Tenders
S.No. Project Name ERPOC
Tender
Number (CPPP)
Estimated Project Cost (Cr) Executing Agency Project Type Mode of Execution Bid Issue Date Bid Due Date
1 Reconstruction and Widening of 8 nos. narrow culvert at km 22.445, km 22.450, km 22.840, km 27.565, km 29.000 (half portion), km 29.500, km 30.650, km 38.290 & spot improvement from km 22.397 to km 22.442, km 22.445 to km 22.450, km 22.453 to km 22.493, km 26.855 to km 26.935, km 27.125 to km 27.175, km 27.492 to km 27.562, km 27.565 to km 27.710 , km 29.487 to km 29.502, km 29.506 to km 29.513, km 32.710 to km 32.750 km, km 32.885 to km 32.910, km 38.185 to km 38.285, km 38.290 to km 38.330 & repair of old parapets, construction of new parapets, road signage such as Median Marker, Road Marking etc. in selected stretches from km 20.00 to km 40.00 of NH-110 (Old NH-55) in the District of Darjeeling under Annual Plan 2022-23 (Job No. NH-110/KOL/2022-23/502) - (3rd call).

2023_MoRTH_768389_1 12.619 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2023
Time 18:0Hrs
25/09/2028
Time 17:0Hrs
2 Rehabilitation, Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane-2 Lane with Paved Shoulder of NH 965DD from Lonand –Shirval-Bhor –Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border from Km 33.550 to 92.550 (Design Ch 33.550 to 91.003) in the state of Maharashtra.

2023_MoRTH_736700_1 496.135 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 13:5Hrs
25/08/2024
Time 17:0Hrs
3 CONSTRUCTION IMPROVEMENT OF ROAD SINGTHAMDIKCHU FROM CL 9 TO NHDL SPECIFICATIONS THROUGH EPC MODE BETWEEN KM 10.00 (KM 0.00) TO KM 32.700 (EXISTING) (KM 32.110 PROPOSED) (NET DESIGN LENGTH22.110 KM) UNDER 87 RCC764 BRTF UNDER PROJECT SWASTIK IN SIKKIM STATE

1 212.350 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
13/04/2024
Time 15:0Hrs
4 Rehabilitation and Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 and km.35.400toKm.52.345(Design len.-24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to Bihar Border and Bihar Border to Majhauli)on EPC mode in the State of UP

2023_MoRTH_771732_1 338.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
30/10/2023
Time 11:0Hrs
5 Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh

2023_MoRTH_771974_1 829.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
30/10/2023
Time 11:0Hrs
6 Rehabilitation and Upgradation of Single and Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand

2023_MoRTH_770684_1 70.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 15:0Hrs
26/10/2023
Time 12:0Hrs
7 WIDENING IMPROVEMENT OF ROAD KAYING TATO FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS FROM KM 47.850 TO KM 66.600 (DESIGN CHAINGE KM 45.800 TO KM 62.850 TOTAL LENGTH 17.05 KM) UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG III

2023_bro_616900_1 144.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2023
Time 18:0Hrs
17/10/2023
Time 11:0Hrs
8 EPC MODE FOR WIDENING IMPROVEMENT OF KAYING TATO ROAD BETWEEN KM 66.600 TO KM 86.600 (DESIGN CHAINGE KM 62.850 TO KM 78.367 TOTAL LENGTH 15.517 KM) FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG-IV

2023_BRO_616781_1 99.580 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
16/10/2023
Time 15:0Hrs
9 Work of road safety Improvement by means of widening of Existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 Borbhatha Ankleshwar Section under Road Safety Annual Plan 2023-24 Total Length 4.4km

2023_MoRTH_772343_1 4.100 MoRTH Normal Highway Project OTHERS 19/09/2023
Time 18:30Hrs
16/10/2023
Time 12:0Hrs
10 Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140.960 (Patranga) to Km 160.200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh

2023_MoRTH_769510_1 688.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
16/10/2023
Time 11:0Hrs
11 Rehabilitation and Up-gradation from design Km 0.000 to Km. 69.280 of NH-931 (Pratapgarh - Amethi - Gauriganj - Musafirkhana) to two lane with paved shoulder on Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2023_MoRTH_769274_1 582.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
16/10/2023
Time 11:0Hrs
12 Construction of Bypass to Narsapuram town on NH 216 of 2 Lane with paved shoulder configuration starting from Existing Ch. Km 126.100 of NH 216 old NH 214A and ending at Km 10.814 existing chainage of NH 216 in the State of Andhra Pradesh

2023_MoRTH_768943_1 419.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 12:0Hrs
12/10/2023
Time 17:0Hrs
13 For Construction of 4 Lane ROB and its approaches at the level crossing LC No 29 B of Km 29 Ekangarsarai at NH110 New NH 33 and Railway Km 32.63 of Fatwa FUT Islampur IPR section with Utility Shifting in the state of Bihar on EPC mode.

2023_MoRTH_768403_1 109.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2023
Time 10:0Hrs
12/10/2023
Time 15:0Hrs
14 Repair and Rehabilitation of Mayurakshi Bridge at Sainthia at km 91.200 of NH 2B (New NH-114) in the district of Birbhum, West Bengal in the year 2023-24 in EPC Mode (Job No. 114/WB/2023-24/…..)

2023_MoRTH_769178_1 10.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/08/2023
Time 9:0Hrs
12/10/2023
Time 14:0Hrs
15 Construction of Jharsuguda Bypass on NH-49 from CH 258/636 km to CH 283/300 km design chainage from Km 258/636 to Km 289/876 in the state of Odisha under EPC mode

2023_MoRTH_755909_1 253.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
12/10/2023
Time 12:0Hrs
16 Widening and strengthening to 2LPS of Balikuda Mulakani from Km 318.970 Start of Balikuda By Pass to Km 353.450 Mulakani of NH 55 in the State of Odisha on EPC mode

2023_MoRTH_759236_1 402.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2023
Time 16:0Hrs
11/10/2023
Time 12:0Hrs
17 Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode

2023_NHAI_157666_1 449.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 17:55Hrs
11/10/2023
Time 11:0Hrs
18 Work of Design, Procurement, Installation, Operation and Maintenance of Bridge Health Monitoring system on Narmada Bridge at Ch. 248.428 km of Vadodara-Mumbai expressway in the state of Gujarat

2023_NHAI_160065_2 9.150 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 19/09/2023
Time 18:15Hrs
10/10/2023
Time 16:0Hrs
19 Construction of bypass Road to Daspalla town from KM. 195/250 to K.m 200/635 of NH-57 in the State of Odisha on EPC Mode (Bid Ref. No. 24 CE NH of 2023-24)

2023_MoRTH_759732_1 94.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
10/10/2023
Time 12:0Hrs
20 Widening and Strengthening of existing S/L, I/L & D/L to 2 lane with PS from Km. 256/455 to 256/503,256/820 to 256/960,265/760 to 266/010,266/010 to 266/800,270/975 to 271/055, 276/460 to 276/560, 276/560 to 276/700, 276/700 to 277/480,285//780 to 288/290, 288/290 to 291/050 and 3 Nos of Bypass from Km. 266/800 to 267/300,270/025 to 270/975 & 284/700 to 285/780 on NH53 in the State of odisha under EPC mode (Bid Ref. No. 25 CE NH of 2023

2023_MoRTH_759757_1 73.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
10/10/2023
Time 12:0Hrs
21 Construction of Two Lane Bypass road at Rairangpur on Ranghi Viayawada Corridor of NH-220 in the State of Odisha on EPC mode for the year 2022-23 (Bid.Ref. No. 26 CE NH of 2023-24)

2023_MoRTH_759772_1 64.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
10/10/2023
Time 12:0Hrs
22 Development of 4 lane with paved shoulders for the road section Talwandi Sabo-Raman to Refinery Road Junction with Bathinda-Dabwali road of NH-254 from existing Km 131.600 to 155.650 (Design Km 131.600 to Km 152.600) in the State of Punjab under EPC

2023_MoRTH_762465_1 227.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 17:0Hrs
10/10/2023
Time 11:0Hrs
23 Rehabilitation and Up-gradation to 2 lane with paved shoulders of Patto Jawahar Singh Wala to Dina Village Kangar road section of NH-254 Design Ch. From Km 38.00 to 51.200 in the state of Punjab. (Package-III) (Length 13.200 Km).

2023_MoRTH_753556_1 72.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 18:30Hrs
10/10/2023
Time 11:0Hrs
24 Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH 566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa

2023_NHAI_146949_1 367.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
10/10/2023
Time 11:0Hrs
25 Balance works of four laning from Waranga (Km.253.700) to Mahagaon (Km.320.580) Section of NH-361 in the state of Maharashtra under Bharatmala Pariyojna on EPC mode

2023_NHAI_144016_1 360.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2023
Time 15:0Hrs
10/10/2023
Time 11:0Hrs
26 RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_750739_1 351.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 18:55Hrs
10/10/2023
Time 11:0Hrs
27 Upgradation of MP/RJ border-Sheopur-Goras road section of NH-552E from Design Chainage 0.000 to 48.400 Km (Total length 48.40 km) to two Lane with paved shoulder configuration along with OTI of 16.6 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768222_1 326.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
09/10/2023
Time 17:30Hrs
28 Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768349_1 308.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
09/10/2023
Time 17:30Hrs
29 Upgradation To Two Lane Four lane With Paved Shoulders of Newly Declared NH 440 Vempalli to Chagalamarri Via Yerraguntla and Proddatur Design Ch from Km 55.00 to Km 106.52 And Km 109.65 to Km.137.08 Design length 78.95 Km in the state of AP2022 23

2023_MoRTH_768131_1 1,059.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
09/10/2023
Time 17:0Hrs
30 Rehabilitation and Up gradation of Thorrur to Nehru Nagar Section to Two Lane with Paved Shoulders from Km 109.420 to Km 178.500 of NH 930P in the State of Telangana

2023_MoRTH_768186_1 548.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 16:0Hrs
09/10/2023
Time 15:0Hrs
31 Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode

2023_MoRTH_767971_1 334.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 15:0Hrs
09/10/2023
Time 15:0Hrs
32 Construction of ROB with approaches on NH 848 B at Udvada, Railway crossing LC No 87 at Km 181/18/20 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_770645_1 22.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 9:0Hrs
09/10/2023
Time 12:0Hrs
33 Construction of Borigumma Bypass on NH-26 from Km 317.400 to Km 320.700 design chainage 317.400 to Km 321.415 in the state of Odisha on EPC Mode

2023_MoRTH_753578_1 62.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2023
Time 9:0Hrs
07/10/2023
Time 12:0Hrs
34 Strengthening from Km. 44/700 to Km. 62/200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat for the year 2022-23 (Length = 17.50 Km.) based on SOR 2022-23. (Job No. 168G/GJ/2022-23/684)

2022_MoRTH_712216_1 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 14:0Hrs
06/10/2023
Time 12:0Hrs
35 Construction of Six Lane Flyover at the Junction of Nilam Hotel (Ch. 261.500) ,Chalthan Chokdi (Ch. 263.400) and Service road at Palod (Ch. 235.600) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the state of Gujarat

NHAI/RO-GNR/NH-48/Blackspots/Nilam-Chalthan/2023 61.500 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 06/09/2023
Time 16:55Hrs
06/10/2023
Time 12:0Hrs
36 IRQP work from km 0.00 to 9.300 of NH 133 on EPC mode in state of Bihar (Job No.- NH-133/BR/2023-24/81)

2023_MoRTH_768081_1 9.557 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/08/2023
Time 17:0Hrs
05/10/2023
Time 17:0Hrs
37 Construction of Dharmagarh Bypass on NH-130C in the State of Odisha on EPC Mode

2023_MoRTH_758179_1 88.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 12:0Hrs
04/10/2023
Time 12:0Hrs
38 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section Btn Km 0.0 to 21.5 and Km 27.9 to 30.9 and Km 46.8 to 61.5 under EPC mode in the state of Gujarat

771726 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2023
Time 18:55Hrs
04/10/2023
Time 12:0Hrs
39 RFP for the work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_765017_1 121.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/08/2023
Time 15:0Hrs
04/10/2023
Time 11:0Hrs
40 Rectification of accident prone area with widening of curve & Re-alignment to the road of Govindpalli ghat area at ch.348/900 and ch.350/400 km of NH-326 in the State of Odisha for the year 2022-23 (BID Ref. No.-29 CE NH of 2023-24)

2023_MoRTH_767711_1 7.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2023
Time 18:55Hrs
03/10/2023
Time 12:0Hrs
41 Rectification of accident prone area with widening of curve & Re-alignment to the road of Jeypore ghat area at ch. 349/000 and ch. 347/800 of NH-26 in the State of Odisha” (BID Ref. No.-30 CE NH of 2023-24)

2023_MoRTH_767715_1 6.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2023
Time 18:55Hrs
03/10/2023
Time 12:0Hrs
42 Construction of 6-lane flyover Size-40 Nos of 25m Span x 6m Height including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul- Sambalpur section of NH-42 (New NH-55) at Km. 202.533 on EPC Mode in the State of Odisha.

2022-NHAI-139953-1 116.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2022
Time 19:44Hrs
03/10/2023
Time 11:0Hrs
43 Construction of Balance work of 8 nos. of Elephant Underpasses (EUPs), 1 no. of Vehicular Underpass (VUP), 1 nos. of Light Vehicular Underpass (LVUP), 1 nos. of Pedestrian Underpass (PUP), 1 nos. of Foot Over Bridge (FOB) and A2 side approach of Jharpokharia Flyover at km.215.270 in Baharagora-Singhara Section of NH-49 in the state of Odisha.

2022_NHAI_138816_1 254.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 12:20Hrs
03/10/2023
Time 11:0Hrs
44 RFP for Rehabilitation and Up-gradation from Km. 0.000 to Km. 51.600 of NH-321G (Agra (Junction on NH-509 at Tedhi Baghia) to Nuhkhas) to two lane with paved shoulder configuration in the state of Uttar Pradesh on (EPC) Basis Contract .

2023_MoRTH_740519_1 394.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
30/09/2023
Time 17:0Hrs
45 Construction of Service Road between Aena & Palsana from km 48.950 to 53.550 (LHS), Vanesha from km 57.700 to 58.050 (BHS), Nandida Village BHS from km 59.300 to 60.470 and Mandal Village LHS from km 101.800 to 102.300 on Hazira Port- Surat- Gujarat Maharashtra Border Section of NH-53 (Old NH-06) in the State of Gujarat on EPC Mode

2023_NHAI_165846_1 7.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2023
Time 16:15Hrs
30/09/2023
Time 11:0Hrs
46 Construction of Vehicular Underpass (VUP) at Daman Ganga ( Ch. 368.850 km) including Service road, Culverts and Minor bridge between Daman Ganga river and Mohan Gam railway for rectification of blackspots id GJ-(02)-066 on Surat-Vapi section of nh-8 (new NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Damanganga/2023 31.140 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 18:55Hrs
28/09/2023
Time 17:0Hrs
47 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_771496_1 4.280 MoRTH Maintenance Project OTHERS 13/09/2023
Time 15:0Hrs
28/09/2023
Time 15:0Hrs
48 Construction of by-pass road on NH-26 for Nabarangpur town in the state of Odisha on EPC Mode (Bid Ref No 21 CE NH of 2023-24

2023_MoRTH_759285_1 75.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2023
Time 18:55Hrs
28/09/2023
Time 12:0Hrs
49 “Construction of bypass to Titlagarh town from km 45.162 to km 52.678 including widening and strengthening from single lane/double lane to double lane with paved shoulder from km 44.000 to km 45.162 (missing link) of NH-59 in the state of Odisha on EPC mode (Bid Ref No.22 CE NH of 2023-24)”

2023_MoRTH_759286_1 92.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2023
Time 18:55Hrs
28/09/2023
Time 12:0Hrs
50 Improvement and up-gradation of newly declared National Highways NH-227B(84 Kosi Parikrama Marg)Package II Design Km29.000 (Sarpur) to Km47.878/47.800 (Gosaiganj)in the state of Uttar Pradesh on Engineering, Procurement and Construction(EPC) basis.

2023_MoRTH_758308_1 591.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 17:0Hrs
28/09/2023
Time 11:0Hrs
51 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) basis.

2023_MoRTH_749787_1 808.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
28/09/2023
Time 11:0Hrs
52 Construction of Paderu bypass Km 0.000 to Km 13.000 of 2 lane with paved shoulder on NH 516E in the state of Andhra Pradesh under NH O on EPC mode.

2023_MoRTH_766895_1 179.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2023
Time 16:0Hrs
27/09/2023
Time 17:0Hrs
53 Construction of four-lane with paved shoulder of Darbhanga (Dilli More) – Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the state of Bihar.

2023_MoRTH_764394_1 285.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 12:30Hrs
27/09/2023
Time 15:0Hrs
54 Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on EPC Mode

2023_NHAI_163935_1 640.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 15:0Hrs
27/09/2023
Time 15:0Hrs
55 Construction of new bridge over Sagada river at ch-192.030km on NH-26 including approaches in the state of Odisha on EPC mode (Bid Ref No.-14 CE NH of 2023-24)

2023_MoRTH_757381_1 19.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 18:55Hrs
27/09/2023
Time 12:0Hrs
56 Construction of new bridge over Ret river at Ch-149.753km on NH-26 including approaches in the state of Odisha on EPC mode. (Bid Ref No. 15 CE NH of 2023-24)

2023_MoRTH_757355_1 17.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 18:55Hrs
27/09/2023
Time 12:0Hrs
57 Short term maintenance work and activities on NH927D Jamnagar Dhoraji road Km 4/700 to 107/600 in the state of Gujarat under ordinary repairs under MandR head during 2023/2024

766501 25.730 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
58 Short term maintenance work btn km 0/0 to 66/0 on Khambhaliya Advana Porbandar of NH151AD in the state of Gujarat

766509 3.970 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
59 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

766507 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
60 Construction of Fly Over Including Junction Improvements @ km 348/6 – 349/8 of NH 67 (km 15/6 To 16/8 New NH 181) (Nagapattinam – Gudalur – Mysore Road) At Saibaba Colony Junction In Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_766679_1 46.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2023
Time 10:0Hrs
26/09/2023
Time 15:0Hrs
61 short term maintenance work btn km 0/0 to 45/400 on NH151K Porbandar Bhanvad Tranpatiya section in the state of Gujarat under ordinary repair under MandR head during 2023/2024

766512 2.200 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 12:0Hrs
62 Construction of Canal Bridge RCC Twin Box 2x 4.25m x 4.15m as a Deposit work at Canal Chainage Km 51.400 Main Canal of Pkg No 16 in Kaleshwaram Project by Box Pushing Method at NH Km 51.520 on Hyderabad Yadgiri Section of NH163

2023_NHAI_162561_1 3.770 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 11:0Hrs
26/09/2023
Time 11:0Hrs
63 Rehabilitation and Up gradation of Newly Declared National Highway Nandyala Kadapa Kurnool Border of Nh 167K to 2 lane with paved shoulders from Km 186.0 To Km 250.0 Design Ch.186.000 To Ch. 248.010 in Kurnool District in the State of Andhra Pradesh

2023_MoRTH_766050_1 514.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 10:0Hrs
25/09/2023
Time 17:0Hrs
64 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(3rd call)

Tender Notice No. 54/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 13:0Hrs
25/09/2023
Time 14:0Hrs
65 Construction of 4 lane Raniganj Bypass from km 273.000 of NH 60 (new NH 14) to km 478.18 of NH-2 (New NH 19) in Paschim Bardhaman, West Bengal in EPC Mode. (Job No. 014- WB-2022-23/514)

2023_MoRTH_745163_1 278.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 14:0Hrs
25/09/2023
Time 14:0Hrs
66 Widening to 2 lane with paved shoulder of Jareikela Jharkhand/Odisha Border Dhabaleswarsection from km 0.00 to km 25.450 of section of NH-320D in the state of Odisha on EPC Mode

2023_MoRTH_753089_1 163.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2023
Time 9:0Hrs
25/09/2023
Time 12:0Hrs
67 Improvement of Major Junction at ch. 152.000 (at Madhapur) on NH-57 in the state of Odisha on EPC mode” (Bid Ref No. - 11 CE NH of 2023-24)

2023_MoRTH_757108_1 3.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 18:55Hrs
25/09/2023
Time 12:0Hrs
68 Short Term maintenance work on section from Km. 629/400 to 642/400 of NH 56 Unai Vansda Section in the State of Gujarat under STMCM and R scheme

2023_MoRTH_771087_1 3.310 MoRTH Normal Highway Project OTHERS 11/09/2023
Time 18:55Hrs
25/09/2023
Time 12:0Hrs
69 REHABILITATION & UPGRADATION OF EXISTING ROAD BETWEEN KM 29.725 TO KM 60.550 (SURAITHOTA - MALARI) NHSL TO DOUBLE LANE SPECIFICATION ON JOSHIMATH – MALARI (NH-107B) ROAD ON EPC MODE IN THE STATE OF UTTARAKHAND (Length 30.825 Km).

2022_BRO_562362_2 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 18:0Hrs
23/09/2023
Time 11:0Hrs
70 Widening of 2L to 2LPS from Km.86/040 to 91.770 and 103/260 to 107/870Km. Of NH-0n EPC mode in the State of Odisha (Bid Ref. No. 28 CE NH of 2023-24

2023_MoRTH_763217_1 24.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
21/09/2023
Time 12:0Hrs
71 Design and Construction of 6 lane Standalone single span Grade Separated structure at Km. 532.552 on Gonde Vadape section of NH-3 New NH-848 in the state of Maharashtra balance work on EPC Mode

2023_NHAI_165326_1 49.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
21/09/2023
Time 11:0Hrs
72 Widening and strengthening of existing alignment from Km 64.70 to Km 72.119 and from Km 78.600 to Km 81.800 to 2L PS and construction of 2L PS Ramnagar By Pass from Km 72.119 to Km 78.600 of NH 116B in the District of Purba Medinipur in the State of West Bengal under Annual Plan 2022 23 in EPC Mode Job No 116B WB 2022 23 515

2023_MoRTH_745759_1 286.473 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:0Hrs
21/09/2023
Time 11:0Hrs
73 Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch. 0.000 to Garhani (at SH-12) at Ch 74.432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of Bihar on HAM Mode

2023_NHAI_163301_1 1,143.360 NHAI Normal Highway Project HAM 04/08/2023
Time 15:0Hrs
20/09/2023
Time 15:0Hrs
74 PR Btn Km 0/0 to 10/200 on NH351K Bagasara Hamapur road in the state of Gujarat under EPC mode for year 2022/2023

766494 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
20/09/2023
Time 12:0Hrs
75 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_770644_1 4.400 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 21:0Hrs
76 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_770638_1 6.080 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 15:0Hrs
18/09/2023
Time 15:0Hrs
77 Improivement/ Construction of 2-lane with hard shoulder of Askote-Lipulekh road from Tawaghat Village to Budhi Village (Design Km 56.935 to Km 95.748) and from end of tunnel portal to Kali Mandir (Design Km 113.828 to Km 133.078) (Total Design Length = 58.063 Km) under Project Hirak of BRO in the state of Uttarakhand under Bharatamala Pariyojna on EPC mode

2023_MoRTH_740109_2 274.960 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 11:0Hrs
18/09/2023
Time 15:0Hrs
78 Short Term maintenance work between Km. 535/500 to 566.900 of NH 56 Kelikuva Zankhwav Mandvi Section in the State of Gujarat

2023_MoRTH_770641_1 6.800 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
79 Short Term maintenance work between Km. 572.000 to 604.000 (Tarsada - Kanja - Vyara - Kapura Section) of N.H.-56 in the State of Gujarat.

2023_MoRTH_770643_1 6.790 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
80 Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 Songadh Bardipada Section of NH 953 in the State of Gujarat

2023_MoRTH_770633_1 3.300 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
81 Construction of FOB at 24 locations relating to six laning of Bangalore to Mysore Section from Km.18.000 to Km.135.304 of NH-275 in the State of Karnataka (Package-I &2) to be executed on EPC mode

NIT No.09/NHAI/RO-BNG/22016/Tender/2023-24 dated 16.08.2023 46.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2023
Time 15:0Hrs
18/09/2023
Time 11:0Hrs
82 Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800) (PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode

2023_MoRTH_767176_1 531.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/09/2023
Time 15:0Hrs
15/09/2023
Time 15:0Hrs
83 Construction of HL Major Bridge across Dahuka River at Km. 226.377(Design Chainage) of NH-57 including approaches in the state of Odisha on EPC mode

2023_MoRTH_755528_1 23.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 12:0Hrs
15/09/2023
Time 12:0Hrs
84 REHABILITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 (EXISTING CHAINAGE 136.00 TO KM 169.00) OF NH-309A IN THE STATE OF UTTARAKHAND.

2023_MoRTH_764734_1 349.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 18:35Hrs
15/09/2023
Time 11:0Hrs
85 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar.J0b No NH 327E BR 2022 23 67.

2023_MoRTH_766582_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 17:0Hrs
14/09/2023
Time 17:0Hrs
86 Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 of NH 309B (Almora-Panar-Ghat) Under Annual Plan 2020-21 in the State of Uttarakhand(Balance work)

2023_MoRTH_763260_1 21.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 15:0Hrs
14/09/2023
Time 15:0Hrs
87 Construction of new Four-lane Sambalpur Ring Road from Km. 0.000 to Km. 35.384 under Bharatmala Pariyojna on Hybrid Annuity Mode in the state of Odisha.

2022-NHAI-139947-1 947.310 NHAI Normal Highway Project HAM 29/12/2022
Time 18:44Hrs
14/09/2023
Time 11:0Hrs
88 Construction of Four Lane at existing road section of NH-30 (Old NH-24B) from km 82.650 to 83.880 (length-1.150 km), 84.635 to 98.750 (length-14.290 km), 103.660 to 107.260 (length-3.6 km), 111.390 to 115.425 (length-4.025 km), 124.345 to 130.445 (length-6.050 km), 133.155 to 161.450 (length-27.9 km) and Link road from 161.450 to 641.350 (length-6.156 km) of NH-2 for Raebareli to Prayagraj section in the State of Uttar Pradesh (Total length - 63.171 km) on EPC mode.

2023_NHAI_143873_1 981.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
14/09/2023
Time 11:0Hrs
89 “Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km. 39.000 (Design ch. 7.250 ) of NH-157 in the state of Odisha on EPC Mode (Bid Ref No - 20 CE NH of 2023-24)”.

2023_MoRTH_759284_1 123.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 18:55Hrs
13/09/2023
Time 12:0Hrs
90 DEVELOPMENT OF SIX LANE GREEN FIELD RING ROAD (PACKAGE-III) STARTS FROM DESIGN CH.51.200 TO DESIGN CH. 68.650 (LENGTH=17.450 KMS) AROUND KANPUR CITY AND CONSTRUCTION OF 4-LANE AIRPORT LINK ROAD (LENGTH = 1.45 KM) AT CHAINAGE 62.090 OF KANPUR RING ROAD IN THE STATE OF UTTAR PRADESH

2023_NHAI_142633_1 844.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 15:33Hrs
13/09/2023
Time 11:0Hrs
91 Widening to two lane with hard shoulder configuration of Kalimandir (Chainage Km 133.078) and Lipulekh (Chainage Km 159.479) road of NH-09 under Bharatmala Pariyojna in the state of Uttarakhand on EPC mode

2023_MoRTH_764115_1 216.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2023
Time 15:0Hrs
12/09/2023
Time 15:0Hrs
92 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode. 2ND CALL

2023_MoRTH_763783_1 10.640 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:30Hrs
11/09/2023
Time 17:30Hrs
93 Improvement of Lucknow Ayodhya Section of NH-28 New NH 27 from Existing km 8000 to km 68900 in the state of Uttar Pradesh on EPC ModePkgI

2023_NHAI_163075_1 237.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 14:0Hrs
11/09/2023
Time 15:0Hrs
94 Improvement & Rehabilitation of Lucknow Ayodhya Section of NH-28 New NH27 from Existing km 68900 to km 121600 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_163089_1 208.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
11/09/2023
Time 15:0Hrs
95 Construction of Fly Over Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction in Coimbatore City and including Accident Prone Spot Near Bala Hospital (Km 337) & Jai Shanthi Theatre (Km 335/8 ) & Shanthi Petrol Bunk (Km 335/10) in Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_763746_1 110.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 10:0Hrs
11/09/2023
Time 15:0Hrs
96 Treatment of 04 no. of Landslide Location (Location Ch. Km to 0.150 to km 0.310, Location Ch. Km 49.395 to km 49.535, Location Ch. 53.160 to km 53.500 and Location Ch. Km 66.860 to Ch. Km 67.020 on NH-134) from Dharasu to Yamnotri on NH-134 (Old NH-94)

2023_MoRTH_765806_1 43.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 15:0Hrs
11/09/2023
Time 12:0Hrs
97 Construction of Flyover at chainage Km 165.020 (Pastikudi) on NH-26 including approaches in the state of Odisha on EPC Mode.

2023_MoRTH_759698_1 26.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
11/09/2023
Time 12:0Hrs
98 Slope Stabilization Scheme at location of landslide at km 52.240 km of NH-110 (Old NH-55) at Tindharia, West Bengal & Permanent Restoration of damaged Road bench at km 42.80 of NH -110 (Old NH-55) under NH Division-IX in the district of Darjeeling West Bengal during the year 2022-2023. (Job No.110/WB/2022-23/ 517).

2023_MoRTH_748021_1 22.176 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/09/2023
Time 17:0Hrs
99 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_757254_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:0Hrs
07/09/2023
Time 15:0Hrs
100 Construction of Bypass to Madurai - Achambathu - Viratipathu in between km 6/850 to 10/382 of NH 49 Extn. (New NH 85) including Land Acquisition on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2023_MoRTH_762850_1 113.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2023
Time 15:0Hrs
05/09/2023
Time 15:0Hrs
101 Realignment from Km 227.770 to 227.970, Km 233.260 to 233.980 Km, Km 234.090 to 234.860 Km, Km 235.980 to 236.770 Km of NH-26(Missing section of Bhawanipatna- Koksara Stretch) on EPC mode in the state of Odisha(Bid Ref.No. 27CE of 2023-24).

2023_MoRTH_763207_1 16.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
05/09/2023
Time 12:0Hrs
102 Widening and Strengthening to four lane of Gorantla Hindupur section of NH 716G from km 120 300 Design Chainage to km 153 880 Design Chainage Package 03 under NH O under Annual Plan 2022 23 on EPC mode in the State of Andhra Pradesh A P 2022 23

2023_MoRTH_762341_1 540.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 10:0Hrs
04/09/2023
Time 17:0Hrs
103 Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locationsunder EPC mode.(Asper DPR submitted by THDC) under AnnualPlan2022-23in the State Of Uttarakhand

2023_MoRTH_763547_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
104 Treatment of sinking zone in Kaladhungi-I(69.880 to 69.980),Kaiadhungi- II (70.540 to 70.610) and Rampur (71.440 to 71.520) of NH-109(New NH-107) in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_765040_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
105 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_764621_1 4.280 MoRTH Maintenance Project OTHERS 01/08/2023
Time 15:0Hrs
02/09/2023
Time 16:0Hrs
106 Rehabilitation Upgradation and reconstruction of existing intermediate lane to 2-lane with paved shoulders configuration Barna River to Ken River length 34.000 km on Gulganj-Amanganj-Pawai-Katni NH-43 Ext. in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751230_1 234.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 15:0Hrs
01/09/2023
Time 17:30Hrs
107 Rehabilitation and Upgradation of existing intermediate lane to 2 lane with paved shoulders from Km 0.600 Gulganj Bypass on NH-34 to Km 43.000 Barna River, length 42.400 Km on Gulganj- Amanganj- Pawai-Katni NH-43 Ext. in the State of Madhya Pradesh

2023_MoRTH_751224_1 190.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
01/09/2023
Time 17:30Hrs
108 Slope Protection and Landslide Mitigation at 5 Vulnerable Locations (km 6.20 to km 6.95 (Hill and Valley side), km 7.10 to km 7.25, km 21.40 to km 21.65, km 22.20 to km 22.300) within Sevoke-Rangpoo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (JobNo.010/WB/2022-23/519).

2023_MoRTH_748031_1 65.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 15:0Hrs
31/08/2023
Time 17:0Hrs
109 Slope Protection and Landslide Mitigation at 8 Vulnerable Locations (km 3.75 to km 3.90 km 8.21 to km 8.36, km 11.393 to km 11.628, km 33.35 to km 33.70, km 38.95 to 39.220, to km 44.903 to km 45.078, km 48.490 to km 48.560 and km 49.310 to km 49.570) within Sevoke-Rangpo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (Job No.010/WB/2022-23/520).

2023_MoRTH_748011_1 89.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 18:0Hrs
31/08/2023
Time 17:0Hrs
110 CONSTR OF RD HANLE ZURSAR IMISLA FROM KM 0.00 TO KM 48.002(ESISTING RD OF 20.800 KM AFTER KM 38.955 AND NEW RD OF 9.047 KM STARTS AFTER EXISING RD ON 20.800 KM) ESISTING TRACK TO NHSL SPECS OF EPC MODE (NET LENGTH 48.002 KMS)

2023_BRO_607681_1 162.200 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 18:0Hrs
31/08/2023
Time 11:0Hrs
111 2-lane with paved shoulder of Ashapur to Rudhy (Betul – Khandwa Pkg – IV) from Design CH. km 114.000 to km 149.000 in State of MP on EPC mode

2023_NHAI_159721_1 264.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
112 Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha

Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha 1,381.330 NHAI Normal Highway Project HAM 18/10/2022
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
113 IRQP work of NH131A from Km 1.900 to 29.120 Existing Portion for the year 2023 24 on EPC mode in the state of Bihar.

2023_MoRTH_760380_1 30.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
28/08/2023
Time 17:0Hrs
114 PR work from km 193 to 233 (41 km) and Provision of “THRIE” Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 EPC

2023_MoRTH_764275_1 19.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 15:0Hrs
28/08/2023
Time 12:0Hrs
115 RFP for the work of Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Package I, Design Km 228.920 (Jagarnathpur) to Km 235.960/0.000 (Makhauda Dham) to Km 29.000 (Sarpur) in the State of Uttar Pradesh

2023_MoRTH_764348_1 384.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2023
Time 15:0Hrs
28/08/2023
Time 11:0Hrs
116 Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC

157225 485.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 18:0Hrs
28/08/2023
Time 11:0Hrs
117 Construction of proposed ROB and its approaches in replacement of existing Level Crossing No 21X at Ch 107/500 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_760920_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2023
Time 10:0Hrs
28/08/2023
Time 11:0Hrs
118 Widening Carriageway width along with construction of footpath from km 69.00 to km 71.40, Permanent Restoration of depressed road bench at km 60.480 and Restoration of Valley side protection wall at km 60.950 in between km 60 to km 61 & Repair & Rehabilitation of Panchanai bridge at km 75.030 of NH-110 (Old NH-55) in the district of Darjeeling West Bengal during the year 2022-2023 (Job No.110/WB/2022-23/ 521) – 2nd call.

2023_MoRTH_763903_1 16.686 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:0Hrs
26/08/2023
Time 17:0Hrs
119 Short Term Maintenance Ordinary Repairs from km 396/2 – 404/7, km 428/0 – 430/8 & km 431/4 – 434/4 of NH 181 (old NH-67) under OR (DPP) 2022-23- in the State of Tamil Nadu

2023_MoRTH_763497_1 1.610 MoRTH Maintenance Project OTHERS 24/07/2023
Time 10:0Hrs
25/08/2023
Time 15:0Hrs
120 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode.

2022_NHAI_139085_1 972.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
121 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 (design length 14.980 km) (Package 3 under Phase I) in the state of UP on EPC mode under Bharatmala Pariyojna

2022_NHAI_139094_1 600.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
122 Widening to two lane with paved shoulder from Km 34/250 to Km 71/675 of Khammam-Kurvi section of NH365A in the State of Telangana

2023_MoRTH_757978_1 322.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
22/08/2023
Time 15:0Hrs
123 Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 in the state of Himachal Pradesh Sh Formation cutting from Km 347 250 to 347 520 C o R wall and edge wall with steel dowels from km 347 250 to 347 270 and 347 600 to 347 690 C o artificial tunnel from km 347 270 to 347 520 MT work and thrie beam crash barriers from km 347 250 to 347 690 and C o drain from km 347 250 to 347 720 in the state of Himachal Pradesh

2023_MoRTH_759731_1 36.070 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
22/08/2023
Time 11:0Hrs
124 Balance Works of Four laning of Nerchowk- Pandoh section of NH-21 from Km 190.000 to Km 211.035 (Design Chainage) in the State of Himachal Pradesh under residual NHDP on EPC Mode

2022_NHAI_138129_1 404.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
22/08/2023
Time 11:0Hrs
125 Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo-Solan section of NH 22 (now NH 5) on EPC mode in the State of Himachal Pradesh (HP)

2023_NHAI_146839_1 121.750 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 15:0Hrs
22/08/2023
Time 11:0Hrs
126 Widening and Strengthing of Existing Highway 2L PS (10M) in Km 0/00 to 21/500 ( NH 548 C Kuslamb to Nh 52 Yedshi) section of NH 63 ie Barshi - Yedshi - Murud - Latur - Renapur - Udgir - Deglur - Sargoli ) in the state of Maharashtra through (EPC) Contract

2023_MoRTH_758755_1 39.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2023
Time 15:0Hrs
21/08/2023
Time 17:30Hrs
127 Widening to 4 Lane with paved shoulder Configuration of Vodarevu Chilakaluripet Section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh under Annual Plan 2022 23

2023_MoRTH_759123_1 825.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 17:0Hrs
21/08/2023
Time 17:0Hrs
128 Widening to 2 lane with paved shoulders from 0.00 to 32.970 of Adilabad-Bela section of NH-353B in the State of Telangana

2023_MoRTH_757888_1 360.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
129 Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 (Green Field Alignment) of NH-930P in the State of Telangana

2023_MoRTH_758290_1 405.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
130 Permanent Improvement of Black Spot (TN-(02)-635) at New Cinema junction @ Km 62/4-63/0 by Providing additional high level bridge @

2023_MoRTH_759739_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
21/08/2023
Time 11:0Hrs
131 Construction Of Six Lane Flyover at the Junction Of Kandari Chokdi (Ch. 149.440) And Luvara Patiya (Ch. 186.640) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Kandari-Luvara/2023 57.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2023
Time 18:55Hrs
19/08/2023
Time 17:0Hrs
132 RFP for the work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH-730S (Maharajganj , Nichloul , Thuthibari) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_744967_1 543.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 18:0Hrs
18/08/2023
Time 11:0Hrs
133 Widening from Two Lane Paved Shoulder to Four Lane with Paved Shoulder Km 81/300 - 86/630, Km 88/600 - 90/550, Km 90/550 - 90/850 (RHS) Km 90/850 - 96/300 & 97/600 - 110/700 of NH-81 (Old NH-67 - Km 221/600 - 234/700, Km 236/000 - 241/450, Km 241/450 - 241/750(LHS), Km 241/750 - 243/700 & Km 245/670 - 251/000) and Strengthening from Km 81/300 - 86/500 and Km 87/600 - 96/300 of NH-81 (Old NH-67 Km 236/000 - 244/700 and Km 245/800 - 251/000) of NH-81 (Coimbatore - Chidambaram Section) (Old NH- 67) (Nagappattinam-Guddalur-Mysore Road) on EPC mode in the State of Tamil Nadu

2023_MoRTH_762713_1 103.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2023
Time 15:0Hrs
17/08/2023
Time 15:0Hrs
134 Six Laning and Strengthening of km 340.000 to km 403.400 of Hubli Haveri section of NH 48 Old NH 4 in the State of Karnataka to executed on EPC Standard mode - Construction of LVUP at Kursapur Km.361.900, Service road at Varur Km.391.760 and Structure of VOP at Chabbi Km.392.600 on EPC mode.

7/NHAI/RO-BNG/14016/Tender/2023-24 dated 28.06.2023 24.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
16/08/2023
Time 11:0Hrs
135 Construction of I ROB with approaches at Bhaiyachowk and SR on Sangli Solapur II VUP at Yawali incl SVUP on Pune Solapur PkgII III VUP with street light work on SolapurYedshi IV SR and widening of Box culvert on Akkalkot Solapur in Maharashtra on EPC

2023_NHAI_158889_1 102.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 11:0Hrs
16/08/2023
Time 11:0Hrs
136 PR Work from ch.93.612 to ch.98.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760578_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
137 PR Work from Ch.98.00 to ch.112.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760579_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
138 CONSTR OF RD LUKUNG CHARTSE NEW TO NHSL SPECS INCDL LA FA WLC FM KM 0.000 TO KM 37.398 UNDER 51RCC 50TF PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 37.398 KM)

2023_BRO_601696_1 153.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 18:0Hrs
11/08/2023
Time 11:0Hrs
139 Construction of Dubrajpur Bypass with 4 lane configuration of length 5.676 km on NH 60 (new NH 14) from design chainage 0.00 (existing km 316.135 on NH 60) to design chainage 5.676 (existing km 320.980 on NH 60) in the district of Birbhum, West Bengal in EPC Mode.(JobNo014-WB-2022-23/518)

2023_MoRTH_747726_1 278.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 16:0Hrs
10/08/2023
Time 14:0Hrs
140 New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752381_1 199.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/05/2023
Time 17:30Hrs
09/08/2023
Time 17:30Hrs
141 Widening to two lane with paved shoulders of Sangameswaram Nallakaluva Velugodu Nandyal section from Km. 93.819 to 124.530 141.700 to 173.560 of NH 167K in the State of Andhra Pradesh under Annual Plan 2022 23 on EPC mode under NH O

2023_MoRTH_759155_1 550.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 11:55Hrs
09/08/2023
Time 17:0Hrs
142 One time Improvement of existing bypass road from Km 64/000 to 65/620 (Bhojpur) (Total length 1.62 Km) of NH 52 in the state of Madhya Pradesh under EPC mode under NH (O)

2022_MoRTH_726216_1 4.220 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 17:30Hrs
07/08/2023
Time 17:30Hrs
143 Wideing and strengthening to NH-26 from Km. 367/480 to 376/480 Km in the State of odisha under EPC mode

2023_MoRTH_757478_1 37.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 15:0Hrs
05/08/2023
Time 12:0Hrs
144 Widening of Kondamodu to Perecherla Section Design Ch. Km 0.00 to Km 49.917 of NH 167AG to 4 Lane with paved shoulder Configuration on EPC Mode in the state of Andhra Pradesh under AnnuaI Plan 2022 23

2023_MoRTH_757082_1 699.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 10:0Hrs
03/08/2023
Time 17:0Hrs
145 HILL SLOPE STABILIZATION AT KM 28.990, KM 29.500, KM 30.800,KM 31.900, KM 32.300, KM 32.500, KM 33.500, KM 34.400 & KM 35.600 ON MELYAL-PHARKIYAN GALI-DATT BRIDGE ROAD IN THE SECTOR OF 109 RCC32BRTF PROJECT BEACON IN J&K UT EPC MODE

CE (P) BCN/EPC/07/2023-24 26.770 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 17:30Hrs
03/08/2023
Time 12:0Hrs
146 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 0.00 TO KM 30.00 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.00 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT)

2023_BRO_604241_1 112.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
147 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 30.00 TO KM 60.540 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.540 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT) PACKAGE II

2023_BRO_604288_1 104.190 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
148 Long Term Rectification Construction Of Three Lane River Bridge At Bhukhi Khadhi Ch. 176.420 And Amravati Khadi Ch. 202.845 Additionally Construction Of Service Road From Chainage 114.470 To 116.180 Vadodara Bharuch And Chainage 186 885 To 190.675 Bharuch Surat For Blackspots On Vadodara - Surat Section Of Nh-8 New Nh-48 In The State Of Gujarat on EPC Mode

NHAI/RO-GNR/Bhukhi-Amravati/NH-48/June/2023 52.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:55Hrs
02/08/2023
Time 17:0Hrs
149 Short term maintenance under OR (DPP) works for Supplying of machineries as hire basis with drivers, cleaners staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along with Cutting of road side Jungle and clearance of drain & Blockage of Culverts from km 591.00 to km 598.00 of NH-31 (New NH-10 & 17) under NH Division - IX in the Districts of Darjeeling and Kalimpong - (Job No. TA/10-17/WB/2023-24/815).

2023_MoRTH_762403_1 0.670 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 13:45Hrs
01/08/2023
Time 17:0Hrs
150 Beautification works of Highway Stretch from Km 199.660 to 210.350 of Agra- Etawah (NH-19) on EPC Mode

2023_NHAI_162169_1 5.240 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 18:0Hrs
01/08/2023
Time 11:0Hrs
151 Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751238_1 299.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
31/07/2023
Time 17:30Hrs
152 Periodical renewal work in km 8/540 to 10/340 on NH-86 Extn. in the state of MP under EPC mode

2023_MoRTH_752483_1 4.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 17:30Hrs
28/07/2023
Time 17:30Hrs
153 Construction of an additional two lane bridge with approaches at km 249/6 of NH-948 (old NH-209) (Bangalore-Coimbatore section) on Engineering, Procurement & Construction (EPC) basis contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757443_1 7.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
154 Improvements to existing paver block carriageway from Km 429/2 – 430/8 and Km 433/2 (Selected Stretches), providing safety measures at vulnerable locations at Km 397/2, 397/4, 398/4, 398/6, 399/4, 399/6, 399/10, 400/2, 400/4 & 400/10 including CD works & protective works, Construction of Box Culverts at Km 428/003, 428/392, 432/284, 432/325 and improvements to Charring Cross Junction (Udhagamandalam) from Km 430/8 – 431/4 of NH 67 (New NH-181) on EPC Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757466_1 32.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
155 CONSTRUCTION OF 2 LANE 386 MTR SPAN (260 PLUS 63 PLUS 63) EXTRADOSED BRIDGE OVER RIVER SIANG AT DESIGN KM 2 PLUS 908 AND 63 POINT 50 MTR SPAN MAJOR BRIDGE AT DESIGN KM 2 PLUS 590 IN BETWEEN KM 118 POINT 8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93 POINT 50 ON DITTE DIMME MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE ON EPC MODE

2023_BRO_586892_1 118.350 BRO Special Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 18:0Hrs
28/07/2023
Time 11:0Hrs
156 Short term maintenance under OR (DPP) works for supplying of machineries on hire basis with drivers, cleaners’ staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along road & cutting of road side Jungle and clearance of drain & blocked culverts from km 0.00 (Sevoke) to km 52.10 (Rangpoo) of N H -10 (Old NH 31A) under NH Division No. IX, P. W. (Roads) Directorate during the year 2022-2023 (Job No. TA/10/WB/2022-23/813) - (3rd call).

2023_MoRTH_760452_1 4.437 MoRTH Maintenance Project OTHERS 05/07/2023
Time 15:5Hrs
27/07/2023
Time 17:0Hrs
157 Shifting and Fixing of 24.00 M. Span Steel Girder Bailey Bridge in Km 220 Ch. 219.400 with Widening of Existing Road in Km. 219.200 To 219.600 and including Widening of Railway Crossing 1 - BRR at Shyampur Near Rishikesh on NH - 58 (New No.-34 ) in The State of Uttarakhand Under Annual Plan 2023-24

2023_MoRTH_761276_1 4.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2023
Time 15:0Hrs
27/07/2023
Time 12:0Hrs
158 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode - 2nd call

2023_NHAI_157520_1 620.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
27/07/2023
Time 11:0Hrs
159 HILL SLOPE STABILIZATION AT KM 32.500 KM 34.770 KM 35.090 AND KM 35.250 ON KASTWAR NILDORI LOKUT BUNGUS DRANGARI ROAD IN THE SECTOR OF 109 RCC 32 BRTF PROJECT BEACON IN J AND K UT EPC MODE

CE (P) BCN/EPC/08/2023-24 41.340 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 15:0Hrs
26/07/2023
Time 15:0Hrs
160 Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752770_1 272.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
25/07/2023
Time 17:30Hrs
161 Strengthening from km 0/000 to 1/500 & km 30/830 – 32/230 of NH 383 (Kottampatti – Thiruppathur Section) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_756828_1 9.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 15:0Hrs
25/07/2023
Time 15:0Hrs
162 Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode

2023_NHAI_148546_1 125.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:0Hrs
25/07/2023
Time 15:0Hrs
163 Construction of 4 Lane With PS Pattan Bypass From Existing Km 24.320 To Km 33.760 nd Dsgn Km 24.400 To Km 35.300 Length 10.900 Km On Road SBU NH01 in Ut JK Under Project Beacon Bro on EPC Mode

2023_MoRTH_756891_1 432.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 15:0Hrs
25/07/2023
Time 9:0Hrs
164 Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2023_MoRTH_751211_1 81.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
24/07/2023
Time 17:30Hrs
165 Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode

2023_MoRTH_756989_1 111.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 17:0Hrs
24/07/2023
Time 17:0Hrs
166 Rehabilitation and upgradation to 2 lane with paved shoulders from Design Ch. Km 248/010 to 269/900 i.e., Kurnool/Kadapa border Jammalamadugu. Section of NH167K in the state of Andhra Pradesh on EPC mode under Annual Plan

2023_MoRTH_755438_1 244.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 15:0Hrs
167 Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode

2023_MoRTH_753562_1 64.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2023
Time 9:0Hrs
24/07/2023
Time 12:0Hrs
168 Construction of Baghamari By-pass on NH-57 from Km 281/700 to Km 285/330 in the state of Odisha on EPC Mode (Bid Ref No.-10 CE NH of 2023-24)

2023_MoRTH_756892_1 41.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 18:55Hrs
24/07/2023
Time 12:0Hrs
169 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_759010_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2023
Time 15:0Hrs
24/07/2023
Time 12:0Hrs
170 Construction of 37 50 mtr span Bridge at Karian RD 113 550 on NH 154A and Construction of 14 mtr span Bridge at Kalsuin RD 125 400 on NH 154A in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755491_1 12.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 11:0Hrs
171 Construction of two Lane RUB in lieu of existing railway level Crossing No 96 C 2 E at Railway Km 119 3 4 on NH 503A at Km 20 690 in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755545_1 14.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 18:0Hrs
24/07/2023
Time 11:0Hrs
172 Design and construction of crossing facility of VUP at 4 locations viz i Kikvi Village Km 801 080 ii Harischandri Km 806 020 iii Shivare km 817 360 iv Khedshivapur km 820 340 and FOB at 863 200 on Pune Satara Section of NH 4 from km 725 000 to 865 350 in the State of Maharashtra on EPC Mode

2023_NHAI_155058_1 52.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 9:0Hrs
24/07/2023
Time 11:0Hrs
173 Construction of 2-lane with paved shoulder configuration of Shujalpur Bypass, from Km 33/100 to 43/570, design length 10.47 Km section of NH-752C in the State of Madhya Pradesh under EPC mode

2023_MoRTH_752714_1 101.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
21/07/2023
Time 17:30Hrs
174 Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project BEACON BRO on EPC Mode

2023_MoRTH_756528_1 456.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 16:0Hrs
20/07/2023
Time 15:0Hrs
175 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_760041_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 15:0Hrs
19/07/2023
Time 14:0Hrs
176 Improvements to Riding Quality at km 32 000 33 400 km 35 640 37 000 km 47 000 57 400 km 59 200 64 400 km 68 800 77 200 km 83 600 84 000 km 84 400 95 000 km 95 400 96 200 Tuticorin Tiruchendur Kanyakumari section of NH 32

2023_MoRTH_758113_1 39.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 17:35Hrs
19/07/2023
Time 11:0Hrs
177 Maintenance of NH-76E Km.400.878 to 450.00 and NH-96 Km 153.330 to 154.010 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Prayagraj in the State of Uttar Pradesh

2023_MoRTH_761147_1 1.310 MoRTH Normal Highway Project OTHERS 10/07/2023
Time 17:0Hrs
18/07/2023
Time 17:0Hrs
178 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana (2nd call)

NHAI/Tech/BM/Pathankot Link Road/ 2nd Call/ 2023 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 11:0Hrs
18/07/2023
Time 11:0Hrs
179 Construction of 6-lane Flyover at Km.518.440 (Mouda Y-Junction) on Nagpur-Wainganga Bridge Section of NH-53 from Km.517.655 to Km.519.100 in the State of Maharashtra on EPC Mode

2022_NHAI_141737_1 62.590 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
18/07/2023
Time 11:0Hrs
180 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode

2023_MoRTH_751766_1 10.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2023
Time 17:30Hrs
17/07/2023
Time 17:30Hrs
181 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar

2023_MoRTH_756199_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 17:0Hrs
17/07/2023
Time 17:0Hrs
182 Rehabilitation/Upgradation from Lagam to Alapalli section (km 199/400 to km 227/400) (Length = 28 km) to 2L-PS / 4 lane configuration section of NH-353 C (Sakoli - Wadsa - Armori - Gadchiroli - Ashti - Alapalli - Sironcha Road) in Gadchiroli District in the state of Maharashtra on EPC mode

2023_MoRTH_734259_1 324.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
17/07/2023
Time 17:0Hrs
183 Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 from Km 0.000 to Km 15.972 (Total length 15.972 km) of NH 333C in the State of Bihar (Job No- NH-333C-BR-2022-2023-72)

2023_MoRTH_750242_1 101.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
17/07/2023
Time 15:0Hrs
184 Construction of Six Lane VUP at Karan (Ch. 263.350) [GJ-(02)-24] and Sarodhi (Ch. 330.500) (GJ-(02)-29) for Rectification of Blackspots on Surat- Dahisar Section of NH-8 (New NH- 48) in the State of Gujarat on EPC Basis

NHAI/RO-GNR/NH‐48/Blackspot/VUP/June-2023/ 55.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 11:30Hrs
14/07/2023
Time 12:0Hrs
185 Widening to Two lane with paved shoulders from Km 106/830 to 158/496 of Yellareddy-Rudrur Section of NH-765D in the State of Telangana on Engineering, Procurement and Construction (EPC) Basis

[2023_MoRTH_755359_1 402.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/05/2023
Time 15:0Hrs
13/07/2023
Time 15:0Hrs
186 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_756893_1 5.260 MoRTH Maintenance Project OTHERS 08/06/2023
Time 18:30Hrs
12/07/2023
Time 15:0Hrs
187 Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I- Package-VIII)

NHAI/BM/VME/2023/Pkg8 1,403.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
188 Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I-Package IX)

NHAI/BM/VME/2023/Pkg9 970.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
189 Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode.

2023_MoRTH_752196_1 474.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/05/2023
Time 17:0Hrs
10/07/2023
Time 17:0Hrs
190 Widening to 2 lane with paved shoulders from Km 62/920 to Km 106/830 of Medak - Yellareddy Section of NH-765D in the state of Telangana on Engineering, Procurement and Construction (EPC) Basis

2023_MoRTH_755197_1 307.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2023
Time 15:0Hrs
10/07/2023
Time 15:0Hrs
191 STRENGTHENING AND WIDENING OF NH-251 FROM KM 11.000 TO KM 22.770 IN DIU. (5th Call)

Tender Notice No. 19/RFPNH251DIUan/2023-24 73.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2023
Time 18:45Hrs
06/07/2023
Time 16:0Hrs
192 Construction of Tadipatri Bypass (Km 0/000 to Km 6/285) of 4 Lane on NH67 in Anantapuramu district of Andhra Pradesh state under NH(O).

2023_MoRTH_752843_1 122.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 15:40Hrs
06/07/2023
Time 15:0Hrs
193 Shifting & fixing of 24.00 M span Steel Girder Bailey Bridge in km 220 Ch. 219.400 with widening of existing road from km. 219.200 to 219.600 including widening of Railway Crossing 1- BRR at Shyampur new Rishikesh on NH-58 (New No. 34) in the State of Uttarakhand under Annual Plan 2023-24.

2023_MoRTH_758580_1 4.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/06/2023
Time 15:0Hrs
06/07/2023
Time 12:0Hrs
194 Balance work of rehabilitation and construction of Barela Mandla section of NH-30 from km 22/8 to 89/6 (length - 63.55 Km) two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2023_MoRTH_745062_1 53.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 17:30Hrs
05/07/2023
Time 17:30Hrs
195 Rehab and upgradation work for double lane with paved shoulder on Gangotri Dharasu road between Km 95.287 to Km 100.30 on NH 34

2023_BRO_583664_1 54.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
196 REHABILITATION & UP GRADATION OF EXISTING ROAD BETWEEN KM 86.120 TO KM 95.287 (DESIGN CHAINAGE KM 73.730 TO KM 81.800) SINGLE LANE TO DOUBLE LANE WITH PAVED SHOULDER SPECIFICATION ON GANGOTRI-UTTARKASHI-DHARASU ROAD (NH-34) ON EPC MODE IN THE STATE OF UTTARAKHAND (DESIGN LENGTH 8.07 KM)

2023_BRO_587942_1 134.440 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
197 Construction of Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH-26 in the state of Odisha on EPC mode

2023_MoRTH_753072_1 115.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 18:55Hrs
04/07/2023
Time 12:0Hrs
198 Upgradation/Strengthening of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch. 161.000 (Existing Km. 484.300) in Jitnagar Village in Nandod Taluka to Ch. 179.780 (Existing Km. 506.660) in Bitada/Movi Village in Netrang Taluka (Length 18.780 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode [Package IV (B)]

2023_NHAI_154362_1 971.850 NHAI Normal Highway Project HAM 17/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
199 Construction of Underpass at Sohal Town on Pathankot - Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode

2023_NAHI_153883_1 28.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
200 Providing Service Road on Panve lMahad Panji Road NH 66 Km. 406/030 to 450/170, Road Safety PanvelMahadPanji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EPC mode

2023_MoRTH_751367_1 3.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
201 Panvel-Mahad-Panji Road NH-66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Construction of vehicular underpass in km existing ch 466/650 at Khamdeo Naka in the village Insuli, Construction of vehicular underpass in km existing ch 450/370 at Zarap - Sawantwadi Junction, in Sindhudurg district in the State of Maharashtra on EPC Mode

2023_MoRTH_751635_1 67.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
202 Construction of Service Roads in stretches, pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332/200 to 406/030, on Panvel Mahad Panali Road NH-66 under Road Safety Annual Plan 2022-23 in the state of Maharashtra on EPC mode

2023_MoRTH_752283_1 14.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
203 Panvel-Mahad-Panji Road NH66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Whitetoping work in stretches from Km. 450/170 to Km. 52/000 and Km. 455/330 to Km. 460/000 and Service Road of 4.09 Km. in Sindhudurg istrict in the State of Maharashtra on EPC mode.

2023_MoRTH_751715_1 38.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
204 Widening to 2-lane with Paved shoulders of Dornala to Kunta Junction from Design Chainage Km 244.000 to Km 267.990 (Existing Km.244.000 to 268.700) section of NH-765 (Package-2) in the State of Andhra Pradesh on EPC mode for the year 2022-23

2023_MoRTH_750753_1 180.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2023
Time 15:0Hrs
03/07/2023
Time 15:0Hrs
205 Widening & strengthening to two lane with paved shoulder from Km 59/594 to 60/042 & Km 60/292 To 63/400 (Missing section of Rairangpur to Jashipur section) of NH-220 in the State of Odisha on EPC basis.(Bid Ref No 02 CE NH of 2023-24)

2023_MoRTH_752792_1 27.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 18:55Hrs
03/07/2023
Time 12:0Hrs
206 Construction of New Minor Bridge across Jeriguda Nallah at Km 297.520 (Design Chainage) of NH-326 including approaches in the state of Odisha on EPC Mode

2023_MoRTH_752772_1 7.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 18:55Hrs
03/07/2023
Time 12:0Hrs
207 Const of 4L EC and atgrade improve from 0.0 to 19.87 of Danapur Bihta with connectivity to existing RoB 1.35 Km ramps and atgrade improvements to 4L and Upgrade of existing 2L-4L from 19.87-23.5 of Bihta Koilwar in Bihar on EPC (2nd Call)

2023_NHAI_153034_1 3,146.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:10Hrs
03/07/2023
Time 11:0Hrs
208 Rehabilitation -Upgradation of Karanja - Kherda - Murtizapur Section to 4 LPS from Design km 74.351 to km 102.331 (Excluding overlapping portion with Samruddhi Mahamarg from Design Km 76.380 to 78.280) section of NH 361C

2023_MoRTH_750199_1 594.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 15:0Hrs
30/06/2023
Time 17:0Hrs
209 Four Laning with paved shoulders from Km 29 00 to Km 36 25 Section of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu Road NH 703A 7 25 Kms under NH Division Jalandhar on EPC Mode in the State of Punjab for the year 2022 23

2023_MoRTH_745933_1 48.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 15:30Hrs
30/06/2023
Time 11:0Hrs
210 Short term maintenance under OR (DPP) works for removal of land slide materials and soft rock cutting etc in hilly region & cutting of road side Jungle and clearance of drain & blocked Culvert from km 0.00 to km 77.00 of NH 110(Old NH-55) under NH Division -IX during the year 2022-2023 (Job No. TA/110/WB/2022-23/814). (2nd Call).

2023_MoRTH_756527_1 2.292 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 9:5Hrs
28/06/2023
Time 17:0Hrs
211 Widening to two lane with paved shoulder of Chintoor to Motu section of NH326 from km 0 to Km 9.6 Design Chainage KM 0 to Km 8.345 in the state of AP on EPC mode under Annual Plan 2022-23

SENHVJA/27/2023-24 Dated.28.02.2023 84.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
28/06/2023
Time 15:0Hrs
212 Construction of Dadwindi realignment starting from existing Km 36 250 and terminating at existing Km 38 650 including 2 lane ROB on NH 703A on EPC mode in the State of Punjab

2023_MoRTH_748334_1 67.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 1:0Hrs
28/06/2023
Time 11:0Hrs
213 PR Work FROM K.M. 139 TO 157/6 ON NH-934 SAGAR-BINA ROAD (TOTAL LENGTH 17.320 KM) EXCEPTING 1.22 KM. ROB PORTION in the State of Madhya Pradesh on EPC Mod

2023_MoRTH_739573_1 13.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
214 P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode

2023_MoRTH_739570_1 7.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
215 Rehabilitation and upgradation of existing road between Km 29.725 to Km 60.55 Suraithota Malari NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_562362_1 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 17:0Hrs
26/06/2023
Time 18:0Hrs
216 HILL SLOPE STABILIZATION AT KM 14.00,17.50,17.700,76.00 & KM 76.300 ON ROAD BANDIPORA-GUREIZ UNDER PROJECT BEACON IN J&K (UT) (EPC MODE)

CE (P) BCN/05/2023-24 23.120 BRO Special Project EPC (Lump Sum/Item Rate Contract) 17/06/2023
Time 10:0Hrs
24/06/2023
Time 15:0Hrs
217 Construction of ROB at Railway in line of LC165B km 921.450 Between Chondi Basmat Bhendegaon Stations Chainage at 60.780 Length from Km 60.179 to 61.278 1.099 km in the State of Maharashtra on EPC Mode

2023_MoRTH_749558_1 44.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:0Hrs
23/06/2023
Time 17:30Hrs
218 Maintenance of NH NH 28B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758180_1 1.520 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
219 Maintenance of NH 227A, NH 727A and NH 727B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758190_1 1.900 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
220 Maintenance of NH 328 and NH 730S under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758197_1 1.960 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
221 Treatment of sinking zOne in Kaladhungi-I(69.880 to 69.980),Kaiadhungi-II (70.540 to 70.610) & Rampur(71.440 to 71.520) of NH-109(New NH-107)in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_753584_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
22/06/2023
Time 12:0Hrs
222 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from Design Ch 0/0 to 58/115 to two lane with paved shoulder configuration in the state of Gujarat total length 58/115 Km

754715 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2023
Time 16:0Hrs
22/06/2023
Time 12:0Hrs
223 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_751503_1 35.374 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2023
Time 18:15Hrs
20/06/2023
Time 11:0Hrs
224 One Time Improvement of existing carriageway in Deoli Town with white topping (Length 3.200 Km.) on Yavatmal to Wardha Section of NH-361 in the State of Maharashtra on EPC Mode

2023_NHAI_152877_1 24.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 13:0Hrs
20/06/2023
Time 11:0Hrs
225 Construction of Four Lane Greenfield National Highway in the State Of Bihar Starting From NH-30 Near Saristabad (Patna) To Nathupur (Project End Point of Patna-Gaya-Dobhi Section of NH-83) [2.8km] To Connect Missing Link of Patna-Gaya-Dhobi Corridor in the State of Bihar on EPC Mode

2023_NHAI_148546_1 124.180 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:55Hrs
19/06/2023
Time 17:0Hrs
226 providing Road safety and flood damage repair from Km 54 00 to 60 800 on Jalandhar Kapurthala Sultanpur Lodhi Dadwindi Lohian Makhu Road NH 703A in the state of Punjab on EPC Mode

2023_MoRTH_747129_1 13.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 12:30Hrs
19/06/2023
Time 11:0Hrs
227 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat

2023_MoRTH_754522_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 16:0Hrs
17/06/2023
Time 16:0Hrs
228 Strengthening of NH 68 from Km 297.100 to 307.515, 328.257 to 329.600, 346.700 to 369.700 and 387.700 to 407.700 Section Khoda border- Mesra road, Budhanpur-Tharad road, Vav-Suigam road and Uchosan-Bhabhar-Ujjanwada Road in the State of Gujarat.

2023_MoRTH_755199_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 15:0Hrs
17/06/2023
Time 15:0Hrs
229 MAINTENANCE OF SELECTED STRETCHES OF JALGAON – BHADGAON-CHALISGAON ROAD OF NH 753 J FROM KM 04/000 TO 103/000 WHERE LA IS DELAYED ON REALIGNMENT PORTIONS ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747066_1 8.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
16/06/2023
Time 17:30Hrs
230 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_749211_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
15/06/2023
Time 12:0Hrs
231 Rehabilitation & Upgradation of Risod Town to Four Lane with Paved Shoulders standards from Km. 36/845 to Km. 39/340 & Km. 41/520 to Km. 44/220 (Total Length = 5.2 KM) of NH 461B in the state of Maharashtra on EPC mode.

2023_MoRTH_749282_1 82.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:30Hrs
14/06/2023
Time 17:30Hrs
232 Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_143889_1 46.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 9:0Hrs
14/06/2023
Time 11:0Hrs
233 (2nd Attempt) Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH-47 in the State of Gujarat

2023_MoRTH_747875_2 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
13/06/2023
Time 12:0Hrs
234 Strengthening of existing 2-Lane road from Km 24.00 to 41.00 of NH-144 of Domail – Katra – Reasi – Bhambla road in District Reasi in UT of Jammu & Kashmir on EPC mode LENGTH 17.00 KMS.

Bid/Job No. NH-144-J&K-2022-23-116 dated 22.05.2023 23.185 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
235 Improvement of Riding Quality Programme IRQP of existing 2-Lane road from Km 41.000 to 67.500 of NH-144 of Domail – Katara – Reasi – Bhambla road in District Reasi in UT of Jammu Kashmir on EPC mode under Annual plan for the year 2022-23 LENGTH 26.50 KMS

Bid/Job No. NH-144-J&K-2022-23-117 dated 22.05.2023 26.218 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
236 Maintenance of NH 730B, NH 730A, NH 731K under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 in the State of Uttar Pradesh

2023_MoRTH_754356_1 1.580 MoRTH Maintenance Project OTHERS 22/05/2023
Time 15:0Hrs
12/06/2023
Time 15:0Hrs
237 Rehabilitation Upgradation to 4 lane with paved shoulder of Existing Section in Sillod Town with Design Ch. Km. 54.500 to Km. 60.679 Length 6.179 Km. Section of NH.753 F Aurangabad Jalgaon road on EPC Mode in the state of Maharashtra.

2023_MoRTH_748054_1 112.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/06/2023
Time 17:30Hrs
238 Rehabilitation of the distressed Bridge at Gandhigram across Purna river on Akola Akot Road NH 161 A in the state of Maharashtra

2023_MoRTH_748892_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2023
Time 10:30Hrs
08/06/2023
Time 17:30Hrs
239 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(2nd call)

Tender Notice No. 01/RFP848BDaman/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 12:0Hrs
08/06/2023
Time 14:0Hrs
240 Upgradation and widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(EPC MODE)

Tender Notice No.126/2022-23 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2023
Time 17:30Hrs
08/06/2023
Time 14:0Hrs
241 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode

2023_NHAI_146145_1 621.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
08/06/2023
Time 11:0Hrs
242 Balance works of Rampur-Kathgodam Section of NH-87 from km 42.791 (Design Chainage km 43.446) to km 88.00 (design Chainage km 93.226) (Package-II) in the State of Uttarakhand on EPC Mode

NHAI/Tech/UKD/BW/RK-II/2022 273.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 17:30Hrs
08/06/2023
Time 11:0Hrs
243 Construction of ROB with approaches from km 79.400 to 81.200 of Rampur - Kathgodam section of NH-87 [New NH No. 109 [Package-II] in the state of Uttarakhand under NHDP Phase-III on EPC Mode

NHAI/Tech/UKD/BW/RK-II/ROB/2023 58.320 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 18:0Hrs
08/06/2023
Time 11:0Hrs
244 Construction of Major Bridge on Painganga River at design chainage from Km. 52/685 to 52/785 on NH 548CC along with approaches of 1130m (Total Length = 1230m) of National Highway Mehkar-Chikhli-Khamgaon (Section Chikhli -Khamgaon) Road on EPC mode in the state of Maharashtra

2023_MoRTH_747294_2 26.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 10:30Hrs
07/06/2023
Time 17:30Hrs
245 CONSTR OF RD TANGTSE TO KELA TSO KM 0.000 TO KM 12.500 (TAKEN TANGTSE AS KM 0.000) TO NHDL SPECS INCDL MINOR BRS AND THEIR APPROACH UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 12.500 KM)

2023_BRO_590969_1 82.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/04/2023
Time 18:0Hrs
07/06/2023
Time 11:0Hrs
246 STRENGTHENING AND WIDENING TO SECTION KUSUMBA TO DONDAICHA OFNH-160H IN KM 42/00 TO 97/00 DESIGN CHAINAGE KM 43/375 TO 98/241 (LENGTH=54.866 KM) ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747115_1 92.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
247 STRENGTHENING TO MALEGAON KUSUMBA DONDAICHA TO JUNCTION OF NH 752G NEAR SHAHADA ROAD NH 160H IN KM. 98/00 TO 125/00 ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747138_1 29.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
248 Construction of New 2 lane Major bridge length 144 m. on Terna River at km. 227.311 design ch. 20.890 along with approaches on Mantha Latur Omerga Nagansur section of Nh 548B on EPC mode in the state of Maharashtra

2023_MoRTH_746703_1 26.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
249 Widening and Strengthening to Borgaon Kale to Murud Akola Section 1 from km. 61.800 to 72.900 length 11.10 km. section on NH 63 to 2 lane configuration and Latur Airport Junction to Mahila Polytechnic section 2 from km. 78.900 to 86.850 length 7.95 km. section of Nh 63 to 4 lane configuration total project length 19.05 km. in the state of Maharashtra

2023_MoRTH_746673_1 72.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
250 Rehabilitation and Upgradation of Kopra to Gharola km. 76.350 to 102.350 section of NH 752K Total project length 26.00 km. to 2Lane 4Lane configuration on EPC mode in the state of Maharashtra

2023_MoRTH_746653_1 105.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
251 Widening and Strengthening to Yedshi to Jawale section of NH 63 from km 20.350 to 24.350 length 4.00 km. to 2lane confifuration in the state of Maharashtra

2023_MoRTH_746804_1 8.004 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
252 CONSTRUCTION OF 01 MAJOR BRIDGE & 05 MINOR BRIDGE ON MANGALWEDHA UMDAI SECTION ( FROM SC.96/00 TO 123/100) IN SANGALI DISTRICT IN THE STATE OF MAHARASHTRA ON EPC MODE

2023_MoRTH_749885_1 43.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 10:0Hrs
05/06/2023
Time 17:30Hrs
253 DESIGN AND CONS OF UNI-DIRECTIONAL TWIN TUNNELS AT SHINKUN LA PASS OF LENGTH 4.1 KM (APPROX LENGTH) INCL CIVIL AND ELEC/ MECHANICAL WORK ALONG WITH APPROACHES CONNECTING DARCHA-PADAM HIGHWAY TO NHDL SPECS IN HIMACHAL PRADESH AND THE UT OF LADAKH

2023_BRO_582500_1 1,504.640 BRO Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 17:30Hrs
03/06/2023
Time 11:0Hrs
254 SLOPE REHABILITATION WORKS (SRW) AT KM 96.000 ON ROAD BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_590218_1 29.510 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 15:0Hrs
02/06/2023
Time 15:0Hrs
255 Providing and laying Crash Barrier for Road Safety in Nagrota Bagwan Ranital Mubarikpur road Km 5 to 18 of NH 20A New NH 303 in the State of H.P

2023_MoRTH_749523_1 6.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2023
Time 18:0Hrs
02/06/2023
Time 11:0Hrs
256 OR(DPP) to Pathri-Sonpeth-Injegaon Road NH-548 B from km.58/200 to 83/700 (Length 25.5km) in the State of Maharashtra. (Filling pot hole by MPM & OGC)

2023_MoRTH_753065_1 2.800 MoRTH Maintenance Project OTHERS 12/05/2023
Time 17:0Hrs
01/06/2023
Time 17:0Hrs
257 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh (3rd call)

2022_MoRTH_720387_3 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2023
Time 15:0Hrs
31/05/2023
Time 17:30Hrs
258 Maintenance of NH 730 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Division, PWD, Siddharthnagar in the State of Uttar Pradesh.

2023_MoRTH_753205_1 1.570 MoRTH Normal Highway Project OTHERS 15/05/2023
Time 15:0Hrs
31/05/2023
Time 15:0Hrs
259 Construction of LVUP Design Ch.117.920, LVUP and other related works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana on EPC Mode

2023_NHAI_151140_1 17.940 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 15:0Hrs
31/05/2023
Time 11:0Hrs
260 Repair/ Rehabilitation of 6 (Six) number Bridges i.e Leesh bridge, Gheesh bridge, Chell bridge, Mal bridge, Newra bridge, New Zarda bridge at km 607.151, km 611.920, km 614.775, km 628.720, km 630.895 & km 672.830 respectively on NH-17 (Old NH-31) under NH Division-IX in the district of Jalpaiguri West Bengal during the year 2022-2023. (Job No. 17/WB/2022-23/ 516).

2023_MoRTH_748126_1 12.119 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 10:0Hrs
30/05/2023
Time 17:0Hrs
261 4/6 Lane of Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from Km.70.830 to Km.115.400 – Treatment of 2 Nos. of Potential Blackspot locations (1) Karera Khurd, Yamunanagar at km.78.520 and (2) Thana Chapper, Yamunanagar at km.101.228 in the State of Haryana on EPC mode

2023_NHAI_150330_1 33.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
30/05/2023
Time 11:0Hrs
262 Construction of 2 new ROBs in parallel in lieu of LC-6 at Km 284/3-4 along with LA for approaches on Daund Manmad railway line (DD-MNR) Crossing at Ch 116/700 of NH-548D near Limpangaon on Talegaon Shikrapur Nhavara Shrigonda Jamkhed Road in Ahmednagar District in the State of Maharashtra on EPC Mode.

2023_MoRTH_743698_1 73.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
263 Construction of Major Bridge including construction of approach road & RCC gutter on Sina River at km 214.180 Kalyan Ahmednagar Pathardi road NH-61 (Old NH-222) in the State of Maharashtra

2023_MoRTH_748428_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
264 Construction of Mariahu bypass with four lane with paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_743986_1 210.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 18:30Hrs
27/05/2023
Time 15:0Hrs
265 SLOPE REHABILITATION WORKS (SRW) FROM KM 56.490 TO KM 56.600 ON ROAD ON BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_589058_1 34.060 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 9:0Hrs
26/05/2023
Time 12:0Hrs
266 CONSTRUCTION OF ROAD MANALI-SARCHU-LEH TO NHDL SPECIFICATIONS FROM DESIGN CHAINAGE KM 244.000 TO KM 268.670 ON NH-03 (TAKEN MANALI AS KM 0.000) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 24.670 KM)

2023_BRO_586320_1 346.400 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 18:0Hrs
26/05/2023
Time 11:0Hrs
267 Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH 2 from Km 215 to Km 230 and from Km 280 to 295 as per Crash Vulnerability Audit Report on EPC Mode

2022_NHAI_138534_1 95.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 9:0Hrs
24/05/2023
Time 11:0Hrs
268 Construction of 4laning of Kishanganj Bahadurganj rd sec starting from NH (NH31) near Uttar Rampur (Km. 0.000) and terminating at NH327E near Satal Istamarar Bahadurganj (Km. 22.719) under BMP in Bihar on HAM

2022_NHAI_122794_1 747.480 NHAI Special Project HAM 18/07/2022
Time 18:5Hrs
22/05/2023
Time 17:0Hrs
269 CONSTRUCTION OF 50 MTR CAVERN AND 21M APPROACH TUNNEL WITH PORTAL AT ONE END AT GENERAL AREA HANLE UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_589608_1 20.250 BRO Special Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 18:0Hrs
22/05/2023
Time 12:0Hrs
270 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat.

2023_MoRTH_752674_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 18:55Hrs
22/05/2023
Time 11:0Hrs
271 Construction of Balance Works (i) Pedestrian Underpass at Km.514.960 including approaches, both side service road, (ii) Bus lay bay, bus shelter, (iii) Drain from Km.514.660 to Km.515.087 on both sides and (iv) Junction at Km.514.960 on 4-laned Wardha - Butibori section of NH-361 [Km.465.500 to Km.524.690 in the state of Maharashtra on EPC Mode

2023_NHAI_150589_1 15.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 18:30Hrs
22/05/2023
Time 11:0Hrs
272 CONS OF ROAD K-N-S FROM EXISTING TRACK TO NHSL SPECS FROM DESIGN CHAINAGE KM 20.000 TO KM 38.765 (TAKEN KARZOK AS KM 0.000) INCL TWO MAJOR BRIDGES OF SPAN 400 MTR (50 MTR x 8) AND 275 MTR (55 MTR x 5) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 18.765 KM)

2023_BRO_588309_1 148.550 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 18:0Hrs
20/05/2023
Time 11:0Hrs
273 Construction of ROB and their Approaches at Km 99 4 LC Gate No 503 Spl A 3 E of NH 744 Old NH 208 of Kollam Thirumangalam Road

2023_MoRTH_747027_1 35.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:25Hrs
19/05/2023
Time 11:0Hrs
274 Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul- Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra on EPC Mode

2023_MoRTH_747270_1 14.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 15:0Hrs
17/05/2023
Time 17:0Hrs
275 Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode

2023_NHAI_143784_1 347.640 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
17/05/2023
Time 11:0Hrs
276 Road Safety work from Km 0.000 to Km 38.600 of NH-124C (Tarighat-Bara Road) on EPC Mode in the State of Uttar Pradesh under Road Safety 2022-2023(2nd Call)

2023_MoRTH_749250_1 4.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
277 Oridinary repairs from Km 158/0 -160/4 & Km 167/850 -168/785 of NH 209 (Dindugal – Bangalore Road ) under OR (DPP) in the state of Tamil Nadu

2023_MoRTH_748941_1 0.320 MoRTH Maintenance Project OTHERS 12/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
278 Periodical Renewal from Km 27/6 – 29/2 of NH 181 (Coimbatore to Gundlupet Road) under Annual Renewal Programme (ARP) for year 2022-23 in the State of Tamil Nadu

2023_MoRTH_747472_1 4.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
279 Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH No.47 in the state of Gujarat.

2023_MoRTH_747875_1 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 9:0Hrs
15/05/2023
Time 12:0Hrs
280 Protection of Embankment with Toe Wall and concrete drain in Nagzari Village portion from km 7.300 to 8.200 Length 900m on MehkarChikhali Road of NH 548 CC in the state of Maharashtra.

2023_MoRTH_747328_1 1.340 MoRTH Normal Highway Project OTHERS 29/03/2023
Time 10:30Hrs
12/05/2023
Time 17:30Hrs
281 Treatment of landslide zone 11 location from km 101.01 to km 191.365 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_747123_1 26.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 13:0Hrs
11/05/2023
Time 11:0Hrs
282 Stabilisation of 09 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_586685_1 61.600 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 18:0Hrs
10/05/2023
Time 18:0Hrs
283 Construction to Two laning with paved shoulder of Daudnagar Bypass Nasriganj Bypass and Dawath Bypass of NH 120 in the State of Bihar on EPC Mode.

2023_MoRTH_747561_1 47.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
10/05/2023
Time 15:0Hrs
284 Construction of Steel Truss Bridge at Km. 1.700, 2.450, 3.300 and 3.900 over Sidhwan Canal on 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.000 to Km 17.041 in the State of Punjab on EPC mode

2023_NHAI_150025_1 19.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 15:0Hrs
10/05/2023
Time 11:0Hrs
285 Construction Of Balance Works Of Four Laning Of Vijayawada – Machilipatnam Section of NH-65 And Overlay On Existing Bypassed Sections (Old NH-9) In The State Of AP On EPC Mode

NHAI/NH-65/ VIJ-Machilipatnam/Bal Works/2023 30.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2023
Time 11:0Hrs
09/05/2023
Time 11:0Hrs
286 Up-gradation to four lane- two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15.200 to Km 38.00 and from Km. 58.00 to Km 84.00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra.

2023_MoRTH_737532_1 625.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 14:0Hrs
08/05/2023
Time 17:0Hrs
287 RFP for the Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH- 76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of Uttar Pradesh

2023_MoRTH_742875_1 174.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:55Hrs
08/05/2023
Time 15:0Hrs
288 Construction to 2 lanes with Paved Shoulder of Jandaha Bypass of NH 103 NH 322 in CH 0.000 existing km 30 of NH 103 to CH 4.800 existing Km 35 of NH 103 in the State of Bihar for the Year 2022 23.

2023_MoRTH_746266_1 41.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2023
Time 17:0Hrs
04/05/2023
Time 17:0Hrs
289 Improvement of the stretch from km 597.00 to km 598.00 of NH-31 by providing Mastic Asphalt wearing course, Construction of New Five Numbers of Culverts including valley / hill side protective work & Restoration of rain damaged embankment by Construction of guard wall at km 598.900 under NH Division No-IX in the District of Kalimpong in the State of West Bengal during the year 2022-23 in EPC Mode (Job No.17/WB/2022-23/513).

2023_MoRTH_747286_1 7.196 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
04/05/2023
Time 17:0Hrs
290 Short term maintenance from Km 0/0 0/8, 60/200 60/450, 64/280 64/695 and 110/942 111/152 of Cuddalore Vridhachalam Salem Road (NH 532) under OR (DPP) in the state of Tamilnadu

2023_MoRTH_749382_1 2.000 MoRTH Maintenance Project OTHERS 17/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
291 Maintenance of NH 730B, NH 730A, NH 731K , NH 334DD , NH 730H, NH 727H under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Bareilly in the State of Uttar Pradesh

2023_MoRTH_749181_1 1.920 MoRTH Maintenance Project OTHERS 13/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
292 Geometric improvement of NH 327E at Bhargama and Sukela More including Provislon of Raniganj Bypass in the State of Bihar for the Year 2022 23.

2023_MoRTH_745855_1 60.254 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
03/05/2023
Time 17:0Hrs
293 Construction of Trumpet Interchange Connecting Bangalore Chennai Green Field Expressway from Km 261/705 to Km 263/010 with Maduravoyal to Wallajapet Section of NH48 near Sriperumbudur toll plaza at Km 35/700 in state of Tamil Nadu under Bharatmala on EPC Mode

147642 122.030 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/03/2023
Time 15:0Hrs
03/05/2023
Time 11:0Hrs
294 Construction of 3 Nos. of standalone structures at 3 nos. of locations (i.e. (i) Flyover at 10th Mile Junction at Ch. 401.730 (ii) VUP at DRDO at Ch. 403.600 (iii) VUP at Ambebahula Junction at Ch. 429.120) on Pimpalgaon-Nashik-Gonde (Km 380.000 - Km 440.000) section of NH-3 in the state of Maharashtra on EPC Mode

2023_NHAI_147395_1 161.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 18:0Hrs
03/05/2023
Time 11:0Hrs
295 Design and Construction of Vehicular Underpass with approaches at Khodad Junction Km 78 600 and Ambikhalsa Junction Km 113 150 on Khed Sinnar section of NH 60 Old NH 50 in the State of Maharashtra as Standalone project on EPC Mode

2023_NHAI_148149_1 40.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/03/2023
Time 9:0Hrs
03/05/2023
Time 11:0Hrs
296 Widening from two lane with paved shoulder to four lane with paved shoulder and improvements from km 26/5 - 34/2, Km 35/6 - 40/2, Km 42/2 - 53/2, Km 55/8 - 56/2, Km 58/7 - 61/2, Km 76/6 - 81/3 and widening from two lane with paved shoulder to four lane with paved shoulder from Km 40/2 - 42/2, Km 53/2 - 55/8, Km 61/2-66/7, Km 67/2 - 72/4, improvements from Km 34/2 – 35/6 including CD works of NH 81 (Coimbatore – Chidambaram) (Old NH-67) (Nagapattinam – Trichy -Coimbatore - Gudalur) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_744953_1 206.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
297 Construction of bypass to Bagalur town branching from Km.3/0 (Kothapalli) and joining at km 9/350 (Jee Mangalam) including Shifting of Utilities of NH 207 (New NH 648) on Engineering, Procurement & Construction (EPC) Basis Contract in the state of Tamilnadu

2023_MoRTH_744221_1 47.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
298 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat

2023_MoRTH_748110_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2023
Time 15:0Hrs
02/05/2023
Time 15:0Hrs
299 Strengthening work from Km. 37 to 70 on NH107(A) under Annual Plan of NH(O) 2022-2023 in the State of Uttarakhand

2023_MoRTH_748291_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
300 Slope Protection Measures (CH.7.590 Km to 7.690 Km Near Medanpur and CH.35.210 km to 35.265 km near Kund Barrage Along Rudraprayag - Gaurikund Road, NH-107) Under Annual Plan 2022-23 in the state of uttarakhand

2023_MoRTH_748300 20.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
301 Up-gradation to 4 lane configuration for the work of Peth Naka to Sangli Road (Km 0.000 to 41.250 Km) (Length = 41.250 km) section of NH-166H in the state of Maharashtra on EPC mode.

2023_MoRTH_735470_1 596.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
27/04/2023
Time 17:0Hrs
302 Repair and rehabilitation work of Major Bridge over Ghaghra River and its approaches in Km.- 56.000 and Km.57.000 and Major Bridge over Kuwano river in Km. 42.000 on NH 328A in Uttar Pradesh under Road Safety 2022 2023.

2023_MoRTH_748498_1 3.800 MoRTH Normal Highway Project OTHERS 07/04/2023
Time 14:0Hrs
27/04/2023
Time 12:0Hrs
303 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 593 on EPC mode under Bharatmala Pariyojana in the State of TamilNadu Package 1 Km 0 342 to Km 4 604

122527 987.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:35Hrs
26/04/2023
Time 11:0Hrs
304 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 2 Km 4 604 to Km 9 700 on EPC mode

122532 1,179.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:0Hrs
26/04/2023
Time 11:0Hrs
305 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 3 km 9.700 to Km 14.185

122540 946.370 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
306 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 4 km 14.185 to Km 20.223

122542 823.090 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
307 Strengthening of NH 68 Bet. Km 297/100 to 307/515, 328/257 to 329/600, 346/700 to 369/700 and 387/700 to 407/700

2022_MoRTH_719704_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 11:0Hrs
25/04/2023
Time 16:0Hrs
308 Improvement of existing alignment of Pandharpur Town (Part bypassed section) from Wakhari to Lord Vitthal Temple (Length – 8 km) in the State of Maharashtra on EPC Mode

NHAI/RO/MUM/PANDR/TOWN/OTI/26 114.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 11:0Hrs
25/04/2023
Time 11:0Hrs
309 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_745731_1 5.260 MoRTH Normal Highway Project OTHERS 17/03/2023
Time 15:0Hrs
24/04/2023
Time 15:0Hrs
310 Upgradation and strengthening to 2 lane PS from Km. 95.500 to km. 129.775 of NH 168G Idar Bhiloda Samlaji Section in the State of Gujarat Length 34.275 Km Job No. 168 GJ 2022 23 687

2022_MoRTH_732387_1 177.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 12:0Hrs
24/04/2023
Time 12:0Hrs
311 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_744572_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
312 Treatment of landslide zone 11 location from km 168.605 to km 191.970 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_744588_1 42.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
313 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_748247_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 17:30Hrs
24/04/2023
Time 11:0Hrs
314 Construction/Widening of Structures i.e., MJB, MNB, ROBs, LVUP etc. rectification of drainage and rain cuts and other works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.

2023_NHAI_148697_1 551.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
24/04/2023
Time 11:0Hrs
315 OR DPP Renapur - Ashtamode (NH - 361) - Udgir - Degluí (NH101) - Adampur phata (NH101) - khatgaon - Sagroli - Bodhan - Nizamabad (NH63) Telgana State Border Section from Raavi to Gojegaon of NH- 63 km 208/700 to km 221/700 in the State of Maharashtra. 3rd call.

2023_MoRTH_749201_1 1.450 MoRTH Maintenance Project OTHERS 13/04/2023
Time 9:0Hrs
22/04/2023
Time 17:30Hrs
316 WIDENING FROM TWO LANE WITH PAVED SHOULDER TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 0/8 – 17/6, 18/0 – 25/0, 25/500 – 27/900, 29/6 – 34/0 & KM 39/0 – 50/570 AND STRENGTHENING IN KM 17/6 – 18/0, 25/0 – 25/5, 27/9 – 29/6, AND WIDENING FROM FOUR LANE TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 34/0 – 39/0 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF STORM WATER DRAIN INCLUDING WIDENING AND RECONSTRUCTION OF CD WORKS AND ADDITIONAL BRIDGE AT KM 39/8 OF NH 532 (CUDDALORE – VRIDHACHALAM – SALEM ROAD) ON ENGINEERING, PROCUREMENT &CONSTRUCTION (EPC) BASIS CONTRACT IN THE STATE OF TAMIL NADU

2023_MoRTH_743817_1 206.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 19:15Hrs
19/04/2023
Time 15:0Hrs
317 CONSTRUCTION OF NELYA – PT 4340 – RING CONTOUR ROAD FROM KM 0.000 (STARTING POINT MANDIR TIKRI) TO KM 16.275 (RC POST) (APPROX NET LENGTH 16.275 KMS) AND ADDITIONAL LINK TO PT 4340 OF 0.950 KM TO NHSL SPECIFICATION UNDER 42 BRTF/PROJECT VARTAK IN ARUNACHAL PRADESH STATE IN EPC MODE

2023_BRO_584467_1 147.090 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 11:30Hrs
19/04/2023
Time 12:0Hrs
318 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Lambasingi to Paderu section (Km 205.000 to Km 253.010) of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode

2023_WBRTH_740575_1 282.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
319 Rehabilitation and Upgradation to 2-lane configuration of Karnohal-Kalwahn section (Km 181.000 to Km 208.950) of NH-70 in the State of Himachal Pradesh under GNHCP on EPC Mode

2023_WBRTH_740593_1 196.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
320 Stabilisation of 04 Nos land slides on Rishikesh Joshimath Mana road NH 107

2023_BRO_584359_1 50.380 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:30Hrs
17/04/2023
Time 18:0Hrs
321 Stabilisation of 08 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_583075_1 70.170 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
17/04/2023
Time 18:0Hrs
322 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_1 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 17:30Hrs
17/04/2023
Time 17:30Hrs
323 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/808).

2023_MoRTH_742772_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 16:0Hrs
17/04/2023
Time 14:0Hrs
324 CONSTRUCTION OF SEVEN FOBS BETWEEN KM. 307.700 AND KM. 364.000 ALONG WITH RCC CRASH BARRIER OF 600M LENGTH AT KM. 336.550 ON SURAT VAPI SECTION OF NH 48 IN THE STATE OF GUJARAT

2023_NHAI_141852_1 14.070 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 11:0Hrs
17/04/2023
Time 11:0Hrs
325 IRQP to newly declared NH151K btn km 67.60 to 83.60 and km 88.60 to 112.8 and km 124.8 to 134.69 section Tran Patiya Jamjodhpur Kalavad road and road safety items btn km 45.4 to 134.69 in the state of Gujarat for the year 2022.23 total length 50.09 km

2023_MoRTH_745852_1 29.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 9:0Hrs
11/04/2023
Time 12:0Hrs
326 Periodic Renewal Work in km. 21.627 to km. 34.000 of NH-328A in the State of Uttar Pradesh on EPC Mode.

2023_MoRTH_746541_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2023
Time 17:0Hrs
11/04/2023
Time 12:0Hrs
327 Construction of LVUP of size 12m x 4m for full width of ROW between two parcels of land allotted for IISER, Tirupati campus at km 504.850 in Penchalkona to Yerpedu section from km 425.400 to km. 509.400 of NH-565 in the State of Andhra Pradesh on EPC Mode

NHAI/RO-VJA/PIU-TPT/NH-565/P-Y/IISER/Works/2023 4.430 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2023
Time 19:0Hrs
11/04/2023
Time 11:0Hrs
328 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_2 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 17:30Hrs
10/04/2023
Time 17:30Hrs
329 RFP for the Construction of Gilaula bypass with two lane with paved shoulder configuration starts near km. 281.930 of NH-730 and ends near Km. 284.900 of NH-730 (Design length- 3.510 km) on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_742093_1 24.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 15:0Hrs
10/04/2023
Time 15:0Hrs
330 PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 20221-23 EPC Mode

2023_MoRTH_739775_1 23.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
331 Work of reconstruction of 2 no minor bridge in place of old weak narrow and minor bridge identified at km 69 900 and at km 130 521 of NH51 and construction of diversion road for major bridge at km 81 400 in the state of Gujarat under road safety annual plan 2022 23

739283 6.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
332 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER OF SARAIGARH ON NH 327A LALGANJ GANPATGANJ UPTO NH 106 NEW NH 131 FROM KM 0.000 TO KM 10.672 TOTAL LENGTH 10.672 KM OF NH 327AD ON EPC MODE IN THE STATE OF BIHAR

NIT NO 02EPC/NH-MADHEPURA/2022-23 NO 02EPC/NH-MADHEPURA/2022-23 83.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
10/04/2023
Time 11:0Hrs
333 Rehab existing road between Km 0 to Km 29.30 on Gangotri Dharasu road NH 34

2023_BRO_581993_1 235.080 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2023
Time 18:0Hrs
05/04/2023
Time 11:0Hrs
334 Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode

2023_MoRTH_744116_1 4.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:0Hrs
04/04/2023
Time 12:0Hrs
335 Widening to 2 Lane with Hard shoulder configuration of Mana Ch 0.00 to Mana Pass Ch 50.987 road on NH-07 under Bharatmala Pariyojana in the State of Uttarakhand Length 50.987 on EPC mode

2023_MoRTH_740815_1 423.610 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2023
Time 10:0Hrs
03/04/2023
Time 17:0Hrs
336 IRQP Work of NH 131A from km 1.900 to km 29.120 Existing Portion in the State of Bihar for the year 2022 23.

2023_MoRTH_733725_1 31.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
337 PR Work from ch.98.00 to ch.112.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733729_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
338 PR Work from ch.93.612 to ch.98.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733727_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
339 CONSTRUCTION OF ADVANCE LANDING GROUND AND ALLIED SERVICES FOR DEVELOPMENT OF BASIC INFRASTRUCTURE AT NYOMA LADAKH

2022_BRO_572375_1 214.090 BRO Special Project EPC (Lump Sum/Item Rate Contract) 31/12/2022
Time 18:0Hrs
31/03/2023
Time 12:0Hrs
340 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_736044_1 35.424 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2023
Time 18:0Hrs
30/03/2023
Time 11:0Hrs
341 Permanent rectification of 4 Nos of black spots on NH-27 (old NH-28) of Kotwa - Mehsi- Muzaffarpur Section from km 440 00 to km 520 00 (Total Length 80 Km) 4 nos of black spot on NH-27 of Muzaffarpur- Darbhanga - Purnia section (km 0 to km 148-550 and km 159-357 to km 287-860) (total length 277-053 km) & Removal of 1 No of at-grade junction near Satanpur Junction in Satanpur Village on NH-122 in the State of Bihar on EPC Mode

2023_NHAI_147142_1 295.293 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:5Hrs
29/03/2023
Time 11:0Hrs
342 Construction of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the State of Uttar Pradesh

2023_MoRTH_737151_1 286.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2023
Time 9:0Hrs
28/03/2023
Time 15:0Hrs
343 Improvement and Rehabilitation of Existing Ayodhya Bypass from Design km 121.600 to Design km 144.020 (Design Length 22.420 km) of NH28 (New NH27) on EPC Mode under Bharatmala Pariyojana in the State of Uttar Pradesh

2023_NHAI_144047_1 382.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
28/03/2023
Time 11:0Hrs
344 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
345 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
346 Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23

2023_MoRTH_743234_1 40.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
27/03/2023
Time 12:0Hrs
347 Construction of Pratapgarh Bypass (Extension) connecting NH-31 to NH-330 on EPC mode in the state of Uttar Pradesh

2023_MoRTH_736338_1 99.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
348 Construction of Amethi Bypass (Part-II) at km 30.050 of NH-931 (Design Length-8.178 km) on EPC mode in the state of Uttar Pradesh

2023_MoRTH_737658_1 126.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 19:0Hrs
24/03/2023
Time 15:0Hrs
349 Work of Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 (Km 42.0 to Km 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the state of Uttar Pradesh

2023_MoRTH_737668_1 205.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
350 Construction of four-lane Concrete Road from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on section from Kohmara- Goregaon- Police Headquarter (Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi- Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra. Total Length of the project 15.781 Km

2023_MoRTH_735288_1 230.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
23/03/2023
Time 17:0Hrs
351 Construction of 4 lane/2 lane Major/Minor bridges and 2 lane ROBs in the Stretch from km 251 (Golawali) to km 352.000(Rajapur) section of NH- 66(Erstwhile NH-17) in the State of Maharashtra under NHDP-IV on Package II (Balance Work).

2023_MoRTH_737918_1 11.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:30Hrs
21/03/2023
Time 15:30Hrs
352 Short Term Maintenance from Km 96 800 to 97 600 Km 113 000 to 113 440 and Km 119 000 to 131 400 of NH744

2023_MoRTH_741293_1 1.240 MoRTH Maintenance Project OTHERS 17/02/2023
Time 18:20Hrs
21/03/2023
Time 15:0Hrs
353 Improvement works of Agra Bypass section from km. 0.00 to km. 32.800 connecting km. 176.800 of NH-2 to km. 13.030 of NH-3 in Uttar Pradesh.

2023_NHAI_142808_1 125.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
21/03/2023
Time 11:0Hrs
354 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_2 7.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 17:30Hrs
20/03/2023
Time 17:30Hrs
355 Upgradation to two lane with paved shoulder configuration from km 0.0 to 47.0 of NH351 Mahuva to Badhada section in the state of Gujarat length 47 km

732154 153.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
20/03/2023
Time 17:0Hrs
356 Periodical Renewal between km. 0/00 to 17/600, km. 117/00 to 138/500 and 269/700 to 278/00 of NH-754K in the State of Gujarat.

2023_MoRTH_744504_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
20/03/2023
Time 16:0Hrs
357 Short Term Maintenance from Km 1/4 - 2/4, Km 10/350 – 15/6, Km 16/8 – 17/0, Km 20/860 – 21/6, Km 40/4 – 41/2 and Km 58/3 – 63/2 of NH-181 (Coimbatore to Gundlupet Road) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740683_1 1.020 MoRTH Maintenance Project OTHERS 15/02/2023
Time 10:0Hrs
20/03/2023
Time 15:0Hrs
358 Short Term Maintenance from km 212/0 – 223/8, 252/8 – 258/6 & 268/4 – 273/8 of NH 948 of Bangalore – Coimbatore Road (Km 256/0 – 267/8, 222/0 – 227/8 and 206/0 – 211/4 old NH-209) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740688_1 1.680 MoRTH Maintenance Project OTHERS 15/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
359 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2023_MoRTH_742794_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
360 Widening from 2lane to 4lane of km 92.935 start point of old NH82 to 99.685 km End Point of Gaya Bypass of NH83 of NH120 Total Length 6.750 km on EPC mode in the State of Bihar.

2022_MoRTH_730025_1 54.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2022
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
361 Hill side treatment of Lambagarh Land Slide Zone at km 504.371 to km 504.871 on NH-58 (New NH-07) under Annual Plan 2022-23 in the State of Uttarakhand

2023_MoRTH_737934_1 47.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
362 Land slide treatement work on NH-58 from Kodiyala km. 266.130 to Devprayag km. 296.925 (10 locations) based on DPR submitted by THDC India Ltd. in the State of Uttarakhand on EPC mode.

2023_MoRTH_739247_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
363 CONS OF 110 MTR MAJ PMT BRIDGE AT KM 1PT825 (55MTR X 2) AND MINOR PMT BRS AT KM 8PT625 (30 MTR) AND KM 16PT925 (30 MTR) ON SASER BRANGASA GAPSHAN RD (STARING POINT KM 0PT00 AT GAPSAN) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_581660_1 20.940 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 18:0Hrs
20/03/2023
Time 11:0Hrs
364 Construction of four laning with paved shoulder from Hassan to Adihalli EC-20 Ch. Km 00.000 Hassan to Ch. Km 37.000 Adihalli Village under Bharatmala Pariyojana on EPC Mode in the state of Karnataka (Package-I)

2022_NHAI_139398_1 899.540 NHAI Normal Highway Project HAM 23/12/2022
Time 11:0Hrs
20/03/2023
Time 11:0Hrs
365 Construction of Minor Bridge 1X30.00 mtr. at Km 214.704 on NH 730 under EPC mode in the state of Uttar Pradesh.

2023_MoRTH_737359_1 6.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 15:0Hrs
17/03/2023
Time 12:0Hrs
366 Construction of Six Lane Elevated Kona Expressway from Km 0.145 to Km 7.337 of NH-117 in the state of West Bengal on EPC mode

2023-NHAI-143743-1 839.460 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
17/03/2023
Time 11:0Hrs
367 Construction of flyover at Sanatnagar Junction including its Approaches Km 290.784 to Km 291.516 of four lane with paved shoulders of NH44 at Srinagar in the UT of Jammu and Kashmir on Engineering Procurement and Construction EPC mode.

NIT 131 41.820 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/02/2023
Time 11:0Hrs
16/03/2023
Time 16:0Hrs
368 Short Term Maintenance Contract of Khairipalli-Talbeda Section from Km 246/100 to 321/000 Km

2023_MoRTH_742553_1 3.230 MoRTH Maintenance Project OTHERS 28/02/2023
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
369 Construction of (i) RUB with service road at Km. 357.450 (Tukwada) (ii) PUP at Km. 362.864 (Chharwada) on Surat-Dahisar Section of NH-48 in the State of Gujarat.

2022_NHAI_105962_1 17.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2022
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
370 Strengthening work from Zero Point (junction of Lal Bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (ch. 160.00 to 161.50 km) in the section of NH-707A (Tyuni- Chakrata- Mussoorie- Dhanaulti- New Tehri) in the State of Uttrakhand under NH Division Doiwala

2023_MoRTH_741314_1 4.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
16/03/2023
Time 12:0Hrs
371 Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280/080 (Design Chainage) to Km 375/450 (Design Chainage) of NH 63 in the State of Karnataka on EPC Mode

2022_NHAI_138951_1 1,055.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
16/03/2023
Time 11:0Hrs
372 Construction of New Additional 4 lane Major Bridge besides Existing bridge over the Sabarmati River and its approaches at 5/400 Km of NH-8C (147), under NH Division Ahmedabad in the state of Gujarat.

2023_MoRTH_737656_1 59.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 18:0Hrs
15/03/2023
Time 12:0Hrs
373 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 km 27.9 to 30.9 and km 46.8 to 61.5 under EPC mode in the state of Gujarat

743191 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 13:0Hrs
15/03/2023
Time 12:0Hrs
374 OR-DPP to Akluj Velapur Mahud Sangola of NH 965G Km from 160.400 to 185.400 ( Part Mahud Sangola) in the state of Maharashtra

203MoRTH_742712_1 2.290 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
375 OR DPP to Deogon Phata Parali Latur Omerga Murum Mode Murum Alur Wagdari Akkalkot Indi Vijapur Road NH 548 B Km. 296/300 to 315/500 ( Section Wagdari to Akkalkot) and 337/700 to 340/700 ( Nagansur Tolanur) in the state of Maharashtra.

2023_ MoRTH_742705_1 1.350 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
376 Widening to four lane with paved shoulder from Design Km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_682564_1 367.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 17:0Hrs
14/03/2023
Time 17:0Hrs
377 Strengthening of Existing 2Lane4Lane NH501 Khanabal Pahalgam Road CH 0.000 To 19.050 and CH. 47.000 To 49.500 AlStop to Seer and Police Station Pahalgam To Sumo Stand after Crossing Pahalgam Bridge in the UT of Jammu Kashmir on Engineering Procurement and Construction EPC mode

NIT 128 39.120 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
14/03/2023
Time 16:0Hrs
378 Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413 700 and ends near ch. 419 000) under Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2022_MoRTH_728515_1 101.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
379 OR DPP to Tuljapur Naldurge Akkalkot road NH 652 KM 0.00 to 8.00 and 20.00 to 28.00 in the state of Maharashtra

2023_MoRTH_742708_1 0.500 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
380 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg III, Design Km 47 800 (Gosaiganj) to Km 73 300 (Bikapur)in the state of Uttar Pradesh on (EPC) basis in the State of Uttar Pradesh.

2022_MoRTH_705660_1 243.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
381 Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing Km 420.000 to Km 454.000(Design length Km 420.000 to Km 454.643, Design length 32.543 Km)of NH730(Shohratgarh to Uska Bazar)in the state of U.P. on(EPC)basis.

2022_MoRTH_680682_1 247.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 18:55Hrs
14/03/2023
Time 15:0Hrs
382 Strengthening work from km 37 to km 70 on NH 107(A) under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740377_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
383 Strengthening and improvement of NH-58(New NH-07) in Chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109(New NH-107) in Chainage km. 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740380_1 8.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
384 DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA – CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE

2023_BRO_577386_1 104.500 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 9:0Hrs
13/03/2023
Time 12:0Hrs
385 Design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length – 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode

2022_NHAI_139388_1 760.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/12/2022
Time 15:0Hrs
13/03/2023
Time 11:0Hrs
386 Rehabilitation Upgradation of Newly Declared National Highway Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 Design Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in Kurnool District in the State Of Andhra Pradesh on EPC Mode

2023_MoRTH_736785_1 505.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
10/03/2023
Time 17:0Hrs
387 Rehabilitation and Upgradation of Existing Road to 2 Lane with Paved Shoulder Configuration from Seetharamapuram to Duttaluru Section of NH-167 BG From Km. 0.000 To Km. 36400 36.400 Km in the State Of Andhra Pradesh

2023_MoRTH_736418_1 309.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2023
Time 15:0Hrs
10/03/2023
Time 17:0Hrs
388 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_741116_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
389 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_741139_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
390 Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 [Effective Length – 5.16 km] on EPC Mode in the state of Tamil Nadu on EPC mode

2022_NHAI_136793_1 164.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
10/03/2023
Time 11:0Hrs
391 REHABILITATION OF 2.5 KM LONG JAWAHAR TUNNEL (TWIN TUBE SINGLE LANE TUNNEL) ON NH-44 IN THE STATE OF JAMMU-KASHMIR NOW UT ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

CE (P) BCN/14/2022-23 76.000 BRO Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
09/03/2023
Time 15:0Hrs
392 CONS OF ROAD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEI FROM KM 0PT00 TO KM 56PT240 (INCDL MAJ BRIDGE OF 140 MTR SPAN AT KM 55PT800) FROM EX TRACK TO NHSL SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 56PT240 KM)

2023_BRO_576733_1 162.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
393 CONS OF RD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEIII FROM KM 82PT340 TO KM 128PT740 (INCDL TWO MINOR BRIDGES) FROM EXISTING TRACK TO NH SINGLE LANE SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 46PT40 KM)

2023_BRO_576745_1 161.540 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
394 Repair and Rehabilitation of Balisai Bridge Chaddyamile at Km 75.300 of NH-116B in the district of Purba Medinipur in the State of West Bengal during the year 2022-2023 in EPC Mode. Job No. 116B-WB-2022-23-503.

2023_MoRTH_735329_1 7.542 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:45Hrs
09/03/2023
Time 11:0Hrs
395 Construction of 4 lane Greenfield North - East side Gorakhpur bypass (26.616 kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode

2022_NHAI_139214_1 819.710 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 15:0Hrs
09/03/2023
Time 11:0Hrs
396 Four Laning of left over works including Additional Structures in Kerala Tamil Nadu Border Kanyakumari from Km 43.000 to Km 96.714 of NH 47 in the State of Tamil Nadu on EPC Mode

135473 1,141.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 17:5Hrs
09/03/2023
Time 11:0Hrs
397 Rehabilitation and Upgradation of Hoshiarpur to Una up to PB-HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage km 15.200 to Design Chainage km 30.348) & construction of 4 lane Hoshiarpur Bypass (from Design Chainage km 2.425 to Design Chainage km 15.200) (Total Length 27.923 Kms) in the State of Punjab (Package-IV) under NH(O) on EPC mode

2023_NHAI_141491_1 332.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2023
Time 11:0Hrs
06/03/2023
Time 11:0Hrs
398 Upgradation of existing 4 lane Ismailabad Ambala section of NH 152 - Km. 0.000 to Km 42.500 - Part of Ambala-Kotputli Corridor to 4-lane access controlled stretch by providing grade separated structures and service-Slip roads under Bharatmala Pariyojana–I in state of Haryana on EPC mode

2023_NHAI_140614_1 446.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2022
Time 15:0Hrs
06/03/2023
Time 11:0Hrs
399 Strengthening of Existing 2-Lane 4-Lane road with paved shoulders of NH-254 from KM 82.400 to 104.200 KM from Rampura to Maur in the State of Punjab (21.80 km) on EPC Mode.

2022_MoRTH_732296_1 30.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
400 Periodical repairs(PR) of NH-44 Srinagar Bypass 4 Lane from Km 0.00 to Km 0.950 , Km 2.400 to Km 4.50 and Km 11.500 to Km 17.80 in the UT of Jammu & Kashmir on Engineering, Procurement & Construction (EPC) mode

NIT 127 10.160 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
401 Construction of ROB at Km 202.992 of NH-76 including approaches in the state of Uttar Pradesh

2022_MoRTH_719462_1 38.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 16:0Hrs
01/03/2023
Time 15:0Hrs
402 Construction of Six Lane Ring road around Kanpur in the state of Uttar Pradesh under NHDP phase VII on EPC Mode (Package-I).

2022_NHAI_135667_1 846.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
01/03/2023
Time 11:0Hrs
403 Strengthening and widening of NH-251 from Km. 11.000 to Km.22.770 in Diu on EPC mode 3rd Call.

2023_MoRTH_740429_1 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 12:20Hrs
28/02/2023
Time 16:0Hrs
404 Construction of 4-Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road, Package-2) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode.

2022_NHAI_133516_1 633.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
405 Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH 4 from AP Tamil Nadu Border Km 134.890 to Nalagampalli village Km. 172.000 under EPC mode in the state of Andhra Pradesh

184.45 184.450 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/12/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
406 Balance Works of Four Laning of Udhampur- Ramban Section of NH-1A (now NH-44) from Km 67.00 to Km 89.00, Km 130.00 to Km 151.00 on Engineering Procurement & Construction (EPC) Mode in the Union Territory of Jammu & Kashmir under NHDP Phase-II

NHAI/Balance Work of U-R/J&K/EPC/2021 550.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 19:0Hrs
28/02/2023
Time 11:0Hrs
407 Balance work of Rehabilitation and Up gradation of existing carriageway to Two Lane with paved shoulder standard in Arvi to Talegaon section of NH347A in the state of Maharashtra on Engineering, Procurement and Construction mode. Total Length of the project 13.700 Km

2023_MoRTH_735025_1 99.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 15:0Hrs
27/02/2023
Time 15:0Hrs
408 Development of Six lane green field Ring Road (Package-IV) starts from Design Ch.68.650 to Design Ch. 93.209 (Length 24.559 kms) around Kanpur City in the state of Uttar Pradesh.

2022_NHAI_136422_1 734.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 17:0Hrs
27/02/2023
Time 11:0Hrs
409 Rehabilitation and upgradation of existing road between Km 0.00 to Km 29.725 Joshimath Suraithota NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_558726_1 213.040 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:40Hrs
27/02/2023
Time 11:0Hrs
410 Construction of Flyover/Underpass at Vizag Airport Junction to ensure Flow of container trailers to/from MMLP setup at NH-16 in the State of Andhra Pradesh on EPC mode

NHAI/PC/MMLP VIZAGAIRPORT/2022 44.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
27/02/2023
Time 11:0Hrs
411 Periodic renewal work of NH-121 (New-309) from Km.3.000 to Km. 13.000 & Km 27, 28 under Annual Plan 2022-23 in the state of Uttarakhand

2023_MoRTH_735321 4.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
21/02/2023
Time 15:0Hrs
412 Construction of 4-Laning of Kushner to Amjhar Road from km 75.480 to Km 98.950 (Jabalpur Ring Road, Pkg – 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_133148_1 418.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 15:0Hrs
21/02/2023
Time 11:0Hrs
413 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana

NHAI/Tech/BM/Pathankot Link Road/2021 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2022
Time 11:20Hrs
21/02/2023
Time 11:0Hrs
414 Road Safety work from Km. 77.000 to Km. 105.170 of NH-135C (Prayagraj - Koraon - Dramandganj - Halia - Awadhdham - Pipra - Manigadha - UP/MP Border) on EPC mode in the State of Uttar Pradesh in Year 2022-23

2023_MoRTH_733363_1 4.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 12:0Hrs
20/02/2023
Time 15:0Hrs
415 Treatment of landslide zone from location no. 01 to 28 (km 62.860 to km 152.750) on NH-125(09) in the state of Uttarakhand under EPC mode

2022_MoRTH_731620_1 147.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 17:0Hrs
20/02/2023
Time 11:0Hrs
416 Construction of VUP at Km 51.300 (Baghola) of Delhi-Agra Section from Km 20.500 to 200.000 of National Highway No.2 (New NH-19) in the state of Haryana on EPC mode

2023_NHAI_140161_1 26.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2023
Time 10:43Hrs
20/02/2023
Time 11:0Hrs
417 Construction of Katihar Bypass on NH 81 to four lanes with paved shoulders standard in State of Bihar Total length 4.7 Km through an Engineering Procurement and Construction EPC Contract.

2023_MoRTH_733995_1 169.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 15:0Hrs
20/02/2023
Time 11:0Hrs
418 Rehabilitation & Up- gradation for Talere – Gaganbawda– Kolhapur Road (NH- 166G) stretches start from Ch. 6.00 Km to Ch. 11.00 Km and Ch.19.300 Km (Start of Karul Ghat) to Ch. 35.300 Km (End of Gaganbawda) of NH- 166G, length 21.00 Km in the State of Maharashtra on EPC Mode

2022_MoRTH_727201_1 183.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
419 Rehabilitation & Up-Gradation To 2-Lanes with Paved Shoulder Configuration of Mahud-Sangola of NH-965G Chainage From km.159.400 to 161.900 & 162.400 to 183.960 km (Design Chainage from km 32.300 to km 34.800 & km35.300 to km56.860) In the State of Maharashtra on EPC Mode

2022_MoRTH_726627_1 189.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
420 Rehabilitation and Upgradation of Chorma – Bairgania section of National Highway No 227F to 2 lane with paved shoulders from Design Ch 0 000 to Ch 34 566 in the state of Bihar through Hybrid annuity mode (HAM) Basis

2022-NHAI-124214-1 391.610 NHAI Normal Highway Project HAM 30/07/2022
Time 15:0Hrs
15/02/2023
Time 17:0Hrs
421 Construction of Major Bridge on Shivani River at design chainage from km 122.080 to km 123.100 on NH353C along with approaches of 940m (Total Length 1020m) of National Highway Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Ashti Alapalli Sironcha Road on EPC mode in the state of Maharashtra

2023_MoRTH_732615_1 14.760 MoRTH Normal Highway Project BOT 04/01/2023
Time 12:0Hrs
15/02/2023
Time 17:0Hrs
422 Construction of seven minor bridges at design chainage km 2.400, km9.200, km14.200, km32.600, km34.200, km43.400 and km 46.400 on NH130D section (Total length of the project is 1.645 km with approaches) from Alapalli Bhamragad Narayanpur in Gadchiroli district on EPC mode in the state of Maharashtra

2023_MoRTH_732611_1 28.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
423 Widening and Strengthening Upgradation of 2 lane with PS from Existing Chainage km192 980 to km229 820(DC km162 800 to km198 180)(PackageVIII) under 31TF on AKHNOOR POONCH road (NH144A) in the UT of JK Under Project Sampark(BRO) on EPC

2022_MoRTH_731914_1 382.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
424 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode (3rd call)

2022_MoRTH_710564_3 6.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 15:0Hrs
14/02/2023
Time 15:0Hrs
425 Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under Bharatmala Pariyojana in the UT of J&K (Phase II-Package XVIII)

NHAI/BM/DAK Expressway/2022/Pkg XVIII 777.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
426 Rehabilitation and Up-gradation to Four Lane Road from km. 70.500 to km. 78.600 of NH-92 under EPC mode in the State of Uttar Pradesh

2022_MoRTH_667462_1 213.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
427 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_73756_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
13/02/2023
Time 16:0Hrs
428 Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh.

2022_NHAI_138409_1 152.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2022
Time 18:0Hrs
09/02/2023
Time 11:0Hrs
429 Rectification of MORTH Identified Black Spots JK .02.020 GOLE MELA and Construction of Service Road to existing VUP at SINGOOR on Jammu UDHAMPUR section of NH44 Km 14.200 in UDHAMPUR Jammu and Kashmir on EPC mode.

2022_NHAI_138938_1 44.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
08/02/2023
Time 15:0Hrs
430 Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode.

133905 765.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 18:0Hrs
01/02/2023
Time 11:0Hrs
431 Remaining work of periodic renewal (PR) work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode on Engineering Procurement Construction (EPC) basis.

2023_MoRTH_733300_1 6.050 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/01/2023
Time 15:0Hrs
31/01/2023
Time 15:0Hrs
432 Construction Of 4 Lane Rob At Level Crossing No. S-25/E-2 Old (A-25) On NH-15(54) At Km 0.800 In District Tarn Taran (Punjab)

2022_MoRTH_731522_1 68.230 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 14:0Hrs
30/01/2023
Time 15:0Hrs
433 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_2 6.540 MoRTH Maintenance Project OTHERS 07/01/2023
Time 16:0Hrs
30/01/2023
Time 12:0Hrs
434 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand- Package-III- Kashipur Bypass -Length-14.490 km Starts from Ch- 38.770 near UP-UK Border and ends at Ch- 53.260 -existing Ch-05.560 of NH 309

2022_NHAI_128979_1 392.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 15:0Hrs
30/01/2023
Time 11:0Hrs
435 Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77.100 to Km 170.580 Total length 93.48km to 2-lane with PS configuration along with OTI in 04 nos of bypasses in a total length of 7.23 km in the state of Madhya Pradesh

2022_MoRTH_691497_1 376.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
28/01/2023
Time 17:30Hrs
436 Slope Protection works for Treatment of Landslide zone near Khat Village from Ch. 54.750 to 54.950 (based on DPR submitted by THDC India Ltd.) and Strengthening of existing road from Ch. 53.425 to 55.335 on NH-107 (Old NH-109) in the State of Uttarakhand

2022_MoRTH_730786_1 33.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 14:0Hrs
27/01/2023
Time 12:0Hrs
437 Construction of 59 mtr Span PSC Segmental Box Girder bridge over Tirthan River at km 83 780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of Himachal Pradesh on EPC Mode.

2022_MoRTH_728833_1 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 18:0Hrs
27/01/2023
Time 11:0Hrs
438 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (3rd Call).

2022_MoRTH_730710_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 10:10Hrs
25/01/2023
Time 17:0Hrs
439 Strengthening from Km. 44.700 to Km. 62.200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat.(3rd Attempt)

2022_MoRTH_728211_2 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
25/01/2023
Time 15:0Hrs
440 Construction Of 2 Nos Of Major Bridge, 4 Nos. Minor Bridge And 8 Nos. Of Box Culverts Along With Road Safety Improvement Works Between Km 122.00 To Km 290.200 Of NH 41 In The State Of Gujarat.

2023_MoRTH_734111_1 40.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2023
Time 16:0Hrs
24/01/2023
Time 16:0Hrs
441 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2022_MoRTH_725679_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/11/2022
Time 15:0Hrs
24/01/2023
Time 15:0Hrs
442 Upgradation and widening of NH-848B From Ch. 8/180 to Ch. 12/000 and Ch. 14/100 to Ch. 20/300 at Daman

2022_MoRTH_731986_1 81.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 16:0Hrs
24/01/2023
Time 14:0Hrs
443 Construction of 4lane Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6lane elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojna in Odisha State on EPC Mode

NHAI/PC/BM/ Gopalpur PC /2022 165.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/09/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
444 Construction of Four-Laning of NH-45 to Kushner from km 38.400 to km 74.700 (Jabalpur Ring Road, Pkg – 3) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_127469_1 580.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
445 Improvement of 4 lane road to 6 lane road and 4 lane dedicated Port Roads for the Port connectivity road from Convent junction to Sheelanagar Junction in the State of Andhra Pradesh on EPC mode (2nd Call)

NHAI/PC/Convent-SheelaNagar/2021 506.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:15Hrs
24/01/2023
Time 11:0Hrs
446 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_733883_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
447 Rehabilitation and Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32 00 to km 79 650 Puttaparthi Koduru Section of NH342 in Sri Satyasai District in the State of AP on EPC Mode under Annual Plan 2022 23

2022_MoRTH_725788_1 909.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2022
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
448 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_733924_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 17:55Hrs
23/01/2023
Time 11:0Hrs
449 Design and Construction of standalone 6-lane Purmepada VUP Balance work at Km 282.800 in Dhule - Pimpalgaon section of NH-3 New NH-60 in the State of Maharashtra on EPC Mode

2022_NHAI_139705_1 42.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
19/01/2023
Time 15:0Hrs
450 Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli- Prayagraj section of NH- 30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd )

2022_NHAI_136309_1 70.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2022
Time 17:0Hrs
18/01/2023
Time 11:0Hrs
451 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_722759_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2022
Time 17:30Hrs
17/01/2023
Time 17:30Hrs
452 Periodic Renewal work from Km 198 to Km 217.425 (Paligad to Foolchatti) on NH 94(134) under NH Division Barkot in the state of Uttarakhand under Annual Plan 2022-23

2022_MoRTH_729860_1 4.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2022
Time 12:0Hrs
17/01/2023
Time 12:0Hrs
453 RFP for the work of Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_666965_1 330.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 9:0Hrs
16/01/2023
Time 17:0Hrs
454 Widening and StWidening to 2 lane with paved shoulders of Jareikela (Jharakhand/Odisha border)-Dhabaleswara section from km 0.000 to 36.000 km of NH-320D in the State of Odisha on EPC Mode

2022_MoRTH_706981_1 156.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 15:0Hrs
16/01/2023
Time 12:0Hrs
455 Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC

2022_MoRTH_683448_1 81.164 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 15:0Hrs
12/01/2023
Time 17:30Hrs
456 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_2 85.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 17:30Hrs
12/01/2023
Time 17:30Hrs
457 Widening of existing road of Kalinga Ghat in Valley Side for elimination of Black spot using innovative Reinforced Earth Composite Hybrid system from Km 86.330 to Km 86/615 including Reconstruction of Minor Bridge at 86.700 of N.H. 157 in the state of Odisha on EPC mode

2022_MoRTH_713461_2 27.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 13:30Hrs
10/01/2023
Time 12:0Hrs
458 Permanent rectification of 3 nos. of black spots in NH-27 of U.P border - Dewapur - Kotwa section from km. 360.915 to km. 440.000 (total length of 79.085 km) & 5 nos. of black spots of project Highway NH-27 of Kotwa - Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) in the State of Bihar

2022_NHAI_130142_1 276.650 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 26/09/2022
Time 18:0Hrs
10/01/2023
Time 11:0Hrs
459 Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-Dabwali section of old NH-10 (new NH-09) at Chainage-218.276 in the State of Haryana on EPC Mode

2022_NAHI_134967_1 17.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2022
Time 15:0Hrs
09/01/2023
Time 11:0Hrs
460 Construction of proposed Bypass at Reamal on NH -53 in the state of Odisha on EPC Mode. (Bid Ref No 26 CE NH of 2022-23)

2022_MoRTH_725530_1 17.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 18:55Hrs
07/01/2023
Time 12:0Hrs
461 Strengthening work of NH 107 (Old 109) (Kakdagad-Kund-Guptkashi) from Km. 33.130 to Km. 41.260 and Treatment of sinking zones in village Semi and Bhainsari from Kund to Guptkashi under Annual Plan 2022-23 in the state of Uttarakhand under EPC mode

2022_MoRTH_720508_1 71.427 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
06/01/2023
Time 12:0Hrs
462 Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH-19 Km 26.530) near Hinotiya Village to Design Km 75.700 (of existing SH-19 Km 74.820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode.

127462 392.810 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 18:0Hrs
05/01/2023
Time 11:0Hrs
463 Design and Construction of Standalone 4-lane Vehicular Underpass with approaches at Sangamner Bypass End Junction (Km.150.200) and Wavi Junction (Km.163.900) on Khed Sinnar section of NH-60 (Old NH-50) in the State of Maharashtra on EPC Mode

2022_NHAI_136814_1 41.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
464 Design and construction of crossing facility (VUP/VOP) at 4 locations viz. (i) Bhandgaon Jn (Km 47.920) (ii) Varkute Jn(Km 126.735) (iii) Indapur bypass Entry (km 135.675) (iv) Indapur Bypass Exit (Km 142.735) on Pune-Solapur (Pkg-I) (Km 40/000 to Km 144/400) section of NH-65 in the State of Maharashtra on EPC Mode

2022_NHAI_136845_1 139.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
465 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_728285_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
466 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2022_MoRTH_728321_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
467 Construction of 3 no of Bypasses at Sheikhpura Jamui Khaira alongwith 1 no of realignment at Sikandra with pre construction activity total length 13 472 Kmto two lane with PS standard along with U/S in N H 333A under EPC mode in State of Bihar

2022_MoRTH_721471_1 148.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 15:0Hrs
03/01/2023
Time 15:0Hrs
468 Six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun EC in Uttar Pradesh and Uttarakhand on EPC under BMP Phase- 1, Package 1- Saharanpur Bypass.

NHAI/BM/Delhi-Dehradun/Saharanpur-Ganeshpur-P1/2022 69.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 15:0Hrs
03/01/2023
Time 11:0Hrs
469 Upgradation and reconstruction of Jabalpur to Kundam Section of NH-45 from Km 40.500 (Design) to Km 68.100 (Design) including Kundam bypass Total length 27.60 km to Two lane with paved shoulder in the state of Madhya Pradesh

2022_MoRTH_720465_1 96.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
02/01/2023
Time 17:30Hrs
470 Upgradation and reconstruction of shahpura-Dindori section of NH 45 from Km 103.700 (Design) to Km 164.580 (Design) including 3 bypasses (Total length 60.88km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2022_MoRTH_682465_1 185.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
02/01/2023
Time 17:30Hrs
471 Strengthening from km 44.700 to 62.200 of NH168G NH168G under NH Division Ahmedabad in the state of Gujarat

728211 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
30/12/2022
Time 15:0Hrs
472 Widening from two lane to four lane with service roads from km 1.050 to km 3.470 of existing link road connecting NH-67 to NH-16 in Kovur town on EPC mode in the state of Andhra Pradesh

SENHVJA/22/2022-23 Dated.05.11.2022 50.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2022
Time 17:0Hrs
29/12/2022
Time 17:0Hrs
473 Strengthening of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

728194 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 13:0Hrs
29/12/2022
Time 16:0Hrs
474 Construction of proposed Half Clover Leaf interchanges cum ROB at Yerramanchi and Gudipalli villages across NH-44 at KM 416.005 in the state of Andhra Pradesh on EPC Mode.

2022_NHAI_122586_1 82.850 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:0Hrs
29/12/2022
Time 11:0Hrs
475 “Improvement of Road Budhal-Mahore-Gul from Km 0.000 to Km 22.72 (net length 21.00 km) (Pkg –I) to NHDL specification under Project Sampark in UT of J&K

CE(P)SPK/BMG/PKG-I/2022-23 210.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
28/12/2022
Time 15:0Hrs
476 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from design chainage km 0.0 to 58.115 to two lane with paved shoulder configuration under EPC mode in the state of Gujarat.

2022_MoRTH_720468_1 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 18:45Hrs
28/12/2022
Time 12:0Hrs
477 Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode

2022_NHAI_123842_1 4,994.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/07/2022
Time 18:0Hrs
27/12/2022
Time 11:0Hrs
478 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_1 6.540 MoRTH Maintenance Project OTHERS 28/10/2022
Time 10:55Hrs
26/12/2022
Time 12:0Hrs
479 Up-gradation to 4-lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under BMP on EPC Mode

2022_NHAI_134593_1 676.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 19:0Hrs
26/12/2022
Time 11:0Hrs
480 “Widening of Existing Road from Intermediate Lane/2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A (Rakholi-Khadoli-Velugam Section) in U.T. of Dadra & Nagar Haveli and Daman & Diu on EPC mode.”

E-Tender Notice No. 15 of 2022-23 172.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 13:0Hrs
24/12/2022
Time 12:0Hrs
481 Widening and strengthening to 4LPS 2LPS from km 0.000 to 35.800 Kuakhia Mangalpur Section of NH 20 in the State of Odisha on EPC mode. Bid Ref No.-01 ROBBSR 2022 23

2022_MoRTH_702919_1 341.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/07/2022
Time 15:0Hrs
22/12/2022
Time 12:0Hrs
482 Improvement from Km 94 0 96 0 96 2 96 8 97 6 101 0 102 0 103 0 138 0 139 3 142 0 151 4 including Protective works and CD works of Thirumangalam Kollam road NH 744 Old No 208 on EPC Basis

2022_MoRTH_721844_1 29.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:15Hrs
21/12/2022
Time 11:0Hrs
483 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_710564_2 6.310 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
484 One Time improvement of existing bypass road from Km 278 plus 650 to 281 plus 850 obedullaganj and Km 272 plus 200 To 269 plus 000 Goharganj Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_721813_1 5.070 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
485 One time improvement of existing bypass road from Km 161.700 to 163.100 ( Udaipura) Km 141.200 to 142.000 (Deori) and Km 181.200 to 184.900 (Khargone) Total length 5.09 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721814_1 4.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
486 Balance Work of Four laning of Panvel - Indapur section of NH-66 (Old NH-17) from km 0.000 (Panvel) to km 42.300 (Kasu) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode

2022_NHAI_133672_1 239.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 15:35Hrs
19/12/2022
Time 11:0Hrs
487 Periodic Renewal Work in Km. 0.000 to 39.000 of NH-730S in the State of Uttar Pradesh

2022_MoRTH_714209_1 16.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
16/12/2022
Time 15:0Hrs
488 Periodic Renewal Work in Km. 112.000 to 130.400 and 152.600 to 154.000 of NH-28B in the State of Uttar Pradesh on (EPC) basis

2022_MoRTH_714093_1 8.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
16/12/2022
Time 15:0Hrs
489 Construction of Six Lane VUP (Single box 12x5.5 m with approach) at Sachendi (Ch. 454.460) on Etawah-Chakeri (Kanpur) Section of NH-19 (Old NH-2) in the State of Uttar Pradesh on EPC Mode

2022_NHAI_132046_1 32.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 11:0Hrs
15/12/2022
Time 11:0Hrs
490 Construction of VUP at Km 1224.054 (Nagulauppalapadu/Growth centre) with Blackspot Id AP-(02)-038 and VUP at Km 291.646 of NH-16 (Rajupalem Junction) with Blackspot Id AP-(02)-033 on NH16 for rectification of Blackspots in the State of Andhra Pradesh

2022_NHAI_133564_1 70.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2022
Time 16:40Hrs
13/12/2022
Time 11:0Hrs
491 Construction of twin tube tunnels on Jammu Ring Road NH244A between Design Ch.50.600 to 51.700 and Design Ch. 53.535 to 55.700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase

NHAI/J&K/Jammu Ring Road/Tunnel/2022 698.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 15:0Hrs
13/12/2022
Time 11:0Hrs
492 strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand

2022_MoRTH_722210_1 6.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 16:30Hrs
07/12/2022
Time 12:0Hrs
493 4-Laning of Khandwa bypass from Rudhi to Deshgaon, Km 149.000 to Km 177.680 section of SH-71/NH-347B/NH-753L (Betul – Khandwa Pkg-V) in State of MP on EPC Mode

2022_NHAI_126175_1 356.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
07/12/2022
Time 11:0Hrs
494 Periodic Renewal Work in Km. 21.627 to Km. 34.000of NH-328A in the State of Uttar Pradesh on EPC Mode. Job No. CE-RO/LKO/PR/NH-328A/22-23/653 dt 20.09.2022

2022_MoRTH_723925_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 18:0Hrs
05/12/2022
Time 11:0Hrs
495 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 122.200 near Guddehosur at start of Kushalnagara Bypass to Ch. Km 144.900 at Near Hemming Village/ SH-21 Hassan - Periyapatna Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-II)

2022_NHAI_129471_1 694.870 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
496 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 144.900 Near Hemmige Village/ SH-21 Hassan - Periyapatna Road Junction to Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-III)

2022_NHAI_129444_1 666.970 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
497 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur to Ch. Km 195.550 at Yalachahalli Near SH-117 Yelawala – KR Nagara Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-IV)

2022_NHAI_129474_1 842.930 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
498 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 195.550 at Yalachahalli near SH-117 Yelawala – KR Nagara road junction to Ch. Km 214.535 joining (at ch. Km 131.180 approx) to Srirangapatna bypass near Paschima Vahini under NH (O) in the state of Karnataka (Package-V)

2022_NHAI_129475_1 735.270 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
499 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_1 7.846 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
03/12/2022
Time 17:30Hrs
500 Improvement of road Budhal-Mahore-Gul from Km 22.72 to Km 62.94 (net length 29.080 Km) (Package-II) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_527228_1 307.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
03/12/2022
Time 15:0Hrs
501 Rehabilitation and upgradation of existing road between Km 480.95 to Km 489.35 Joshimath Marwari on Joshimath - mana road

2022_BRO_558360_1 45.730 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2022
Time 15:0Hrs
01/12/2022
Time 11:0Hrs
502 Work of IRQP from Km 222/00 to Km.230/300 Derol Bharuch Section, and between Km 238/400 to 252/200 Ankleshwar- Modinagar- Sajod-Digas Section, Km. 182/00 to Km.184/150Amod-Nahiyer Section, Km 204/00 to Km.204/700Sudi Patiya to Samni Section of NH64

2022_MoRTH_718265_1 36.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 9:0Hrs
30/11/2022
Time 12:30Hrs
503 Construction of Rail Over Bridge in Lieu of Railway Crossing No. E/2 On Ferozepur- Fazilka Rail Section at Km. 2/4-5 &On NH-95 (New NH-05) Section Ferozepur to Indo Pak Border at Km 205.320 (Near Ferozepur City &Village Madhre) In the state of Punjab on EPC Mode (Job No. NH-95 (New NH-05)-PB- 2021-22/550 Dated 27.12.2021

2022_MoRTH_719231_1 33.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
504 Upgradation of Road Budhal-Mahore-Gul from km 65.880 to km 86.725 (net length 34.950 km) (Package-III) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_557550_1 249.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
505 4- Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode.

123351 468.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 18:0Hrs
29/11/2022
Time 11:0Hrs
506 Construction of 59 mtr. Span PSC Segmental Box Girder bridge over Tirthan River at km 83.780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of HP.

2022_MoRTH_717515 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
28/11/2022
Time 15:0Hrs
507 Strengthening & widening of NH-251 from Km. 11.000 to Km.22.770 in Diu (on EPC mode)

Tender Notice no.21/NH-251-Diu/2022-23 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 16:59Hrs
28/11/2022
Time 11:0Hrs
508 Development of existing 2 Lane NH1 from km 8.660 to km 33.775 Sumbal to Wayul to 4 lane dual carriageway NH standard as part of Srinagar Ring Road Phase II Design Ch 41907 to Ch 66609 under Bharatmala Pariyojna Phase I in the Union Territory of Jammu and Kashmir on EPC mode

2022_NHAI_127505_1 617.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 11:0Hrs
28/11/2022
Time 11:0Hrs
509 Rehabilitation and Upgradation of Parli to Sirsala section of NH 361F km 136.700 to 115.000 Length 21.70 km to Two Lanes with paved shoulder Four lane configurations on EPC in the state of Maharashtra

2022_MoRTH_710782_1 229.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
510 Rehabilitation and Upgradation of Shirapur Junction to Shivaji Chowk Design Chainage km. 130.00 to 144.500 section of NH 561 and Barshi Naka to Jarud Phata Design chainage km 49.500 to 59.500 section of NH 361F to Two lanes with paved shoulders Four lanes configuration on EPC Mode in the State of Maharashtra Total porject Length 24.5 km.

2022_MoRTH_711028_1 212.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
511 Widening to 4 lane in Km 40/510 to 41/450 and Strengthening from Km 15/600 to 19/800, km 36/000 to 54/500, km 55/375 to 57/400, km 58/600 to 59/600, km 60/200 to 61/900, km 62/600 to 64/000, km 74/000 to 75/126, km 76/373 to 76/450 & Km 77/600 to 90/275 including Geometrical Improvement at Km 37/400 & 46/800, Construction of Retaining wall & Breast wall, Construction of storm water drain, Reconstruction & Widening of culverts and Foot over bridge at km 78/900 of NH 85 (Old NH 49 Extn) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_717031_1 73.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/10/2022
Time 16:0Hrs
25/11/2022
Time 15:0Hrs
512 Periodical Renewal work from km 221.00 to km 225.00, IRQP from km 225.00 to km 232.00, PR from km 232.00 to km 260.00 & 266.00 to km 271.00 (Except km 247.066 to km 248.040, From km 269.067 to km 269.598, From km 258.226 to km 258.990 & From km 267.060 km to km 267.440 km) of NH-60 (new NH-14) under NH Division No- III in the District of Bankura, West Bengal during the year 2022-23. (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715219_1 41.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:55Hrs
24/11/2022
Time 14:0Hrs
513 Periodical Renewal work from km 181.00 to km 205.20 (Except km 181.636 to km 182.132, from km 193.25 to km 195.406 & From km 203.255 to km 203.45) of NH-60, under NH Div No - III in the District of Bankura, West Bengal during the year 2022-23 (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715356_1 22.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2022
Time 15:30Hrs
24/11/2022
Time 14:0Hrs
514 Widening and Strengthening to 2L with PS of Kandarpur- Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode

2022_MoRTH_699999_1 290.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
24/11/2022
Time 12:0Hrs
515 DESIGN AND CONSTR OF MULTISTORY BUILDING (G PLUS 2) WITH MI ROOM IN N AREA (PRESENT LOCATION OF HAD) BY 3D CONCRETE PRINTING TECHNOLOGY FOR ESTABLISHMENT OF AIR DISPATCH UNIT FOR PROJECT HIMANK AND VIJAYAK IN CHANDIGARH

2022_BRO_555867_1 33.130 BRO Special Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
516 Demolition and Re-construction of Deck Slab of Minor Bridge at km. 60.682 LHS on Patiala bypass Section of NH-07 on EPC Mode

2022_NAHI_131166_1 1.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
517 Four laning of Ottanchatram to Palani section from km 30/700 to km 55/000 of NH 209 (New NH-83) including footpath for pedestrian and way side amenities except from km 37/870 to 38/130, from km 39/200 to km 41/000, from km 43/400 to km 44/100, from km 47/400 to km 51/000 and from km 52/200 to km 52/965 on EPC mode under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_716364_1 127.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
23/11/2022
Time 15:0Hrs
518 Construction of HL bridges at CH 377/420 km, CH 423/800km , CH 433/750 km and CH 484/500 km in Malkangiri - Motu road on NH-326 in the state of Odisha on EPC mode

2022_MoRTH_701321_1 46.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2022
Time 18:55Hrs
23/11/2022
Time 12:0Hrs
519 Periodical renewal work from km. 0.165 to 17.756 on NH-11 Agra-Jaipur-Bikaner road Under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_718253_1 7.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 15:0Hrs
22/11/2022
Time 15:0Hrs
520 Periodical Renewal work on NH 503 Extn. in km.19.00 to 28.00 in the State of Himachal Pradesh on EPC mode.

2022_MoRTH_716413_1 4.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
521 PERIODICAL RENEWAL FOR KALA AMB PAONTA SAHIB DEHRADUN ROAD KM 52.00 TO 83.00 ON NH 07 IN THE STATE OF HIMACHAL PRADESH ON EPC MODE.

2022_MoRTH_716423_1 18.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
22/11/2022
Time 11:0Hrs
522 PERIODICAL RENEWAL WORK ON SELECTED STRETCHES KM 0/00 TO 69/00 (ON SELECTED STRETCHES FROM KM 0/0 TO 9/670, 9/800 TO 17/070,18/380 TO 21/032,21/580 TO 23/015,23/220 TO 23/630,24/980 TO 26/100,26/267 TO 28/648,28/850 TO 29/680,29/720 TO 30/400,30/480 TO 3100,30/480 to 31/150,31/270 to 31/800,37/400 to 37/485,41/350 to 59/240,59/280 to 62/790,62/900 to 64/642,64/780 to 69/00) of Theog-Kotkhai-Hatkoti Road NH-705 under annual renewal program(ARP) for year 2022-23 in the state of Himachal Pradesh On EPC Mode

2022_MoRTH_716447_1 34.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
523 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (2nd Call).

2022_MoRTH_711036_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
21/11/2022
Time 17:0Hrs
524 Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis

2022_MoRTH_714105_1 20.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
21/11/2022
Time 15:0Hrs
525 Construction of Shikaripura bypass starting at existing Km 146.150 and ending at existing Km 154.00 (design chainage from Km.0.00 to Km 6.576) of NH 766C in the State of Karnataka

RW/BNG /NH-766C/Km.146.15 to 154.00/21/2022 50.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 15:0Hrs
21/11/2022
Time 15:0Hrs
526 Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137/080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh on EPC Mode

2022_MoRTH_716585_1 15.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 18:0Hrs
21/11/2022
Time 11:0Hrs
527 Balance work for construction of approach slabs-wing wall and return wall along with approach roads for newly constructed bridge at Km 146.709 of NH-60 new NH-l4 in the district of Paschim Medinipur in the State of West Bengal on EPC Mode under Annual Plan 2022-23. Job No. 14-WB-2022-23-500.

2022_MoRTH_716662_1 6.562 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 17:0Hrs
21/11/2022
Time 11:0Hrs
528 Rehabilitation work for Damaged road sections AS27 KM 40.000 to KM 60.500 , AS25 KM 83.400 to KM 111.000, AS24 KM 111.000 to KM 126.450 and AS23 KM 126.450 to 140.700 in the State of Assam

2022_NHAI_128187_1 105.510 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
529 Strengthening of Pavement Including Improvement of Road Safety Work Construction of Retaining Wall Breast Wall Thrie Beam Crash Barriers Road Side Drains Slab Culverts Solid Cause Way etc in Km 286 00 to 329 00 on NH05 in the State of HP

2022_MoRTH_712867_1 80.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
530 Stabilisation of land slide and slope protection between Km 28.60 to Km 142.00 on Rishikesh Dharasu road on NH 34 state Uttarakhand on EPC mode No of slide locations 12 Nos

2022_BRO_555763_1 81.640 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
531 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/…….)

2022_MoRTH_714864_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:30Hrs
17/11/2022
Time 14:0Hrs
532 Widening and Strengthening to 2 lane with PS from 0.00 to 40.00 (Dhaugaon – Podamari section ) of NH 326 in the in the state of Odisha on EPC Mode.

2022_MoRTH_700046_1 155.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
17/11/2022
Time 12:0Hrs
533 PR of existing carriageway of NH-60 new NH-14 stretches from Km 173 to Km 181 Except 173.5 Km to 173.880 Km under NH Div No-II P.W.Rds Direct in the dist. of Paschim Medinipur WB under ARP 2022-2023. Job No. TA-14-WB-2022-23-807.

2022_MoRTH_714952_1 10.376 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:0Hrs
17/11/2022
Time 11:0Hrs
534 Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (Package-1)

2022_NHAI_126172_1 480.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
17/11/2022
Time 11:0Hrs
535 Road safety works in different stretches from (km 35.545 to km 36.20, km 38.97 to km 39.22, km 42.01 to km 42.32 & km 44.78 to km 45.04) for improvement of sharp turning & narrow road bench and construction of Over Head Gantry signs at 51.3 km of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong in the State of West Bengal under Road Safety Annual Plan 2022-23 (Job No.-NH-10/KOL/2022-23/RSCE-08).

2022_MoRTH_717906_1 8.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 10:0Hrs
16/11/2022
Time 17:0Hrs
536 Stregthning of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

718413 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 16:0Hrs
537 Balance work for construction of Fulahar Bridge approach on NH 131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode Job No. 131A/WB/2022-23/494

2022_MoRTH_715166_1 38.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:30Hrs
16/11/2022
Time 14:0Hrs
538 IRQP to newly declared NH151K Porbandar Bhanvad Tranpatiya road section btn km 0.0 to 18.4 and km 39.3 to 43.2 under EPC mode in the state of Gujarat

718402 17.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 12:0Hrs
539 Construction of VOP at Nanthoor Junction KA 02 135 at Km. 375.300 on NH 66 falls under completed four lane highway stretch of new Mangalore Port Road Connectivity stretch from Surathkal Nantoor of NH66 and Nantoor Talapady of NH73 developed under SPV to be executed on EPC mode

NIT No.22/NHAI/RO-BNG/15016/Tender/2022-23 dated 27.09.2022 60.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 15:0Hrs
16/11/2022
Time 11:0Hrs
540 Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, From Km 82.300 to 89.880,Total design length 7.580 Kml section of NH-752C in the State of Madhya Pradesh under EPC mode

2022_MoRTH_691384_1 48.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 15:0Hrs
14/11/2022
Time 17:30Hrs
541 Periodical Renewal work from km 598.00 to km 641.00 of NH-31(New NH-17 and 717) under NH Division IX in the District of Jalpaiguri, P.W Roads Directorate, West Bengal, under ARP 2022-2023. [Job No. TA/17&717/WB/2022-23/809].

2022_MoRTH_714300_1 47.392 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 17:10Hrs
14/11/2022
Time 17:0Hrs
542 Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G (Nuhkhas to Etah section) to two lane with paved shoulder configuration under EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_714083_1 241.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 15:0Hrs
10/11/2022
Time 15:0Hrs
543 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124501_1 783.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
10/11/2022
Time 11:0Hrs
544 Construction of Mihona bypass, Lahar bypass, Daboh bypass and Bhander Bypass (total length 20.60 km) to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh

2022_MoRTH_690776_1 92.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2021
Time 15:0Hrs
09/11/2022
Time 17:30Hrs
545 Construction of 2-lane with paved shoulder configuration of Khilchipur Bypass of Length 5.500 Km From Km 0.000 to 5.500 Total design length 5.500 Km section of NH-752B in the State of Madhya Pradesh under EPC Mode

2022_MoRTH_691394_1 52.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 17:30Hrs
07/11/2022
Time 17:30Hrs
546 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_1 85.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
07/11/2022
Time 17:30Hrs
547 Restoration-Rehabilitation work of Birendra SasmalSetu over river Kangsabati at Km 118.70 of NH-60 new NH-14 in the dist. of Paschim Medinipur in the State of West Bengal under Annual Plan 2022-23 on EPC mode. Job No. 14-WB-2022-23-495.

2022_MoRTH_713822_1 10.222 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/09/2022
Time 18:0Hrs
04/11/2022
Time 11:0Hrs
548 Work of Periodic Renewal from km. 28.580 to 29.639, Km. 30.029 to km. 30.060 and km. 30.659 to km. 44.843 of NH-334DD on EPC mode in the State of Uttar Pradesh

2022_MoRTH_718245_1 8.710 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 15:0Hrs
03/11/2022
Time 15:0Hrs
549 Construction of ROB at Km 146.488 of NH-76 including approaches on EPC basis in the state of Uttar Pradesh.

2022_MoRTH_699459_1 51.560 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 06/07/2022
Time 15:0Hrs
03/11/2022
Time 15:0Hrs
550 Construction Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH-26 in the state of Odisha on EPC mode (Bid Ref No.-19 CE NH of 2022-23)

2022_MoRTH_701682_1 115.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 18:55Hrs
03/11/2022
Time 12:0Hrs
551 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124497_1 845.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
03/11/2022
Time 11:0Hrs
552 Construction of External Road Connectivity to the proposed Multimodal Logistics Park at Nagpur

NHLML/MMLP/Nagpur/Ext/202 76.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/06/2022
Time 15:0Hrs
03/11/2022
Time 11:0Hrs
553 Development of Model Stretch-Provision of street lighting and beautification of Dhapewada Bridge and VoP on Saoner–Dhapewada-Kalmeshwar and Gondkhairi section of NH-547E from Km.4.700 to Km.33.575 in the State of Maharashtra on EPC Mode

2022_NHAI_131715_1 8.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 9:30Hrs
01/11/2022
Time 11:0Hrs
554 Improvement Up gradation of NH734 section of Moradabad Thakurdwara Kashipur including Moradabad Kashipur bypasses on EPC basis in the state of Uttar Pradesh Uttarakhand Package I Moradabad Bypass Length 33.724 km Start from Ch 000 Km 144381 of NH24 and ends at Ch 33724 Km 167790 of NH 24

2022_NHAI_123457_1 796.310 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/07/2022
Time 15:0Hrs
01/11/2022
Time 11:0Hrs
555 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand Package-II Moradabad - Thakurdwara Length- 38-770 km Start from Ch 0-00 Existing Km 389-00 at Bijna and ends at Ch 38-770 near UP-UK Border

2022_NHAI_124110_1 814.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2022
Time 15:0Hrs
01/11/2022
Time 11:0Hrs
556 Constructions of Missing Storm Water drain in Selected Stretches from Km 170/800 - 192/600 (8000m) and Construction of Box Culvert at Km 171/0, 175/7 & 197/0 and Berms Protection work from Km 199/0-199/2 (200m) of NH 234 Mangalagiri - Vengatagiri Kottah – Pernampet – Gudiyatham – Katpadi – Vellore – Polur – Thiruvannamalai - Villupuram road in the State of Tamil Nadu

2022_MoRTH_712639_1 12.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 16:0Hrs
31/10/2022
Time 15:0Hrs
557 STRENGTHENING INCLUDING IMPROVEMENT WITH ROAD SAFETY WORK ON NH503A IN KM NEW CHAINAGE 42 000 TO 70 000 OLD CHAINAGE KM 39 700 TO 67 250 IN THE STATE OF HP

2022_MoRTH_712903_1 41.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2022
Time 18:0Hrs
31/10/2022
Time 11:0Hrs
558 Construction of 4 laning of Green field Road connecting North and South Industrial Cluster of Khandaleru creek near Krishnapatnam port at Thamminapatnam to Narikellapalle (Part-I from km 0.000 to Km 14.650) and Six laning of extension of Dedicated port road on NH-67 (Part-II form Km 18.000 to Km 19.300) in the State Andhra Pradesh under Bharatmala Pariyojana Phase-I on EPC Mode (2nd Call)

NHAI/PC/BM /2022 (Thaminapatnam) 420.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/09/2022
Time 16:0Hrs
31/10/2022
Time 11:0Hrs
559 Periodical Renewal from km 11/0 to 34/480 of NH51 under NH Division Rajkot Road and Building Departmetn in the state of Gujarat for the year 2022.23 length 23.48Km

714478 25.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/09/2022
Time 18:0Hrs
28/10/2022
Time 16:0Hrs
560 Construction of 69 Bridges including approach road on the Tamu-Kalewa-Kyigone (TKK) section from km 0.00 to km 149.70 of Trilateral Highway in Myanmar to be executed on EPC mode

2022_NHAI_122381_1 384.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 17:0Hrs
27/10/2022
Time 17:0Hrs
561 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-III from Pindari (km 78.150) to Rawalganj Bypass (km 117.120) on EPC Mode in the state of Uttar Pradesh and Bihar

2022_NHAI_124506_1 806.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
27/10/2022
Time 11:0Hrs
562 Upgradation of Jirapur-Pachore Road including Pachore-Jirapur-Chhapiheda and Khujner Bypasses from 0.000 to 58.790 (Design Length 58.79 Km) section of NH-752C to 2L and PS in the State of Madhya Pradesh under EPC mode

2022_MoRTH_691402_1 253.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 15:0Hrs
24/10/2022
Time 17:30Hrs
563 Periodic Renewal Work in Km. 454.000 to 470.900 and km 474.000 to 484.000 of NH-730 in the State of Uttar Pradesh

2022_MoRTH_714181_1 14.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
21/10/2022
Time 15:0Hrs
564 PERIODIC RENEWAL OF ROAD FROM KM 8.00 TO 52.00 OF NH309A UNDER NH DIVISION LOHAGHAT IN THE STATE OF UTTARAKHAND UNDER ARP 2022-23 under EPC Mode

2022_MoRTH_710740_1 9.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
21/10/2022
Time 15:0Hrs
565 I.R.Q.P between km. 169.900 to km. 222.000 of NH-754K in the State of Gujarat. Section Dholavira - Balasar Road.

2022_MoRTH_714410_1 31.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
20/10/2022
Time 17:0Hrs
566 Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-IV Buxar Spur of length 17.270 km on EPC Mode in the state of Uttar Pradesh

2022_NHAI_124510_1 309.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 11:0Hrs
20/10/2022
Time 11:0Hrs
567 Balance Work of Strengthening of road stretches along with provision for retaining walls, Breast walls & hill side drains from km 0.00 to km 4.40 & km 14.00 to km 28.00 of NH-10 (old NH-31A) Dist-Darjeeling, West Bengal in EPC mode [Job No-10/WB/2022-23/496].

2022_MoRTH_711885_1 13.834 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/09/2022
Time 10:15Hrs
19/10/2022
Time 17:0Hrs
568 Construction of Foot Over Bridges on Km. 21.500 (Design Ch 21.500 PKG-I) & Km. 29.500 (Design Ch 29.500 PKG-I) on NH-148B and Km. 17.500 (Design Ch 3.100 PKG-III) & Km. 58.600 (Design Ch 44.200 PKG-II) on NH-11 in the State of Haryana on EPC mode.

2022_NHAI_125121_1 13.100 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/08/2022
Time 15:0Hrs
19/10/2022
Time 11:0Hrs
569 Construction of two lane with paved shoulders including Land acquisition from km 56/860 to km 68/369 of NH-59 (Rigdol to Belgaon) in the state of Odisha under EPC Mode. (Bid Ref No.-20 CE NH of 2022-23)

2022_MoRTH_703569_1 66.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2022
Time 18:55Hrs
17/10/2022
Time 12:0Hrs
570 Construction of 2 lanes ROB over L C NO S 53 T 2 at CH 50 665 of NH 703A Jalandhar Kapurthala Sultanpur Lodhi Makhu in the State of Punjab on EPC Mode

2022_MoRTH_692451_2 75.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2022
Time 15:30Hrs
14/10/2022
Time 10:0Hrs
571 Widening and Reconstruction of existing road to 4lane from Km 56.400 to Km 120.300 i.e. from B. Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70.200 to Km 77.105 of NH 716G in the State of Andhra Pradesh on EPC mode under AP 2021 22

2022_MoRTH_709164_1 650.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2022
Time 15:0Hrs
13/10/2022
Time 15:0Hrs
572 CONSTRUCTION OF 6 LANE ELEVATED CORRIDOR ALONG WITH DEVELOPMENT OF EXISTING 4 LANE ROAD AT GROUND LEVEL FROM AROOR TO THURAVOOR THEKKU SECTION OF NH 66 FROM KM 366.330 TO KM 379.082 OF NH 66 LENGTH 12.752 KM UNDER BHARATMALA PARIYOJANA IN THE STATE OF KERALA

2022_NHAI_118890_1 1,993.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
13/10/2022
Time 11:0Hrs
573 Periodic Renewal Work in Km 1 to Km 12, Km 19 to Km 21 , Km 40 &Km 43 on NH-731K in the state of Uttar Pradesh on EPC Mode

2022_MoRTH_709046_1 6.130 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/08/2022
Time 15:0Hrs
11/10/2022
Time 15:0Hrs
574 Six lane Flyover with approaches and Slip Road from km 0.000 to km 1.460 along NH 44 at Start of NH 530B Mathura Bypass at Existing km 154.200 of NH 02 (New NH 44) in the State of Uttar Pradesh on EPC Mode Basis.

NHAI/HQ/UP(W)/Agra/ Pkg-1A/6L Flyover/2022 75.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2022
Time 18:0Hrs
11/10/2022
Time 11:0Hrs
575 Construction of Kaithi Padaria Kala bypass,Patna Tamoli bypass,Jaso bypass and Nagod bypass total length 15.44 Km to 2 lane with paved shoulders flexible pavement on NH 943 in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_683463_1 94.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 15:0Hrs
10/10/2022
Time 17:30Hrs
576 Periodical Renewal from Km. 77.000 to 78.460, 78.645 to 84.600, 85.290 to 85.750, 86.950 to 87.210 and 87.360 to 105.000 of NH-135C on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_709232_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2022
Time 9:0Hrs
10/10/2022
Time 15:0Hrs
577 Periodical Renewal from Km 73.134 to Km 129.00 of NH-135A on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_708639_1 27.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:0Hrs
08/10/2022
Time 15:0Hrs
578 Periodical Renewal from Km 129.000 to 147.000 of NH-135A on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_708668_1 7.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:55Hrs
08/10/2022
Time 15:0Hrs
579 Periodical Renewal from Km 0.000 to Km 30.000 of NH-135A on EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_708591_1 25.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2022
Time 18:0Hrs
08/10/2022
Time 15:0Hrs
580 Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77.100 to Km 170.580 Total length 93.48km to 2-lane with PS configuration along with OTI in 04 nos of bypasses in a total length of 7.23 km in the state of Madhya Pradesh

2022_MoRTH_691497_1 377.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
07/10/2022
Time 17:30Hrs
581 Construction of four lane Bypass to Jeypore town on NH-26 in the state of Odisha on EPC Mode under Annual plan of 2021-22 ( Bid Ref No.-23 CE NH of 2022-23)”

2022_MoRTH_708060_1 84.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/08/2022
Time 18:55Hrs
06/10/2022
Time 12:0Hrs
582 Periodical Renewal on NH-351G between km 78/700 to km 143/700 & km 148/700 to 169/220 (Length-85.52km) in the state of Gujarat under EPC mode for the year 2022-23

710742 54.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2022
Time 10:45Hrs
06/10/2022
Time 12:0Hrs
583 Cons and Upgradation to 4L from Siwan (Design Ch. 4.217) to Mashrakh (Design Ch. 50.123)of NH-227A including construction of 4L Tanrwa/Siwan Bypass (0 to Km 4.217) of NH 531 under Backward Area/Religious/Tourist Places(BRT)scheme in Bihar on HAM mode

2022_NHAI_122010_1 1,027.320 NHAI Special Project HAM 11/07/2022
Time 15:0Hrs
06/10/2022
Time 11:0Hrs
584 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand Package-I Moradabad Bypass Length 33-724 km Start from Ch 0-00 Km 144-381 of NH-24 and ends at Ch 33-724 Km 167-790 of NH-24

2022_NHAI_123457_1 796.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/09/2022
Time 15:0Hrs
06/10/2022
Time 11:0Hrs
585 Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode

NHAI/Bharatmala/ICR/PAB/Pkg1/2022 1,306.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/04/2019
Time 11:0Hrs
29/09/2022
Time 11:0Hrs
586 Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode

NHAI/Bharatmala/ICR/PAB/Pkg2/2022 1,388.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/04/2022
Time 11:0Hrs
29/09/2022
Time 11:0Hrs
587 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2022_MoRTH_675191_1 179.265 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2022
Time 15:0Hrs
27/09/2022
Time 17:30Hrs
588 Periodical Renewal works in km. 3.939 to 15.450 Chaigaon Makhan Road on NH 347B under NH Division Indore in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_684790_2 4.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 10/08/2022
Time 17:30Hrs
26/09/2022
Time 17:30Hrs
589 Work of Periodic Renewal (PR) from km. 28.580 to 44.843 of NH-334DD in the State of Uttar Pradesh under EPC mode

2022_MoRTH_709079_1 8.710 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:0Hrs
26/09/2022
Time 15:0Hrs
590 Construction of a bridge over river Shali at Km 247.00 of NH 60 (New-NH 14) in Bankura district in the State of West Bengal on EPC mode (Job No. 14/WB/2021- 22/491)

2022_MoRTH_707070_1 19.444 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:0Hrs
26/09/2022
Time 14:0Hrs
591 Construction of 4 lane VUP at Bhankarpur junction at Km 33.275 on Ambala-Chandigarh section of Old NH-22 (New NH-152) in the State of Punjab on EPC basis

2022_NAHI_125144_1 13.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/08/2022
Time 15:0Hrs
22/09/2022
Time 11:0Hrs
592 Rectification of MORTH Identified Black Spots JK 02020 (GOLE MELA) and Construction of Service Road to existing VUP at SINGOOR on Jammu UDHAMPUR section of NH44 (km 14.200) in UDHAMPUR (Jammu and Kashmir) on EPC mode.

2022_NHAI_124328_1 44.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2022
Time 15:0Hrs
20/09/2022
Time 15:0Hrs
593 Construction of Bypass to Nayagarh town from km 235.469 to km 252.482 of NH-57 in the State of Odisha on EPC mode” (Bid Ref No.11 CE NH of 2022-23)

2022_MoRTH_697372_1 95.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:55Hrs
20/09/2022
Time 12:0Hrs
594 Rehabilitation Upgradation of Kurwai Mungaoli Chanderi road section of NH-346, Total Length- 83.1 km to Two lane with paved shoulder configuration along with one time improvement in 07 nos. of bypassed total length of 22.615 km on EPC mode

2022_MoRTH_689194_1 298.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 17:30Hrs
19/09/2022
Time 17:30Hrs
595 WIDENING and DEVELOPMENT OF EXISTING NH 85 FROM KM 0.000 TO KM 124.636 SECTION OF NH 85 TO 2L/2L plus PS SECTION IN THE STATE OF KERALA

2022_NHAI_124194_1 889.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 15:0Hrs
19/09/2022
Time 15:0Hrs
596 Rehab. Upgrad. and Const. of 2L PS from I Bakaur(CH 13.300)to Parsarma(CH 18.875)NH 527A ii)Parsarma(Design Km0.000)to Bariyahi (CH24.068)iii)Bangaon Bypass KM0.000 to Km3.820 and iv)Spur Road Mahishi Km 0.000 to Km 5.720 to 2L with PS/4L in Bihar

2022_NHAI_124186_1 485.310 NHAI Special Project HAM 30/07/2022
Time 14:0Hrs
19/09/2022
Time 11:0Hrs
597 Four laning of Aurangabad to Paithan section of NH-752E from design km 0.000 to design km 42.417 (Design Length – 42.417 km) in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana

2022_NHAI_124133_1 495.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2022
Time 17:40Hrs
19/09/2022
Time 11:0Hrs
598 Stabilisation of land slide and slope protection at Govindghat at existing chainage 499.350 on Joshimath Mana road of NH 07 on EPC mode in the state of Uttarakhand

2022_BRO_540064_1 39.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 15:0Hrs
16/09/2022
Time 10:0Hrs
599 Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_682510_1 110.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
14/09/2022
Time 17:30Hrs
600 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_690878_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 17:30Hrs
13/09/2022
Time 17:30Hrs
601 Construction of Two Viaducts at Km 88.440 LHS and Km 103.320 LHS at Parwanoo-Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.

2022_NHAI_124266_1 37.340 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/08/2022
Time 15:30Hrs
12/09/2022
Time 11:0Hrs
602 Construction and upgradation of road Km 504.871 to Km 509.725 Lambagarh to Benakuli incl Benakuli land slide on road Joshimath Mana under EPC mode NH 07 in Uttrakhand

2022_BRO_524185_1 190.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 14:0Hrs
12/09/2022
Time 11:0Hrs
603 Proposal for slope stabilization and rock fall mitigation works at Km 314 220 to 314 300 including construction of Rwall along with steel dowels and Thrie beam crash barrier at km 314 200 to 314 300 on NH 5 near Nigulsari, Tehsil Nichar of Distt Kinnaur in the State of HP

2022_MoRTH_696578_1 11.310 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 18:0Hrs
12/09/2022
Time 11:0Hrs
604 Construction of Major Bridge Across Wainganga river in Km. 134/000 (Near Armori) on Nagpur-Umred-Nagbhid-Bramhapuri-Armori Road NH-353D in the State of Maharashtra on EPC Mode

2022_ MoRTH_668784_1 52.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 14:0Hrs
08/09/2022
Time 17:0Hrs
605 Construction of H.L. Major Bridge at CH 323/957, H.L. Minor Bridge at CH 323/780 & RCC Box at CH 323/500 over Kolab river, near Patraput (Koraput district), on NH-326 in the state of Odisha

2022_MoRTH_687093_2 21.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
08/09/2022
Time 12:0Hrs
606 Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH-44 (old NH-03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.

44022/2/2021 UP(W) 233.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2022
Time 18:55Hrs
08/09/2022
Time 11:0Hrs
607 Construction of Railway over Bridge at Km 60/200 of NH-316 (Km 3.2 of Old NH-203E) at Matiapada on Puri Konark Road, (KP-42 of Khurdha-Puri-Rail Line) in the state of Odisha under EPC Mode.(Bid Ref No.-16 CE NH of 2022-23)

2022_MoRTH_700818_2 55.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 18:55Hrs
07/09/2022
Time 12:0Hrs
608 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

707192 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 18:45Hrs
07/09/2022
Time 12:0Hrs
609 PR from km 28.200 to 62.840 of NH351G Total length 34.640 Km Khambha Chalala road section in the state of Gujarat under EPC mode

707182 11.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 18:45Hrs
07/09/2022
Time 12:0Hrs
610 CONS AND UPGRAD TO NHDL SPEC INCL TUNNEL AND MINOR BRIDGE FROM KM 0PT000 TO KM 7PT900 (DESIGN CHAINAGE KM 0PT000 TO KM 7PT900) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR-AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 7PT900 KM)

2022_BRO_536976_1 80.720 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/07/2022
Time 19:0Hrs
06/09/2022
Time 12:0Hrs
611 Balance work for construction of Fulahar Bridge approach on NH-131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode (Job No. 131A/WB/2022-23/494)

2022_MoRTH_699599_1 38.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/07/2022
Time 9:0Hrs
06/09/2022
Time 11:0Hrs
612 Work of Periodic Renewal between Km 356/905 to 376/300 Ferkuva-Dhamodi section road and Km 405/305 to Km 407/105, Pavijetpur town section of NH No- 56 in Chhotaudepur district in Gujarat

2022_MoRTH_706705_1 10.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/08/2022
Time 15:0Hrs
05/09/2022
Time 15:0Hrs
613 Construction of Kotpad Bypass (Length-14.310Km) to Two lane with paved shoulders configuration on NH-63 in the state of Odisha on EPC Mode. (Bid Ref No.-12 CE NH of 2022-23)

2022_MoRTH_698368_1 63.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/07/2022
Time 17:0Hrs
05/09/2022
Time 12:0Hrs
614 Work of PR/IRQP between km 15/700 to km 16/930 (Nadiad Bypass section) of NH 848K and and km 104/920 to 108/200 (in selected length) of NH 64 in the state of Gujarat

2022_MoRTH_706711_1 5.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
05/09/2022
Time 11:0Hrs
615 Construction of VUP, Service road at km.17.325 in village Behram on Phagwara-Rupnagar section of NH-344A in the State of Punjab on EPC Mode.

2022_NAHI_122973_1 17.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2022
Time 15:0Hrs
05/09/2022
Time 11:0Hrs
616 Balance work for improvement to 2 lane with PS in realignment from Km 52.320 to Km 52.940 of NH81 Protection works in HL Bridges at Km 33 and Km 36 for the approach of Mahananda River and recons. of culvert in 30th km of NH81 on EPC mode in Bihar.

2022_MoRTH_702670_1 18.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 15:0Hrs
05/09/2022
Time 11:0Hrs
617 Construction LVUP on Six Lanning of Agra Etawah Bypass section of NH-2 from km 270.270 to km 270.830 and Construction of Foot Over Bridge at Km 274.055 in the state of Uttar Pradesh to be executed on EPC Mode

2022_NHAI_122933_1 44.644 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2022
Time 9:0Hrs
05/09/2022
Time 11:0Hrs
618 Rehabilitation and Up-gradation to 4 lane Road with PS configuration from Undewadi Kade pathar (Ch. Deshmukh Chowk and Dhawan Patil Chowk (Baramati) Phaltan section of NH-160 in the State of Maharashtra on EPC mode.

2022_MoRTH_685345_1 669.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
619 Rehabilitation and Up-gradation to 2 LPS/ 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H from Km 179.430 to Km 141.800 in the State of Maharashtra on EPC Mode.

2022_MoRTH_685346_1 301.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
620 Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section Km 258.300 to Km 306.300 of NH-752 I to two LPS configuration on EPC Mode in the State of Maharashtra.

2022_MoRTH_685348_1 356.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 15:0Hrs
02/09/2022
Time 17:0Hrs
621 Construction of new four lane bypass to Parbhani city (Parwa to Asola) km 463.265 to km 481.180 (Design Ch. 19.220 to km 34.434) section of NH-61 on EPC mode in the State of Maharashtra.

2022_MoRTH_685352_1 430.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
622 Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH-752G Design Ch Km 64.000 to Km 101.140 2LPS Four Lane configuration in the state of Maharashtra on EPC mode.

2022_MoRTH_685353_1 361.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:0Hrs
02/09/2022
Time 17:0Hrs
623 Construction of Bypass to Gudiyatham Town in Km 23/100 – 29/250 including LA & Shifting of NH-234 (Mangalore – Villupuram Road) (NEW NH-75) in the State of Tamil Nadu on EPC Mode

2022_MoRTH_697006_1 101.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 13:15Hrs
02/09/2022
Time 15:0Hrs
624 Balance works of the project “4-laning of Rampur-Kathgodam section of NH-87 (New NH No. 09) from Km 0.000 (Km 190.000 of NH-24) to Km 42.791 (design Chainage Km 43.446) (Package-I) in the state of Uttar Pradesh under NHDP Phase-III on Hybrid Annuity Mode” on EPC Mode.

2022_NHAI_115331_1 295.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/05/2022
Time 18:40Hrs
02/09/2022
Time 11:0Hrs
625 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_690878_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 17:30Hrs
01/09/2022
Time 17:30Hrs
626 Work of Widening of road to 4-lane from km 710/600 to 718/500 of NH-56 under NH division Bharuch in the state of Gujarat On EPC Mode.

2022_MoRTH_706874_1 48.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/08/2022
Time 15:0Hrs
01/09/2022
Time 15:0Hrs
627 Construction of 4 lane access controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH16 connectivity in Andhra Pradesh on EPC mode under Bharatmala Pariyojana

2021_NHAI_106927_1 416.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2022
Time 15:0Hrs
01/09/2022
Time 11:0Hrs
628 Construction of 4Lane with PS Delina Flyover including flyover length 1.704 km of total length 22.736 kms in AOR of 760 BRTF on road SRINAGAR BARAMULA URI NH 01 in the UT of JK

2022_MoRTH_698225_1 457.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2022
Time 15:55Hrs
29/08/2022
Time 17:0Hrs
629 Periodical Renewal (P/R) to NH-316 from 28/500 to km 33/00 & Km 35/500 to km 48.000(Puri -Satapada) in the State of Odisha

2022_MoRTH_703994_1 7.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
29/08/2022
Time 12:0Hrs
630 CONS AND UPGRAD TO NHDL SPEC INCL MINOR BRIDGES FROM KM 24PT500 TO KM 33PT460 (DESIGN CHAINAGE KM 22PT400 TO KM 31PT360) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM SHYOK UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 8PT960 KM)

2022_BRO_539337_1 81.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 18:0Hrs
29/08/2022
Time 12:0Hrs
631 Upgradation of Dindori-Sagartola-Kabirchabutra MP-CG border Section of NH 45 Total length 77km to Two lane with paved shoulder configuration along with OTI in 04 nos of bypassed in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode

2022_MoRTH_686466_1 251.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
26/08/2022
Time 17:30Hrs
632 Construction of 4- Lane Chapra- Manjhi By-Pass Connecting NH-19 and NH-85 on EPC mode in the state of Bihar (Length-7.155 Km)

2022_MoRTH_694396_1 261.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 15:0Hrs
26/08/2022
Time 15:0Hrs
633 Construction of new two lane bridge over Sabarmati River near Dharoi dam on NH58 at Km 84/0 in the state of Gujarat

2022_MoRTH_687236_2 55.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 17:10Hrs
25/08/2022
Time 12:0Hrs
634 Development of External Road Connectivity to the proposed Multimodal Logistics Park at Nagpur

NHLML/MMLP/ Nagpur/Ext/2022 76.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 11:0Hrs
24/08/2022
Time 11:0Hrs
635 Construction of Kaithi Padaria Kala bypass,Patna Tamoli bypass,Jaso bypass and Nagod bypass total length 15.44 Km to 2 lane with paved shoulders flexible pavement on NH 943 in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_683463_1 94.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
23/08/2022
Time 17:30Hrs
636 Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC

2022_MoRTH_683448_1 80.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
23/08/2022
Time 17:30Hrs
637 PR from Km 119.0 to 181.2 Total length 62.2 Km of NH351 Jetpur Vadiya Bagasara road in the state of Gujarat on EPC mode

703868 25.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2022
Time 14:0Hrs
23/08/2022
Time 12:0Hrs
638 Upgradation and reconstruction of shahpura-Dindori section of NH 45 from Km 103.700 (Design) to Km 164.580 (Design) including 3 bypasses (Total length 60.88km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2022_MoRTH_682465_1 186.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 15:0Hrs
22/08/2022
Time 17:30Hrs
639 Upgradation of Dindori-Sagartola-Kabirchabutra MP-CG border Section of NH 45 Total length 77km to Two lane with paved shoulder configuration along with OTI in 04 nos of bypassed in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode

2022_MoRTH_686466_1 253.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 15:0Hrs
22/08/2022
Time 17:30Hrs
640 Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_682510_1 111.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 17:30Hrs
22/08/2022
Time 17:30Hrs
641 Construction of additional two lane with PS of NH98 New NH139 from existing Ch. 7.000 to Ch. 17.840 Design Ch.0.000 to Ch.10.840 AIIMS Bhusaula Golambar to Naubatpur Patna Ring Road section on EPC mode in the state of Bihar year 2021 22 Length 10.84

2022_MoRTH_699589_1 77.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2022
Time 11:0Hrs
22/08/2022
Time 11:0Hrs
642 Providing Crash Barrier as Road Safety measures on NH-26 from km 410/000 to 434/767 km(Sunki Ghat portion) in the State of Odisha under AP-2021-22

2022_MoRTH_685766_2 5.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
20/08/2022
Time 12:0Hrs
643 Improvement of Road Safety through providing Metal Beam Crash Barriers, Removal of Black spot by Improvement of Junctions and Improvement of night time visibility by providing Highway Lighting from km 35/700 to 71/117 of NH-220 in the state of Odisha under Road Safety Annual Plan 2021-22.

2022_MoRTH_689824_2 7.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/07/2022
Time 18:55Hrs
20/08/2022
Time 12:0Hrs
644 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2022_MoRTH_675191_1 178.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 15:0Hrs
16/08/2022
Time 17:30Hrs
645 Construction and Site for Improvement of existing 4 Lane National Highway Old NH-22 (New NH-5) on Zirakpur Parwanoo section from Km 42.350 to Km 43.850 including 2nos.VUP at Km 43.051 and Km 43.286 in the State of Haryana on EPC Mode

2022_NAHI_120638_1 43.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
16/08/2022
Time 11:0Hrs
646 Improvements to RC-12 Sanniyasikuppam road and RC-13 Vadhanur road connecting Moolakulam junction and Thirubuvanai junction in NH45A, Puducherry on EPC mode, under Central Road Infrastructure Fund

2022_MoRTH_689102_1 11.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 15:0Hrs
12/08/2022
Time 16:0Hrs
647 Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch. 44.500 (Vill. Parsada) to design ch. 92.230 (Vill. Paragaon) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package B)

NHAI/BM/Durg- Raipur -Bypass/Package-B 1,033.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 15:0Hrs
11/08/2022
Time 15:0Hrs
648 IRQP of existing carriageway from Km 148 to Km 156 except Km 148.24 to Km 148.69 and Km 153 to Km 155.54 of NH-60 New NH-14 in the district of Paschim Medinipur in the State of WB under ARP 2021-22 on EPC mode. Job No. TA-14-WB-2021-22-803

2022_MoRTH_697390_1 9.209 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:0Hrs
11/08/2022
Time 11:0Hrs
649 Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch. 0.000 (Vill. Tendesara) to design ch. 44.500 (Vill. Parsada) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package A)

NHAI/BM/Durg -Raipur -Bypass/Package-A 968.570 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 15:0Hrs
11/08/2022
Time 11:0Hrs
650 Construction of Additional 2-lane High Level Bridge across the river Kamandala at Km 92/8 of NH- 234 (New NH-38) (Mangalore-Villupuram Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_692312_1 6.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2022
Time 12:0Hrs
10/08/2022
Time 15:0Hrs
651 Strengthening in Km 93 6 111 4 of NH 230 New NH 85 on EPC Basis Contract in the State of Tamil Nadu

2022_MoRTH_696121_1 17.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 13:10Hrs
10/08/2022
Time 11:0Hrs
652 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_1 85.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
08/08/2022
Time 17:30Hrs
653 Construction of Flyover in km.468/500, Vehicular Underpass in km.470/00 and Overpass in km.451/300 to 451/900 including Road Safety along with avenue and median plantation from km 450/170 to km 471/330 on NH-66 Panvel Mahad Panji Road (2nd call)

2022_MoRTH_702910_1 73.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/07/2022
Time 18:0Hrs
08/08/2022
Time 17:30Hrs
654 Construction of VUP at Km 1379.934 at Golagamudi Junction, Service Road from Km 1380.350 to Km 1380.957 at Sundaraiah Junction, Flyover at Km 1383.195 at Nellore T Junction and VUP at Km 1374.945 at Chintareddypalem Junction of NH16 in AP on EPC

NHAI/BS/NelloreBypass/2021 116.410 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
06/08/2022
Time 17:0Hrs
655 Development to 4/6-lanning of NH-31 (New NH-10) with both sides service roads from km 569.258 to km 581.030 (End of AH-02 on NH-31 near Shivmandir to Sevoke Army Cantonment) in the districts of Darjeeling and Jalpaiguri, West Bengal on EPC Mode

2022_MoRTH_692080_1 754.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2019
Time 15:0Hrs
06/08/2022
Time 15:0Hrs
656 Additional works (2VUPs, MR-10 junction flyover and underpass) in Six lane Indore-Dewas section of NH-52 in the state of Madhya Pradesh on EPC mode

2022_NHAI_106549_1 118.520 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2022
Time 18:50Hrs
05/08/2022
Time 11:0Hrs
657 Rehabilitation and Upgradation of existing road to two Lane with paved shoulder configuration from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa Nellore Border section) of NH167B in the state of Andhra Pradesh under Annual Plan 2021 22 (2nd Call)

2022_MoRTH_695848_1 222.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/06/2022
Time 15:0Hrs
04/08/2022
Time 15:0Hrs
658 Work of Widening of road to 4-lane from km 710/600 to 718/500 of NH-56 under NH division Bharuch.

2022_MoRTH_696407_1 48.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 16:10Hrs
04/08/2022
Time 12:0Hrs
659 Construction of Bridge Across Simuli Nallah (Missing Link) At Km 107.470 Of NH-220 in the State of Odisha on EPC Mode.

2022_MoRTH_700526_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2022
Time 18:55Hrs
04/08/2022
Time 12:0Hrs
660 Construction of Interchange at km 126.137 (Junction of Palwal – Aligarh Highway – SH 22A with Eastern Peripheral Expressway), access to Wayside Amenities at Km. 39.500, Km 83.005 & Km. 95.575 and access to Trilok Tirth Dham at Km 22.500 to km. 23.020 of Eastern Peripheral Expressway on EPC mode in the State of Haryana and Uttar Pradesh.

2022_NHAI_117188_1 66.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 17:34Hrs
04/08/2022
Time 11:0Hrs
661 Construction of VUP, Service road at Army Gate no. 6 at km 474.600 on Amritsar Wagha Border Section of old NH-01 (new NH-03) in the State of Punjab on EPC Mode

2022_NAHI_119198_1 19.180 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 17:0Hrs
04/08/2022
Time 11:0Hrs
662 Construction of four laning of Chillakuru cross road to Turpu Kanupur (Part 1 of PkgII) km 0.000 (131.500 of NH16) to km 23.770 on New NH516W including six lane flyover and approaches on NH16 (length km 1.050) and six laning of Turpu Kanupuru to Port South Gate (Part 2 of PkgII) km 23.770 to km 35.015 on New NH516W in the state of Andhra Pradesh on HAM Mode under Bharatmala Pariyojana Phase I

2021_NHAI_95786_1 658.760 NHAI Normal Highway Project HAM 23/11/2021
Time 15:0Hrs
03/08/2022
Time 11:0Hrs
663 Improvement and Upgradation/Construction of Spur of Muzaffarnagar connecting NH-709 AD (Panipat-Shamli-Muzaffarnagar Highway) and NH-58 (New NH-334) (Meerut-Roorkee Highway) bypassing Muzaffarnagar town in the State of Uttar Pradesh under Bharartmala Pariyojna (ICR) on EPC mode

2022_NHAI_118039_1 284.770 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 18:0Hrs
02/08/2022
Time 11:0Hrs
664 Strengthening and Widening of NH 251 from Km 11.00 to Km 22.77 in Diu on EPC mode of contract

2022_MoRTH_700514_1 56.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/07/2022
Time 17:0Hrs
02/08/2022
Time 11:0Hrs
665 Construction of Retaining Wall and Repairing of Service Road at Ch.2.820 to 4.140 of NH-24A Under EPC Mode in the State of Uttar Pradesh

2022_MoRTH_695671_1 13.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 15:0Hrs
30/07/2022
Time 17:0Hrs
666 Rehabilitation Up Gradation Of Two Lane Four Lane Road With Paved Shoulders Length In Risod Town Nh 461 B From Km.36.845 To Km.39.340 and Km. 41.520 To 44.220 (Total Length = 5.20 Km) On EPC Mode In The State Of Maharashtra

2022_MoRTH_668572_1 44.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 9:0Hrs
30/07/2022
Time 11:0Hrs
667 Widening to two lane with paved shoulder of Rampachodavaram Koyyuru section of NH 516E from Km 43 700 to Km 113 820 in the State of Andhra Pradesh

2022_MoRTH_693367_1 426.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2022
Time 15:0Hrs
28/07/2022
Time 17:0Hrs
668 Road safety works in different stretches (km 18.50, km 19.20, km 19.50, km 20.50 & km 21.30) for improvement of sharp turning & narrow road bench of NH-10 (old NH-31A) including provision of Thrie Metal Beam Crash Barrier from km 18.00 to km 35.00 of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong under Road Safety Annual Plan 2021-22. [ Job No. NH-10, 31- Old NH/WB/RSCE/2021-22 /28]. (2nd Call).

2022_MoRTH_697875_1 9.799 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/06/2021
Time 18:55Hrs
28/07/2022
Time 17:0Hrs
669 Construction of toll plaza at km 175.900 on Ramdas-Gurdaspur section of NH-354 in the State of Punjab on EPC mode (2nd Call).

2022_NAHI_122413_1 4.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/07/2022
Time 11:0Hrs
28/07/2022
Time 11:0Hrs
670 Rehabilitation and Uppradation of Shewali (Sakri)-Nandurbar section of NH-753-B from km 0.000 to km 49.050 (excluding km 0.300 to km 4.500 & km 13.485 to km 25.975(Design Chainage) to Two Lane with Paved Shoulder Configuration and additional bridge works at km 13.915(60m),&km 19.845(70m) on EPC Mode in the State of Maharashtra.

2022_MoRTH_686764_1 190.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 17:45Hrs
27/07/2022
Time 17:30Hrs
671 Construction of a bridge river Shali at Km 247.00 of NH 60 (New-14) in Bankura district in the State of West Bengal on EPC mode (Job No. 14/WB/2021- 22/491)

2022_MoRTH_680476_1 19.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 15:0Hrs
27/07/2022
Time 13:0Hrs
672 Rehabilitation and upgrading to two lanes with paved shoulders configuration and Strengthening from Km 175.00 to km 196.00 (Gumakhal to Satpuli) on NH-119 (New 534) in the State of Uttarakhand Under Annual Plan 2021-22 on EPC mode.

2018_MoRTH_345284_1 289.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 15:0Hrs
27/07/2022
Time 12:0Hrs
673 Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode. (Bid Ref No.-09 CE NH of 2022-23)

2022_MoRTH_693243_1 64.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 18:55Hrs
27/07/2022
Time 12:0Hrs
674 Widening of existing road to 4 lane with paved shoulder from Km 0.000 to Km 51.119 existing ch km 476.700 to km 523.530 51.119 Km of Tadipatri to Muddanur Bypass section of NH67 in the State of Andhra Pradesh on EPC mode under Annual Plan 2021 22

2022_MoRTH_693039_1 594.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 15:0Hrs
26/07/2022
Time 17:0Hrs
675 One Year Annual Maintenance Contract to Malegaon-Risod Road NH-461B in Km 36/845 to 39/340and Km 41/520 to 44/220 in the State of Maharashtra

2022_MoRTH_701397_1 0.470 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 19/07/2022
Time 10:30Hrs
25/07/2022
Time 17:30Hrs
676 Construction of Light Vehicular Under Pass (LVUP) including approaches at Km 109/10 of NH-4 (New NH 40) (Chennai-Chittoor-Bangalore Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_692302_1 10.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2022
Time 12:0Hrs
25/07/2022
Time 15:0Hrs
677 Construction of Bypass Road to Bolangir Town from km 72.400(Design Km 0.000) to Km 79.800 (Design Chainage Km 11.670) of N.H.26 in the State of Odisha on EPC Mode

2022_MoRTH_688089_1 210.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2022
Time 18:55Hrs
25/07/2022
Time 12:0Hrs
678 Construction of Bypass to Khordha town from km 294.000 to km 300.300 of NH-57 in the State of Odisha under EPC mode 10 CENH of 2022-23

2022_MoRTH_694282_1 82.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/06/2022
Time 18:55Hrs
25/07/2022
Time 12:0Hrs
679 Work of periodical renewal between km 0/0 to km 22/200 and km 35/7 to 37/4 and rehabilitation/restoration in selected section of NH-848 under NH Division Bharuch

2022_MoRTH_694387_1 14.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
25/07/2022
Time 12:0Hrs
680 Periodical Renewal between Km 665/8 to 710/600 (Khanpur-Dharampur-Nanapondha -Vapi section) and rehabilitation/restoration in selected section of NH-56 in Valsad district in the state of Gujarat.

2022_MoRTH_694389_1 21.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
25/07/2022
Time 12:0Hrs
681 Construction of flyover at km 233.110 on Dogal Kalan To Punjab-Haryana Border Section on NH-71 (new NH -52) in the State of Punjab on EPC Mode

2022_NAHI_118526_1 19.700 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2022
Time 11:0Hrs
25/07/2022
Time 11:0Hrs
682 Strengthening on NH 22 New NH 05 on Kalka Shimla Wangtoo road from Km 208 700 to 214 00 and 223 500 to 236 00 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_694176_1 14.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2022
Time 18:0Hrs
25/07/2022
Time 11:0Hrs
683 Rectification of Street lighting of Bengaluru – Nelamangala Section from km.10.000 to km. 29.500 of NH-4 (New NH-48) in the State of Karnataka under EPC Mode

NIT No.05/ NHAI/RO-BNG/11018/Tender/2022-23 Dated 22.06.2022 5.020 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 15:30Hrs
21/07/2022
Time 17:0Hrs
684 Construction of VOP at Kantharaja Circle at Black Spot location (KA-02-106) in the stretch of Bengaluru - Hoskote - Mulbagal Section from Km.237.700 to Km. 318.000 of NH-75 (old NH-4) in the State of Karnataka under standalone mode to be taken up under Engineering, Procurement & Construction (EPC) Mode (3rd Call)

NIT No.06/NHAI/RO-BNG/11019/Tender/2022-23 dt.22.06.2022 24.005 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 15:30Hrs
21/07/2022
Time 17:0Hrs
685 IRQP Betn. Km. 0/000 to Km. 21/500, Km. 27/900 to Km. 30/900 & 51/500 to 61/500 (Ranavav - Bhanvad - Khambhaliya Section) of Newly Declared NH-927K in the state of Gujarat.

697955 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
686 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

697960 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
687 IRQP from Km 63/700 to 78/680 of NH351G in the state of Gujarat

697661 9.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 15:0Hrs
21/07/2022
Time 12:0Hrs
688 Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode.(Bid Ref No.- 07 CE NH of 2022-23)

2022_MoRTH_693369_1 43.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2022
Time 17:0Hrs
21/07/2022
Time 12:0Hrs
689 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_696279_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 16:55Hrs
21/07/2022
Time 12:0Hrs
690 Six laning of Kagal-Satara section of NH-48 (old NH-4) (Package – I from km 592.240 to km 658.000) in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana

2022_NHAI_116922_1 1,491.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 18:55Hrs
21/07/2022
Time 11:0Hrs
691 Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar

2022_MoRTH_691201_1 234.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/05/2022
Time 15:0Hrs
19/07/2022
Time 11:0Hrs
692 6 - lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length = 11.844 Km) on Hyderabad – Bangalore Section of NH-44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode.

2022_NHAI_104887_1 358.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2022
Time 19:0Hrs
19/07/2022
Time 11:0Hrs
693 Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH 548DG Nhavara to Choufula Section of state highway in the state of Maharashtra on EPC Mode Length 24.037 Km

2022_MoRTH_668863_1 245.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 16:0Hrs
18/07/2022
Time 17:5Hrs
694 Construction of two lane Major Bridge across Penna River at Km 739.234 of NH 67 including approaches parallel to existing 2 lane bridge in SPS Nellore District in the State of Andhra Pradesh through EPC Contract under Annual Plan 2021-22 2nd call

2022_MoRTH_692515_1 80.790 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 03/06/2022
Time 17:0Hrs
18/07/2022
Time 17:0Hrs
695 Construction and improvement of Road Bakhasar Mavasari from Km 0.00 to Km 32.49 Design Length 31.703 Km from existing CL9 specifications to NHDL specifications under 45 BRTF of Project Chetak in Rajasthan and Gujarat State in EPC mode

2022_BRO_626554_1 326.190 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 18:0Hrs
18/07/2022
Time 11:0Hrs
696 Reconstruction of minor bridges at Km 158 280 Km 186 560 and Km 212 840 of NH 208

2022_MoRTH_690602_1 10.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 13:35Hrs
18/07/2022
Time 11:0Hrs
697 Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137 080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh

2022_MoRTH_692032_1 15.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/05/2022
Time 15:0Hrs
14/07/2022
Time 15:0Hrs
698 Construction of 2 no. Bridges at RD 78/450 and 79/550 on NH-154A in the State of Himachal Pradesh.

2022_MoRTH_692043_1 7.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/05/2022
Time 15:0Hrs
14/07/2022
Time 15:0Hrs
699 Periodical Renewal From km 221.800 to 291.450 of NH- 41 under NH Division, Gandhidham in the state of Gujarat.

2022_MoRTH_696506_1 21.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2022
Time 19:0Hrs
14/07/2022
Time 12:0Hrs
700 Construction of Six Lane Standalone Flyovers at Bongaigaon Chapaguri Pathsala Simalguri Chowk and Baihata Bypass Junctions on stretches of NH 31 and NH 31C (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis

2022_NHAI_112376_1 372.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
14/07/2022
Time 11:0Hrs
701 One time improvement of existing bypassed road from Km 64.000 to 65.620 (Bhojpur) and km 44.780 to 52.000 (khilchipur) (total length 8.82km) of NH-52 in the state of Madhya Pradesh under EPC mode

2022_MoRTH_691570_1 14.370 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
12/07/2022
Time 17:30Hrs
702 One Time improvement of existing bypass road from Km 161.700 to 163.100 (Udaipura), Km 141.200 To 142.000(Deori) and Km 181.200 to 184.900 (Khargone) Total Length 5.09 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_685117_1 4.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 15:0Hrs
12/07/2022
Time 15:0Hrs
703 One Time improvement of existing bypass road from Km 278.650 to 281.850 (Obedullaganj) and Km 269.000 to 272.200 (Goharganj) Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_685093_1 5.070 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 15:0Hrs
12/07/2022
Time 15:0Hrs
704 Elimination of Identified Black spots by providing permanent measures in between km 107 800 109 800 Duraisamypuram Bus stop and in between Km 101 530 103 450 E Vilakku Express City on Kollam Thirumangalam road NH 208

2022_MoRTH_689367_1 12.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 18:10Hrs
12/07/2022
Time 11:0Hrs
705 Construction of 5 Nos. VUPs and Service Road (km 60.300 to km 66.790, BHS) on Delhi-Haryana Border to Rohtak Section on NH-09 in the State of Haryana on EPC Mode

2022_NAHI_117417_1 137.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/05/2022
Time 15:0Hrs
11/07/2022
Time 15:0Hrs
706 Strengthening including improvement of safety from km 38.0 to 45.0 km, km 50.0 to 60.0 km & km 65.0 to 70.0 km of NH-326 (A) in the state of odisha.” (01 CE NH of 2022-23)

2022_MoRTH_683992_2 19.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/06/2022
Time 17:0Hrs
11/07/2022
Time 12:0Hrs
707 Construction of Rail over Bridge in Lieu of Railway Crossing No. E/2 on Ferozepur -Fazilka Rail Section at Km 2/4-5 & On NH-95 ( New NH-05) section Ferozepur to Indo Pak Border at Km 205.320 ( near Ferozepur city & village madhre) in the state of Punjab on EPC mode

11/EE/PWD/FZR 37.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2022
Time 11:0Hrs
08/07/2022
Time 15:0Hrs
708 Construction of Vehicular Underpass at km 6/600 of Ariyalur Bypass Road on NH 226 Extn (New NH 136) on Engineering, Procurement and Construction (EPC) Mode in the State of Tamil Nadu.

2022_MoRTH_688838_1 23.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
07/07/2022
Time 15:0Hrs
709 Construction of Bridge Across Simuli Nallah (Missing Link) At Km 107.470 Of NH-220 in the State of Odisha on EPC Mode.

2022_MoRTH_690711_1 10.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 18:55Hrs
07/07/2022
Time 12:0Hrs
710 Development of Six-Lane Access Controlled Highway from Gogwan Jalalpur (Shamli district) to Ranipur Barsi (Saharanpur district) (from Ch. -(000.600) to 45.500) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor under Bharatmala Pariyojana Phase-I in the State of Uttar Pradesh (Package-1).

NHAI/BM/EC(BL)/Shamli-Ambala/Package-1/2021 990.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
07/07/2022
Time 11:0Hrs
711 Development of Six-Lane Access Controlled Highway from Ranipur Barsi (Saharanpur district) to Adhoya Musalmana (Ambala district) (from Ch. 45.500 to 84.400) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package-2)

NHAI/BM/EC(BL)/Shamli-Ambala/Package-2/2021 811.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2022
Time 15:0Hrs
07/07/2022
Time 11:0Hrs
712 Elimination of identified blackspot at Km 46/020-46/810 (Arasakuzhi – TN-(02)-310) and Km 84/200 – 84/840 (Adari – TN-(02)-112) by Permanent remedial measures of NH 532 (Cuddalore – Vridhachalam – Salem road) in the State of Tamil Nadu

2022_MoRTH_689833_1 12.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 11:0Hrs
06/07/2022
Time 15:0Hrs
713 Work of reconstruction of 2Nos of bridges across river Kosh (km 634/400-600) and Kavero (km 637/800-638/00) in lieu of old, narrow and weak bridges and reconstruction of box culverts of NH56 under NH Division Bharuch on EPC mode in the SoG

2022_MoRTH_695668_1 17.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/06/2022
Time 16:10Hrs
06/07/2022
Time 12:0Hrs
714 Balance Work of 2/4 laning of Chappra-Hajipur Section of NH-19 From Km 143-200 to km 209-940 in state of Bihar under NHDP Phase-III

2022-NHAI-118273-1 437.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/06/2022
Time 15:0Hrs
06/07/2022
Time 11:0Hrs
715 Improvement construction of existing class 5 Rd to NHIL specification with hard shoulder from existing km 169pt970 to km 211pt364 design ch km 166pt000 to km 203pt770 total length 37pt770km of NH 505 SUMDO KAZA GRAMPHO Rd on EPC mode in HP PKG III

2022_BRO_670783_1 222.620 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/01/2022
Time 15:0Hrs
06/07/2022
Time 11:0Hrs
716 Construction of Fly Over Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction in Coimbatore City and including Accident Prone Spot Near Bala Hospital (Km 337) & Jai Shanthi Theatre (Km 335/8 ) & Shanthi Petrol Bunk (Km 335/10) in Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nad

2022_MoRTH_680810_1 110.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 15:0Hrs
05/07/2022
Time 15:0Hrs
717 Construction 2Lane ROB in replacement of LCNo3E/SPL3 on Gudivada Machilipatnam railway sec at Km231.7 of NH165 and LCNo52 on Vijayawada Bhimavaram railway sec at Km230.6 of NH165 inc. one time improvement of bypass Gudiwada Km228 to 233.540 in AP EPC

2022_MoRTH_685404_1 239.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 17:0Hrs
04/07/2022
Time 17:0Hrs
718 Rehabilitation and Up-gradation of NH167B from Km. 143 320 Malakonda to 189 050 Singarayakonda on NH16 to 2L with paved shoulders in Andhra Pradesh on EPC mode 2nd Call

2022_MoRTH_690073_1 301.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/05/2022
Time 15:0Hrs
04/07/2022
Time 17:0Hrs
719 Construction of Six Lane Standalone Flyovers at Raha Demow Borghat Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 37 (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis

2022_NHAI_112380_1 206.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
720 RFP for Corridor efficiency improvement including removal of black spots in Lakhanpur Samba section of NH-44 from chainage Km 16 30 to Km 74 10 in UT of Jammu & Kashmir under Bharatmala Pariyojana Phase 1 on EPC Mode

NHAI/J&K/L-S/CorrEff/EPC/2022 240.990 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
721 Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode

2022_NAHI_114130_1 25.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/04/2022
Time 15:0Hrs
04/07/2022
Time 11:0Hrs
722 EXECUTION OF HILL SLOPE STABILISATION MEASURES FOR SINKING ZONE ON ROAD LGG-MUKTO - TELI BETWEEN KM 7.000 TO KM 8.000 UNDER 90 RCC/42 BRTF/PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION

CE (P) VTK/NIB-02 OF 2022-23 21.480 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2022
Time 15:0Hrs
30/06/2022
Time 15:0Hrs
723 CONS AND UPGRAD TO NHDL SPEC FROM KM 7PT900 TO KM 18PT000 (DESIGN CHAINAGE KM 7PT900 TO KM 16PT904) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 9PT004 KM)

2022_BRO_529704_1 62.610 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2022
Time 18:0Hrs
30/06/2022
Time 12:0Hrs
724 Improvement of RC-22 Sedarapet road from Pathukannu road junction at Ch.0/000 to Mailam road junction at Ch.10/300 of Sedarapet village in Puducherry by EPC mode, under Central Road Infrastructure Fund

2022_MoRTH_689098_1 8.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 15:0Hrs
29/06/2022
Time 15:0Hrs
725 Periodical Renewal from Km.37/420 to 54/180 of NH45A by providing 50mm thick DBM (selected stretches) and 40mm thick Bituminous Concrete including Recycling existing pavement by cold milling and laying 40mm BC on wearing coat of bridges as per IRC 120-2015 and other road safety measures on Engineering, Procurement & Construction (EPC) Basis Contract under NH(O) Annual Renewal Programme (ARP) 2021-22 in the Union Territory of Puducherry

2022_MoRTH_689103_1 14.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2022
Time 9:0Hrs
29/06/2022
Time 15:0Hrs
726 Construction and up gradation of existing road to 2 lane with paved shoulder from existing Chainage Km 504 pt 871 to Km 509 pt 725 of NH 07 Old NH 58 on EPC mode in the state of Uttarakhand Length 4.236 Km

2022_BRO_524185_1 190.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/05/2022
Time 13:30Hrs
28/06/2022
Time 17:0Hrs
727 Construction of ROB at Km 168.231 on NH-76 with approaches in the state of Uttar Pradesh on EPC mode.

2022_MoRTH_691688_1 38.520 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 28/05/2022
Time 15:0Hrs
28/06/2022
Time 15:0Hrs
728 Reconstruction of Additional Two Lane Bridge across Bhavani river at Km 229/2-4 of NH 209 (in Sathyamangalam town) in the state of Tamilnadu on EPC mode

2022_MoRTH_686141_1 9.341 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
28/06/2022
Time 15:0Hrs
729 IRQP to NH151K Porbandar Bhanvad up to Tran patiya road section between km 39.3 to 43.2 Tran patiya to Jamjodhpur Kalavad road section between km 74.1 to 83.6, km 88.6 to 103.4 and km 112.8 to 124.8 (length 40.2 km) under EPC mode in the state of Gujarat IVth Trial

692898 16.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
730 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode Vth Trial

692899 11.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
731 PR btn km 170.450 to 190.650 Limbdi Wadhwan road section and km 201.600 to 229.700 Surendranagar Dhrangadhra road section of NH51 Providing and laying 50mm DBM in selected stretches and 30 mm BC in full length under EPC mode IIIrd Trial

692902 13.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
732 PR btn km 229.700 to 233.390 and km 237.590 to 255.890 Dhrangadhra Kuda road section on Nh51 Providing and laying 50mm DBM in selected stretches and 40mm BC in full length under EPC mode IIIrd Trail

692903 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
28/06/2022
Time 12:0Hrs
733 Construction of new two-lane bridge over Sabarmati River near Dharoi dam on NH58 at Km 84/00 in the state of Gujarat

2022_MoRTH_687236_1 55.070 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 17:30Hrs
28/06/2022
Time 12:0Hrs
734 Widening of existing 2 lane road to 4 lane from km. 92/320 to 115/320 (Vav chokdi, Satlasana to Vrundavan chokdi, Kheralu) of NH58 in the state of Gujarat under EPC mode

2022_MoRTH_687248_1 122.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 18:0Hrs
28/06/2022
Time 12:0Hrs
735 Rehabilitation and Upgradation to four lane configuration & strengthening of Thanpuri to Paror section from Km 85.135 to 100.840 of NH-20 (New NH-154) (Design Length-16.275) of Pathankot Mandi under NH O in the state of Himachal Pradesh on EPC mode.

NHAI/Pathankot-Mandi/Pkg-IIC/EPC/HP/2022 373.660 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/01/2022
Time 15:0Hrs
28/06/2022
Time 11:0Hrs
736 Balance work of Rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane with paved shoulder configuration from KM 343.800 to 401.300 of Madhugiri- Chikkaballapura Section of NH-69 (old NH-234) excluding Gauribidanur bypass (from Km 362.400 to Km 368.400) in the state of Karnataka on EPC mode (Job No NH-69-2021-22-KNT-952 dated 31-3-2022)

RW/BNG /NH-69/km 343-401/69/2022 323.429 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2022
Time 15:0Hrs
27/06/2022
Time 15:0Hrs
737 Construction of HL Major Bridge at CH 323/957, HL Minor Bridge at CH 323/780 & RCC Box at CH 323/500 over Kolab river, near Patraput (Koraput district), on NH-326 in the state of Odisha. (Bid Ref No.-05 CE NH of 2022-23)

2022_MoRTH_687093_1 21.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 18:55Hrs
23/06/2022
Time 12:0Hrs
738 Improvement of Road Safety through providing Metal Beam Crash Barriers, Removal of Black spot by Improvement of Junctions and Improvement of night time visibility by providing Highway Lighting from km 35/700 to 71/117 of NH-220 in the state of Odisha under Road Safety Annual Plan 2021-22. (Bid Ref No.- 03 CE NH of 2022-23)

2022_MoRTH_689824_1 7.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2022
Time 18:55Hrs
23/06/2022
Time 12:0Hrs
739 Medium Term Maintenance works from km 124.800 to 134.690 Section Tran patiya Jamkandorana Kalavad road of NH151K in the state of Gujarat under OR DPP scheme IV Try

692895 1.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
740 Medium Term Maintenance works on section from Km. 11.0 to 19.0 Tad to Keshariya section on NH251 in the state of Guajrat under OR DPP scheme III Try

692896 1.170 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
741 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_694390_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 9:0Hrs
23/06/2022
Time 12:0Hrs
742 Widening/Upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib to Malout road from Km.279.400 to Km 307.060 section of NH-354 in the state of Punjab on EPC mode

09/EE/ABH 129.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2022
Time 16:0Hrs
23/06/2022
Time 12:0Hrs
743 6 laning of existing 4 lane stretch from Kalkallu at km. 454.000 to Gundla Pochanpally at km 471.000 on Nagpur - Hyderabad section (Design length 17.000 km) of NH-44 in the state of Telangana under Bharatmala Pariyojana on EPC Mode.

2022_NHAI_104879_1 607.110 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2022
Time 19:0Hrs
23/06/2022
Time 11:0Hrs
744 CONSTn OF REALIGNMENT BETWEEN PANDRASS-PASHKYUM (LENGTH 27.10 KM) ON ROAD ZOZILA KARGIL LEH (NH 1) TO 2 LANE SPECIFICATIONS DRASS REALIGNMENT (9.30 KM) KHARBOO REALIGNMENT (6.30 KM) and KARGIL ALIGNMENT (11.50 KM) UNDER PROJECT VIJAYAK (BRO) LADAKH

2022_MoRTH_677367_1 308.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 11:0Hrs
22/06/2022
Time 11:0Hrs
745 Construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH - 730 in the state of Uttar Pradesh under EPC mode

2022_MoRTH_685838_1 100.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
21/06/2022
Time 15:0Hrs
746 Construction of Flyover at Saravanampatty including Junction Improvements from km 168/785 - 170/200 of NH 209 (km 308/400 - 309/815 of New NH 948) covering Kalapatty road junction and Thudiyalur road junction in Coimbatore city on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_679508_1 63.023 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2022
Time 15:0Hrs
21/06/2022
Time 15:0Hrs
747 Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj – Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode

2022-NHAI-109329-1 225.220 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2022
Time 18:35Hrs
21/06/2022
Time 11:0Hrs
748 Balance Work of Four laning of Panvel - Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode

2021_NHAI_100081_ 430.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/12/2021
Time 15:0Hrs
21/06/2022
Time 11:0Hrs
749 Periodical Renewal works in km. 3.939 to 15.450 Chaigaon Makhan Road on NH 347B under NH Division Indore in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_684790_1 4.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 15:0Hrs
20/06/2022
Time 17:30Hrs
750 Permanent Improvement of Black Spot (TN-(02)-635) at New Cinema junction @ Km 62/4-63/0 by Providing additional high level bridge @ Km 62/6-62/880 including widening of existing road with Centre median, Storm Water drain, CD works and Junction improvements of NH-45A (New NH 32) (Villupuram – Pondy – Nagapattinam Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_685768_1 17.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 12:0Hrs
20/06/2022
Time 15:0Hrs
751 Construction up gradation of existing road to 2 lane with paved shoulder from existing Chainage Km 468.000 to Km 489.350 Design Chainage Km 465.150 to Km 471.500 of NH 07 Joshimath Bypass on EPC mode in the state of Uttarakhand Length 6.35 Km

2022_BRO_526474_1 202.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 15:0Hrs
18/06/2022
Time 17:0Hrs
752 construction and upgradation f existing road to 2 lane specification with paved shoulder from exisiting chainage 468.00 to Km 489.35 Design chainage 465.150 to Km 471.500 of NH 07 including Joshimath Bys pass under Chardham Pariyojana on EPC Mode in Uttrakhand

2022_BRO_526474_1 202.020 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 15:0Hrs
18/06/2022
Time 15:0Hrs
753 Widening of Existing Road to Two lane with paved shoulder from Km 0.000 to Km 32.000 Mudigubba to Puttaparthi of NH342 in the State of Andhra Pradesh through Engineering, procurement and Construction EPC basis under Annual Plan 2021 22

2022_MoRTH_685546_1 316.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 15:0Hrs
17/06/2022
Time 17:0Hrs
754 CONS OF CUT AND COVER TUNNEL HAVING 520 MTRS LENGTH BETWEEN KM 51PT950 TO KM 52PT500 AND 400 MTRS LENGTH BETWEEN KM 52PT550 TO KM 52PT950 INCL MINOR BRIDGE ON DSDBO ROAD UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET TUNNEL LENGTH 920 MTRS)

2022_BRO_523550_1 89.840 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2022
Time 18:55Hrs
17/06/2022
Time 12:0Hrs
755 IRQP from km 34/480 to 74/0 of NH51 under NH division Rajkot RandB department Gujarat in the state of Gujarat for the year 2021-22 Length 39.52 km

687732 49.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2022
Time 18:0Hrs
16/06/2022
Time 12:0Hrs
756 IRQP Betn. Km. 59/500 to 65/00,77/900 to 79/900, 86/500 to 99/400. on N.H. 351K (Bagasara- Khambha-Una) Road.

690277 9.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2022
Time 20:0Hrs
16/06/2022
Time 12:0Hrs
757 IRQP Betn. Km. 0/000 to Km. 21/500, Km. 27/900 to Km. 30/900 & 51/500 to 61/500 (Ranavav - Bhanvad - Khambhaliya Section) of Newly Declared NH-927K in the state of Gujarat.

690279 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/06/2022
Time 12:30Hrs
16/06/2022
Time 12:0Hrs
758 Widening to 4 lane of existing road from Km 184.200 to Km 191.100 of NH 214A (NH 216) in Bapatla town in Guntur District as one time improvement proposal in the State of Andhra Pradesh on EPC mode

2022_MoRTH_685248_1 76.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/04/2022
Time 15:0Hrs
14/06/2022
Time 17:0Hrs
759 Construction of Fly Over Including Junction Improvements @ km 348/6 – 349/8 of NH 67 (km 15/6 To 16/8 New NH 181) (Nagapattinam – Gudalur – Mysore Road) At Saibaba Colony Junction In Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_681671_1 46.616 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 10:0Hrs
14/06/2022
Time 15:0Hrs
760 Rehabilitation and Upgradation from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa/Nellore Border section) of NH167B two lane with paved shoulders configuration in the state of Andhra Pradesh on EPC mode

2021_MoRTH_660751_1 223.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/12/2021
Time 15:0Hrs
14/06/2022
Time 15:0Hrs
761 Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli via Paluvai Junction Rentachinthala Gurazala from Km 0 000 to 43 659 to two lane with paved shoulders in the state of Andhra Pradesh

RW/NH-12014/11/2021AP/ZoneIII 324.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 15:0Hrs
13/06/2022
Time 17:0Hrs
762 Rehabilitation and Up-gradation from km 58/635 to 99/409 of Kadapa/Nellore Border to CS Puram (via) Seetharampuram section of NH-167B to two lane with paved shoulder configuration in the state of Andhra Pradesh on EPC mode

SENHVJA/01/2022-23 Dated. 18.04.2022 235.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 17:0Hrs
13/06/2022
Time 17:0Hrs
763 Widening to 4 lane of missing link between NH40 and NH69 from existing chainage Km 351/460 to Km 358/260 (Design Chainage 351/460 to 358/130 (6.67 Km)) of NH40 as continuation of NH40 in the state of Andhra Pradesh under NH(O) in EPC Mode 2nd call

2022_MoRTH_686049_1 77.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
13/06/2022
Time 15:0Hrs
764 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_690348_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2022
Time 13:0Hrs
13/06/2022
Time 12:0Hrs
765 Rehabilitation and Upgradation of Jamkhed to Sautada Section of NH 548D

2022_MoRTH_668595_1 133.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 15:0Hrs
10/06/2022
Time 17:30Hrs
766 Rehabilitation and Upgradation to Kopargaon to Savali Vihir Section from Km 354.00 to Km 362.663 Total Length 8.663 Km Of NH 752G to Four Lane with Paved Shoulder In the State of Maharashtra on EPC Mode. Basis Contract

2022_MoRTH_668595_1 161.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
10/06/2022
Time 17:30Hrs
767 Improvement & Upgradation of Existing Two Lane Bypass to Six Laning from Km. 403.100 to Km. 433.000 of Hubli-Dharwad Bypass section of NH-48 in the State of Karnataka to be executed on EPC Mode

2022_NHAI_100994_1 832.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/01/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
768 Development of Six-Lane Access Controlled Highway from Adhoya Musalmana (Ambala district) to Sadopur (Ambala district) (from Ch. 84.400 to 121.786) of Shamli – Ambala section of Bareilly – Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package-3)

NHAI/BM/EC(BL)/Shamli-Ambala/Package-3/2021 769.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
769 Construction of Four Lane Bypasses for Jagatpur, Babuganj, Unchahar, Alapur Bypass and Sai river bridge of Raebareli – Prayagraj section of NH-30 (Old NH-24B) under Bharatmala Pariyojna in the State of Uttar Pradesh on EPC mode

2022_NHAI_115392_1 620.500 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2022
Time 15:0Hrs
09/06/2022
Time 15:0Hrs
770 Work of reconstruction of 2Nos of bridges across river Kosh (km 634/400-600) and Kavero (km 637/800-638/00) in lieu of old, narrow and weak bridges and reconstruction of box culverts of NH56 under NH Division Bharuch on EPC mode in the SoG

2022_MoRTH_685882_1 17.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
09/06/2022
Time 12:0Hrs
771 Work of Construction of New Minor Bridge in Place of Old Narrow Bridge on Kadrama Khadi between KM 280/00 to 280/200 of NH 64 in the State of Gujarat on EPC mode in the state of Gujarat for the year 2021-2022 Job No 64- GJ/2021-22/671

2022_MoRTH_685876_1 7.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2022
Time 15:0Hrs
09/06/2022
Time 12:0Hrs
772 Construction of Additional ROB’s under six laning of Delhi-Agra Section of National Highway No. 2 (New NH-19) in the State of Haryana & Uttar Pradesh between Km. 34.050 and Km. 167.190 on EPC Mode

2022_NHAI_101084_1 281.200 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 13:0Hrs
09/06/2022
Time 11:0Hrs
773 Development of External Road Connectivity to the proposed Multimodal Logistics Park at Chennai

NHLML/MMLP/ Chennai/Ext/2022 62.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 18:55Hrs
09/06/2022
Time 11:0Hrs
774 Construction of Flyover in km.468/500, Vehicular Underpass in km.470/00 and Overpass in km.451/300 to 451/900 including Road Safety along with avenue and median plantation from km 450/170 to km 471/330 on NH-66 Panvel Mahad Panji Road

2022_MoRTH_669763_1 73.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/05/2022
Time 17:0Hrs
08/06/2022
Time 17:30Hrs
775 Widening of existing 2 lane to four lane road from km. 176.50 to km. 178.00 of NH-76 under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_689538_1 5.048 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/05/2022
Time 16:30Hrs
07/06/2022
Time 15:0Hrs
776 Up-gradation of Daulatabad T-point to Shivoor from existing Km. 222/893 (On SH-16, Daulatabad Jn.) to Km. 64/000 (On SH-51, shivoor) (Design Km. 0.000 to Km. 4.000 (Daulatabad T-point to Maliwada) 4L & Km. 23.650 to Km. 44.900 (Devgaon Rangari to Shivoor) 2L/4L (Construction Length=25.250 Km.) NH-752H to Two lane with paved shoulders and construction EPC Mode Basis Contract)

2022_MoRTH_668958_1 156.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2021
Time 10:0Hrs
06/06/2022
Time 17:30Hrs
777 Periodical Renewal from Km. 310.220 to Km. 323.745 of NH-730 on EPC mode in the state of Uttar Pradesh

2022_MoRTH_687335_1 7.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/05/2022
Time 15:0Hrs
06/06/2022
Time 15:0Hrs
778 Improvement of Riding Quality of NH 707 A From Ch 0.00 to 52.180, Ch 61.750 to 70.750, Ch 72.900 to 79.350 & Km 83.000 to 127.000 in the State of Uttrakhand Under annual plan 2020-2021 {N.H.(O)} in the state of Uttarakhand ( Under EPC mode)

2022_MoRTH_687671_1 25.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2022
Time 15:0Hrs
06/06/2022
Time 12:0Hrs
779 Construction of four lane Bypass to Jeypore town on NH-26 including Land Acquisition in the state of Odisha on EPC Mode under Annual plan of 2021-22

2022_MoRTH_685222_1 84.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 18:55Hrs
06/06/2022
Time 12:0Hrs
780 Periodical Renewal on Jalandhar Hoshiarpur Gagret Amb Naudan Hamirpur TauniDevi Awahdevi Sarkaghat Mandi road from km 100 0 to 114 0 and km 137 435 to 140 200 on NH 70 in the state of HP on EPC Mode

2022_MoRTH_687506_1 5.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/05/2022
Time 18:0Hrs
06/06/2022
Time 11:0Hrs
781 Construction of 2 lane ROB at Railway crossing no.C-28A on Abohar-Fazilka Rail section at Km 39/3-4 & NH-07 at Km. 12.560 on Fazilka Border in the State of Punjab on EPC Mode (Job No.NH-07-PB-2021-22/549 dated 16.12.2021)

01/EE/NH/ABH 33.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/04/2022
Time 15:0Hrs
05/06/2022
Time 15:0Hrs
782 Upgradation of four lane road with Cement Concrete Road Whitetopping in km 0/800 to km 2/240 Length 1.440 km and km 5/050 to km 8/500 Length 3.450 km Total Length 4.890 km on Nagpur Amravati Road of NH 53 in Nagpur City in the State of Maharashtra

2022_MoRTH_668773_1 64.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2022
Time 14:30Hrs
03/06/2022
Time 17:0Hrs
783 Widening of existing 2 LPS road to 4 L P S Bathalapalli to Mudigubba Sec from Km 97 410 to 136 410 Design Chain Km 96 300 to 129 300 including Bathalapalli Bypass From Km 97 410 to Km 103 300 De Ch Km 96 300 to 102 300 of NH 42 in the State of AP

RW/NH-12014/26/2021AP/ZoneIII 418.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
03/06/2022
Time 17:0Hrs
784 Work of Periodic Renewal from Km. 0.000 to Km. 16.000 and from km. 22.000 to km. 28.580 of NH-334DD in the State of Uttar Pradesh under EPC mode

2022_MoRTH_684015_1 4.656 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 15:0Hrs
03/06/2022
Time 15:0Hrs
785 4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode

2022_NHAI_102706_1 725.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 15:0Hrs
03/06/2022
Time 11:0Hrs
786 Widening Minor Bridge at km 477/6, Reconstruction of Minor bridge at km 480/2 including Reconstruction of Slab culvert at km 474/4 of NH 67 on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_681685_1 6.094 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 10:0Hrs
02/06/2022
Time 15:0Hrs
787 Re-Construction of Major Bridge at Km. 160.100 LHS of NH-44 (Panipat- Jalandhar section) in State of Haryana on EPC mode

2022_NAHI_113230_1 6.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2022
Time 15:0Hrs
02/06/2022
Time 15:0Hrs
788 Construction of Bhabhua Bypass from Ch.10.800 to Ch.19.860 and Chand Bypass from Ch.38.060 to Ch.40.460 and widening of existing road to 2lane with Paved shoulder from Ch. 40.460 to Ch.46.860 of NH219 Total length16.150 Km under EPC Mode in Bihar.

2022_MoRTH_682211_1 94.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
01/06/2022
Time 17:0Hrs
789 Providing Crash Barrier as Road Safety measures on NH-26 from km 410/000 to 434/767 km(Sunki Ghat portion) in the State of Odisha under AP-2021-22( Bid Ref No.-02 CE NH of 2022-23)”

2022_MoRTH_685766_1 5.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2022
Time 18:55Hrs
01/06/2022
Time 12:0Hrs
790 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH 953 Laskariya-Ahwa-borkhal section of NH 953 under NH Division Bharuch in the state of Gujarat On EPC Mode Job No. TA-953-GJ-2021-22-358

2022_MoRTH_687366_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/05/2022
Time 16:50Hrs
30/05/2022
Time 16:0Hrs
791 Construction of 65 Meter Span Steel Truss Girder Bridge at Km 1 of NH-707A under Annual plan 2021-22 N.H.(O) in the state of Uttarakhand (Under EPC mode)

2022_MoRTH_686142_1 9.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
30/05/2022
Time 15:0Hrs
792 Construction of Two lane with paved shoulder from Km. 0.000 to Km. 10.603 (UP-Bihar Border to Chandauli) of NH-219 on EPC mode in the state of Uttar Pradesh.

2021_MoRTH_665390_1 64.775 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2021
Time 18:0Hrs
30/05/2022
Time 15:0Hrs
793 Strengthening of Existing 2-Lane 4-Lane NH-501 Khanabal-Pahalgam Road CH. 0000 To 19050 and CH. 47000 To 49500 Al-Stop to Seer and Police Station Pahalgam To Sumo Stand after Crossing Pahalgam Bridge in the UT of Jammu and Kashmir

PCD-RnB -01of 2022-23 25.693 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/04/2022
Time 15:0Hrs
28/05/2022
Time 16:0Hrs
794 Design n Construction of Kulgam Bypass on NH-444 taking off from existing chainage Km 61.650 and rejoining at Km 73.100 of existing chainage Revised Design Chainage from Km 50.260 to Km 59.010 Old Design Chainage Km 53.600 to Km 62.350 as 2 lane without paved shoulder in the UT of Jammu n Kashmir on EPC mode

PCD-RnB-04of 2022-23 8.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 10:0Hrs
28/05/2022
Time 16:0Hrs
795 Design and Construction of Pulwama Bypass on NH-444 taking off from existing chainage km 17.400 and rejoining at km 22.550 of existing chainage Design Chainage km 9.450 to km 14.300 as 2 lane without paved shoulder in the UT of Jammu n Kashmir on EPC mode

PCD RnB 03 of 2022-23 20.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 15:0Hrs
28/05/2022
Time 15:0Hrs
796 Balance work for improvement to 2 lane with PS in realignment from Km 52.320 to Km 52.940 of NH81 Protection works in HL Bridges at Km 33 and Km 36 for the approach of Mahananda River and recons. of culvert in 30th km of NH81 on EPC mode in Bihar.

2022_MoRTH_682198_1 18.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
27/05/2022
Time 11:0Hrs
797 REHABILITATION AND UP-GRADATION TO 2 LPS OF RAJEWADI TO WARANDH VILLAGE SECTION (KM. 75.100 TO 88.100) PART OF LONAND- BHOR- MAHAD - MHAPRAL - MANDANGAD - PACHRAL - AMBADAVE, NH-965 DD IN THE STATE OF MAHARASHTRA ON EPC BASIS

2022_MoRTH_668557_1 98.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 17:45Hrs
24/05/2022
Time 17:30Hrs
798 STRENGTHENING IN KM 88/100 TO 96/700 (RAJEWADI PHATA TO VARANDH GHAT OF PUNE DISTRICT BOUNDARY) OF NH 965DD STARTING FROM ITS JUNCTION WITH NH-965DD NEAR LONAND AND CONNECTING ANDORI, SHIWAL, BHOR,ATI, MAHAD, MANDANGAD TERMINATING AT PACHRAL

2022_MoRTH_668563_1 33.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2022
Time 18:0Hrs
24/05/2022
Time 17:30Hrs
799 Construction of VOP at Kantharaja Circle at Black Spot location KA 02 106 in the stretch of Bengaluru Hoskote Mulbagal Section from Km.237.700 to Km. 318.000 of NH 75 Second Call

NIT No.01 NHAI RO BNG 11019 Tender 2022 23 Dated 22.04.2022 24.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 0:0Hrs
24/05/2022
Time 15:0Hrs
800 VOP at Basaveshwara circle in ILKAL BYPASS CH 330.275 in Hunugund to Hospet Section of NH 13 New NH 50 in the state of Karnataka on EPC mode Second Call

NIT No.02 NHAI RO BNG 17016 Tender 2022 23 Dated 22.04.2022 32.240 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/04/2022
Time 0:0Hrs
24/05/2022
Time 11:0Hrs
801 Up gradation to 2LPS/ 4 lane of NH 353E in Chimur Khadsangi Section from Km 52/700 to 60/600 (Length 6.70 KM) [ Excluding Animal Underpass and its approaches from Km 53/410 to 54/610 (Length 1.20 Km ) ] and Concrete Overlay in Chimur Town from Km 45/550 to 46/715 (L=1.165 Km) in Chandrapur District in the state of Maharashtra

2022_MoRTH_668582_1 61.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
802 Rehabilitation/Upgradation of existing Highway to 2L PS/4 lane of Dhawali to Rajoli from Design Km.149/476 to 163/476 (existing Km.150/000 to 164/000), Pandharsala to Mohadongri from design Km.170/476 to 181/476 (existing Km.171/000 to 182/000), Ambeshivni Fata to Bodli from design Km.183/476 to 185/476 (existing Km 184/000 to 186/000) and Made Tukum to Gadchiroli from design Km 188/476 to 189/476 (existing Km 188/000 to 189/00) having length 28 km of NH 930 of Dhawali to Gadchroli road in the state of Maharashtra on EPC mode

2022_MoRTH_675653_1 270.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
803 Rehabilitation/Upgradation of existing Highway to four lane standards in Kurkheda town from (Km 413/257 to Km 410/775), Two lane in Shankarkpur Gurnuli (KM 424/00 TO KM 431/00) section and Reconstruction of Major Bridge at CH.448/558 (Bhuti Nallah) and Ch 411/695 (Sati river bridge), Minor bridge at Ch. 411/477 and Ch. 405/800 Lendhari Bridge) of NH 543 Bramhapuri Wadsa kurkheda Korchi Deori Amgaon road on EPC mode in the State of Maharashtra

2022_MoRTH_675651_1 140.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
804 Strengthening and Widening from Ashti to Lagam (from km 182/350 to km 199/400) section of NH 353C (i.e Sakoli Wadsa Armori Gadchiroli Ashti Alapalli Sironcha road) in Gadchiroli district in the state of Maharashtra on EPC mode (L = 17.05 km)

2022_MoRTH_668576_1 46.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
805 Strengthening to Allapalli - Bhamragad - Laheri in km 0/00 to 18/600 Road NH 130 D ( Section from Junction 353C to Medpalli ) of Gadchiroli District in the state of Maharashtra

2022_MoRTH_668577_1 35.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 10:0Hrs
24/05/2022
Time 11:0Hrs
806 CONSTRUCTION OF MAJOR BRIDGE ACROSS GUNDENUR NALLA ON ALAPALLI BHAMRAGARH TO STATE BORDER ROAD NH 130 D AT CH 84/000 IN GADCHIROLI DISTRICT IN THE STATE OF MAHARASHTRA

2022_MoRTH_668578_1 30.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 15:0Hrs
24/05/2022
Time 11:0Hrs
807 Up-gradation to 2/4 LPS of Section Tiwatgyalpati to Malkapur village) with PQCon EPC mode in the state of Maharashtra

2022_MoRTH_669215_1 71.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
808 Rehabilitation and Upgradation of NH 561 Sablakhed toAshti Section from and Chinchpur to Jamkhed sectionfrom to 2LPS / Four lane configuration in the state of Maharashtra on EPC mode

2022_MoRTH_669253_1 183.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
809 Rehabilitation And Upgradation Of Parli-Dharmapuri-Pangaon-Kharolapati- Renapur Phata On NH361H in Km 52/400 to 38/200(Section Pangaon to Kharola pati , Length-14.2km) to Two lane Configuration (Rigid Pavement) in the State Maharashtra on EPC Mode.

2022_MoRTH_669262_1 69.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2022
Time 18:55Hrs
23/05/2022
Time 17:30Hrs
810 Periodical Renewal work from Km 23 to 53 of Sainj Luhri Aut Road on NH 305 in the State of HP on EPC Mode

2022_MoRTH_684679_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2022
Time 18:0Hrs
20/05/2022
Time 11:0Hrs
811 Road safety works in different stretches (km 18.50, km 19.20, km 19.50, km 20.50 & km 21.30) for improvement of sharp turning & narrow road bench of NH-10 (old NH-31A) including provision of Thrie Metal Beam Crash Barrier from km 18.00 to km 35.00 of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong under Road Safety Annual Plan 2021-22.

2022_MoRTH_683185_1 9.799 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/04/2022
Time 18:45Hrs
19/05/2022
Time 17:0Hrs
812 Widening from Two lane with Paved shoulder to four lane and Strengthening from km 10/000 to 18/740 of NH 209 (New NH 83) including CD works, footpath, protective works and Drain (Total length - 8.74 km) on Engineering, Procurement and Construction (EPC) Basis contract in the State of Tamil Nadu.

2022_MoRTH_681601_1 30.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
19/05/2022
Time 15:0Hrs
813 PR work from km 41.00 to km 47.00 & km 72.00 to km 82.40 (except black spot location Mahinagar from km 78.209 to km 79.529) including road furniture on NH- 512 in Dakshin Dinajpur district in the state of West Bengal on EPC mode (Job No. TA/512/WB/2021-22/804)

2022_MoRTH_680481_1 14.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
18/05/2022
Time 13:0Hrs
814 Widening from Two lane with paved shoulder to four lane with paved shoulder and Strengthening in Km 0/8 – 17/6, 18/0 – 25/0, 25/500 – 27/900, 29/6 – 34/0 & Km 39/0 – 50/570 and strengthening in km 17/6 – 18/0, 25/0 – 25/5, 27/9 – 29/6, and widening from Four lane to four lane with paved shoulder and strengthening in km 34/0 – 39/0 including centre median in selected stretches, Construction of Storm water drain including Widening and Reconstruction of CD works and Additional Bridge at Km 39/8 of NH 532 (Cuddalore – Vridhachalam – Salem Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_679604_1 206.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 12:0Hrs
18/05/2022
Time 11:0Hrs
815 Rehabilitation and Up gradation of Pathri to Selu Design Chainages from Km 41/000 to 47/900 (L-6.90 Km.) & Selu to Deogaon Phata Design Chainage from Km 63/100 to Km.68/700 (L- 5.60 Km.) of Injegaon-Sonpeth-Pathri-Selu-Deogaon Phata road NH-548B into 2 lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra

2022_MoRTH_668565_1 127.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
17/05/2022
Time 17:30Hrs
816 Rehabilitation and Up gradation of Bhokardan to Kumbhari Fata Design Ch.(Km 13/500 to 17/00) and Rajur Jalna Design Ch. (Km.39/850 to 62/420) to 2L/4L Configuration Section of NH 753-H Starting from its juction with 753F near Sillod and connecting to Bhokardan-Hasnabad-Rajur-Bawnepangri-Jalna-Ambad and terminating at its Junction with NH-52 near Wadigodri in the state of Maharashtra on EPC Mode Length=26.07

2022_MoRTH_668558_1 255.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2022
Time 17:30Hrs
17/05/2022
Time 17:30Hrs
817 Strengthening from km 48/500 to 93/600 (excluding from km 54/400 - 55/050, km 56/750 - 57/400, km 63/025 - 63/875 and km 66/950 - 67/650) of NH 230 (New NH 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu. (Total Length - 42.250 km)

2022_MoRTH_681128_1 59.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2022
Time 16:0Hrs
17/05/2022
Time 15:0Hrs
818 Stage strengthening of road stretches from km 0.00 to km 3.50 along with provision for both side covered drain and construction of one culvert (at km 0.00) of NH-512 in the district of Malda on EPC mode during FY year 2021-22 (Job No. 512/WB/2021-22/492)

2022_MoRTH_681545_1 15.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2022
Time 15:0Hrs
17/05/2022
Time 13:0Hrs
819 Six laning along with full aaccess control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun Economic Corridor in the states of Uttar Pradesh and Uttarakhand on EPC Mode under Bharatmala Pariyojana PhaseI (Package2)

NHAI/BM/EC/Delhi-Dehradun/Saharanpur-Ganeshpur-P2/2021 495.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 19:0Hrs
17/05/2022
Time 11:0Hrs
820 Widening from Km 0/0-0/6 and Strengthening from Km 0/0 -9/0 including Reconstruction of culverts, Widening of culverts, Construction of Drains, and Bus Lay By in Krishnagiri - Kuppam Road NH-219 (New NH-42) in the state of Tamil Nadu on Engineering, Procurement & Construction (EPC) Basis Contract

2022_MoRTH_681514_1 12.935 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2022
Time 10:0Hrs
16/05/2022
Time 15:0Hrs
821 PR to NH342 from Km 32/0 to 48/7 of NH 342 Mudigubba to Koduru road (Via) Puttaparthi in Ananthapuramu District in Andhra Pradesh on EPC Mode.

2022_MoRTH_683683_1 12.610 MoRTH Maintenance Project OTHERS 12/04/2022
Time 15:0Hrs
16/05/2022
Time 15:0Hrs
822 Construction of Flyover at Km 936.440 in Jonnada Jn, at Km 967.180 in Undrajavaram Jn, at Km 970.370 in Tetali Jn, VUP at Km 1006.525 in Kaikaram Jn for rectification of Blackspots and Flyover at Km 910.760 ofNH-216A in Morampudi Jn in AP on EPC Mode

NHAI/BS/NH-216A/RJY/2021 135.870 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 17:0Hrs
12/05/2022
Time 11:0Hrs
823 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand

2022_MoRTH_679959_1 188.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2022
Time 15:0Hrs
11/05/2022
Time 12:0Hrs
824 Conversion of Partially Excavated Escape Tunnel to UniDirectional 2 Lane Tunnel Length 1.80 Km from Km 12.732 to Km 14.568 of NH 21 including construction of cross passages and approach roads on either side of the tunnel on Kiratpur to Nerchowk section of NH 21 in the State of Himachal Pradesh on EPC Mode

NHAI/Escape Tunnel to Uni Directional Tunnel/ KN/HP/2022/EPC 330.950 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 15:0Hrs
10/05/2022
Time 11:0Hrs
825 Rehabilitation and up gradation of Kolha to Nasratpur section of NH-222 from existing Km 444/000 to 463/545 and Km 481/000 to 513/990 in the state of Maharashtra to Two lanes with paved shoulder on EPC Basis under NHDP-IV (Balance Work)

2022_MoRTH_668845_1 167.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/04/2022
Time 18:0Hrs
09/05/2022
Time 17:30Hrs
826 Rehabilitation and Upgradation of Mudkhed to Nanded from Km 372.000 to km 388.400 to two lane with paved shoulder configurations of NH 161A on EPC mode in the state of Maharashtra

2022_MoRTH_668594_1 160.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2022
Time 12:30Hrs
09/05/2022
Time 17:30Hrs
827 IRQP work (2021-22) from km 120.00 to 149.000 on NH-87 Ext. (New NH-109) in the State of Uttarkhand

2022_MoRTH_680598_1 30.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 16:10Hrs
09/05/2022
Time 14:0Hrs
828 Widening and strengthening from km 0.00 to 18.450 (Rajapur- Raipura section) of National Highway No. 731 AG in the state of Uttar Pradesh on Engineering Procurement and Construction Mode.

2022_MoRTH_680576_1 104.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 15:0Hrs
09/05/2022
Time 11:0Hrs
829 Periodical Renewal on Nagrota Bagwan Ranital Mubaripur road Km 18 00 to 39 00 of NH 20A in the State of HP on EPC mode

2022_MoRTH_682736_1 5.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 18:0Hrs
09/05/2022
Time 11:0Hrs
830 Strengthening of Solapur Vijapur road NH.52 Km. 0.00 to 10.00 in the state of Maharashtra on EPC Mode

2022_MoRTH_669485_1 27.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 15:0Hrs
05/05/2022
Time 17:0Hrs
831 Periodical renewal (PR) work from km 582.00 to km 597.00 of NH-31 (New NH-l0) in Darjeeling district in the state of west Bengal on EPC mode under Annual Renewal Plan in year 2021-22 [Job No.TA/10/WB/ 2021-22/802].

2022_MoRTH_681997_1 7.890 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/04/2022
Time 17:15Hrs
05/05/2022
Time 17:0Hrs
832 Rehabilitation and Upgradation to Two lane with paved Shoulders configuration for the work of Helwak - Patan - Karad Km - 85/000 to 88/500 , 90/000 to 97/000 & 99/700 to 102/200 ( Length 13.00 km ) and additional balance work in between chainage 102/200 to 133/417of NH 166 E in the state of Maharashtra on EPC mode

2021_MoRTH_664809_1 129.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/04/2022
Time 15:0Hrs
05/05/2022
Time 15:0Hrs
833 Rehabilitation upgradation from 2L to 2 OR 4 L PS of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202 050 to Km 245 640 Excl Retain Stretch from Km 208270 to Km 209 970 Km 220 190 to Km 221 620 Length of 40 460 Km in the State of AP

RW/NH-12014/18/2021AP/ZoneIII 342.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2022
Time 15:0Hrs
05/05/2022
Time 15:0Hrs
834 Construction of 211.880 m Major Bridge on well foundation over River Gomti on NH-128A (Parallel to Shashtri Bridge) in Jaunpur city on Engineering , Procurement and Construction (EPC) mode in the state of UP

2022_NHAI_111835_1 22.560 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/04/2022
Time 15:0Hrs
05/05/2022
Time 12:0Hrs
835 Construction of new MNB on Main Carriageway at km 462.087 on Old NH-01 (New NH-03) near Loharka crossing, MNB on Service Road including dismantling of old bridge, service road at RHS and concrete crash barrier with friction slab at RHS in the State of Punjab on EPC Basis

2022_NAHI_109958_1 3.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 15:0Hrs
05/05/2022
Time 11:0Hrs
836 Widening and Strengthening from km. 15.000 to km. 58.600 (Bhadewara Dramandganj section) of NH 135C in the state of Uttar Pradesh on EPC mode.

2022_MoRTH_678804_1 168.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 15:0Hrs
04/05/2022
Time 11:0Hrs
837 Development of 4/6 lane Mohali to Sirhind Greenfield Highway Section (Design length - 27.370 Km) under Bharatmala Pariyojana in the state of Punjab on EPC mode

2021_NHAI_91693_1 651.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2021
Time 16:0Hrs
04/05/2022
Time 11:0Hrs
838 PR from Km 175/6 to 177/8 and from Km 184/0 to 186/0 of Kalwakurthy-Nandyal road of new NH-167K in Kurnool District, in the state of Andhra Pradesh.

2022_MoRTH_681142_1 3.340 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/03/2022
Time 15:0Hrs
30/04/2022
Time 15:0Hrs
839 PR from Km 50/800 to 52/600 of Somayajulapalli to Dhone road of new NH 340B , in the state of Andhra Pradesh.

2022_MoRTH_681181_1 0.947 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/03/2022
Time 15:0Hrs
30/04/2022
Time 15:0Hrs
840 Maintenance work on section from Unai to Vansda Km.629/400 to Km. 642/400 on NH-56 in the State of Gujarat.

2022_MoRTH_684381_1 1.630 MoRTH Maintenance Project OTHERS 18/04/2022
Time 18:55Hrs
28/04/2022
Time 12:0Hrs
841 Upgradation of Dhoraji Jamkandorana Kalavad section of NH927D from design ch km0.0 to 58.115 to two lane with paved shoulder configuration in the state of Gujarat on EPC mode of contract

683021 148.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/04/2022
Time 13:30Hrs
28/04/2022
Time 12:0Hrs
842 PR btn km 102.2 to 119.5 Gadhada Botad road NH51 length 17.3 in the state of Gujarat Pro. and Lay. 50mm DBM in selected length and 40mm BC in full length under EPC mode

683896 11.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2022
Time 16:0Hrs
28/04/2022
Time 12:0Hrs
843 Elimination of identified Black Spot TN-(02)-076 by permanent remedial measures at km 306/4 (Panapalayam Junction) of NH 67 (New NH 81) (Coimbatore to Chidambaram Road) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

TNNo20/HDO/NH/21-22/Dt.8.3.22 8.972 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2022
Time 15:0Hrs
25/04/2022
Time 15:0Hrs
844 Strengthening on NH 22 New NH 05 on Kalka Shimla Wangtoo road from Km 208/700 to 214/00 and 223/500 to 236/00 in the State of Himachal Pradesh on EPC mode

2022_MoRTH_678151_1 14.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2022
Time 18:0Hrs
25/04/2022
Time 11:0Hrs
845 Work of Road Safety from Km 65.000 to 111.350 on NH 123 (507) in the state of Uttarakhand under EPC mode under Road Safety Annual Plan 2021-22

2022_MoRTH_679882_1 8.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2022
Time 15:0Hrs
23/04/2022
Time 15:0Hrs
846 Medium Term Maintenance works on section from Km. 11.0 to 19.0 Tad to Keshariya section on NH251 in the state of Guajrat under OR DPP scheme II Try

682675 1.170 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
847 Medium Term Maintenance works from km 124.800 to 134.690 Section Tran patiya Jamkandorana Kalavad road of NH151K in the state of Gujarat under OR DPP scheme III Try

682674 1.680 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
848 IRQP to NH151K Porbandar Bhanvad up to Tran patiya road section between km 39.3 to 43.2 Tran patiya to Jamjodhpur Kalavad road section between km 74.1 to 83.6, km 88.6 to 103.4 and km 112.8 to 124.8 (length 40.2 km) under EPC mode in the state of Gujarat

682390 16.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
849 IRQP to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0 to 21.5 and 27.9 to 30.902 and 51.5 to 61.5 total length 34.5 Km under EPC mode in the state of Gujarat

682381 18.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
850 Widening from DL to Four lane from km 170/2 - 172/0 (km 308/4-306/6 of NH 948), Widening from DL to DL - PS from km 176/0 - 204/8 (km 302/6 - 273/8 of NH 948) including Strengthening in km 180/0-190/8 (298/6-287/8 of NH 948) including widening and Reconstruction of CD works of NH 209 (New NH 948) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2022_MoRTH_677084_1 57.408 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2022
Time 15:0Hrs
21/04/2022
Time 15:0Hrs
851 PR from km 4.7 to 48.850 of NH927D Jamnagar Kalavad road section on EPC mode

682364 14.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 9:0Hrs
21/04/2022
Time 12:0Hrs
852 CONS AND UPGRAD TO NHDL SPEC FROM KM 14PT000 TO KM 25PT000 (DESIGN CHAINAGE KM 14PT000 TO KM 25PT000) (KM 0PT000 RECKONED AT TANGTSE) OF ROAD TANGTSE-LUKUNG UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 11PT000 KM

2022_BRO_514143_1 64.830 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 14:0Hrs
20/04/2022
Time 12:0Hrs
853 CONS AND UPGRAD TO NHDL SPEC FROM KM 0PT000 TO KM 14PT000 (DESIGN CHAINAGE KM 0PT000 TO KM 14PT000) (KM 0PT000 RECKONED AT TANGTSE) OF ROAD TANGTSE-LUKUNG UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 14PT000 KM

2022_BRO_514010_1 77.380 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/03/2022
Time 16:30Hrs
20/04/2022
Time 12:0Hrs
854 Widening of existing four lane to six lane road from chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to Bijli Bamba chauraha) in the State of Uttar Pradesh under EPC mode.

2022_MoRTH_678480_1 35.596 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2022
Time 15:0Hrs
19/04/2022
Time 15:0Hrs
855 Periodic Renewal between Km. 58/300 to Km. 69/900 of NH953 Laskariya-Ahwa-borkhal section of NH 953 under NHDivision Bharuch in the state of Gujarat On EPC Mode Job No.TA-953-GJ-2021-22-358

2022_MoRTH_682927_1 5.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/04/2022
Time 18:55Hrs
19/04/2022
Time 12:0Hrs
856 Periodical Renewal work in Km. 215.000 to 281.000 & Km. 285 of N.H.-76 (New N.H-35) in the State of Uttar Pradesh under EPC Mode.

2022_MoRTH_679869_1 32.480 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
857 Widening of existing 2 lane to four lane road from km. 176.50 to km. 178.00 of NH-76 under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_679164_1 5.048 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
858 Periodical Renewal work in Km. 5.360 to 22.000 of N.H.-86 (New N.H-34) in the State of Uttar Pradesh under EPC Mode on Engineering, Procurement, Construction (EPC) basis.

2022_MoRTH_678939_1 6.115 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/03/2022
Time 11:0Hrs
19/04/2022
Time 11:0Hrs
859 Strengthening work from Km 37.00 to 40.450 including Junction Improvements of NH-72A ( New No. 307) in the State of Uttarakhand under NH (0) Annual Plan 2021-22 EPC mode

2022_MoRTH_679327_1 13.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2022
Time 15:0Hrs
18/04/2022
Time 12:0Hrs
860 Construction of additional two lane with paved shoulders of NH-98 (New NH 139) from existing Ch. 7.000 to Ch. 17.840 (Design Ch. 0.000 to Ch. 10.840) AIIMS (Bhusaula Golambar) to Naubatpur (Patna Ring Road) section on EPC mode in the state of Bihar

2022_MoRTH_668331_1 80.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2022
Time 15:0Hrs
18/04/2022
Time 11:0Hrs
861 Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH-44 (old NH-03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.

2021_NHAI_91906_1 237.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2021
Time 15:0Hrs
18/04/2022
Time 11:0Hrs
862 IImprovement and Up-gradation of Existing Road to 2/4–lane with Paved Shoulder from Km 40.000 to 88.750, start of Khutar bypass to start of Shahjahanpur bypass of NH 731 (PKG-1) in the state of Uttar Pradesh

NHAI/11013/Bareilly/Pkg.-I/E-115669 548.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2021
Time 15:0Hrs
12/04/2022
Time 11:0Hrs
863 Widening and Strengthing of existing carriageway from Km 265/200 to km 266/200 and from km 273/00 to km 287/905 on NH- 56 under NH division Vadodara in the state of Gujarat for the year 2021-22. 15.905 km Job. No. 56-GJ-2021-22-658

2022_MoRTH_671564_1 29.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2022
Time 19:7Hrs
11/04/2022
Time 11:0Hrs
864 Improvement of road safety on Kalka Shimla Wangtoo road NH 22 New NH 05 Km 156/507 to 236/00 SH Providing and fixing Thrie Beam Metal Crash Barriers road marking sign boards and road delineators and C/O of R/wall and B/wall in the State of HP.

2022_MoRTH_673752_1 17.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2022
Time 18:0Hrs
07/04/2022
Time 11:0Hrs
865 Periodical Renewal work from Km 254 0 to 269 0 of Kalka Shimla Wangtoo Road on NH 22 New NH 05 in the State of HP on EPC Mode

2022_MoRTH_677476_1 4.806 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2022
Time 18:0Hrs
07/04/2022
Time 11:0Hrs
866 Construction of 6-Lane ROB at Km. 314.630 over Existing NH-24 of Bareilly-Sitapur section on EPC basis in the state of Uttar Pradesh for proposed private railway siding of KFL

NHAI/11013/NH-24/ROB/KRIBHCO/2021/E-84195 51.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/10/2021
Time 15:0Hrs
07/04/2022
Time 11:0Hrs
867 Periodical Renewal of Chakki Banikhet Chamba Bharmour Road NH-154A from Km. 39 0 to 65 0 and km 76 0 to 84 0 in the State of HP

2022_MoRTH_677222_1 10.550 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/03/2022
Time 15:0Hrs
05/04/2022
Time 15:0Hrs
868 Construction of 4 lane with paved shoulders Thiruvaiyaru Bypass in between existing Km.55/926 to 62/680 in NH 226Extn. (New NH 136) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673595_1 150.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 18:0Hrs
05/04/2022
Time 15:0Hrs
869 Widening from two lane to four lane with paved shoulder in km 60/650-73/2 and strengthening in km 60/650 - 61/8, 62/8-63/4, 65/2-67/2, 67/6-70/0, 71/2-71/450 and 71/750 – 73/2 and only wearing course at km.61/8-62/8, 63/4-65/2, 67/2-67/6, 70/0-71/2 including widening of minor bridges, construction of additional bridge at km.64/2, widening and reconstruction of culverts, construction of retaining walls and drain in built up areas in Musiri - Namakkal road (NH 381B) in the State of Tamil Nadu on EPC Mode

2022_MoRTH_669834_1 85.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2022
Time 10:0Hrs
05/04/2022
Time 15:0Hrs
870 Periodical Renewal on Nagrota Bagwan Ranital Mubaripur road Km 18 00 to 39 00 of NH 20A in the State of HP on EPC mode

2022_MoRTH_677227_1 5.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/03/2022
Time 18:0Hrs
05/04/2022
Time 11:0Hrs
871 Widening from two lane to two lane with paved shoulder from km 34/000 to 49/000 and two lane to four lane with paved shoulder from km 49/000 - 60/650 with Strengthening in km 34/000 - 45/000, 46/000 - 56/000 and km 58/000 - 60/650 including Construction of Retaining wall, Culverts, Minor Bridge, Drains and Bus Lay bay in Musiri - Namakkal Road (NH 381B) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673515_1 145.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 15:0Hrs
04/04/2022
Time 15:0Hrs
872 Elimination of identified Black spots TN-(02)-492, TN-(02)-491, TN-(02)-609, TN-(02)-490, by permanent Remedial Measures at km 55/075 (Thimmarasanaickanur Junction), km 58/225 (Subbulapuram Junction), km 59/875 (Aundipatti Check post), km 62/200 (Sakkampatti Ramar Tea Stall) of NH 49 Extn (New NH No 85) on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2022_MoRTH_673556_1 13.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2022
Time 16:0Hrs
04/04/2022
Time 15:0Hrs
873 Work of IRQP for NH 64 from Km. 222/0 to 230/300 (Derol-Bharuch Section) and Km. 239/00 to 252/200 (Ankleshwar- Sajod-Digas section) in the State of Gujarat. On EPC Mode

2022_MoRTH_678246_1 24.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
874 Medium Term Maintenance work between Km. 69/900 to 94/600 of NH 953 (Gulkand- Shamgahan Section) in the State of Gujarat under OR (DPP) Scheme

2022_MoRTH_678252_1 5.470 MoRTH Normal Highway Project OTHERS 10/03/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
875 Construction of four lane ROB and its approaches in lieu of existing Level Crossing No. RV-168 (Presently RV-172) at Km 176 on NH-201 (New NH-26) at Kesinga including land acquisition under NH(O) in Annual Plan 2021-22. (Bid Ref No.- 10 CE NH of 2021-22)

2021_MoRTH_668265_1 225.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2022
Time 18:55Hrs
04/04/2022
Time 12:0Hrs
876 Periodical Renewal Link Roads connecting NH-544E to 544E from Km 2.150 to 7.650 (Chilamathur village limits), Km. 10.200 to Km 12.100 (Demakethapalli village limits) and Km 47.200 to 50.000 (Kallumarri village limits) of Madakasira – Sira Road, in the stae of Andhra Pradesh on EPC mode

2022_MoRTH_674189_1 5.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
877 PR to road from Km 39/0 to 40/2 and 42/3 to 52/0 of Renigunta Kadapa road NH716, in the state of Andhra Pradesh on EPC Mode

2022_MoRTH_674021_1 7.760 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs
878 PR from Km 545/150 to 563/400 of NH67 of Hubli Krishnapatnam road, in the state of Andhra Pradesh on EPC Mode

2022_MoRTH_674032_1 15.520 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2022
Time 15:0Hrs
31/03/2022
Time 15:0Hrs