070,18/380 TO 21/032,21/580 TO 23/015,23/220 TO 23/630,24/980 TO 26/100,26/267 TO 28/648,28/850 TO 29/680,29/720 TO 30/400,30/480 TO 3100,30/480 to 31/150,31/270 to 31/800,37/400 to 37/485,41/350 to 59/240,59/280 to 62/790,62/900 to 64/642,64/780 to 69/00) of Theog-Kotkhai-Hatkoti Road NH-705 under annual renewal program(ARP) for year 2022-23 in the state of Himachal Pradesh On EPC Mode

2022_MoRTH_716447_1 34.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
854 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (2nd Call).

2022_MoRTH_711036_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
21/11/2022
Time 17:0Hrs
855 Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis

2022_MoRTH_714105_1 20.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
21/11/2022
Time 15:0Hrs
856 Construction of Shikaripura bypass starting at existing Km 146.150 and ending at existing Km 154.00 (design chainage from Km.0.00 to Km 6.576) of NH 766C in the State of Karnataka

RW/BNG /NH-766C/Km.146.15 to 154.00/21/2022 50.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 15:0Hrs
21/11/2022
Time 15:0Hrs
857 Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137/080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh on EPC Mode

2022_MoRTH_716585_1 15.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 18:0Hrs
21/11/2022
Time 11:0Hrs
858 Balance work for construction of approach slabs-wing wall and return wall along with approach roads for newly constructed bridge at Km 146.709 of NH-60 new NH-l4 in the district of Paschim Medinipur in the State of West Bengal on EPC Mode under Annual Plan 2022-23. Job No. 14-WB-2022-23-500.

2022_MoRTH_716662_1 6.562 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 17:0Hrs
21/11/2022
Time 11:0Hrs
859 Rehabilitation work for Damaged road sections AS27 KM 40.000 to KM 60.500 , AS25 KM 83.400 to KM 111.000, AS24 KM 111.000 to KM 126.450 and AS23 KM 126.450 to 140.700 in the State of Assam

2022_NHAI_128187_1 105.510 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
860 Strengthening of Pavement Including Improvement of Road Safety Work Construction of Retaining Wall Breast Wall Thrie Beam Crash Barriers Road Side Drains Slab Culverts Solid Cause Way etc in Km 286 00 to 329 00 on NH05 in the State of HP

2022_MoRTH_712867_1 80.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
861 Stabilisation of land slide and slope protection between Km 28.60 to Km 142.00 on Rishikesh Dharasu road on NH 34 state Uttarakhand on EPC mode No of slide locations 12 Nos

2022_BRO_555763_1 81.640 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
862 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/…….)

2022_MoRTH_714864_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:30Hrs
17/11/2022
Time 14:0Hrs
863 Widening and Strengthening to 2 lane with PS from 0.00 to 40.00 (Dhaugaon – Podamari section ) of NH 326 in the in the state of Odisha on EPC Mode.

2022_MoRTH_700046_1 155.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
17/11/2022
Time 12:0Hrs
864 PR of existing carriageway of NH-60 new NH-14 stretches from Km 173 to Km 181 Except 173.5 Km to 173.880 Km under NH Div No-II P.W.Rds Direct in the dist. of Paschim Medinipur WB under ARP 2022-2023. Job No. TA-14-WB-2022-23-807.

2022_MoRTH_714952_1 10.376 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:0Hrs
17/11/2022
Time 11:0Hrs
865 Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (Package-1)

2022_NHAI_126172_1 480.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
17/11/2022
Time 11:0Hrs
866 Road safety works in different stretches from (km 35.545 to km 36.20, km 38.97 to km 39.22, km 42.01 to km 42.32 & km 44.78 to km 45.04) for improvement of sharp turning & narrow road bench and construction of Over Head Gantry signs at 51.3 km of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong in the State of West Bengal under Road Safety Annual Plan 2022-23 (Job No.-NH-10/KOL/2022-23/RSCE-08).

2022_MoRTH_717906_1 8.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 10:0Hrs
16/11/2022
Time 17:0Hrs
867 Stregthning of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

718413 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 16:0Hrs
868 Balance work for construction of Fulahar Bridge approach on NH 131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode Job No. 131A/WB/2022-23/494

2022_MoRTH_715166_1 38.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:30Hrs
16/11/2022
Time 14:0Hrs
869 IRQP to newly declared NH151K Porbandar Bhanvad Tranpatiya road section btn km 0.0 to 18.4 and km 39.3 to 43.2 under EPC mode in the state of Gujarat

718402 17.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 12:0Hrs
870 Construction of VOP at Nanthoor Junction KA 02 135 at Km. 375.300 on NH 66 falls under completed four lane highway stretch of new Mangalore Port Road Connectivity stretch from Surathkal Nantoor of NH66 and Nantoor Talapady of NH73 developed under SPV to be executed on EPC mode

NIT No.22/NHAI/RO-BNG/15016/Tender/2022-23 dated 27.09.2022 60.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 15:0Hrs
16/11/2022
Time 11:0Hrs
871 Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, From Km 82.300 to 89.880,Total design length 7.580 Kml section of NH-752C in the State of Madhya Pradesh under EPC mode

2022_MoRTH_691384_1 48.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 15:0Hrs
14/11/2022
Time 17:30Hrs
872 Periodical Renewal work from km 598.00 to km 641.00 of NH-31(New NH-17 and 717) under NH Division IX in the District of Jalpaiguri, P.W Roads Directorate, West Bengal, under ARP 2022-2023. [Job No. TA/17&717/WB/2022-23/809].

2022_MoRTH_714300_1 47.392 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 17:10Hrs
14/11/2022
Time 17:0Hrs
873 Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G (Nuhkhas to Etah section) to two lane with paved shoulder configuration under EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_714083_1 241.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 15:0Hrs
10/11/2022
Time 15:0Hrs
874 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124501_1 783.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
10/11/2022
Time 11:0Hrs
875 Construction of Mihona bypass, Lahar bypass, Daboh bypass and Bhander Bypass (total length 20.60 km) to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh

2022_MoRTH_690776_1 92.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 15:0Hrs
09/11/2022
Time 17:30Hrs
876 Construction of 2-lane with paved shoulder configuration of Khilchipur Bypass of Length 5.500 Km From Km 0.000 to 5.500 Total design length 5.500 Km section of NH-752B in the State of Madhya Pradesh under EPC Mode

2022_MoRTH_691394_1 52.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 17:30Hrs
07/11/2022
Time 17:30Hrs
877 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_1 85.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
07/11/2022
Time 17:30Hrs
878 Restoration-Rehabilitation work of Birendra SasmalSetu over river Kangsabati at Km 118.70 of NH-60 new NH-14 in the dist. of Paschim Medinipur in the State of West Bengal under Annual Plan 2022-23 on EPC mode. Job No. 14-WB-2022-23-495.

2022_MoRTH_713822_1 10.222 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/09/2022
Time 18:0Hrs
04/11/2022
Time 11:0Hrs
879 Work of Periodic Renewal from km. 28.580 to 29.639, Km. 30.029 to km. 30.060 and km. 30.659 to km. 44.843 of NH-334DD on EPC mode in the State of Uttar Pradesh

2022_MoRTH_718245_1 8.710 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 15:0Hrs
03/11/2022
Time 15:0Hrs
880 Construction of ROB at Km 146.488 of NH-76 including approaches on EPC basis in the state of Uttar Pradesh.

2022_MoRTH_699459_1 51.560 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 06/07/2022
Time 15:0Hrs
03/11/2022
Time 15:0Hrs
881 Construction Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH-26 in the state of Odisha on EPC mode (Bid Ref No.-19 CE NH of 2022-23)

2022_MoRTH_701682_1 115.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 18:55Hrs
03/11/2022
Time 12:0Hrs
882 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124497_1 845.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
03/11/2022
Time 11:0Hrs
883 Construction of External Road Connectivity to the proposed Multimodal Logistics Park at Nagpur

NHLML/MMLP/Nagpur/Ext/202 76.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2022
Time 15:0Hrs
03/11/2022
Time 11:0Hrs
884 Development of Model Stretch-Provision of street lighting and beautification of Dhapewada Bridge and VoP on Saoner–Dhapewada-Kalmeshwar and Gondkhairi section of NH-547E from Km.4.700 to Km.33.575 in the State of Maharashtra on EPC Mode

2022_NHAI_131715_1 8.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 9:30Hrs
01/11/2022
Time 11:0Hrs
885 Improvement Up gradation of NH734 section of Moradabad Thakurdwara Kashipur including Moradabad Kashipur bypasses on EPC basis in the state of Uttar Pradesh Uttarakhand Package I Moradabad Bypass Length 33.724 km Start from Ch 000 Km 144381 of NH24 and ends at Ch 33724 Km 167790 of NH 24

2022_NHAI_123457_1 796.310 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/07/2022
Time 15:0Hrs
01/11/2022
Time 11:0Hrs
886 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand Package-II Moradabad - Thakurdwara Length- 38-770 km Start from Ch 0-00 Existing Km 389-00 at Bijna and ends at Ch 38-770 near UP-UK Border

2022_NHAI_124110_1 814.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2022
Time 15:0Hrs
01/11/2022
Time 11:0Hrs
887 Constructions of Missing Storm Water drain in Selected Stretches from Km 170/800 - 192/600 (8000m) and Construction of Box Culvert at Km 171/0, 175/7 & 197/0 and Berms Protection work from Km 199/0-199/2 (200m) of NH 234 Mangalagiri - Vengatagiri Kottah – Pernampet – Gudiyatham – Katpadi – Vellore – Polur – Thiruvannamalai - Villupuram road in the State of Tamil Nadu

2022_MoRTH_712639_1 12.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 16:0Hrs
31/10/2022
Time 15:0Hrs
888 STRENGTHENING INCLUDING IMPROVEMENT WITH ROAD SAFETY WORK ON NH503A IN KM NEW CHAINAGE 42 000 TO 70 000 OLD CHAINAGE KM 39 700 TO 67 250 IN THE STATE OF HP

2022_MoRTH_712903_1 41.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2022
Time 18:0Hrs
31/10/2022
Time 11:0Hrs
889 Construction of 4 laning of Green field Road connecting North and South Industrial Cluster of Khandaleru creek near Krishnapatnam port at Thamminapatnam to Narikellapalle (Part-I from km 0.000 to Km 14.650) and Six laning of extension of Dedicated port road on NH-67 (Part-II form Km 18.000 to Km 19.300) in the State Andhra Pradesh under Bharatmala Pariyojana Phase-I on EPC Mode (2nd Call)

NHAI/PC/BM /2022 (Thaminapatnam) 420.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2022
Time 16:0Hrs
31/10/2022
Time 11:0Hrs
890 Periodical Renewal from km 11/0 to 34/480 of NH51 under NH Division Rajkot Road and Building Departmetn in the state of Gujarat for the year 2022.23 length 23.48Km

714478 25.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/09/2022
Time 18:0Hrs
28/10/2022
Time 16:0Hrs
891 Construction of 69 Bridges including approach road on the Tamu-Kalewa-Kyigone (TKK) section from km 0.00 to km 149.70 of Trilateral Highway in Myanmar to be executed on EPC mode

2022_NHAI_122381_1 384.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 17:0Hrs
27/10/2022
Time 17:0Hrs
892 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-III from Pindari (km 78.150) to Rawalganj Bypass (km 117.120) on EPC Mode in the state of Uttar Pradesh and Bihar

2022_NHAI_124506_1 806.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
27/10/2022
Time 11:0Hrs
893 Upgradation of Jirapur-Pachore Road including Pachore-Jirapur-Chhapiheda and Khujner Bypasses from 0.000 to 58.790 (Design Length 58.79 Km) section of NH-752C to 2L and PS in the State of Madhya Pradesh under EPC mode

2022_MoRTH_691402_1 253.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 15:0Hrs
24/10/2022
Time 17:30Hrs
894 Periodic Renewal Work in Km. 454.000 to 470.900 and km 474.000 to 484.000 of NH-730 in the State of Uttar Pradesh

2022_MoRTH_714181_1 14.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
21/10/2022
Time 15:0Hrs
895 PERIODIC RENEWAL OF ROAD FROM KM 8.00 TO 52.00 OF NH309A UNDER NH DIVISION LOHAGHAT IN THE STATE OF UTTARAKHAND UNDER ARP 2022-23 under EPC Mode

2022_MoRTH_710740_1 9.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
21/10/2022
Time 15:0Hrs
896 I.R.Q.P between km. 169.900 to km. 222.000 of NH-754K in the State of Gujarat. Section Dholavira - Balasar Road.

2022_MoRTH_714410_1 31.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
20/10/2022
Time 17:0Hrs
897 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-IV Buxar Spur of length 17.270 km on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124510_1 309.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
20/10/2022
Time 11:0Hrs
898 Balance Work of Strengthening of road stretches along with provision for retaining walls, Breast walls & hill side drains from km 0.00 to km 4.40 & km 14.00 to km 28.00 of NH-10 (old NH-31A) Dist-Darjeeling, West Bengal in EPC mode [Job No-10/WB/2022-23/496].

2022_MoRTH_711885_1 13.834 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/09/2022
Time 10:15Hrs
19/10/2022
Time 17:0Hrs
899 Construction of Foot Over Bridges on Km. 21.500 (Design Ch 21.500 PKG-I) & Km. 29.500 (Design Ch 29.500 PKG-I) on NH-148B and Km. 17.500 (Design Ch 3.100 PKG-III) & Km. 58.600 (Design Ch 44.200 PKG-II) on NH-11 in the State of Haryana on EPC mode.

2022_NHAI_125121_1 13.100 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/08/2022
Time 15:0Hrs
19/10/2022
Time 11:0Hrs
900 Construction of two lane with paved shoulders including Land acquisition from km 56/860 to km 68/369 of NH-59 (Rigdol to Belgaon) in the state of Odisha under EPC Mode. (Bid Ref No.-20 CE NH of 2022-23)

2022_MoRTH_703569_1 66.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2022
Time 18:55Hrs
17/10/2022
Time 12:0Hrs
901 Construction of 2 lanes ROB over L C NO S 53 T 2 at CH 50 665 of NH 703A Jalandhar Kapurthala Sultanpur Lodhi Makhu in the State of Punjab on EPC Mode

2022_MoRTH_692451_2 75.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2022
Time 15:30Hrs
14/10/2022
Time 10:0Hrs
902 Widening and Reconstruction of existing road to 4lane from Km 56.400 to Km 120.300 i.e. from B. Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70.200 to Km 77.105 of NH 716G in the State of Andhra Pradesh on EPC mode under AP 2021 22

2022_MoRTH_709164_1 650.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2022
Time 15:0Hrs
13/10/2022
Time 15:0Hrs
903 CONSTRUCTION OF 6 LANE ELEVATED CORRIDOR ALONG WITH DEVELOPMENT OF EXISTING 4 LANE ROAD AT GROUND LEVEL FROM AROOR TO THURAVOOR THEKKU SECTION OF NH 66 FROM KM 366.330 TO KM 379.082 OF NH 66 LENGTH 12.752 KM UNDER BHARATMALA PARIYOJANA IN THE STATE OF KERALA

2022_NHAI_118890_1 1,993.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
13/10/2022
Time 11:0Hrs
904 Periodic Renewal Work in Km 1 to Km 12, Km 19 to Km 21 , Km 40 &Km 43 on NH-731K in the state of Uttar Pradesh on EPC Mode

2022_MoRTH_709046_1 6.130 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/08/2022
Time 15:0Hrs
11/10/2022
Time 15:0Hrs
905 Six lane Flyover with approaches and Slip Road from km 0.000 to km 1.460 along NH 44 at Start of NH 530B Mathura Bypass at Existing km 154.200 of NH 02 (New NH 44) in the State of Uttar Pradesh on EPC Mode Basis.

NHAI/HQ/UP(W)/Agra/ Pkg-1A/6L Flyover/2022 75.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2022
Time 18:0Hrs
11/10/2022
Time 11:0Hrs
906 Construction of Kaithi Padaria Kala bypass,Patna Tamoli bypass,Jaso bypass and Nagod bypass total length 15.44 Km to 2 lane with paved shoulders flexible pavement on NH 943 in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_683463_1 94.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 15:0Hrs
10/10/2022
Time 17:30Hrs
907 Periodical Renewal from Km. 77.000 to 78.460, 78.645 to 84.600, 85.290 to 85.750, 86.950 to 87.210 and 87.360 to 105.000 of NH-135C on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_709232_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2022
Time 9:0Hrs
10/10/2022
Time 15:0Hrs
908 Periodical Renewal from Km 73.134 to Km 129.00 of NH-135A on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_708639_1 27.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:0Hrs
08/10/2022
Time 15:0Hrs
909 Periodical Renewal from Km 129.000 to 147.000 of NH-135A on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_708668_1 7.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:55Hrs
08/10/2022
Time 15:0Hrs
910 Periodical Renewal from Km 0.000 to Km 30.000 of NH-135A on EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_708591_1 25.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:0Hrs
08/10/2022
Time 15:0Hrs
911 Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77.100 to Km 170.580 Total length 93.48km to 2-lane with PS configuration along with OTI in 04 nos of bypasses in a total length of 7.23 km in the state of Madhya Pradesh

2022_MoRTH_691497_1 377.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
07/10/2022
Time 17:30Hrs
912 Construction of four lane Bypass to Jeypore town on NH-26 in the state of Odisha on EPC Mode under Annual plan of 2021-22 ( Bid Ref No.-23 CE NH of 2022-23)”

2022_MoRTH_708060_1 84.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/08/2022
Time 18:55Hrs
06/10/2022
Time 12:0Hrs
913 Periodical Renewal on NH-351G between km 78/700 to km 143/700 & km 148/700 to 169/220 (Length-85.52km) in the state of Gujarat under EPC mode for the year 2022-23

710742 54.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2022
Time 10:45Hrs
06/10/2022
Time 12:0Hrs
914 Cons and Upgradation to 4L from Siwan (Design Ch. 4.217) to Mashrakh (Design Ch. 50.123)of NH-227A including construction of 4L Tanrwa/Siwan Bypass (0 to Km 4.217) of NH 531 under Backward Area/Religious/Tourist Places(BRT)scheme in Bihar on HAM mode

2022_NHAI_122010_1 1,027.320 NHAI Special Project HAM 11/07/2022
Time 15:0Hrs
06/10/2022
Time 11:0Hrs
915 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand Package-I Moradabad Bypass Length 33-724 km Start from Ch 0-00 Km 144-381 of NH-24 and ends at Ch 33-724 Km 167-790 of NH-24

2022_NHAI_123457_1 796.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2022
Time 15:0Hrs
06/10/2022
Time 11:0Hrs
916 Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode

NHAI/Bharatmala/ICR/PAB/Pkg1/2022 1,306.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/04/2019
Time 11:0Hrs
29/09/2022
Time 11:0Hrs
917 Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode

NHAI/Bharatmala/ICR/PAB/Pkg2/2022 1,388.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/04/2022
Time 11:0Hrs
29/09/2022
Time 11:0Hrs
918 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2022_MoRTH_675191_1 179.265 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2022
Time 15:0Hrs
27/09/2022
Time 17:30Hrs
919 Periodical Renewal works in km. 3.939 to 15.450 Chaigaon Makhan Road on NH 347B under NH Division Indore in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_684790_2 4.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 10/08/2022
Time 17:30Hrs
26/09/2022
Time 17:30Hrs
920 Work of Periodic Renewal (PR) from km. 28.580 to 44.843 of NH-334DD in the State of Uttar Pradesh under EPC mode

2022_MoRTH_709079_1 8.710 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:0Hrs
26/09/2022
Time 15:0Hrs
921 Construction of a bridge over river Shali at Km 247.00 of NH 60 (New-NH 14) in Bankura district in the State of West Bengal on EPC mode (Job No. 14/WB/2021- 22/491)

2022_MoRTH_707070_1 19.444 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:0Hrs
26/09/2022
Time 14:0Hrs
922 Construction of 4 lane VUP at Bhankarpur junction at Km 33.275 on Ambala-Chandigarh section of Old NH-22 (New NH-152) in the State of Punjab on EPC basis

2022_NAHI_125144_1 13.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2022
Time 15:0Hrs
22/09/2022
Time 11:0Hrs
923 Rectification of MORTH Identified Black Spots JK 02020 (GOLE MELA) and Construction of Service Road to existing VUP at SINGOOR on Jammu UDHAMPUR section of NH44 (km 14.200) in UDHAMPUR (Jammu and Kashmir) on EPC mode.

2022_NHAI_124328_1 44.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2022
Time 15:0Hrs
20/09/2022
Time 15:0Hrs
924 Construction of Bypass to Nayagarh town from km 235.469 to km 252.482 of NH-57 in the State of Odisha on EPC mode” (Bid Ref No.11 CE NH of 2022-23)

2022_MoRTH_697372_1 95.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:55Hrs
20/09/2022
Time 12:0Hrs
925 Rehabilitation Upgradation of Kurwai Mungaoli Chanderi road section of NH-346, Total Length- 83.1 km to Two lane with paved shoulder configuration along with one time improvement in 07 nos. of bypassed total length of 22.615 km on EPC mode

2022_MoRTH_689194_1 298.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 17:30Hrs
19/09/2022
Time 17:30Hrs
926 WIDENING and DEVELOPMENT OF EXISTING NH 85 FROM KM 0.000 TO KM 124.636 SECTION OF NH 85 TO 2L/2L plus PS SECTION IN THE STATE OF KERALA

2022_NHAI_124194_1 889.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 15:0Hrs
19/09/2022
Time 15:0Hrs
927 Rehab. Upgrad. and Const. of 2L PS from I Bakaur(CH 13.300)to Parsarma(CH 18.875)NH 527A ii)Parsarma(Design Km0.000)to Bariyahi (CH24.068)iii)Bangaon Bypass KM0.000 to Km3.820 and iv)Spur Road Mahishi Km 0.000 to Km 5.720 to 2L with PS/4L in Bihar

2022_NHAI_124186_1 485.310 NHAI Special Project HAM 30/07/2022
Time 14:0Hrs
19/09/2022
Time 11:0Hrs
928 Four laning of Aurangabad to Paithan section of NH-752E from design km 0.000 to design km 42.417 (Design Length – 42.417 km) in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana

2022_NHAI_124133_1 495.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2022
Time 17:40Hrs
19/09/2022
Time 11:0Hrs
929 Stabilisation of land slide and slope protection at Govindghat at existing chainage 499.350 on Joshimath Mana road of NH 07 on EPC mode in the state of Uttarakhand

2022_BRO_540064_1 39.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 15:0Hrs
16/09/2022
Time 10:0Hrs
930 Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_682510_1 110.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
14/09/2022
Time 17:30Hrs
931 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_690878_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 17:30Hrs
13/09/2022
Time 17:30Hrs
932 Construction of Two Viaducts at Km 88.440 LHS and Km 103.320 LHS at Parwanoo-Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.

2022_NHAI_124266_1 37.340 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/08/2022
Time 15:30Hrs
12/09/2022
Time 11:0Hrs
933 Construction and upgradation of road Km 504.871 to Km 509.725 Lambagarh to Benakuli incl Benakuli land slide on road Joshimath Mana under EPC mode NH 07 in Uttrakhand

2022_BRO_524185_1 190.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 14:0Hrs
12/09/2022
Time 11:0Hrs
934 Proposal for slope stabilization and rock fall mitigation works at Km 314 220 to 314 300 including construction of Rwall along with steel dowels and Thrie beam crash barrier at km 314 200 to 314 300 on NH 5 near Nigulsari, Tehsil Nichar of Distt Kinnaur in the State of HP

2022_MoRTH_696578_1 11.310 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 18:0Hrs
12/09/2022
Time 11:0Hrs
935 Construction of Major Bridge Across Wainganga river in Km. 134/000 (Near Armori) on Nagpur-Umred-Nagbhid-Bramhapuri-Armori Road NH-353D in the State of Maharashtra on EPC Mode

2022_ MoRTH_668784_1 52.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 14:0Hrs
08/09/2022
Time 17:0Hrs
936 Construction of H.L. Major Bridge at CH 323/957, H.L. Minor Bridge at CH 323/780 & RCC Box at CH 323/500 over Kolab river, near Patraput (Koraput district), on NH-326 in the state of Odisha

2022_MoRTH_687093_2 21.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
08/09/2022
Time 12:0Hrs
937 Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH-44 (old NH-03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.

44022/2/2021 UP(W) 233.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2022
Time 18:55Hrs
08/09/2022
Time 11:0Hrs
938 Construction of Railway over Bridge at Km 60/200 of NH-316 (Km 3.2 of Old NH-203E) at Matiapada on Puri Konark Road, (KP-42 of Khurdha-Puri-Rail Line) in the state of Odisha under EPC Mode.(Bid Ref No.-16 CE NH of 2022-23)

2022_MoRTH_700818_2 55.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 18:55Hrs
07/09/2022
Time 12:0Hrs
939 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

707192 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 18:45Hrs
07/09/2022
Time 12:0Hrs
940 PR from km 28.200 to 62.840 of NH351G Total length 34.640 Km Khambha Chalala road section in the state of Gujarat under EPC mode

707182 11.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 18:45Hrs
07/09/2022
Time 12:0Hrs
941 CONS AND UPGRAD TO NHDL SPEC INCL TUNNEL AND MINOR BRIDGE FROM KM 0PT000 TO KM 7PT900 (DESIGN CHAINAGE KM 0PT000 TO KM 7PT900) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR-AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 7PT900 KM)

2022_BRO_536976_1 80.720 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/07/2022
Time 19:0Hrs
06/09/2022
Time 12:0Hrs
942 Balance work for construction of Fulahar Bridge approach on NH-131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode (Job No. 131A/WB/2022-23/494)

2022_MoRTH_699599_1 38.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/07/2022
Time 9:0Hrs
06/09/2022
Time 11:0Hrs
943 Work of Periodic Renewal between Km 356/905 to 376/300 Ferkuva-Dhamodi section road and Km 405/305 to Km 407/105, Pavijetpur town section of NH No- 56 in Chhotaudepur district in Gujarat

2022_MoRTH_706705_1 10.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2022
Time 15:0Hrs
05/09/2022
Time 15:0Hrs
944 Construction of Kotpad Bypass (Length-14.310Km) to Two lane with paved shoulders configuration on NH-63 in the state of Odisha on EPC Mode. (Bid Ref No.-12 CE NH of 2022-23)

2022_MoRTH_698368_1 63.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/07/2022
Time 17:0Hrs
05/09/2022
Time 12:0Hrs
945 Work of PR/IRQP between km 15/700 to km 16/930 (Nadiad Bypass section) of NH 848K and and km 104/920 to 108/200 (in selected length) of NH 64 in the state of Gujarat

2022_MoRTH_706711_1 5.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
05/09/2022
Time 11:0Hrs
946 Construction of VUP, Service road at km.17.325 in village Behram on Phagwara-Rupnagar section of NH-344A in the State of Punjab on EPC Mode.

2022_NAHI_122973_1 17.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2022
Time 15:0Hrs
05/09/2022
Time 11:0Hrs
947 Balance work for improvement to 2 lane with PS in realignment from Km 52.320 to Km 52.940 of NH81 Protection works in HL Bridges at Km 33 and Km 36 for the approach of Mahananda River and recons. of culvert in 30th km of NH81 on EPC mode in Bihar.

2022_MoRTH_702670_1 18.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 15:0Hrs
05/09/2022
Time 11:0Hrs
948 Construction LVUP on Six Lanning of Agra Etawah Bypass section of NH-2 from km 270.270 to km 270.830 and Construction of Foot Over Bridge at Km 274.055 in the state of Uttar Pradesh to be executed on EPC Mode

2022_NHAI_122933_1 44.644 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2022
Time 9:0Hrs
05/09/2022
Time 11:0Hrs
949 Rehabilitation and Up-gradation to 4 lane Road with PS configuration from Undewadi Kade pathar (Ch. Deshmukh Chowk and Dhawan Patil Chowk (Baramati) Phaltan section of NH-160 in the State of Maharashtra on EPC mode.

2022_MoRTH_685345_1 669.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
950 Rehabilitation and Up-gradation to 2 LPS/ 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H from Km 179.430 to Km 141.800 in the State of Maharashtra on EPC Mode.

2022_MoRTH_685346_1 301.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
951 Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section Km 258.300 to Km 306.300 of NH-752 I to two LPS configuration on EPC Mode in the State of Maharashtra.

2022_MoRTH_685348_1 356.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 15:0Hrs
02/09/2022
Time 17:0Hrs
952 Construction of new four lane bypass to Parbhani city (Parwa to Asola) km 463.265 to km 481.180 (Design Ch. 19.220 to km 34.434) section of NH-61 on EPC mode in the State of Maharashtra.

2022_MoRTH_685352_1 430.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
953 Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH-752G Design Ch Km 64.000 to Km 101.140 2LPS Four Lane configuration in the state of Maharashtra on EPC mode.

2022_MoRTH_685353_1 361.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
954 Construction of Bypass to Gudiyatham Town in Km 23/100 – 29/250 including LA & Shifting of NH-234 (Mangalore – Villupuram Road) (NEW NH-75) in the State of Tamil Nadu on EPC Mode

2022_MoRTH_697006_1 101.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 13:15Hrs
02/09/2022
Time 15:0Hrs
955 Balance works of the project “4-laning of Rampur-Kathgodam section of NH-87 (New NH No. 09) from Km 0.000 (Km 190.000 of NH-24) to Km 42.791 (design Chainage Km 43.446) (Package-I) in the state of Uttar Pradesh under NHDP Phase-III on Hybrid Annuity Mode” on EPC Mode.

2022_NHAI_115331_1 295.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/05/2022
Time 18:40Hrs
02/09/2022
Time 11:0Hrs
956 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_690878_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 17:30Hrs
01/09/2022
Time 17:30Hrs
957 Work of Widening of road to 4-lane from km 710/600 to 718/500 of NH-56 under NH division Bharuch in the state of Gujarat On EPC Mode.

2022_MoRTH_706874_1 48.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/08/2022
Time 15:0Hrs
01/09/2022
Time 15:0Hrs
958 Construction of 4 lane access controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH16 connectivity in Andhra Pradesh on EPC mode under Bharatmala Pariyojana

2021_NHAI_106927_1 416.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2022
Time 15:0Hrs
01/09/2022
Time 11:0Hrs
959 Construction of 4Lane with PS Delina Flyover including flyover length 1.704 km of total length 22.736 kms in AOR of 760 BRTF on road SRINAGAR BARAMULA URI NH 01 in the UT of JK

2022_MoRTH_698225_1 457.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:55Hrs
29/08/2022
Time 17:0Hrs
960 Periodical Renewal (P/R) to NH-316 from 28/500 to km 33/00 & Km 35/500 to km 48.000(Puri -Satapada) in the State of Odisha

2022_MoRTH_703994_1 7.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
29/08/2022
Time 12:0Hrs
961 CONS AND UPGRAD TO NHDL SPEC INCL MINOR BRIDGES FROM KM 24PT500 TO KM 33PT460 (DESIGN CHAINAGE KM 22PT400 TO KM 31PT360) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM SHYOK UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 8PT960 KM)

2022_BRO_539337_1 81.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 18:0Hrs
29/08/2022
Time 12:0Hrs
962 Upgradation of Dindori-Sagartola-Kabirchabutra MP-CG border Section of NH 45 Total length 77km to Two lane with paved shoulder configuration along with OTI in 04 nos of bypassed in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode

2022_MoRTH_686466_1 251.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
26/08/2022
Time 17:30Hrs
963 Construction of 4- Lane Chapra- Manjhi By-Pass Connecting NH-19 and NH-85 on EPC mode in the state of Bihar (Length-7.155 Km)

2022_MoRTH_694396_1 261.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 15:0Hrs
26/08/2022
Time 15:0Hrs
964 Construction of new two lane bridge over Sabarmati River near Dharoi dam on NH58 at Km 84/0 in the state of Gujarat

2022_MoRTH_687236_2 55.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 17:10Hrs
25/08/2022
Time 12:0Hrs
965 Development of External Road Connectivity to the proposed Multimodal Logistics Park at Nagpur

NHLML/MMLP/ Nagpur/Ext/2022 76.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 11:0Hrs
24/08/2022
Time 11:0Hrs
966 Construction of Kaithi Padaria Kala bypass,Patna Tamoli bypass,Jaso bypass and Nagod bypass total length 15.44 Km to 2 lane with paved shoulders flexible pavement on NH 943 in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_683463_1 94.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
23/08/2022
Time 17:30Hrs
967 Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC

2022_MoRTH_683448_1 80.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
23/08/2022
Time 17:30Hrs
968 PR from Km 119.0 to 181.2 Total length 62.2 Km of NH351 Jetpur Vadiya Bagasara road in the state of Gujarat on EPC mode

703868 25.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2022
Time 14:0Hrs
23/08/2022
Time 12:0Hrs
969 Upgradation and reconstruction of shahpura-Dindori section of NH 45 from Km 103.700 (Design) to Km 164.580 (Design) including 3 bypasses (Total length 60.88km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2022_MoRTH_682465_1 186.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 15:0Hrs
22/08/2022
Time 17:30Hrs
970 Upgradation of Dindori-Sagartola-Kabirchabutra MP-CG border Section of NH 45 Total length 77km to Two lane with paved shoulder configuration along with OTI in 04 nos of bypassed in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode

2022_MoRTH_686466_1 253.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 15:0Hrs
22/08/2022
Time 17:30Hrs
971 Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_682510_1 111.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
22/08/2022
Time 17:30Hrs
972 Construction of additional two lane with PS of NH98 New NH139 from existing Ch. 7.000 to Ch. 17.840 Design Ch.0.000 to Ch.10.840 AIIMS Bhusaula Golambar to Naubatpur Patna Ring Road section on EPC mode in the state of Bihar year 2021 22 Length 10.84

2022_MoRTH_699589_1 77.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2022
Time 11:0Hrs
22/08/2022
Time 11:0Hrs
973 Providing Crash Barrier as Road Safety measures on NH-26 from km 410/000 to 434/767 km(Sunki Ghat portion) in the State of Odisha under AP-2021-22

2022_MoRTH_685766_2 5.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
20/08/2022
Time 12:0Hrs
974 Improvement of Road Safety through providing Metal Beam Crash Barriers, Removal of Black spot by Improvement of Junctions and Improvement of night time visibility by providing Highway Lighting from km 35/700 to 71/117 of NH-220 in the state of Odisha under Road Safety Annual Plan 2021-22.

2022_MoRTH_689824_2 7.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
20/08/2022
Time 12:0Hrs
975 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2022_MoRTH_675191_1 178.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 15:0Hrs
16/08/2022
Time 17:30Hrs
976 Construction and Site for Improvement of existing 4 Lane National Highway Old NH-22 (New NH-5) on Zirakpur Parwanoo section from Km 42.350 to Km 43.850 including 2nos.VUP at Km 43.051 and Km 43.286 in the State of Haryana on EPC Mode

2022_NAHI_120638_1 43.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
16/08/2022
Time 11:0Hrs
977 Improvements to RC-12 Sanniyasikuppam road and RC-13 Vadhanur road connecting Moolakulam junction and Thirubuvanai junction in NH45A, Puducherry on EPC mode, under Central Road Infrastructure Fund

2022_MoRTH_689102_1 11.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 15:0Hrs
12/08/2022
Time 16:0Hrs
978 Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch. 44.500 (Vill. Parsada) to design ch. 92.230 (Vill. Paragaon) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package B)

NHAI/BM/Durg- Raipur -Bypass/Package-B 1,033.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 15:0Hrs
11/08/2022
Time 15:0Hrs
979 IRQP of existing carriageway from Km 148 to Km 156 except Km 148.24 to Km 148.69 and Km 153 to Km 155.54 of NH-60 New NH-14 in the district of Paschim Medinipur in the State of WB under ARP 2021-22 on EPC mode. Job No. TA-14-WB-2021-22-803

2022_MoRTH_697390_1 9.209 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:0Hrs
11/08/2022
Time 11:0Hrs
980 Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch. 0.000 (Vill. Tendesara) to design ch. 44.500 (Vill. Parsada) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package A)

NHAI/BM/Durg -Raipur -Bypass/Package-A 968.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 15:0Hrs
11/08/2022
Time 11:0Hrs
981 Construction of Additional 2-lane High Level Bridge across the river Kamandala at Km 92/8 of NH- 234 (New NH-38) (Mangalore-Villupuram Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_692312_1 6.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2022
Time 12:0Hrs
10/08/2022
Time 15:0Hrs
982 Strengthening in Km 93 6 111 4 of NH 230 New NH 85 on EPC Basis Contract in the State of Tamil Nadu

2022_MoRTH_696121_1 17.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 13:10Hrs
10/08/2022
Time 11:0Hrs
983 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_1 85.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
08/08/2022
Time 17:30Hrs
984 Construction of Flyover in km.468/500, Vehicular Underpass in km.470/00 and Overpass in km.451/300 to 451/900 including Road Safety along with avenue and median plantation from km 450/170 to km 471/330 on NH-66 Panvel Mahad Panji Road (2nd call)

2022_MoRTH_702910_1 73.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2022
Time 18:0Hrs
08/08/2022
Time 17:30Hrs
985 Construction of VUP at Km 1379.934 at Golagamudi Junction, Service Road from Km 1380.350 to Km 1380.957 at Sundaraiah Junction, Flyover at Km 1383.195 at Nellore T Junction and VUP at Km 1374.945 at Chintareddypalem Junction of NH16 in AP on EPC

NHAI/BS/NelloreBypass/2021 116.410 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
06/08/2022
Time 17:0Hrs
986 Development to 4/6-lanning of NH-31 (New NH-10) with both sides service roads from km 569.258 to km 581.030 (End of AH-02 on NH-31 near Shivmandir to Sevoke Army Cantonment) in the districts of Darjeeling and Jalpaiguri, West Bengal on EPC Mode

2022_MoRTH_692080_1 754.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2019
Time 15:0Hrs
06/08/2022
Time 15:0Hrs
987 Additional works (2VUPs, MR-10 junction flyover and underpass) in Six lane Indore-Dewas section of NH-52 in the state of Madhya Pradesh on EPC mode

2022_NHAI_106549_1 118.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2022
Time 18:50Hrs
05/08/2022
Time 11:0Hrs
988 Rehabilitation and Upgradation of existing road to two Lane with paved shoulder configuration from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa Nellore Border section) of NH167B in the state of Andhra Pradesh under Annual Plan 2021 22 (2nd Call)

2022_MoRTH_695848_1 222.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/06/2022
Time 15:0Hrs
04/08/2022
Time 15:0Hrs
989 Work of Widening of road to 4-lane from km 710/600 to 718/500 of NH-56 under NH division Bharuch.

2022_MoRTH_696407_1 48.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 16:10Hrs
04/08/2022
Time 12:0Hrs
990 Construction of Bridge Across Simuli Nallah (Missing Link) At Km 107.470 Of NH-220 in the State of Odisha on EPC Mode.

2022_MoRTH_700526_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2022
Time 18:55Hrs
04/08/2022
Time 12:0Hrs
991 Construction of Interchange at km 126.137 (Junction of Palwal – Aligarh Highway – SH 22A with Eastern Peripheral Expressway), access to Wayside Amenities at Km. 39.500, Km 83.005 & Km. 95.575 and access to Trilok Tirth Dham at Km 22.500 to km. 23.020 of Eastern Peripheral Expressway on EPC mode in the State of Haryana and Uttar Pradesh.

2022_NHAI_117188_1 66.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 17:34Hrs
04/08/2022
Time 11:0Hrs
992 Construction of VUP, Service road at Army Gate no. 6 at km 474.600 on Amritsar Wagha Border Section of old NH-01 (new NH-03) in the State of Punjab on EPC Mode

2022_NAHI_119198_1 19.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 17:0Hrs
04/08/2022
Time 11:0Hrs
993 Construction of four laning of Chillakuru cross road to Turpu Kanupur (Part 1 of PkgII) km 0.000 (131.500 of NH16) to km 23.770 on New NH516W including six lane flyover and approaches on NH16 (length km 1.050) and six laning of Turpu Kanupuru to Port South Gate (Part 2 of PkgII) km 23.770 to km 35.015 on New NH516W in the state of Andhra Pradesh on HAM Mode under Bharatmala Pariyojana Phase I

2021_NHAI_95786_1 658.760 NHAI Normal Highway Project HAM 23/11/2021
Time 15:0Hrs
03/08/2022
Time 11:0Hrs
994 Improvement and Upgradation/Construction of Spur of Muzaffarnagar connecting NH-709 AD (Panipat-Shamli-Muzaffarnagar Highway) and NH-58 (New NH-334) (Meerut-Roorkee Highway) bypassing Muzaffarnagar town in the State of Uttar Pradesh under Bharartmala Pariyojna (ICR) on EPC mode

2022_NHAI_118039_1 284.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 18:0Hrs
02/08/2022
Time 11:0Hrs
995 Strengthening and Widening of NH 251 from Km 11.00 to Km 22.77 in Diu on EPC mode of contract

2022_MoRTH_700514_1 56.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2022
Time 17:0Hrs
02/08/2022
Time 11:0Hrs
996 Construction of Retaining Wall and Repairing of Service Road at Ch.2.820 to 4.140 of NH-24A Under EPC Mode in the State of Uttar Pradesh

2022_MoRTH_695671_1 13.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 15:0Hrs
30/07/2022
Time 17:0Hrs
997 Rehabilitation Up Gradation Of Two Lane Four Lane Road With Paved Shoulders Length In Risod Town Nh 461 B From Km.36.845 To Km.39.340 and Km. 41.520 To 44.220 (Total Length = 5.20 Km) On EPC Mode In The State Of Maharashtra

2022_MoRTH_668572_1 44.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 9:0Hrs
30/07/2022
Time 11:0Hrs
998 Widening to two lane with paved shoulder of Rampachodavaram Koyyuru section of NH 516E from Km 43 700 to Km 113 820 in the State of Andhra Pradesh

2022_MoRTH_693367_1 426.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2022
Time 15:0Hrs
28/07/2022
Time 17:0Hrs
999 Road safety works in different stretches (km 18.50, km 19.20, km 19.50, km 20.50 & km 21.30) for improvement of sharp turning & narrow road bench of NH-10 (old NH-31A) including provision of Thrie Metal Beam Crash Barrier from km 18.00 to km 35.00 of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong under Road Safety Annual Plan 2021-22. [ Job No. NH-10, 31- Old NH/WB/RSCE/2021-22 /28]. (2nd Call).

2022_MoRTH_697875_1 9.799 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 18:55Hrs
28/07/2022
Time 17:0Hrs
1000 Construction of toll plaza at km 175.900 on Ramdas-Gurdaspur section of NH-354 in the State of Punjab on EPC mode (2nd Call).

2022_NAHI_122413_1 4.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 11:0Hrs
28/07/2022
Time 11:0Hrs
1001 Rehabilitation and Uppradation of Shewali (Sakri)-Nandurbar section of NH-753-B from km 0.000 to km 49.050 (excluding km 0.300 to km 4.500 & km 13.485 to km 25.975(Design Chainage) to Two Lane with Paved Shoulder Configuration and additional bridge works at km 13.915(60m),&km 19.845(70m) on EPC Mode in the State of Maharashtra.

2022_MoRTH_686764_1 190.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 17:45Hrs
27/07/2022
Time 17:30Hrs
1002 Construction of a bridge river Shali at Km 247.00 of NH 60 (New-14) in Bankura district in the State of West Bengal on EPC mode (Job No. 14/WB/2021- 22/491)

2022_MoRTH_680476_1 19.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 15:0Hrs
27/07/2022
Time 13:0Hrs
1003 Rehabilitation and upgrading to two lanes with paved shoulders configuration and Strengthening from Km 175.00 to km 196.00 (Gumakhal to Satpuli) on NH-119 (New 534) in the State of Uttarakhand Under Annual Plan 2021-22 on EPC mode.

2018_MoRTH_345284_1 289.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 15:0Hrs
27/07/2022
Time 12:0Hrs
1004 Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode. (Bid Ref No.-09 CE NH of 2022-23)

2022_MoRTH_693243_1 64.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 18:55Hrs
27/07/2022
Time 12:0Hrs
1005 Widening of existing road to 4 lane with paved shoulder from Km 0.000 to Km 51.119 existing ch km 476.700 to km 523.530 51.119 Km of Tadipatri to Muddanur Bypass section of NH67 in the State of Andhra Pradesh on EPC mode under Annual Plan 2021 22

2022_MoRTH_693039_1 594.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 15:0Hrs
26/07/2022
Time 17:0Hrs
1006 One Year Annual Maintenance Contract to Malegaon-Risod Road NH-461B in Km 36/845 to 39/340and Km 41/520 to 44/220 in the State of Maharashtra

2022_MoRTH_701397_1 0.470 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 10:30Hrs
25/07/2022
Time 17:30Hrs
1007 Construction of Light Vehicular Under Pass (LVUP) including approaches at Km 109/10 of NH-4 (New NH 40) (Chennai-Chittoor-Bangalore Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_692302_1 10.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2022
Time 12:0Hrs
25/07/2022
Time 15:0Hrs
1008 Construction of Bypass Road to Bolangir Town from km 72.400(Design Km 0.000) to Km 79.800 (Design Chainage Km 11.670) of N.H.26 in the State of Odisha on EPC Mode

2022_MoRTH_688089_1 210.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2022
Time 18:55Hrs
25/07/2022
Time 12:0Hrs
1009 Construction of Bypass to Khordha town from km 294.000 to km 300.300 of NH-57 in the State of Odisha under EPC mode 10 CENH of 2022-23

2022_MoRTH_694282_1 82.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:55Hrs
25/07/2022
Time 12:0Hrs
1010 Work of periodical renewal between km 0/0 to km 22/200 and km 35/7 to 37/4 and rehabilitation/restoration in selected section of NH-848 under NH Division Bharuch

2022_MoRTH_694387_1 14.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
25/07/2022
Time 12:0Hrs
1011 Periodical Renewal between Km 665/8 to 710/600 (Khanpur-Dharampur-Nanapondha -Vapi section) and rehabilitation/restoration in selected section of NH-56 in Valsad district in the state of Gujarat.

2022_MoRTH_694389_1 21.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
25/07/2022
Time 12:0Hrs
1012 Construction of flyover at km 233.110 on Dogal Kalan To Punjab-Haryana Border Section on NH-71 (new NH -52) in the State of Punjab on EPC Mode

2022_NAHI_118526_1 19.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2022
Time 11:0Hrs
25/07/2022
Time 11:0Hrs
1013 Strengthening on NH 22 New NH 05 on Kalka Shimla Wangtoo road from Km 208 700 to 214 00 and 223 500 to 236 00 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_694176_1 14.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2022
Time 18:0Hrs
25/07/2022
Time 11:0Hrs
1014 Rectification of Street lighting of Bengaluru – Nelamangala Section from km.10.000 to km. 29.500 of NH-4 (New NH-48) in the State of Karnataka under EPC Mode

NIT No.05/ NHAI/RO-BNG/11018/Tender/2022-23 Dated 22.06.2022 5.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 15:30Hrs
21/07/2022
Time 17:0Hrs
1015 Construction of VOP at Kantharaja Circle at Black Spot location (KA-02-106) in the stretch of Bengaluru - Hoskote - Mulbagal Section from Km.237.700 to Km. 318.000 of NH-75 (old NH-4) in the State of Karnataka under standalone mode to be taken up under Engineering, Procurement & Construction (EPC) Mode (3rd Call)

NIT No.06/NHAI/RO-BNG/11019/Tender/2022-23 dt.22.06.2022 24.005 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 15:30Hrs
21/07/2022
Time 17:0Hrs
1016 IRQP Betn. Km. 0/000 to Km. 21/500, Km. 27/900 to Km. 30/900 & 51/500 to 61/500 (Ranavav - Bhanvad - Khambhaliya Section) of Newly Declared NH-927K in the state of Gujarat.

697955 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
1017 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

697960 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
1018 IRQP from Km 63/700 to 78/680 of NH351G in the state of Gujarat

697661 9.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
1019 Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode.(Bid Ref No.- 07 CE NH of 2022-23)

2022_MoRTH_693369_1 43.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2022
Time 17:0Hrs
21/07/2022
Time 12:0Hrs
1020 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_696279_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 16:55Hrs
21/07/2022
Time 12:0Hrs
1021 Six laning of Kagal-Satara section of NH-48 (old NH-4) (Package – I from km 592.240 to km 658.000) in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana

2022_NHAI_116922_1 1,491.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 18:55Hrs
21/07/2022
Time 11:0Hrs
1022 Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar

2022_MoRTH_691201_1 234.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 15:0Hrs
19/07/2022
Time 11:0Hrs
1023 6 - lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length = 11.844 Km) on Hyderabad – Bangalore Section of NH-44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode.

2022_NHAI_104887_1 358.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2022
Time 19:0Hrs
19/07/2022
Time 11:0Hrs
1024 Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH 548DG Nhavara to Choufula Section of state highway in the state of Maharashtra on EPC Mode Length 24.037 Km

2022_MoRTH_668863_1 245.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 16:0Hrs
18/07/2022
Time 17:5Hrs
1025 Construction of two lane Major Bridge across Penna River at Km 739.234 of NH 67 including approaches parallel to existing 2 lane bridge in SPS Nellore District in the State of Andhra Pradesh through EPC Contract under Annual Plan 2021-22 2nd call

2022_MoRTH_692515_1 80.790 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 17:0Hrs
18/07/2022
Time 17:0Hrs
1026 Construction and improvement of Road Bakhasar Mavasari from Km 0.00 to Km 32.49 Design Length 31.703 Km from existing CL9 specifications to NHDL specifications under 45 BRTF of Project Chetak in Rajasthan and Gujarat State in EPC mode

2022_BRO_626554_1 326.190 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 18:0Hrs
18/07/2022
Time 11:0Hrs
1027 Reconstruction of minor bridges at Km 158 280 Km 186 560 and Km 212 840 of NH 208

2022_MoRTH_690602_1 10.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 13:35Hrs
18/07/2022
Time 11:0Hrs
1028 Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137 080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh

2022_MoRTH_692032_1 15.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/05/2022
Time 15:0Hrs
14/07/2022
Time 15:0Hrs
1029 Construction of 2 no. Bridges at RD 78/450 and 79/550 on NH-154A in the State of Himachal Pradesh.

2022_MoRTH_692043_1 7.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/05/2022
Time 15:0Hrs
14/07/2022
Time 15:0Hrs
1030 Periodical Renewal From km 221.800 to 291.450 of NH- 41 under NH Division, Gandhidham in the state of Gujarat.

2022_MoRTH_696506_1 21.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 19:0Hrs
14/07/2022
Time 12:0Hrs
1031 Construction of Six Lane Standalone Flyovers at Bongaigaon Chapaguri Pathsala Simalguri Chowk and Baihata Bypass Junctions on stretches of NH 31 and NH 31C (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis

2022_NHAI_112376_1 372.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
14/07/2022
Time 11:0Hrs
1032 One time improvement of existing bypassed road from Km 64.000 to 65.620 (Bhojpur) and km 44.780 to 52.000 (khilchipur) (total length 8.82km) of NH-52 in the state of Madhya Pradesh under EPC mode

2022_MoRTH_691570_1 14.370 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
12/07/2022
Time 17:30Hrs
1033 One Time improvement of existing bypass road from Km 161.700 to 163.100 (Udaipura), Km 141.200 To 142.000(Deori) and Km 181.200 to 184.900 (Khargone) Total Length 5.09 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_685117_1 4.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 15:0Hrs
12/07/2022
Time 15:0Hrs
1034 One Time improvement of existing bypass road from Km 278.650 to 281.850 (Obedullaganj) and Km 269.000 to 272.200 (Goharganj) Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_685093_1 5.070 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 15:0Hrs
12/07/2022
Time 15:0Hrs
1035 Elimination of Identified Black spots by providing permanent measures in between km 107 800 109 800 Duraisamypuram Bus stop and in between Km 101 530 103 450 E Vilakku Express City on Kollam Thirumangalam road NH 208

2022_MoRTH_689367_1 12.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 18:10Hrs
12/07/2022
Time 11:0Hrs
1036 Construction of 5 Nos. VUPs and Service Road (km 60.300 to km 66.790, BHS) on Delhi-Haryana Border to Rohtak Section on NH-09 in the State of Haryana on EPC Mode

2022_NAHI_117417_1 137.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2022
Time 15:0Hrs
11/07/2022
Time 15:0Hrs
1037 Strengthening including improvement of safety from km 38.0 to 45.0 km, km 50.0 to 60.0 km & km 65.0 to 70.0 km of NH-326 (A) in the state of odisha.” (01 CE NH of 2022-23)

2022_MoRTH_683992_2 19.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2022
Time 17:0Hrs
11/07/2022
Time 12:0Hrs
1038 Construction of Rail over Bridge in Lieu of Railway Crossing No. E/2 on Ferozepur -Fazilka Rail Section at Km 2/4-5 & On NH-95 ( New NH-05) section Ferozepur to Indo Pak Border at Km 205.320 ( near Ferozepur city & village madhre) in the state of Punjab on EPC mode

11/EE/PWD/FZR 37.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2022
Time 11:0Hrs
08/07/2022
Time 15:0Hrs
1039 Construction of Vehicular Underpass at km 6/600 of Ariyalur Bypass Road on NH 226 Extn (New NH 136) on Engineering, Procurement and Construction (EPC) Mode in the State of Tamil Nadu.

2022_MoRTH_688838_1 23.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
07/07/2022
Time 15:0Hrs
1040 Construction of Bridge Across Simuli Nallah (Missing Link) At Km 107.470 Of NH-220 in the State of Odisha on EPC Mode.

2022_MoRTH_690711_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 18:55Hrs
07/07/2022
Time 12:0Hrs
1041 Development of Six-Lane Access Controlled Highway from Gogwan Jalalpur (Shamli district) to Ranipur Barsi (Saharanpur district) (from Ch. -(000.600) to 45.500) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor under Bharatmala Pariyojana Phase-I in the State of Uttar Pradesh (Package-1).

NHAI/BM/EC(BL)/Shamli-Ambala/Package-1/2021 990.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
07/07/2022
Time 11:0Hrs
1042 Development of Six-Lane Access Controlled Highway from Ranipur Barsi (Saharanpur district) to Adhoya Musalmana (Ambala district) (from Ch. 45.500 to 84.400) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package-2)

NHAI/BM/EC(BL)/Shamli-Ambala/Package-2/2021 811.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2022
Time 15:0Hrs
07/07/2022
Time 11:0Hrs
1043 Elimination of identified blackspot at Km 46/020-46/810 (Arasakuzhi – TN-(02)-310) and Km 84/200 – 84/840 (Adari – TN-(02)-112) by Permanent remedial measures of NH 532 (Cuddalore – Vridhachalam – Salem road) in the State of Tamil Nadu

2022_MoRTH_689833_1 12.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 11:0Hrs
06/07/2022
Time 15:0Hrs
1044 Work of reconstruction of 2Nos of bridges across river Kosh (km 634/400-600) and Kavero (km 637/800-638/00) in lieu of old, narrow and weak bridges and reconstruction of box culverts of NH56 under NH Division Bharuch on EPC mode in the SoG

2022_MoRTH_695668_1 17.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/06/2022
Time 16:10Hrs
06/07/2022
Time 12:0Hrs
1045 Balance Work of 2/4 laning of Chappra-Hajipur Section of NH-19 From Km 143-200 to km 209-940 in state of Bihar under NHDP Phase-III

2022-NHAI-118273-1 437.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 15:0Hrs
06/07/2022
Time 11:0Hrs
1046 Improvement construction of existing class 5 Rd to NHIL specification with hard shoulder from existing km 169pt970 to km 211pt364 design ch km 166pt000 to km 203pt770 total length 37pt770km of NH 505 SUMDO KAZA GRAMPHO Rd on EPC mode in HP PKG III

2022_BRO_670783_1 222.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2022
Time 15:0Hrs
06/07/2022
Time 11:0Hrs
1047 Construction of Fly Over Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction in Coimbatore City and including Accident Prone Spot Near Bala Hospital (Km 337) & Jai Shanthi Theatre (Km 335/8 ) & Shanthi Petrol Bunk (Km 335/10) in Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nad

2022_MoRTH_680810_1 110.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 15:0Hrs
05/07/2022
Time 15:0Hrs
1048 Construction 2Lane ROB in replacement of LCNo3E/SPL3 on Gudivada Machilipatnam railway sec at Km231.7 of NH165 and LCNo52 on Vijayawada Bhimavaram railway sec at Km230.6 of NH165 inc. one time improvement of bypass Gudiwada Km228 to 233.540 in AP EPC

2022_MoRTH_685404_1 239.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 17:0Hrs
04/07/2022
Time 17:0Hrs
1049 Rehabilitation and Up-gradation of NH167B from Km. 143 320 Malakonda to 189 050 Singarayakonda on NH16 to 2L with paved shoulders in Andhra Pradesh on EPC mode 2nd Call

2022_MoRTH_690073_1 301.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/05/2022
Time 15:0Hrs
04/07/2022
Time 17:0Hrs
1050 Construction of Six Lane Standalone Flyovers at Raha Demow Borghat Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 37 (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis

2022_NHAI_112380_1 206.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
1051 RFP for Corridor efficiency improvement including removal of black spots in Lakhanpur Samba section of NH-44 from chainage Km 16 30 to Km 74 10 in UT of Jammu & Kashmir under Bharatmala Pariyojana Phase 1 on EPC Mode

NHAI/J&K/L-S/CorrEff/EPC/2022 240.990 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
1052 Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode

2022_NAHI_114130_1 25.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/04/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
1053 EXECUTION OF HILL SLOPE STABILISATION MEASURES FOR SINKING ZONE ON ROAD LGG-MUKTO - TELI BETWEEN KM 7.000 TO KM 8.000 UNDER 90 RCC/42 BRTF/PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION

CE (P) VTK/NIB-02 OF 2022-23 21.480 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2022
Time 15:0Hrs
30/06/2022
Time 15:0Hrs
1054 CONS AND UPGRAD TO NHDL SPEC FROM KM 7PT900 TO KM 18PT000 (DESIGN CHAINAGE KM 7PT900 TO KM 16PT904) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 9PT004 KM)

2022_BRO_529704_1 62.610 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2022
Time 18:0Hrs
30/06/2022
Time 12:0Hrs
1055 Improvement of RC-22 Sedarapet road from Pathukannu road junction at Ch.0/000 to Mailam road junction at Ch.10/300 of Sedarapet village in Puducherry by EPC mode, under Central Road Infrastructure Fund

2022_MoRTH_689098_1 8.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 15:0Hrs
29/06/2022
Time 15:0Hrs
1056 Periodical Renewal from Km.37/420 to 54/180 of NH45A by providing 50mm thick DBM (selected stretches) and 40mm thick Bituminous Concrete including Recycling existing pavement by cold milling and laying 40mm BC on wearing coat of bridges as per IRC 120-2015 and other road safety measures on Engineering, Procurement & Construction (EPC) Basis Contract under NH(O) Annual Renewal Programme (ARP) 2021-22 in the Union Territory of Puducherry

2022_MoRTH_689103_1 14.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 9:0Hrs
29/06/2022
Time 15:0Hrs
1057 Construction and up gradation of existing road to 2 lane with paved shoulder from existing Chainage Km 504 pt 871 to Km 509 pt 725 of NH 07 Old NH 58 on EPC mode in the state of Uttarakhand Length 4.236 Km

2022_BRO_524185_1 190.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 13:30Hrs
28/06/2022
Time 17:0Hrs
1058 Construction of ROB at Km 168.231 on NH-76 with approaches in the state of Uttar Pradesh on EPC mode.

2022_MoRTH_691688_1 38.520 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 28/05/2022
Time 15:0Hrs
28/06/2022
Time 15:0Hrs
1059 Reconstruction of Additional Two Lane Bridge across Bhavani river at Km 229/2-4 of NH 209 (in Sathyamangalam town) in the state of Tamilnadu on EPC mode

2022_MoRTH_686141_1 9.341 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
28/06/2022
Time 15:0Hrs
1060 IRQP to NH151K Porbandar Bhanvad up to Tran patiya road section between km 39.3 to 43.2 Tran patiya to Jamjodhpur Kalavad road section between km 74.1 to 83.6, km 88.6 to 103.4 and km 112.8 to 124.8 (length 40.2 km) under EPC mode in the state of Gujarat IVth Trial

692898 16.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
1061 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode Vth Trial

692899 11.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
1062 PR btn km 170.450 to 190.650 Limbdi Wadhwan road section and km 201.600 to 229.700 Surendranagar Dhrangadhra road section of NH51 Providing and laying 50mm DBM in selected stretches and 30 mm BC in full length under EPC mode IIIrd Trial

692902 13.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
1063 PR btn km 229.700 to 233.390 and km 237.590 to 255.890 Dhrangadhra Kuda road section on Nh51 Providing and laying 50mm DBM in selected stretches and 40mm BC in full length under EPC mode IIIrd Trail

692903 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
1064 Construction of new two-lane bridge over Sabarmati River near Dharoi dam on NH58 at Km 84/00 in the state of Gujarat

2022_MoRTH_687236_1 55.070 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 17:30Hrs
28/06/2022
Time 12:0Hrs
1065 Widening of existing 2 lane road to 4 lane from km. 92/320 to 115/320 (Vav chokdi, Satlasana to Vrundavan chokdi, Kheralu) of NH58 in the state of Gujarat under EPC mode

2022_MoRTH_687248_1 122.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 18:0Hrs
28/06/2022
Time 12:0Hrs
1066 Rehabilitation and Upgradation to four lane configuration & strengthening of Thanpuri to Paror section from Km 85.135 to 100.840 of NH-20 (New NH-154) (Design Length-16.275) of Pathankot Mandi under NH O in the state of Himachal Pradesh on EPC mode.

NHAI/Pathankot-Mandi/Pkg-IIC/EPC/HP/2022 373.660 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2022
Time 15:0Hrs
28/06/2022
Time 11:0Hrs
1067 Balance work of Rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane with paved shoulder configuration from KM 343.800 to 401.300 of Madhugiri- Chikkaballapura Section of NH-69 (old NH-234) excluding Gauribidanur bypass (from Km 362.400 to Km 368.400) in the state of Karnataka on EPC mode (Job No NH-69-2021-22-KNT-952 dated 31-3-2022)

RW/BNG /NH-69/km 343-401/69/2022 323.429 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
27/06/2022
Time 15:0Hrs
1068 Construction of HL Major Bridge at CH 323/957, HL Minor Bridge at CH 323/780 & RCC Box at CH 323/500 over Kolab river, near Patraput (Koraput district), on NH-326 in the state of Odisha. (Bid Ref No.-05 CE NH of 2022-23)

2022_MoRTH_687093_1 21.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 18:55Hrs
23/06/2022
Time 12:0Hrs
1069 Improvement of Road Safety through providing Metal Beam Crash Barriers, Removal of Black spot by Improvement of Junctions and Improvement of night time visibility by providing Highway Lighting from km 35/700 to 71/117 of NH-220 in the state of Odisha under Road Safety Annual Plan 2021-22. (Bid Ref No.- 03 CE NH of 2022-23)

2022_MoRTH_689824_1 7.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2022
Time 18:55Hrs
23/06/2022
Time 12:0Hrs
1070 Medium Term Maintenance works from km 124.800 to 134.690 Section Tran patiya Jamkandorana Kalavad road of NH151K in the state of Gujarat under OR DPP scheme IV Try

692895 1.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
1071 Medium Term Maintenance works on section from Km. 11.0 to 19.0 Tad to Keshariya section on NH251 in the state of Guajrat under OR DPP scheme III Try

692896 1.170 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
1072 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_694390_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
1073 Widening/Upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib to Malout road from Km.279.400 to Km 307.060 section of NH-354 in the state of Punjab on EPC mode

09/EE/ABH 129.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 16:0Hrs
23/06/2022
Time 12:0Hrs
1074 6 laning of existing 4 lane stretch from Kalkallu at km. 454.000 to Gundla Pochanpally at km 471.000 on Nagpur - Hyderabad section (Design length 17.000 km) of NH-44 in the state of Telangana under Bharatmala Pariyojana on EPC Mode.

2022_NHAI_104879_1 607.110 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2022
Time 19:0Hrs
23/06/2022
Time 11:0Hrs
1075 CONSTn OF REALIGNMENT BETWEEN PANDRASS-PASHKYUM (LENGTH 27.10 KM) ON ROAD ZOZILA KARGIL LEH (NH 1) TO 2 LANE SPECIFICATIONS DRASS REALIGNMENT (9.30 KM) KHARBOO REALIGNMENT (6.30 KM) and KARGIL ALIGNMENT (11.50 KM) UNDER PROJECT VIJAYAK (BRO) LADAKH

2022_MoRTH_677367_1 308.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 11:0Hrs
22/06/2022
Time 11:0Hrs
1076 Construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH - 730 in the state of Uttar Pradesh under EPC mode

2022_MoRTH_685838_1 100.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
21/06/2022
Time 15:0Hrs
1077 Construction of Flyover at Saravanampatty including Junction Improvements from km 168/785 - 170/200 of NH 209 (km 308/400 - 309/815 of New NH 948) covering Kalapatty road junction and Thudiyalur road junction in Coimbatore city on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_679508_1 63.023 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2022
Time 15:0Hrs
21/06/2022
Time 15:0Hrs
1078 Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj – Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode

2022-NHAI-109329-1 225.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2022
Time 18:35Hrs
21/06/2022
Time 11:0Hrs
1079 Balance Work of Four laning of Panvel - Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode

2021_NHAI_100081_ 430.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2021
Time 15:0Hrs
21/06/2022
Time 11:0Hrs
1080 Periodical Renewal works in km. 3.939 to 15.450 Chaigaon Makhan Road on NH 347B under NH Division Indore in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_684790_1 4.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 15:0Hrs
20/06/2022
Time 17:30Hrs
1081 Permanent Improvement of Black Spot (TN-(02)-635) at New Cinema junction @ Km 62/4-63/0 by Providing additional high level bridge @ Km 62/6-62/880 including widening of existing road with Centre median, Storm Water drain, CD works and Junction improvements of NH-45A (New NH 32) (Villupuram – Pondy – Nagapattinam Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_685768_1 17.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 12:0Hrs
20/06/2022
Time 15:0Hrs
1082 Construction up gradation of existing road to 2 lane with paved shoulder from existing Chainage Km 468.000 to Km 489.350 Design Chainage Km 465.150 to Km 471.500 of NH 07 Joshimath Bypass on EPC mode in the state of Uttarakhand Length 6.35 Km

2022_BRO_526474_1 202.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 15:0Hrs
18/06/2022
Time 17:0Hrs
1083 construction and upgradation f existing road to 2 lane specification with paved shoulder from exisiting chainage 468.00 to Km 489.35 Design chainage 465.150 to Km 471.500 of NH 07 including Joshimath Bys pass under Chardham Pariyojana on EPC Mode in Uttrakhand

2022_BRO_526474_1 202.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 15:0Hrs
18/06/2022
Time 15:0Hrs
1084 Widening of Existing Road to Two lane with paved shoulder from Km 0.000 to Km 32.000 Mudigubba to Puttaparthi of NH342 in the State of Andhra Pradesh through Engineering, procurement and Construction EPC basis under Annual Plan 2021 22

2022_MoRTH_685546_1 316.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 15:0Hrs
17/06/2022
Time 17:0Hrs
1085 CONS OF CUT AND COVER TUNNEL HAVING 520 MTRS LENGTH BETWEEN KM 51PT950 TO KM 52PT500 AND 400 MTRS LENGTH BETWEEN KM 52PT550 TO KM 52PT950 INCL MINOR BRIDGE ON DSDBO ROAD UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET TUNNEL LENGTH 920 MTRS)

2022_BRO_523550_1 89.840 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2022
Time 18:55Hrs
17/06/2022
Time 12:0Hrs
1086 IRQP from km 34/480 to 74/0 of NH51 under NH division Rajkot RandB department Gujarat in the state of Gujarat for the year 2021-22 Length 39.52 km

687732 49.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 18:0Hrs
16/06/2022
Time 12:0Hrs
1087 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

690277 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 20:0Hrs
16/06/2022
Time 12:0Hrs
1088 IRQP Betn. Km. 0/000 to Km. 21/500, Km. 27/900 to Km. 30/900 & 51/500 to 61/500 (Ranavav - Bhanvad - Khambhaliya Section) of Newly Declared NH-927K in the state of Gujarat.

690279 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 12:30Hrs
16/06/2022
Time 12:0Hrs
1089 Widening to 4 lane of existing road from Km 184.200 to Km 191.100 of NH 214A (NH 216) in Bapatla town in Guntur District as one time improvement proposal in the State of Andhra Pradesh on EPC mode

2022_MoRTH_685248_1 76.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/04/2022
Time 15:0Hrs
14/06/2022
Time 17:0Hrs
1090 Construction of Fly Over Including Junction Improvements @ km 348/6 – 349/8 of NH 67 (km 15/6 To 16/8 New NH 181) (Nagapattinam – Gudalur – Mysore Road) At Saibaba Colony Junction In Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_681671_1 46.616 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 10:0Hrs
14/06/2022
Time 15:0Hrs
1091 Rehabilitation and Upgradation from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa/Nellore Border section) of NH167B two lane with paved shoulders configuration in the state of Andhra Pradesh on EPC mode

2021_MoRTH_660751_1 223.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
14/06/2022
Time 15:0Hrs
1092 Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli via Paluvai Junction Rentachinthala Gurazala from Km 0 000 to 43 659 to two lane with paved shoulders in the state of Andhra Pradesh

RW/NH-12014/11/2021AP/ZoneIII 324.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 15:0Hrs
13/06/2022
Time 17:0Hrs
1093 Rehabilitation and Up-gradation from km 58/635 to 99/409 of Kadapa/Nellore Border to CS Puram (via) Seetharampuram section of NH-167B to two lane with paved shoulder configuration in the state of Andhra Pradesh on EPC mode

SENHVJA/01/2022-23 Dated. 18.04.2022 235.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 17:0Hrs
13/06/2022
Time 17:0Hrs
1094 Widening to 4 lane of missing link between NH40 and NH69 from existing chainage Km 351/460 to Km 358/260 (Design Chainage 351/460 to 358/130 (6.67 Km)) of NH40 as continuation of NH40 in the state of Andhra Pradesh under NH(O) in EPC Mode 2nd call

2022_MoRTH_686049_1 77.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
13/06/2022
Time 15:0Hrs
1095 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_690348_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2022
Time 13:0Hrs
13/06/2022
Time 12:0Hrs
1096 Rehabilitation and Upgradation of Jamkhed to Sautada Section of NH 548D

2022_MoRTH_668595_1 133.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 15:0Hrs
10/06/2022
Time 17:30Hrs
1097 Rehabilitation and Upgradation to Kopargaon to Savali Vihir Section from Km 354.00 to Km 362.663 Total Length 8.663 Km Of NH 752G to Four Lane with Paved Shoulder In the State of Maharashtra on EPC Mode. Basis Contract

2022_MoRTH_668595_1 161.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
10/06/2022
Time 17:30Hrs
1098 Improvement & Upgradation of Existing Two Lane Bypass to Six Laning from Km. 403.100 to Km. 433.000 of Hubli-Dharwad Bypass section of NH-48 in the State of Karnataka to be executed on EPC Mode

2022_NHAI_100994_1 832.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
1099 Development of Six-Lane Access Controlled Highway from Adhoya Musalmana (Ambala district) to Sadopur (Ambala district) (from Ch. 84.400 to 121.786) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package-3)

NHAI/BM/EC(BL)/Shamli-Ambala/Package-3/2021 769.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
1100 Construction of Four Lane Bypasses for Jagatpur, Babuganj, Unchahar, Alapur Bypass and Sai river bridge of Raebareli – Prayagraj section of NH-30 (Old NH-24B) under Bharatmala Pariyojna in the State of Uttar Pradesh on EPC mode

2022_NHAI_115392_1 620.500 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
1101 Work of reconstruction of 2Nos of bridges across river Kosh (km 634/400-600) and Kavero (km 637/800-638/00) in lieu of old, narrow and weak bridges and reconstruction of box culverts of NH56 under NH Division Bharuch on EPC mode in the SoG

2022_MoRTH_685882_1 17.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
09/06/2022
Time 12:0Hrs
1102 Work of Construction of New Minor Bridge in Place of Old Narrow Bridge on Kadrama Khadi between KM 280/00 to 280/200 of NH 64 in the State of Gujarat on EPC mode in the state of Gujarat for the year 2021-2022 Job No 64- GJ/2021-22/671

2022_MoRTH_685876_1 7.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
09/06/2022
Time 12:0Hrs
1103 Construction of Additional ROB’s under six laning of Delhi-Agra Section of National Highway No. 2 (New NH-19) in the State of Haryana & Uttar Pradesh between Km. 34.050 and Km. 167.190 on EPC Mode

2022_NHAI_101084_1 281.200 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 13:0Hrs
09/06/2022
Time 11:0Hrs
1104 Development of External Road Connectivity to the proposed Multimodal Logistics Park at Chennai

NHLML/MMLP/ Chennai/Ext/2022 62.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 18:55Hrs
09/06/2022
Time 11:0Hrs
1105 Construction of Flyover in km.468/500, Vehicular Underpass in km.470/00 and Overpass in km.451/300 to 451/900 including Road Safety along with avenue and median plantation from km 450/170 to km 471/330 on NH-66 Panvel Mahad Panji Road

2022_MoRTH_669763_1 73.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2022
Time 17:0Hrs
08/06/2022
Time 17:30Hrs
1106 Widening of existing 2 lane to four lane road from km. 176.50 to km. 178.00 of NH-76 under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_689538_1 5.048 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2022
Time 16:30Hrs
07/06/2022
Time 15:0Hrs
1107 Up-gradation of Daulatabad T-point to Shivoor from existing Km. 222/893 (On SH-16, Daulatabad Jn.) to Km. 64/000 (On SH-51, shivoor) (Design Km. 0.000 to Km. 4.000 (Daulatabad T-point to Maliwada) 4L & Km. 23.650 to Km. 44.900 (Devgaon Rangari to Shivoor) 2L/4L (Construction Length=25.250 Km.) NH-752H to Two lane with paved shoulders and construction EPC Mode Basis Contract)

2022_MoRTH_668958_1 156.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2021
Time 10:0Hrs
06/06/2022
Time 17:30Hrs
1108 Periodical Renewal from Km. 310.220 to Km. 323.745 of NH-730 on EPC mode in the state of Uttar Pradesh

2022_MoRTH_687335_1 7.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2022
Time 15:0Hrs
06/06/2022
Time 15:0Hrs
1109 Improvement of Riding Quality of NH 707 A From Ch 0.00 to 52.180, Ch 61.750 to 70.750, Ch 72.900 to 79.350 & Km 83.000 to 127.000 in the State of Uttrakhand Under annual plan 2020-2021 {N.H.(O)} in the state of Uttarakhand ( Under EPC mode)

2022_MoRTH_687671_1 25.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2022
Time 15:0Hrs
06/06/2022
Time 12:0Hrs
1110 Construction of four lane Bypass to Jeypore town on NH-26 including Land Acquisition in the state of Odisha on EPC Mode under Annual plan of 2021-22

2022_MoRTH_685222_1 84.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 18:55Hrs
06/06/2022
Time 12:0Hrs
1111 Periodical Renewal on Jalandhar Hoshiarpur Gagret Amb Naudan Hamirpur TauniDevi Awahdevi Sarkaghat Mandi road from km 100 0 to 114 0 and km 137 435 to 140 200 on NH 70 in the state of HP on EPC Mode

2022_MoRTH_687506_1 5.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/05/2022
Time 18:0Hrs
06/06/2022
Time 11:0Hrs
1112 Construction of 2 lane ROB at Railway crossing no.C-28A on Abohar-Fazilka Rail section at Km 39/3-4 & NH-07 at Km. 12.560 on Fazilka Border in the State of Punjab on EPC Mode (Job No.NH-07-PB-2021-22/549 dated 16.12.2021)

01/EE/NH/ABH 33.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/04/2022
Time 15:0Hrs
05/06/2022
Time 15:0Hrs
1113 Upgradation of four lane road with Cement Concrete Road Whitetopping in km 0/800 to km 2/240 Length 1.440 km and km 5/050 to km 8/500 Length 3.450 km Total Length 4.890 km on Nagpur Amravati Road of NH 53 in Nagpur City in the State of Maharashtra

2022_MoRTH_668773_1 64.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 14:30Hrs
03/06/2022
Time 17:0Hrs
1114 Widening of existing 2 LPS road to 4 L P S Bathalapalli to Mudigubba Sec from Km 97 410 to 136 410 Design Chain Km 96 300 to 129 300 including Bathalapalli Bypass From Km 97 410 to Km 103 300 De Ch Km 96 300 to 102 300 of NH 42 in the State of AP

RW/NH-12014/26/2021AP/ZoneIII 418.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
03/06/2022
Time 17:0Hrs
1115 Work of Periodic Renewal from Km. 0.000 to Km. 16.000 and from km. 22.000 to km. 28.580 of NH-334DD in the State of Uttar Pradesh under EPC mode

2022_MoRTH_684015_1 4.656 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 15:0Hrs
03/06/2022
Time 15:0Hrs
1116 4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode

2022_NHAI_102706_1 725.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 15:0Hrs
03/06/2022
Time 11:0Hrs
1117 Widening Minor Bridge at km 477/6, Reconstruction of Minor bridge at km 480/2 including Reconstruction of Slab culvert at km 474/4 of NH 67 on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_681685_1 6.094 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 10:0Hrs
02/06/2022
Time 15:0Hrs
1118 Re-Construction of Major Bridge at Km. 160.100 LHS of NH-44 (Panipat- Jalandhar section) in State of Haryana on EPC mode

2022_NAHI_113230_1 6.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2022
Time 15:0Hrs
02/06/2022
Time 15:0Hrs
1119 Construction of Bhabhua Bypass from Ch.10.800 to Ch.19.860 and Chand Bypass from Ch.38.060 to Ch.40.460 and widening of existing road to 2lane with Paved shoulder from Ch. 40.460 to Ch.46.860 of NH219 Total length16.150 Km under EPC Mode in Bihar.

2022_MoRTH_682211_1 94.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
01/06/2022
Time 17:0Hrs
1120 Providing Crash Barrier as Road Safety measures on NH-26 from km 410/000 to 434/767 km(Sunki Ghat portion) in the State of Odisha under AP-2021-22( Bid Ref No.-02 CE NH of 2022-23)”

2022_MoRTH_685766_1 5.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 18:55Hrs
01/06/2022
Time 12:0Hrs
1121 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_687366_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2022
Time 16:50Hrs
30/05/2022
Time 16:0Hrs
1122 Construction of 65 Meter Span Steel Truss Girder Bridge at Km 1 of NH-707A under Annual plan 2021-22 N.H.(O) in the state of Uttarakhand (Under EPC mode)

2022_MoRTH_686142_1 9.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
30/05/2022
Time 15:0Hrs
1123 Construction of Two lane with paved shoulder from Km. 0.000 to Km. 10.603 (UP-Bihar Border to Chandauli) of NH-219 on EPC mode in the state of Uttar Pradesh.

2021_MoRTH_665390_1 64.775 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2021
Time 18:0Hrs
30/05/2022
Time 15:0Hrs
1124 Strengthening of Existing 2-Lane 4-Lane NH-501 Khanabal-Pahalgam Road CH. 0000 To 19050 and CH. 47000 To 49500 Al-Stop to Seer and Police Station Pahalgam To Sumo Stand after Crossing Pahalgam Bridge in the UT of Jammu and Kashmir

PCD-RnB -01of 2022-23 25.693 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/04/2022
Time 15:0Hrs
28/05/2022
Time 16:0Hrs
1125 Design n Construction of Kulgam Bypass on NH-444 taking off from existing chainage Km 61.650 and rejoining at Km 73.100 of existing chainage Revised Design Chainage from Km 50.260 to Km 59.010 Old Design Chainage Km 53.600 to Km 62.350 as 2 lane without paved shoulder in the UT of Jammu n Kashmir on EPC mode

PCD-RnB-04of 2022-23 8.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 10:0Hrs
28/05/2022
Time 16:0Hrs
1126 Design and Construction of Pulwama Bypass on NH-444 taking off from existing chainage km 17.400 and rejoining at km 22.550 of existing chainage Design Chainage km 9.450 to km 14.300 as 2 lane without paved shoulder in the UT of Jammu n Kashmir on EPC mode

PCD RnB 03 of 2022-23 20.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 15:0Hrs
28/05/2022
Time 15:0Hrs
1127 Balance work for improvement to 2 lane with PS in realignment from Km 52.320 to Km 52.940 of NH81 Protection works in HL Bridges at Km 33 and Km 36 for the approach of Mahananda River and recons. of culvert in 30th km of NH81 on EPC mode in Bihar.

2022_MoRTH_682198_1 18.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
27/05/2022
Time 11:0Hrs
1128 REHABILITATION AND UP-GRADATION TO 2 LPS OF RAJEWADI TO WARANDH VILLAGE SECTION (KM. 75.100 TO 88.100) PART OF LONAND- BHOR- MAHAD - MHAPRAL - MANDANGAD - PACHRAL - AMBADAVE, NH-965 DD IN THE STATE OF MAHARASHTRA ON EPC BASIS

2022_MoRTH_668557_1 98.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 17:45Hrs
24/05/2022
Time 17:30Hrs
1129 STRENGTHENING IN KM 88/100 TO 96/700 (RAJEWADI PHATA TO VARANDH GHAT OF PUNE DISTRICT BOUNDARY) OF NH 965DD STARTING FROM ITS JUNCTION WITH NH-965DD NEAR LONAND AND CONNECTING ANDORI, SHIWAL, BHOR,ATI, MAHAD, MANDANGAD TERMINATING AT PACHRAL

2022_MoRTH_668563_1 33.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 18:0Hrs
24/05/2022
Time 17:30Hrs
1130 Construction of VOP at Kantharaja Circle at Black Spot location KA 02 106 in the stretch of Bengaluru Hoskote Mulbagal Section from Km.237.700 to Km. 318.000 of NH 75 Second Call

NIT No.01 NHAI RO BNG 11019 Tender 2022 23 Dated 22.04.2022 24.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 0:0Hrs
24/05/2022
Time 15:0Hrs
1131 VOP at Basaveshwara circle in ILKAL BYPASS CH 330.275 in Hunugund to Hospet Section of NH 13 New NH 50 in the state of Karnataka on EPC mode Second Call

NIT No.02 NHAI RO BNG 17016 Tender 2022 23 Dated 22.04.2022 32.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 0:0Hrs
24/05/2022
Time 11:0Hrs
1132 Up gradation to 2LPS/ 4 lane of NH 353E in Chimur Khadsangi Section from Km 52/700 to 60/600 (Length 6.70 KM) [ Excluding Animal Underpass and its approaches from Km 53/410 to 54/610 (Length 1.20 Km ) ] and Concrete Overlay in Chimur Town from Km 45/550 to 46/715 (L=1.165 Km) in Chandrapur District in the state of Maharashtra

2022_MoRTH_668582_1 61.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
1133 Rehabilitation/Upgradation of existing Highway to 2L PS/4 lane of Dhawali to Rajoli from Design Km.149/476 to 163/476 (existing Km.150/000 to 164/000), Pandharsala to Mohadongri from design Km.170/476 to 181/476 (existing Km.171/000 to 182/000), Ambeshivni Fata to Bodli from design Km.183/476 to 185/476 (existing Km 184/000 to 186/000) and Made Tukum to Gadchiroli from design Km 188/476 to 189/476 (existing Km 188/000 to 189/00) having length 28 km of NH 930 of Dhawali to Gadchroli road in the state of Maharashtra on EPC mode

2022_MoRTH_675653_1 270.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
1134 Rehabilitation/Upgradation of existing Highway to four lane standards in Kurkheda town from (Km 413/257 to Km 410/775), Two lane in Shankarkpur Gurnuli (KM 424/00 TO KM 431/00) section and Reconstruction of Major Bridge at CH.448/558 (Bhuti Nallah) and Ch 411/695 (Sati river bridge), Minor bridge at Ch. 411/477 and Ch. 405/800 Lendhari Bridge) of NH 543 Bramhapuri Wadsa kurkheda Korchi Deori Amgaon road on EPC mode in the State of Maharashtra

2022_MoRTH_675651_1 140.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
1135 Strengthening and Widening from Ashti to Lagam (from km 182/350 to km 199/400) section of NH 353C (i.e Sakoli Wadsa Armori Gadchiroli Ashti Alapalli Sironcha road) in Gadchiroli district in the state of Maharashtra on EPC mode (L = 17.05 km)

2022_MoRTH_668576_1 46.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
1136 Strengthening to Allapalli - Bhamragad - Laheri in km 0/00 to 18/600 Road NH 130 D ( Section from Junction 353C to Medpalli ) of Gadchiroli District in the state of Maharashtra

2022_MoRTH_668577_1 35.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
1137 CONSTRUCTION OF MAJOR BRIDGE ACROSS GUNDENUR NALLA ON ALAPALLI BHAMRAGARH TO STATE BORDER ROAD NH 130 D AT CH 84/000 IN GADCHIROLI DISTRICT IN THE STATE OF MAHARASHTRA

2022_MoRTH_668578_1 30.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 15:0Hrs
24/05/2022
Time 11:0Hrs
1138 Up-gradation to 2/4 LPS of Section Tiwatgyalpati to Malkapur village) with PQCon EPC mode in the state of Maharashtra

2022_MoRTH_669215_1 71.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
1139 Rehabilitation and Upgradation of NH 561 Sablakhed toAshti Section from and Chinchpur to Jamkhed sectionfrom to 2LPS / Four lane configuration in the state of Maharashtra on EPC mode

2022_MoRTH_669253_1 183.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
1140 Rehabilitation And Upgradation Of Parli-Dharmapuri-Pangaon-Kharolapati- Renapur Phata On NH361H in Km 52/400 to 38/200(Section Pangaon to Kharola pati , Length-14.2km) to Two lane Configuration (Rigid Pavement) in the State Maharashtra on EPC Mode.

2022_MoRTH_669262_1 69.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
1141 Periodical Renewal work from Km 23 to 53 of Sainj Luhri Aut Road on NH 305 in the State of HP on EPC Mode

2022_MoRTH_684679_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 18:0Hrs
20/05/2022
Time 11:0Hrs
1142 Road safety works in different stretches (km 18.50, km 19.20, km 19.50, km 20.50 & km 21.30) for improvement of sharp turning & narrow road bench of NH-10 (old NH-31A) including provision of Thrie Metal Beam Crash Barrier from km 18.00 to km 35.00 of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong under Road Safety Annual Plan 2021-22.

2022_MoRTH_683185_1 9.799 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/04/2022
Time 18:45Hrs
19/05/2022
Time 17:0Hrs
1143 Widening from Two lane with Paved shoulder to four lane and Strengthening from km 10/000 to 18/740 of NH 209 (New NH 83) including CD works, footpath, protective works and Drain (Total length - 8.74 km) on Engineering, Procurement and Construction (EPC) Basis contract in the State of Tamil Nadu.

2022_MoRTH_681601_1 30.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
19/05/2022
Time 15:0Hrs
1144 PR work from km 41.00 to km 47.00 & km 72.00 to km 82.40 (except black spot location Mahinagar from km 78.209 to km 79.529) including road furniture on NH- 512 in Dakshin Dinajpur district in the state of West Bengal on EPC mode (Job No. TA/512/WB/2021-22/804)

2022_MoRTH_680481_1 14.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
18/05/2022
Time 13:0Hrs
1145 Widening from Two lane with paved shoulder to four lane with paved shoulder and Strengthening in Km 0/8 – 17/6, 18/0 – 25/0, 25/500 – 27/900, 29/6 – 34/0 & Km 39/0 – 50/570 and strengthening in km 17/6 – 18/0, 25/0 – 25/5, 27/9 – 29/6, and widening from Four lane to four lane with paved shoulder and strengthening in km 34/0 – 39/0 including centre median in selected stretches, Construction of Storm water drain including Widening and Reconstruction of CD works and Additional Bridge at Km 39/8 of NH 532 (Cuddalore – Vridhachalam – Salem Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_679604_1 206.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 12:0Hrs
18/05/2022
Time 11:0Hrs
1146 Rehabilitation and Up gradation of Pathri to Selu Design Chainages from Km 41/000 to 47/900 (L-6.90 Km.) & Selu to Deogaon Phata Design Chainage from Km 63/100 to Km.68/700 (L- 5.60 Km.) of Injegaon-Sonpeth-Pathri-Selu-Deogaon Phata road NH-548B into 2 lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra

2022_MoRTH_668565_1 127.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
17/05/2022
Time 17:30Hrs
1147 Rehabilitation and Up gradation of Bhokardan to Kumbhari Fata Design Ch.(Km 13/500 to 17/00) and Rajur Jalna Design Ch. (Km.39/850 to 62/420) to 2L/4L Configuration Section of NH 753-H Starting from its juction with 753F near Sillod and connecting to Bhokardan-Hasnabad-Rajur-Bawnepangri-Jalna-Ambad and terminating at its Junction with NH-52 near Wadigodri in the state of Maharashtra on EPC Mode Length=26.07

2022_MoRTH_668558_1 255.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
17/05/2022
Time 17:30Hrs
1148 Strengthening from km 48/500 to 93/600 (excluding from km 54/400 - 55/050, km 56/750 - 57/400, km 63/025 - 63/875 and km 66/950 - 67/650) of NH 230 (New NH 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu. (Total Length - 42.250 km)

2022_MoRTH_681128_1 59.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 16:0Hrs
17/05/2022
Time 15:0Hrs
1149 Stage strengthening of road stretches from km 0.00 to km 3.50 along with provision for both side covered drain and construction of one culvert (at km 0.00) of NH-512 in the district of Malda on EPC mode during FY year 2021-22 (Job No. 512/WB/2021-22/492)

2022_MoRTH_681545_1 15.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
17/05/2022
Time 13:0Hrs
1150 Six laning along with full aaccess control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun Economic Corridor in the states of Uttar Pradesh and Uttarakhand on EPC Mode under Bharatmala Pariyojana PhaseI (Package2)

NHAI/BM/EC/Delhi-Dehradun/Saharanpur-Ganeshpur-P2/2021 495.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 19:0Hrs
17/05/2022
Time 11:0Hrs
1151 Widening from Km 0/0-0/6 and Strengthening from Km 0/0 -9/0 including Reconstruction of culverts, Widening of culverts, Construction of Drains, and Bus Lay By in Krishnagiri - Kuppam Road NH-219 (New NH-42) in the state of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2022_MoRTH_681514_1 12.935 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2022
Time 10:0Hrs
16/05/2022
Time 15:0Hrs
1152 PR to NH342 from Km 32/0 to 48/7 of NH 342 Mudigubba to Koduru road (Via) Puttaparthi in Ananthapuramu District in Andhra Pradesh on EPC Mode.

2022_MoRTH_683683_1 12.610 MoRTH Maintenance Project OTHERS 12/04/2022
Time 15:0Hrs
16/05/2022
Time 15:0Hrs
1153 Construction of Flyover at Km 936.440 in Jonnada Jn, at Km 967.180 in Undrajavaram Jn, at Km 970.370 in Tetali Jn, VUP at Km 1006.525 in Kaikaram Jn for rectification of Blackspots and Flyover at Km 910.760 ofNH-216A in Morampudi Jn in AP on EPC Mode

NHAI/BS/NH-216A/RJY/2021 135.870 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 17:0Hrs
12/05/2022
Time 11:0Hrs
1154 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand

2022_MoRTH_679959_1 188.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2022
Time 15:0Hrs
11/05/2022
Time 12:0Hrs
1155 Conversion of Partially Excavated Escape Tunnel to UniDirectional 2 Lane Tunnel Length 1.80 Km from Km 12.732 to Km 14.568 of NH 21 including construction of cross passages and approach roads on either side of the tunnel on Kiratpur to Nerchowk section of NH 21 in the State of Himachal Pradesh on EPC Mode

NHAI/Escape Tunnel to Uni Directional Tunnel/ KN/HP/2022/EPC 330.950 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 15:0Hrs
10/05/2022
Time 11:0Hrs
1156 Rehabilitation and up gradation of Kolha to Nasratpur section of NH-222 from existing Km 444/000 to 463/545 and Km 481/000 to 513/990 in the state of Maharashtra to Two lanes with paved shoulder on EPC Basis under NHDP-IV (Balance Work)

2022_MoRTH_668845_1 167.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/04/2022
Time 18:0Hrs
09/05/2022
Time 17:30Hrs
1157 Rehabilitation and Upgradation of Mudkhed to Nanded from Km 372.000 to km 388.400 to two lane with paved shoulder configurations of NH 161A on EPC mode in the state of Maharashtra

2022_MoRTH_668594_1 160.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:30Hrs
09/05/2022
Time 17:30Hrs
1158 IRQP work (2021-22) from km 120.00 to 149.000 on NH-87 Ext. (New NH-109) in the State of Uttarkhand

2022_MoRTH_680598_1 30.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 16:10Hrs
09/05/2022
Time 14:0Hrs
1159 Widening and strengthening from km 0.00 to 18.450 (Rajapur- Raipura section) of National Highway No. 731 AG in the state of Uttar Pradesh on Engineering Procurement and Construction Mode.

2022_MoRTH_680576_1 104.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 15:0Hrs
09/05/2022
Time 11:0Hrs
1160 Periodical Renewal on Nagrota Bagwan Ranital Mubaripur road Km 18 00 to 39 00 of NH 20A in the State of HP on EPC mode

2022_MoRTH_682736_1 5.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 18:0Hrs
09/05/2022
Time 11:0Hrs
1161 Strengthening of Solapur Vijapur road NH.52 Km. 0.00 to 10.00 in the state of Maharashtra on EPC Mode

2022_MoRTH_669485_1 27.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 15:0Hrs
05/05/2022
Time 17:0Hrs
1162 Periodical renewal (PR) work from km 582.00 to km 597.00 of NH-31 (New NH-l0) in Darjeeling district in the state of west Bengal on EPC mode under Annual Renewal Plan in year 2021-22 [Job No.TA/10/WB/ 2021-22/802].

2022_MoRTH_681997_1 7.890 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/04/2022
Time 17:15Hrs
05/05/2022
Time 17:0Hrs
1163 Rehabilitation and Upgradation to Two lane with paved Shoulders configuration for the work of Helwak - Patan - Karad Km - 85/000 to 88/500 , 90/000 to 97/000 & 99/700 to 102/200 ( Length 13.00 km ) and additional balance work in between chainage 102/200 to 133/417of NH 166 E in the state of Maharashtra on EPC mode

2021_MoRTH_664809_1 129.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
05/05/2022
Time 15:0Hrs
1164 Rehabilitation upgradation from 2L to 2 OR 4 L PS of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202 050 to Km 245 640 Excl Retain Stretch from Km 208270 to Km 209 970 Km 220 190 to Km 221 620 Length of 40 460 Km in the State of AP

RW/NH-12014/18/2021AP/ZoneIII 342.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
05/05/2022
Time 15:0Hrs
1165 Construction of 211.880 m Major Bridge on well foundation over River Gomti on NH-128A (Parallel to Shashtri Bridge) in Jaunpur city on Engineering , Procurement and Construction (EPC) mode in the state of UP

2022_NHAI_111835_1 22.560 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/04/2022
Time 15:0Hrs
05/05/2022
Time 12:0Hrs
1166 Construction of new MNB on Main Carriageway at km 462.087 on Old NH-01 (New NH-03) near Loharka crossing, MNB on Service Road including dismantling of old bridge, service road at RHS and concrete crash barrier with friction slab at RHS in the State of Punjab on EPC Basis

2022_NAHI_109958_1 3.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 15:0Hrs
05/05/2022
Time 11:0Hrs
1167 Widening and Strengthening from km. 15.000 to km. 58.600 (Bhadewara Dramandganj section) of NH 135C in the state of Uttar Pradesh on EPC mode.

2022_MoRTH_678804_1 168.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 15:0Hrs
04/05/2022
Time 11:0Hrs
1168 Development of 4/6 lane Mohali to Sirhind Greenfield Highway Section (Design length - 27.370 Km) under Bharatmala Pariyojana in the state of Punjab on EPC mode

2021_NHAI_91693_1 651.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2021
Time 16:0Hrs
04/05/2022
Time 11:0Hrs
1169 PR from Km 175/6 to 177/8 and from Km 184/0 to 186/0 of Kalwakurthy-Nandyal road of new NH-167K in Kurnool District, in the state of Andhra Pradesh.

2022_MoRTH_681142_1 3.340 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/03/2022
Time 15:0Hrs
30/04/2022
Time 15:0Hrs
1170 PR from Km 50/800 to 52/600 of Somayajulapalli to Dhone road of new NH 340B , in the state of Andhra Pradesh.

2022_MoRTH_681181_1 0.947 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/03/2022
Time 15:0Hrs
30/04/2022
Time 15:0Hrs
1171 Maintenance work on section from Unai to Vansda Km.629/400 to Km. 642/400 on NH-56 in the State of Gujarat.

2022_MoRTH_684381_1 1.630 MoRTH Maintenance Project OTHERS 18/04/2022
Time 18:55Hrs
28/04/2022
Time 12:0Hrs
1172 Upgradation of Dhoraji Jamkandorana Kalavad section of NH927D from design ch km0.0 to 58.115 to two lane with paved shoulder configuration in the state of Gujarat on EPC mode of contract

683021 148.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/04/2022
Time 13:30Hrs
28/04/2022
Time 12:0Hrs
1173 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode

683896 11.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 16:0Hrs
28/04/2022
Time 12:0Hrs
1174 Elimination of identified Black Spot TN-(02)-076 by permanent remedial measures at km 306/4 (Panapalayam Junction) of NH 67 (New NH 81) (Coimbatore to Chidambaram Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

TNNo20/HDO/NH/21-22/Dt.8.3.22 8.972 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2022
Time 15:0Hrs
25/04/2022
Time 15:0Hrs
1175 Strengthening on NH 22 New NH 05 on Kalka Shimla Wangtoo road from Km 208/700 to 214/00 and 223/500 to 236/00 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_678151_1 14.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2022
Time 18:0Hrs
25/04/2022
Time 11:0Hrs
1176 Work of Road Safety from Km 65.000 to 111.350 on NH 123 (507) in the state of Uttarakhand under EPC mode under Road Safety Annual Plan 2021-22

2022_MoRTH_679882_1 8.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2022
Time 15:0Hrs
23/04/2022
Time 15:0Hrs
1177 Medium Term Maintenance works on section from Km. 11.0 to 19.0 Tad to Keshariya section on NH251 in the state of Guajrat under OR DPP scheme II Try

682675 1.170 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
1178 Medium Term Maintenance works from km 124.800 to 134.690 Section Tran patiya Jamkandorana Kalavad road of NH151K in the state of Gujarat under OR DPP scheme III Try

682674 1.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
1179 IRQP to NH151K Porbandar Bhanvad up to Tran patiya road section between km 39.3 to 43.2 Tran patiya to Jamjodhpur Kalavad road section between km 74.1 to 83.6, km 88.6 to 103.4 and km 112.8 to 124.8 (length 40.2 km) under EPC mode in the state of Gujarat

682390 16.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
1180 IRQP to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0 to 21.5 and 27.9 to 30.902 and 51.5 to 61.5 total length 34.5 Km under EPC mode in the state of Gujarat

682381 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
1181 Widening from DL to Four lane from km 170/2 - 172/0 (km 308/4-306/6 of NH 948), Widening from DL to DL - PS from km 176/0 - 204/8 (km 302/6 - 273/8 of NH 948) including Strengthening in km 180/0-190/8 (298/6-287/8 of NH 948) including widening and Reconstruction of CD works of NH 209 (New NH 948) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_677084_1 57.408 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
1182 PR from km 4.7 to 48.850 of NH927D Jamnagar Kalavad road section on EPC mode

682364 14.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 9:0Hrs
21/04/2022
Time 12:0Hrs
1183 CONS AND UPGRAD TO NHDL SPEC FROM KM 14PT000 TO KM 25PT000 (DESIGN CHAINAGE KM 14PT000 TO KM 25PT000) (KM 0PT000 RECKONED AT TANGTSE) OF ROAD TANGTSE-LUKUNG UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 11PT000 KM

2022_BRO_514143_1 64.830 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 14:0Hrs
20/04/2022
Time 12:0Hrs
1184 CONS AND UPGRAD TO NHDL SPEC FROM KM 0PT000 TO KM 14PT000 (DESIGN CHAINAGE KM 0PT000 TO KM 14PT000) (KM 0PT000 RECKONED AT TANGTSE) OF ROAD TANGTSE-LUKUNG UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 14PT000 KM

2022_BRO_514010_1 77.380 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2022
Time 16:30Hrs
20/04/2022
Time 12:0Hrs
1185 Widening of existing four lane to six lane road from chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to Bijli Bamba chauraha) in the State of Uttar Pradesh under EPC mode.

2022_MoRTH_678480_1 35.596 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2022
Time 15:0Hrs
19/04/2022
Time 15:0Hrs
1186 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH953 Laskariya-Ahwa-borkhal section of NH 953 under NHDivision Bharuch in the state of Gujarat On EPC Mode Job No.TA-953-GJ-2021-22-358

2022_MoRTH_682927_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 18:55Hrs
19/04/2022
Time 12:0Hrs
1187 Periodical Renewal work in Km. 215.000 to 281.000 & Km. 285 of N.H.-76 (New N.H-35) in the State of Uttar Pradesh under EPC Mode.

2022_MoRTH_679869_1 32.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
1188 Widening of existing 2 lane to four lane road from km. 176.50 to km. 178.00 of NH-76 under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_679164_1 5.048 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
1189 Periodical Renewal work in Km. 5.360 to 22.000 of N.H.-86 (New N.H-34) in the State of Uttar Pradesh under EPC Mode on Engineering, Procurement, Construction (EPC) basis.

2022_MoRTH_678939_1 6.115 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
1190 Strengthening work from Km 37.00 to 40.450 including Junction Improvements of NH-72A ( New No. 307) in the State of Uttarakhand under NH (0) Annual Plan 2021-22 EPC mode

2022_MoRTH_679327_1 13.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 15:0Hrs
18/04/2022
Time 12:0Hrs
1191 Construction of additional two lane with paved shoulders of NH-98 (New NH 139) from existing Ch. 7.000 to Ch. 17.840 (Design Ch. 0.000 to Ch. 10.840) AIIMS (Bhusaula Golambar) to Naubatpur (Patna Ring Road) section on EPC mode in the state of Bihar

2022_MoRTH_668331_1 80.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2022
Time 15:0Hrs
18/04/2022
Time 11:0Hrs
1192 Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH-44 (old NH-03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.

2021_NHAI_91906_1 237.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
18/04/2022
Time 11:0Hrs
1193 IImprovement and Up-gradation of Existing Road to 2/4–lane with Paved Shoulder from Km 40.000 to 88.750, start of Khutar bypass to start of Shahjahanpur bypass of NH 731 (PKG-1) in the state of Uttar Pradesh

NHAI/11013/Bareilly/Pkg.-I/E-115669 548.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 15:0Hrs
12/04/2022
Time 11:0Hrs
1194 Widening and Strengthing of existing carriageway from Km 265/200 to km 266/200 and from km 273/00 to km 287/905 on NH- 56 under NH division Vadodara in the state of Gujarat for the year 2021-22. 15.905 km Job. No. 56-GJ-2021-22-658

2022_MoRTH_671564_1 29.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2022
Time 19:7Hrs
11/04/2022
Time 11:0Hrs
1195 Improvement of road safety on Kalka Shimla Wangtoo road NH 22 New NH 05 Km 156/507 to 236/00 SH Providing and fixing Thrie Beam Metal Crash Barriers road marking sign boards and road delineators and C/O of R/wall and B/wall in the State of HP.

2022_MoRTH_673752_1 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2022
Time 18:0Hrs
07/04/2022
Time 11:0Hrs
1196 Periodical Renewal work from Km 254 0 to 269 0 of Kalka Shimla Wangtoo Road on NH 22 New NH 05 in the State of HP on EPC Mode

2022_MoRTH_677476_1 4.806 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2022
Time 18:0Hrs
07/04/2022
Time 11:0Hrs
1197 Construction of 6-Lane ROB at Km. 314.630 over Existing NH-24 of Bareilly-Sitapur section on EPC basis in the state of Uttar Pradesh for proposed private railway siding of KFL

NHAI/11013/NH-24/ROB/KRIBHCO/2021/E-84195 51.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 15:0Hrs
07/04/2022
Time 11:0Hrs
1198 Periodical Renewal of Chakki Banikhet Chamba Bharmour Road NH-154A from Km. 39 0 to 65 0 and km 76 0 to 84 0 in the State of HP

2022_MoRTH_677222_1 10.550 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/03/2022
Time 15:0Hrs
05/04/2022
Time 15:0Hrs
1199 Construction of 4 lane with paved shoulders Thiruvaiyaru Bypass in between existing Km.55/926 to 62/680 in NH 226Extn. (New NH 136) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673595_1 150.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 18:0Hrs
05/04/2022
Time 15:0Hrs
1200 Widening from two lane to four lane with paved shoulder in km 60/650-73/2 and strengthening in km 60/650 - 61/8, 62/8-63/4, 65/2-67/2, 67/6-70/0, 71/2-71/450 and 71/750 – 73/2 and only wearing course at km.61/8-62/8, 63/4-65/2, 67/2-67/6, 70/0-71/2 including widening of minor bridges, construction of additional bridge at km.64/2, widening and reconstruction of culverts, construction of retaining walls and drain in built up areas in Musiri - Namakkal road (NH 381B) in the State of Tamil Nadu on EPC Mode

2022_MoRTH_669834_1 85.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 10:0Hrs
05/04/2022
Time 15:0Hrs
1201 Periodical Renewal on Nagrota Bagwan Ranital Mubaripur road Km 18 00 to 39 00 of NH 20A in the State of HP on EPC mode

2022_MoRTH_677227_1 5.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/03/2022
Time 18:0Hrs
05/04/2022
Time 11:0Hrs
1202 Widening from two lane to two lane with paved shoulder from km 34/000 to 49/000 and two lane to four lane with paved shoulder from km 49/000 - 60/650 with Strengthening in km 34/000 - 45/000, 46/000 - 56/000 and km 58/000 - 60/650 including Construction of Retaining wall, Culverts, Minor Bridge, Drains and Bus Lay bay in Musiri - Namakkal Road (NH 381B) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673515_1 145.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 15:0Hrs
04/04/2022
Time 15:0Hrs
1203 Elimination of identified Black spots TN-(02)-492, TN-(02)-491, TN-(02)-609, TN-(02)-490, by permanent Remedial Measures at km 55/075 (Thimmarasanaickanur Junction), km 58/225 (Subbulapuram Junction), km 59/875 (Aundipatti Check post), km 62/200 (Sakkampatti Ramar Tea Stall) of NH 49 Extn (New NH No 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673556_1 13.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 16:0Hrs
04/04/2022
Time 15:0Hrs
1204 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_678246_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
1205 Medium Term Maintenance work between Km. 69/900 to 94/600 of NH 953 (Gulkand- Shamgahan Section) in the State of Gujarat under OR (DPP) Scheme

2022_MoRTH_678252_1 5.470 MoRTH Normal Highway Project OTHERS 10/03/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
1206 Construction of four lane ROB and its approaches in lieu of existing Level Crossing No. RV-168 (Presently RV-172) at Km 176 on NH-201 (New NH-26) at Kesinga including land acquisition under NH(O) in Annual Plan 2021-22. (Bid Ref No.- 10 CE NH of 2021-22)

2021_MoRTH_668265_1 225.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
1207 Periodical Renewal Link Roads connecting NH-544E to 544E from Km 2.150 to 7.650 (Chilamathur village limits), Km. 10.200 to Km 12.100 (Demakethapalli village limits) and Km 47.200 to 50.000 (Kallumarri village limits) of Madakasira – Sira Road, in the stae of Andhra Pradesh on EPC mode

2022_MoRTH_674189_1 5.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
1208 PR to road from Km 39/0 to 40/2 and 42/3 to 52/0 of Renigunta Kadapa road NH716, in the state of Andhra Pradesh on EPC Mode

2022_MoRTH_674021_1 7.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
1209 PR from Km 545/150 to 563/400 of NH67 of Hubli Krishnapatnam road, in the state of Andhra Pradesh on EPC Mode

2022_MoRTH_674032_1 15.520 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
1210 “PR from Km 246/6 to 262/2 and from Km 263/0 to 268/7 of Hyderabad - Srisailam - Tokkapalli road of NH-765 in Prakasam District, in the state of Andhra Pradesh on EPC mode”

2022_MoRTH_674067_1 15.500 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
1211 Periodic Renewal from km. 18/100 to km 19/800, km. 25/800 to km 44/300,km 44/700 to km 49/300 of NH 64(Aslali Bareja Matar Section) under NH Division Vadodara in the State of Gujarat

2022_MoRTH_672990_1 9.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/02/2022
Time 15:50Hrs
31/03/2022
Time 11:0Hrs
1212 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_678235_1 5.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2022
Time 18:55Hrs
30/03/2022
Time 12:0Hrs
1213 CONS AND UPGRAD TO NHSL SPEC FROM KM 29PT000 TO KM 60PT652 KM 60PT652 RECKONED AT SALSA LA PASS OF ROAD HANLE CHUMAR UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 25PT900 KM

2022_BRO_507681_1 241.320 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2022
Time 16:0Hrs
29/03/2022
Time 12:0Hrs
1214 Periodical Renewal work from Km.88 to Km 104(400) (Ch 87.000 to 103.400) of NH-91A in Uttar Pradesh under EPC mode

2022_MoRTH_678490_1 10.056 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/03/2022
Time 11:0Hrs
25/03/2022
Time 11:0Hrs
1215 Construction of Rail Over Bridge in Lieu of Railway Crosssing No. E.2 on Ferozepur Fazilka Rail section at Km 2 by 4 dash 5 and On NH.95 New NH.05 section Ferozepur to Indo Pak Border at Km 205.320 Near Ferozepur city and village madhre in the state

2021_MoRTH_664501_1 37.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2021
Time 15:0Hrs
24/03/2022
Time 15:0Hrs
1216 Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh

2021_MoRTH_661578_1 351.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2021
Time 15:0Hrs
23/03/2022
Time 11:0Hrs
1217 Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610 (Des. Ch. 0.00 to 54.048) of NH-124D on EPC mode in the state of Uttar Pradesh.

2021_MoRTH_665628_1 392.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2021
Time 15:0Hrs
22/03/2022
Time 17:0Hrs
1218 Improvement of Stretches Junctions and Providing Road Safety measures on NH 503 Extn at following locations i Pakka Paroh Km 2 900 to 3 700 ii Baduhi near Dussara Km 13 750 to 14 150 ii Kuthiyari Km 4908 to 6 677 iv Diara Km 14 150 to 15 665 and v Basal Km 25 900 to 27 450 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_671656_1 4.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2022
Time 18:0Hrs
18/03/2022
Time 11:0Hrs
1219 Widening to Four lane in km 309/600-313/850, 315/0-318/300 & Km 331/0 – 332/2 (Palladam –Karanampettai – Chinthamanipudur – L&T Bypass stretch) of NH 67 in the State of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2022_MoRTH_669836_1 38.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2022
Time 15:0Hrs
17/03/2022
Time 15:0Hrs
1220 Widening from Two Lane to Four Lane and Improvements of the stretch from Km 370/5 - 373/400 and 374/2 - 375/0 of Old NH 67 (Km 37/500 - 40/400 and 41/2 - 42/0 of New NH 181) in the State of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2022_MoRTH_669837_1 28.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2022
Time 10:0Hrs
17/03/2022
Time 15:0Hrs
1221 Widening to Two Lane with paved shoulders from Km 456/0 – 463/0 & Km 466/0 - 466/4 and Strengthening from Km 456/0 – 472/0 of NH-67 (New No 181) including widening of minor Bridge at Km 458/8 & Construction of CD works and Protective works in the State of Tamil Nadu

2022_MoRTH_669838_1 75.884 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2022
Time 10:0Hrs
17/03/2022
Time 15:0Hrs
1222 4 laning of Tirupati-Tiruthani-Chennai Section of NH-205 from Km. 274.800 to Km 341.600 in the State of Andhra Pradesh and from Km. 0.000 to Km. 59.600 in the State of Tamil Nadu on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis

NHAI/11040/TTC/Balance/EPC/2022 364.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2022
Time 18:5Hrs
16/03/2022
Time 11:0Hrs
1223 Construction o 1 ROB and 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 in the State of Uttar Pradesh (approx.3.800 km)

2021_MoRTH_665628_1 257.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2021
Time 15:0Hrs
15/03/2022
Time 17:0Hrs
1224 Strengthening work from Chainage Km 232.000 to Km. 274.470 on NH-119 (New 534) under NH(O) 2021-22 in the state of Uttarakhand on EPC mode

2022_MoRTH_667318_1 230.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 17:0Hrs
15/03/2022
Time 12:0Hrs
1225 Widening to 4 lane of missing link between NH-40 and NH-69 from Chainage Km.351/460 to Km.358/260 of NH-40 in the state of Andhra Pradesh under NH(O) for the year 2021 - 22 on EPC mode

2021_MoRTH_660466_1 77.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
11/03/2022
Time 15:0Hrs
1226 Medium Term Maintenance works from km 124.800 to 134.690 Section Tran patiya Jamkandorana Kalavad road of NH151K in the state of Gujarat under OR DPP scheme

670296 1.680 MoRTH Normal Highway Project OTHERS 27/01/2022
Time 15:0Hrs
11/03/2022
Time 12:0Hrs
1227 Medium Term Maintenance works on section from Km. 11.0 to 19.0 Tad to Keshariya section on NH251 in the state of Guajrat under OR DPP scheme

670301 1.170 MoRTH Maintenance Project OTHERS 27/01/2022
Time 9:0Hrs
11/03/2022
Time 12:0Hrs
1228 Widening to Six Lane of Existing Four lane Jetpur Gondal Rajkot Section from Km 117 600 to Km 185 00 on National Highway No 27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana

NHAI/Jetpur-Gondal-Rajkot/6lane/2021 1,580.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2022
Time 17:0Hrs
10/03/2022
Time 17:0Hrs
1229 I.R.Q.P. work from Km. 0.000 to 7.000 and Km 52.000 to Km 68.700 of NH-309A in the state of Uttarakhand under Annual Plan 2021-22 under NH division Lohaghat. for the year 2021-22

2022_MoRTH_666375_1 24.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2022
Time 15:10Hrs
10/03/2022
Time 14:0Hrs
1230 PR from km 4.7 to 48.850 of NH927D Jamnagar Kalavad road section on EPC mode

667867 14.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 12:0Hrs
10/03/2022
Time 12:0Hrs
1231 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode

667855 11.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 12:0Hrs
10/03/2022
Time 12:0Hrs
1232 PR btn km 229.700 to 233.390 and km 237.590 to 255.890 Dhrangadhra Kuda road section on Nh51 Providing and laying 50mm DBM in selected stretches and 40mm BC in full length under EPC mode

667864 9.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 12:0Hrs
10/03/2022
Time 12:0Hrs
1233 PR btn km 170.450 to 190.650 Limbdi Wadhwan road section and km 201.600 to 229.700 Surendranagar Dhrangadhra road section of NH51 Providing and laying 50mm DBM in selected stretches and 30 mm BC in full length under EPC mode

667858 13.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 12:0Hrs
10/03/2022
Time 12:0Hrs
1234 Upgradation of Dhoraji Jamkandorana Kalavad section of NH927D from design ch km0.0 to 58.115 to two lane with paved shoulder configuration in the state of Gujarat on EPC mode of contract

666969 148.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 12:40Hrs
10/03/2022
Time 12:0Hrs
1235 IRQP to Nh351G Nageshri Khambha road section between km 0.0 to 28.2 under EPC mode in the state of Gujarat

668035 13.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 20:0Hrs
10/03/2022
Time 12:0Hrs
1236 IRQP to NH351K Bagasara Khambha Una road section between km 65.0 to 77.9 under EPC mode in the state of Gujarat

668080 5.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 20:0Hrs
10/03/2022
Time 12:0Hrs
1237 IRQP to NH927K Ranavav Bhanvad Khambhaliya road section between km 0.0 to 21.5, km 27.9 to 30.902 and km 51.5 to 61.5 (length 34.5 Km) under EPC mode in the state of Gujarat

668085 18.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 20:0Hrs
10/03/2022
Time 12:0Hrs
1238 IRQP to NH151K Porbandar Bhanvad up to Tran patiya road section between km 39.3 to 43.2 Tran patiya to Jamjodhpur Kalavad road section between km 74.1 to 83.6, km 88.6 to 103.4 and km 112.8 to 124.8 (length 40.2 km) under EPC mode in the state of Gujarat

668086 16.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2022
Time 20:0Hrs
10/03/2022
Time 12:0Hrs
1239 Construction of Elevated Corridor in Ranchi city from km 0.00 to km 3.570 of NH-75 including down ramp on NH-23 from km 0.000 to km 0.610 in the State of Jharkhand on EPC mode

2021_NHAI_97552_1 430.710 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 15:0Hrs
09/03/2022
Time 11:0Hrs
1240 Construction of 4 lane Elevated viaduct at Km 7 030 to 8 890 including construction of 4 Lane flyover from Km 7 080 to 8 890 (Munshipulia Chouraha) including RE Wall, Retaining wall and approaches on NH-24 A

2021_MoRTH_660562_1 149.047 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2021
Time 15:0Hrs
08/03/2022
Time 17:0Hrs
1241 Four Laning of Thirumangalam-Vadugapatti Section of NH-744 (Old NH-208) (Package-I) from Km 0.000 to Km 36.000 in the State of Tamil Nadu on EPC mode

2021_NHAI_97979_1 745.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2021
Time 15:0Hrs
08/03/2022
Time 15:0Hrs
1242 Re-construction/Strengthening from from km 401.00 (Nalhati) to km 422.450 (Moregram) of NH-60 (new NH-14) except Ghambhira bridge (km 420.479 to km 420.634 – 155 m) along with permanent rectification of 7 black spots in the districts of Birbhum and Murshidabad in the State of West Bengal under Annual Plan 2021-22 on EPC mode

2021_MoRTH_666236_1 91.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 18:0Hrs
08/03/2022
Time 13:0Hrs
1243 Four Laning of Vadugapatti-Therkuvenganallur Section of NH-744 (Old NH-208) (Package-2) from Km.36.000 to Km.71.600 in the State of Tamil Nadu on EPC mode

2021_NHAI_97984_1 854.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2021
Time 18:30Hrs
08/03/2022
Time 11:0Hrs
1244 Construction of 2 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar Stage 1 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.

2021_NHAI_91851_1 217.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
08/03/2022
Time 11:0Hrs
1245 Additional Works on Six Lane Jaipur Kishangarh Ajmer Beawar section of NH 48 NH 448 and NH-58 (Old NH-8) in the states of Rajasthan on EPC Mode

2021_NHAI_83755_1 232.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:0Hrs
08/03/2022
Time 11:0Hrs
1246 Short term maintenance under OR (DPP) work over the damage surface in stretches between 3.5 km to 19.00 of NH-512 under Balurghat N.H. Sub-Division of N.H.Division No.VII in the district of Dakshin Dinajpur in the state of West Bengal during the year 2021-22

2022_MoRTH_671791_1 0.690 MoRTH Maintenance Project OTHERS 16/02/2022
Time 19:0Hrs
07/03/2022
Time 13:0Hrs
1247 Construction of New Four Lane of Sundarnagar Bypass from Existing Km. 173.900 to Km. 179.600 of NH 21(Design Chainage Km. 0.000 to Km. 6.680) in the State of Himachal Pradesh on EPC Mode

NHAI/HP/Sundernagarbypass/2022 156.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2022
Time 15:0Hrs
07/03/2022
Time 11:0Hrs
1248 Stage Strengthening from km 34 to km 56 km 64 to km 80 and km 94.5 to km 98 including reconstruction of 600 m in selected stretches and rectification of 22 identified black spots on NH-117 and IMS from km 22.76 to km 137.684 in the dist. of South 24 Pgs WB on EPC mode. Job No. 117-WB-2021-22-486

2021_MoRTH_665166_1 53.828 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2021
Time 18:0Hrs
07/03/2022
Time 11:0Hrs
1249 Stage Strengthening from km 98 to km 111.710 including reconstruction of 500 m in selected stretches including rectification of one identified black spot at Sima Bandh WB-02-564 on NH-117 in the district of South 24 Parganas West Bengal on EPC mode. Job No. 117-WB-2021-22-487

2021_MoRTH_665796_1 15.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2021
Time 18:0Hrs
07/03/2022
Time 11:0Hrs
1250 Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode

NHAI/Raj/2021/GKJ/ Structure 276.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
07/03/2022
Time 11:0Hrs
1251 Medium Term Maintenance work between Km. 69/900 to 94/600 of NH 953 (Gulkand- Shamgahan Section) in the State of Gujarat under OR (DPP) Scheme

2022_MoRTH_672524_1 5.470 MoRTH Normal Highway Project OTHERS 08/02/2022
Time 15:0Hrs
04/03/2022
Time 15:0Hrs
1252 Permanent Improvement of the Black Spot ID TN-(02)-680 (Alpet Junction) at Km 59/200-59/600 and 60/100-60/800 and Black Spot ID TN-(02)-457 (Manjukuppam Clock Tower Junction) at Km 60/800-60/900 by providing widening the existing two lane

2021_MoRTH_665935_1 7.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 17:0Hrs
04/03/2022
Time 11:0Hrs
1253 4- laning of Indore to Raghav Garh section of NH 59 (Indore-Harda package 1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design Length = 26.653 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor) in the state of Madhya Pradeshv on EPC Mode.

2022_NHAI_102090_1 507.990 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2022
Time 15:0Hrs
03/03/2022
Time 15:0Hrs
1254 Maintenance work on section from Unai to Vansda Km.629/400 to Km. 642/400 on NH-56 in the State of Gujarat.

2022_MoRTH_674030_1 1.630 MoRTH Maintenance Project OTHERS 16/02/2022
Time 15:15Hrs
03/03/2022
Time 12:0Hrs
1255 Four Lanning of Ratapani Stretch from Km. 8.300 to Km. 20.680 (length 12.380 Km.) of Obedullaganj – Itarsi section of NH-46 (Old NH-69) in the state of Madhya Pradesh on EPC Mode.

2022_NHAI_102063_1 315.530 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2022
Time 18:10Hrs
03/03/2022
Time 11:0Hrs
1256 Construction of Major Bridge at Km 12.865 on Shillong bypass connecting NH40 and NH44 in the State of Meghalaya on EPC Mode

2022_NHAI_100512_1 9.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 15:0Hrs
02/03/2022
Time 11:0Hrs
1257 Periodic Renewal from Km. 426/500 to Km. 447/910 of NH-68 under NH Division Ahmedabad in the State of Gujarat for the year 2021-22 (21.41 Km.) (Job No. TA-68/GJ/ 2021-22/360)

670522 5.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/01/2022
Time 20:0Hrs
28/02/2022
Time 12:0Hrs
1258 Periodic Renewal from Km. 475/850 to Km. 477/500 and Km. 569/600 to Km. 581/500 of NH-68 under NH Division Ahmedabad in the State of Gujarat for the year 2021-22 (16.55 Km.) (Job No. TA-68/GJ/2021-22/361)

670525 5.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/01/2022
Time 20:0Hrs
28/02/2022
Time 12:0Hrs
1259 Construction of STRR (West side)-NH948A-Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144.170 to km 179.936 in the state of Tamil Nadu on Hybrid Annuity Mode under Bharatmala Pariyojana.

2021_NHAI_98154_1 1,116.190 NHAI Normal Highway Project HAM 03/12/2021
Time 15:0Hrs
24/02/2022
Time 15:0Hrs
1260 Strengthening in km 90/000 - 96/000 (except from km 90/000 to 90/275, km 92/400 to 93/000 and 93/069 to 93/920) of NH 49 Extn (Madurai - Cochin Road) (New NH - 85) including rectification of Black Spot ID No. TN - 02 - 651 (km 91/200, Salaikaliyamman Kovil), ID No. TN - 02 - 652 (Km 92/000, Bojan Park), ID No. TN - 02 -720 (Km 92/400, Kattabomman Statue) and ID No. TN - 02 - 722, (Km 95/400, C.P.A College) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_667276_1 7.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
24/02/2022
Time 15:0Hrs
1261 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_673260_1 5.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2022
Time 16:15Hrs
24/02/2022
Time 12:0Hrs
1262 CONSTRUCTION OF 4 LANE REALIGNMENT OF OLD NH 207 (NEW NH 648) FROM TN KA BORDER (CH 0 000) TO HOSKOTE (CH 20 900) UNDER BHARATMALA PARIYOJANA AS A PART OF BANGALORE RING ROAD IN THE STATE KARNATAKA

2021_NHAI_98783_1 530.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2021
Time 15:0Hrs
24/02/2022
Time 11:0Hrs
1263 Permanent remedial measures (Widening to four lane and Strengthening of existing carriage way) to eliminate 7 black spots located in between km 0/400 - 10/000 of NH 209 (New NH 83)- (TN-(02)-547 at Km 1/120 (Ramayanpatty), TN(02) 648 at km 3/600 (Palamrajakkapatty), TN (02)-700 at km 5/790 (Edaiyapatty), TN (02)-345, at Km 6/440 (Muthanampatty), TN (02)-649 at km 7/325 (PSNA College), TN (02)-650 at km 8/270 (Kathirayankulam) and TN (02)-548 at Km 9/270 (Mangarai Pirivu) (Total length - 9.60km) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_667071_1 49.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 16:0Hrs
22/02/2022
Time 15:0Hrs
1264 Strengthening of selected stretches (18.80 km) to the road from Km 0/0 to 40/2 of Puttur – Uthkottai road NH-716A in the state of Andhra Pradesh on EPC Mode

2021_MoRTH_660773_1 39.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
22/02/2022
Time 15:0Hrs
1265 Construction of 2 lane ROB with approaches in lieu of existing LC No.119 at Km 226/80 of NH205 (New NH71) under setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC Mode

2021_MoRTH_660539_1 45.240 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
22/02/2022
Time 15:0Hrs
1266 Widening to two lane with paved shoulders including strengthening of existing 2 lane and 4 lane stretches of bypassed stretches of NH544E of Hindupur and Parigi towns from Chainage 21.640 to 41.680 under one time improvement in the state of AP

2021_MoRTH_660334_1 88.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
22/02/2022
Time 15:0Hrs
1267 “Construction of proposed 2-lane ROB and its approaches in lieu of existing Level Crossing No.120 is at Km.56.700 of NH-18 (New NH-40)under Setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC MODE. ”

2021_MoRTH_662376_1 44.000 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 10/12/2021
Time 15:0Hrs
22/02/2022
Time 15:0Hrs
1268 Periodical renewal of existing road from km 171.350 to km 177.800 180.800 to 186.600 189.200 to 189.450 190.00 to 190.250 190.250 to 201.500 of NH 354A under National Highways Division No1 PWD B&R Amritsar in the state of Punjab for the year 2021 2022 24.00KM

2021_MoRTH_661925_1 702.870 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/12/2021
Time 15:0Hrs
22/02/2022
Time 13:0Hrs
1269 Periodic Renewal of road from km 1 to 95 and km 100 to 128.18 of NH-347B under NH division Indore in the state of Madhya Pradesh for the year 2021-22(Total Length 124.180 Km on Betul (Khedi) Ashapur road section in the state of Madhya Pradesh on EPC

2022_MoRTH_668912_1 29.990 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/01/2022
Time 17:30Hrs
21/02/2022
Time 17:30Hrs
1270 STRENGTHENING OF EXISTING ROAD AND WIDENING TO INTERMEDIATE LANE CONFIGURATION FROM KM 468.300 HELONG TO KM 480.950 JOSHIMATH OF NH58 NEW NH07 UNDER PROJECT SHIVALIK BORDER ROAD ORGANIZATION IN THE STATE OF UTTARAKHAND FOR THE YEAR 2021 22

2021_BRO_498388_1 87.520 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2021
Time 15:0Hrs
21/02/2022
Time 17:0Hrs
1271 Construction of bypass to Mozari town on NH-53 (Old NH-6) Taluka-Tiwasa, Dist. Amravati (Existing km. 118.700 to km. 124.400) (Design km. 0.000 to km. 6.100) in the State of Maharashtra on EPC mode

2021_NHAI_97702_1 83.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2021
Time 13:30Hrs
21/02/2022
Time 11:0Hrs
1272 Rehabilitation and Upgradation of Nasrullaganj-Rehti-Budhni Section of NH-146-B, total design length 47.300 Km from Km 0/150 to Km 50/500 to 2-lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2022_MoRTH_667622_1 197.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2022
Time 15:0Hrs
18/02/2022
Time 17:30Hrs
1273 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_671557_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2022
Time 18:55Hrs
18/02/2022
Time 12:0Hrs
1274 Elimination of identified blackspots TN - (02)-418, TN-(02)-286, TN-(02)-285, TN-(02)484, TN-(02)-485 by permanent remedial measures at km 39/200 - 39/900 (Chatrapatti periyapalam) km 43/400 - 44/100 (Mookambikai Kovil near), Km 60/100 - 60/600 (Vandivaikkal), km 62/800 - 63/800(Pethanayakkanpatti), km 68/000 - 68/800 (sukkamanayakkanpatti) of NH 209 (New NH No.83) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu

2021_MoRTH_664519_1 13.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2021
Time 17:0Hrs
17/02/2022
Time 15:0Hrs
1275 Work of Periodic Renewal from Km. 0.000 to Km. 16.000 and from km. 22.000 to km. 28.580 of NH-334DD on EPC mode in the State of Uttar Pradesh

2021_MoRTH_666037_1 10.567 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2021
Time 15:0Hrs
17/02/2022
Time 15:0Hrs
1276 Widening from Km 0/0-0/6 and Strengthening from Km 0/0 -9/0 including Reconstruction of culverts, Widening of culverts, Construction of Drains, and Bus Lay By in Krishnagiri - Kuppam Road NH-219 (New NH-42) in the state of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2021_MoRTH_663252_1 12.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2021
Time 10:0Hrs
17/02/2022
Time 15:0Hrs
1277 Strengthening and improvement of road including road safety items from Km 334/00 to Km 337/140 on NH-05 22 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_666658_1 4.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 18:0Hrs
17/02/2022
Time 11:0Hrs
1278 Strengthening on NH-22 New NH-05 on Kalka- Shimla-Wangtoo road from Km 208/700 to 214/00 and 223/500 to 236/00 including IMS Incidental Management System from km 174/00 to 236/00 of NH-22 New NH-05 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_666670_1 18.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 18:0Hrs
17/02/2022
Time 11:0Hrs
1279 Construction of Twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No. KA-38 Rly Km. 165-21-165-23 between Chondrakona Road and Garbeta Stations in Kadamdiha at km 159.448 of NH-60 in the state of West Bengal. Job No.NH-60-WB-3-15-16-025-SandR-B.

2021_MoRTH_639625_1 81.175 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2021
Time 18:0Hrs
17/02/2022
Time 11:0Hrs
1280 Strengthening in Km 120/484 – 156/984 & Km 169/484 – 185/550 of NH-49 (New NH-87) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_663336_1 53.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2021
Time 18:15Hrs
16/02/2022
Time 15:0Hrs
1281 Construction of Two lane with Paved Shoulder/Four laning of Harda-Betul section of NH-47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 81.000 (length-51.000 km) (Harda - Betul Pkg-II) in the state of Madhya Pradesh on EPC Mode

2021_NHAI_99527_1 392.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2021
Time 15:0Hrs
15/02/2022
Time 11:0Hrs
1282 Permanent rectification measures for identified blackspot (ID No TN - (02) - 278) at km 244/700 - 245/800 (Koonampatti privu) of NH 67 (New NH No.81) (Nagapattinam - Guddalore - Mysore Road) on (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_664050_1 4.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2021
Time 15:0Hrs
14/02/2022
Time 15:0Hrs
1283 Maintenance work on section from Unai to Vansda Km.629/400 to Km. 642/400 on NH-56 in the State of Gujarat.

2022_MoRTH_670768_1 1.630 MoRTH Maintenance Project OTHERS 29/01/2022
Time 18:30Hrs
14/02/2022
Time 12:0Hrs
1284 Construction 4 lane ROB in Lieu of LC no. 9 between Piska More to Palma Section at Km.14.370 of NH-23 on EPC mode in the State of Jharkhand

2021_NHAI_97618_1 47.230 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 11:0Hrs
14/02/2022
Time 11:0Hrs
1285 Construction of Four Lane Access Controlled Greenfield NH from Amas (on NH-02) (Ch 00-000) to village Shivrampur (Ch 55-002) at (NH-119D) under BMP in Bihar (Amas-Darbhanga package-I of 55-002 km) on HAM

2021-NHAI-96059-1 996.700 NHAI Special Project HAM 25/11/2021
Time 16:0Hrs
10/02/2022
Time 17:0Hrs
1286 Construction of Four Lane Access Controlled Construction of Four lane access controlled Greenfield NH from Shivrampur (Ch 55-002 Km) to Ramnagar (Ch 109-324 km), at NH-119D under BMP in Bihar- (Amas Darbhanga PKG-II of 54-322Km) on HAM

2021-NHAI-96050-1 1,004.980 NHAI Special Project HAM 25/11/2021
Time 16:0Hrs
10/02/2022
Time 17:0Hrs
1287 Development of section of Four Laning of Najibabad Bypass of NH-119 from Km 105.423 to Km. 118.373 (excluding 2.45 Km. of NH-74 bypass), (Total Project Length = 10.764 Km.) on EPC Mode in the State of Uttar Pradesh.

NHAI/11013/Najibabas Bypass/UP/10165 294.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2021
Time 15:0Hrs
10/02/2022
Time 15:0Hrs
1288 Construction of four lane ROB and its approaches in lieu of existing Level Crossing No. RV-71 at Km 435 on NH-217 (New NH-353) at Khariar including land acquisition under NH(O) in Annual Plan 2021-22 for the state of Odisha(Bid Ref No.- 09 CE NH of 2021-22).

2021_MoRTH_663981_1 99.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2021
Time 18:55Hrs
10/02/2022
Time 12:0Hrs
1289 Improvements from Km 91/8 - 93/7, 95/0 - 96/0, 96/8 - 97/2, 97/7 - 98/568, 99/798 - 100/0, 114/0 - 119/560, 120/0 - 130/0, 131/0 - 132/0, 136/8 - 137/0, 139/0 - 141/6 & 143/2 - 153/0 including Junction and curve Improvement, CD works and protective works of Kollam - Thirumangalam road NH-208 (New No. 744) on Engineering, Procurement & Construction (EPC) Basis Contract.

2021_MoRTH_657191_1 48.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 18:0Hrs
10/02/2022
Time 11:0Hrs
1290 Widening to two lane with paved shoulders in km 212/4 - 222/0 & Strengthening in km 211/4 - 212/4 Reconstruction of Minor bridge at km 212/8 and construction of Minor bridge at km 213/10 of NH 209 (New NH-948) in the state of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2021_MoRTH_663216_1 19.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2021
Time 10:0Hrs
09/02/2022
Time 15:0Hrs
1291 Strengthening from km 237/0 - 256/0 of NH 209 including widening of minor bridge at km 243/2 and km 244/8 and Construction of CD works and Protective works (Dindigul - Bangalore road) (New NH 948) in the state of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2021_MoRTH_663232_1 19.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2021
Time 10:0Hrs
09/02/2022
Time 15:0Hrs
1292 Providing New Jersey Type Crash barrier along with Anti Glare Screen on in place of Median on NH 503Ext in km 28 450 to 31 00 35 00 to 43 300 4 lane portion excluding Municipal Committee area in the State of Himachal Pradesh on EPC mode

2021_MoRTH_664272_1 5.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2021
Time 18:0Hrs
09/02/2022
Time 11:0Hrs
1293 CONSTRUCTION AND UPGRADATION OF ROAD MANALI-SARCHU-LEH TO NHDL SPECIFICATIONS FROM DESIGN CHAINAGE KM 266.000 TO KM 293.866 UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 27.886 KM)

2021_BRO_478053_1 171.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 16:30Hrs
08/02/2022
Time 17:0Hrs
1294 Short Term Maintenance from Km 163/0 to 170/0, km 183/0-201/0 and km 217/0-231/6 of NH208 (NH-744) under OR (DPP) 2021-22 in the state of Tamilnadu.

2022_MoRTH_666689_1 2.480 MoRTH Maintenance Project OTHERS 04/01/2022
Time 17:10Hrs
08/02/2022
Time 15:0Hrs
1295 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_669583_1 5.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 15:0Hrs
08/02/2022
Time 12:0Hrs
1296 Periodic Renewal of road from Km. 233.00 to km.239.00, Km 242.00 to Km. 244.00 and Km. 261.00 to 274.00 of NH-707(A) under Annual Renewal Plan 2021-22 in the state of Uttarakhand

2022_MoRTH_667397_1 8.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 11:0Hrs
07/02/2022
Time 12:0Hrs
1297 Periodic Renewal of road from km 175.00 to 192.00 on NH- 707A in the State of Uttarakhand under NH(0) Annual Plan 2021-22

2022_MoRTH_667402_1 7.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 10:0Hrs
07/02/2022
Time 12:0Hrs
1298 Periodic Renewal from km. 18/100 to km 19/800, km. 25/800 to km 44/300,km 44/700 to km 49/300 of NH 64(Aslali Bareja Matar Section) under NH Division Vadodara in the State of Gujarat

2022_MoRTH_669039_1 9.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 9:0Hrs
07/02/2022
Time 11:0Hrs
1299 Long term measures for rectification of Accident Blackspots at various locations of Ahmedabad – Vadodara section of NH-48 in the state of Gujarat on EPC Basis.

2021_NHAI_100183_1 43.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/12/2020
Time 14:0Hrs
07/02/2022
Time 11:0Hrs
1300 Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh

2021_MoRTH_664541_1 24.097 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 22/12/2021
Time 18:0Hrs
04/02/2022
Time 11:0Hrs
1301 Widening 2-lane to 4-lane from km. 155.100 to 160.700 (ISBT to Ajabpur Railway Crossing on NH-72 on EPC mode

2021_MoRTH_666079_1 33.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2021
Time 20:0Hrs
04/02/2022
Time 11:0Hrs
1302 Providing permanent restoration to valley side slips occurred during monsoon of 2019-20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 (Charmadi ghat) of NH73(old NH234), Mangalore Tumkur section (Job No NH 73 KNT 2019 20 904)- 5th Call

2022_MoRTH_668822_1 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2022
Time 17:0Hrs
03/02/2022
Time 16:0Hrs
1303 Widening of existing four lane to six lane road from km. 3.000 to km. 7.469 of NH-235 (New NH-334) under EPC mode in the State of Uttar Pradesh

2021_MoRTH_664443_1 35.596 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2021
Time 15:0Hrs
02/02/2022
Time 15:0Hrs
1304 Strengthening from Km 18/400 - 46/275 of NH 230 (New NH 85) (Thiruppuvanam - Sivagangai) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_663704_1 49.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2021
Time 16:0Hrs
02/02/2022
Time 15:0Hrs
1305 6 laning of existing 4-lane stretch of NH-44 from Gundlapochampally (Design chainage Km 471.300) to Bowenpally (Design chainage Km 481.331) total length 10.031 Km, in the State of Telangana on EPC mode under Bharatmala Pariyojana

NHAI/Tech/TS/NH-44/ GP-BP/2021 422.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2021
Time 18:0Hrs
01/02/2022
Time 11:0Hrs
1306 I.R.Q.P. work from Km. 0.000 to 7.000 and Km 52.000 to Km 68.700 of NH-309A in the state of Uttarakhand under Annual Plan 2021-22 under NH division Lohaghat. for the year 2021-22.

2022_MoRTH_666375_1 24.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2022
Time 4:30Hrs
01/02/2022
Time 2:0Hrs
1307 Rehabilitation and Up gradation of NH 167B from Km 99.103 CS Puram to Km 143.320 Malakonda to two lane with paved shoulders in Andhra Pradesh through EPC contract under Annual Plan 2021-22

2021_MoRTH_660664_1 232.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 17:0Hrs
31/01/2022
Time 17:0Hrs
1308 Rehabilitation and Up gradation of NH 167B from Km 99.103 CS Puram to Km 143.320 Malakonda to two lane with paved shoulders in Andhra Pradesh through EPC contract under Annual Plan 2021-22 for JV compliance

2021_MoRTH_660664_1 232.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 17:0Hrs
31/01/2022
Time 17:0Hrs
1309 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2021_MoRTH_664391_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2021
Time 17:0Hrs
31/01/2022
Time 12:0Hrs
1310 Periodical Renewal from Km 24/0 – 33/0 (Except Km 26/6 – 26/8), Km 35/0 – 37/8, 38/940 – 39/120, 39/900 – 40/500 & 42/280 – 42/710 of NH 234 (Mangalore – Villupuram Road) New NH-75 on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamilnadu

2021_MoRTH_662094_1 6.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/12/2021
Time 17:0Hrs
31/01/2022
Time 11:0Hrs
1311 Construction of leftover portion of additional additional 2-lane Gandak Bridge and rehabilitation of existing operational 2-lane Gandak Bridge in km 423- 424 of NH-28 (New NH-27) in the State of Bihar on item rate contract (percentage contract)

2021-NHAI-98648-1 165.760 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/12/2021
Time 11:0Hrs
29/01/2022
Time 11:0Hrs
1312 Rehabilitation and up-gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53.590 Km of Rayachoty to Vempalli section of NH 440 in the State of Andhra Pradesh on EPC mode

RW/NH-12014/10/2021-AP/ZoneIII 356.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2021
Time 15:0Hrs
27/01/2022
Time 17:0Hrs
1313 Improvement Construction of existing Class 5 Road to NH Intermediate Lane Specification with Hard Shoulder from existing Km 76pt340 to Km 134pt940 Design chainage from Km 76pt300 to Km 133pt000 Total Length 56pt700 km of NH 505 Sumdo Kaza Gramphoo Road on EPC mode in the state of Himachal Pradesh Package I

2021-BRO-634242-1 243.650 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2021
Time 14:0Hrs
27/01/2022
Time 12:0Hrs
1314 Four lane Spur of Meerut Garhmukteshwar section of NH709A connecting NH119 New NH34 near village Salarpur Jalalpur Meerut to NH58 New NH334 near village Daurala Meerut Bypassing Meerut city Design Km 00.000 to Design Km 12.828 under Bharatmala Pariyojna in the state of Uttar Pradesh on EPC mode

NHAI/11013/Meerut-Garhmukteshwar/2021/108551 344.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
27/01/2022
Time 11:0Hrs
1315 Construction of 4 lane VUP at km 39.960, flyover at km 40.320 and km 46.630 between km 39.300 to km 47.170 in Kurali-Kiratpur section of old NH-21 (new NH-205) in the State of Punjab on EPC Mode

2021_NHAI_97428_1 68.400 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/12/2021
Time 18:25Hrs
27/01/2022
Time 11:0Hrs
1316 Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH-31 from design Chainage 221 047 to 225 302 in the State of Bihar on EPC Mode

2021-NHAI-98072-1 371.450 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 13/12/2021
Time 11:0Hrs
27/01/2022
Time 11:0Hrs
1317 TWO- LANES WITH/ WITHOUT PAVED SHOULDERS FROM KM 0.000 TO KM 69.480 (DESIGN) OF SANQUELIM TO BELAGAVI SECTION OF NH-748AA IN THE STATE OF GOA AND KARNATAKA UNDER BHARATMALA PARIYOJANA

2021_NHAI_97260_1 229.190 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2021
Time 15:0Hrs
27/01/2022
Time 11:0Hrs
1318 CONSTRUCTION OF BALANCE WORK OF 2 LANING WITH PAVED SHOULDER FROM KM 30 800 TO KM 70 800 AND 2 LANING WITHOUT PAVED SHOULDER WITH RIGID CARRIAGEWAY FROM KM 70 800 TO KARNATAKA/GOA BORDER KM 84 120 OF NH 4A IN THE STATE OF KARNATAKA

2021_NHAI_97257_1 187.410 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2021
Time 15:0Hrs
27/01/2022
Time 11:0Hrs
1319 CONSTRUCTION OF SIX LANE FLYOVER AT THE JUNCTION OFBHANKROTA, NARSINGHPURA, MAHALAN, MOKHAMPURA, PADASOLI AND CONSTRUCTION OF 3 LANE FLYOVER AT HEERAPURA JUNCTION ON JAIPUR KISHANGARH SECTION OF NH 8 (NEW NH 48) IN THE STATE OF RAJASTHAN

2021_NHAI_83794_1 115.010 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:0Hrs
27/01/2022
Time 11:0Hrs
1320 Construction of upgradation of carriageway Km 180.200 to 188.700 of Raebareli- Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC mode.

2021-NHAI-90823-1 68.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
25/01/2022
Time 11:0Hrs
1321 Rebuilding of Existing 2 Lane ROB (RHS) to 3 Lane ROB at Railway Km.102 / 3-4 Crossing the NH - 44 Chainage 86/200-300 Near Divitipally Village on Hyderabad - Bangalore section of NH-44 in the state of Telangana on EPC Mode

2021_NHAI_97514_1 32.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/12/2021
Time 14:0Hrs
24/01/2022
Time 11:0Hrs
1322 Periodic Renewal work from Km. 421.300 to Km. 422.200, Km. 423.100 to Km. 424.00, Km. 425.500 to Km. 427.460, Km. 428.250 to 430.00 and 430.500 to Km. 432.200 of NH-91 under N.H. Division, PWD, Kanpur in the State of Uttar Pradesh.

2022_MoRTH_666999_1 4.180 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 11:0Hrs
20/01/2022
Time 11:0Hrs
1323 Construction of ROB at Project Ch. 146.533 of NH-56 (new NH-731) along with its approaches and associated slip roads on EPC Mode in the state of Uttar Pradesh

2021_NHAI_97253_1 94.940 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 06/12/2021
Time 16:20Hrs
20/01/2022
Time 11:0Hrs
1324 Six Laning of Kadambattukonam (Design Ch. 517.250) - Start of Kazhakuttam Flyover (Design Ch. 547.080) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana. (Package-5)

2021_NHAI_92673_1 856.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/10/2021
Time 15:0Hrs
18/01/2022
Time 11:0Hrs
1325 Six Laning of Paravoor (Design Ch. 417.000) – Kottunkulangara (Design Ch.454.500) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana

2021_NHAI_67645_1 1,310.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 17:0Hrs
18/01/2022
Time 11:0Hrs
1326 Rehabilitation and Up-gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh

RW/NH-12014/12/2021AP/Zone-III 314.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/11/2021
Time 15:0Hrs
17/01/2022
Time 17:0Hrs
1327 Construction of two lane Major Bridge across Penna River at Km 739.234 of NH 67 including approaches parallel to existing 2 lane bridge in SPS Nellore District in the State of Andhra Pradesh through EPC Contract under Annual Plan 2021-22

2021_MoRTH_660569_1 80.790 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 17:0Hrs
17/01/2022
Time 17:0Hrs
1328 Periodic Renewal from Km. 426/500 to Km. 447/910 of NH-68 under NH Division Ahmedabad in the State of Gujarat for the year 2021-22 (21.41 Km.) (Job No. TA-68/GJ/ 2021-22/360)

2021_MoRTH_663790_1 5.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 20:0Hrs
17/01/2022
Time 12:0Hrs
1329 Periodic Renewal from Km. 475/850 to Km. 477/500 and Km. 569/600 to Km. 581/500 of NH-68 under NH Division Ahmedabad in the State of Gujarat for the year 2021-22 (16.55 Km.) (Job No. TA-68/GJ/2021-22/361)

2021_MoRTH_663799_1 5.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2022
Time 20:0Hrs
17/01/2022
Time 12:0Hrs
1330 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_667424_1 5.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 13:0Hrs
15/01/2022
Time 12:0Hrs
1331 Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with Kapurthala – Sultanpur Lodhi road (NH-703A) near Isharwal village ch.24.000 to MDR Junction at ch. 40.900 Dhunda Village on EPC mode under Bharatmala Pariyojna in the state of Punjab

NHAI/BM/DAKExpressway/2020/Pkg.Spur-I 1,413.270 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 18/06/2021
Time 11:0Hrs
13/01/2022
Time 11:0Hrs
1332 Four Lanning of Karwar (Km. 281.980 of NH 62 Nagaur road) to Dangiyavas section Package-II (design length 30.093 km) of Jodhpur ring road in Rajasthan on EPC Mode under NHDP Phase-VII

2021_NHAI_87332_1 514.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 18:30Hrs
12/01/2022
Time 11:0Hrs
1333 Construction of Agra Bypass (Northern) connecting km. 174.500 of NH-19 (old NH-2) to km 141.000 of Yamuna Expressways in the district of Mathura in the state of Uttar Pradesh on EPC mode

2021_NHAI_91926_1 483.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
11/01/2022
Time 11:0Hrs
1334 Widening and Strengthening in Km 70/000 - 74/000 of NH 49 Extn. (Madurai - Cochin Road) (New NH- 85) including rectification of Black spot ID No. TN - 02 - 550 (Km 70/200, Thirumalapuram Junction) and ID No. TN - 02 - 420 (Km 72/800, Kunnur Bus Stop) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_659405_1 9.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2021
Time 15:0Hrs
10/01/2022
Time 15:0Hrs
1335 Improvement of Riding Quality of NH-121(309) from km. 189.00 to 205.00 (Salondhar to Krisal), km. 218.00 to 238.00 (Paithani to Musagali) and km. 243.00 to 263.115 (Pabon to Buakhal) in the State of Uttarakhand under Annual Plan 2021-22

2021_MoRTH_662277_1 41.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2021
Time 15:0Hrs
10/01/2022
Time 12:0Hrs
1336 Periodical Renewal work from Km 254/0 to 269/0 of Kalka Shimla Wangtoo Road on NH-22(New NH-05) including IMS(Incidental Management System from Km 236/0 to 284/0 ) in the State of HP on EPC Mode (Job No.TA-NH-22(New NH-05)-2021-22-669)

2021_MoRTH_662602_1 7.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2021
Time 18:0Hrs
10/01/2022
Time 11:0Hrs
1337 Periodical Renewal work from Km 23/0 to 53/0 of Sainj-Luhri-Aut Road on NH-305 including IMS(Incident Management System from Km. 0/0 to 53/0) of NH-305 in the State of HP on EPC Mode (Job No.TA-NH-305-2021-22-666 ) ( Tender No. EPC-37/2021).

2021_MoRTH_662579_1 6.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2021
Time 16:0Hrs
10/01/2022
Time 11:0Hrs
1338 Construction of 4 lane LVUP at Dhakoli Junction (on Zirakpur Parwanoo road) at Km 39.784 on Ambala-Chandigarh section of old NH-22 (New NH-152) in the State of Punjab on EPC mode

2021_NHAI_95944_1 14.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2021
Time 16:50Hrs
10/01/2022
Time 11:0Hrs
1339 Strengthening from Km 332/600- Km334/000, Km 335/000- Km 336/400,Km338/000- Km 338/600, Km 339/000 - Km 339/800, Km 350/000- Km 350/560, Km 351/560- Km 352/320, Km 352/990- Km 353/860, Km 356/000- Km 358/700 and Km 359/350- 360/600 of old NH 67 (Km 0/000- 1/400, Km 2/400-3/800,Km 5/400-6/000, Km 6/400-7/200, Km 17/000-Km 17/560, Km 18/560 - Km 19/320, Km 19/990- Km 20/860, Km 23/000- Km 25/700 and Km 26/350- Km 27/600 of NH 67 (New NH 181) on Engineering , Procurement & Construction (EPC) Basis Contract

2021_MoRTH_658818_1 19.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2021
Time 10:0Hrs
06/01/2022
Time 15:0Hrs
1340 Periodic Renewal between Km. 169/00 to 222/00 of NH 64 in scattered length of Jambusr Amod Samani Derol Section under NH Division, Bharuch in the state of Gujarat Under EPC Mode Job No. TA/64 GJ 2021 22/679

2021_MoRTH_660379_1 14.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2021
Time 16:0Hrs
06/01/2022
Time 12:0Hrs
1341 Four laning of existing Beas – Baba Bakala - Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417.700) and terminating at Kartarpur Sahib Corridor (Km. 0.000 of NH-354B and Km. 153.800 of NH.354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-II –from start of Batala Bypass (Design Chainage Km 31.300) till intersection with Ajnala Gurdaspur Highway (NH 354) near Dera Baba Nanak (Design Chainage Km 69.100 ) on EPC mode in the State of Punjab

2021_NHAI_88527_1 452.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2021
Time 15:0Hrs
06/01/2022
Time 11:0Hrs
1342 Construction of 2 Lane Class A Loading Steel Girder RCC deck composite Bridge of 15m Span at Km. 11 (0-2) and RCC Bridge of 13.5m Span bridge at Km 11 (8-10) 36m Span Steel Girder RCC Deck composite Bridge at Km. 31 (2-4) and 9.32 m Span RCC Bridge at km 33 (4-6) on NH-87Ext. (New NH-109) in the state of Uttarakhand

2021_MoRTH_664525_1 12.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2021
Time 14:0Hrs
05/01/2022
Time 15:0Hrs
1343 Periodic Renewals work from Km 577/0 to Km 583/0 of Hubli Krishnapatnam road NH67 in the state of Andhra Pradesh on EPC Mode.

2021_MoRTH_660194_1 4.180 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
04/01/2022
Time 15:0Hrs
1344 Strengthening from Km 149.00 (Ballupur Flyover) to Km 156.00 and km 162.00 to km 164.00 of including Junction Improvement at Kamla Palace of NH-72 (New NH-07) in the State of Uttarakhand under Annual Plan 2021-22

2021_MoRTH_660035_1 36.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2021
Time 15:0Hrs
03/01/2022
Time 12:0Hrs
1345 IMPROVEMENT OF RIDING QUALITY OF NH-707A FROM CH 0.00 TO 52.180 CH 61.750 TO 70.750 CH 72.900 TO 79.350 and KM 83.000 TO 127.000 IN THE STATE OF UTTRAKHAND UNDER ANNUAL PLAN 2020-2021

2021_MoRTH_661011_1 28.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2021
Time 15:0Hrs
03/01/2022
Time 12:0Hrs
1346 Periodic Renewal from km. 18/100 to km 19/800, km. 25/800 to km 44/300,km 44/700 to km 49/300 of NH 64(Aslali Bareja Matar Section) under NH Division Vadodara in the State of Gujarat

2021_MoRTH_661244_1 9.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/12/2021
Time 14:30Hrs
03/01/2022
Time 11:0Hrs
1347 Construction of flyover at Rau circle at Km 12600 from design km 11700 to Km 12920 in Indore Dewas stretch in the state of Madhya Pradesh on EPC mode

2021_NHAI_90754_1 34.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 14:0Hrs
03/01/2022
Time 11:0Hrs
1348 Construction of new 3-Lane Major Bridge over River Brahmani at Km. 401.250 of NH-200 (New NH -53) in Duburi-Chandikhole Section in the State of Odisha on (EPC) Mode.

2021_NHAI_92131_1 107.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2021
Time 15:0Hrs
03/01/2022
Time 11:0Hrs
1349 I.R.Q.P. work from Km. 28.00 (Ramnagar) to 63.00 (Marchula) on NH-121(New 309) in the state of Uttarakhand under NH division haldwani for the year 2021-22 under EPC Mode

2021_MoRTH_660538_1 20.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
01/01/2022
Time 14:0Hrs
1350 IRQP to NH351G Nageshri Khambha road section btn km 0 to 28.200 under EPC mode in the state of Gujarat

2021_MoRTH_657134_1 13.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/11/2021
Time 15:0Hrs
31/12/2021
Time 15:0Hrs
1351 Widening and Strengthening from km. 15.000 to km. 58.600 (Bhadewara to Dramandganj section) of NH 135C in the state of Uttar Pradesh on EPC mode

2021_MoRTH_653306_1 204.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 16:50Hrs
31/12/2021
Time 11:0Hrs
1352 Periodic Renewal Work from Km. 454.000 to Km. 470.900 and Km. 474.000 to Km. 484.000 of NH-730 in the State of Uttar Pradesh on Engineering, Procurement and Construction (EPC) mode Contract

2021_MoRTH_656692_1 16.660 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
28/12/2021
Time 15:0Hrs
1353 Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28 500 to Km 73 744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana Package2

2021 NHAI 86770 1 1,724.670 NHAI Normal Highway Project HAM 11/10/2021
Time 11:30Hrs
28/12/2021
Time 11:0Hrs
1354 Periodical Renewal from km 225/000 to 234/400 of Nagapattinam - Guddalore - Mysore Road - NH 67 ( New NH 81) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_659609_1 8.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/11/2021
Time 15:0Hrs
27/12/2021
Time 15:0Hrs
1355 Construction of Flyover at Y-Junction in Rahatgaon in front of Hotel Gauri Inn, Amravati from Km.148.490 to Km.150.070 on NH-53 (Old NH-6) in the State of Maharashtra on EPC Mode

2021_NHAI_94700_1 35.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2021
Time 15:0Hrs
27/12/2021
Time 11:0Hrs
1356 Construction of Railway Under Bridge RUB 470 Box Culvert Service Road at Km 24.670 Old Chandapura and Bus Shelter and Bus bay of RHS at Km. 24.830 and 3 Bus Shelter and Bus bay of LHS at Km.24.850 for Remedial Measures to accident prone locations in the stretch of Silk Board Junction to Attibele Km.8.765 to Km 33.130 of NH 44 Old NH 07 in the State of Karnataka under EPC mode

NIT No.41 NHAI RO BNG 22018 Tender 2021 22 Dated 11.11.2021 19.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 15:0Hrs
27/12/2021
Time 11:0Hrs
1357 Construction of 6-lanning of Kanpur Lucknow Expressway (NE-6), starting from Lucknow Ring Road near Shaheed Path at km. 10.980 to km. 28.500 of NH-27 including spur in the state of Uttar Pradesh (length 17.52 km) on Hybrid Annuity Mode. Package-1

2021_NHAI_86765_1 1,675.180 NHAI Normal Highway Project HAM 01/09/2021
Time 15:0Hrs
24/12/2021
Time 11:0Hrs
1358 Construction of 2 lane ROB and its approaches in KM 158 old KM 153 on NH 104 at Jaynagar Bypass in the state of Bihar on EPC mode for the year 2021 22.

2021_MoRTH_659150_1 60.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2021
Time 15:0Hrs
23/12/2021
Time 15:0Hrs
1359 Construction of LVUP at Chikkanahalli at grade Junction Ch.111.000 KA 02 221 under road safety for rectification of Black spot in the stretch of Tumkur Chitradurga section from Km 75.00 to 189.000 of NH 48 Old NH 4 in the state of Karnataka under EPC Mode

NIT No.36 NHAI RO BNG Road safety Tender 2021 22 dt.01.11.2021 18.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1360 Construction of LVUP at Kasturi Rangappana Halli at grade Junction Ch.147.500 KA 02 044 and Giddobanahalli at grade Junction Ch.171.400 KA 02 265 Under road safety for rectification of Block spot in the stretch of Tumkur Chitradurga section from Km 75.00 to 189.000 of NH 48 Old NH 4 In the state of Karnataka Under EPC Mode

NIT No. 37 NHAI RO BNG Road Safety Tender 2021 22 dated 01.11.2021 39.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1361 Construction of LVUP at Javanagondanahalli at grade Junction Ch.141.150 KA 02 005 and Gorladaku at grade Junction Ch.144.500 KA 02 099 Under road safety for rectification of Block spot in the stretch of Tumkur Chitradurga section from Km 75.00 to 189.000 of NH 48 Old NH 4 in the state of Karnataka Under EPC Mode

NIT No.38 NHAI RO BNG Road safety Tender 2021 22 Dated 01.11.2021 40.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1362 Construction of LVUP at Ajjagondanahalli at grade Junction Ch.82.410 KA 02 466 and Nelahal at grade Junction Ch.91.000 KA 02 175 Under road safety for rectification of Block spot in the stretch of Tumkur Chitradurga section from Km 75.00 to 189.000 of NH 48 Old NH 4 In the state of Karnataka Under EPC Mode

NIT No.39 NHAI RO BNG Road safety Tender 2021 22 dt.01.11.2021 39.530 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1363 WIDENING STRENGTHENING TO TWO LANE CHAKKI BANIKHET CHAMBA BHARMOUR ROAD NH 154A KM 93 0 TO 106 0 IN THE STATE OF HIMACHAL PRADESH

2021_MoRTH_656461_1 61.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2021
Time 18:0Hrs
23/12/2021
Time 11:0Hrs
1364 Four Laning of NH 530B from Mathura Bypass (Start) at Existing km 154.20 of NH-44 (Existing km 266.000 of SH 33/Design km 0.000) to Gaju Village (Design km 32.982) (Design length = 32.982 km) in the State of Uttar Pradesh on HAM mode [PACKAGE 1-B]

2021_NHAI_92501_1 1,064.500 NHAI Normal Highway Project HAM 25/10/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1365 Four Laning of NH 530B from Gaju Village (Design km 32.982, Mathura - Aligarh District Boundary) to Devinagar Bypass (End) (Existing Km. 208.000 of SH 33(NH-530B)/Design Km. 66.000) (Design length = 33.018 km) in the State of Uttar Pradesh on HAM mode (Package-1C)

2021_NHAI_92509_1 901.460 NHAI Normal Highway Project HAM 25/10/2021
Time 15:0Hrs
23/12/2021
Time 11:0Hrs
1366 Periodical Renewal of Road from Km 1.23 to 8.00 ( 6.77 Km) of NH-03 in the State of Punjab ON EPC MODE.

2021_MoRTH_659954_1 6.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/11/2021
Time 15:0Hrs
22/12/2021
Time 15:0Hrs
1367 PR from km 4.7 to 48.850 of NH927D Jamnagar Kalavad road section on EPC mode

658881 14.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
21/12/2021
Time 15:0Hrs
1368 Widening and Strengthening from Km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to two lane with paved shoulder configuration in the State of Uttar Pradesh on EPC mode.

2267/1-Tender Cashier (GZB)-28/21 dt. 01.11.2021 154.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2021
Time 15:0Hrs
21/12/2021
Time 15:0Hrs
1369 Periodic Renewal (PR) work in the stretch from Ch. 0.000 to 16.000 & 22.000 to 28.580 of NH-334DD of Uttar Pradesh on EPC mode.

2268/1-Tender Cashier (GZB)-28/21 dt. 01.11.2021 13.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2021
Time 15:0Hrs
21/12/2021
Time 12:0Hrs
1370 Construction of New 4-lane Greenfield Highway of (a) Malout Bypass from chainage 44.500 (Abohar – Malout Road) to chainage 35.500 (Bathinda – Malout Road) on NH-07 and chainage 0.000 (Bathinda - Malout Road) on NH-07 to chainage 6.984 (Malout – Dabwali Road) on NH-09 and (b) Mandi Dabwali Bypass from chainage 29.500 (Malout – Dabwali Road) on NH-09 to chainage 38.450 (Km 27.910 of Bathinda – Sangaria Road on NH-54) near Jogewala village (Total Design Length = 24.934 Kms) on Engineering Procurement and Construction (EPC) mode in the State of Punjab under Bharatmala Pariyojana Pkg-II

2021_NHAI_88649_1 421.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 15:0Hrs
21/12/2021
Time 11:0Hrs
1371 Strengthening from km 259/600-262/000, 276/400- 279/000, 290/000-291/000 & Widening and Strengthening from km 291/000-292/000 of NH 67 (km.40/600-42/600,56/200-56/600, 70/600 - 73/000 of New NH-81) & Strengthening from km 262/000-271/000 & 274/600-275/200 of NH67 (km 57/400-58/000, km 61/600-70/600 of New NH-81) on Engineering, Procurement & Construction (EPC) Basic Contract under Annual Plan 2021-22 in the state of Tamil Nadu.

2021_MoRTH_655833_1 21.317 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
20/12/2021
Time 15:0Hrs
1372 6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojana

2021_NHAI_66236_1 1,112.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2020
Time 15:0Hrs
20/12/2021
Time 15:0Hrs
1373 Four laning of existing 2/4 lane stretch from Lonand (Design km 166.400) to Dive Ghat (Design km 220.900) {Design Length – 54.500 km} of Mohol – Alandi section (Package - V) of NH-965 in the State of Maharashtra to be executed on EPC Mode under Bharatmala Pariyojana

2021_NHAI_92617_1 771.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/10/2021
Time 14:0Hrs
20/12/2021
Time 11:0Hrs
1374 Improvement and Upgradation of Existing Road to 4–lane with Paved Shoulder from Km 229.070 to 260.800, End of Hardoi District to Lucknow of NH 731 on EPC basis in the state of Uttar Pradesh

NHAI/11013/2021/Hardoi-Lucknow/ E-103668 405.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2021
Time 15:0Hrs
20/12/2021
Time 11:0Hrs
1375 Construction of 2 Lane right turning flyover from Sector 12A and industrial area Phase-I to Zirakpur over old NH-22 (new NH-05) between km 41.740 to km 42.350 including junction improvement and widening of at grade HUDA road in Panchkula city in the State of Haryana in EPC Mode

2021_NHAI_93057_1 19.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2021
Time 17:50Hrs
20/12/2021
Time 11:0Hrs
1376 Improvement and Up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 174.641 to 229.070, End of Hardoi Bypass to End of Hardoi District of NH-731 in the state of Uttar Pradesh on Hybrid Annuity Mode.

NHAI/11013/PkgIII/HAM/Bareilly/2021/108455 954.360 NHAI Normal Highway Project HAM 07/10/2021
Time 15:0Hrs
20/12/2021
Time 11:0Hrs
1377 Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan Near Rajpur at Km 52 000 design to Gojariya at Km 128 940 design a length of 76 940 km Package II of NH68 in the State of Gujarat under NHO on EPC Mode

NHAI/Guj/Patan-Gojaria/2021 875.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 15:0Hrs
20/12/2021
Time 11:0Hrs
1378 Four laning of existing Beas – Baba Bakala - Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417.700) and terminating at Kartarpur Sahib Corridor (Km. 0.000 of NH-354B & Km. 153.800 of NH-354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-I – from intersection with Jalandhar-Amritsar Highway (NH 3) near Beas till Start of Batala Bypass near Village Acchhal (Km 0.000 to Km 31.300) on EPC mode in State of Punjab

2021_NHAI_84049_1 527.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 17:0Hrs
20/12/2021
Time 11:0Hrs
1379 Periodic Renewal Work in Km. Km. 151.000 to 159.000 186.000 to 191.000 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_655987_1 5.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2021
Time 17:0Hrs
17/12/2021
Time 17:0Hrs
1380 Construction of cement concrete pavements from Km. 224.830 to Km. 229.630 of NH-330 (4.8 km) in the state of Uttar Pradesh under EPC Mode. (Job No. NH(O)330/UP/2021-22/595,dated-03.08.2021)

2021_MoRTH_658490_1 20.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2021
Time 15:0Hrs
17/12/2021
Time 15:0Hrs
1381 Periodic Renewal work from Km. 41 to 55 (Ch. 40.000 to 55.000) and Km. 70 to 95 (Ch. 69.000 to 95.000) of NH-330D in Uttar Pradesh of NH-330D under EPC mode

2021_MoRTH_658299_1 13.230 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/11/2021
Time 15:0Hrs
16/12/2021
Time 15:0Hrs
1382 Strengthening of existing carriageway from Km 16.490 to Km 44.780 & Km 46.100 to Km 49.500 of Bathinda-Muktsar Sahib-Jalabad road NH-754 in the State of Punjab (Length=31.640 km) under Head 5054-01-01-337-03 Capital outlay on Road & Bridges.(Job No. NH-754-PB-2021-22-543)

2021_MoRTH_657904_1 39.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2021
Time 15:0Hrs
16/12/2021
Time 11:0Hrs
1383 STRENGTHENING AND ROAD SAFETY OF PATHANKOT TO KULLU ROAD UPTO MAMUN CHOWK FROM KM 0.000 TO 5.550 (FOUR LANE SECTION) OF NH-154 IN DISTT PATHANKOT (PUNJAB) FOR YEAR 2021-2022 ON EPC MODE.

2021_MoRTH_658190_1 11.470 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 15/11/2021
Time 15:0Hrs
15/12/2021
Time 17:0Hrs
1384 Improvement and Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana, Shamli, Muzaffarnagar, Mairanpur, Bijnor and terminating at its junction with Nh-74 at Kotawali to Two/four lane with paved shoulder configuration–SPUR of Shamli which is Connects from Km 30.800 of NH-709 AD to KM. 68.100 of NH-709 A in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode

NHAI/11013/SPUR/Shamli bypass/2021/E-103334 177.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/10/2021
Time 15:0Hrs
15/12/2021
Time 11:0Hrs
1385 2lane with paved shoulder of Najibabad Kotdwar section of NH-119 from Design Ch. 122.200 to Km. 137.760 (Existing Ch. 138.635) in the state of Uttar Pradesh.

NHAI/11013/NajibabadtoKotdwar/2021/E-107944 81.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/10/2021
Time 15:0Hrs
15/12/2021
Time 11:0Hrs
1386 Medium Term maintenance works from Km.124.800 to 1343690 Sec.Tran Patiya Jamjodhpur Kalavad Road of NH.151K in State of Gujarat under OR DPP scheme

658956 1.680 MoRTH Maintenance Project OTHERS 09/12/2021
Time 15:0Hrs
14/12/2021
Time 15:0Hrs
1387 Periodical Renewal of Malout-Dabwali Road from km 0.00 to km 6.400 & from km 30.00 to km 33.050 of NH-09 under NH Division, Abohar in state of Punjab on EPC mode for the year 2021-22 (9.450 km) (Job No.NH-09-PB-2021-22/547 dated 10.11.2021)

03/EE/NH/ABH 10.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2021
Time 13:0Hrs
14/12/2021
Time 11:0Hrs
1388 Construction of Four Lane Bypasses for Jagatpur, Babuganj, Unchahar, Alapur Bypass, Link Road and Sai river bridge of Raebareli – Prayagraj section of NH-30 (Old NH-24B) under Bharatmala Pariyojna in the State of Uttar Pradesh on EPC mode

2021_NHAI_86077_1 701.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2021
Time 15:0Hrs
14/12/2021
Time 11:0Hrs
1389 IRQP to NH351K Bagasara Khambha Una road section between km 65 to 77.9 under EPC mode in the state of Gujarat

657164 5.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1390 IRQP to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0 to 21.5 and 27.9 to 30.902 and 51.5 to 61.5 total length 34.5 Km under EPC mode in the state of Gujarat

657185 18.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1391 IRQPto NH151K Porbandar Bhanvad up to Tran Patiya road section btn km 39.3 to 43.2 Tran Patiya Jamjodhpur Kalavad road section btn km 74.1 to 83.6 Km 88.6 to 103.4 Km 112.8 to 124.8 Total length 40.2 Km under EPC mode in the state of Gujarat

657195 16.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1392 PR Btn Km 74.0 to 102.200 Dhasa Gadhada road on NH51 length 28.2 km in the state of Gujarat (Pro and laying 50mm BM in selected stretches and 40mm BC in full length under EPC mode

657548 13.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1393 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode

657549 11.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1394 PR btn km 170.450 to 190.650 Limbdi Wadhwan road section and km 201.600 to 229.700 Surendranagar Dhrangadhra road section of NH51 Providing and laying 50mm DBM in selected stretches and 30 mm BC in full length under EPC mode

657550 13.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1395 PR btn km 229.700 to 233.390 and km 237.590 to 255.890 Dhrangadhra Kuda road section on Nh51 Providing and laying 50mm DBM in selected stretches and 40mm BC in full length under EPC mode

657551 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2021
Time 15:0Hrs
13/12/2021
Time 15:0Hrs
1396 Construction of Four-lane Western side spur of Rampur - Rudrapur section connecting NH-24 (NEW NH-09) to NH-87 bypassing Rampur town (Design Km 00.000 to Design Km 13.700) on EPC Mode in the state of Uttar Pradesh

2021_NHAI_91919_1 311.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
13/12/2021
Time 11:0Hrs
1397 2 Lane existing bypass of rampur to be developed to 4 lane in the state of uttar pradesh

2021_NHAI_91912_1 275.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
13/12/2021
Time 11:0Hrs
1398 Improvement and upgradation to two lane with paved shoulder configuration from existing km. 55.00 to km.90.000 (Design length 34.760) of NH-227A (Near Chhapia Village to near Sikriganj) in the state of Uttar Pradesh o Engineering, Procurement and Construction (EPC) mode Contract.

2021_MoRTH_653581_1 211.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/10/2021
Time 15:0Hrs
09/12/2021
Time 15:0Hrs
1399 Periodic Renewal work from Km 46.220 to Km 71.450 of NH-727H in the State of Uttar Pradesh under EPC mode

2021_MoRTH_656565_1 11.370 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
09/12/2021
Time 15:0Hrs
1400 Periodic Renewal work from Km 5.190 to Km 47.250 (Except Km 7.00 to Km 14.00) of NH-730H in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_656816_1 20.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
09/12/2021
Time 15:0Hrs
1401 Periodic Renewal work from 40.500 to 54.500 of NH-931A (Salon-Jais-Jagdishpur Road) under EPC Mode in the State of Uttar Pradesh

2021_MoRTH_656706_1 6.040 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
09/12/2021
Time 15:0Hrs
1402 Periodic Renewal work from 0.000 to 46.470 of NH-96 (330) (Ayodhya-Sultanpur-Prayagraj Road) under EPC Mode in the State of Uttar Pradesh

2021_MoRTH_656720_1 34.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/11/2021
Time 15:0Hrs
09/12/2021
Time 15:0Hrs
1403 Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing km. 90.000 to km.130.000 (Design length 39.150) of NH-227A (Sikriganj to Barhalganj) in the state of Uttar Pradesh on (EPC) mode Contract.

2021_MoRTH_654561_1 230.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2021
Time 15:0Hrs
07/12/2021
Time 15:0Hrs
1404 CONSTRUCTION OF 220 MTR (55 MTR X 4) MAJOR PERMANENT BRIDGES AT KM 186.55 (55 MTR X 2), KM 194.00 (55 MTR X 1), KM 199.00 (55 MTR X 1) AND CONSTRUTION OF 110 MTR (55 MTR X 2) MAJOR PERMANENT BRIDGES AT KM 236.27 (55 MTR X 1) AND KM 247.40 (55 MTR X 1), INCLUDING APPROACHES ON D-S-DBO ROAD UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2021_BRO_480089_1 49.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2021
Time 18:0Hrs
07/12/2021
Time 12:0Hrs
1405 Strengthening of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu road from Km 0 00 to 0 715 Km1 88 to 4 040 and From Km 37 680 to Km 48 490 section of NH 703A in the State of Punjab on EPC Mode

2021_MoRTH_654215_1 18.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/10/2021
Time 12:40Hrs
07/12/2021
Time 11:0Hrs
1406 Construction of single cell Box Culverts at Km 8 (5mx3m), Km 10 (6mx6m) & at Km 12 (6mx6m) on Tarighat - Bara Road of NH-124C in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_656006_1 6.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2021
Time 14:0Hrs
03/12/2021
Time 15:0Hrs
1407 Stage strengthening work from km 19.00 to km 36.00 (Except Black Spot location i.e., from km 19.74 to km 20.88, km 25.18 to km 26.26, km 26.36 to km 27.43, km 29.80 to km 30.77, km 31.10 to km 32.10, km 34.20 to km 35.29) including road furnitures in NH-512 under NH Division VII, P.W.(Roads) Dte. in the district of Dakshin Dinajpur during the year 2021-22 on EPC mode [Job No. 512/WB/2021-22/483]

2021_MoRTH_651983_1 7.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2021
Time 14:0Hrs
30/11/2021
Time 13:0Hrs
1408 STRENGTHENING ON ABOHAR BYEPASS FROM KM.42.560 TO KM.48.713 (NEW NH 07) ON EPC MODE IN THE STATE OF PUNJAB (JOB NO.NH-07-PB-2021-22/538 DATED 01.10.2021)

02/EE/NH/ABH 7.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/10/2021
Time 15:0Hrs
29/11/2021
Time 15:0Hrs
1409 Work of IRQP and rehabilitation/restoration between KM 0/00 to 43/00 on NH 756 Bodeli Shivrajpur Jhambughoda Chapaner bypass section in the State of Gujarat.

2021_MoRTH_653423_1 40.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2021
Time 17:50Hrs
29/11/2021
Time 11:0Hrs
1410 FOUR LANING OF HARIDWAR – NAGINA SECTION OF EUP MITIGATION MEASURES ON NH-74 IN THE STATE OF UTTARAKHAND UNDER NHDP PHASE-IV ON EPC MODE (FROM DESIGN CHAINAGE LME FROM KM 13.829 TO KM 17.110 & KM 26.077 TO KM 27.508 AND DESIGN CHAINAGE RME FROM KM 13.839 TO KM 17.120 & KM 26.078 TO KM 27.509)

2021_NHAI_87525_1 139.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2021
Time 13:0Hrs
25/11/2021
Time 11:0Hrs
1411 Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode

2021_NHAI_85354_1 101.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2021
Time 16:0Hrs
25/11/2021
Time 11:0Hrs
1412 Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km 515 to Km 555 017 of NH48 in the state of Karnataka on EPC Mode under Bharatmala Pariyojana Package I

2021_NHAI_85137_1 1,295.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
23/11/2021
Time 11:0Hrs
1413 Construction of 6 laning from Sankeshwar Bypass to MH KNT Border from Km 555 017 to Km 592 853 of NH 48 in the state of Karnataka on EPC Mode under Bharatmala Pariyojana Package II

2021_NHAI_85144_1 1,223.200 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 15:0Hrs
23/11/2021
Time 11:0Hrs
1414 IRQP and rehabilitation/restoration between KM 377/305 to 388/000, KM 407/000 to 418/305 , KM 421/205 to 429/405, KM 441/00 to 443/00, KM 444/00 to 445/00 and KM 449/00 to 452/00 Section Ferkuva Chhotaudepur Bodeli Naswadi Road of NH56 in SoG

2021_MoRTH_652307_1 29.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/10/2021
Time 15:0Hrs
22/11/2021
Time 15:0Hrs
1415 Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Junction of EPE (near Khekra) Design Chainage 0.000 to Design Chainage 27.000 (Vill.-Lohadda) in the state of Uttar Pradesh on EPC Mode (Package-I)-2nd call

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-I/2020 653.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/10/2021
Time 15:0Hrs
22/11/2021
Time 11:0Hrs
1416 Periodic Renewal of existing road from km 12 720 to km 23 400 of NH 703A under National Highways Division PWD B and R Jalandhar in the State of Punjab for the year 2021 2022 10 68 KM on EPC Mode

2021_MoRTH_653632_1 8.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2021
Time 11:0Hrs
22/11/2021
Time 11:0Hrs
1417 Widening to Two Lane with Paved shoulders including strengthening of existing pavement from km 0.00 to km 24.800 of NH 28B New NH 727 on EPC mode in the state of Bihar for the year 2021 22 Length 24.800 Km

2021_MoRTH_650270_1 87.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 15:0Hrs
17/11/2021
Time 11:0Hrs
1418 CONSTRUCTION/IMPROVEMENT ON EPC MODE OF EXISTING ROAD TO NHDL SPECIFICATION WITH PAVED SHOULDER FROM EXISTING KM 67.000(MANGAN) TO KM 95.000 (CHUNGTHANG) OF TOTAL DESIGN LENGTH 27.476 KM (EXCEPT PERPETUAL LAND SLIDES/SINKING ZONE AT RAFONG KHOLA LANGTHA KHOLA, MANUAL AND RITCHU) ON ROAD GANGTOK-MANGAN-CHUNGTHANG IN THE STATE OF SIKKIM UNDER PROJECT SWASTIK OF BRO

2021_BRO_650103_1 290.360 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2021
Time 9:0Hrs
16/11/2021
Time 17:0Hrs
1419 PERIODICAL RENEWAL OF BATHINDA-DABWALI ROAD NH-64 EXTN.(NEW NH-54) FROM KM 0.00 TO 5.710, KM 6.170 TO 7.147 AND KM 8.620 TO 10.820 NEW KM 287.215 TO 292.925, KM 293.385 TO 294.362 AND KM 295.835 TO 298.035

CWD No.1 /BTI-NH/05 10.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 11:0Hrs
13/11/2021
Time 11:0Hrs
1420 Strengthening of Bathinda-Muktsar road from Km.0.000 to 16.490 of NH-754 under NH Division No. 1, Bathinda in the State of Punjab for the year 2021-22 (16.49km) on EPC mode.(Job No. NH-No.754PB-2021-22/2663/NH

CWD No.1 /BTI-NH/04 19.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 11:0Hrs
13/11/2021
Time 11:0Hrs
1421 Balance work of 4-Laning of Chandigarh-Landran-Chunni-Sirhind Road (SH-12A) from Km. 38.00 to Km 46.969 under CRF Scheme.

2021_MoRTH_654696_1 1.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2021
Time 10:0Hrs
10/11/2021
Time 14:0Hrs
1422 Periodic Renewal of Abohar Fazilka road from Km.24.560 to 42.560 of NH-07 under NH Division, Abohar in the State of Punjab for the year 2021-22 (18km) on EPC mode

01/EE/NH/ABH 10.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2021
Time 14:0Hrs
08/11/2021
Time 11:0Hrs
1423 Strengthening from km153/000 - 160/000 & from Km.161/400-163/000 of NH 208 (New NH 744) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_646744_1 10.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:30Hrs
08/11/2021
Time 11:0Hrs
1424 Providing permanent restoration to valley side slips occurred during monsoon of 2019-20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 (Charmadi ghat) of NH73(old NH234), Mangalore Tumkur section (Job No NH 73 KNT 2019 20 904)

2020_MoRTH_555594_4 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2021
Time 15:0Hrs
06/11/2021
Time 17:30Hrs
1425 Providing permanent restoration to valley side slips occurred during monsoon of 2018-19 from Km.237.000 to 263.000 (ShiradiGhat) of NH-75, Bangalore - Mangalore section on EPC mode

2020_MoRTH_546015_4 32.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2021
Time 17:0Hrs
06/11/2021
Time 17:30Hrs
1426 Construction of two no. of new RCC minor Bridge 3x18.84 m and 3x5x4 and 3 nos of new box culverts 2 nos 1x3x3 and 1 no 3x3x3 in place of old bridge and culvert at various chainage in NH 33 old nh 110 on epc mode in the State of Bihar

2021_MoRTH_648739_1 11.114 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 15:0Hrs
01/11/2021
Time 15:0Hrs
1427 Construction of Tunnels Viaducts at identified sliding slip zones in Design Ch. 130.550 to Ch. 130.750 Ch. 131.170 to Ch. 131.763, Ch. 132.560 to Ch. 133.168, Ch. 133.590 to Ch. 133.743 and Ch. 147.877 to 148.715 in Udhampur Ramban section of NH 44 in the UT of J&K under residual NHDP on EPC Mode 2nd Call

NHAI/Part of U-R/JK/EPC/2021 325.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/10/2021
Time 15:0Hrs
01/11/2021
Time 11:0Hrs
1428 CONSTRUCTION OF FOOT TRACK INCLUDING EARTHWORK, SURFACING WORKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

CE (P) VTK/NIB-07/2021-22 42.710 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/09/2021
Time 15:0Hrs
29/10/2021
Time 15:0Hrs
1429 Four laning of Sangrur Internal Bypass of City Portion of Sangrur Dirba section of old NH-71 from Sangrur Bypass to Mehlan Chowk under CRIF Scheme

2021_MoRTH_651662_1 10.390 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2021
Time 10:0Hrs
27/10/2021
Time 11:0Hrs
1430 Permanent Rectification of Blackspot KA 02 373 by Constructing VUP with RE Wall Approaches at Chainage 319.960 and Service Road Chainage Km.319.560 Km. 320.840 on NH 66 at Ambalpaddy in the State of Karnataka under EPC mode

NIT No.30 NHAI RO BNG Road safety Tender 2021 22 dated 22.09.2021 24.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
1431 Permanent Rectification of Blackspot KA 02 345 by Constructing Vehicular Overpass VOP with Retaining wall at Chainage Km.374.200 and Service Road Chainage Km.374.000 Km. 375.600 on NH 66 at KPT junction in the State of Karnataka under EPC mode

NIT No.31 NHAI RO BNG Road Safety Tender 2021 22 dated 22.09.2021 30.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
1432 Permanent Rectification of Blackspot KA 02 304 by Constructing VOP with Retaining wall Approaches at Chainage Km.314.092 and Service Road Chainage Km. 313.650 Km. 314.720 on NH 66 at Santhekatte in the State of Karnataka under EPC Mode

NIT No.32 NHAI RO BNG Road Safety Tender 2021 22 dated 22.09.2021 24.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
22/10/2021
Time 15:0Hrs
1433 Construction of VOP at Vaddahalli junction Ch. 226.715 KA 02 420 under road safety for rectification of blackspots in the stretch of Mulbagal AP KNT Border Section of NH 75 old No. NH 4 from Km. 216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.25 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 16.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 15:0Hrs
20/10/2021
Time 15:0Hrs
1434 Construction of VOP at Narasimhatheertha Ch.233.300 KA 02 416 in the stretch of Mulbagal AP KNT Border Section of NH 75 old No.NH 4 from Km.216.912 to Km.239.100 Realignment the crossroads at Mulbagal junction Ch.1.050 KA 02 415 in the stretch of Banglore Hoskote Mulbagal Section from Km.237.700 to Km.318.000 of NH75 Old NH 4 under road safety for rectification of blackspots in the State of Karnataka under EPC mode

NIT No.26 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 35.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 15:0Hrs
20/10/2021
Time 15:0Hrs
1435 Construction of Single Flyover on LHS at Bellur Bridge Ch.45.100 and Provision of VUP at Narasapura Industrial Area Cross Ch.44.800 KA 02 063 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 old No.NH4 from Km.237.700 to Km.318 in the State of Karnataka under EPC mode

NIT No.27 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 34.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
1436 Construction of LVUP at Nangali cross CH.220.770 and provision of PUP Ch.220.380 in the approach portion of Black spot KA 02 186 under road safety for rectification of blackspots in the stretch of Mulbagal AP KNT Border Section of NH 75 old No.NH 4 from Km.216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.24 NHAI RO-BNG 11019 Tender 2021 22 dated 15.09.2021 21.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
1437 Construction of Single Flyover on LHS at Narasapura CH.41.774 KA 02 231 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH75 old No. NH 4 from Km.237.700 to Km.318 in the State of Karnataka under EPC mode

NIT No.28 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 18.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
1438 Construction of Single Flyover on RHS at Katamanallur Ch.71.885 KA 02 290 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 old No. NH 4 from Km. 237.700 to Km. 318.0 in the State of Karnataka under EPC mode

NIT No.29 NHAI RO BNG 11019 Tender 2021 22 dated 15.09.2021 16.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2021
Time 17:0Hrs
20/10/2021
Time 15:0Hrs
1439 Up gradation of Ghanauli Nalagarh road to HP Border as concrete road from Km 0.00 to Km. 3.00 MDR 59 Under CRIF Scheme

2021_MORTH_650403_1 8.760 MoRTH Normal Highway Project OTHERS 28/09/2021
Time 15:25Hrs
20/10/2021
Time 11:0Hrs
1440 Six Laning of Thuravoor (Design Ch. 378.612) - Paravoor (Design Ch. 417.000) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana

2021_NHAI_77012_1 1,248.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2021
Time 15:0Hrs
13/10/2021
Time 11:0Hrs
1441 The consultancy work for suggesting long term permanent measures for Removal of 07 Nos Black Spots

2021_MORTH_651264_1 0.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2021
Time 17:0Hrs
13/10/2021
Time 10:0Hrs
1442 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode

2021_NHAI_84956_1 607.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 11:0Hrs
11/10/2021
Time 11:0Hrs
1443 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from 209.827 to km. 249.525 (PKG-II) in the State of Bihar under Bharatmala

2021_NHAI_84962_1 759.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 11:0Hrs
11/10/2021
Time 11:0Hrs
1444 Periodic Renewal work from km. 0.00 to 2.00, 8.00 to 13.00 and 13.00 to 25.00 of NH-330D under N.H. Division, PWD, Kanpur in the State of Uttar Pradesh on Engineering, Procurement, Construction (EPC) basis.

2021_MoRTH_649532_1 5.290 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/09/2021
Time 15:0Hrs
07/10/2021
Time 15:0Hrs
1445 Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode on EPC mode

2021_NHAI_84062_1 621.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 18:0Hrs
07/10/2021
Time 11:0Hrs
1446 Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode

2021_MoRTH_646802_1 142.420 MoRTH Normal Highway Project OTHERS 06/09/2021
Time 17:0Hrs
05/10/2021
Time 15:0Hrs
1447 CONS AND UPGRAD TO NHSL SPEC FM KM 60.562 SALSA LA PASS TO KM 96.577 CHUMAR DESIGN CHAINAGE KM 60 562 TO 96 577 KM 60 562 RECKONED AT SALSA LA PASS AND KM 96 577 RECKONED AT CHUMAR OF ROAD HANLE-CHUMAR UNDER (P) HMK IN LADAKH UT ON EPC MODE LENGTH 36.015

2021_BRO_464554_1 299.400 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2021
Time 15:20Hrs
05/10/2021
Time 12:0Hrs
1448 Strenthening of Hussainiwala-Ferozzepur Cantt-Malwal road from Km 0.00 to 17.97 section of NH-05 excluding portion of ROB at LC No. A-54 E alongwith appraoches and the proposed VUP from Km. 9.243 to Km 10.246 in the State of Punjab on EPC mode

2021_MoRTH_645559_1 20.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2021
Time 9:0Hrs
04/10/2021
Time 14:0Hrs
1449 Balance work of Four Laning from Ramban Km 151.00 to Banihal Km 187.00 of NH-1A (Now NH-44) with value addition at critical location on engineering Procurement and Construction mode (EPC mode) in the union territory of Jammu and Kashmir under NHDP Phase II

NHAI/Balance Work of R-B/J&K/EPC/2021 750.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:0Hrs
30/09/2021
Time 11:0Hrs
1450 Construction of minor bridge in Km. 152 on NH-330 in the state of Uttar Pradesh on EPC Mode.

2021_MoRTH_643846_1 6.465 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2021
Time 15:0Hrs
29/09/2021
Time 15:0Hrs
1451 Construction of Tunnels Viaducts at identified sliding slip zones in Design Ch 130.550 to Ch. 130.750 Ch. 131.170 to Ch. 131.763 Ch. 132.560 to Ch. 133.168 Ch. 133.590 to Ch. 133.743 and Ch. 147.877 to 148.715 in Udhampur Ramban section of NH 44 in the UT of J&K under residual NHDP on EPC Mode

2021_NHAI_82218_1 325.440 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 11:0Hrs
29/09/2021
Time 11:0Hrs
1452 Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with six laning of approaches from section Ch Km 146.172 to Km 162.620 on Guwahati Bypass (NH-37) in the state of Assam under Bharatmala Pariyojna on EPC Basis

2021_NHAI_84978_1 356.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2021
Time 9:0Hrs
28/09/2021
Time 11:0Hrs
1453 Construction of 4 Lane Connector from Delhi Meerut Expressway (Km 50.00 of Package IV) to Km 8.520 of NH235 in the State of Uttar Pradesh on EPC mode

2021_NHAI_73017_1 534.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2021
Time 15:0Hrs
28/09/2021
Time 11:0Hrs
1454 Up gradation 2/4 lane NH connectivity under Sagarmala Scheme SH2 Haveri Yekambi (54 Km), SH69 Yekambi Kumta/Belekere under State of Karnataka (Sirsi to Haveri road) (Package No NHAI/PC/SM/04)

NHAI_NHAI_83147_1 222.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/07/2021
Time 15:0Hrs
27/09/2021
Time 11:0Hrs
1455 Strengthening Major Maintenance work of Chhindwara-Soaner Section & Chhindwara ring road (133.222 km) Chhindwara-Amarwara-Narsinghpur Section (113.000 km) Chhindwara-Multai & Sonakhar - Seoni section (136.877 km) of NH – 347 & NH- 547 in the state of Madhya Pradesh & Maharashtra on EPC mode.

2021_NHAI_82214_1 412.490 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 15:0Hrs
21/09/2021
Time 15:0Hrs
1456 Construction of VUP including approaches and Service Roads at Shedgaon Junction at Existing Ch. 59.455 (Design Ch. 59.437) of NH-44 on Nagpur Hyderabad Section in the State of Maharashtra on EPC mode

2021_NHAI_84065_1 39.510 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 04/08/2021
Time 18:0Hrs
20/09/2021
Time 11:0Hrs
1457 CO RW Thrie Beam, Crash Barriers, Signages from Katori Bangla to Chamba Km 39 0 to 106 0 including rectification of identified black spots 7 Nos of NH 154 A in the state of HP

2021_MoRTH_641998_1 22.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/08/2021
Time 18:0Hrs
20/09/2021
Time 11:0Hrs
1458 Periodic renewal work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode

2021_MoRTH_646661_1 8.050 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 11:0Hrs
18/09/2021
Time 15:0Hrs
1459 Construction of flyover at Nowgam Junction including its Approaches, Km 290.725 to Km 291.575 of four lane with paved shoulders of NH-44 at Srinagar in the UT of Jammu and Kashmir on Engineering, Procurement & Construction (EPC) mode

PCD-RnB-32 of 2021-2022 Dated:-18 /08/2021 44.800 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/08/2021
Time 15:0Hrs
17/09/2021
Time 16:0Hrs
1460 Strengthening in Km 19/8 - 21/700, 22/700 - 36/0 of NH 49 Extn. (Madurai - Cochin Road) (New NH- 85) in the state of Tamil Nadu on Engineering, Procurement and Construction (EPC) Basis contract.

2021_MoRTH_641471_1 31.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
17/09/2021
Time 15:0Hrs
1461 Construction of flyover at Bemina Junction including its Approaches, Km 299.145 to Km 300.027 Length 0.882 Kms of four lane with paved shoulders of NH-44 at Srinagar in the UT of JnK

PCD-RnB-31-of 2021-2022 30.920 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 23/08/2021
Time 15:0Hrs
15/09/2021
Time 15:0Hrs
1462 Construction of Truck Parking at Bijakhaman of Bolangir town from km 79/700 to km 80/000 adjacent to NH - 26 in the state of Odisha on EPC mode.Bid Ref No.- 07 CE NH of 2021-22

2021_MoRTH_639609_1 9.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2021
Time 9:0Hrs
14/09/2021
Time 12:0Hrs
1463 Construction of 4 Lane Elevated Highway and at grade improvements at Gopalganj Town from Design Ch. 384 000 to Design Ch. 386 750 on NH 28 in the state of Bihar on EPC mode

2021_NHAI_82191_1 243.190 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2021
Time 17:0Hrs
14/09/2021
Time 11:0Hrs
1464 Improvement of Dharuhera- Bhiwadi link road (NH-919, Old NH-71B) to 4-Lane with Service Road, starting from NH-48 (km 67.820) upto km 22.400 of NH-919 (4.3 km length) in the State of Haryana

2021_NHAI_81048_1 117.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2021
Time 11:0Hrs
14/09/2021
Time 11:0Hrs
1465 Widening to Two Lane with Paved shoulders including strengthening work from km 14.500 to km 30.000 of NH101 New NH 331 on EPC mode in the state of Bihar for the year 2021 22 Length 15.50 Km

2021_MoRTH_640915_1 76.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2021
Time 15:0Hrs
13/09/2021
Time 15:0Hrs
1466 Improvement of road safety from Km 200 00 to 219 350 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh on EPC mode of contract

2021_MoRTH_640966_1 8.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2021
Time 18:0Hrs
13/09/2021
Time 11:0Hrs
1467 Widening to two lane including road safety works on Paonta Sahib Rajban Shillai Meenus Hatkoti Road from Km. 149/00 to 161/715 on NH-72B (New NH-707)

2021_MoRTH_640800_1 73.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 18:0Hrs
13/09/2021
Time 11:0Hrs
1468 Rehabilitation and up-gradation to 2 lane with paved shoulder from Existing Chainage Km 134.950 to Km 166.100 (Design Chainage Km 116.980 to Km 146.700) (Package - VI) under 31 BRTF on Akhnoor-Poonch Road (NH-144A) under Project Sampark in the UT of Jammu & Kashmir under project Sampark, Border Roads Organization (BRO) on EPC Mode

SPK/PKG-6/A-P RD/2021-22-01 295.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 17:0Hrs
13/09/2021
Time 11:0Hrs
1469 Widening and Strengthening to 2 lane with Paved Shoulders from Intermediate lane of NH- 516E from Km 16/000 to Km 28/000 (except Km 18/400 to Km 20/000) of Rajamahendravaram to Rampachodavaram in the state of Andhra Pradesh on EPC mode

SENHVJA/34/2020-21, Dated.05.07.2021. 54.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2021
Time 15:0Hrs
09/09/2021
Time 15:0Hrs
1470 PR work from Km 189/100 to Km 192/0 of Kurnool – Ranipet road New NH-40 in the State of Andhra Pradeshon through EPC mode(2nd call).

32/SE,NH,ATP/EPC/AEE1/2021-22,Dt: 02.08.2021 2.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
1471 PR work from Km 23/0 to 23/4, from Km 31/8 to 32/3, from Km 33/2 to 33/4, Km 39/0-6, Km 40/0-4 from km 43/4-8, Km 49/0-2,in Km 57/0 to 57/5, Km 74/6-8, In Km 75/4-6 and from Km 76/0 to 79/0 of Kurnool – Guntur road of NH340C in Kurnool District on EPC Mode.(2nd call)

2021_MoRTH_642127_1 2.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
1472 Periodic Renewal Work from Km. 91.075 to Km. 98.475 (Except 200m from Km 92.125 to Km 92.325) of NH-727H under EPC Mode in the State of Uttar Pradesh.

2021_MoRTH_643836_1 4.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2021
Time 15:0Hrs
06/09/2021
Time 15:0Hrs
1473 Rehabilitation and Up-gradation of Amboli Junction to Ajara Section and Section of Ajara to Sankeshwar in the state of Maharashtra on EPC Mode.

2021_MoRTH_637340_1 468.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 17:0Hrs
03/09/2021
Time 15:0Hrs
1474 Widening the Existing Two Lane to Four Lane of Puducherry-Villupuram Road (NH-45A, New NH-32) from km 25/600 – km 37/420 including Strengthening and Construction of a new High Level Bridge across Sankarabarani River at Ariyapalayam in Puducherry Region on Engineering Procurement and Construction (EPC) Basis

2021_MoRTH_639345_1 70.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
03/09/2021
Time 11:0Hrs
1475 Widening of existing 2 lane bridge into 4 lane across Malatar at Ch.47/570 of NH45A in Puducherry

2021_MoRTH_639371_1 4.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
03/09/2021
Time 11:0Hrs
1476 Widening to two lane with paved shoulder and strengthening of Bhanjanagar to Aska road (NH-157) from km 119/000 to km 159/500 (Design chainage km 117/000 to km 157/500) in the state of Odisha on EPC mode. Bid ref no.- 06 CE NH of 2021-22

2021_MoRTH_639606_1 68.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2021
Time 9:0Hrs
02/09/2021
Time 12:0Hrs
1477 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727Gunder EPC Mode in the State of Uttar Pradesh

2021_MoRTH_643356_1 8.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2021
Time 15:0Hrs
01/09/2021
Time 15:0Hrs
1478 Permanent measures for Black Spot (ID.TN-02-316) at Km 198/300 - 199/2 of NH 209 (New No.NH 948)

2021_MoRTH_640807_1 4.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 15:0Hrs
31/08/2021
Time 15:0Hrs
1479 Permanent Measures to the BlackSpot (ID.TN-(02)-435) (Near SRP Mills) from Km 166/4 - 167/850 of NH 209 (Dindigul - Bangalore road) including Widening of CD Works

2021_MoRTH_640826_1 4.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2021
Time 10:0Hrs
31/08/2021
Time 15:0Hrs
1480 P/R to NH-326 from Km 192/450 to 192/797,194/000 to 198/000,199/150 to 202/150 & 202/790 to 212/700 in the state of Odisha on EPC mode (Bid Ref No.- 08 CE NH of 2021-22)

2021_MoRTH_642769_1 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2021
Time 18:55Hrs
31/08/2021
Time 12:0Hrs
1481 Construction of Four Lane LVUP alongwith approaches between existing Km 172.500 to km 174.000 on Barnala-Bathinda section of old NH-64 (New NH-07) in the State of Punjab on EPC Mode

2021_NHAI_82356_1 14.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/07/2021
Time 9:10Hrs
31/08/2021
Time 11:0Hrs
1482 Construction of LVUP near Dakoha railway crossing at Jalandhar City on old NH 01 (New NH 44) at Km 370.100 including entry/exit and other related works in State of Punjab on EPC mode

2021_NHAI_82079_1 12.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2021
Time 16:0Hrs
31/08/2021
Time 11:0Hrs
1483 Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode

2021_NHAI_80186_1 53.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 6:45Hrs
26/08/2021
Time 11:0Hrs
1484 Improvement Construction of existing Class 5 Road to NHIL Spec with Hard Shoulder from existing Km 134pt940 to Km 169pt970 Design chainage from Km 133 to Km 166 Total Length 33 of NH 505 Sumdo-Kaza-Gramphoo Road on EPC mode in HP Package II

2021-BRO-63499-1 186.890 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 17:55Hrs
24/08/2021
Time 12:0Hrs
1485 Construction of VUP at Tayalur cross CH 237.080 and provision of SVUP Ch.237.370 KGF cross in the approach portion of Black spot KA 02 486 Construction of LVUP at Virupakshi junction Ch.238.250 KA 02 417 under road safety for rectification of blackspot in the stretch of Mulbagal AP KNT Border Section of NH 75 old No. NH 4 from Km. 216.912 to Km. 239.100 in the State of Karnataka under EPC mode

NIT No.15 NHAI RO BNG 11019 Tender 2021 22 dated 22.07.2021 52.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2021
Time 15:0Hrs
19/08/2021
Time 15:0Hrs
1486 Rehabilitation and Upgradation of NH-565 from Km 86.057 to 132.920 Nagarjuna Sagar Dam to Davulapally section to two lane with paved shoulder in the State of Andhra Pradesh through EPC mode

RW/NH-12014/66/2020-AP/Z-III Dt21-06-2021 313.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/07/2021
Time 15:0Hrs
18/08/2021
Time 17:0Hrs
1487 Construction of Railway over Bridge at Km 60/200 of NH-316 (Km 3.2 of Old NH-203E) at Matiapada on Puri Konark Road, (KP-42 of Khurdha-Puri-Rail Line) in the state of Odisha on EPC Mode. (Bid Ref No.- 04 CE NH of 2021-22).

2021_MoRTH_636093_1 49.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 16:0Hrs
18/08/2021
Time 12:0Hrs
1488 Construction of 5 HL Bridges at 379/000 km (Pangam), 439/400 km (Potteru),444/237km(Kongurukonda), 457/075 km(MV-90), 468/150 km (MV-96), of NH-326 at on Malkangiri-Motu road in the state of Odisha on EPC mode.(Bid Ref No. - (05 CE NH of 2021-22)

2021_MoRTH_636090_1 103.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 16:0Hrs
18/08/2021
Time 12:0Hrs
1489 Rehabilitation and Up gradation of NH-167B from Km 143/320 (Malakonda) to 189/050 (Singarayakonda) (on NH16) to two lane with paved shoulders in Andhra Pradesh on EPC mode

2021_MoRTH_634782_1 301.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2021
Time 17:0Hrs
16/08/2021
Time 17:0Hrs
1490 Construction of LVUPs at Km 153 600 at Adhegaon Junction and at Km 217 565 at Mohol Junction on NH 65 and four laning of Tembhurni town portion from Old Chainage Km 153 050 to Km 159 280 (Not a part of NH 65) with Design Length 6 230 Km in Pune Solapur section of NH 09 (New NH 65) in the state of Maharashtra

2021 NHAI 80200 1 82.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2021
Time 15:0Hrs
16/08/2021
Time 11:0Hrs
1491 CONSTRUCTION OF TWO NOS OF 40 M SINGLE SPAN TWO LANE PERMANENT BRIDGES OF LOAD CLASS 70R AT KM 0PT50 AND KM 2PT10 ON HANLE CHUMAR ROAD UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE

2021_BRO_455156_1 8.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2021
Time 19:0Hrs
12/08/2021
Time 12:0Hrs
1492 Strengthening and Improvement of existing 2/4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.

2021_NHAI_80461_1 24.810 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2021
Time 17:5Hrs
09/08/2021
Time 11:0Hrs
1493 Periodic Renewal Work in Km. 160 to 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_637283_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2021
Time 17:0Hrs
05/08/2021
Time 17:0Hrs
1494 Work of Strengthening of NH-727B from Sikandarpur to Ballia (km. 102.000 to km. 136.900) in the State of Uttar Pradesh under EPC mode

2021_MoRTH_637681_1 35.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2021
Time 15:0Hrs
05/08/2021
Time 15:0Hrs
1495 Rehabilitation and Up gradation of existing road to two Lane with paved shoulder configuration from Design Chainage Km. 36/400 to Km. 107/224 of NH-167BG from Duttaluru (at NH-565 Junction) to Kavali (Joining on NH-16) in the State of Andhra Pradesh on EPC mode

2021_MoRTH_633942_1 362.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2021
Time 17:0Hrs
05/08/2021
Time 15:0Hrs
1496 Development of Four Lane Road Connectivity from existing East break water upto Convent Junction from Phase 1 of the project start from Km. 0.312 [End of Visakhapatnam Port Trust (VPT) (under construction) and Ends at Km. 3.800 [VCTPL Exit Gate having a total length of 3.488 Km] in Andhra Pradesh on EPC mode under Bharatmala Pariyojana.

67725 50.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 11:0Hrs
05/08/2021
Time 11:0Hrs
1497 Periodical Renewals from Km 194.00 (Murgundi) to 282.475 (Gotur) of NH-548B) MH Border-Vijayapur-Sankeshwar section in the State of Karnataka. (Job No.NH-548B-KNT-PR-2020-21-31).

2021_MoRTH_625561_1 20.280 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/07/2021
Time 11:0Hrs
04/08/2021
Time 17:0Hrs
1498 Construction of Bypass on NH-59 from km 336.350 to 349.910 km (13.560 km) near Berhampur including four lane ROB in the state of Odisha on EPC Mode. (Bid Ref No.- 01 CE NH of 2021-22)

2021_MoRTH_634960_1 153.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 18:55Hrs
04/08/2021
Time 12:0Hrs
1499 Reconstruction of H.L.Bridge over Kantyialli Nallah at 47/200 Km. of N.H.-153B in the state of Odisha on EPC mode (Bid Ref No.- 02 CE NH of 2021-22)

2021_MoRTH_634982_1 7.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2021
Time 18:55Hrs
04/08/2021
Time 12:0Hrs
1500 Widening to Two Lane with Paved Shoulder from Km 105.00 to 110.838 of NH 544DD Anantpur- Molkalmuru section in the State of Karnataka on Engineering, Procurement and Construction (EPC). Basis Contract. (Job no. NH-544DD-KNT-2020-21-922)

2021_MoRTH_634543_1 29.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2021
Time 13:0Hrs
03/08/2021
Time 15:0Hrs
1501 Four laning of Miraj city portion Length in Miraj Solapur section of NH 166 from Km 189 300 to Km 200 100 Design Length 10 800 Km in the state of Maharashtra on EPC mode

2021 NHAI 80212 1 23.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2021
Time 15:0Hrs
29/07/2021
Time 11:0Hrs
1502 Construction of Four Laning of Pinjore (End of Pinjore Bypass) – Nalagarh Section from Km 4.200 to Km 35.395 on NH- 105 (old NH-21A) in the State of Haryana and Himachal Pradesh under Bharatmala Pariyojna

2021_NHAI_78322_1 731.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2021
Time 11:0Hrs
28/07/2021
Time 11:0Hrs
1503 Widening of existing 2-lane pavement to 4-lane divided carriageway with paved shoulders from 24.700 km to 25.700 km strengthening-stage-strengthening from 14.400 km to 24.700 km construction of two minor bridges at 17.036 km and 18.736 km widening reconstruction of culverts construction of retaining wall and permanent rectification of 13 black spots Sarat Colony WB-02-570-Birati WB-02-469-Gouripur Kalibari WB-02-569-Bankra More WB-02-568-Michaelnagar WB-02-470-B.T. College WB-02-468-Doltala More WB-02-196-Madhyamgram Chowmatha WB-02-127-Narayani Hospital WB-02-465-Dakbanglow More WB-02-562-Colony More WB-02-640-Helabattala More WB-02-687 and Airport Gate no. 3 WB-02-349 on NH-34 New NH-12 under NH Division-V in the State of West Bengal on EPC mode

2021_MoRTH_618135_1 77.072 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2021
Time 18:0Hrs
28/07/2021
Time 11:0Hrs
1504 Construction of 2 Lane, Class –A Loading Steel Girder RCC deck composite Bridge of 15m Span at Km. 11 (0-2) and RCC Bridge of 13.5m Span bridge at K. 11 (8-10), 36m Span Steel Girder RCC Deck composite Bridge at Km. 31 (2-4) and 9.32 m Span RCC Bridge at km 33 (4-6) on NH-87Ext. (New NH-109) in the state of Uttarakhand.

2021_MoRTH_635797_1 12.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/06/2021
Time 14:0Hrs
24/07/2021
Time 17:0Hrs
1505 Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh On EPC mode

2021-MoRTH-633104_1 24.097 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2021
Time 18:0Hrs
23/07/2021
Time 11:30Hrs
1506 Construction of bypass for providing inter-connectivity amongst National Highways (NHs) around the Pratapgarh city (Pratapgarh Bypass)on EPC mode in the state of Uttar Pradesh (Job No. Pratapgarh Bypass- UP-2021-22-593 Dt. 12-04-2021

2021_MoRTH_633457_1 240.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2021
Time 15:0Hrs
23/07/2021
Time 11:0Hrs
1507 Re construction of 6 bridges on NH 21A New NH 105 Pinjore Swarghat in the State of Himachal Pradesh.

2021-MoRTH-632201-1 36.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/06/2021
Time 18:0Hrs
23/07/2021
Time 11:0Hrs
1508 Formation of Bypass to Mudigubba on NH42 from Km 130/400 to 137/500 Total Length 7.749 Km in the state of Andhra Pradesh on EPC mode

2021_MoRTH_629971_1 94.942 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2021
Time 15:0Hrs
22/07/2021
Time 15:0Hrs
1509 Construction and Upgradation of road to NHSL specification from Sumna i.e chainage km 0.0 to Km 22.050 (Design chainage km 0.0 to km 22.050)(Lapthal) of road Sumna-Lapthal-Topidunga (SLT) , in 21 BRTF area under Project Shivalik in Uttarakhand State on EPC mode (Length 22.050 Km)

2021_BRO_448014_1 226.770 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2021
Time 15:0Hrs
22/07/2021
Time 12:0Hrs
1510 Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.154.210 to Ch.158.650 (North Bound) and from Ch.155.940 to Ch.160.260 (South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_74088_1 1,245.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
20/07/2021
Time 11:0Hrs
1511 Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.158.650 to Ch.164.660 (North Bound) and Ch.160.260 to Ch.163.406 (South Bound connecting with Existing Tunnel-T4) excluding Ch.161.350 to Ch.164.100 (North Bound) including construction of twin tube tunnel (Package-II) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_74096_1 1,030.440 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
20/07/2021
Time 11:0Hrs
1512 Construction of Four Laning of Ramban to Banihal Section of NH-IA (Now NH-44), from Ch 165.092 to Ch 171.855 (North Bound) and from Ch 166.895 to Ch 173.638 (South Bound) (Makarkot- Ramsu-Nachlana - upto end of 3km Viaduct) excluding section from Ch 166.610 to Ch 167.150 (North Bound) Ch 168.425 to Ch 168.935 (South Bound) and Section from Ch 167.960 to Ch. 168.168(North Bound), Ch 169.745 to Ch 169.951 (South Bound) (Package-III) in the UT of Jammu & Kashmir on EPC Mode

2021_NHAI_73875_1 665.590 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/03/2021
Time 17:0Hrs
20/07/2021
Time 11:0Hrs
1513 Construction of Six lane Elevated highway between km 414.000 at Beas to km 438.850 at Jandiyala including VUP at km 432.300 at Chouhan and flyover at km 425.880 at Khilchanon on Amritsar Jalandhar section from km 413.100 to km. 439.990 of old NH01 in the State of Punjab on EPC mode

2021_NHAI_75493_1 164.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/04/2021
Time 15:0Hrs
19/07/2021
Time 11:0Hrs
1514 Construction of New High Level RCC Major Bridge at existing location of Old Bridge Across Chir River in KM 199 on NH-333A & its approaches having an aggregate length of 700m (350m on both side) in district banka in the State of Bihar on EPC Mode.

2021_MoRTH_632140_1 40.049 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 12:0Hrs
16/07/2021
Time 15:0Hrs
1515 Reconstruction of badly damaged sunken stretches and overlay in balance stretches (in bits) in Km 336-337, Km 343-347, Km 348-351, Km 373-375 and Km 380-381 of NH-544D in the State of Andhra Pradesh on EPC Basis.

2021_MoRTH_631601_1 14.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 17:0Hrs
15/07/2021
Time 17:0Hrs
1516 Upgradation of port connectivity NH configuration from existing 2- lane to 4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of Andhra Pradesh on EPC Mode under Bharatmala Scheme

67542 130.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 11:0Hrs
15/07/2021
Time 11:0Hrs
1517 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727G under EPC Mode in the State of Uttar Pradesh. (Job No. CE-RO/LKO/NH-727G/ PR/16/2020-21, dated- 09.03.2021)

2021_MoRTH_635473_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 24/06/2021
Time 14:30Hrs
14/07/2021
Time 15:0Hrs
1518 Four laning of Honnavar Port Connectivity road from Km 0.00 (Kasarkod side of Honnavar Port) to Km 2.58 (towards NH-66) connecting Honnavar Port with NH-66 at Km 196.00 and to improve NH-66 from Km 195.00 to Km 197.00 to integrate port connectivity road on EPC mode under Bharatmala Phase-I in the State of Karnataka

NHAI/11011/PC/Kasarkod-Honnavar Port 111.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
14/07/2021
Time 11:0Hrs
1519 P/R to NH-326 from Km 40/000 to 69/200 (Except from KM 50/000 to 51/000 and 52/000 to 53/000) in the state of Odisha on EPC mode(Bid Ref No.- 03 CE NH of 2021-22)

2021_MoRTH_635194_2 6.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2021
Time 18:55Hrs
13/07/2021
Time 12:0Hrs
1520 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis Contract

2021_MoRTH_634017_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2021
Time 14:0Hrs
13/07/2021
Time 11:0Hrs
1521 UP-GRADATION OF DHORAJI – JAMKANDORANA – KALAVAD – SECTION OF NH-927D FROM DESIGN CHAINAGE KM 0/00 TO KM 58/115 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF GUJARAT

2021_MoRTH_611716_2 148.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2021
Time 12:0Hrs
12/07/2021
Time 16:0Hrs
1522 Reconstruction and Strengthening of Deverapalli to Jeelugumilli (NH 516D) from Km 20.500 to 29.630 and from Km 33.130 to 56.230 (Package-2) in the State of Andhra Pradesh on EPC Basis.

2021_MoRTH_631234_1 76.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2021
Time 15:0Hrs
12/07/2021
Time 15:0Hrs
1523 Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in the state of Uttarakhand on EPC Mode.

2021_NHAI_78122_1 167.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 18:40Hrs
12/07/2021
Time 11:0Hrs
1524 6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna

66236 1,245.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 11:0Hrs
12/07/2021
Time 11:0Hrs
1525 Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode(Job No. NH-24A-UP-2020-21-592)

2021_MoRTH_631198_1 138.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2021
Time 15:0Hrs
10/07/2021
Time 15:0Hrs
1526 Rehabilitation and Up gradation on Barnala Mansa Sardulgarh NH 703 Road in the state of Pb

CWD No.1 /BTI-NH/08 71.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2021
Time 15:0Hrs
10/07/2021
Time 11:0Hrs
1527 PR work from Km 133/6 to 157/6 and from Km 168/6 to 175/6 Atmakur Nandyal section of NH 167K in Kurnool District of Andhra Pradesh on EPC mode

2021_MoRTH_630517_1 15.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1528 Periodic Renewal to link roads connecting NH 544DD to NH 544DD from Km 23.750 to Km 27.960 (Atmakur village limits), Km 42.788 to Km 45.267 (Golla village limits) and Km 47.910 to Km 50.282 (Borampalli village limits) of Aanantapuramu Kalyandurg Rayadurg Road in the state of Andhra Pradesh on EPC Mode.

2021_MoRTH_630675_1 2.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1529 PR work from Km 14/0 to 21/0 and Km 60/0 to 68/0 of Ananthapuramu Tadipatri Bhogasamudram road of NH544D (4L) in Ananthapuramu district in the state of Andhra Pradesh on EPC mode

2021_MoRTH_630386_1 8.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1530 PR work from Km 26/0 to Km 53/0 of Madanapalli Naidupeta road of NH71 in the state of Andhra Pradesh through EPC mode

2021_MoRTH_629735_1 11.152 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1531 PR work from Km 203/0 to 209/100 on Ananthapuramu Guntur road of NH544D in Prakasam District in the state of Andhra Pradesh on EPC mode

2021_MoRTH_630515_1 1.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1532 PR work from Km 209/0 to 210/0, From Km 211/0 to 213/0, From Km 228/0 to 232/0 and from Km 262/2 to 263/0 of Hyderabad-Srisailam-Tokapalli road of NH765 in Prakasham District of Andhra Pradesh on EPC mode

2021_MoRTH_630520_1 1.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1533 PR work from Km 23/0 to 23/4, From Km 31/8 to 32/3, From Km 33/2 to 33/4, Km 39/0 6, Km 40/0 4,From Km 43/4 8, Km 49/0 2, In Km 50/0 4, Km 57/0 to 57/5, Km 74/6 8, in Km 75/4 6 and From Km 76/0 to 79/0 of Kurnool Guntur Road of NH340C in Kurnool Dist

2021_MoRTH_630516_1 2.594 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2021
Time 15:0Hrs
08/07/2021
Time 15:0Hrs
1534 Construction of Eight Lane access-controlled expressway starting from MP-Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village in Dahod district (Ch. 696.920 to 729.755) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg26 1,417.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2020
Time 15:0Hrs
07/07/2021
Time 11:0Hrs
1535 Widening to Two lane with paved shoulders/ Four lane from Km. 455.845 (SH chainage) (NH km.24.125) to Km.489.845 (SH chainage) (NH Km.58.125) of Belur to Hassan section of NH - 373 on EPC mode in the State of Karnataka (Job No.NH-373-KNT-2020-21-923)

2021_MoRTH_629336_1 178.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 17:30Hrs
06/07/2021
Time 17:30Hrs
1536 Widening and Strengthening from km 0.000 to 35.000 (Mohanganj to Autarpur) of National Highway No. 731A to two lane with paved shoulder in the state of Uttar Pradesh on Engineering, Procurement Construction (EPC) Mode.

2021_MoRTH_625106_1 185.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
06/07/2021
Time 11:0Hrs
1537 Periodic Renewal Work from Km. 91.075 to Km. 98.475 (Except 200m from Km 92.125 to Km 92.325) of NH-727H under EPC Mode in the State of Uttar Pradesh.

2021_MoRTH_631901_1 4.830 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/06/2021
Time 15:0Hrs
02/07/2021
Time 15:0Hrs
1538 PR work from Km 572/2 to 577/0 and 583/0 to 588/0 of Hubli Krishnapatnam road NH-67 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629732_1 7.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
1539 PR work from Km 189/100 to 192/0 of Kurnool Ranipet Road New NH40 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629810_1 2.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
1540 PR work from Km 72/0 to Km 75/2, Km 80/0 to Km 85/0 and Km 87/0 to Km 91/0 of Madanapalli Naidupeta road of NH71 in the state of Andhra Pradesh through EPC mode.

2021_MoRTH_629805_1 5.578 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2021
Time 15:0Hrs
01/07/2021
Time 15:0Hrs
1541 Improvement of Road Safety on NH-70 from Km 58 400 to Km 114 0 by Providing and fixing Thrie Metal Beam Crash Barrier Construction of Retaining wall Breast wall Construction of U-Shape drain with edge wall and Providing and fixing of Sign

2021_MoRTH_629183_1 27.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
1542 Improvement of Road Safety on NH-503 20A between Km. 39 0 to 91 0 Ranital-Mubarikpur Providing and Fixing Thrie single side Metal Beam Crash Barrier etc in the State of Himachal Pradesh on EPC mode

2021_MoRTH_629192_1 20.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
1543 Improvement of Road Safety on NH-205 between Km. 111 0 to 118 0 by Providing and Fixing Thrie single side Metal Beam Co R wall Extn. of RCC slab culvert in the State of Himachal Pradesh on EPC mode

2021_MoRTH_629198_1 11.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 18:0Hrs
01/07/2021
Time 11:0Hrs
1544 Construction of 2 lane service road alongwith Retaining Wall at Patiala-Sanaur Junction existing VUP km 54.702 on Patiala Bypass section of NH64 New NH 07 in the State of Punjab in EPC Mode

2021_NHAI_76965_1 12.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 17:30Hrs
29/06/2021
Time 11:0Hrs
1545 SANGRAMA FLYOVER

CE (P) BCN/29/2020-21 26.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2021
Time 15:0Hrs
26/06/2021
Time 11:0Hrs
1546 Widening and Strengthening from KM 93/400 to 95/410 of Madanapalle -Naidupeta road of NH-71 to two lane with paved shoulder in the State of Andhra Pradesh on EPC mode

2021_MoRTH_629402_1 10.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
1547 WIDENING and STRENGTHENING OF 2/4 LANE TO 4 LANE CARRIAGEWAY FROM KM 6/0 TO 15/0 OF KURNOOL GUNTUR ROAD (NH-340C) IN KURNOOL DISTRICT (KURNOOL MUNICIPAL CORPORATION LIMITS) IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE OF CONTRACT UNDER NH(O).

2021_MoRTH_629396_1 84.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
1548 Construction of 4- Lane ROB at Km 510/8 of NH- 565, Near yerpedu in Lieu of L.C No. 36 in the state of Andhra Pradesh on EPC mode

2021_MoRTH_629406_1 79.590 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 10/05/2021
Time 15:0Hrs
24/06/2021
Time 15:0Hrs
1549 Widening and Upgradation to four lane configuration from km 34.900 (Bhadohi) to Km 73.134 (Jaunpur) of NH-135A in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) mode.

2021_MoRTH_626267_1 244.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2021
Time 16:0Hrs
23/06/2021
Time 18:0Hrs
1550 Periodic Renewal work from Km. 160 to km. 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_631125_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 17:0Hrs
23/06/2021
Time 11:0Hrs
1551 Strengthening of Existing road between km. 407/700 to 426/500 on NH 68 in the state of Gujarat on EPC mode of Contract

2021_MoRTH_629216_1 14.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 15:0Hrs
21/06/2021
Time 17:0Hrs
1552 Strengthening of existing road between km 33/600 to Km 55/400 [excluding km 39/320 to km 40/190] (Thavar- Zerda Section) on NH-168A in the State of Gujarat under EPC mode of Contract

2021_MoRTH_629203_1 13.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
1553 Widening and Strengthening in Km 64/0 -70/0 of NH 49 Extn (New NH No - 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_629044_1 18.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2021
Time 16:0Hrs
21/06/2021
Time 15:0Hrs
1554 work of strengthening of existing road from Km. 109.300 to Km. 131.625 of NH-330D (Between Bilgram and Kannauj) in the State of Uttar Pradesh under EPC Mode

2021_MoRTH_629912_1 13.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
1555 Upgradation to 4 Lane Bameetha to Khajuraho section of NH-339B from Km 0/000 to Km 10/150 on EPC mode in the state of Madhya Pradesh

2021_MoRTH_629197_1 56.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2021
Time 15:0Hrs
21/06/2021
Time 15:0Hrs
1556 IMPROVEMENT OF JUNCTION AT I SAINWALA Km 54 0, II NAHAN DOSARKA Km 60 0, III KOLAR JUNCTION Km 79 0 AND IV MAJRA JUNCTION Km 88 700 ON KALA AMB PAONTA DEHRADUN ROAD ON NH 07 BETWEEN Km 46 0 TO 103 0 IN THE STATE OF HIMACHAL PRADESH.

2021_MoRTH_629309_1 5.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/05/2021
Time 18:0Hrs
21/06/2021
Time 11:0Hrs
1557 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727Gunder EPC Mode in the State of Uttar Pradesh

2021_MoRTH_630653_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/05/2021
Time 18:0Hrs
19/06/2021
Time 15:0Hrs
1558 Widening and Strengthening to Urban Link of NH-42 from Km 0/000 to Km 9/200 in Anantapur Town in the state of Andhra Pradesh through EPC mode of Contract under NH(O).

2021_MoRTH_628737_1 272.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/05/2021
Time 15:0Hrs
17/06/2021
Time 15:0Hrs
1559 Construction of Retaining wall, Thrie Beam, Crash Barriers, Signages from Katori Bangla to Chamba Km 39/0 to 106/0 including rectification of identified black spots (7 Nos) of NH 154-A in the state of Himachal Pradesh.

2021_MoRTH_627691_1 22.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2021
Time 18:0Hrs
15/06/2021
Time 11:0Hrs
1560 Construction of flyover at existing km 6.000 at Bharat Nagar Junction with 4 lane flyover towards ISBT from km 5.302 and 2 lane Ramp towards railway station from km 5.240 (back Chainage) including resurfacing/ construction of existing Service Road of old NH95 (New NH05) (Section Passing through Ludhiana City) in the State of Punjab on EPC Mode

PD-LDH/ELEVT-CORR/SMRL-CHK/(EPC)/RFP 59.410 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2021
Time 15:0Hrs
14/06/2021
Time 11:0Hrs
1561 Rehabilitation of Major Bridge at Km 186/621-187/091 of NH45A (Viluppuram -Pudhucherry-Cuddalore-Chidambaram-Sirgazhi-Nagapattinam Road) on Engineering Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu.

2021_MoRTH_614033_1 0.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2021
Time 15:0Hrs
08/06/2021
Time 15:0Hrs
1562 Strengthening in Km 5/2 - 5/6 and Km 10/2 - 14/6 of NH 49 Extn. (Madurai - Cochin Road) New No. NH - 85 on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2021_MoRTH_619170_1 0.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/03/2021
Time 15:0Hrs
08/06/2021
Time 15:0Hrs
1563 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand.

657/13Yata-NH-10/2021 dated 10.02.2021 188.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2021
Time 15:0Hrs
08/06/2021
Time 11:0Hrs
1564 The work of Construction of 4-Laned Single Span Steel Bridge on Sirhind Canal at RD 86.900 in Ropar City Portion of NH-344A in the State of Punjab on EPC Mode

03 70.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2021
Time 17:0Hrs
08/06/2021
Time 10:0Hrs
1565 Improvement to 2 lane with PS of stretch from Bikramganj Dawath Maleyabagh Nawanagar Dumraon of NH 120 CH 201.665 to 240.200 excluding Dawath Bypass on EPC mode

2021_MoRTH_621661_1 148.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2021
Time 15:0Hrs
07/06/2021
Time 11:0Hrs
1566 Rectification of 2 number Black Spots Package 4 Maheshwar (65.338 to 65.746,66.175 to 66.885) and km 70.684 to 71.310 km (Chichi Mata) i.e.1.744 Km section District Samba in the union territory of Jammu and Kashmir

2021_NHAI_76191_1 18.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2021
Time 9:0Hrs
07/06/2021
Time 11:0Hrs
1567 Periodic Renewal Work from Km.95.000 to Km.97.000, Km.101.000 to Km.102.000, Km. 103.000 to Km.107, Km.108.000 to Km.111.000, Km.120.000 to Km.124.000, Km.132.000 to Km.151.000 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_618390_1 8.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/02/2021
Time 15:0Hrs
03/06/2021
Time 15:0Hrs
1568 Periodic renewal (PR) Work from Km. 10.000 to Km. 29.990 and From Km. 71.450 to Km. 72.080 of NH-727H on EPC Mode in the State of Uttar Pradesh

2021_MoRTH_618408_1 4.990 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/02/2021
Time 18:0Hrs
03/06/2021
Time 15:0Hrs
1569 Periodic Renewal (PR) Work in the stretch from km 13.000 to km 21.000 and km 34.000 to km 56.800 on NH-328A in the State of Uttar Pradesh on EPC mode

2021_MoRTH_618558_1 8.130 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/02/2021
Time 15:0Hrs
03/06/2021
Time 15:0Hrs
1570 P/R to NH-326 from Km 192/450 to 192/797,194/000 to 198/000,199/150 to 202/150 & 202/790 to 212/700 for the year 2020-21 (Bid Ref No.- 16 CE NH of 2020-21)

2021_MoRTH_619981_2 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2021
Time 18:55Hrs
03/06/2021
Time 12:0Hrs
1571 Development of six lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 0.000(Aksardham NH-9 (old NH 24)) to Design Chainage 14.750 (Delhi/UP Border) in the state of Delhi (Package 1) on EPC mode

NHAI/BM/EC/Delhi-Saharanpur/Akshardham-EPE/PKG-1/2019 1,264.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1572 Strengthening work from km. 128.00 to 158.00 and km. 164.00 to 189.00 on NH-121(309) in the State of Uttarakhand on EPC mode

2021_MoRTH_629018_1 26.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1573 “Protection Work From Km 30.00 To Km 40.00 On NH-534(119) In The State Of Uttarakhand Under Road Safety On EPC Mode

2021_MoRTH_629052_1 5.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2021
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1574 Development of 6 lane Urban Extension Road UER 2 NH344 M Package 1 from NH 1 to Karala Kanjhawala road Km 0.700 to 15.000 in the State of Delhi

2019_NHAI_38962_1 1,579.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1575 Development of 6 lane Urban Extension Road II UER II NH 344 M Package 2 From Karala Kanjhawala Road Km 15.000 to Nangloi Najafgarh Road Km 28.450 in the state of Delhi.

2019_NHAI_38969_1 1,132.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1576 Development of 6 lane Urban Extension Road II UER II NH 344 M Package 3 From Nangloi Najafgarh Road Km 28.450 to Dwarka Sector 24 Road Km 38.111 in the state of Delhi on EPC mode.

2019_NHAI_38956_1 685.310 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1577 Development of 4 lane Road Link from Km 0.000 to 7.269 7.3km NH 344 N starting from NH 344 M Delhi at Km 26.135 of NH 344M or UER II till Bahadurgarh bypass of NH 10 near Bahadurgarh in Haryana as spur of NH 344M Urban Extension Road II Package V under National Corridor Route under Bharatmala Pariyojana Phase I in the state of Delhi and Haryana

2019_NHAI_38968_1 324.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1578 Construction of 4 lane NH 344P Package 4 from Km 0.000 to 29.600 29.6 kms starting from Bawana Industrial Area Delhi at Km 7.750 of NH 344M till Sonipat bypass of NH 352A at Village Barwasani Sonipat in Haryana as spur of NH 344M in the state of Delhi and Haryana

2019_NHAI_38959_1 741.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
03/06/2021
Time 11:0Hrs
1579 Stage strengthening work from km 374.00 to km 401.00 of NH-60 (new NH-14) including rectification of 5 identified black spots [WB-(02)-013-Mansuba More, WB-(02)- 198-Tejhati, WB-(02)-199-Lotus Press More, WB-(02)-262-Mollarpur, WB-(02)-352- Majhkhanda More] under NH Division No. XII, P.W. (Roads) Directorate in the District of Birbhum, West Bengal

2021_MoRTH_618280_1 39.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2021
Time 19:0Hrs
02/06/2021
Time 13:0Hrs
1580 Strengthening work from Km 104.00 to Km 125.00 & km 132.00 to km139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode

2021_MoRTH_626795_1 22.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/04/2021
Time 15:0Hrs
01/06/2021
Time 11:0Hrs
1581 Construction of ROB and its approaches in replacement of existing level crossings at LC no. 50/B/E at km 298.000 on NH-75E in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_628545_1 22.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2021
Time 15:0Hrs
31/05/2021
Time 15:0Hrs
1582 [Strengthening work from Chainage Km. 68.570 to Km. 75.000 on NH 107 under Annual Plan of NH(O) 2020-21 in the state of Uttarakhand

2021_MoRTH_628664_1 6.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2021
Time 15:0Hrs
31/05/2021
Time 12:0Hrs
1583 Rectification of Black Spot Package 5 from km 67.180 to km 69.030 (Samba) i.e.1.85 Km section in Union Territory of Jammu and Kashmir on EPC Mode

2021_NHAI_75909_1 92.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 16:0Hrs
31/05/2021
Time 11:0Hrs
1584 Rectification of Black Spot Mansar Morh from km 69.780 to km 70.690 (Mansar Morh) i.e. 0.91 Km section district Samba in union territory of Jammu and Kashmir on EPC Mode

2021_NHAI_75924_1 21.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 16:30Hrs
31/05/2021
Time 11:0Hrs
1585 Strengthening Work from Km 16.000 to 19.860 and 38.060 to 40.000 of NH 219 on EPC mode in the state of Bihar

2021_MoRTH_626840_1 17.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2021
Time 15:0Hrs
27/05/2021
Time 15:0Hrs
1586 Construction of of 4-Lane Road in Km 226.200 to Km 228.200 (Geeta nagar chowk to Chandrabhaga Bridge) and Construction of Both side shoulders by Interlocking Tiles from Km 218.200 to Km 228.200 on NH 58 in the state of Uttarakhand ( Under EPC mode)

1355/13yata-nh-10/2021 dated 25.03.2021 10.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2021
Time 15:0Hrs
27/05/2021
Time 11:0Hrs
1587 Development of six lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in the state of Uttar Pradesh on EPC Mode (Package-II)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-II/2020 693.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
24/05/2021
Time 11:0Hrs
1588 Development of of six lane access control greenfield highway of Delhi Saharanpur Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 56.500 (Vill Karaunda Mahajan) to Design Chainage 82.000 (Vill Khyawari) in the state of Uttar Pradesh on EPC Mode (Package III)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-III/2020 633.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
24/05/2021
Time 11:0Hrs
1589 Road Safety of Jalandhar Hoshiarpur Manali Road NH 70 New NH 03 from Km 49.200 to 58.85 in the State of Punjab on EPC mode

2021_MoRTH_628461_1 4.940 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/04/2021
Time 15:0Hrs
17/05/2021
Time 17:0Hrs
1590 Rectification of Black Spot by means of construction of VUP on NH-05 Km 236.845 to Km 237.654 (0.80 Km) Section Black Spot location at Tax Barrier Zirakpur-Ambala Road in the State of Punjab on EPC Mode.

2021_MoRTH_627019_1 9.530 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 17/04/2021
Time 15:0Hrs
17/05/2021
Time 15:0Hrs
1591 Periodic Renewal work from Km. 160 to km. 174 of NH-227A under EPC mode in the state of Uttar Pradesh

2021_MoRTH_625168_1 5.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 15:0Hrs
15/05/2021
Time 11:0Hrs
1592 Construction of Road Side Covered Drain in Km 213(P) to 215(P) in Bihra Bazar of NH-327E for the year 2020-21 on EPC Mode (Job No. 327E-BR-2020-21-29)

2021_MoRTH_626409_1 5.506 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/04/2021
Time 15:0Hrs
13/05/2021
Time 11:0Hrs
1593 widening of 2-lane to 4 - lane in ch 155.100 to 160.700 from i.s.b.t to railway crossing of nh -72 (new no-7) in distt - dehradun in state of uttrakhand epc mode

1371/13yata-nh-10/2021 33.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2021
Time 15:0Hrs
11/05/2021
Time 12:0Hrs
1594 Strengthening of Stretches from Km140/6 to 153/6 of Renigunta - Kadapa- Muddanur road NH 716 in the state of AndhraPradesh on EPC mode

2021_MoRTH_622947_1 15.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2021
Time 15:0Hrs
10/05/2021
Time 15:0Hrs
1595 Rectification measures for black spot in the State of Punjab (1) black spot location at bus stand Shutrana on NH-52, km. 224.200 to 224.700 and (2) black spot location at bus stand Dhabi Gujjran on NH-52, km. 236.330 to km. 236.700 in the State of Punjab on EPC Mode

2021_MoRTH_626787_1 14.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/04/2021
Time 15:0Hrs
05/05/2021
Time 10:0Hrs
1596 Improvement/Up-gradation of road from KM 41st to Km 67th (Domail to Bhamla) and Providing Retaining wall, B/walls, Signages, Crash Barriers, 02 Nos 1Mtr Span RCC Culvert, 02Nos 6 Mtr Span RCC Culvert & Const. of 01No Minor Bridges etc in the selected reaches of NH-1C (New NH-144) in the UT of Jammu and Kashmir through an Engineering, Procurement and Construction (EPC) Contract

Bid/Package no. NH-144/44 of 2020-21 Dated 13.03.2021 30.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2021
Time 9:0Hrs
30/04/2021
Time 17:0Hrs
1597 Providing Retaining wall, B/walls, Minor Bridges, Signages, Crash Barriers & Slope protection in the selected reaches of NH-1C (New NH-144) from Km 24 to Km 41 in the UT of Jammu & Kashmir on EPC Mode

Bid/Package no. NH-144/39 of 2020-21 Dated 19.02.2021 47.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2021
Time 9:0Hrs
30/04/2021
Time 17:0Hrs
1598 Periodic renewal work from Km. 17.680 to Km. 46.900 of NH-727G under EPC Mode in the State of Uttar Pradesh

2021_MoRTH_625007_1 8.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/04/2021
Time 9:0Hrs
30/04/2021
Time 15:0Hrs
1599 Strengthening of NH-501 from Km. 49.50 to 63.50 (Length 14.00 K.M) Pahalgam-Chandanwari in the UT of Jammu and Kashmir on EPC mode Complete job

PCD-RnB-79of 2020-21 18.868 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 14:0Hrs
28/04/2021
Time 16:0Hrs
1600 The work for Construction of 4 Lane Single Span Steel Truss Bridge on Phagwara-Banga-Nawanshahar-Ropar road at RD 82.400 on Bist Doab Canal of NH-344A including approaches Ropar City in the State of Punjab

02 13.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2021
Time 15:0Hrs
26/04/2021
Time 10:0Hrs
1601 Construction of Protective works from Km 472/0 - 474/0 and Km 480/0 - 485/0 (Gudalur Town) including construction of CC drain and CD works of NH67 in the State of Tamil Nadu-EPC Basis

2021_MoRTH_619175_1 18.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2021
Time 10:0Hrs
22/04/2021
Time 11:0Hrs
1602 Construction of Six lane Elevated highway including LVUP/VUP at Junction of Amritsar Tanda section of NH-503A with Amritsar Jalandhar section of NH-01 (New NH-03) from km 451.120 to km. 452.810 of NH-01.

2021_NHAI_72802_1 48.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2021
Time 9:0Hrs
22/04/2021
Time 11:0Hrs
1603 RECONSTRUCTION /REHABILITATION OF DAMAGED ROAD SURFACE BY WMM/DBM/BC FROM KM 100.00 TO KM 128.00 ON NH-121 (NEW NH-309) in the State of Uttarakhand.

1165/13Yata-RaMa-10/2021 17.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2021
Time 15:0Hrs
20/04/2021
Time 11:0Hrs
1604 Up-gradation to two lane with paved shoulder configuration of NH-354 section Arifke-Ferozepur-Mukatsar-Malout from Km. 201.500 to km. 212.500 and km. 229.690 to km 269.960 and strengthing of Existing pavement from km. 212.500 to km 229.690 (Excluding km 218.500 to 223.690) of NH-354 on EPC Mode in the state of Punjab

2020_MoRTH_594868_1 208.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/11/2020
Time 9:0Hrs
19/04/2021
Time 16:30Hrs
1605 Providing Additional Street Light Facility at various Black Spot locations on the Project Highway under Road safety in the stretch of Bengaluru Hoskote Mulbagal Section from Km 237 700 to Km 318 000 of NH-4 in the State of Karnataka to be taken up under EPC mode

NIT No 57 NHAI RO-BNG 11019 Tender 2020 21 dated 30 03 2021 7.400 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/03/2021
Time 17:0Hrs
19/04/2021
Time 15:0Hrs
1606 Improvement of road safety from Km 200 00 to 219 350 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh

2021_MoRTH_620238_1 8.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2021
Time 18:0Hrs
17/04/2021
Time 11:0Hrs
1607 Construction of 4 lane Vehicular Underpass at Aler Jeedikal Cross Road at Km 72/010 along with Slip/Service Roads on Hyderabad Warangal section of NH 163 in the state of Telangana on EPC mode

NHAI/Tech/TS/Aler-Jeedikal/2021 35.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2021
Time 15:0Hrs
15/04/2021
Time 15:0Hrs
1608 CONSTRUCTION OF ROAD SIDE COVERED DRAIN IN KM 213(P) TO 215(P) IN BIHRA BAZAR OF NH-327E FOR THE YEAR 2020-21 ON EPC MODE (JOB NO. 327E-BR-2020-21-29)

2021_MoRTH_622180_1 5.506 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2021
Time 10:0Hrs
08/04/2021
Time 11:0Hrs
1609 Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase-I existing Km 72.000 to Km 107.620 Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand

RO/UK/BRO/NH-09/Askot-Lipulekh 406.630 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
07/04/2021
Time 11:0Hrs
1610 Construction of 6 lane Flyover at km 417.374 and 6 lane VUP at km 416.700 including construction of new service road at location of flyover and VUP on Jalandhar-Amritsar section of NH-01 New NH-03 for rectification of Blackspots in State of Punjab on EPC mode

2021_NHAI_70541_1 43.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2021
Time 9:0Hrs
05/04/2021
Time 11:0Hrs
1611 Construction of six lane flyover at existing km 430.625 near Tangra town and six lane VUP at existing km 435.170 near Mallian town including construction of new service road at location of flyover and VUP on Jalandhar Amritsar section of NH 01 New NH 03 in the State of Punjab on EPC Mode

2021_NHAI_69391_1 53.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 1:50Hrs
05/04/2021
Time 11:0Hrs
1612 Flood Damage Repair work in km 77.000 to 105.100 of NH-135C during 2020-21 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh.

2021_MoRTH_623679_1 0.790 MoRTH Normal Highway Project OTHERS 22/03/2021
Time 17:30Hrs
31/03/2021
Time 15:0Hrs
1613 Strengthening work in km 38.850Tarwara More Siwan to km 97.050 Ambedkar Chowk Dumerson Golumber of NH 227A under EPC mode in state of Bihar.

2021_MoRTH_608335_1 66.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2021
Time 15:0Hrs
31/03/2021
Time 11:0Hrs
1614 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 82.000 (VILL-KHYAWARI) TO DESIGN CHAINAGE 119.790 (VILL-LATIFPUR AT SAHARANPUR BYPASS) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-IV)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-IV/2020 835.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
30/03/2021
Time 11:0Hrs
1615 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM JUNCTION OF EPE (NEAR KHEKRA) DESIGN CHAINAGE 0.000 TO DESIGN CHAINAGE 27.000 (VILL.-LOHADDA) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-I).

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-I/2020 750.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
30/03/2021
Time 11:0Hrs
1616 Construction of rob and their approaches at km 103/4 near Ettivady in lieu of existing level crossing no.86/A-3/E @ Railway km 107/000-100 of NH-234 (Mangalore – Villupuram road) including land acquisition on EPC mode in the state of Tamilnadu

2021_MoRTH_615370_1 48.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2021
Time 16:0Hrs
29/03/2021
Time 11:0Hrs
1617 Construction of VOP at Basaveshwara Circle CH 330 275 on Ilkal Bypass Black spot ID KA 02 199 in Hungund Hospet Section of NH 13 New NH 50 in the State of Karnataka through EPC mode

NIT No 53 NHAI RO BNG 17016 Tender 2020 21 dated 05 03 2021 32.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2021
Time 17:0Hrs
25/03/2021
Time 15:0Hrs
1618 Long Term Remedial Measures at 1 Muguru Km 251 450 2 Dodda Aladamara to Kumar Farm Km 217 450 and 3 Tirumala Tower to SVP Nagar Km 215 900 on Kerala Border to Kollegala section on NH 766 Old NH 212 in the State of Karnataka under EPC mode

NIT No 54 NHAI RO BNG Road Safety Tender 2020 21 dated 05 03 2021 16.360 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2021
Time 17:0Hrs
25/03/2021
Time 15:0Hrs
1619 Construction of ROB and its approaches in replacement of existing level crossings at LC no. 50/B/E at km 298.000 on NH-75E in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_614693_1 22.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 18:0Hrs
22/03/2021
Time 15:0Hrs
1620 Work of Strengthening of NH-727B from Sikandarpur to Ballia (km. 102.000 to km. 136.900) in the State of Uttar Pradesh under EPC mode.

2021_MoRTH_614725_1 35.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 18:0Hrs
22/03/2021
Time 15:0Hrs
1621 Improvement of NH-76 35 from Km. 278.00 to Km. 284.00 Bedipuliya to Karvi Station under road safety in the State of Uttar Pradesh under EPC Mode.

2021_MoRTH_617437_1 9.580 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/02/2021
Time 15:0Hrs
20/03/2021
Time 15:0Hrs
1622 Flood damage Repair work in Km. 77.000 to 105.100 of NH-135C during 2020-2021 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh

2021_MoRTH_618570_1 0.790 MoRTH Normal Highway Project OTHERS 24/02/2021
Time 17:0Hrs
19/03/2021
Time 17:0Hrs
1623 Construction of VOP at Kantharaja Circle at Black Spot location KA 02 106 in the stretch of Bengaluru Hoskote Mulbagal Section from Km 237 700 to Km 318 000 of NH 4 in the State of Karnataka under standalone mode to be taken up under EPC mode

NIT No.51/NHAI/RO-BNG/11019/Tender/2020-21 dated 25.02.2021 24.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/02/2021
Time 17:0Hrs
18/03/2021
Time 15:0Hrs
1624 Permanent rectification of black spot by means of construction of VUP on NH.05 Km 9.243 to Km 10.426 Old Km 201.895 to 203.078 section Ferozepur to Indo Pak Border in the State of Punjab on EPC Mode

2020_MoRTH_586331_1 23.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/09/2020
Time 15:0Hrs
18/03/2021
Time 15:0Hrs
1625 Reconstruction of narrow and distressed major bridge over Lalpool at km 119.207 and Dashmile at km 128.344 of NH-117 in the district of South 24 Pgs. WB on EPC mode. Job No. 117-WB-2020-21-467

2021_MoRTH_616660_1 27.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2021
Time 18:0Hrs
18/03/2021
Time 11:0Hrs
1626 Construction of 4-Laning of Puruliya Bypass section from Km 84.030 to Km. 94.345 of NH-32 (length 10.315 km.) in the state of West Bengal on EPC Mode.

2021_NHAI_68580_1 235.830 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 17:0Hrs
15/03/2021
Time 11:0Hrs
1627 Two / Four laning of Raebareli - Jagdishpur Section of NH-330A from Km.0.000 to Km. 47.800 (Design Length – 46.020 km) including Jagdishpur Bypass and Excluding 4.1 Km overlapping Length of Jagdishpur Bypass with NH-731(Old NH-56) in the State of Uttar Pradesh on EPC mode under NH(O).

2021_NHAI_67809_1 518.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2021
Time 11:0Hrs
12/03/2021
Time 11:0Hrs
1628 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 27.000 (VILL-LOHADA) TO DESIGN CHAINAGE 56.500 (VILL-KARAUNDA MAHAJAN) IN THE STATE OF UTTAR PRADESH (PACKAGE-II)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-II/2020 723.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
11/03/2021
Time 17:15Hrs
1629 DEVELOPMENT OF SIX LANE ACCESS CONTROL GREENFIELD HIGHWAY OF DELHI-SAHARANPUR-DEHRADUN ECONOMIC CORRIDOR UNDER BHARATMALA PARIYOJANA FROM DESIGN CHAINAGE 56.500 (VILL-KARAUNDA MAHAJAN) TO DESIGN CHAINAGE 82.000 (VILL-KHYAWARI) IN THE STATE OF UTTAR PRADESH ON EPC MODE (PACKAGE-III)

NHAI/BM/Delhi-Saharanpur-Greenfield/Pkg-III/2020 641.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2021
Time 15:0Hrs
11/03/2021
Time 17:15Hrs
1630 Development of Memmadpur (Ambala) - Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode

2021_NHAI_67163_1 789.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2021
Time 15:0Hrs
11/03/2021
Time 11:0Hrs
1631 Four Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka

67513 407.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 11:0Hrs
10/03/2021
Time 11:30Hrs
1632 Construction of 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.

2021_NHAI_68216_1 241.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:0Hrs
10/03/2021
Time 11:0Hrs
1633 4-laning of Sagar-Mohari section of NH-934 from Design Chainage 8.000 to 50.300 (Length = 42.300 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor category) on EPC mode in the State of Madhya Pradesh.

2021_NHAI_68213_1 491.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:45Hrs
10/03/2021
Time 11:0Hrs
1634 Construction of Two lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

2021_NHAI_68220_1 397.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2021
Time 17:30Hrs
10/03/2021
Time 11:0Hrs
1635 Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from MDR Junction at ch. 40.900 Dhunda Village to Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70.950 (km 40.900 to km 70.950 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

NHAI/BM/DAKExpressway/2020/Pkg.Spur-II 1,180.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
09/03/2021
Time 15:0Hrs
1636 Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70.950 to Junction with NH354 Ajanala road near Harsh china village chainage 99.020 (km 70.950 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

NHAI/BM/DAKExpressway/2020/Pkg.Spur-III 1,041.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
1637 Construction of Two laning with Paved Shoulder of Khatima bypass of Sitarganj-Tanakpur section on NH-125 from Km. 24.720 to Km. 32.975 in the State of Uttarakhand under NHDP Phase-IV on EPC mode.

NHAI/Khatima bypass/2021 46.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2021
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
1638 Construction of four-lane Greenfield Delhi – Amritsar - Katra Expressway from Junction with Jalandhar – Kapurthala road (NH-703A) near Khojewal village to Junction with Amritsar - Mehta - Sri Hargobindpur - Tanda road (NH-503A) near Sri Hargobindpur (Km 319.400 to km 362.420) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_63229_1 1,437.200 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/11/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
1639 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Amritsar-Mehta-SriHargobindpur-Tanda road (NH-503A) near Sri Hargobindpur to Junction with Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km 362.420 to km 397.700) under Bharatmala Pariyojna in the state of Punjab on EPC mode

2020_NHAI_63233_1 978.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/11/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
1640 UPGRADATION OF HIGHWAY STARTING FROM JUNCTION WITH NH-44 AT PANIPAT CONNECTING KAIRANA, SHAMLI, MUZAFFARNAGAR, MIRANPUR, BIJNOR AND TERMINATING AT ITS JUNCTION WITH NH-74 AT KOTAWALI TO TWO/FOUR LANE WITH PAVED SHOULDER CONFIGURATION - BIJNOR TO KOTAWALI, PKG.-IV OF NH-709AD.

NHAI/UP/2018-19/709AD/Pkg-IV 234.050 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
09/03/2021
Time 11:0Hrs
1641 Strengthening of road from km 0/0 to 35/00 (Mohana- Malwa) section of NH-326A in the State of Odisha on EPC basis. (Bid Ref No.- 12 CE NH of 2020-21)

2021_MoRTH_614779_1 18.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 15:0Hrs
08/03/2021
Time 15:0Hrs
1642 Construction of 40.00m span P.S.C. Bridge over Hadvaha Nala at km. 29.00 of Purkaji-Laksar-Haridwar NH-334A in Distt. Haridwar in the State of Uttarakhand

546/13yata-NH-10/2021 dated 04.02.2021 6.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2021
Time 15:0Hrs
08/03/2021
Time 15:0Hrs
1643 Strengthening of road from km 35/350 to 58/000 (Angabira to Naktideul) of NH-153B in the State of Odisha on EPC basis. (Bid Ref No.- 13 CE NH of 2020-21)

2021_MoRTH_614788_1 11.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2021
Time 15:0Hrs
08/03/2021
Time 12:0Hrs
1644 IMPROVEMENT AND UP-GRADATION OF NATIONAL HIGHWAY-709AD PKG-III FROM MUZAFFARNAGAR-MIRANPUR IN THE STATE OF UP

NHAI/UP/2018-19/709AD/MM/Pkg-III 636.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
08/03/2021
Time 11:0Hrs
1645 DESIGN AND CONSTRUCTION OF ROAD AS PART OF ICBR WORKS FROM SURVANSAMBA TO KANAKSPUR FROM CHAINAGE KM 0.000 TO KM 6.550 (NET LENGTH 6.550 KM) THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION WORKS, PERMANENT WORKS, MINOR BRIDGES & SURFACING WORKS IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

CE (P) VTK/NIB-33/2020-21 101.860 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2021
Time 16:0Hrs
05/03/2021
Time 12:0Hrs
1646 Periodical Renewal at Km 52/800-55/900, Km 56/800-57/0, Km 57/8-110/942 excluding the stretches Km 59/4-61/235, Km 63/800-65/300 of NH 532

2021_MoRTH_613462_1 40.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2021
Time 18:48Hrs
04/03/2021
Time 11:0Hrs
1647 Strengthening work from Chainage Km 200.000 to Km. 232.000 on NH-119(New 534) under NH(O) 2020-21 in the state of Uttarakhand on EPC mode

444/13yata-NH-10/2021 dated 30.01.2021 63.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2021
Time 15:0Hrs
04/03/2021
Time 11:0Hrs
1648 Construction of four lane ring road/bypass around Srinagar city from km 0.000 to km 42.100 (Phase-I) on Engineering, Procurement and Construction (EPC) Mode under NHDP Phase VII in the Union Territory of Jammu and Kashmir under Bharatmala Pariyojana

2020_NHAI_65474_1 1,446.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 18:0Hrs
04/03/2021
Time 11:0Hrs
1649 Periodical renewal work from Km 153 to 177 on Kalka Shimla Wangtoo road of NH 22 New NH 05 under Annual Renewal Program ARP for year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_613162_1 9.100 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/01/2021
Time 15:0Hrs
01/03/2021
Time 15:0Hrs
1650 Periodic Renewal of existing road from km 96.600 to km 132.850 (Mahewa Ghat to Chitrakoot section) of National Highway No. 731A in the state of Uttar Pradesh on Engineering, Procurement Construction (EPC) Mode.

2021_MoRTH_613156_1 12.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2021
Time 15:45Hrs
01/03/2021
Time 11:0Hrs
1651 Periodical Renewal Work from km.0 to 20 of Nahan Kumarhatti Road of NH 907A under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612844_1 6.820 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
1652 Periodical Renewal work from Km 83 to 96 of Kala Amb Paonta Sahib Dehradun road of NH 07 under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612904_1 6.060 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
1653 Periodical Renewal Work from Km.269 to 284 of Kalka Shimla Wangatoo Road on NH 05 Under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2021_MoRTH_612875_1 5.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 18:0Hrs
01/03/2021
Time 11:0Hrs
1654 Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode

2021_NHAI_66903_1 430.110 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2021
Time 17:45Hrs
01/03/2021
Time 11:0Hrs
1655 Six laning of existing TaranTaran flyover to Golden Gate stretch of Jalandhar Amritsar Section of NH 1 New NH 03 including Construction of 6 lane flyover at Km 446.590 in front of best price and Km. 448.100 in front of the Daboorja Road and construction of VUP at Km 448.590 and reconstruction of Major bridge at Km. 445.957 New construction on LHS and widening on RHS for rectification of Blackspots in the State of Punjab on EPC basis

2020_NHAI_65521_1 93.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2020
Time 15:0Hrs
01/03/2021
Time 11:0Hrs
1656 Construction of 6 lane elevated structure in Rayya at km. 419.690 on Jalandhar Amritsar section of NH I New NH 03 with service road on both sides including approaches for rectification of blackspots in the State of Punjab on EPC mode

2020_NHAI_65784_1 69.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2020
Time 15:0Hrs
01/03/2021
Time 11:0Hrs
1657 Four Laning of Amritsar Bypass (Greenfield Alignment) from New Tarn Taran Road to Ajnala Road from Design km 0.750 to Design km 43.750 (Design Length- 43.00 kms) and Upgradation of existing Amritsar - Khemkaran Road (NH- 354) to Four Lane Configuration from Design km 71.496 to Design km 78.440 (Design Length- 6.944 kms) (Total Design Length- 49.944 kms) in the State of Punjab on EPC mode under Bharatmala Pariyojana

2021_NHAI_65900_1 731.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2021
Time 12:30Hrs
25/02/2021
Time 11:0Hrs
1658 Construction of ROB at km 75/8 (Railway km 72/6-7) of NH 49 Extn in lieu of existing LC - 68 Madurai - Cochin road, between Aundipatti - Theni Railway station Under Sethubharatham Project on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_608577_1 63.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
24/02/2021
Time 15:0Hrs
1659 SUB SOIL INVESTIGATION, DESIGN, DRAWING AND CONSTRUCTION OF 135 MTR SPAN MAJOR PERMANENT PINJOLI BRIDGE OVER PINJOLI NALLAH INCLUDING APPROACH ROADS AT KM 49.750 ON ROAD BALIPARA-CHARDUAR-TAWANG UNDER 1441 BCC/14 BRTF/PROJECT VARTAK IN ARUNACHAL PRADESH

CE (P) VTK/NIB-23/2020-21 22.410 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 16:0Hrs
23/02/2021
Time 12:0Hrs
1660 Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 30.000 to km 49.150 (design chainage km 30.000 to km 46.450) including design and construction of kandi tunnel (total length of tunnel 260mt) incl approaches (Pkg-I) under 13 TF on Akhnoor - Poonch road (NH-144A) in the UT of J and K under Project Sampark, BRO on EPC mode (2nd CALL)

2020_BRO_605970 231.580 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2020
Time 15:0Hrs
22/02/2021
Time 15:0Hrs
1661 Construction of ROB at km 93/4 (Railway km 89/6-7) of NH 49 Extn (New NH No 85) in lieu of LC - 85 Madurai - Cochin Road, between Theni - Bodi railway stations under Sethubharatham project on EPC Mode.

2021_MoRTH_611651_1 27.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 15:0Hrs
22/02/2021
Time 15:0Hrs
1662 Strengthening to NH-53 from Km 314/130 to 321/000 Km for the year 2020-21 in the State of Odisha on EPC basis. (Bid Ref No.- 09 CE NH of 2020-21)

2021_MoRTH_611654_1 5.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 18:55Hrs
22/02/2021
Time 12:0Hrs
1663 Repair/ Rehabilitation including repainting of Pamban Bridge in Km 157/4- 159/8 of NH-49 (New NH No.87) in the State of Tamil Nadu on EPC mode.

2021_MoRTH_612996_1 13.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/01/2021
Time 19:0Hrs
22/02/2021
Time 11:0Hrs
1664 Construction of Hard shoulders from km. 161.00 to 164.00 on NH-72(07) on EPC mode in the State of Uttarakhand

257/13yata-NH-10/2020 dated 19.01.2021 5.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 15:0Hrs
22/02/2021
Time 11:0Hrs
1665 Strengthening work in Km 36 to 68 of NH 110 on EPC Mode for the year 2020 21

2021_MoRTH_612700_1 29.617 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2021
Time 10:0Hrs
22/02/2021
Time 11:0Hrs
1666 Construction of New Six Lane Major Bridge including Approaches from Km.172.895 to Km.173.670 of NH-215 (New NH -520) in Rimuli – Koida Section in the State of Odisha under NHDP Phase III on Engineering, Procurement & Construction (EPC) Mode.

2020_NHAI_64710_1 94.010 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/12/2020
Time 18:30Hrs
22/02/2021
Time 11:0Hrs
1667 Balance work of Construction of two/four lane with paved shoulder from Km. 422.00 to Km. 523.600 (Chitradurga to Shivamogga section) of NH 13 in the state of Karnataka on EPC mode

RW/BNG/NH-13/KM 422-528/94/2019 439.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 15:0Hrs
20/02/2021
Time 11:0Hrs
1668 Strengthening of road from km 277/461 to 280/249 Km, 281/400 to 286/725 Km, 287/883 Km to 289/454 km, 304/720 km to 341/741 km & Km 346/000 to 360/391 km of NH-55 in the state of Odisha on EPC basis. (Bid Ref No.- 07 CE NH of 2020-21)

2021_MoRTH_610828_1 18.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2021
Time 15:0Hrs
18/02/2021
Time 15:0Hrs
1669 Strengthening of road from Km 174/570 to 186/094 Km, 210/570 to 234/751 & Km 235/748 to 243/648 km of NH-20 in the State of Odisha on EPC basis. (Bid Ref No.- 08 CE NH of 2020-21)

2021_MoRTH_610839_1 14.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2021
Time 12:15Hrs
18/02/2021
Time 12:0Hrs
1670 Periodical Renewal from Km 218/900 - 225/0 & 234/4 - 236/0 of Nagapattinam - Gudalore - Mysore road -NH 67 (New NH 81) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2021_MoRTH_608582_1 8.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
16/02/2021
Time 15:0Hrs
1671 Flood Damage Repair work in km 77.000 to 105.100 of NH-135C during 2020-21 under NH Division, PWD, Mirzapur in the State of Uttar Pradesh.

2021_MoRTH_613263_1 0.790 MoRTH Normal Highway Project OTHERS 01/02/2021
Time 15:0Hrs
15/02/2021
Time 17:0Hrs
1672 STRENGTHENING WORK FROM KM 10.000 TO 25.000 AND KM 48.000 TO 77.100 OF NH-309 B UNDER ANNUAL PLAN 2020-2021 ON EPC MODE IN THE STATE OF UTTARAKHAND.

2021_MoRTH_609922_1 38.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2021
Time 16:0Hrs
15/02/2021
Time 11:0Hrs
1673 Construction of Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode

2020_NHAI_63764_1 462.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2020
Time 18:20Hrs
12/02/2021
Time 11:0Hrs
1674 Balance 11.96 km. stretch between Km.66.000 to Km.77.960 on NH-12(New NH-45) in Nauradehi Wildlife Sanctuary in the State of Madhya Pradesh on EPC Mode Basis.

65432 161.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 16:0Hrs
12/02/2021
Time 11:0Hrs
1675 4-laning of Balwara to Dhangaon section of NH-347BG & 753L (Indore to Boregaon- Pkg III) Design Ch. 42.260/Existing Ch. 45.000 to Design Ch. 82.810/ Existing Ch. 86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on EPC mode.

2020_NHAI_64695_1 770.480 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2020
Time 15:0Hrs
11/02/2021
Time 11:0Hrs
1676 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ludhiana-Moga road (NH-5) near Mullanpur Dakha to Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village (Km 260.860 to km 303.900) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62421_1 1,404.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
11/02/2021
Time 11:0Hrs
1677 Construction of ROB and their Approaches at Km 81/800 (Near Kannamangalam) in Lieu of existing LC No.109A/3T at Railway Km 130/23-25 of NH-234 Mangalore-Villupuram Road including Land Acquisition” on Engineering, Procurement & Construction (EPC) Basis Contract

2020_MoRTH_604294_1 63.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 17:30Hrs
09/02/2021
Time 11:0Hrs
1678 Construction of Service road 5.5m width along NH-44 bypass both sides From Ch. 1.900 to 4.500 and Ch. 11.900 to 17.800 except km 13.145 to km 14.027 Bemina flyover length 15.236 kms and renewal coat on main existing 4-lane carriageway from Ch. 4

PCD-RnB-63of 2020-21 34.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 15:0Hrs
08/02/2021
Time 16:0Hrs
1679 Permanent measures to improve the Black Spot (ID No. TN - (02) - 647) at Old Ayakudi Market from km 48/400 - 51/0 of NH 209 (New NH No. 83) (Dindigul - Coimbatore - Annur - Sathiyamangalam - Mysore - Bengaluru road) in the state of Tamil Nadu.

2021_MoRTH_607783_1 9.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2021
Time 15:0Hrs
08/02/2021
Time 15:0Hrs
1680 Widening and strengthening of existing carriageway to two lane configuration in the stretch from Km. 0.000 to Km.13.000 (excluding rigid pavement portion from Km. 3.100 to 5.100) & Construction of Major Bridge at river Aami on NH-328A in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme

2020_MoRTH_580532_1 37.308 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2020
Time 15:0Hrs
08/02/2021
Time 15:0Hrs
1681 Construction Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH 65 near Patas -Vasunde Phata – Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra on EPC Mode

2020_NHAI_62809_1 702.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2020
Time 16:40Hrs
08/02/2021
Time 11:0Hrs
1682 6-laning of Nashik Phata to Khed Pkg-II (from Design Ch.24.230 km at Indrayani river to Ch.42.000 km at village Chandoli/Khed) total length 17.770 km, on Pune-Nashik section of NH-60 (Old NH-50) in the state of Maharashtra on EPC Mode

2020_NHAI_63437_1 648.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2020
Time 15:0Hrs
08/02/2021
Time 11:0Hrs
1683 Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode

2020_NHAI_61035_1 805.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/10/2020
Time 16:0Hrs
08/02/2021
Time 11:0Hrs
1684 Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500 (Indapur), Design Length 42.131 km and One time improvement of selected stretches (Package–II) in the State of Maharashtra under Bharatmala Pariyojna on EPC Mode

2020_NHAI_64279_1 806.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2020
Time 18:15Hrs
08/02/2021
Time 11:0Hrs
1685 Four Lanning of NH-965G from km 83.500 (Indapur) to km 130.202 (Tondale), Design Length 46.702 km and One time improvement of selected stretches (Package–III) in the State of Maharashtra under Bharatmala Pariyojna on EPC mode

2020_NHAI_64281_1 853.360 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2020
Time 18:15Hrs
08/02/2021
Time 11:0Hrs
1686 2-lane with Paved shoulder of Ujjain – Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 =133.575 km section of NH-552G in the state of Madhya Pradesh on EPC mode.

64179 454.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2020
Time 15:0Hrs
08/02/2021
Time 11:0Hrs
1687 Permanent measures for Blackspot (ID No. TN(02)-316) from km 198/300-199/200 of NH-209 ( New NH 948) in the State of Tamil Nadu on (EPC) Basis Contract

2020_MoRTH_604741_1 4.181 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 17:0Hrs
04/02/2021
Time 15:0Hrs
1688 Permanent measures to improve the Blackspot (ID No. TN(02) 435) (Near SRP Mills) from km 166/4 - 167/850 of NH 209 (Dindugul – Bangalore road) including Widening of CD Works in the State of Tamil Nadu on (EPC) Basis Contract

2020_MoRTH_604753_1 4.045 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 18:0Hrs
04/02/2021
Time 15:0Hrs
1689 Construction of Grade Seperator at Kochadai Junction at km 5/10 of NH 49 Extn (New NH No.85) on Engineering, Procurement and Construction (EPC) Basis contract.

2020_MoRTH_603278_1 31.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2020
Time 14:0Hrs
04/02/2021
Time 15:0Hrs
1690 Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Junction with Patiala Samana Patran road SH10 near Ghagga village to Junction with Patiala Bathinda road NH7 near Bhawanigarh Km 157.920 to Km 188.830 on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62412_1 850.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 18:0Hrs
04/02/2021
Time 11:0Hrs
1691 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303.900 to km 319.400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0.000 to km 24.000 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62498_1 1,230.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
1692 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village (Km 188.830 to km 225.770) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62419_1 983.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
1693 Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village to Junction with Ludhiana-Moga road (NH-5) near Mullanpur Dakha (Km 225.770 to km 260.860) on EPC mode under Bharatmala Pariyojna in the state of Punjab

2020_NHAI_62414_1 1,129.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
04/02/2021
Time 11:0Hrs
1694 Permanent Measures for Black spots at Km 87/6 - 90/2 of NH 49 Extn New NH No -85.(Black Spot ID - TN -02-199) in the state of Tamil Nadu

2020_MoRTH_603339_1 5.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2020
Time 15:0Hrs
01/02/2021
Time 15:0Hrs
1695 Four laning of Bangalore Mangalore Section from km 270.270 (Periya Shanthi) to km 318.755 (Bantwal) including 6 lane Flyover at Kalladka Town in km. 311 – km. 314 on NH-75 on EPC Basis in Karnataka

64966 1,480.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 11:0Hrs
01/02/2021
Time 11:0Hrs
1696 Periodic renewal Major maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka on EPC mode under risk and cost of Concessionaire

NIT No.49 NHAI RO-BNG 11019 Tender 2020-21 dated 08.01.2021 73.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/01/2021
Time 15:0Hrs
30/01/2021
Time 15:0Hrs
1697 CONSTRUCTION/IMPROVEMENT ON EPC MODE OF EXISTING ROAD TO NHDL SPECIFICATION WITH PAVED SHOULDER FROM EXISTING KM 67.000(MANGAN) TO KM 95.000 (CHUNGTHANG) OF TOTAL DESIGN LENGTH 27.476 KM (EXCEPT PERPETUAL LAND SLIDES/SINKING ZONE AT RAFONG KHOLA LANGTHA KHOLA, MANUAL AND RITCHU) ON ROAD GANGTOK-MANGAN-CHUNGTHANG IN THE STATE OF SIKKIM UNDER PROJECT SWASTIK OF BRO

2020_BRO_604307_1 290.360 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2020
Time 15:0Hrs
25/01/2021
Time 15:0Hrs
1698 i Re-constn of Bow String Girder type Minor Bridge at km 16.567 of NH35 including its approaches ii extn of existing arch culvert by providing a box culvert adjacent to it at km 3.780 of NH35 iii rehab of existing steel bridge over river Ichamati at km 53.53 of NH35 iv repair and rehab of bridge over Bidyadhari Canal at km 13.872 of NH35 and v repair and rehab of Bridge over river Nouvasan Thakur Haridas Setu at km 56.06 of NH35 in the dist of North 24 Pgs. WB. Job No. 035-WB-2019-20-461

2020_MoRTH_605529_1 20.511 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2020
Time 18:0Hrs
23/01/2021
Time 11:0Hrs
1699 Permanent Rectification of Black Spot (TN-02-588) at KNR Bend from Km 401/2-402/4 of NH 67 in the State of Tamil Nadu on EPC Basis Contract

2020_MoRTH_604379_1 721.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2020
Time 15:0Hrs
22/01/2021
Time 15:0Hrs
1700 Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(9)/15-16/013-S&R(B)

2020_MoRTH_598001 123.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/11/2020
Time 14:0Hrs
21/01/2021
Time 13:0Hrs
1701 Permanent Measures to improve Black Spot ID. TN-(02)-717 at from Km 59/460 – 61/235 of NH 532 (Cuddalore – Vridhachalam – Salem Road)

2020_MoRTH_604818_1 4.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2020
Time 18:15Hrs
21/01/2021
Time 11:0Hrs
1702 Improvement of road safety from Km 200 to 219 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh

2020_MoRTH_600776_1 8.040 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/12/2020
Time 18:0Hrs
18/01/2021
Time 11:0Hrs
1703 4-Laning of existing 2-laning stretch from Dharmapuri at km. 117.000 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode

2020_NHAI_60480_1 798.430 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 11:0Hrs
18/01/2021
Time 11:0Hrs
1704 Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from Design Chainage km ASR 100.835 to Design Chainage km 139.965 for Length of 39.130 km into Four-Lane under Bharatmala scheme in the State of Punjab (Package-IV) under EPC Mode

2020_NHAI_59773_1 329.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/10/2020
Time 18:0Hrs
14/01/2021
Time 11:0Hrs
1705 Development of Six lane access controlled highway from Design Chainage 8 130 near Mohand to 16 380 Daat kali Tunnel of Ganeshpur Dehradun section of NH72A in the state of Uttar Pradesh and Uttarakhand under Bharatmala Pariyojana on EPC mode Package 2

NHAI/BM/Ganeshpur Dehradun/Pkg2/2020 838.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/10/2020
Time 15:0Hrs
11/01/2021
Time 11:0Hrs
1706 RFP for Development of six lane access controlled highway from design chainage 0 000 (Ganespur) to design chainage 8 130 (near Mohand) of Ganeshpur – Dehradun section of NH-72A in the state of Uttar Pradesh under bharatmala pariyojana (Package-1) on EPC mode.

NHAI/BM/Ganeshpur Dehradun/Pkg1/ 707.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/10/2020
Time 15:0Hrs
11/01/2021
Time 11:0Hrs
1707 4-laning of existing two lane section of Malout-Mandi Dabwali section of NH- 09 from Danewala at km 7.000 (Design Ch. Km 7.00) to Mandi Dabwali at km 29.500 (Design Ch. 29.500) having design length of 22.5 km under Bharatmala Pariyojana in the state of Punjab (Package-1)

2020_NHAI_60218_1 298.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2020
Time 18:30Hrs
04/01/2021
Time 11:0Hrs
1708 Four laning with paved shoulder of Madhavpur to Porbandar section of NH 8E Ext old NH 51 new from km 338 400 Design Chainage km 338 400 to km 379 100 Design Chainage km 379 100 in the State of Gujarat through on EPC mode

NHAI/Guj/Madhavpur Porbandar/EPC/2020 132.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/11/2020
Time 15:0Hrs
28/12/2020
Time 15:0Hrs
1709 Construction of 2lane ROB and its approaches in replacement of existing level crossing No T 50SPL at km 91 on NH 28B in the State of Bihar.

2020_MoRTH_599384_1 39.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
28/12/2020
Time 11:0Hrs
1710 Construction of ROB and its approaches in lieu of existing level crossing LC No 55C/2E at km 94 on NH 28B in the State of Bihar.

2020_MoRTH_599472_1 49.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2020
Time 15:0Hrs
28/12/2020
Time 11:0Hrs
1711 Four laning with paved side shoulders of the road section from Km 4 96 to Km 12 00 Section Jalandhar Nakoder Shahkot Moga Road of NH 71 703 in the state of Punjab

2020_MoRTH_550134_1 48.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2020
Time 12:0Hrs
24/12/2020
Time 11:0Hrs
1712 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 129.31 TO KM 152.810 AND EXISTING CHAINAGE FROM KM 142.020 TO KM 167.100) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575956_1 281.850 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2020
Time 18:0Hrs
22/12/2020
Time 11:0Hrs
1713 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 152.810 TO KM 173.340 AND EXISTING CHAINAGE FROM KM 167.100 TO KM 189.100) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_577230_1 256.130 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2020
Time 18:0Hrs
22/12/2020
Time 11:0Hrs
1714 Work of stage strengthening of existing road from Km. 79.350 to Km. 107.000 (excluding Km. 99.00 to Km.104.00) of NH-731K in the State of Uttar Pradesh under EPC mode

2183/1-Tender cashier(Bareilly)-28/20 Dated 30.09.2020 11.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/10/2010
Time 12:0Hrs
21/12/2020
Time 15:0Hrs
1715 Construction of Protective work in Km 0/8 - 1/6 including widening of culvert at Km 1/8, 4/6, Construction of Retaining wall and truck lay bay in Ariyalur Bye Pass of NH 226 Extn (New NH No 136) in Tamil Nadu on Engineering, Procurement & Construction (EPC) mode.

2020_MoRTH_594610_1 6.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2020
Time 15:0Hrs
21/12/2020
Time 15:0Hrs
1716 construction of 3lane new rob including widening, construction of vup and ramps at lhs rhs and merging of alignment with pap flyover on panipat jalandhar section of nh44 (old nh01) in the state of punjab on epc basis

2020_NHAI_61667_1 28.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2020
Time 13:30Hrs
21/12/2020
Time 11:0Hrs
1717 Construction and Up gradation of existing road to 2-lane NHDL specification from existing chainage km 0.0 to Km 18.530 (Design chainage km 0.0 to km 17.350) of road Kurkuti-Ghamsali-Niti (KGN), in 21 BRTF area under Project Shivalik in Uttarakhand State on EPC mode (Length 17.35 Km)

2020_BRO_591484_1 191.550 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2020
Time 15:0Hrs
12/12/2020
Time 12:0Hrs
1718 Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(10)/15-16-020-S&R(B)

2020_MoRTH_589674_1 92.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2020
Time 9:0Hrs
08/12/2020
Time 13:0Hrs
1719 Construction of Additional Structures in KeralaTamil Nadu Border Kanyakumari section (From Km 43.300 to Km 96.714) of NH 47 in the State of Tamil Nadu on EPC Mode

NHAI/11012/KL-TN-KAN/AddlStr/EPC/05/20 545.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 13:0Hrs
08/12/2020
Time 11:0Hrs
1720 4-Laning of Pangare to Waranga Phata section from km 134.500 to km 174.645 (Design Chainage) of NH-161 including Bypasses at Kalamnuri and Akhada Balapur and additional lengths of 800 m from Waranga Junction to Nanded (NH-161) (existing Chainage 244.360) and 700 m road from Waranga Junction (NH-161) to Mahagaon (NH-361) (existing Chainage 253.700) in the State of Maharashtra on EPC mode

2020_NHAI_58837_1 746.390 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2020
Time 17:0Hrs
07/12/2020
Time 11:0Hrs
1721 Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 (Design Chainage) in the state of Uttarakhand under Bharatmala Pariyojana on EPC mode (Package3)

NHAI/BM/Ganeshpur Dehradun/Package 3/2020 142.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
1722 Construction of Eight Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village in Dahod district and ending at junction with SH-152 near Matariya Vadi village in Panchmahal district (Ch.729.700 to 756.052) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg27 874.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
1723 Construction of Eight Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi village and ending at junction with NH-47 near Bhamaiya village in Panchmahal district (Ch. 756.052 to 781.282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg28 803.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 15:0Hrs
03/12/2020
Time 11:0Hrs
1724 Construction of 6 lane access controlled Greenfield highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat under Bharatmala Pariyojana Phase I AJ RGBS Package 3 on EPC Mode

2020_NHAI_57423_1 595.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
26/11/2020
Time 15:0Hrs
1725 4-Laning From km 100.757 To km 107.350 Section OF Gwalior-Shivpuri (NH-03) Passing Through Madhav National Park in the State of Madhya Pradesh on EPC Mode.

2020_NHAI_58547_1 162.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/09/2020
Time 18:5Hrs
24/11/2020
Time 11:0Hrs
1726 Construction of VUP, widening of existing Minor Bridge including construction of new Service Road at Loharaka crossing at Km 462.339 on Amritsar Wagha Border Section of NH-03 (old NH-01) in the State of Punjab

NHAI/RO/CHD/11011/PD-JAL/ ASR-WAG/NH-1/EPC/RFP 22.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2020
Time 10:30Hrs
23/11/2020
Time 11:0Hrs
1727 Work of construction of a minor bridge over Kaimua Nala in Km 24 on newly declared NH-731 K on Shahjahanpur- Bisalpur road in the state of Uttar Pradesh under EPC mode

2184/1-Tender cashier(Bareilly)-28/20 Dated 30.09.2020 5.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2020
Time 12:0Hrs
18/11/2020
Time 15:0Hrs
1728 Strengthening the existing carriageway in km.11/0 – 19/0 including Geometrical Improvements, Widening of Minor bridges at km.12/2 & km.18/2, Construction of Drains, Construction of Brest Wall, Widening and Reconstruction of culverts, Construction of Retaining walls in Krishnagiri – Kuppam Road NH -219 (New NH-42)

2020_MoRTH_583421_1 15.422 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
06/11/2020
Time 15:0Hrs
1729 Maintenance of Existing Two lane Carriageway of Hospet Bellary Karnataka Ap Border from 280.080 Design Ch. to Km. 375.450 Design Ch. Design Length 95.370, NH 63 New NH-67 in the State of Karnataka at the risk and cost of the EPC Contractor

NIT No.36 NHAI RO-BNG 17017 Tender 2020 21 dated 22.10.2020 8.010 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/10/2020
Time 15:0Hrs
05/11/2020
Time 15:0Hrs
1730 Construction of Flyover at Mandi Gobindgarh at Design km 0.350 (existing km 260.800) including resurfacing of existing Service Road at location of flyover at km 260.800 on Jalandhar Panipat Section of NH 44 (old NH 01) in the State of Punjab on EPC basis

2020_NHAI_56523_1 22.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 17:30Hrs
05/11/2020
Time 11:0Hrs
1731 Periodical renewal work on selected stretches from Km 17/350 to 18/380, 23/750 to 24/980, 30/400 to 30/480, 31/800 to 37/400, 38/800 to 41/350 of Theog Hakoti road NH-705 under Annual Renewal Program(ARP) for year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_585411_1 4.750 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 21/09/2020
Time 15:0Hrs
04/11/2020
Time 15:0Hrs
1732 Construction of Six Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Chainage km 368.356 Existing Chainage Km 368.356 to Design Chainage km 369.132 Existing Chainage Km 369.132 on NH66 on EPC mode in the state of Karnataka

56743 61.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 17:0Hrs
04/11/2020
Time 11:0Hrs
1733 Stage Strengthening work from km 99.50 to km 104.20 including road furniture’s in NH – 512 under NH Division –VII, P.W.(Roads) Directorate in the District of Dakshin Dinajpur, West Bengal on EPC Mode (Job No. 512-WB-2019-20/468)

2020_MoRTH_583090_1 5.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/09/2020
Time 18:0Hrs
02/11/2020
Time 13:0Hrs
1734 Development of six lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH9 Old NH 24 Junction to Delhi UP border (Ch.0.00 to Ch. 14.750) in the State of Delhi on EPC mode under Economic Corridor in phase 1 of Bharatmala Pariyojana

NHAI/BM/EC/Delhi Saharanpur/Akshardham EPE/PKG1/2019 1,264.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2019
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
1735 Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in the State of Uttar Pradesh on EPC mode under Economic Corridor in phase 1 of Bharatmala Pariyojana.

NHAI/BM/EC/Delhi-Saharanpur/Akshardham-EPE/PKG-II/2019 1,654.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2019
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
1736 Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh.

2020_NHAI_56526_1 258.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 15:0Hrs
02/11/2020
Time 11:0Hrs
1737 Construction of ROB at km 22/2 of NH 49 Extn (New NH No 85) (Madurai - Cochin Road) & Railway chainage in km 19/2-3 in lieu of LC-17 between Vadapalanji & Usilampatti Railway Stations under Sethubharatham project on Engineering, Procurement and Construction (EPC) Basis contract.

2020_MoRTH_583287_1 42.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2020
Time 15:0Hrs
31/10/2020
Time 15:0Hrs
1738 DESIGN AND CONSTRUCTION OF CL-9 ROAD AS PART OF ICBR WORKS FROM BANGA JANGA GOMPA (BJG) TO NAGA GG (NGG) BETWEEN CHAINAGE KM 20.00 TO KM 54.00 (NET LENGTH 36.694 KM) THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION, PERMANENT & SURFACING WORKS IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_583430_1 135.140 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2020
Time 10:0Hrs
28/10/2020
Time 12:30Hrs
1739 Strengthening work from chainage 0.00 to chainage 36.000 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the State of Uttarakhand

3145/13yata-NH-10/2020 dated 24.09.2020 20.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2020
Time 15:0Hrs
28/10/2020
Time 11:0Hrs
1740 Construction of ROB with Approaches in lieu of LC no.165 , of Ahmadabad- Palanpur (IR Ch-650/2-3) between Rly station – Karjoda and Palanpur NH-58 in the State of Gujarat on EPC mode under NH(O) through an Engineering, Procurement and Construction (EPC) Contract

2020_MoRTH_581300_1 123.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 15:0Hrs
27/10/2020
Time 12:0Hrs
1741 IRQP WORK OF NH-327E ROAD FROM KM CH. 225.05 (BANGAOU) TO KM CH. 232.55 (MAHESHI, TARAPEETH) FOR THE YEAR 2019-20(JOB NO. 327E-BR-2020-21/27)

2020_MoRTH_583193_1 5.029 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/09/2020
Time 15:0Hrs
22/10/2020
Time 17:0Hrs
1742 Periodical Renewal (PR) between Km.102/200 to 119/500 on N.H. 51 in the State of Gujarat under EPC mode of Contract (Using Hot In Place Recycling Technology)(Job No.TA/051/GJ/2019-20/667)

2020_MoRTH_585662_1 5.772 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 18:0Hrs
22/10/2020
Time 15:0Hrs
1743 CONSTRUCTION AND UPGRADATION OF TATO MENCHUKA ROAD DESIGN CHAINAGE KM 23PT800 TO KM 33PT100 AND EXISTING CHAINAGE KM 24PT800 TO KM 36PT000 TO 2LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_575115_1 101.070 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 1:0Hrs
21/10/2020
Time 11:0Hrs
1744 CONSTRUCTION AND UPGRADATION OF TATO-MENCHUKA ROAD (DESIGN CHAINAGE KM 33.100 TO KM 41.275 AND EXISTING CHAINAGE KM 36.000 TO KM 45.410) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_574045_1 86.080 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 18:55Hrs
21/10/2020
Time 11:0Hrs
1745 CONSTRUCTION AND UPGRADATION OF TATO-MENCHUKA ROAD (DESIGN CHAINAGE FROM KM 0.0 TO KM 23.80 AND EXISTING CHAINAGE FROM KM 0.0 TO KM 24.80) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE

2020_BRO_574573_1 234.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2020
Time 17:30Hrs
21/10/2020
Time 11:0Hrs
1746 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 85.657 TO KM 104.530 AND EXISTING CHAINAGE FROM KM 92.250 TO KM 113.650) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575334_1 174.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 18:0Hrs
21/10/2020
Time 11:0Hrs
1747 CONSTRUCTION AND UPGRADATION OF DITTE DIMME - MIGGING ROAD (DESIGN CHAINAGE FROM KM 104.530 TO KM 129.310 AND EXISTING CHAINAGE FROM KM 113.650 TO KM 142.020) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH

2020_BRO_575390_1 301.460 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 18:0Hrs
21/10/2020
Time 11:0Hrs
1748 Construction of Additional Structures in KeralaTamil Nadu Border Kanyakumari section (From Km 43.300 to Km 96.714) of NH-47 in the State of Tamil Nadu on EPC Mode

NHAI/11012/KL-TN-KAN/AddlStr/EPC/05/20 533.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2019
Time 15:0Hrs
20/10/2020
Time 11:0Hrs
1749 Construction of RCC HL Bridge at Km 111.675 of NH-333 in the State of Bihar

2020_MoRTH_581905_1 20.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 16:44Hrs
19/10/2020
Time 11:0Hrs
1750 Widening and Stage Strengthening work in stretch from Km. 579.500 to 598.500 of NH-730 in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme

2020_MoRTH_579330_1 53.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2020
Time 9:0Hrs
15/10/2020
Time 15:0Hrs
1751 Widening and Stage Strengthening (by raising) work in stretch from Km. 95, 100, 101, 103, 108 and km. 112 to 115 of NH-227A in the state of Uttar Pradesh on EPC Basis under NH(O) Scheme.

2020_MoRTH_579356_1 28.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2020
Time 9:0Hrs
15/10/2020
Time 15:0Hrs
1752 Four laning/ widening of road Patiala-Sangrur-Barnala road section RD 106.990 to 116.000 under CRIF Scheme

02 20.910 MoRTH Normal Highway Project OTHERS 26/09/2020
Time 10:0Hrs
15/10/2020
Time 15:0Hrs
1753 Construction of 4-Lane Bypass for Bhiwani town from Bhiwani-Dadri road to Bhiwani -Loharu road NH-709 (Extn.) on EPC Mode in the state of Haryana

2020_MoRTH_580744_1 14.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 14:0Hrs
15/10/2020
Time 11:0Hrs
1754 Construction of six lane Flyover at km. 315.200 and Construction of entry/exit ramp from km. 320.300 to km. 321.200 including FOB at km. 320.840 and Construction of Additional Two Lane ROB on Both sides of Existing Four Lane ROB at km. 311.865 along with approaches and Construction of VUP at km. 311.770 alongwith Improvement of Sherpur Chowk on Panipat Jalandhar section of NH 44 (Old NH 1) in the State of Punjab

2020_NHAI_55635_1 115.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 16:45Hrs
14/10/2020
Time 11:0Hrs
1755 “Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length - 95.00 Km] in the state of Nagaland for the FY 2020-21”

2020_NHIDC_583503_1 83.030 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/09/2020
Time 11:0Hrs
12/10/2020
Time 15:0Hrs
1756 Construction of integrated 6-lane grade-separator at km 36.530 with a LVUP at km 36.894 accommodated within the Hazaribagh side approach of grade-separator in Barhi-Hazaribagh Section (Hazaribagh Bypass) of NH-33 in the state of Jharkhand on EPC mode.

2020_NHAI_53770_1 49.070 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/07/2020
Time 11:0Hrs
12/10/2020
Time 11:0Hrs
1757 Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode

NHAI/Guj/Jet-Gondal-Rajkot/DPR/2020 92.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2020
Time 15:0Hrs
08/10/2020
Time 15:0Hrs
1758 Stage strengthening work from Ch 10 km to 30 km of NH-35 under Barasat NH Sub Divin-II of NH Division V P.W. Rds Directt in the Dist of North 24 Pgs WB during the year 2020-21 on EPC mode. Job No. 035-WB-2020-21-469

2020_MoRTH_569367_1 12.294 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2020
Time 18:0Hrs
07/10/2020
Time 11:0Hrs
1759 Construction of Left out work of four Laning of Mahuva to Kagavadar Section of NH-8E from Km. 100.100 to Km 139.915 (Design Chainage from Km 100.450 to km 140.470) (Package-III) in the State of Gujarat on Single Percentage Item Rate Contract.

NHAI/11012/Proc./NH-8E/Balance/Mahu-Kagvadar/2020 559.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 11:0Hrs
06/10/2020
Time 15:0Hrs
1760 Left Out Work of Four laning of Talaja – Mahuva Section of NH – 8E from km 53.585 to km. 100.100 (design chainage from km. 54.990 to km. 100.450) (Package – II) in the state of Gujarat on single percentage item rate Contract

NHAI/11012/Proc./NH-8E/Balance/Tal-Mahu/2020 646.610 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 15:0Hrs
06/10/2020
Time 11:0Hrs
1761 Providing permanent restoration to valley side slips occurred during monsoon of 2019-20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 (Charmadi ghat) of NH73(old NH234), Mangalore Tumkur section (Job No NH 73 KNT 2019 20 904)

2020_MoRTH_555594_3 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 18:0Hrs
05/10/2020
Time 17:0Hrs
1762 Providing permanent restoration to valley side slips occurred during monsoon of 2018-19 from Km.237.000 to 263.000 (ShiradiGhat) of NH-75, Bangalore - Mangalore section on EPC mode

2020_MoRTH_546015_3 32.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2020
Time 18:0Hrs
05/10/2020
Time 17:0Hrs
1763 “Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length - 63.00 Km] in the state of Nagaland for the FY 2020-21”

2020_NHIDC_581868_1 53.590 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 11:0Hrs
05/10/2020
Time 15:0Hrs
1764 Construction of road from Km 0/0 to 72/0 Km of NH-26 such as 4 Lane from Km 0/0 to 21/0 Km (Bargarh to Barpali) and Widening & Strengthening of double lane with paved shoulder from Km 21/0 to 72/0 Km (Barpali to Bolangir) in the State of Odisha on EPC mode. (Bid Ref No 06 CENH of 2020-21)

2020_MoRTH_578297_1 290.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2020
Time 15:0Hrs
05/10/2020
Time 15:0Hrs
1765 Permanent measures to Black Spot (Id.No. TN-(02)-060) by Construction of Grade Separator at km 22/800 of NH532 (Cuddalore-Vridhachalam-Salem Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_580390_1 18.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2020
Time 18:0Hrs
05/10/2020
Time 11:0Hrs
1766 P.R. work from km 114.975 to km 133 except from km 118.707 to km 119.707 for Lalpole Bridge and from km 127.844 to km 128.844 for Dashmile Bridge of NH-117 under NH Divn-I in the dist. of South 24 Pgs. WB on EPC mode including change of scope from HIPR to conventional PR. Job No. 117-WB-2018-19-792

2020_MoRTH_576030_1 8.264 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 18:0Hrs
05/10/2020
Time 11:0Hrs
1767 Construction of 90 M. span P.S.C. Bridge over Panod Stream at Km 44.00 of NH-121-309 on stretch Ramnagar to Buwakhal Motor Road Ramnagar Distt Nainital in the state of Uttarakhand

2020_MoRTH_585602_1 6.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
1768 Construction of 150 M. Span PSC Box Bridge over Dhangadi Nala Ramnagar to Buwakhal Motor Road Near Km stone No. 46 NH-309 Ramnagar, Distt Nainital

2020_MoRTH_585610_1 7.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
1769 Improvement/Augmentation of Two lane with paved shoulders from Km. 1.600 to Km. 16.690 & Km. 29.850 to Km. 80.133 of Nagapattinam – Thanjavur section of NH-67 (Old) (New NH-83) (Total Design Length 65.373 Km) in the State of Tamil Nadu on EPC Mode

NHAI/11012/Nag-Pat/2019 358.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2020
Time 15:0Hrs
05/10/2020
Time 11:0Hrs
1770 Strengthening of Pathankot - Banikhet road upto Katori Bangla (Himachal Pradesh Boundary) from Km 0.000 to 39.360 of NH-154A in the State of Punjab on EPC Mode.

2020_MoRTH_577550_1 29.800 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/08/2020
Time 16:20Hrs
03/10/2020
Time 17:0Hrs
1771 Periodical Renewal between KM 5/560 to 14/535 of NH- 141 in State of Gujarat under EPC mode

EPC/09 PR OF 202021 5.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2020
Time 17:15Hrs
03/10/2020
Time 17:0Hrs
1772 Periodical Renewal (PR) between KM 122/000 to 138/600 on NH- 41 in State of Gujarat under EPC mode

EPC/10 PR of 2020-21 7.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2020
Time 13:0Hrs
03/10/2020
Time 17:0Hrs
1773 PR 2019-20 to Km 33/500 to 56/620 OF NH-58 (Section Mathasur to Antarsuba ) in the State of Gujarat under ARP 2020-21 on EPC mode.

2020_MoRTH_581316_1 6.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/09/2020
Time 15:0Hrs
03/10/2020
Time 15:0Hrs
1774 Construction of 4 Lane ROB and its approaches in lieu of existing Level Crossing No 43B at Km 2.400 on NH121 New 309 in the State of Uttarakhand

2020MoRTH5818641 56.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2020
Time 15:30Hrs
03/10/2020
Time 14:0Hrs
1775 Four laning from End of Pinjore Bypass to Haryana/Himachal Pradesh Border (Km- 4.200 to Km 18.000) section of NH-21A in the State of Haryana on EPC Mode.

2020_NHAI_41792_1 255.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/01/2020
Time 15:0Hrs
28/09/2020
Time 11:0Hrs
1776 Improvements in km 96/0 - 99/0, Construction of Retaining wall and Breast wall in selected locations, Improvements to Hair Pin Bends (17 nos) in km 99/0 - 119/0 Bodimettu Ghat section), Geometric Improvements in km 52/2 and providing bus bay in km 61/6 of NH 49 Extn (New NH -85) of Madurai - Cochin Road in the state of Tamil Nadu on Engineering, Procurement Construction (EPC) Basis.

2020_MoRTH_575971_1 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 15:0Hrs
23/09/2020
Time 15:0Hrs
1777 Periodical Renewal Work from km 74 0 to 94 830 of Sainj Luhari Jalori Banjar Aut NH 305 under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2020_MoRTH_578882_1 5.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/08/2020
Time 15:45Hrs
22/09/2020
Time 11:0Hrs
1778 Formation of bypass road to Kadiri town from design ch. 0/0 to 11/078 and 0/0 to 1/500 (existing ch 159/250 to ch. 168/450) on NH-42 of two lane with paved shoulder road in the state of Andhra Pradesh on EPC Mode

NIT NO 10/2020-21 126.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2020
Time 15:0Hrs
21/09/2020
Time 15:0Hrs
1779 Widening of existing single/ intermediate lane road to 2 lane road from Km 101.00 to Km 125.00 on NH-61 in the State of Nagaland

2020_MoRTH_575918_1 173.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 18:0Hrs
21/09/2020
Time 12:0Hrs
1780 Permanent measures to Black Spot (Id.No. TN-(02)-023) from Km 114/640-115/100 & 116/280-116/780 of NH45A (Villupuram-Pondicherry-Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578537_1 8.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
1781 Permanent measures to Black Spot (ID.No. TN-(02)-129) from Km 95/4-Km 96/8 of NH45A (Villupuram-Pondicherry - Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578558_1 6.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
1782 Permanent measures to Black Spot (Id.No. TN-(02)-379) from Km 103/7-105/0 of NH45A (Villupuram-Pondicherry-Nagapattinam Road) in the State of Tamil Nadu in EPC mode

2020_MoRTH_578564_1 6.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2020
Time 18:30Hrs
21/09/2020
Time 11:0Hrs
1783 Widening and Strengthening from km 100.40 to km 107.80 From Lakhipur to Faijullahpur of NH 227A under EPC mode in state of Bihar.

2020_MoRTH_579410_1 22.969 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2020
Time 11:0Hrs
21/09/2020
Time 11:0Hrs
1784 Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 64.535 to km 85.385 (design chainage km 55.800 to km 74.350) (package - iii) under 13 TF on Akhnoor-Poonch road (NH-144A) in UT of J and K under Project Sampark, BRO

2020_BRO_564955_1 106.300 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2020
Time 14:0Hrs
21/09/2020
Time 11:0Hrs
1785 Package I Improvement to 2 lane with paved shoulder of NH40 section from Km 81740 to Km 93490 design Km 0000 to Km 10670 and Improvement to 4 lane section of NH44 from design Km 0000 to Km 0930 total length 11600 Km in the state of Meghalaya on EPC mode under JICA Loan Assistance

2020NHIDCL5641401 125.010 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
1786 Package II Improvement to 2 lane with paved shoulder of NH40 section from Km 93490 to Km 123800 design Km 10670 to Km 37550 design length 2655 km in the State of Meghalaya on EPC Mode under JICA Loan Assistance

2020NHIDC5641511 280.480 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
1787 Package IV Improvement to 2 Lane with paved shoulder of NH40 section from Km 131820 to Km 151330 design Km 45760 to Km 63530 design length 1777 km in the State of Meghalaya on EPC Mode under JICA loan Assistance

2020NHIDC5641581 122.500 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
1788 Package V Improvement to 2 Lane with paved shoulder 4 lane of NH40 section from Km 151330 to Km 163400 design Km 63530 to Km 71520 design length 799 Km in the State of Meghalaya on EPC Mode under JICA loan Assistance

2020NHIDC5641631 176.420 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/06/2019
Time 17:0Hrs
14/09/2020
Time 14:30Hrs
1789 Widening existing 2 lane to 4 lane with paved shoulder including strengthening carriageway from km 80/0 – km 125/0 of Salem - Tirupathur – Vaniyambadi Road of NH-179A

2020_MoRTH_580129_1 223.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/08/2020
Time 17:0Hrs
14/09/2020
Time 11:0Hrs
1790 Strengthening work in Km 36.00 to 68.00 of NH-110 in the State of Bihar on EPC mode for the year 2020-21.

2020_MoRTH_578329_1 31.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2020
Time 11:0Hrs
14/09/2020
Time 11:0Hrs
1791 Construction of Service Road and covered drain with Footpath along with other facilities from Km.336.240 to Km.338.100 of Kundapur to Surathkal section of NH 66 Total design length 1.86km in the State of Karnataka on EPC mode

NIT No.20 NHAI RO-BNG 15017 Tender 2020 dated 28.07.2020 10.650 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 15:0Hrs
10/09/2020
Time 15:0Hrs
1792 Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_572728_1 41.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/07/2020
Time 15:0Hrs
10/09/2020
Time 11:0Hrs
1793 Widening and strengthening to two lane with paved shoulders from km 296.500 to km 336.500 (Mundamarai to Ratanpur Section) of NH-59 in the state of odisha on EPC mode.

2020_Morth_573785_1 86.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2020
Time 17:0Hrs
09/09/2020
Time 12:0Hrs
1794 Construction of new bridge over river Kumatia(Br.No.397/1) including subway bridge and approaches on NH-52 (New NH No-15) under Nagaon NH Division,Nagaon in the state of Assam(Job No.015/AS/2020-21/211)

2020_MoRTH_575942_1 39.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 15:0Hrs
08/09/2020
Time 15:0Hrs
1795 Stage Strengthening from km 411/000 to 419/900 and from km 420.00 to 437.00(L=25.90km) of NH-52 (New NH-15) under Annual Plan for the year 2019-2020 on EPC Mode in the State of Assam, Job no 052/AS/2020-21/210

2020_MoRTH_575870_1 17.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/08/2020
Time 16:0Hrs
08/09/2020
Time 14:0Hrs
1796 Construction of Service road on RHS of NH-66 from Km.370.200 to Km.370.600 including construction of Box culvert, Rataining wall, shifting of median opening and providing signages for permanent Rectification of Black Spot location Kottara Chowki BS ID KA-086 at Chainage 370.600 of National Highways No.66 on Engineering Procurement and Construction basis EPC in the State of Karnataka

NIT No.19 NHAI RO-BNG Road Safety-Black Spot 2020 dated 28.07.2020 11.130 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/07/2020
Time 15:0Hrs
07/09/2020
Time 15:0Hrs
1797 IRQP Work of Umgon- Basopatti- Kaluhai Road in KM.0.00 to 20.50 of NH.-227L for the year 2020-21 under NH- Division Jaynagar in EPC Mode.Job No (227L-BR-2020-21/25)

NH/JAINAGAR/EPC/03/2020-21 28.910 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/08/2020
Time 10:0Hrs
05/09/2020
Time 15:0Hrs
1798 Periodical Renewal Work from km 00 to 20/0 of Nahan Kumarhatti Road of NH 907A under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh

2020_MoRTH_573203_1 6.820 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
1799 Periodical Renewal work from Km 83/0 to 96/0 of Kala Amb Paonta Sahib Dehradun road of NH-07 under Annual Renewal Program (ARP) for the year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_573186_1 6.060 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
1800 Periodical Renewal Work from Km 269/0 to 284/0 of Kalka- Shimla-Wangtoo Road NH-05 Under Annual Renewal Program (ARP) for the year 2020-21 in the State of Himachal Pradesh

2020_MoRTH_573213_1 5.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 18:0Hrs
03/09/2020
Time 11:0Hrs
1801 Periodical renewal work on selected stretches from Km 17/350 to 18/380, 23/750 to 24/980, 30/400 to 30/480, 31/800 to 37/400, 38/800 to 41/350 of Theog Hakoti road NH-705 under Annual Renewal Program(ARP) for year 2020-21 in the State of Himachal Pra

2020_MoRTH_570022_1 4.750 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/07/2020
Time 15:0Hrs
03/09/2020
Time 11:0Hrs
1802 Restoration/ Rehabilitation of Ukhrul to Nagaland Border via Jessami road for km 63.00 to Km 126.00 (Length 63km) NH-150 in the State of Manipur on EPC mode-3rd Call

2020_NHIDC_576368_1 16.640 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 15:0Hrs
01/09/2020
Time 15:0Hrs
1803 Construction of proposed ROB and its approaches on NH60 at 193.800 in lieu of LC Gate No 39 A 3E in the state of West Bengal Job No 060 WB 2019 20 472

2020_MoRTH_570792_1 53.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2020
Time 10:0Hrs
31/08/2020
Time 13:0Hrs
1804 Strengthening Work in Km 68 to 89 of NH 110 on EPC Mode in the State of Bihar

2020_MoRTH_575463_1 32.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2020
Time 11:0Hrs
31/08/2020
Time 11:0Hrs
1805 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)

2020_NHIDC_576188_1 191.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2020
Time 11:0Hrs
28/08/2020
Time 11:0Hrs
1806 Construction of 2-lane ROB and its approaches in lieu of existing level crossing No. KB/1B at km 49 (railway chainage 1.8) on NH-131A in the State of Bihar (on EPC mode)

2020_MoRTH_574413_1 38.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2020
Time 9:0Hrs
27/08/2020
Time 15:0Hrs
1807 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis ContractEPC) Basis Contract

2020_MORTH_556016_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/08/2020
Time 11:0Hrs
24/08/2020
Time 17:0Hrs
1808 6 laning of Kanhauli Ramnagar section of SH 78 from design Ch. Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana

2020_NHAI_51025_1 823.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/08/2020
Time 16:0Hrs
24/08/2020
Time 11:0Hrs
1809 Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_570025_1 183.950 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2020
Time 18:15Hrs
24/08/2020
Time 11:0Hrs
1810 Construction of Eight Lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch. 419.000 – 427.300) section of Delhi - Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg15 1,237.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
24/08/2020
Time 11:0Hrs
1811 FOUR LANING OF ARRAH TO PARARIA SECTION OF NH 319 OLD NH 30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I.

2020_NHAI_44539_1 690.480 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 16:16Hrs
24/08/2020
Time 11:0Hrs
1812 FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH319 OLD NH30 FROM KM 54.530 TO KM 11.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PAHSE-I ON EPC MODE PACKAGE II

2020_NHAI_44535_1 727.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 16:20Hrs
24/08/2020
Time 11:0Hrs
1813 Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (Widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section in the State of Karnataka on Engineering, Procurement and Construction (EPC) Basis ContractEPC) Basis Contract

2020_MORTH_556016_1 93.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2020
Time 15:0Hrs
24/08/2020
Time 5:0Hrs
1814 Strengthening with paved shoulders from Km 0.00 t Km 12.00 (L=12.00 Km) of NH 427 under PWD, Rangia NH Division, Rangia in the state of Assam(Job No.427/AS/2019-20/209)

2020_MoRTH_573118_1 39.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/07/2020
Time 14:0Hrs
21/08/2020
Time 14:0Hrs
1815 Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. Job No. NH-2B/(WB)/(18)/15-16-018-S&R(B)

2020_MoRTH_566040_1 138.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2020
Time 15:0Hrs
20/08/2020
Time 13:0Hrs
1816 Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH-2B/(WB)/(17)/15-16-014-S&R(B)

2020_MoRTH_566078_1 157.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2020
Time 15:0Hrs
20/08/2020
Time 13:0Hrs
1817 Rehabilitation including river training works of Bridge No. 427/1 on NH-52(New NH No.15) over River Gai under Annual Plan for the year 2019-20 under PWD Nagaon NH Division in the state of Assam.(Job No.-015/AS/2019-20/205)

2020_MoRTH_572429_1 22.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2020
Time 17:0Hrs
19/08/2020
Time 14:0Hrs
1818 Construction of Grade Separator at Km 144/2 of NH - 234 (at Junction with Tindivanam – Krishnagiri Road New NH -77) on Engineering, Procurement & Construction (EPC) Mode.

2020_MoRTH_575183_1 16.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/08/2020
Time 9:0Hrs
19/08/2020
Time 11:0Hrs
1819 Construction of ROB with approaches on NH 848B at Karambeli Railway crossing L C No 77 at km 0/0 0/600 on EPC mode under NH O in the State of Gujarat

2020_MoRTH_561283_1 86.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2020
Time 18:30Hrs
19/08/2020
Time 11:0Hrs
1820 Up gradation to 2 lanes with paved shoulders on Sagartola to Kabir Chabutra Road of NH 45 Ext., Length 44.970 Km (Excluding Gadasarai, Madhopur, Roosa and Barnai Bypasses),in the State of Madhya Pradesh on EPC mode

2020_MoRTH_545416_1 170.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2020
Time 15:0Hrs
17/08/2020
Time 17:30Hrs
1821 Strengthening from Km. 211.200 to 220.00, 221.00 to 222.00, 224.00 to 225.00, 247.00 to 249.00,254.00 to 263.535 and 298.00 to 302.478 of NH 75E (New NH No. 39) length 26.813 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_571295_1 22.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2020
Time 18:0Hrs
17/08/2020
Time 15:0Hrs
1822 Rehabilitation and upgradation for 4-Lanning of Saha to Sahabad Section from Km. 14.840 to Km 31.760 of NH-444A (Total Length-16.920 km) under Bharatmala Pariyojna in the State of Haryana on EPC Basis

2020_NHAI_40645_1 163.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 18:30Hrs
17/08/2020
Time 11:0Hrs
1823 Stage strengthening from km. 0.140 to 2.000, 4.000 to 6.000, 9.000 to 10.000, 11.000 to 12.000, 13.000 to 16.000, 67.300 to 73.200, 75.200 to 79.200, 83.200 to 87.200 and 89.800 to 96.000 of NH-731A in Uttar Pradesh on EPC mode.

2020_MoRTH_571562_1 31.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/07/2020
Time 11:0Hrs
14/08/2020
Time 11:0Hrs
1824 Balance work under Phase-II for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches of Kalamb bypass (km 68.576 to km 72.390), Linear length of Bhatkalwadi (km 89.550 to km 90.400) and Alephata bypass (km 92.030 to km 96.000) (Total length- 8.634 Km) of Pune District in the State of Maharashtra on EPC Mode

2020_NHAI_41588_1 119.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 17:40Hrs
13/08/2020
Time 11:0Hrs
1825 Stage Strengthening Work from km 57.00 to km 77.00 of N.H 55 in the District of Darjeeling under NH Division IX, West Bengal, during the year 2020-21

2020_MoRTH_567967_1 18.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2020
Time 18:55Hrs
10/08/2020
Time 17:0Hrs
1826 Reconstruction of minor bridges over Bamni Jhora at km 190.729 Dakuwa Jhora at km 190.872 of NH-31C, in the district of Alipurduar, West Bengal on EPC mode (Job No. 31C-WB-2019-20/463)

2020_MoRTH_563224_1 15.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 18:55Hrs
10/08/2020
Time 17:0Hrs
1827 Construction of Six Lane Grade Separated structures along with slip roads at Km 210.780, Km 260.400 & Km 263.558 and  Service Roads from Km 204.800 to Km 205.800 (Both Sides) from Km 213.500 to Km 215.500 (RHS), Km 260.940 to Km 261.460 (Both Sides) and Km 261.950 to Km 262.850 on NH-44 (old NH-07) in the State of Andhra Pradesh on EPC mode.

NHAI/Tech/AP/NH-44/VUP 107.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/06/2020
Time 9:0Hrs
06/08/2020
Time 15:0Hrs
1828 Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode

2020_NHAI_45974_1 66.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2020
Time 16:0Hrs
06/08/2020
Time 11:0Hrs
1829 Upgradation of Kullu Manali section of NH 21 now NH 3 from Km 272 00 to Km 309 345 designed chainage on EPC Mode in the State of Himachal Pradesh under NHDP phase IVB Regarding Maintenance of Bypassed sections of National Highways

2020_MoRTH_569210_1 4.870 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/07/2020
Time 18:0Hrs
05/08/2020
Time 11:0Hrs
1830 Construction of balance works as part 2 (two numbers of interchanges) of Jaipur Ring Road (NH-148C) from Tonk Road (NH-52) to Ajmer Road Section (NH-48) in the State of Rajasthan on EPC mode.

2020_NHAI_45237_1 128.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 15:0Hrs
05/08/2020
Time 11:0Hrs
1831 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)

2020_NHIDC_560357_1 191.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/05/2020
Time 11:0Hrs
05/08/2020
Time 11:0Hrs
1832 Widening from two lane with paved shoulder to Four Lane from Km 51/4 – 52/8, 55/9 – 56/8 & 57/0 – 57/8 including Construction of Centre Median at selected stretches of NH - 532 in the State of Tamil Nadu on Engineering Procurement & Construction (EPC) Mode

2020_MoRTH_565650_1 9.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2020
Time 9:0Hrs
05/08/2020
Time 11:0Hrs
1833 Widening existing Two lane to Two lane with paved shoulder from Km 195/600 to Km 218/050 km (Odisha-Chhattisgarh to Baldhiamal Chhak) of NH-130C on EPC basis in the state of Odisha.” (Bid Ref No.- 03 CE NH of 2020-21)

2020_MoRTH_562778_1 77.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2020
Time 15:0Hrs
04/08/2020
Time 12:0Hrs
1834 PR Work of Bindeshwar Asthan Jhanjharpur Madhepur Bheja Road in KM 28 to 59 of NH 527A for the year 2020 21 under NH Division Jaynagar in EPC Mode.

2020_MoRTH_568126_1 9.676 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/07/2020
Time 10:0Hrs
03/08/2020
Time 15:0Hrs
1835 Widening from 10m to 12m and strengthening the existing carriageway from km 0/0-6/0 & 8/0-14/0 and widening to multi-lane with strengthening in built-up area from km 7/0-8/0 & 14/0-16/0 including geometrical improvements, Construction of drain, Reconstruction of CD works, Junction improvements & Bus bays and retaining walls and rectification to Black spot at km 9/4-9/8 in Sharjapur – Bagalur -Hosur road NH 207(New NH 648)

2020_MoRTH_565633_1 51.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2020
Time 10:0Hrs
03/08/2020
Time 11:0Hrs
1836 Construction of Seawall at Arichalmunai Roundana in Km 192/700, widening the approaches of the Pamban Bridge in Km 156/500 – 157/277 and 159/622 – 160/0, widening in Km 169/0 - 170/0 & 188/2 - 192/700, Construction of drain in Km 171/6 - 172/8 and Providing Wayside amenities in Km 166/0 - 192/7 (Near Dr.APJ Abdul Kalam National Memorial, Rameswaram and Dhanushkodi) in New NH 87 (Old NH No.49) on EPC mode

2020_MoRTH_565490 18.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/06/2020
Time 15:0Hrs
31/07/2020
Time 11:0Hrs
1837 Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP

2020_NHIDC_565278_1 189.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2020
Time 11:0Hrs
30/07/2020
Time 11:0Hrs
1838 Construction of Eight Lane access-controlled expressway from junction with SH175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803.420 to 824.920, design Ch. 351.000 to Ch. 372.500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM / Delhi-Vadodara/2018/Pkg30 836.098 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2020
Time 15:0Hrs
30/07/2020
Time 11:0Hrs
1839 Stage-strengthening of NH 151 from Km 0/000 to Km 14/064 under Annual Plan 2019-20 (Total Length 14.064 Km) in the state of Assam. (Job No. 151/AS/2019-20/200)

2020_MoRTH_565672_1 13.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2020
Time 11:0Hrs
28/07/2020
Time 14:0Hrs
1840 Construction of 2-lane ROBs with approaches at Km 103.717 and Km 120.850 (existing chainage) on NH-730 under EPC mode in the state of Uttar Pradesh. through an Engineering, Procurement and Construction (EPC) Contract

2020_MoRTH_547623_1 75.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/02/2020
Time 15:30Hrs
27/07/2020
Time 15:0Hrs
1841 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 15:0Hrs
27/07/2020
Time 15:0Hrs
1842 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21.

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 17:0Hrs
27/07/2020
Time 15:0Hrs
1843 Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand

1928/13yata-NH-10/2020 dated 26.06.2020 9.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2020
Time 11:0Hrs
27/07/2020
Time 12:0Hrs
1844 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III)

2020_NHIDC_561284_1 113.520 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2020
Time 11:0Hrs
27/07/2020
Time 11:0Hrs
1845 Stage strengthening work on the road stretch btn km 80 to km 94.5 of NH 117 during the year 2019-20 under NH Divn-I in the Dist of South 24 Pgs WB on EPC Mode. Job No. 117-WB-2019-20-465

2020_MoRTH_564115_1 12.248 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2020
Time 18:0Hrs
27/07/2020
Time 11:0Hrs
1846 Rectification of black spots at km 119.3 Amtala km 119.745 Hosenabad km 121.25 Dharma and km 125.5 Keranichoti of NH 60 under NH div-II in the dist of Paschim Medinipur during the year 2019-20 on EPC mode Job No 060-WB-2019-20-466

2020_MoRTH_564124_1 6.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2020
Time 18:0Hrs
27/07/2020
Time 11:0Hrs
1847 Strengthening of the road from KM 0.00 to Km 24.00 (Domail to Bhamla) and Providing Retaining wall, B/walls, Signages, & Crash Barriers in the selected reaches of NH-1C (New NH-144) in the UT of Jammu and Kashmir

NH-144/01 of 2020-21 Dated01.06.2020 57.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/07/2020
Time 15:0Hrs
22/07/2020
Time 17:0Hrs
1848 Widening and Strengthening to Two lane with paved shoulders including Geometric Improvements from km 491/000 to 525/200 & km 525/200 of Raipur – Visakhapatnam Section of NH 26 in the state of Andhra Pradesh on EPC mode under Annual Plan 2020-21

2020_MoRTH_562834_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2020
Time 15:0Hrs
22/07/2020
Time 15:0Hrs
1849 TN.No.03/HDO/NH/2020-21/Dt.05.06.2020(1)

2020_MoRTH_563352_1 8.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 15:0Hrs
22/07/2020
Time 15:0Hrs
1850 TN.No.03/HDO/NH/2020-21/Dt.05.06.2020(2)

2020_MoRTH_563365_1 37.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/06/2020
Time 10:0Hrs
22/07/2020
Time 11:0Hrs
1851 Construction of Grade Separator at Km 51/2 of NH - 532 (Cuddalore – Vridhachalam – Salem road) in the State of Tamil Nadu on Engineering Procurement & Construction (EPC) Mode.

2020_MoRTH_563373_1 27.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2020
Time 17:0Hrs
22/07/2020
Time 11:0Hrs
1852 Construction of VUP with RE Wall Approaches Design Chainage Km 43.050 Existing Chainage Km 43.070 and Service Road Design Chainage Km 42.650 to Km 43.450 BHS of BarBilaraJodhpur Road Project of NH25 Old NH112 in the State of Rajasthan

1234 16.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/06/2020
Time 18:0Hrs
17/07/2020
Time 18:0Hrs
1853 Up-Gradation to Intermediate lane of NH-301 Kargil-Zanskar Road from Km 148.320 to Km. 196.250 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_538898_1 243.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2020
Time 11:0Hrs
09/07/2020
Time 17:0Hrs
1854 Upgradation to Intermediate lane of NH 301 Kargil Zanskar Road from Km 117.180 to Km 148-320 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_533814_1 199.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2020
Time 15:0Hrs
09/07/2020
Time 17:0Hrs
1855 Widening and Strengthening of kottampatti - Thiruppathur section from km 1/500 - 30/350 of NH 383Extn in the state of Tamil Nadu (EPC mode)

2020_MoRTH_560705_1 84.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 17:0Hrs
08/07/2020
Time 15:0Hrs
1856 Widening & Strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC Mode.

503M/13M-NHCK/19 dated 21.04.2020 181.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2020
Time 15:0Hrs
08/07/2020
Time 11:0Hrs
1857 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I)

2020_NHIDC_560357_1 162.890 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/05/2020
Time 11:0Hrs
08/07/2020
Time 11:0Hrs
1858 Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV)

2020_NHIDC_559587_1 143.714 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2020
Time 11:0Hrs
08/07/2020
Time 11:0Hrs
1859 Construction of New Six lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh

2019_MoRTH_528953_1 1,156.290 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 19/12/2019
Time 15:0Hrs
07/07/2020
Time 17:0Hrs
1860 Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Package-I).

NHAI/GUJ/Ahmedabad-Dholera/Pkg-I/2020/ 774.530 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 15:0Hrs
1861 Construction of Four Lane Expressway from Sindhrej Village to Vejalka village of Ahmedabad District from km 22.000 to km 48.520 of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat (Package-II)

NHAI/Guj/Ahmedabad-Dholera/Pkg-II/2020/ 913.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 15:0Hrs
1862 Construction of Four lane expressway from start of DSIR zone of Ahmedabad district to Adhelai village of Bhavnagar district (ch. 71.00 to ch. 109.019) section of Ahmedabad- Dholera Greenfield alignment (NH-751) on EPC mode under Bharatmalapriyojana in the state of Gujarat (Package-IV)

NHAI/GUJ/Ahmedabad-Dholera/Pkg-IV/2020 932.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 12:0Hrs
1863 Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujarat (Package-III).

NHAI/GUJ/Ahmedabad-Dholera/Pkg-III/2020 746.550 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2020
Time 11:0Hrs
07/07/2020
Time 11:30Hrs
1864 Work of Up gradation of NH-703 (Newly NH declared) Sirsa to Sardulgarh road upto Punjab Border from Km. 21.50 to 25.13 ( Road ID 5795) in Sirsa in the state of Haryana on Engineering, Procurement & Construction (EPC) Mode

2020_MoRTH_560724_1 5.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2020
Time 15:0Hrs
06/07/2020
Time 17:0Hrs
1865 Sample Project

Samp777 126.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/10/2019
Time 15:0Hrs
06/07/2020
Time 15:0Hrs
1866 4 laning of Channarayanapatna Bypass from km. 140/449 to km 149/596 and Hassan Bypass from km 175/935 to km 185/684 and providing Grade Separator Structures, Service Road and other safety measures in Devihalli km 108/486 to Hassan (km. 185/684) section of NH-75 old NH-48 on EPC basis in the state of Karnataka

2020_NHAI_40058_1 595.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
06/07/2020
Time 11:0Hrs
1867 Construction of Flyover at Km 362/790 - 364/555 of (Nagapattinam - Gudalur-Mysore Road) Periyanaickenpalyam Junction- Coimbatore Outskirt in the state of Tamilnadu on EPC mode

2020_MoRTH_566008_1 74.061 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2020
Time 10:0Hrs
06/07/2020
Time 11:0Hrs
1868 Design and Construction Improvement of Road Rajouri-Thanamandi-Surankot on EPC mode from Existing Km 3.900 to Km 56.951 (Design Km 3.900 to Km 59.420) [Design Length – 55.520 km] from Existing IW CL-9 Specifications to NHDL Specifications under Project Sampark in Jammu and Kashmir (UT)

2020_BRO_546760_1 330.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 17:0Hrs
06/07/2020
Time 11:0Hrs
1869 Construction of 4 Four Minor Bridges at km 21.717 km 23.150 km 88.300 km 92.100 on NH 4 in the Union Territory of Andaman Nicobar Islands on EPC basis

2020_NHIDC_557580_1 24.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2020
Time 15:0Hrs
03/07/2020
Time 15:0Hrs
1870 Construction of Balance work of Two lane with paved shoulder of Joram Koloriang Road NH 713 on EPC Basis from existing Km 50.050 to km 70.000 Design Km44.989 to Km 61.547 Design length 16.558 Km in the State of Arunachal Pradesh under SARDP NE.

2020_NHIDC_558068_1 117.890 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
1871 Construction of Balance work of two Lane with paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 70.000 to Km 88.700 Design Km. 61.547 to Km. 78.724 Design Length 17.177 Km in the state of Arunachal Pradesh under SARDP NE

2020_NHIDC_558072_1 183.640 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
1872 Construction of Balance work of two Lane with paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 88.700 to Km 104.850 Design Km. 78.724 to Km. 93.724 Design Length 15 Km in the state of Arunachal Pradesh under SARDP NE

2020_NHIDC_557857_1 140.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2020
Time 15:0Hrs
02/07/2020
Time 15:0Hrs
1873 Construction of New Link NH 133B from Km 0.200 (Km 200.700 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Km 25.240 of NH 131A) including Ganga Bridge and Construction of Manihari Bypass from Km 0.000 (Km 25.240 of NH 131A) to Km 5.500 (Km 34.100 of NH 131A near Narenpur) and widening of NH 131A from Km 5.500 (Km 34.100 of NH 131A) to Km 6.000 (Km 34.600 of NH 131A) in the state of Bihar to 4 lane Standards on EPC Mode

2020_NHAI_40014_1 2,124.170 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
01/07/2020
Time 11:0Hrs
1874 Widening & strengthening to two lane with paved shoulder from km 0/000 to km 35/840 km of NH-220 (Tiring to Rairangapur section) on EPC basis in the state of Odisha. (BID No. 01 CENH of 2020-21)

2020_MoRTH_557230_1 66.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 10:0Hrs
30/06/2020
Time 12:0Hrs
1875 Construction of Balance work of Two lane Paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 104.850 to km 122.600 Design km 92.724 to km 108.724 Design length 15.000 km in the State of Arunachal Pradesh under SARDP NE

2020_NHIDC_557798_1 122.980 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 15:0Hrs
29/06/2020
Time 15:0Hrs
1876 Construction of Balance work of Two lane Paved shoulders of Joram Koloriang Road NH 713 on EPC basis from existing Km 122.600 to km 138.000 Design km 108.724 to km 123.714Design length 14.99 km in the State of Arunachal Pradesh under SARDP NE

2020_NHIDC_557828_1 119.050 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 15:0Hrs
29/06/2020
Time 15:0Hrs
1877 Widening to Double Lane with Paved Shoulder from Km. 294/280 to km. 319/280 (Nabarangpur to Borigumma) of NH-26 for the year 2019-20 in the State of Odisha on EPC mode. (Bid Ref No.- 02 CE NH of 2020-21)

2020_MoRTH_559629_1 70.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 16:55Hrs
29/06/2020
Time 12:0Hrs
1878 Widening to 2 lane with paved shoulder from Km 181.465 to 201.665 of N.H-120 (Nasariganj to Bikramganj) in the State of Bihar on EPC mode

2020_MoRTH_559675_1 70.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2020
Time 9:0Hrs
24/06/2020
Time 15:0Hrs
1879 Strengthening work from chainage 0.00 to chainage 36.000 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the State of Uttarakhand

1361/13Yata-NH-10/2020 dated 19.05.2020 20.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 15:0Hrs
22/06/2020
Time 12:0Hrs
1880 Strengthening work of the road on National Highway 109(old NH-87 Ext.) Panduwakhal to Karanprayag, from km 171.000 to km 200.00, km 218.00 to km 235.00 and construction of damaged scuppers and protection work between km 171.00 to km 200.00 in the state of Uttarakhand

1361/13Yata-NH-10/2020 dated 19.05.2020 27.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2020
Time 15:0Hrs
22/06/2020
Time 12:0Hrs
1881 IRQP Work of Umgon- Basopatti- Kaluhai Road in KM.0.00 to 20.50 of NH.-227L for the year 2020-21 under NH- Division Jaynagar in EPC Mode

NH/Jainagar/EPC/01/2020-21 28.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/05/2020
Time 15:0Hrs
18/06/2020
Time 15:0Hrs
1882 PR Work of Bindeshwar Asthan- Jhanjharpur- Madhepur- Bheja Road in KM.28.00 to 59.00 of NH.-527A for the year 2020-21 under NH- Division Jaynagar in EPC Mode

NH/Jainagar/EPC/01/2020-21 9.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/05/2020
Time 15:0Hrs
18/06/2020
Time 15:0Hrs
1883 Strengthening work from km 89.00to 101.00 and 108.500 to 120.00 including road safety work on NH 87 ext. (New 109)inthe state ofUttarakhand.

2020_MoRTH_559901 11.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 12:0Hrs
16/06/2020
Time 15:0Hrs
1884 Strengthening work from km. 125.00 to km. 132.00 and reconstruction of damaged drain and Protection work from km. 104.00 to km. 139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode

camp33/13yata-NH-10/2020 dated 29.04.2020 8.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 15:0Hrs
16/06/2020
Time 12:0Hrs
1885 Strengthening work from km. 13.00 to km. 24.00 and construction of damaged retaining wall from km. 18.00 to 44.00 with drain improvement of sinking portion in km. 26.00 and Protection of sliding zone at km. 38.00 on NH-123(507) in the State of Uttarakhand under EPC mode

camp33/13yata-NH-10/2020 dated 29.04.2020 6.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2020
Time 15:0Hrs
16/06/2020
Time 12:0Hrs
1886 Construction of VUP alongwith additional exit entry ramp at Shastri Colony Ambala Cantt. at km. 198.300 on NH44 (old NH1) in the State of Haryana on EPC mode

2020_NHAI_47556_1 13.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2020
Time 15:0Hrs
16/06/2020
Time 11:0Hrs
1887 Balance work of Bridges on Theog Kotkhai Hatkoti road NH 705 KM 0 to 69 on EPC mode in the state of HP EPC 17

2020_MoRTH_552414_1 34.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:40Hrs
15/06/2020
Time 11:0Hrs
1888 Balance work of Road work culvert protection work and additional road safety work on Theog Kotkhai Hatkoti road on NH 705 from km 00 to 69 in the state of HP EPC 16

2020_MoRTH_552374_1 39.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:10Hrs
15/06/2020
Time 11:0Hrs
1889 Improvement of existing single / Intermediate lane of NH-44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504 (Ex. Ch.-260/109) to Km 263/191 (Ex. Ch.261/761) and Km 272/241 (Ex. Ch. 271/000) to Km 284/033 (Ex. Ch. 284/053) (Total Length=30.28Km) under SARDP-NE (Phase-A) in the State of Assam (Job No.-SARDP-NE/NH-44/AS/PWD/2010-11/182)

2020_MoRTH_557758_1 140.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2020
Time 16:0Hrs
12/06/2020
Time 14:0Hrs
1890 Construction of LVUPs at Vadaguru (Km.256.500) & Tambahalli (Km.250.460) including Service road & Drain of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 (New NH-48) in the State of Karnataka on EPC mode

NIT No. 02/NHAI/RO-BNG/11019/Tender/2020-21 dated 12.05.2020 44.633 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2020
Time 15:0Hrs
10/06/2020
Time 15:0Hrs
1891 Construction of grade separator at km 218/6 of NH 67 (Nagappatinam – Guddalore – Mysore Road (New NH - 81). in the State of Tamil Nadu (EPC mode)

2020_MoRTH_560903_1 22.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2020
Time 9:0Hrs
10/06/2020
Time 15:0Hrs
1892 Periodical Renewal (Re-carpeting) in the length of 15.275 km of NH-05 in selected stretches in the UT Chandigarh under EPC mode

2020_MoRTH_558680_1 10.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2020
Time 18:30Hrs
10/06/2020
Time 11:0Hrs
1893 Construction of new Bridge over river Dhansiri (Br. No.82/1) on NH-15 (Old NH- 52) under Annual Plan for the year 2019-20 in the state of Assam under EPC mode. Job No. 015/AS/2019-20/202

2020_MoRTH_556776_1 35.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
1894 Construction of Guide Bund and Bridge protection works of Bridge No. 338/1 over river Ranganadi and Re-construction of superstructure of Bridge over river Haijan (Br. No. 342/1) on NH -15 under Nagaon NH Division under in the state of Assam. Job No. 015/AS/2019-20/208.

2020_MoRTH_556803_1 17.257 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
1895 Periodical Renewal of NH-154 from km. 3/500 to Km 18/800 and from Km. 26/000 to Km 35/400 on existing two-lane with paved shoulder for the year 2019-20 in the state of Assam.Job No.TA/154/AS/2019-20/253

2020_MoRTH_556685_1 14.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
1896 Periodical Renewal for the year 2019-20 from Km 365/00 to Km 373/00 (Total Length 8.00 km) on NH-15 under Nagaon NH Division on EPC mode in the state of Assam, Job TA/015/AS/2019-20/254

2020_MoRTH_556773_1 5.976 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
1897 Periodical Renewal for the year 2019-20 from 373/000 to km. 396/425 (Total Length=23.425 Km) on NH-15 under Nagaon NH Division on EPC mode in the state of Assam, JobTA/015/AS/2019- 20/252

2020_MoRTH_556774_1 14.947 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
05/06/2020
Time 14:0Hrs
1898 Restoration/Rehablitation of Churachandpur-Tipaimukh Road (NH-150) Km 9.00 to Km 70.00 (Total Length-61 km) in the state of Manipur.

NHIDCL/RO-Imphal/SR/C-T/Km9.00-Km70.00/2020-21 16.930 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 15/05/2020
Time 18:0Hrs
05/06/2020
Time 11:0Hrs
1899 Renewal of existing road from km 162.56 to km 178.00 (approx. length 15.440 km) of the Jhansi-Banda-Allahabad section of National Highway No. 76 in the state of Uttar Pradesh by bituminous concrete in wearing course on Engineering, Procurement, Construction (“EPC”) basis.

558M/13M-NHCK/19 dated 18.05.2020 6.459 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 15:0Hrs
04/06/2020
Time 15:0Hrs
1900 Renewal of existing road from km. 43.000 to Km. 61.000 (approx. length 18.00 km) of the Etawah-Bela-Kannauj section of National Highway No 91A in the State of Uttar Pradesh by bituminous concrete in wearing course on Engineering, Procurement, Construction (EPC) basis.

556M/13M-NHCK/19 dated 18.05.2020 7.287 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/05/2020
Time 15:0Hrs
04/06/2020
Time 15:0Hrs
1901 Strengthening the existing B.T. carriageway from Km 338/450 to 351/113 of NH-59 inside Berhampur city in the state of Odisha. (Bid Ref No 12 CENH of 2019-20)

2020_MoRTH_546228_2 15.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2020
Time 15:0Hrs
03/06/2020
Time 12:0Hrs
1902 Periodical Renewal under Annual Renewal programme (ARP) for the year 2019-20 in Km 11th, Km12th, from km 16th to km 19th, km 50th, 81st & Km 95th (from Ch.94.570 to ch.94.93) (Total length= 8.360 km) on Nh-15 under Rangia NH division , Rangia in the state of assam (Job No. TA/015/As/2019-20/251)

2020_MoRTH_556775_1 6.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2020
Time 11:0Hrs
02/06/2020
Time 14:0Hrs
1903 The work for Strengthening of Phagwara-Nawanshahar-Ropar road from Km. 81.900 to 88.00 in Ropar City of NH-344A in the State of Punjab on EPC Mode.

2020_MoRTH_556240_1 4.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/04/2020
Time 16:0Hrs
01/06/2020
Time 16:0Hrs
1904 Widening to two lane with geometric improvement from km 205.00 to km 210.00 (Kirshal-Chaura) of NH-121 in the state of Uttarakhand under Annual Plan 2019-20

camp33/13yata-NH-10/2020 dated 29.04.2020 8.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 15:0Hrs
01/06/2020
Time 15:0Hrs
1905 Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand

camp33/13yata-NH-10/2020 dated 29.04.2020 9.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2020
Time 15:0Hrs
01/06/2020
Time 15:0Hrs
1906 Widening and Strengthening from km. 0.000 to km. 15.000 (Rampur-Bhadewara section) of NH 135C in the state of Uttar Pradesh on EPC mode

2020_MoRTH_555704_1 49.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2020
Time 15:0Hrs
29/05/2020
Time 11:0Hrs
1907 Widening from Double with Paved Shoulder upto drain in km 3/2 - 5/0 (Built up area of Madurai city) of NH 49 (New NH No. 87) including way side amenities, Construction of Drain cum Footpath and Junction Improvement in the state of Tamil Nadu on EPC mode.

2020_MoRTH_555207_1 13.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 15:0Hrs
27/05/2020
Time 15:0Hrs
1908 Providing Paved Shoulders on both sides from Km 0/0 - 4/0, widening from Two lane to Four lane with paved shoulder from Km 4/0 - 10/0 including drains, culverts and construction of service road from Km 0/2 - 1/2 on LHS in NH 210 (New No NH 336) in Tamil Nadu on EPC mode.

2020_MoRTH_555215_1 48.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 15:0Hrs
27/05/2020
Time 15:0Hrs
1909 Widening of minor bridge at Km407/970 and Reconstruction of slab culvert at Km.408/650 including widening pipe culvert at km 403/950 and 408/220 construction of protective works at Km403/8,403/10,408/2,408/8 of NH67 (New NH 181) in the state of Tamil Nadu on EPC basis

2020_MoRTH_555245_1 5.823 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/04/2020
Time 10:0Hrs
27/05/2020
Time 15:0Hrs
1910 Construction of 1.New Jersey Barrier at the Center of median from Silk Board Junction Km 8.765 to Attibele KR TN Border Km 33.130, 2. Construction of Street Light facilities from Veerasandra Junction Km 19.000 to Attibele KR TN Border Km 33.130, 3.Construction of Foot Over Bridge FOB at Km 19.700 Near SFS College, 4.Construction of Speed Table and Automatic Traffic Red Led Blinkers for Black spots Silk Board Junction Km 8.765 to Attibele KR TN Border Km 33.130, 5.Construction of Junction Improvements Km 9.790 between P3 and P4 and Km 10.350 P20 and P21, 6. Construction of Bus-bay Km 19.000 to Km 33.130 in Silk Board to Attibele section of NH44 Old NH7 in the state of Karnataka on Engineering Procurement and Construction EPC Mode

NIT No.21 NHAI RO BNG 22018 Tender 2019 20 dated 20.03.2020 43.925 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 20/03/2020
Time 17:0Hrs
26/05/2020
Time 15:0Hrs
1911 Maintenance of Existing Two lane carriageway from Addahole Near Gundya of Existing Chainage Km.263.000 Design Chainage Km.255.703 To Bantwal Cross of Exiting km.328.000 Design Chainage Km.318.755 Section of NH-75 old NH-48 in the State of Karnataka on EPC mode

NIT No.18/NHAI/RO-BNG/15032/Tender/2019-20 dated 13.03.2020 19.980 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 13/03/2020
Time 17:0Hrs
26/05/2020
Time 15:0Hrs
1912 Construction of proposed 2-lane ROB and its approaches in replacement of existing Level Crossing No 88 at Km 113.00 Railway ch 56/522 of NH 228 New NH 64 in the State of Gujarat

2020_MoRTH_549217_1 18.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2020
Time 15:0Hrs
26/05/2020
Time 11:0Hrs
1913 Construction of proposed ROB and its approaches in replacement of existing Level Crossing No. 3X at Km 88.565 of NH 64 District Anand in the State of Gujarat

2020_MoRTH_549270_1 62.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2020
Time 16:30Hrs
26/05/2020
Time 11:0Hrs
1914 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 13.000 to Km. 25.600 on EPC basis under SARDP-NE Phase A in the State of West Bengal (Package-IV B)

2020_NHIDC_549516_1 226.090 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2020
Time 18:0Hrs
25/05/2020
Time 17:0Hrs
1915 Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from Km 76.350 to Km 96.538 of NH-717A (End of Alagarah Bypass to Reshi Border) under SARDP-NE Phase A on EPC basis in the state of West Bengal- Package VB

2020_NHIDC_548728_1 269.510 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 18:0Hrs
25/05/2020
Time 17:0Hrs
1916 Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of West Bengal (Package-V A)- Retender

2020_NHIDC_554362_1 235.290 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2020
Time 18:30Hrs
25/05/2020
Time 17:0Hrs
1917 Rehabilitation and up-gradation of NH-544E from Km 56/803 to Km 99/179 of Madakasira to Sira section (till AP/Knt border) to two lane with paved shoulder in the State of Andhra Pradesh under NH(O) on EPC mode

NIT No 28/2019-20 140.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
1918 Rehabilitation and Upgradation of NH544D from Two Lane to Four Lane from Km 0/000 To 5/400 of Ananthapuramu to Guntur road in the state of Andhra Pradesh on EPC mode

SE NH ATP NIT 29/2019-20 68.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
1919 Strengthening the road from Km 20/0 to 23/0, Km 33/4 to 34/850, 49/2 to 50/0, 51/0 to 57/0, 58/0 to 61/0, 71/6 to 74/0, 79/0 to 91/0, 93/0 to 94/6, 94/6 to 98/0 and in Selected reaches from Km 107/0 to 128/0 excluding length approved under ARP 2019 20 of Kurnool Dornala Road of NH 340C in the State of Andhra Pradesh on EPC mode (2nd call)

SE NH ATP NIT 34/2019-20 22.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/03/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
1920 PR WORK FROM KM.74/427 TO 95/380, KM.121/200 TO 132/100 & KM. 146/0 TO 154/330 OF ANANTAPUR – GUNTUR ROAD OF NH544D IN KURNOOL DISTRICT IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE

SE NH ATP NIT NO 26 2019 20 7.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
20/05/2020
Time 15:0Hrs
1921 Construction of 2-lane ROB and its approaches in lieu of existing level crossing No.KB/1B at km. 49 (railway chainage 1.8) on NH-131A in the State of Bihar(on EPC mode)

2020_MoRTH_555810_1 38.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2020
Time 18:0Hrs
19/05/2020
Time 15:0Hrs
1922 Strengthening Work from Km 53.000 to Km 89.000 (Length 36.000 Km) of NH-33 (New) (Km 0.000 to Km 36.000 of NH-110 old) for the year 2019-20 on EPC Mode

RE NIT NO 13 NH 33/ 2019-20 31.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 15:15Hrs
18/05/2020
Time 11:0Hrs
1923 Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode

2020_NHIDC_545813_1 30.750 NHIDCL Special Project EPC (Lump Sum/Item Rate Contract) 18/02/2020
Time 15:0Hrs
15/05/2020
Time 15:0Hrs
1924 Widening to Two lanes with earthen shoulder and Geometric improvement from Km 45.00 to 55.560 (Kakrighat to Quarab)

2020_MoRTH_552791_1 59.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/04/2020
Time 15:0Hrs
13/05/2020
Time 11:0Hrs
1925 Strengthing and Road Safety Work from Km. 0.00 to 10.00 Km. and Km. 26 to 48.00 Km. and Road Safety Work from Km. 22.00 to 26.00 Km. on N H 309 B ( Almora- Panar - Ghat Motor Road ) in the State of Uttarakhand Under Annual Plan 2019-20.

2020_MoRTH_555404_1 21.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2020
Time 17:0Hrs
13/05/2020
Time 11:0Hrs
1926 Construction of High-Level Bridge 4 span 20 mtr. each including dismantling of existing bridge, construction of diversion road and approaches in place of existing old/narrow bridge at RD 234.100 of road from Tohana (In Haryana) Punjab/Haryana Border to Moonak Budhlada Bhikhi road National Highway 148-B

08 8.275 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 10:0Hrs
12/05/2020
Time 17:0Hrs
1927 Providing Periodical Renewal on Chandigarh-Ropar-Road from km 22.600-28.600 (New NH-205, Old NH-21) and Chandigarh-Ludhiana Road (New NH-05, Old NH-21) Section Zirakpur to UT Boundary from Old km No. 0.871-1.68 and New km 236.845-237.657 on EPC Mode

2020_MoRTH_551612_1 0.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2020
Time 15:0Hrs
11/05/2020
Time 17:0Hrs
1928 Reconstruction of Major Bridge with approaches at Km 224.800 on Barnala Mansa Sardulgarh

2020_MoRTH_549092_1 16.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2020
Time 15:0Hrs
11/05/2020
Time 15:0Hrs
1929 Providing and laying 50mm thick DBM and 30mm thick BC on Moga Ramgarh Barnala Road section of NH-71 new 703 RD 136.360 to 140.145 and 141.340 to 144.795 and Barnala Handiaya Mansa road section of NH-703 RD 140.950 to 144.450 on EPC mode

2019_MoRTH_529469_1 8.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2019
Time 10:0Hrs
11/05/2020
Time 9:0Hrs
1930 PR Work from Km. 226.370 to 236.600, Km. 239.400 to 241.500 and Km. 243.300 to 244.750 road section of Tohana in Haryana Border to Moonak-Jakhal-Budhlada of NH-148-B on EPC mode in the state of Punjab

2019_MoRTH_529495_1 5.177 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2019
Time 10:0Hrs
11/05/2020
Time 9:0Hrs
1931 Improvements to riding quality programme in Km.474/0 - 476/0 and 487/875 - 504/4 of NH67 (New NH No181) in the State of Tamil Nadu

2020_MoRTH_554095_1 13.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2020
Time 15:0Hrs
05/05/2020
Time 15:0Hrs
1932 Construction of additional High Level Bridge at Km 59/8-10 of NH-45A (Villupuram – Pondicherry – Nagapattinam Road) across Thenpennai River in the State of Tamil Nadu on EPC Mode.

2020_MoRTH_555434_1 20.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2020
Time 18:0Hrs
29/04/2020
Time 11:0Hrs
1933 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the Union Territory of Jammu and Kashmir to be executed on EPC basis.

2020_NHIDC_552087_1 221.940 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2020
Time 15:0Hrs
27/04/2020
Time 15:0Hrs
1934 Periodical Renewal to NH 326 from 429/700 to 475/900 km for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No.- 15 CE NH of 2019-20)

2020_MoRTH_549011_1 14.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
1935 Periodical Renewal from Km. 142/620 to 159/280 Km. of NH-26 for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No.- 16 CE NH of 2019-20)

2020_MoRTH_549021_1 6.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
1936 Periodic Renewal to NH-59 from km 12/400 to km 44/000km, 51/200 to 57/000 & 57/290 to 68/290km (actual length 48.69 km) for the year 2019-20 in the state of Odisha on EPC basis. (Bid Ref No. 14 CENH of 2019-20)

2020_MoRTH_548127_1 12.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2020
Time 18:55Hrs
27/04/2020
Time 12:0Hrs
1937 Improvement of byepassed sections from km 17 760 to km 19 00 Gohir Byepassed section km 21 460 to km 22 098 and from km 25 340 to km 26 715 Nakodar byepassed section from km 36 050 to km 37 075 Malsian byepassed section from km 39 640 to km 43605 Shahkot byepassed section of NH 71 New NH 703 Jalandhar Barnala Road in District Jalandhar in the State of Punjab on EPC Mode

2020_MoRTH_539129_1 5.494 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2020
Time 14:0Hrs
27/04/2020
Time 11:0Hrs
1938 Restoration of stretch at Km, 84/225 to Km. 84/675 down stream side of Dharoi Dam of NH-58 Khokhara Gujarat Border-Vijaynagar-Mathuasar- Dhori-Satlasna-Kheralu-Palanpur Road in the state of Gujarat (on EPC made). (Job No. 058/GJ/2019-20/ 623)

12 of 2019-2020 9.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 18:0Hrs
16/04/2020
Time 12:0Hrs
1939 Widening of existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the state of Gujarat under EPC made). (Job No. 058/GJ/2019-20/ 628)

11 of 2019-2020 16.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2020
Time 16:0Hrs
16/04/2020
Time 11:0Hrs
1940 Construction of Hnathial bypass (Package-2) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance

2020_NHIDC_540211_1 71.480 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 18:30Hrs
15/04/2020
Time 11:0Hrs
1941 Balance work of Construction of Two/Four lane with paved shoulder from Km 54.370 to Km 101.400 (Bidar to Humnabad Section) of NH-50 in the state of Karnataka on EPC mode

2020_MoRTH_546610_1 300.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2020
Time 18:40Hrs
07/04/2020
Time 11:0Hrs
1942 Stage-strengthening of NH 151 from Km 0/000 to Km 14/064 under Annual Plan 2019-20 (Total Length- 14.064 Km) in the state of Assam. (Job No. 151/AS/2019-20/200)

2020_MoRTH_550397_1 13.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 11:0Hrs
04/04/2020
Time 14:0Hrs
1943 Stage strengthening from Km.29.200 to 38.000 (Total Length-8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/201920/197).

2020_MoRTH_550379_1 5.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2020
Time 11:0Hrs
04/04/2020
Time 11:0Hrs
1944 Design and Construction of 4 Nos Stand alone structureson Vadape Gonde section of NH848

2019_NHAI_32158_2 78.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2020
Time 19:0Hrs
03/04/2020
Time 15:0Hrs
1945 IRQP IN kM 114TH TO 128TH OF NH 80 UNDER NH DIVISION BHAGALPUR FOR THE YEAR 2019-20

2020_MoRTH_544723_1 8.895 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 16:0Hrs
03/04/2020
Time 15:0Hrs
1946 Widening and Strengthening to two lane with Paved shoulders including Geometrical Improvements from Km 491.000 to 525.200 of Raipur Visakhapatnam section of NH26 in the State of Andhra Pradesh on EPC mode

2020_MoRTH_543376_1 155.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:0Hrs
26/03/2020
Time 17:0Hrs
1947 Construction of High Level Bridge across Jamni River on Tikamgarh-Jhansi road at km. 74/6 (NH-539) in the State of Madhya Pradesh. (Total Length 840m) on EPC mode

2020_MoRTH_542813_1 35.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 18:30Hrs
24/03/2020
Time 17:30Hrs
1948 Construction of High Level Bridge across Betwa River on Orchha-Tikamgarh road at km. 81/2 (NH-539) in the State of Madhya Pradesh on EPC Mode.

2020_MoRTH_542843_1 20.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 15:0Hrs
24/03/2020
Time 15:0Hrs
1949 Construction of Flyover at Km 362/790 - 364/555 of (Nagapattinam - Gudalur-Mysore Road) Periyanaickenpalyam Junction- Coimbatore Outskirt in the state of Tamilnadu on EPC mode

2020_MoRTH_542649_1 74.061 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/02/2020
Time 15:0Hrs
23/03/2020
Time 15:0Hrs
1950 Strengthening the Existing B.T. carriageway from Km338/450 to Km351/100 of NH-59 in side Berhampur City on EPC Basis in the State of Odisha for the year 2019-20(Bid Ref No.- 12 CE NH of 2019-20)

2020_MoRTH_546228_1 15.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2020
Time 18:45Hrs
19/03/2020
Time 12:0Hrs
1951 Strengthening of NH-26 From Km.351.480 to Km 367/480 and Km 376/480 to Km 434/767 (Koraput to Sunki Ghat) on EPC Basis in the State of Odisha for the year 2019-20 (Bid Ref No.- 13 CE NH of 2019-20)

2020_MoRTH_546248_1 46.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2020
Time 18:45Hrs
19/03/2020
Time 12:0Hrs
1952 Periodical renewal in km 0/260-6/5(Sirkali bypass),km 136/330-152/580 of NH45A (New No NH 32) in the state of Tamil Nadu (EPC mode)

2020_MoRTH_544850_1 9.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 16:0Hrs
18/03/2020
Time 15:0Hrs
1953 Strengthening between Km.418/305 to 421/205,Km 429/405 to 441/00,Km 443/00 to 444/00,Km 445/00 to 449/00,Km 452/00 to 454/405 section Bodeli-Naswadi Road of N H 56 in the State of Gujarat.

2020_MoRTH_548250_1 15.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2020
Time 13:30Hrs
18/03/2020
Time 11:0Hrs
1954 Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad - Bidar Section of NH-161A under Bharatmala Pariyojna in the state of Karnataka on EPC mode

2020_NHAI_40633_1 336.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 17:45Hrs
18/03/2020
Time 11:0Hrs
1955 NHIDCL/West Bengal/Civil Work/Kafer-lava More/VA/2019

2019_NHIDC_529336_1 177.200 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2019
Time 15:0Hrs
18/03/2020
Time 11:0Hrs
1956 Periodical Renewals from km 473.287 to 483.00 and km 546.00 to 552.00 of Raipur Visakhapatnam of NH 26 in the state of Andhra Pradesh

2020_MoRTH_543275_1 6.481 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
1957 Periodical Renewals from km 26.800 to 28.400 km 39.500 to 40.700 Kakinada Bypass and Km107.800 to 122.800 Razole Bypass of Kathipudi Ongole road of NH 216 in the state of Andhra Pradesh

2020_MoRTH_543323_1 6.985 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
1958 Strengthening of the reach from Km 525.200 to Km 537.600 of Raipur Visakhapatnam section of NH26 in the state of Andhra Pradesh on EPC mode

2020_MoRTH_543356_1 16.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 17:0Hrs
17/03/2020
Time 17:0Hrs
1959 Periodic Renewal and Reconstruction of Jetpur-Somnath Section of NH-8D between Km. 0.000 to Km.123.454 (New NH-151) in the State of Gujarat excluding existing junagadh bypass from Km.20.600 to Km. 42.900

NHAI/Guj/Jet-Somn/ Resurfacing/2020 114.690 NHAI Maintenance Project OTHERS 30/01/2020
Time 17:0Hrs
17/03/2020
Time 15:0Hrs
1960 Periodical Renewal in Km.72/7 – 89/500 of NH 45A in the state of TamilNadu on EPC mode.

2020_MoRTH_544791_1 11.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:0Hrs
17/03/2020
Time 11:0Hrs
1961 Periodical Renewal in Km.105/400 – 112/280- NH 45A in the state of TamilNadu on EPC mode.

2020_MoRTH_544831_1 6.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:15Hrs
17/03/2020
Time 11:0Hrs
1962 Construction of 4 lane from Bameetha to Khajuraho section of NH 339B from km 0/000 to km 10/000 under NH(O) in the state of Madhya Pradesh on EPC mode

2019_MoRTH_518116_1 30.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
16/03/2020
Time 17:30Hrs
1963 Strengthening from Km 8.310 to 69.000 of AP TS border to Vodarevu Narasaraopeta Piduguralla road of NH167A in the State of Andhra Pradesh on EPC mode under Annual Plan 2019 20

2020_MoRTH_544092_1 37.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 17:0Hrs
16/03/2020
Time 17:0Hrs
1964 O&M and Routine maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis (Second Call)-reg.

17/NHAI/RO-BNG/11019 A/Tender/2019 dated.10.02.2020 16.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:0Hrs
16/03/2020
Time 17:0Hrs
1965 Strengthening the selected stretches (31.20Km) from Km 153/6 to 168/100 & 171/0 to 187/7 of Renigunta – Kadaopa- Muddanur Road NH 716 in the state of Andhra Pradesh on EPC mode

2020_MORTH_534909_1 28.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
16/03/2020
Time 15:0Hrs
1966 Strengthening to NH 326 from km 311.700 to 327.700 (Design Length 18.255 km instead of 16 km) (Jeypore to Mahuli) for the year 2019-20 on EPC Basis in the State of Odisha. (Bid Ref No.- 10 CE NH of 2019-20)

2020_MoRTH_544865_1 10.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:55Hrs
16/03/2020
Time 12:0Hrs
1967 Strengthening to NH 326 from km 413.700 to 429.700 for the year 2019-20 on EPC Basis in the State of Odisha. (Bid Ref No.- 11 CE NH of 2019-20)

2020_MoRTH_544885_1 13.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2020
Time 18:55Hrs
16/03/2020
Time 12:0Hrs
1968 Deposit work of M s SJVN Limited for Re-alignment toward upper safer level of NH-05 for 1.360 Km. length near Nirth Village due to submergence of the existing NH-05 from Km. 255.250 to 256.610 owing to upcoming construction of the Dam for Luhri Hydro Electric Project-Stage I by M.s Satluj Jal Vidyut Nigam SJVN-A JV of Gol and GoHP in the state of Himachal Pradesh on EPC mode Package No EPC 15.2020.

2020_MoRTH_540797_1 30.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 17:30Hrs
16/03/2020
Time 11:0Hrs
1969 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package IV)

2020_NHIDC_540277_1 242.340 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
16/03/2020
Time 11:0Hrs
1970 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) in Nagaland Under Bharatmala Pariyojna on EPC Mode Package V

2020_NHIDC_540285_1 244.140 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
16/03/2020
Time 11:0Hrs
1971 Rehabilitation and upgradation of NH-165 from Km 0/000 to Km 64/020 (Pamarru to Akiveedu section) to two lane with paved shoulders on EPC mode in the State of Andhra Pradesh

2020_MoRTH_540163_1 353.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 17:0Hrs
13/03/2020
Time 17:0Hrs
1972 Strengthening of selected stretches (13.148 Km) from Km 22/2 to km 23/2, 24/4 to 30/4,32/2 to 33/0,52/0 to 53/0, 54/6 to 55/9, 56/5 to 58/0, 59/1 to 60/0 and 60/6 to 61/4 Renigunta - Kadapa Road NH-716 in the state of Andhra Pradesh on EPC mode

SE r and B NIT No 15/19-20 12.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 13:0Hrs
12/03/2020
Time 15:0Hrs
1973 PR work from Km 0/0 to 13/0, Km 13/0 to 16/0 and Km 18/0 to 26/0 of Madanapalli- Naidupeta Section of NH – 71 in the state of Andhra Pradesh through EPC mode

SE NH ATP NIT NO 27/2019-20 5.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 13:15Hrs
12/03/2020
Time 15:0Hrs
1974 Strengthening the road from Km 20.0 to 23.0 Km 33.4 to 34.850 49.2 to 50.0 51.0 to 57.0 58.0 to 61.0 71.6 to 74.0 79.0 to 91.0 93.0 to 94.6 94.6 to 98.0 and in Selected reaches from Km 107.0 to 128.0 excluding length approved under ARP 2019 20 of Kurnool Dornala Road of NH 340C in the State of Andhra Pradesh on EPC mode

SE NH ATP NIT NO 16 2019 20 22.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
12/03/2020
Time 15:0Hrs
1975 Strengthening to road from Km 206.0 to 207.0 Km 213.0 to 219.0 Km232.0 to 246.0 of Hyderabad Srisailam Tokapalli road of NH765 in the state of Andhra Pradesh on EPC Mode

SE NH ATP NIT NO 17 2019 20 9.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2020
Time 15:0Hrs
12/03/2020
Time 15:0Hrs
1976 P.R to NH 20 from km.195.570 to 210.570,250.948 to 262.948 and 272.168 to 274.738 km. For the year 2019-20.

2019_MoRTH_530267_1 8.020 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
1977 P.R to NH 316 from Km.8.500 to 28.500 Puri-Satapada Link and Km.61.900 to 81.900 Km Puri Konark Link for the year 2019 20 in the state of Odisha on EPC mode.

2019_MoRTH_530303_1 13.140 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
1978 P.R to NH 53 from Km.211.109 to 246.109 Km. For the year 2019 20

2019_MoRTH_530348_1 11.180 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/12/2019
Time 15:0Hrs
12/03/2020
Time 12:0Hrs
1979 Strengthening work from Km. 121.700 to Km 129.450 (Champawat Aabadi portion), Km136.320 to km.142.00 (Lohaghat Aabadi Portion) and km.197.150 to km. 202.00 (Pithoragarh Aabadi Portion) on NH-125 (new NH-09) in the state of Uttarakhand under EPC mode

2020_MoRTH_542595_1 28.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 14:0Hrs
12/03/2020
Time 11:0Hrs
1980 Strengthening work from km. 28.00 to km. 34.00 & km 44.00 to km 58.00 and Protection work from km.23.00 to km. 78.00 on NH-119 (New NH-534) in the State of Uttarakhand under EPC mode

521/13Yata-NH-10/2020 13.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/02/2020
Time 15:0Hrs
11/03/2020
Time 15:0Hrs
1981 Strengthening to NH-153B from Km 0/00 to 24/329 Km for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No. 06 CENH of 2019-20)

2019_MoRTH_531175_1 15.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
11/03/2020
Time 12:0Hrs
1982 Strengthening work from km 41.00 to 60.00 on NH-123(new no. 507) in the state of UttarakhandonEPC mode under Annual Plan 2019-20

672/13yata-NH-10/2020 dated 10.02.2020 17.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 14:0Hrs
11/03/2020
Time 11:0Hrs
1983 Improvement of Road Barmer-Chohtan-Kelnor from Km 8.150 to Km 72.500 (Barmer to Bijdiar Net Length 64.00 Km) from existing IW/Cl-9 specifications to NHDL specification in 45 BRTF area under Project Chetak in Rajasthan State

2019_BRO_530115_1 126.330 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 16:0Hrs
11/03/2020
Time 11:0Hrs
1984 Balance work under Phase-I for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches Khed Bypass (km 42.000 to km 46.981), Peth (km 56.100 to km 56.780), Manchar bypass and linear length of Eklahre from km 60.100 to km 68.576 (Total Length -14.137 km) of Pune District in the State of Maharashtra on EPC mode

2020_NHAI_40466_1 216.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2020
Time 16:0Hrs
09/03/2020
Time 11:0Hrs
1985 Rehabilitation and Up gradation of Polekuru - Komaragiri section from Km 59/800 to Km 70/400 (Design Cjhainage from Km 63/540 to Km 74/165) of NH-216 )(Old NH-214) to two lanes with paved shoulders on EPC mode under NHDP Phase IV in the State of Andhra Pradesh.

2020_MoRTH_538383_1 65.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2020
Time 17:0Hrs
06/03/2020
Time 15:0Hrs
1986 Rehabilitation and upgradation of road from km 0.000 to km 16.290 (Total length 16.29 km) of Manu- Lalchara section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis(Package-I)

2020_NHIDC_537628_1 167.750 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2020
Time 18:0Hrs
05/03/2020
Time 15:0Hrs
1987 Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-III)

2020_NHIDC_537643_1 235.700 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2020
Time 18:0Hrs
05/03/2020
Time 15:0Hrs
1988 4 Laning with paved shoulders from Km 0.900 to Km 11.650 missing Link Project Budhel Junction to Nari circle including Flyover at Nari and its approaches section of NH 51 in the state of Gujarat on EPC Mode

2020_NHAI_39505_1 112.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2020
Time 15:0Hrs
05/03/2020
Time 15:0Hrs
1989 Strengthening including improvement of road safety SH Co Rwall Parapets W beam crash barriers and edge walls road signages in Km 337 000 to Km 356 455 Km 360 890 to 368 000 on NH22 New NH 05 in the state of Himachal Pradesh.

2020_MoRTH_542374_1 22.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2020
Time 13:0Hrs
05/03/2020
Time 11:0Hrs
1990 Strengthening from km 440/0 – 449/700 of NH 67 (New NH 181)

2020_MoRTH_534504_1 8.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
1991 Widening to Two lane with paved shoulders and strengthening in km 434/4 - 440/0 of NH 67 including construction of Retaining wall, Breast wall and CD works in Ooty – Gudalur Ghat section (New NH 181)

2020_MoRTH_534505_1 24.866 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
1992 Widening to Two Lane with paved shoulders and Strengthening from km 449/700 - 456/0 of NH67 including CD works and Protective works in Ooty to Gudalur Ghat section (New NH 181)

2020_MoRTH_534506_1 13.917 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
04/03/2020
Time 15:0Hrs
1993 Widening to Two Lane with paved shoulders from Km 414/4-428/0 and Strengthening from Km 422/0-425/0 of NH 67 including CD works, construction of Retaining wall / Breast wall

2019_MoRTH_523488_1 27.854 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
04/03/2020
Time 15:0Hrs
1994 Strengthening work from km 8.40 to km 20.7 (12.3 km) By Using Waste plastic material on NH-69 on EPC mode under NH division Bhopal in the state of Madhya Pradesh(2ND CALL)

2020_MoRTH_542079_1 5.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 17:30Hrs
04/03/2020
Time 15:0Hrs
1995 Strengthening work Total 40.400 KM on NH-12A Extn. EPC Mode under NH Division Sagar in the state of Madhya Pradesh(2nd Call)

2020_MoRTH_542858_1 15.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/02/2020
Time 15:0Hrs
04/03/2020
Time 15:0Hrs
1996 Construction of approaches to the existing 2Lane ROB in lieu of L.C. No. RV 324 at Km.436.12 13 between Komatipalli and Gajapathimagaram station at km 515.200 NH26 in the state of Andhra Pradesh on EPC mode

2019_MoRTH_527304_1 23.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 17:0Hrs
03/03/2020
Time 17:0Hrs
1997 Construction of Bypass to Salur Town from Km 486.831 to Km491.420 of Raipur to Visakhapatnam section of NH26 in the state of A.P

2019_MoRTH_527296_1 33.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 17:0Hrs
03/03/2020
Time 17:0Hrs
1998 Strengthening of Churabari-Agartala section with paved shoulder of NH-08 74.856km in the State of Tripura on Engineering, Procurement & Construction EPC mode

2020_NHIDC_535228_1 198.980 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/01/2020
Time 9:0Hrs
03/03/2020
Time 15:0Hrs
1999 Stage Strengthening work from km 22.76 to km 34 of NH117 in the dist of South 24 Pgs WB under NHDivI during the year 2019-20 on EPC mode Job No 117-WB-2019-20-455

2020_MoRTH_541322_1 9.477 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 18:0Hrs
03/03/2020
Time 11:0Hrs
2000 Strengthening of existing carriageway from km 32 to km 35 km 40 to km 41 and km 64.7 to km 82.32 of NH116B under NHDivII in the dist. of Purba Medinipur WB on EPC Mode. Job No. 116B-WB-2019-20-458

2020_MoRTH_541332_1 31.693 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2020
Time 18:0Hrs
03/03/2020
Time 11:0Hrs
2001 Improvements to Accident prone stretch at Km 255/650 – 259/225 of NH 67 Vellakovil – Muthur road Junction

2020_MoRTH_540964_1 12.898 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2020
Time 15:0Hrs
03/03/2020
Time 11:0Hrs
2002 StStrengthening work in Km 38.84 to 59.00 of NH-333 on EPC mode in State of Bihar

2020_MoRTH_532742_1 24.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2020
Time 9:0Hrs
02/03/2020
Time 13:0Hrs
2003 Strengthening to NH-326(A) from km (70/000-102/900) in the state of Odisha for the year 2019-20 (07 CENH of 2019-20)

2020_MoRTH_532267_1 20.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
02/03/2020
Time 12:0Hrs
2004 Strengthening to NH-20 from Km 0/00 to 14/000 Km (Champua to Rimuli) and link road to NH-20 from 14/00 to 14/690 Km(at Parsala) and connecting road from Rimuli square at 14/0 to 1/430 km of NH-520 for the year-2019-20 (09CENH of 2019-20)

2020_MoRTH_532238_1 12.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
02/03/2020
Time 12:0Hrs
2005 Construction of 6 lane access controlled Greenfield highway from km 4.888 to km 35.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 1

2019_NHAI_34095_1 516.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
2006 Construction of 6 lane access controlled Greenfield highway from km 35.000 to km 67.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 2

2019_NHAI_34096_1 566.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
2007 Construction of 6 lane access controlled Greenfield highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 3

2019_NHAI_34101_1 595.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
2008 Construction of 6-lane access controlled Greenfield highway from km 99.000 to km 130.073 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana Phase I AJ RGBS Package 4

2019_NHAI_34104_1 619.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2019
Time 15:0Hrs
02/03/2020
Time 11:0Hrs
2009 PR Work from Km 136 to138 (Reevelganj Bazar) of NH- 19 in the State of Bihar on EPC Mode for the year 2019-20.

2020_MoRTH_545602_1 0.849 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2020
Time 15:0Hrs
29/02/2020
Time 17:0Hrs
2010 Widening and Strengthening work from Km. 58.600 to 59.00 & 59.00 to 77.00 of New NH-135C length 18.400 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_533748_1 30.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 18:55Hrs
27/02/2020
Time 15:0Hrs
2011 Strengthening from Km. 220.00 to 221.00, 222.00 to 224.00, 225.00 to 247.00, 249.00 to 254.00 & 263.535 to 298.00 of NH 75E (New NH No. 39) length 64.465 km. in the State of Uttar Pradesh under NH(O) on EPC basis

2020_MoRTH_533680_1 44.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 17:40Hrs
27/02/2020
Time 15:0Hrs
2012 Four laning of Honnavar Port Connectivity road from Km 0/00 (Kasarkod side of Honnavar Port) to Km 2/58 (towards NH-66) connecting Honnavar Port with NH-66 at Km 195/90 and to improve NH-66 from Km 195/00 to Km 197/00 to integrate port connectivity road under Bharatmala Phase-I on EPC mode in the State of Karnataka

NHAI/PC/BM P1/Kasarkod-NH-66/2019 111.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 18:0Hrs
27/02/2020
Time 11:0Hrs
2013 4 laning with paved shoulder from Meerut to after bridge over river Yamuna Haryana via Shamli from km 0.000 to 88.476 of NH 709A 0 at Meerut on ch. 67.550 of NH 58 in the State of Uttar Pradesh re-invitation

2020_NHAI_41604_1 586.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2020
Time 6:15Hrs
27/02/2020
Time 11:0Hrs
2014 Construction of 4 lane ROB and its approaches at km 14/800 (Jerai) on NH 26A in lieu of existing level crossing No. 19 on Katni Bina section Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar Dist in the state of Madhya Pradesh on EPC Mode

2020_MoRTH_533730_1 65.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2020
Time 15:0Hrs
26/02/2020
Time 17:30Hrs
2015 Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A Katni-Bina Railway line on Sagar to Bina road of Sagar District in the state of Madhya Pradesh on EPC Mode under Setu Bharatam.

2020_MoRTH_533374_1 56.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2020
Time 17:30Hrs
26/02/2020
Time 17:30Hrs
2016 Repair and Rehabilitation work for the bridges at km 32/4 (Marudhayar), 51/10 (Kollidam) & 62/8 (Vettar) of NH 226 Extn (New NH 136) in the state of Tamil Nadu. (EPC mode)

2020_MoRTH_534661_1 4.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2020
Time 13:0Hrs
25/02/2020
Time 15:0Hrs
2017 Stage Strengthening Work from Ch 30 to 59.6 Km of NH35 under Bongaon NH Sub Div of NH Div No-V-P.W. Rds Dte in the Dist of North 24 Pgs WB during the year 2019-20 in EPC Mode. Job No. 35-WB-2019-20-454

2020_MoRTH_539444_1 26.854 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2020
Time 18:0Hrs
25/02/2020
Time 11:0Hrs
2018 Up-Gradation to Intermediate lane of NH-301 Kargil-Zanskar Road from Km 98.524 to Km 117.180 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))

2020_MoRTH_532347_1 141.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 11:0Hrs
24/02/2020
Time 17:0Hrs
2019 Strengthening work from Km. 68.70 to Km. 77.00 on NH-309Ain the state of Uttrakhand under EPC mode

2020_MoRTH_537789 6.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2020
Time 14:0Hrs
24/02/2020
Time 11:0Hrs
2020 Widening of minor bridge at Km 185/4,196/4 and 218/2 and Reconstruction of minor bridge at Km 172/8,179/10,182/4,186/6,195/2(i) (ii),199/8,209/10 and Reconstruction of culvert and retaining wall at Km 154/10,156/2,156/10,159/8,159/10,161/8,164/10,174/2,174/4,174/8,180/6 and 190/6 and Widening of culvert at Km 173/8 and Construction of drain at Km 155/4-155/8 and Km 157/100-157/600 of NH 208 and Construction of bus lay bay at Km 187/8-188/2 of NH 208 (New NH no 744) in the state of Tamilnadu on EPC mode

2020_MoRTH_534524_1 1,584.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
24/02/2020
Time 11:0Hrs
2021 Strengthening from Km 91/0-93/7,95/0-101/6,114/0-119/560,126/4-127/4,129/0-130/0,131/0-132/0,136/8-137/0,139/0-153/0 including Reconstruction of Minor bridge at Km 136/2,147/2(i),Widening of Minor bridge at Km 142/4,145/6(ii) and Improvement of Junction,Construction of Cover slab in existing drainage at Km 115/10 of Kollam-Thirumangalam Road NH 208 on EPC mode

2020_MoRTH_534567_1 41.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
24/02/2020
Time 11:0Hrs
2022 4 – Laning of Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH-161 including Bypasses at Patur and Medshi in the state of Maharashtra on EPC mode

2019_NHAI_39190_1 687.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 15:0Hrs
24/02/2020
Time 11:0Hrs
2023 Strengthening of damaged road surface from km 147.00 to 157.00 on NH-94(new no. 134) in the state of Uttarakhandon EPC mode under Annual Plan 2019-20

370/13Yata-NH-10/2020 550.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2020
Time 15:0Hrs
22/02/2020
Time 15:0Hrs
2024 Up-gradation to Intermediate lane of NH-301 Kargil- Zanskar Road from Km 87.000 to Km. 98.524 in the UT Ladakh (Formerly State of JnK)on EPC mode (under NH(O))

2019_MoRTH_530832_1 64.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 11:0Hrs
20/02/2020
Time 17:0Hrs
2025 Rehabilitation and up-gradation of road from design km 19-300 to km 31-300 Total length 12 km of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531706_1 78.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 17:40Hrs
20/02/2020
Time 15:0Hrs
2026 Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length-14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531689_1 96.250 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 17:26Hrs
20/02/2020
Time 15:0Hrs
2027 Four Laning of Banihal Bypass from Km 187.000 to Km 189.350 section of NH 1A in Jammu and Kashmir on EPC Mode.

2020_NHAI_39627_1 257.600 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2020
Time 15:0Hrs
20/02/2020
Time 15:0Hrs
2028 Stage Strengthening from km 758.250 to km 768.945 of NH-31 (Falakata - Pundibari section) in the district of Cooch Behar, West Bengal under NH Division-X during the year 2019-20 on EPC mode. [Job No. 031-WB-2019-20/453]

2020_MoRTH_537998_1 13.346 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/01/2020
Time 15:0Hrs
20/02/2020
Time 15:0Hrs
2029 Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode

2019_NHIDC_531190_1 168.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
19/02/2020
Time 15:0Hrs
2030 Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531396_1 92.990 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 18:23Hrs
18/02/2020
Time 15:0Hrs
2031 Strengthening to NH-326 From Km253/700 to Km 281/700 (Laxmipur To Kakriguma) for the year 2019-20 in the state of Odisha on EPC mode. (Bid Ref No. 05 CENH of 2019-20)

2019_MoRTH_531149_1 18.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
18/02/2020
Time 12:0Hrs
2032 Strengthening work from Km. 13.00 to km. 26.00 on NH-121 (New NH-309) in the state of Uttrakhand under EPC mode

2020_MoRTH_536653 12.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2020
Time 17:25Hrs
17/02/2020
Time 11:0Hrs
2033 Construction of Eight Lane access controlled Expressway starting near Junction with SH 37A to Junction with NH-76 (Ch. 359.170 to 388.420) section of Delhi Vadodara Green field Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/2018/Pkg13 940.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2018
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2034 Construction of Eight Lane access controlled Expressway from Hardeoganj village near Indergarh to Major Bridge on Mej river (Ch. 319.400 – Ch. 331.030) section of Delhi - Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg11 986.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2035 Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030 - 359.170) section of Delhi – Vadodara Access Controlled Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg12 1,052.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2036 Construction of Eight Lane Carriageway starting near Junction with NH-76 to Junction with NH-12 near village Ummedpura (Ch. 388.420 to Ch. 419.000) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg14 794.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2037 Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan/MP Border (Ch. 427.300 to Ch. 452.425) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg16 650.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2038 Construction of Eight Lane Carriageway start at the end approach of interchange on NH-116 at village Mui and end at Hardevganj village near Indergarh (Ch. 292.950- 319.400) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg10 916.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2019
Time 15:0Hrs
17/02/2020
Time 11:0Hrs
2039 Strengthening work from Km149.00 TO Km171.00 on NH-87 Extn.(New NH-109) in the state of Uttarakhand

2020_MoRTH_536921 17.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2020
Time 14:0Hrs
15/02/2020
Time 11:0Hrs
2040 Periodic Renewal work in Km 13 to 18 & 22 to 39 of newly declared NH-731K under EPC mode in the state of Uttar Pradesh

2020_MoRTH_538763_1 5.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2020
Time 15:0Hrs
14/02/2020
Time 15:0Hrs
2041 STRENGTHEING WORK FROM KM 99.00 TO 101.00 and KM 166.00 to KM185.00 ON NH 309A IN THE STATE OF UTTRAKHAND UNDER EPC MODE

2020_MoRTH_536356 13.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:0Hrs
14/02/2020
Time 11:0Hrs
2042 Strengthening work from Km55.550 to Km89.000 on NH-87 Extn.(New NH-109) in the state of Uttarakhand

2020_MoRTH_536307 31.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:0Hrs
14/02/2020
Time 11:0Hrs
2043 CONSTRUCTION OF TWO LANE WITH HARD SHOULDER OF KOHIMA-JESSAMI ROAD ON NH-29 (OLD NH-150) FROM EXISTING KM 53.220 (NEAR KIKRUMA VILLAGE) TO EXISTING KM 76.320 (NEAR MESULUMI VILLAGE) [ DESIGN KM 51.5 TO DESIGN KM 74.2] [DESIGN LENGTH - 22.7 KM] IN THE STATE OF NAGALAND UNDER BHARATMALA PARIYOJNA ON EPC MODE (PACKAGE III)

2019_NHIDC_530428_1 243.040 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 16:0Hrs
14/02/2020
Time 11:0Hrs
2044 Widening and Strengthening for improvement and up-gradation of NH709A Garhmukteshwar (Chainage-83.200 of NH24) to Meerut (Chainage 9.860 of NH-235) including connector to NH-119 Package XII in Uttar Pradesh

2018_NHAI_19202_1 940.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2018
Time 15:0Hrs
13/02/2020
Time 11:0Hrs
2045 Stage Strengthening of the existing carriageway from 115.25 Kmp to 126 kmp and from km 140 to km 148 of NH-60 under Salboni NH Sub Division of National Highway Division No-II of N.H.C.-I during the year 2019-20 in the district of Paschim Medinipur, WB in EPC Mode. Job No. 60-WB-2019-20/448

2020_MoRTH_536060_1 20.982 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2020
Time 18:0Hrs
13/02/2020
Time 11:0Hrs
2046 Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC basis

2019_NHIDC_531733_1 91.950 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 18:36Hrs
13/02/2020
Time 11:0Hrs
2047 Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 Total length 13.450 km of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II

2019_NHIDC_531976_1 96.260 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/12/2019
Time 16:0Hrs
13/02/2020
Time 11:0Hrs
2048 Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 Total length 11.210 km of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-III

2019_NHIDC_532096_1 73.610 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/12/2019
Time 16:0Hrs
13/02/2020
Time 11:0Hrs
2049 RESTORATION/ REHABILITATION OF UKHRUL TO NAGALAND BORDER VIA JESSAMI ROAD FOR KM 63.00 TO KM 126.00 (LENGTH 63KM) NH-150 IN THE STATE OF MANIPUR ON EPC MODE

2019_NHIDC_531157_1 16.640 NHIDCL Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
12/02/2020
Time 15:0Hrs
2050 DESIGN AND CONSTRUCTION OF 450 MTR LONG “NECHIPHU” TUNNEL INCLUDING GEOLOGICAL INVESTIGATION AND STUDIES, DESIGN OF TUNNEL AND CONSTRUCTION OF TUNNEL PROPER INCLUDING CIVIL AS WELL AS ELECTRICAL/MECHANICAL WORKS ALONG WITH APPROACHES BETWEEN KM 81.840 AND KM 87.040 ON BALIPARA-CHARDUAR TAWANG ROAD UNDER PROJECT VARTAK IN ARUNACHAL PRADESH STATE

CE VTK 26 of 2019-20 81.820 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2019
Time 15:0Hrs
12/02/2020
Time 15:0Hrs
2051 Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode

2019_NHIDC_531192_1 154.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
12/02/2020
Time 15:0Hrs
2052 Periodical Renewal from Km. 41.90 to 54.43, 54.50 to 69.90 of NH-766C Ranebennur -Byndoor section in the state of Karnataka under EPC mode in the State of Karnataka

2020_MoRTH_540343_1 7.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 15:0Hrs
12/02/2020
Time 11:0Hrs
2053 Periodical Renewal from Km. 245.000 to 256.000, Km. 259.000 to 278.000 of NH-206 Tumkur –Honnavara section in the state of Karnataka under EPC mode in the State of Karnataka

2020_MoRTH_540301_1 10.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2020
Time 18:0Hrs
12/02/2020
Time 11:0Hrs
2054 Strengthening work from km. 92.00 to km. 106.00 on NH-87 (New NH-109) in the state of Uttrakhand under EPC mode.

2020_MoRTH_536406 9.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/01/2020
Time 18:30Hrs
11/02/2020
Time 11:0Hrs
2055 Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode

NHIDCL/Assam/NH-37/ Dergaon Town/2019/Tender 130.340 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2019
Time 15:50Hrs
11/02/2020
Time 11:0Hrs
2056 Improvement and Widening to two laning with paved shoulder of Khayerpur –Amtali (Agartala Bypass) Section from km 0-00 to km 12-900 of NH-8 in the State of Tripura on EPC basis

2019_NHIDC_530806_1 114.230 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
2057 Widening to Two Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 118.850 to Km 130.000 (Package-4A) in the State of Manipur on Engineering Procurement and Construction EPC mode

2019_NHIDC_531265_1 134.290 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
2058 Widening to Two Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130.00 to Km 141.029 (Package-4B) in the State of Manipur on EPC mode

2019_NHIDC_531188_1 116.820 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
2059 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 13.747 to Km 32.835 (Package 1B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode” under Bharatmala.

2019_NHIDC_531239_1 155.350 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
2060 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 32.835 to Km 48.587 (Package-2A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531246_1 151.630 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
2061 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531255_1 240.010 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 18:0Hrs
10/02/2020
Time 15:0Hrs
2062 Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length = 2.52 Km) on NH-39 near Indo-Myanmar border in the State of Manipur on EPC mode

2019_NHIDC_531188_1 29.880 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
2063 Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 0.000 to Km 13.747 (Package 1A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode

2019_NHIDC_531234_1 105.330 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 15:0Hrs
2064 STRENGTHENING WORK IN CH 123.000 TO 142.000 OF NH-333A ON EPC MODE IN THE STATE OF BIHAR FOR THE YEAR 2019-20 (JOB NO. NH-333A-BR-2019-20/21)

STRENGTHENING WORK IN CH 123.000 TO 142.000 OF NH-333A ON EPC MODE IN THE STATE OF BIHAR FOR THE YEAR 2019-20 (JOB NO. NH-333A-BR-2019-20/21) 18.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2019
Time 9:0Hrs
10/02/2020
Time 15:0Hrs
2065 Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors.

2019_NHIDC_530975_1 148.510 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2019
Time 15:0Hrs
10/02/2020
Time 11:0Hrs
2066 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Seling-Keifang section (Economic Corridor) of NH-6 from Existing chainage Km 0.000 to Km 15.000 (Design Chainage 00.000 to Km 13.510) (Package-I) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531173_1 153.320 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
2067 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Keifang section (Economic Corridor) of NH-6 from Existing chainage Km 15.000 (Keifang) to Km 30.050 (Keifang) (Design Chainage Km 13.510 to Km 27.400) (Package-II) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531181_1 159.540 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
2068 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Keifang-Rulchawm section (Economic Corridor) of NH-6 from Existing chainage Km 30.050 (Keifang) to Km 50.360 (Rulchawm) (Design Chainage Km 27.400 to Km 45.040) (Pack-III) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531185_1 230.880 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
2069 Rehabilitation and Up-gradation to 2-lane with paved shoulders of Rulchawm-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 50.360 (Rulchawm) to Km 69.015 (Dulte) (Design Chainage Km 45.040 to Km 62.200) (Pack-IV) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode.

2019_NHIDC_531186_1 211.850 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2019
Time 9:0Hrs
10/02/2020
Time 11:0Hrs
2070 Balance works of 4 - laning of Fagne to Mah - Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 (design length 140.794 km) to be executed on Engineering Procurement and Construction (EPC) Mode under Bharatmala Pariyojna

2019_NHAI_38111_1 1,198.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2019
Time 17:35Hrs
10/02/2020
Time 11:0Hrs
2071 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [ Design Km 7.88 to design Km 29.6] [Design Length - 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package-I)

2019_NHIDC_530401_1 220.280 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 15:0Hrs
07/02/2020
Time 11:0Hrs
2072 Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length - 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)

2019_NHIDC_530419_1 248.830 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 15:0Hrs
07/02/2020
Time 11:0Hrs
2073 Reconstruction of Existing ROB at Km 113/4 and Construction of Grade Separator at Km 113/8 of NH 4 (Chennai – Chittoor – Bangalore Road)

2019_MoRTH_523542_1 27.247 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 9:8Hrs
07/02/2020
Time 11:0Hrs
2074 Widening Strengthening to Two laning with hard shoulder of Pallel Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement and Construction Mode

2019_NHIDC_528135_1 80.080 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 15:0Hrs
06/02/2020
Time 15:0Hrs
2075 Strengthening of road from km72/000 to 130/280 km of NH-26 in the state of Odisha for the year 2019-20 (08CENH of 2019-20)

2020_MoRTH_532250_1 32.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2020
Time 15:0Hrs
06/02/2020
Time 12:0Hrs
2076 Stage strengthening work from km 25.50 to km 32.00 and km 35.00 to km 40.00 of NH -116B under NH Div-II in the District of Purba Medinipur, State of West Bengal during the year 2019-2020 on EPC mode. (Job No. 116B-WB-2019-20/457)

2020_MoRTH_534276_1 10.804 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2020
Time 18:0Hrs
06/02/2020
Time 11:0Hrs
2077 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 26.100 to Km. 40.000 on EPC basis under SARDP-NE Phase ‘Á’ in the State of West Bengal (Package-IV D).

2019_NHIDC_528238_1 188.380 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 18:30Hrs
06/02/2020
Time 11:0Hrs
2078 REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM. 71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD NH-94) IN THE STATE OF UTTARAKHAND ON EPC MODE UNDER IMPROVEMENT TO NH CONNECTIVITY TO CHARDHAM IN THE STATE OF UTTARAKHAND

2019_MoRTH_452855_1 391.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2019
Time 15:0Hrs
05/02/2020
Time 11:0Hrs
2079 Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP

2019_NHAI_31748_1 219.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2019
Time 6:5Hrs
04/02/2020
Time 11:0Hrs
2080 Rehabilitation and up gradation of road from km 0 to km 18-600 Total length 18-600 km of KumarghatKaiashahar section on NH 208 to two lane with paved shoulder in the State of Tripura on Engineering Procurement and Construction EPC Mode

2019_NHIDC_529029_1 136.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2019
Time 18:0Hrs
04/02/2020
Time 11:0Hrs
2081 O&M and Routine maintenance of Bengaluru - Hoskote - Mulbagal Section from Km. 237.700 to Km. 318.000 of NH-4 in the State of Karnataka under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis- Through EPC mode

09 /NHAI/RO-BNG/11019 A /Tender/2019 dated 12.12.2019 16.850 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 15:0Hrs
03/02/2020
Time 15:0Hrs
2082 Construction of Foot Over Bridges in Gurgaon – Kotputli – Jaipur section of NH-8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode

2019_NHAI_38535_1 42.980 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 19/12/2019
Time 15:0Hrs
03/02/2020
Time 15:0Hrs
2083 One Time Improvement and Maintenance of 4 lane old NH-709B from Km 10.500 to Km 18.050 in the State of Uttar Pradesh on EPC Mode

2020_NHAI_39444_1 20.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
2084 Strengthening work in Km 0.00 to 34.00 of N.H 333A for the year 2019-20 on EPC Mode on EPC Mode.

10 NH333A/2019 34.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
2085 Strengthening work in Km 35.00 to 64(P) of N.H 333A for the year 2019-20 on EPC Mode

11 NH333A/2019 29.867 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
03/02/2020
Time 11:0Hrs
2086 Strengthening of km 0 to km 36 50 of NH 227A on EPC Mode in the state of Bihar

2019_MoRTH_526945_1 38.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 11:0Hrs
31/01/2020
Time 17:0Hrs
2087 Stage strengthening work from km 133.00 to km 137.684 of NH-117 in the Dist. of South 24 Parganas, W.B, during the year 2019-20 on EPC mode. Job No. 117-WB-2019-20/449

2020_MoRTH_532524_1 4.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2020
Time 18:0Hrs
31/01/2020
Time 11:0Hrs
2088 Construction of Bidirectional Tunnel at Km 83 of Length 495 m along with approach road of 664 m and a Major Bridge of 110 m between Km 82675 to Km 82925 on NH 244 in Union Territory Jammu Kashmir on EPC mode under NH O

2019_NHIDC_526933_1 76.650 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 15:0Hrs
31/01/2020
Time 11:0Hrs
2089 Reconstruction of Minor bridge at Km 239/6, 240/8 and 241/2 of NH 209

2019_MoRTH_523466_1 6.739 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
30/01/2020
Time 15:0Hrs
2090 Widening and Strengthening work in stretch from Km. 71.000 to 96.800 of NH-328 in the state of Uttar Pradesh

2019_MoRTH_527101_1 71.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2019
Time 15:0Hrs
29/01/2020
Time 15:0Hrs
2091 Widening and Strengthening work from Ch 0.000 to 17.300 , 46.900 to 48.600 and 49.900 to 68.000 of NH-727-G (Harraiya - Babhnan- Mankapur- Darjikuan marg ) under EPC mode in state of Uttar Pradesh)

2019_MoRTH_528847_1 57.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 10:0Hrs
29/01/2020
Time 15:0Hrs
2092 Widening and Strengthening work from Ch 29.990 to Ch 46.220 and Ch. 99.275 to Ch 110.750 of NH 727H in State of Uttar Pradesh on EPC Mode

2019_MoRTH_528853_1 49.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2019
Time 10:0Hrs
29/01/2020
Time 15:0Hrs
2093 Strengthening work from Chakia NH28 to Lalachhapra chowk via Kesariya from km 118.040 to km 142.756 of NH227A on EPC Mode in the State of Bihar

2020_MoRTH_535238_1 22.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2020
Time 15:0Hrs
29/01/2020
Time 11:0Hrs
2094 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village (near Shivgarh) of Ratlam district (Ch.602.420 to 627.420, design Ch.150.000 to Ch.175.000) section of Delhi- Vadodara Greenfield Alignment (NH 148N) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

NHAI/BM/Delhi-Vadodara/2018/Pkg22 1,022.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2019
Time 15:0Hrs
29/01/2020
Time 11:0Hrs
2095 Stage Strengthening from km 8.200 to km 15.500 of NH-31C in the district of Darjeeling, West Bengal on EPC mode. Job No. 31C-WB-2019-20/442

2019_MoRTH_525875_1 6.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
28/01/2020
Time 17:0Hrs
2096 Stage Strengthening work from km 641.00 to km 651.690 of NH-31 in the District of Darjeeling, West Bengal, during the year 2019-20. (Job No. 031-WB-2019-20/443)

2019_MoRTH_526029_1 9.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2020
Time 10:0Hrs
28/01/2020
Time 15:0Hrs
2097 Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode

NHIDCL/Tripura/NH-108A/ Jola-Belo/2019/Tender 149.140 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2019
Time 17:40Hrs
27/01/2020
Time 15:0Hrs
2098 Stage strengthening from km. 0.000 to km. 43.750 (Mohanganj to Lalgopalganj section), and km. 52.200 to km. 96.600 (Muratganj to Mahewaghat section) of NH-731A in Uttar Pradesh on EPC mode.

2019_MoRTH_524369_1 47.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/12/2019
Time 17:0Hrs
27/01/2020
Time 14:0Hrs
2099 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km 0.000 to Km 18.779] (Design Length – 18.779 Km) in the state of Nagaland under NH (O) Plan

2019_NHIDC_526134_1 218.660 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 17:0Hrs
27/01/2020
Time 11:0Hrs
2100 Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km 18.779 to Km 33.428] (Design Length –14.649 Km) in the state of Nagaland under NH (O) Plan

2019_NHIDC_526150_1 159.930 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 17:0Hrs
27/01/2020
Time 11:0Hrs
2101 Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode-Package-1

NHIDCL/Assam/ NH-37/Nag-Tel/2019 97.990 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 14:0Hrs
27/01/2020
Time 11:0Hrs
2102 Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode- Package-2

NHIDCL/Assam/NH-37/Tel-Rang/2019 73.540 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2019
Time 13:5Hrs
27/01/2020
Time 11:0Hrs
2103 Strengthening from Km 65/0 - 67/170, Km 71/360 - 72/260, Km 72/560 -80/400 & Km 80/500 - 81/0 and including widening in Km71/360 - 72/260, Km 75/290 - 75/505, Km 77/250-78/0, 78/130-78/970 & Km 79/160 - 79/390 of NH 234 (Mangalore -Villupuram Road)

2019_MoRTH_523540_1 20.424 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
24/01/2020
Time 15:0Hrs
2104 Reconstruction of culverts at km 397/8, 398/6, 399/2, 403/6, 403/10 (i) (ii), 404/2 (i) (iii) (iii), 404/6, 405/6, 406/4 of NH 67 including construction of retaining wall

2019_MoRTH_523496_1 4.251 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2019
Time 15:0Hrs
24/01/2020
Time 11:0Hrs
2105 Stage strengthening work from km 156 to km 162 and km. 162 to km. 173 of NH-60 in the dist. of Paschim Medinipur, WB during the year 2019-20. (Job No. 060-WB-2019-20/450)

2019_MoRTH_530273_1 17.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/12/2019
Time 18:0Hrs
22/01/2020
Time 11:0Hrs
2106 Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD

2018_NHAI_19205_1 557.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2018
Time 15:0Hrs
21/01/2020
Time 15:0Hrs
2107 Widening and Strengthening 2 Lane to 2 lane with pave shoulders in Km 7/4 – 10/0 & 11/0 – 13/0 of NH 45A (Villupuram – Pondicherry – Nagapattinam Road)

2019_MoRTH_523545_1 7.685 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 9:36Hrs
21/01/2020
Time 11:0Hrs
2108 Providing Way Side Amenities at Km 630/200 (Parvathipuram) and Km 639/100 of (Aashramam) and Construction of Foot Over Bridge at Km 628/10 of NH 47 (Sungankadai)

2019_MoRTH_523580_1 5.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
20/01/2020
Time 11:0Hrs
2109 Providing Paved Shoulders in Km 183/2-188/2including improvements of NH 49 (New NH no 87)

10/2019-20 4.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/12/2019
Time 10:0Hrs
20/01/2020
Time 11:0Hrs
2110 Construction of Eight Lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village in Panchmahal district (Ch. 780.920 to 803.420 and design Ch. 328.500 to Ch. 351.000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC MODE under Bharatmala Pariyojana in the State of Gujarat

NHAI/BM/ Delhi-Vadodara/2018/Pkg29 781.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
2111 Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803.420 to 824.920 and design Ch. 351.000 to Ch. 372.500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

NHAI/BM/ Delhi-Vadodara/2018/Pkg30 826.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
2112 Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara District (Ch. 824.920 to Ch. 844.382 and Design Ch. 372.500 to Ch. 391.962) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

NHAI/BM/ Delhi-Vadodara/2018/Pkg31 801.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
15/01/2020
Time 11:0Hrs
2113 Stage strengthening work from km 56 to km 64 of NH-117 under NH Div-I in the Dist of South 24 Pgs, WB, during the year 2019-20. Job No. 117-WB-2019-20/444.

2019_MoRTH_528131_1 7.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2019
Time 18:0Hrs
15/01/2020
Time 11:0Hrs
2114 Four laning of Katni-Bypass of National Highway – 7 (old) from km 359.500 to km 378.500 (length 20 km) in the State of Madhya Pradesh on EPC Mode

2019_NHAI_34197_1 213.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2019
Time 18:0Hrs
14/01/2020
Time 11:0Hrs
2115 Stage strengthening work from 260.00 kmp to 266.00 kmp and 271.00 kmp to 275.00 kmp (except 273.05 km to 273.85 km) of NH-60 under NH Div No III in the district of Bankura & Paschim Bardhaman, West Bengal during the year 2019-20 on EPC Mode

2019_MoRTH_525735_1 10.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 9:0Hrs
10/01/2020
Time 13:0Hrs
2116 Stage Strengthening of the existing pavement from 0.00 Kmp to 49.00 kmp of NH- 2B under National Highway Division No-III of N.H.C.-II during the year 2019-20 in the district of Purba Bardhaman & Birbhum ,West Bengal in EPC mode

2019_MoRTH_525071_1 54.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/12/2019
Time 10:0Hrs
10/01/2020
Time 13:0Hrs
2117 Construction of 1x15 M Span Bridge at km 125.493, 1x20 M Span Bridges at Km. 125.852 and 1x10 M Span Bridge at Km. 129.445 including its approaches on NH-301, Kargil-Zanskar Road in the State of Jammu and Kashmir EPC Mode.

2019_MoRTH_525851_1 17.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
2118 Construction of 1x45 M Span Bridge including its approaches at Km 130.230 on NH-301,Kargil-Zanskar Road in the State of Jammu and Kashmir on EPC Mode of Construction Under Prime Minister’s Development Package (PMDP)

2019_MoRTH_525851_2 10.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
2119 Construction of 1x25 M Span Bridge at km.165.296, km 174.425 and 185.509 Including its approaches on NH-301, Kargil-Zanskar Road in the State of Jammu and Kashmir on EPC Mode under Prime Minister’s Development Package (PMDP)

2019_MoRTH_525851_3 16.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2019
Time 10:0Hrs
07/01/2020
Time 16:0Hrs
2120 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2019_NHIDC_521252_1 134.380 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/11/2019
Time 15:0Hrs
07/01/2020
Time 15:0Hrs
2121 Design Engineering Procurement Supply and Construction for CONSTRUCTION OF FOUR LANE BRIDGE INCLUDING APPROACHES OVER RIVER BRAHMAPUTRA BETWEEN DHUBRI ON NORTH BANK AND PHULBARI ON SOUTH BANK IN THE STATE OF ASSAM MEGHALAYA ON NH 127B LENGTH 20km

NHIDCL Assam E 170377 DP Bridge NH 127 B 2019 3,548.500 NHIDCL Special Project EPC (Lump Sum/Item Rate Contract) 20/11/2019
Time 15:0Hrs
07/01/2020
Time 11:0Hrs
2122 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.000 TO KM 339.000 AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-7) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE.

2019_NHIDC_525276_1 497.710 NHIDCL Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2019
Time 18:2Hrs
06/01/2020
Time 11:0Hrs
2123 Construction of 6 lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 4

2018_NHAI_16052_1 437.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
2124 Construction of 6 lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 5

2018_NHAI_16045_1 433.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
2125 Construction of 6 lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 6

2018_NHAI_16051_1 675.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
2126 Construction of 6 lane access controlled Greenfield highway from km 150.000 to km 180.000 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 7

2018_NHAI_16053_1 501.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2019
Time 12:0Hrs
31/12/2019
Time 11:0Hrs
2127 Construction of 6 lane access controlled Greenfield highway from km 180.000 to km 207.100 of Deogarh near Dhandhaniya Rajasthan Gujarat Border section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana Phase I AJ DRGB Package 8

2018_NHAI_16054_1 599.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2019
Time 15:0Hrs
31/12/2019
Time 11:0Hrs
2128 Strengthening Work from Km 0.00 (Paswan chowk) to 58.450 (Mushrigharari) of NH-103 (New no-322) on EPC Mode in state of Bihar for the year 2019-20].

2019_MoRTH_517730_1 68.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2019
Time 11:0Hrs
24/12/2019
Time 17:0Hrs
2129 Periodic Renewal work from Km. 0.000 to 30.470 of NH-931A (Salon-Jais-Jagdishpur Road) under EPC mode in the State of Uttar Pradesh

2019_MoRTH_524901_1 7.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/12/2019
Time 18:0Hrs
21/12/2019
Time 15:0Hrs
2130 Periodic renewal work from Km. 0.000 to 68.300 of NH-931 (Pratapgarh-Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 & 53)

2019_MoRTH_523136_1 20.560 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/11/2019
Time 15:30Hrs
16/12/2019
Time 15:0Hrs
2131 Periodical Renewal (PR) work from km 130.400 to km 135.000 and km 154.000 to km 168.000 of NH 28B ( New NH -727 ) on EPC mode in the State of Uttar Pradesh.

2019_MoRTH_513488_1 9.088 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 23/10/2019
Time 15:0Hrs
16/12/2019
Time 15:0Hrs
2132 Construction of Eight Lane access controlled Expressway starting near Start of RoB near junction with NH-11A to Junction with MDR-1 (Baonli-Jhalai road) (Ch. 214.260 - 247.310) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg8 903.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2018
Time 15:0Hrs
16/12/2019
Time 11:0Hrs
2133 Construction of Eight Lane Carriageway start near Junction with MDR-1 (Baonli-Jhalai road) to end of interchange on NH-166 near village Mui (Ch. 247.310 – 292.950) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 1,198.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2019
Time 15:0Hrs
16/12/2019
Time 11:0Hrs
2134 BID For Balance work of Construciton of Ring Road for Raebareli City on eastern side of NH-24B(Phase-I) in the state of Uttar Pradesh on EPC Basis.

2019_MoRTH_513748_1 114.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/10/2019
Time 15:0Hrs
09/12/2019
Time 15:0Hrs
2135 Four Laning of Rohtak-Jind Section from Km 307.000 to Km 347.800 of NH-71 and connecting link from Km 347.800 of NH-71 to Km 9.400 of NH-71A balance work on EPC Mode under Bharatmala left out in NHDP in the State of Haryana

2019_NHAI_32431_1 472.960 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2019
Time 13:30Hrs
02/12/2019
Time 11:0Hrs
2136 Rehabilitation and up-gradation to 2 lane with paved shoulder from design km 74.350 to km 90.150 (Package - IV) under 13 TF on Akhnoor - Poonch road (NH-144A) in the State of Jammu and Kashmir under BRO on EPC mode

2019_BRO_511094_1 79.440 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2019
Time 15:0Hrs
29/11/2019
Time 15:0Hrs
2137 Construction Of 6 Lane Flyover at Km 5 680 of Chandikhole Jagatpur Bhubaneshwar Section from Km.414.000 to Km 419.000 and from Km 0.000 to Km 62.000 of NH5 in the state of Odisha under NHDP Phase V On EPC Mode

2019_NHAI_33358_1 24.630 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 03/10/2019
Time 17:28Hrs
26/11/2019
Time 11:0Hrs
2138 Construction of Eight Lane access-controlled Expressway from Rajasthan/MP Border to Jodmi village of Mandsaur district (Ch. 452.420 to 484.420 and design Ch. 0.000 to Ch. 32.000) section of Delhi Vadodara Greenfield Alignment (NH 148N) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode

NHAI/BM/ Delhi-Vadodara/2018/Pkg17 888.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2019
Time 11:0Hrs
25/11/2019
Time 11:0Hrs
2139 Construction of Eight Lane access controlled Expressway from Bani Village to Bardawadi village of Mandsaur district (Ch. from Km. 517.420 to Km. 546.920 and design Ch. from Km. 65.000 to Km. 94.500) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojna in the State of Madhya Pradesh

NHAI/BM/Delhi-Vadodara/2018/Pkg19 880.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2019
Time 11:0Hrs
25/11/2019
Time 11:0Hrs
2140 Periodic Renewal from Km110.750 to Km126.970 of NH-727H under EPC mode in the state of Uttar Pradesh in year 2019-20 (Barabanki- Devasharif- Fatehpur- Mahmoodabad-Biswan –Laharpur-Lakhimpur)

2019_MoRTH_507703_1 4.590 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/09/2019
Time 15:0Hrs
14/11/2019
Time 15:0Hrs
2141 Periodic renewal work from Km. 0.000 to 68.300 of NH¬931 (Pratapgarh-Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 & 53)

2019_MoRTH_507263_1 20.560 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/09/2019
Time 15:0Hrs
08/11/2019
Time 15:0Hrs
2142 Periiodic RRenewaal workk from Km. 0..000 too 30.470 of NNH-93 1A (Saalon-Ja is-Jagddishpurr Road)) underr EPC mmode iin the SState off Uttar Pradessh

2019_MoRTH_507255_1 7.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/09/2019
Time 15:0Hrs
08/11/2019
Time 15:0Hrs
2143 Improvements to Koppal city limits from km 245.600 to 248.300 & 255.160 to 255.900 of NH-63 Ankola-Gooty Section delink portion in Koppal Taluka & Koppal District

29/ NHAI/RO-BNG/14035/Tender/2019 1.520 NHAI OTHERS 27/02/2019
Time 9:0Hrs
20/03/2019
Time 15:0Hrs
2144 Routine Maintenance and special repair of NH-207 from Km. 58.300 to Km. 138.320

27 NHAI RO-BNG 11036C 1 Tender 2019 9.990 NHAI EPC (Lump Sum/Item Rate Contract) 22/02/2019
Time 14:15Hrs
15/03/2019
Time 15:0Hrs
2145 Periodic Renewal by resurfacing and other safety devices of Development of adequate road connectivity to New Mangalore Port for length 25.472Km of stretches at Km.358.000 to Km.375.300 on NH-66 and Km.328.000 to Km.338.000 on LHS and Km.345.000 to Km.346.000-on Bypass (From Padil Junction towards Maroli), Km.0.000 to Km.2.172-on Bypass (From Nanthoor Junction towards Padil) of Development of Adequate Port Road Connectivity to New Mangalore Port in the State of Karnataka on EPC mode

NIT No. 25 NHAI RO BNG 15016 e tender 2019 dated 01.02.2019 23.960 NHAI EPC (Lump Sum/Item Rate Contract) 04/02/2019
Time 14:0Hrs
11/03/2019
Time 17:0Hrs
2146 Stabilization of landslide at Hatipahar including construction & upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 489.350 to Km 491.600 (Design chainage Km 471.400 to Km 473.675) (Shingdhar Bridge to Vishnuprayag Bridge) of NH-07, (Old NH-58) on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand (Design length 2.275 Km).

2019_BRO_429041_1 112.550 BRO EPC (Lump Sum/Item Rate Contract) 10/01/2019
Time 11:0Hrs
07/03/2019
Time 15:0Hrs
2147 Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (design chainage from Km 473.675 to Km 486.060) of NH-58, (new NH 7) (Vishnuprayag bridge to Lambagarh) excluding Govindghat-II landslide location (design chainage Km 479.925 to Km 480.075 and existing chainage Km 498.000 to 498.150) and Govindghat-III landslide location (design chainage Km 481.788 to Km 481.938 and existing chainage Km 499.988 to Km 500.138) in EPC mode under Chardham Programme in the State of Uttarakhand (length 12.085 kms)

2019_BRO_427531_1 105.760 BRO EPC (Lump Sum/Item Rate Contract) 07/01/2019
Time 11:10Hrs
06/03/2019
Time 15:0Hrs
2148 Construction and upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 509.725 to Km 528.000 (design chainage Km 490.550 to Km 507.850) of NH-58 (new NH-07) (Benakuli bend to Mana Village) in EPC mode under Chardham Programme in the State of Uttarakhand (length = 17.30 Kms)

2019_BRO_427142_1 159.330 BRO EPC (Lump Sum/Item Rate Contract) 05/01/2019
Time 11:55Hrs
06/03/2019
Time 13:0Hrs
2149 WIDENING TO 2 LANE WITH PAVED SHOULDER AND STRENGTHENING FROM KM 45.00 TO KM 65.140 of NH 101 NEW NH 331 LENGTH 18.990 KM ON EPC MODE IN THE STATE OF BIHAR

2019_MoRTH_441172_1 71.930 MoRTH EPC (Lump Sum/Item Rate Contract) 11/02/2019
Time 11:0Hrs
25/02/2019
Time 17:0Hrs
2150 Construction of 4-lane Bridge over Irang River on Imphal- Jiribam road section (95.500km) NH-37 (Old NH-53) in the State of Manipur on EPC Mode

2018_NHIDC_418296_1 30.750 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:0Hrs
21/02/2019
Time 15:0Hrs
2151 Construction of Eight Lane access controlled Expressway carriageway from Miyati Village to MP-Gujarat Border Ch.221.700 to 244.500 design Ch.674.420 to 697.220 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg25 966.430 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
20/02/2019
Time 11:0Hrs
2152 Improvement and provisioning of additional safety measures for Gangotri-Dharasu (NH-108) from Km 110.860 to Km 123.080 (design chainage from Km 97.400 to Km 109.458) on EPC mode under improvement to NH connectivity to Chardham in the State of Uttarakhand

2018_BRO_422435_1 22.530 BRO EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 11:30Hrs
18/02/2019
Time 15:0Hrs
2153 Construction of Flyover at Karanja (Gh.)Town from Km.73.280 to Km.74.180 section of NH-53 in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Mode

NHAI/RO-NAG/2018-19/28 34.950 NHAI EPC (Lump Sum/Item Rate Contract) 04/01/2019
Time 9:30Hrs
18/02/2019
Time 11:0Hrs
2154 Construction of Eight Lane access controlled Expressway carriageway from Jodmi village to Bani village of Mandsaur district Ch.484.420 to 517.420 design Ch.32.000 to Ch. 65.000 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg18 973.780 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2155 Construction of Eight Lane access controlled Expressway carriageway from Bardawadi village of Mandsaur district to Kamliya village of Ratlam district Ch.546.920 to 572.220 design Ch.94.500 to Ch.119.800 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg20 736.670 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2156 Construction of Eight Lane access-controlled Expressway carriageway from Kamliya village to Kandarwasa village of Ratlam district Ch.572.220 to 602.420 design Ch.119.800toCh.150.000 section of Delhi-Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg21 919.630 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2157 Construction of Eight Lane access controlled Expressway carriageway from Kandarwasa village to Bawadi village Near Shivgarh of Ratlam district Ch.602.420 to 627.420 design Ch.150.000 to Ch.175.000 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg22 1,037.530 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2158 Construction of Eight Lane access controlled Expressway carriageway from Bawadi village Near Shivgarh of Ratlam district to Ranni Village of Jhabua district Ch.627.420 to 652.720 design Ch.175.000 to 200.300 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg23 1,139.890 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2159 Construction of Eight Lane access controlled Expressway carriageway from Ranni Village to Miyati Village of Jhabua district Ch.652.720 to 674.420 design Ch.200.300 to 221.700 section of Delhi Vadodara Greenfield Alignment NH148N on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

NHAI/BM/ Delhi-Vadodara/2018/Pkg24 921.630 NHAI EPC (Lump Sum/Item Rate Contract) 12/10/2018
Time 11:0Hrs
18/02/2019
Time 11:0Hrs
2160 Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg13 940.950 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
14/02/2019
Time 11:0Hrs
2161 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 352 Jind Gohana near Julana to Junction with NH 9 Rohtak Jind section near Kharkara Ch. 108.000 to 131.000, length 23 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg5 621.410 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
2162 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 9 Rohtak Jind section near Kharkara to Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri Ch. 131.000 to 165.000, length 34 km on EPC mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg6 653.850 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
2163 Construction of Six Lane access controlled highway NH 152D starting from Junction with NH 334B Charkhi Dadri Jhajjar section near Charkhi Dadri to Junction with Rewari Kanina road SH 24 near Kanina Ch. 165.0 to 200.0, length 35 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg7 732.570 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
2164 Construction of Six Lane access controlled highway NH 152D starting from Junction with Rewari Kanina road SH 24 near Kanina to Narnaul Ch. 200.000 to 227.020, length 27.20 km on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Ismailabad-Narnaul/2018/Pkg8 607.270 NHAI EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 17:30Hrs
11/02/2019
Time 11:0Hrs
2165 Construction of Two Lane Chisopani Traffic Tunnel of Length 250 m including approaches from Km 67.080 to Km 67.500 on NH10 in East District of Sikkim State on EPC mode

2018_NHIDC_423249_1 30.180 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 19:30Hrs
07/02/2019
Time 15:0Hrs
2166 Construction of 48m Bridge over Chuba Khola from Km 75.300 to Km 75.800 on NH 10 in the State of Sikkim on EPC Basis

2018_NHIDC_423217_1 7.590 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:30Hrs
07/02/2019
Time 15:0Hrs
2167 Strengthening of existing carriageway from km 126.00 to km 140.00 of NH-60 under Salboni NH Sub-division of NH Division No. II, P. W. (Roads) Directorate, in the District of Paschim Medinipur, West Bengal, during the year 2018-19 on EPC mode

2018_MoRTH_423214_1 21.480 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:30Hrs
07/02/2019
Time 14:0Hrs
2168 Construction of Service Road at 1. Ilakal Service Road Ch. 330.816 to 333.386 Including Major Bridge on both sides at Ch.331.048 2. Kerahali Service Road Ch. 401.800 to 402.723 3. Kukanapalli Service Road Ch. 394.900 to 395.869 4. Hitnal Service Road Ch. 407.002 to 407.800 in Hunugund to Hospet Section of NH 13 New NH 50 in the state of Karnataka through Engineering Procurement Construction on EPC Mode

NIT No.24 NHAI RO BNG 17016 Tender 2018 dated 14.11.2018 49.860 NHAI EPC (Lump Sum/Item Rate Contract) 19/12/2018
Time 20:3Hrs
06/02/2019
Time 15:0Hrs
2169 Improvement/widening to Two-laning with earthen shoulder from Ranikor to Nongjri Design Length 33.250Km in the State of Meghalaya under SARDP-NE Phase-A on EPC mode

2018_NHIDC_423242_1 306.280 NHIDCL EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:0Hrs
05/02/2019
Time 18:0Hrs
2170 Widening & Strengthening to 2-lane with paved shoulder from km 53.00 to km 89.00 of NH 33

07RFP/2018-19 149.790 MoRTH EPC (Lump Sum/Item Rate Contract) 14/01/2019
Time 15:0Hrs
05/02/2019
Time 15:30Hrs
2171 Improvement of NH 60 from Km 330.00 to Km 374.00 except the stretch from Km 337.703 to Km 339.046 (for Suri ROB) by way of Strengthening of Existing Carriageway from km 330.000 to km 355.000 & km 360.000 to km 374.000 and Laying of Wearing Course from Km 355.000 to Km 360.000 in the district of Birbhum, West Bengal under EPC Mode

2018_MoRTH_422492_1 52.610 MoRTH EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 12:0Hrs
05/02/2019
Time 13:0Hrs
2172 Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP

2018_NHIDC_421277_1 350.060 NHIDCL EPC (Lump Sum/Item Rate Contract) 19/12/2018
Time 15:0Hrs
01/02/2019
Time 17:30Hrs
2173 Construction of 3 NO Minor Bridge

03EPC/NH-Gaya/2018-19 13.170 MoRTH EPC (Lump Sum/Item Rate Contract) 14/01/2019
Time 15:0Hrs
31/01/2019
Time 15:0Hrs
2174 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845

NHIDCL/Tripura/NH-44A/Manu-Sim/Pkg-III/2018 316.540 NHIDCL EPC (Lump Sum/Item Rate Contract) 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
2175 Improvement and Widening to two lane with paved shoulder of Manu Simlung section of NH 44A in the state of Tripura on EPC mode Package I starting near Manu at km 0.000 and ending near Lalchera at km 16.290

NHIDCL/Tripura/NH-44A/Manu- Simlung/Pkg-I/2018 167.860 NHIDCL EPC (Lump Sum/Item Rate Contract) 18/12/2018
Time 17:0Hrs
31/01/2019
Time 11:0Hrs
2176 Improvement of NH-53 passing through Jalgaon City to four lane along with construction of VUPs & PUP in the State of Maharashtra on EPC Mode

NHAI/RO-NAG/2018-19/26 69.260 NHAI EPC (Lump Sum/Item Rate Contract) 20/12/2018
Time 9:0Hrs
31/01/2019
Time 11:0Hrs
2177 Construction of Flyover from Km. 697.580 to Km.698.560 at Dumri Junction with slip, Service road on Nagpur Bypass section of NH-44 in the state of Maharashtra on Engineering, Procurement and Construction Mode -3rd call

NHAI/RO-NAG/2018-19/25 20.150 NHAI EPC (Lump Sum/Item Rate Contract) 17/12/2018
Time 9:30Hrs
30/01/2019
Time 11:0Hrs
2178 Rehabilitation and Up gradation of NH516D from Ch.0.00 to 29.50 (Devarapalli to Jangareddigudem section) to two lane with paved shoulders in the State of Andhra Pradesh on EPC mode under Annual Plan 2018-19] through an Engineering, Procurement and Construction (EPC) Contract

SE(R&B)/NH/VJA/10/2018-19 dt. 10.12.2018 135.320 MoRTH EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 16:0Hrs
29/01/2019
Time 17:0Hrs
2179 UPGRADATION TO 2 LANE / 4 LANE FROM KM 92/400 TO KM 127/350 NH-248-A (ALWAR NUH SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE

2018_MoRTH_424120_1 122.540 MoRTH EPC (Lump Sum/Item Rate Contract) 28/12/2018
Time 9:0Hrs
29/01/2019
Time 11:0Hrs
2180 Widening Strengthening to standard intermediate lane on Mubarkpur, Dehra Gopipur, Ranital, Kangra, Mataur-Dharamshala-Macleodganj road NH-503 Mataur-Dharamshala-Macleodganj section Km. 00 to 23-105

2018_MoRTH_418748_1 34.570 MoRTH EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
29/01/2019
Time 11:0Hrs
2181 Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH 150 length 262 Km in the State of Manipur Package I Km 0.00 to Km 185.00.

2018_NHIDC_418742_1 35.150 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2018
Time 13:0Hrs
28/01/2019
Time 17:30Hrs
2182 CONSTRUCTION OF MOREH BYPASS FROM KM 421.950 TO KM 425.411 OF NH-39 (LENGTH = 2.52 KM) NEAR INDO-MYANMAR BORDER IN THE STATE OF MANIPUR ON EPC MODE

2018_NHIDC_419318_1 29.880 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 15:0Hrs
28/01/2019
Time 17:0Hrs
2183 Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim

2018_NHIDC_419254_1 160.320 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 17:0Hrs
28/01/2019
Time 15:0Hrs
2184 Construction of proposed 4 Lane ROB at Km 12.4 LC No. 14 near Bandapalli village in Chittoor Division of NH40 in the state of Andhra Pradesh on EPC Mode

SE NH ATP NIT NO 34 2018 19 54.050 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 18:15Hrs
28/01/2019
Time 15:0Hrs
2185 REHABILITATION AND UP GRADATION OF NH 544E FROM KM 57.700 TO KM 103.200 MADAKASIRA TO A.P KARNATAKA BORDER TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH THROUGH ENGINEERING PROCUREMENT and CONSTRUCTION EPC BASIS CONTRACT

SE NH ATP NIT NO 33 2018 19 157.700 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 13:0Hrs
28/01/2019
Time 15:0Hrs
2186 Strengthening of selected stretches 35.40 Kms from Km 85.0 to 95.0 Km 107.0 to 131.8 and 137.0 to 137.6 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode

SE NH ATP NIT NO 31 2018 19 31.570 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
2187 Improvement the selected stretches 21.20 Km to the road from Km.0.0 to 40.2 of Puttur Uthukottai Road NH716A in the state of Andhra Pradesh on EPC Mode under Annual Plan 2018 19.

SE NH ATP NIT NO 32 2018 19 38.540 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
2188 Strengthening from Km 0.0 to 4.0 16.6 to 22.2 23.2 to 24.4 30.4 to 32.2 33.0 to 35.0 53.0 to 54.8 55.9 to 56.5 58.0 to 59.0 60.0 to 60.6 and 61.4 to 63.9 of Renigunta Kadapa Road of NH 716 in the state of Andhra Pradesh EPC Mode.

SE NH ATP NIT NO 35 2018 19 23.550 MoRTH EPC (Lump Sum/Item Rate Contract) 24/12/2018
Time 15:0Hrs
28/01/2019
Time 15:0Hrs
2189 Widening and strengthening of Una- Basoli- Barsar- Bhota Road to Two lane Intermediate lane including raising From Km. 20 to 35-750 on NH-503A Section Una to Bihroo in the State of HP

2018_MoRTH_418398_1 42.730 MoRTH EPC (Lump Sum/Item Rate Contract) 13/12/2018
Time 18:0Hrs
28/01/2019
Time 11:0Hrs
2190 Balance work of Khed Ghat Realignment (Km 46.981 – Km 51.400) & Narayangaon Bypass (Km 76.300 - Km 81.200), Total length – 9.31 Km on Khed - Sinnar section of NH – 60 (Old NH – 50) on EPC Mode in the State of Maharashtra

NHAI/RO/MUM/NSK/KS/2018-19/15 89.110 NHAI EPC (Lump Sum/Item Rate Contract) 22/11/2018
Time 9:0Hrs
28/01/2019
Time 11:0Hrs
2191 Construction of Eight Lane access controlled Expressway starting near Junction with MDR-1 (Baonli-Jhalai road) to Start of RoB near village Itawa (Ch. 247.310 - 279.840) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg9 808.110 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
2192 Construction of Eight Lane access controlled Expressway starting near Junction with NH-11 to Start of RoB near junction with NH-11A (Ch. 183.000 - 214.260) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/ Delhi-Vadodara/2018/Pkg7 955.560 NHAI EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 11:0Hrs
28/01/2019
Time 11:0Hrs
2193 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 0.00 to Design Km 14.00 (Design Length 14.00) in the State of Nagaland under SARDP-NE (Pkg-I)

2018_NHIDC_417952_1 530.550 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:19Hrs
24/01/2019
Time 11:0Hrs
2194 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 14.00 to Design Km 29.00 (Design Length 15.00) in the State of Nagaland under SARDP-NE (Pkg-II)

2018_NHIDC_418092_1 542.470 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:52Hrs
24/01/2019
Time 11:0Hrs
2195 Construction of Kohima Bypass of 4 lane Pavement on EPC Basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from design Km 29.00 to Design Km 44.525 (Design Length 15.525) in the State of Nagaland under SARDP-NE (Pkg-III)

2018_NHIDC_418081_1 482.350 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 13:35Hrs
24/01/2019
Time 11:0Hrs
2196 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 Design Km. 0.000 to Km. 20.751 Design Length 20.751 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418134_1 359.830 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:30Hrs
24/01/2019
Time 11:0Hrs
2197 Construction of two Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 16.592 to Km 29.530 Design Km. 20.751 to Km. 35.461 Design Length 14.710 Km in the state of Nagaland under SARDPNE Phase A

2018_NHIDC_418159_1 164.060 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 15:40Hrs
24/01/2019
Time 11:0Hrs
2198 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-IV starting near Bamanchara at km 68.500 (design chainage 63.700) and ending at Srirampur at km 81.130 (design chainage 75.700)

2018_NHIDC_419273_1 174.000 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
2199 Improvement and Widening to two lane with paved shoulder of Kailashahar - Teliamura section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - Package-VI starting near Singhichara at km 105.300 (Design Chainage 97.319) and ending near Teliamura at km 139.453 (Design Chainage 127.319)

2018_NHIDC_419285_1 404.400 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 18:0Hrs
24/01/2019
Time 11:0Hrs
2200 Widening from Two lane to Four lane on NH 72 New NH 07 on Kala Amb-Paonta Sahib -Dehradun road from km 46 to 103 SH P L 50 mm thick BM, and 65 mm DBM and 30mm thick BC, Road side Furniture, Trapezoidal drain, Con. Median, Con. PCC Rwall, Bwall, Con. Footpath, and utility shifting in km 96 to km 103 i.e. in the State of Himachal Pradesh

2018_MoRTH_417164_1 20.990 MoRTH EPC (Lump Sum/Item Rate Contract) 10/12/2018
Time 18:30Hrs
23/01/2019
Time 11:0Hrs
2201 Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase „Á‟ in the State of West Bengal (Package-IV A).

2018_NHIDC_416435_1 249.930 NHIDCL EPC (Lump Sum/Item Rate Contract) 07/12/2018
Time 18:0Hrs
22/01/2019
Time 15:0Hrs
2202 Construction of Flyover at Morampudi Junction (Km. 910.774) on NH-216 A (OldNH-5) at Rajahmundry City in the State of Andhra Pradesh on EPC Mode (2nd Call)

NHAI/RO-VJA/12029/Bid-Morampudi/2018/ 20.980 NHAI EPC (Lump Sum/Item Rate Contract) 14/12/2018
Time 20:0Hrs
22/01/2019
Time 11:0Hrs
2203 PR Work from Km 10.80 to 16.00 of NH-219 in the State of Bihar for the year 2017-18 on EPC mode

2019_MoRTH_426077_1 1.660 MoRTH EPC (Lump Sum/Item Rate Contract) 02/01/2019
Time 11:0Hrs
21/01/2019
Time 17:0Hrs
2204 Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis

2018_NHIDC_418237_1 21.130 NHIDCL EPC (Lump Sum/Item Rate Contract) 12/12/2018
Time 17:0Hrs
21/01/2019
Time 15:0Hrs
2205 New construction of road along Canal Kasur Branch lower khem karan Distributory from Village Jaura Orginating from MDR 62 Tarn Taran Patti Road to Village Mehmodpura in Distt. Tarn Taran in the State of Punjab under economic importance scheme in the year of 2018 2019 falling in the state of Punjab through EPC Contract.

Bid No. 16 Dated 6.12.2018 45.380 MoRTH EPC (Lump Sum/Item Rate Contract) 06/12/2018
Time 18:55Hrs
18/01/2019
Time 17:0Hrs
2206 Construction of 6-lane access controlled Greenfield highway from km -1.142 to km 21.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-1)

2018_NHAI_16042_1 444.890 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
2207 Construction of 6-lane access controlled Greenfield highway from km 21.000 to km 48.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-2)

2018_NHAI_16047_1 440.570 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
2208 Construction of 6-lane access controlled Greenfield highway from km 48.000 to km 72.000 of Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-3)

2018_NHAI_16050_1 468.030 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
17/01/2019
Time 11:0Hrs
2209 Four Laning from existing 10.0m carriageway width from km.5.550 to km.11.975 of NH-154(Old NH-20) Pathankot- Nurpur Section in the State of Punjab on EPC Mode( Project civil cost 29.68)

17 dated 12.11.2018 29.680 MoRTH EPC (Lump Sum/Item Rate Contract) 12/11/2018
Time 15:0Hrs
16/01/2019
Time 16:0Hrs
2210 Construction of 6-lane access controlled Greenfield highway from km 1.900 to km 30.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-1)

2018_NHAI_16018_1 446.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2211 Construction of 6-lane access controlled Greenfield highway from km 30.000 to km 60.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-2)

2018_NHAI_16024_1 535.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2212 Construction of 6-lane access controlled Greenfield highway from km 60.000 to km 90.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-3)

2018_NHAI_16027_1 541.520 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2213 Construction of 6-lane access controlled Greenfield highway from km 90.000 to km 120.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-4)

2018_NHAI_16031_1 429.890 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2214 Construction of 6-lane access controlled Greenfield highway from km 120.000 to km 148.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-5)

2018_NHAI_16033_1 456.630 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2215 Construction of 6-lane access controlled Greenfield highway from km 148.000 to km 177.658 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-6)

2018_NHAI_16037_1 464.590 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
16/01/2019
Time 11:0Hrs
2216 Stregthening work on NH-158 Ras-Beawar-Badnore-Asind-Mandal Road Km 119/0 to 139/0 in the state of Rajasthan

2018_MoRTH_423340_1 9.967 MoRTH EPC (Lump Sum/Item Rate Contract) 26/12/2018
Time 9:0Hrs
15/01/2019
Time 18:0Hrs
2217 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.35 Km length in the state of Jammu and Kashmir to be executed on EPC basis.

2018_NHIDC_416527_1 221.940 NHIDCL EPC (Lump Sum/Item Rate Contract) 07/12/2018
Time 19:0Hrs
15/01/2019
Time 11:0Hrs
2218 Construction of 6-lane access controlled Greenfield highway from km -0.300 to km 28.700 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-1)

2018_NHAI_15991_1 520.010 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 13:0Hrs
15/01/2019
Time 11:0Hrs
2219 Construction of 6-lane access controlled Greenfield highway from km 28.700 to km 53.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2)

2018_NHAI_15994_1 528.230 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2220 Construction of 6-lane access controlled Greenfield highway from km 53.000 to km 88.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3)

2018_NHAI_16014_1 510.370 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2221 Construction of 6-lane access controlled Greenfield highway from km 88000 to km 115000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-4)

2018_NHAI_16020_1 382.760 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2222 Construction of 6-lane access controlled Greenfield highway from km 115.000 to km 140.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-5)

2018_NHAI_16025_1 362.980 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2223 Construction of 6-lane access controlled Greenfield highway from km 140.000 to km 170.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-6)

2018_NHAI_16028_1 433.410 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2224 Construction of 6-lane access controlled Greenfield highway from km 170.000 to km 200.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-7)

2018_NHAI_16034_1 406.670 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2225 Construction of 6-lane access controlled Greenfield highway from km 200.000 to km 225.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8)

2018_NHAI_16040_1 458.120 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2226 Construction of 6-lane access controlled Greenfield highway from km 225.000 to km 252.500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-9)

2018_NHAI_15992_1 484.090 NHAI EPC (Lump Sum/Item Rate Contract) 05/10/2018
Time 15:0Hrs
15/01/2019
Time 11:0Hrs
2227 Up-gradation Construction to Two Lane with paved shoulders with Flexible Pavement on Kurwai Mungaoli Chanderi Road (NH-346) Design Length 79.700 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392296_1 245.410 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
2228 Up-gradation and Construction to Two lane with paved shoulders with flexible pavement on Jirapura Pachore Road (NH-752C), Length 52.310 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392348_1 195.610 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
2229 Construction of 2-lane ROB and its approaches at km 147/10 (Harda) on NH-59A in lieu of level crossing No. 204 SPL on Khandwa-Jhasni Railway line on Railway chainage 669/1-3 on Indore Betul road of Harda District in the state of Madhya Pradesh on EPC

2018_MoRTH_392384_1 30.311 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
14/01/2019
Time 17:30Hrs
2230 Development to four lanes with paved side shoulders of Jalandhar Hoshiarpur section of NH 03 (Old name NH 70) from design Ch 7.830 (Existing Km 8.000) at village Jandu Singha to Design Ch 11.400 (Existing Km 11.570) at village Madar District Jalandhar (Project Length 3.570 Km) in the State of Punjab on Engineering Procurement and Construction (EPC) Mode.

8 11.480 MoRTH EPC (Lump Sum/Item Rate Contract) 14/11/2018
Time 16:30Hrs
09/01/2019
Time 12:30Hrs
2231 Up-gradation and Construction to Two Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road (NH-347C) Design Length-79.59 Km in the State of Madhya Pradesh on EPC Mode

2018_MoRTH_392333_1 217.400 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
05/01/2019
Time 17:30Hrs
2232 Construction of Dwarka Expressway from Road under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana border (Km 5.300 To Km 9.500) Package 2 in state of Delhi on EPC mode

2018_NHAI_18151_1 1,469.080 NHAI EPC (Lump Sum/Item Rate Contract) 19/11/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
2233 Construction of Elevated Structure including approaches in Phagwara City from Km. 352.675 to Km 354.430 and VUP at Km 355.400 including approaches on NH 44 Old NH 1 in the State of Punjab on EPC mode as Standalone project

13987 147.290 NHAI EPC (Lump Sum/Item Rate Contract) 10/08/2018
Time 15:0Hrs
02/01/2019
Time 11:0Hrs
2234 Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH11 Km 151.840 to Km 183.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojan in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg6 858.570 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
2235 Construction of Eight Lane Carriageway starting near Junction at SH44 to Junction with Keshopura Road Km 115.700 to Km 151.840 section of Delhi Vadodara Greenfield Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg5 925.130 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
2236 Construction of Eight Lane Carriageway starting at Haryana Rajasthan border and ends at Junction with SH44 Km 78.800 to Km 115.700 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

NHAI/BM/Delhi-Vadodara/ 2018/Pkg4 958.820 NHAI EPC (Lump Sum/Item Rate Contract) 20/08/2018
Time 17:0Hrs
01/01/2019
Time 11:0Hrs
2237 Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 47.000 near Khanpur Ghati Km 18.500 to Km 47.000 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg2 1,017.680 NHAI EPC (Lump Sum/Item Rate Contract) 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
2238 Construction of Eight Lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan Border Km 47.000 to Km 78.800 section of Delhi Vadodara Green field Alignment NH 148N on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg3 798.550 NHAI EPC (Lump Sum/Item Rate Contract) 23/08/2018
Time 17:0Hrs
31/12/2018
Time 15:0Hrs
2239 Construction of Eight Lane divided carriageway starting at Sohna Gurugram Road (NH 248A) near Alipur village and ends at Ch. 18.461 before KMP Expressway (Ch. 0.000 to Ch. 18.461) section of Delhi Vadodara Greenfield Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana

NHAI/BM/Delhi-Vadodara/ 2018/Pkg1 1,144.000 NHAI EPC (Lump Sum/Item Rate Contract) 17/09/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
2240 IRQP work in km 0.00 to 4.5 of NH-727A (Near U.P. Border) in the state of Bihar on EPC mode.

2018_MoRTH_422096_1 1.503 MoRTH EPC (Lump Sum/Item Rate Contract) 22/12/2018
Time 11:0Hrs
31/12/2018
Time 15:0Hrs
2241 Construction of Four-Lane divided Highway from Melur (Design km. 0.000/Existing km. 99.920 of NH-38) to Karaikudi (Design km 45.860 /Existing km. 12.900 of NH-383 Ext.) (Design Length- 45.860 km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC mode

2018_NHAI_10794_1 750.520 NHAI EPC (Lump Sum/Item Rate Contract) 16/05/2018
Time 18:40Hrs
27/12/2018
Time 11:0Hrs
2242 Construction of Missing Links in Lakhpat – Gaduli - Hajipir - Odma – Khavda - Dholavira - Mauvana-Gadkabet - Santalpur road (Newly declared National Highway No.754K) in the state of Gujarat. On EPC Mode

4EPC of 2018-19 337.970 MoRTH EPC (Lump Sum/Item Rate Contract) 10/10/2018
Time 14:0Hrs
26/12/2018
Time 17:0Hrs
2243 Construction of 2-lane ROB at NH Km.72/000 of NH-26A on Katni Bina Railway Line at L/C no. 1B on Sagar to Bina Road near Bina Town of Sagar Distt in the state of Madhya Pradesh on EPC Mode

2018_MoRTH_392367_1 24.545 MoRTH EPC (Lump Sum/Item Rate Contract) 06/10/2018
Time 12:30Hrs
26/12/2018
Time 17:0Hrs
2244 Reconstruction of minor bridges at Chainage 181.868 Km of NH 60 in the district of Bankura WB under EPC mode Job No 060 WB 2018 19 430

2018_MoRTH_402642_1 11.810 MoRTH EPC (Lump Sum/Item Rate Contract) 01/11/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
2245 PR work from Km 36.00 to Km 80.00 except Km 67.6 to 68.6 in the district of Dakshin Dinajpur in the State of West Bengal (EPC Mode) Job No. (ARP)/WB/2017-18/788

2018_MoRTH_402020_1 15.680 MoRTH EPC (Lump Sum/Item Rate Contract) 31/10/2018
Time 17:0Hrs
26/12/2018
Time 13:0Hrs
2246 Rehabilitation of 9 (Nine) damaged Bridges/ROB along NH-60 during the year of 2018-19 in the district of Birbhum, West Bengal on EPC mode. Job No. 060-WB-2018-19-429

2018_MoRTH_386715 6.170 MoRTH EPC (Lump Sum/Item Rate Contract) 21/09/2018
Time 16:0Hrs
26/12/2018
Time 13:0Hrs
2247 FOUR LANING OF NH-37 FROM END OF MORAN BYPASS (KM 562.525) TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM 581.700) IN THE STATE OF ASSAM UNDER SARDP-NE, PHASE ‘A’ ON EPC MODE- BALANCE WORK

2018_NHIDC_393028_1 230.340 NHIDCL EPC (Lump Sum/Item Rate Contract) 08/10/2018
Time 17:0Hrs
20/12/2018
Time 11:0Hrs
2248 P/R Work from Km. 0.000 to Km. 31.820 of NH 122A for the year 2017-18 in the State of Bihar

2018_MoRTH_409261_1 6.960 MoRTH EPC (Lump Sum/Item Rate Contract) 20/11/2018
Time 10:0Hrs
19/12/2018
Time 17:0Hrs
2249 Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package-VIII)

2018_NHIDC_384329_1 98.070 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:15Hrs
18/12/2018
Time 15:0Hrs
2250 Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V)

2018_NHIDC_384220_1 24.460 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
2251 Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode (Package-VI)

2018_NHIDC_384290_1 40.770 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:0Hrs
18/12/2018
Time 15:0Hrs
2252 Four Lane divided carriageway from Vadipatti (Design Chainage 0.000) to Thamaraipatti (Design Chainage 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu

NHAI_11012_MR_EPC_7_2018 555.520 NHAI EPC (Lump Sum/Item Rate Contract) 08/06/2018
Time 15:0Hrs
13/12/2018
Time 11:0Hrs
2253 4-laning of Delhi-Saharanpur NH-709B from km 92.200(near Shamli) to km 155.025 (near Saharanpur), (length 62.772 km) in Uttar Pradesh (Pkg-II) on EPC mode under Bharatmala Pariyojana

2018_NHAI_12646_1 612.890 NHAI EPC (Lump Sum/Item Rate Contract) 09/07/2018
Time 17:30Hrs
11/12/2018
Time 11:0Hrs
2254 Construction of one VUP of Six lane at design chainage Km 120.275 on four laning of Surat Hazira Port Section of NH 6 in the State of Gujarat under NHDP Phase III through EPC Contract mode

101 32.630 NHAI EPC (Lump Sum/Item Rate Contract) 09/08/2018
Time 11:0Hrs
27/11/2018
Time 11:0Hrs
2255 Six Lanning of Sriperumbudur to Karaipettai Section of NH-4 (New NH-48) from Km 37.000 (Existing Km 37/000) to Km 71.015 (Existing Km 71/000) on EPC Mode in the state of Tamil Nadu under NHDP Phase-V.

2018_NHAI_15715_1 649.250 NHAI EPC (Lump Sum/Item Rate Contract) 25/09/2018
Time 18:0Hrs
19/11/2018
Time 11:0Hrs
2256 Six laning of existing 4-lane road from Gundugolanu (Design km 1023.280) to Kalaparru (Design km 1050.680) of NH-5 (New NH-16) (Design length = 27.400 km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode

2018_NHAI_7515_1 505.400 NHAI EPC (Lump Sum/Item Rate Contract) 22/10/2018
Time 15:59Hrs
19/11/2018
Time 11:0Hrs
2257 Six-Laning of existing 4-lane road from Kalaparru (Design km 1050.680) to Chinna Avutupalli (Design km 1076.480) of NH-5 (New NH-16) including 6 lane Hanuman Junction bypass from (Existing Km 1055.680 to km 1060.800)(Design Ch. 0.000 to Ch.6.720), (Total Design Length – 27.400km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC mode

2018_NHAI_7435_1 589.950 NHAI EPC (Lump Sum/Item Rate Contract) 22/10/2018
Time 16:55Hrs
19/11/2018
Time 11:0Hrs
2258 Rehabilitation of Km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 25.00 km) on EPC Mode” (Package-VII)

2018_NHIDC_384308_1 54.750 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:0Hrs
09/11/2018
Time 15:0Hrs
2259 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Km. 379.100 to Km. 380.275 of Gholteer Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.( Design Length = 1.175 Km)

2018_NHIDC_384349_1 89.270 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
2260 Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length = 0.600 km)

2018_NHIDC_384359_1 45.370 NHIDCL EPC (Lump Sum/Item Rate Contract) 14/09/2018
Time 18:55Hrs
30/10/2018
Time 15:0Hrs
2261 Upgradation of new NH-341 to two-lane with paved side shoulder configuration between design chainage from Km 65.478 to Km 162.209 including geometric improvement and reconstruction of old/weak structures. (Bhuj Airport Jn.- Khavada - India bridge to Dharmshala section) in the State of Gujarat on EPC Mode.

EPC/5 of 2017-18 ( 2nd Attempt) 261.100 MoRTH EPC (Lump Sum/Item Rate Contract) 21/08/2018
Time 15:0Hrs
20/10/2018
Time 18:0Hrs
2262 Construction of Major Bridge at Km 180.865 across River Krishna on NH-167 Hagari – Jadercela Section in the State of Karnataka

2018_MoRTH_381296_1 124.710 MoRTH EPC (Lump Sum/Item Rate Contract) 01/10/2018
Time 14:0Hrs
20/10/2018
Time 17:0Hrs
2263 Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis

2018_NHIDC_369922_1 260.770 NHIDCL EPC (Lump Sum/Item Rate Contract) 08/08/2018
Time 10:0Hrs
12/10/2018
Time 11:0Hrs
2264 Construction of 4 lane elevated corridor in Dessa Town between km 565.850 to km 569.600 Length 3.750km on East West Corridor of NH-27 (Old NH-14) in Gujarat on EPC Mode

2018_NHAI_13698_1 222.750 NHAI EPC (Lump Sum/Item Rate Contract) 03/08/2018
Time 17:57Hrs
19/09/2018
Time 11:0Hrs
2265 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.000 TO KM 65.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-1) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275446_1 678.060 NHIDCL EPC (Lump Sum/Item Rate Contract) 01/12/2017
Time 15:0Hrs
04/09/2018
Time 15:0Hrs
2266 test project 1

NHIDCL/UK/NH134/Silkyara Tunnel/2017_ test 1,119.690 MoRTH EPC (Lump Sum/Item Rate Contract) 24/08/2018
Time 15:0Hrs
28/08/2018
Time 15:0Hrs
2267 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 65.000 TO KM 125.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-2) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_282985_1 469.230 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2268 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.000 TO KM 166.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-3) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283016_1 464.380 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2269 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.000 TO KM 208.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-4) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275447_1 471.350 NHIDCL EPC (Lump Sum/Item Rate Contract) 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2270 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.000 TO KM 250.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-5) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283024_1 399.370 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2271 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.000 TO KM 298.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-6) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_283003_1 501.740 NHIDCL EPC (Lump Sum/Item Rate Contract) 20/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2272 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.000 TO KM 339.000 AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-7) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275448_1 497.710 NHIDCL EPC (Lump Sum/Item Rate Contract) 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2273 WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.000 TO KM 380.000 ON AIZAWL-TUIPANG SECTION OF NH-54 (PACKAGE-8) IN THE STATE OF MIZORAM WITH JICA LOAN ASSISTANCE

2017_NHIDC_275449_1 487.850 NHIDCL EPC (Lump Sum/Item Rate Contract) 01/12/2017
Time 15:0Hrs
27/08/2018
Time 15:0Hrs
2274 Construction of Two VUPs at Km 223.950 and Km 226.200 and one side storage Lane in Bharuch-Surat Section of NH-8 in the State of Gujarat on EPC Mode

2018_NHAI_13023_1 20.170 NHAI EPC (Lump Sum/Item Rate Contract) 18/07/2018
Time 17:10Hrs
27/08/2018
Time 11:0Hrs
2275 Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode

2018_NHAI_12488_1 87.530 NHAI EPC (Lump Sum/Item Rate Contract) 04/07/2018
Time 17:57Hrs
27/08/2018
Time 11:0Hrs
2276 Six Lanning of Sriperumbudur to Karaipettai Section of NH4 (New NH48) from Km 37.000 (Existing Km 37.000) to Km 71.015 (Existing Km 71.000) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11044_1 649.250 NHAI EPC (Lump Sum/Item Rate Contract) 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs
2277 Six Lanning of Karaipettai to Walajapet Section of NH4 (New NH48) from Km71.015 (Existing Km 71.000) to Km 107.091 (Existing Km 107.068) on EPC Mode in the state of Tamil Nadu under NHDP PhaseV

2018_NHAI_11045_1 590.390 NHAI EPC (Lump Sum/Item Rate Contract) 23/05/2018
Time 11:0Hrs
20/08/2018
Time 11:0Hrs