1 Strengthening from km 6/000 to 10/320 and Km 16/274 to 19/200 including CD works on NH 136 Thanjavur –Perambalure – Atthur road on Engineering, Procurement and Construction (EPC) Basis Contract under Annual Plan 2023-24 in the State of Tamil Nadu

2024_MoRTH_799251_1 8.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 15:0Hrs
12/06/2025
Time 15:0Hrs
2 Construction of 4 Lane access controlled Greenfield Hisar Bypass starting from NH52 Barwala Hisar Rajgarh Design Km 0.000 and terminating at NH 9 Delhi Mandi Dabwali Design Km 7.236 Total Length 9.84 km alongwith development of Interchange at Dhandoor Junction of NH 52 and NH 9 in state of Haryana under NHO on EPC mode

2023_NHAI_176428_1 250.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2023
Time 15:0Hrs
04/07/2024
Time 11:0Hrs
3 Widening the left out existing 2L to 2L PS and Strengthening the selected stretches from Km 9/6 to Km 15/6 of NH 381A (Vellakovil - Sankari road) on EPC mode in Tamil Nadu

2024_MoRTH_807065_1 13.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2024
Time 10:0Hrs
28/06/2024
Time 15:0Hrs
4 Short Term Maintenance at Chainage 52.180 to 61.750, km 70.750 to 72.900 and km 79.360 to km 83.00 on NH-707A

2024_MoRTH_800722_1 3.710 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
5 Short Term Maintenance works from Km 197 to Km 200 on NH-119(New 534)

2024_MoRTH_800795_1 1.960 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
6 Short Term Maintenance works from Km 233 to Km 242 on NH-119(New 534)

2024_MoRTH_800810_1 2.430 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
7 Short Term Maintenance works from Km 251 to Km 262 on NH-119(New 534)

2024_MoRTH_800858_1 2.430 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
8 Short Term Maintenance works from Km 263 to Km 276 on NH-119(New 534)

2024_MoRTH_800911_1 2.350 MoRTH Maintenance Project OTHERS 14/03/2024
Time 15:0Hrs
28/06/2024
Time 12:0Hrs
9 Construction of CC Shoulder Culvert, Drain and Damage R/wall and B/wall from km 68.750 to km 75.00 on NH-107(old 109) under Annual Plan of NH(O) 2023-24 in the State of Uttarakhand under EPC Mode.

2024_MoRTH_800915_1 5.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 15:0Hrs
27/06/2024
Time 12:0Hrs
10 Balance work of Widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (Actual chainage as per site km. 59.700 to km. 64.525 on NH-507 in the State of Uttarakhand under EPC Mode in NH(O) the year 2023-24

2024_MoRTH_799468_1 28.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
27/06/2024
Time 12:0Hrs
11 Treatment of 7 Nos of landslide location on NH 107 and 107A in the State of Uttarakhand under EPC Mode in NH(O) Annual Plan 2023-24

2024_MoRTH_799503_1 43.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 15:0Hrs
27/06/2024
Time 12:0Hrs
12 Development of 4 lane Economic Corridor from Kharagpur to Chandrakona- Ghatal Road Crossing section Km 0.000 to Km 41.000 of NH 116A (Package-I) in the state of West Bengal under HAM Mode

2023_NHAI_166641_1 984.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 11:0Hrs
27/06/2024
Time 11:0Hrs
13 DEVELOPMENT OF 4 LANE ECONOMIC CORRIDOR FROM CHANDRAKONA-GHATAL ROAD CROSSING TO BOWAICHANDI SECTION KM 41.000 TO KM 89.814 OF NH 116A (PACKAGE-2) IN THE STATE OF WEST BENGAL UNDER HAM MODE

2023_NHAI_166636_1 1,503.290 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
27/06/2024
Time 11:0Hrs
14 Development of 4 lane Economic Corridor from Bowaichandi to Guskara-Katwa Road Section Km 89.814 to Km 133.000 of NH 116A (Package-3) in the state of West Bengal under Hybrid Annuity Mode

2023_NHAI_166878_1 1,231.320 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
27/06/2024
Time 11:0Hrs
15 Development of 4 lane Economic Corridor from Guskara- Katwa Road to Mayurakshi Bridge Approach section Km 133.000 to Km 180.000 of NH 116A (Pkg-IV) in the state of West Bengal under Hybrid Annuity Mode

2023_NHAI_166914_1 1,039.260 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
27/06/2024
Time 11:0Hrs
16 Development of 4 lane Economic Corridor from before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal

2023_NHAI_166611_1 1,226.910 NHAI Normal Highway Project HAM 16/02/2024
Time 11:0Hrs
27/06/2024
Time 11:0Hrs
17 Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch. 0.000 to Garhani (at SH-12) at Ch 74.432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of Bihar on HAM Mode

2023_NHAI_163301_1 1,143.360 NHAI Normal Highway Project HAM 04/08/2023
Time 15:0Hrs
26/06/2024
Time 11:0Hrs
18 RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_750739_1 351.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 18:55Hrs
24/06/2024
Time 11:0Hrs
19 Upgradation of Shahdol- Sagartola Section of NH 543 from km 0/000 to km 69/400 to 2 lane with paved shoulders under Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh

2024_MoRTH_798673_1 515.180 MoRTH Normal Highway Project HAM 05/03/2024
Time 11:0Hrs
20/06/2024
Time 17:30Hrs
20 Upgradation of Pendurthi to Bowdara section of NH 516B to 2 4 lane with paved shoulders configuration from its junction with NH 16 near Pendurthi Kothavalasa S. Kota and terminating at its junction with NH 516E near Bowdara in the state of AP

2023_MoRTH_779962_1 782.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2023
Time 17:0Hrs
20/06/2024
Time 17:0Hrs
21 Treatment of 05 nos. of Landslide location (Location Ch. 333.65 km to 333.750 km, Location Ch. 337.940 km to 338.165 km, Location Ch. 350.480 km to 350.680 km, Location Ch. 351.500 km to 351.650 km and Location Ch. 356.250 km to 356.750 km) on NH 58

2024_MoRTH_799496_1 70.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
20/06/2024
Time 12:0Hrs
22 Construction of By-pass Road to Rayagada Town and J K Pur Town on NH 326 in the state of Odisha on EPC mode (Bid Ref No - 57 CE NH of 2023-24)

2024_MoRTH_799596_1 153.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 17:0Hrs
20/06/2024
Time 12:0Hrs
23 Land slide treatment work on NH 58(New 07) at Chainage 238.750 to 238.920 (170 m length), Chainage 246.790 to 246.850 (60 m length), Chainage 247.340 to 247.440 (100 m length), Chainage 254.340 to 254.410 (70 m length),Chainage 279.400 to 279.600

2024_MoRTH_800379_1 45.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 12:0Hrs
20/06/2024
Time 12:0Hrs
24 Reconstruction of 3 nos. of damaged bridges of NH-326 at Toyaput Nallah at Ch. Km 261/060, Khudipadar Nallah at Ch. 268/780 km and Debagarh river at Ch. 270/260 km on NH-326 in the State of Odisha. (Bid Ref No. 59 CE NH of 2023-24)

2024_MoRTH_802149_1 37.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2024
Time 15:0Hrs
20/06/2024
Time 12:0Hrs
25 Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35.550 Design Chainage 0.000 to 42.800 Design Chainage 8.153 on NH 503A including Cable Stayed Bridge 0.860 Km on Back Water of Govind Sagar

2024_MoRTH_795482_1 613.680 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 18:0Hrs
20/06/2024
Time 11:0Hrs
26 Wayside amenities on various National Highways in the State of Himachal Pradesh along with their operation and maintenance Valley Hill& Plain side SH C o Toilet block Septic tank Harvesting tank retaining wall and service lane

2024_MoRTH_806076_1 13.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2024
Time 18:0Hrs
18/06/2024
Time 11:0Hrs
27 Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K under the Short Term Maintenance Contract in the State of Uttar Pradesh

2024_MoRTH_808744_1 0.670 MoRTH Maintenance Project OTHERS 25/05/2024
Time 16:0Hrs
14/06/2024
Time 15:0Hrs
28 Widening of Chilakaluripet Nekarikallu Section Design Chainage 47.000 to 85.080 of NH 167A Package II to 4 Lane with paved shoulder Configuration in the State of Andhra Pradesh under Annual Plan 2022 23

2024_MoRTH_800745_1 476.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 17:55Hrs
13/06/2024
Time 17:0Hrs
29 Construction of Bypass to Narsapuram town on NH 216 of 2 Lane with paved shoulder configuration starting from Existing Ch. Km 126.100 of NH 216 old NH 214A and ending at Km 10.814 existing chainage of NH 216 in the State of Andhra Pradesh

2023_MoRTH_768943_1 419.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 12:0Hrs
12/06/2024
Time 17:0Hrs
30 Widening and Strengthening of existing S/L, I/L,& D/L to 2 Lane with PS from Km 256/455 to 256/503, 256/820 to 256/960, 265/760 to 266/010, 266/010 to 266/800, 268/610 to 268/710, 270/975 to 271/055, 276/460 to 276/560, 276/560 to 276/700, 276/700 to 277/480, 285/780 to 288/290, 288/290 to 291/050 and Construction of 3 Nos. of Bypass from Km 266/800 to 267/300, 270/025to 270/975, & 284/700 to 285/780 onNH-53 inthe State of Odisha under EPC mode. (BID Ref. No.-58 CE NH of 2023-24)

2024_MoRTH_800929_1 73.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 18:55Hrs
12/06/2024
Time 12:0Hrs
31 Construction of 2LPS Bypass for Kothamangalam Town from Design Ch-0.000 to Ch-3.800 (Existing Km -49.40 to Km 43.58) on Kochi-Munnar section of NH-85 in the State of Kerala on EPC mode under NH-O Scheme

NHAI/Kerala/Kothamangalam Bypass/EPC/2023 55.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 11:0Hrs
11/06/2024
Time 11:0Hrs
32 Construction of 2LPS Bypass for Muvattupuzha Town from Design Ch-0.000 to Ch-4.300 (Existing Km-38.20 to Km- 33.97) on Kochi-Munnar section of NH-85 in the State of Kerala on EPC mode under NH-O Scheme on EPC mode

NHAI/Kerala/ Muvattupuzha Bypass/EPC/2023 81.630 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 11:0Hrs
11/06/2024
Time 11:0Hrs
33 Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand

2023_MoRTH_786620_1 70.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
10/06/2024
Time 12:0Hrs
34 Rehabilitation and Upgradation from 2 lane to Four lane of Muddanur to B. Kothapalli section of NH 716G from Km. 0.000 to Km. 56.500 Km in the State of Andhra Pradesh on EPC mode.

2023_MoRTH_779245_1 850.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/11/2023
Time 17:30Hrs
07/06/2024
Time 17:0Hrs
35 Construction of Slope Protection Work at Various Locations on the Hillside between Km 106 139 to Km 129 050 of the Solan Kaithlighat section of NH 22 now NH 5 on EPC mode in the State of Himachal Pradesh

2024 NHAI 190196 1 160.350 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 15:0Hrs
06/06/2024
Time 11:0Hrs
36 ONE TIME IMPROVEMENT FOR NANASA BYPASS, KHATEGAON BYPASS, SANDALPUR BYPASS and KHEDI,MAHADGOAN, DHARGOAN, DHSNORA, BHADUS, AT CHHIRAPATLA OF INDORE - BETUL ROAD NH - 47 IN THE STATE OF MADHYA PRADESH ON EPC MODE

2024_MoRTH_800265_1 66.190 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 13/03/2024
Time 17:30Hrs
05/06/2024
Time 17:30Hrs
37 One Time Improvement for Km. 1 to 23 and Black Spot Near Dudhiya Power House, smooth merging and diverging of junctions and repairs of old drains and RCC drain of Indore Betul Road NH-47 in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_799825_1 27.010 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 17:30Hrs
05/06/2024
Time 17:30Hrs
38 Strengthening of existing Two lane road from Km 0.00 to Km 56.480 Ghazipur-Zamania - Saiyad Raja NH-97 (New NH-24) in the State of Uttar Pradesh on EPC Mode

2023_NHAI_179442_1 71.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 15:0Hrs
05/06/2024
Time 15:0Hrs
39 Strengthening of service roads of NH-147 Chiloda-Gandhinagar-Sarkhej Road Km. 0/000 to 44/040 in the state of Gujarat on EPC mode. Job No. 147/GJ/2023-24/741

2024_MoRTH_800515_1 12.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2024
Time 18:0Hrs
05/06/2024
Time 12:0Hrs
40 Widening from km 3/950 to km 4/300 (0.35 Km) and Strengthening selected stretches from Km 0/0 to Km 12/3 (4.92 Km) of NH-38 (Mangalore-Villupuram road) on EPC mode in Tamil Nadu

2024_MoRTH_799240_1 15.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2024
Time 15:0Hrs
05/06/2024
Time 11:0Hrs
41 Strengthening at selected stretches from km 22/0 to km 78/2 of NH-38 (Mangalore-Villupuram Road) on EPC mode in Tamil Nadu

2024_MoRTH_799982_1 47.400 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 15:0Hrs
05/06/2024
Time 11:0Hrs
42 One Time Improvement And Maintenance of old Gt Road from Junction of Delhi Meerut Expressway Lal Kuan Ghaziabad to Gyani Border Delhi Up Border in the State Of Uttar Pradesh on EPC Mode

2023_NHAI_178936_1 371.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
31/05/2024
Time 11:0Hrs
43 RFP for the work of Four laning of section of NH727 H from Dewa to Fatehpur (km 19.000 to km 39.000) on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_769449_1 325.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
30/05/2024
Time 11:0Hrs
44 RFP for the Rehabilitation and Upgradation of Pratapgarh - Sultanpur Road section of NH-330, from design Chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of Uttar Pradesh on EPC mode.

2023_MoRTH_774157_1 518.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 18:55Hrs
30/05/2024
Time 11:0Hrs
45 One Time Improvement In Bhoura Town Portion, Shahpur Town Portion and Padhar Town Portion on NH 69 (Old) NH 46 (New) Itarsi Betul Road in the State of Madhya Pradesh on EPC mode

2023_MoRTH_770427_2 14.690 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/05/2024
Time 15:0Hrs
29/05/2024
Time 15:0Hrs
46 Strengthening from km 110/2 to km 142/0 of NH-38 (length 31.8 km) (Mangalore-Villupuram Road0 on EPC mode in Tamil Nadu

2024_MoRTH_794400_1 33.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 9:0Hrs
29/05/2024
Time 11:0Hrs
47 Landslide treatment work of 12 location on NH-58 from Km 235.420 (Shivpuri) to km 266.130 (Kodiyata) under EPC mode in the State of Uttarakhand on EPC Mode

2024_MoRTH_800365_1 54.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 12:0Hrs
28/05/2024
Time 12:0Hrs
48 Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi Km 105 700 to Km 106 800 on NH 25 New NH 27 and Interchange at Km 97 100 on NH25 new NH 27 for Shivpuri Kanpur Road Jhansi Bypass section in the State of Uttar Pradesh on EPC Mode

2023_NHAI_179425_1 154.960 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 17:30Hrs
28/05/2024
Time 11:0Hrs
49 UP-GRADATION OF PICHHORE- DINARA SECTION OF NH-346, FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE

2024_MoRTH_795124_1 299.150 MoRTH Normal Highway Project HAM 13/02/2024
Time 10:30Hrs
27/05/2024
Time 17:30Hrs
50 Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.590 km to 2 Lane with paved shoulder configuration along with OTI in 5.88 km length in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_798392_1 255.200 MoRTH Normal Highway Project HAM 01/03/2024
Time 17:30Hrs
27/05/2024
Time 17:30Hrs
51 Upgradation of Multai to MP/MH Boarder section of NH-347A from 0.00 to 23.94 to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode

2024_MoRTH_798453_1 240.420 MoRTH Normal Highway Project HAM 01/03/2024
Time 17:30Hrs
27/05/2024
Time 17:30Hrs
52 Strengthening the selected stretches from Km 58/700 to Km 68/900 of NH-381A (Vellakovil – Sankari road) on EPC mode in Tamil Nadu

2024_MoRTH_794485_1 14.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2024
Time 10:0Hrs
27/05/2024
Time 15:0Hrs
53 Strengthening selected stretches from Km 1/2 to Km 23/6 (9.50 Km) of NH-81 and Strengthening selected stretches from Km 6/0 to Km 23/0 (1.8Km) of NH-181 including junctions improvement at Km 6/0 to Km 6/4 of NH-181 on EPC mode in the Tamil Nadu

2024_MoRTH_799391_1 35.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
27/05/2024
Time 15:0Hrs
54 6 Laning of de scoped work of Chittorgarh Udaipur section of NH 27 from km. 269.650 to km. 270.900 near Village Vana, in the state of Rajasthan on EPC mode

2024_NHAI_191434_1 26.280 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 17:55Hrs
27/05/2024
Time 11:0Hrs
55 Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design length 19.20 Km in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM)

2024_MoRTH_796127_1 434.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/02/2024
Time 15:0Hrs
25/05/2024
Time 17:30Hrs
56 SHORT TERM MAINTENANCE OF JALANDHAR HOSHIARPUR ROAD (NH-70) NEW NH-03 FROM KM 49.200 TO 58.360 IN THE STATE OF PUNJAB

2024_MoRTH_806162_1 1.090 MoRTH Maintenance Project OTHERS 06/05/2024
Time 14:0Hrs
25/05/2024
Time 12:0Hrs
57 One Time Improvement to Kalyan-Ahmednagar-Parbhani-NandedNirmal Road NH-61 (222) Km 463/700 to 481/00 (PARBHANI CITY PORTION) in the State of Maharashtra

2024_MoRTH_799891_1 27.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2024
Time 10:0Hrs
24/05/2024
Time 17:30Hrs
58 Up-gradation of Shyampur to Sabalgarh Road section of NH-552Ext. from km 111.800 to 166.850 to Two Lane with Paved Shoulder configuration in the State of Madhya Pradesh on Hybrid Annuity Mode

2024_MoRTH_796278_1 629.940 MoRTH Normal Highway Project OTHERS 21/02/2024
Time 17:30Hrs
22/05/2024
Time 17:30Hrs
59 Widening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from Km 67/400 to Km 70/400 of NH-353 (Khariar Road town portion) in the State of Odisha on EPC Mode.BID Ref. No.-60 CE NH of 2023-24

2024_MoRTH_802151_1 43.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2024
Time 18:0Hrs
21/05/2024
Time 12:0Hrs
60 Rehabilitation and up-gradation for Talere .Gaganbawada . kolhapur Road NH 166G stretch start from km. 0.00 to Km. 06.00 and km. 13.00 to km 19.440 of NH.166G, length 12.440 km in the State of Maharashtra

2024_MoRTH_799263_1 116.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
20/05/2024
Time 17:30Hrs
61 Talere Gaganbawada Road NH 166G Km. 23.250 to 28.320 Treatment for Five critical land slide prone spots posing significant threat to the safety of travellours is Karul Ghat section in the State of Maharashtra.

2024_MoRTH_798676_1 6.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2024
Time 15:0Hrs
20/05/2024
Time 17:30Hrs
62 DESIGN AND CONSTRUCTION OF STANDALONE FLYOVER AT RASALPUR JUNCTION ON INDORE-DEWAS SECTION OF NH-52 UNDER ROAD SAFETY IMPROVEMENT IN THE STATE OF MADHYA PRADESH ON EPC MODE

2024_NHAI_187840_4 42.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2024
Time 15:0Hrs
20/05/2024
Time 15:0Hrs
63 Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on EPC Basis

2023_MoRTH_775191_1 963.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
20/05/2024
Time 15:0Hrs
64 Rehabilitation and Upgradation to 2/4 lane with paved shoulders from Km 79/300 to Km 87/360 & Km 88/437 to Km 93/819 of NH-167K (Bridge Approaches of Iconic Bridge across river Krishna) in the State of Telangana and Andhra Pradesh on EPC Basis

2023_MoRTH_775185_1 340.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
20/05/2024
Time 15:0Hrs
65 Treatment of 07 no. of landslide location on NH-134 from Dharasu to Yamnotri in the State of Uttarakhand under Annual Plan 2023-24 on EPC Mode.

2024_MoRTH_799487_1 42.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2024
Time 11:0Hrs
20/05/2024
Time 12:0Hrs
66 Road Protection work in Hill side and Valley side at km. 171 (ch. 170.750 to 170.930) and at km 172 (Ch. 171.700 to 171.900) on NH-707 in the State of Uttarakhand under Road Safety Plan 2023-24 on EPC Mode.

2024_MoRTH_800173_1 6.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 15:0Hrs
20/05/2024
Time 12:0Hrs
67 CONSTRUCTION OF DONG-JACHEP ROAD (GREEN-FIELD ALIGNMENT) TO NHSL SPECIFICATIONS FROM KM 8.OOO TO KM 15.OOO (PART-I) {NET LENGTH 7.OOO KM) AND KM 15.OOO TO KM 45.OOO (PART-II) (NET LENGTH 3O.OOOKM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE UNDER EPC MODE

CE(P)/UDK/NIB/01/2024-25 265.980 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2024
Time 11:0Hrs
17/05/2024
Time 11:0Hrs
68 Construction of Kanigiri Bypass on NH 565 from Km 261.700 to Km 267.200 to two lane with paved shoulders in the state of Andhra Pradesh through EPC mode under Annual Plan 2023-24

SENHVJA/25/2023-24 Date: 06.03.2024 45.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 17:0Hrs
16/05/2024
Time 17:0Hrs
69 Rehabilit Shoulders from Km 178.500 tation and Up-gradation of Nehru Nagar to Kothagudem Section to Two Lane/Four Lane with Pavedo Km 230.580 of NH-930P in the State of Telangana on EPC Basis

2023_MoRTH_775194_1 962.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
16/05/2024
Time 15:0Hrs
70 Construction of additional two lane bow string ROB adjacent to the existing two lane Bow string ROB at Km 56/2 of NH234 (New.NH.75) (Mangalore-Villupuram Road) on EPC mode under Annual Plan 2022-23 in the State of TamilNadu

2024_MoRTH_793329_1 24.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 9:0Hrs
16/05/2024
Time 11:0Hrs
71 Rehabilitation and Up gradation of Thorrur to Nehru Nagar Section to Two Lane with Paved Shoulders from Km 109.420 to Km 178.500 of NH 930P in the State of Telangana

2023_MoRTH_768186_1 548.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 16:0Hrs
15/05/2024
Time 15:0Hrs
72 Short Term maintenance between ch.km 361/620 to 364/220 Kasbapar-Navsari Road ch. km 368/520 to370/620 Vejalpore-Eru Road of NH64in Navsari District in the state ofGujarat under STMC M and R scheme.

2024_MoRTH_801231_1 1.260 MoRTH Normal Highway Project OTHERS 16/03/2024
Time 13:45Hrs
15/05/2024
Time 12:0Hrs
73 Treatment for critical land slide prone spots posing significant threat by taking Slope Protection Measures from Km 144.800 to Km145.000, Km148.00 to Km 148.350, Km150.920 to Km 151.020 And Km 155.800 to Km 156.000 in Kashedi Ghat and Km 200.317 to Km 200.932, Km 200.932 to Km 201.487 in Parshuram Ghat on Panvel-Mahad-Panji Road NH-66 on EPC mode in the state of Maharashtra

2024_MoRTH_798878_1 59.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2024
Time 14:0Hrs
13/05/2024
Time 17:30Hrs
74 Improvement and widening to Two Laning with Paved Shoulder of National Highway 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 31.500 in the state of Meghalaya (package-1) on EPC basis under North East Road Network Connectivity Improvement through Japan International Cooperation Agency (JICA) ODA Loan Phase-VII ( Package-1)

2024_WBRTH_800782_1 366.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 18:55Hrs
13/05/2024
Time 16:0Hrs
75 Improvement and widening to two Laning with Paved Shoulder of National Highway 127B from Km 31.500 to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis under North East Road Network Connectivity Improvement) through Japan International Cooperation Agency (JICA) ODA Loan Phase-VII ( Package-2)

2024_WBRTH_800794_1 315.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 18:55Hrs
13/05/2024
Time 16:0Hrs
76 Maintenance works and activities on section from Seer to Pahalgam (km. 19.050 to km 47.000) of NH No.501 in the UT of JK (Total length 27.95 Kms)

NIT 02 29.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/04/2024
Time 15:0Hrs
09/05/2024
Time 16:0Hrs
77 Widening and Strength. to 2 lane with P.S/4 Lane with PS config. from km.61.500 of NH727B near Nawalpur(km178.500 of Sonauli Balia Marg,Old SH01)i.e.end point of Salempur Bypass to km.106.495 of NH727B near Sikanderpur under EPC Mode in the state of UP

2023_MoRTH_769456_1 963.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 9:0Hrs
07/05/2024
Time 11:0Hrs
78 Rehabilitation and upgradation two lane with pave shoulder configuration of NH752G from Sakri to Pimpalner section 0.000 to 21.411 in the state of Maharashtra on EPC Mode.

2024_MoRTH_798855_1 166.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/03/2024
Time 15:0Hrs
03/05/2024
Time 15:0Hrs
79 Permanent repair work to protect abutment of Major Bridge on NH-160H towards Takarkheda side at Ch. 111/300 of Malegaon-Kusumba Dondaicha-Shahada in the state of Maharashtra on EPC Mode.

2024_MoRTH_795632_1 9.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2024
Time 15:0Hrs
02/05/2024
Time 17:30Hrs
80 Reconstruction widening of Narrow Minor Bridges 4 Nos at Ch 71.920 74.064 74.856 and 75.690 in the section Murud Akola to Latur Airport Junction on Nh 63 in the state of Maharashtra on EPC mode

2023_MoRTH_797817_1 3.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 18:55Hrs
30/04/2024
Time 17:30Hrs
81 Up-Gradation to Two / Four lane with paved shoulder configuration of NH 652 from Tuljapur - Naldurge - Akkalkot road ( Chainage from Km 00.000 to Km 30.982) in the state of Maharashtra on EPC Mode ( Length - 30.982Km)

2024_MoRTH_796822_1 136.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2024
Time 10:0Hrs
30/04/2024
Time 17:0Hrs
82 Work of Widening of Road from 5.5m to 10 m carriageway between ch. km 370/620 to 386/020 except km 377/420 to 380/020 of NH-64 in navsari District in the state of Gujrat Eru Matvad Dandi Section

2024_MoRTH_800809_1 48.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/03/2024
Time 9:0Hrs
29/04/2024
Time 12:0Hrs
83 Strengthening of NH 166A to two lane paved shoulder from Km 0.000 to Km 22.200 of Vadhkal Alibag road for design length 22.200 Km in Raigad district in the State of Maharashtra on EPC Mode

2024_MoRTH_800106_1 56.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 14:0Hrs
26/04/2024
Time 17:0Hrs
84 Rehabilitation and upgradation of NH 166A to two lane paved shoulder from km 2.320 to km 3.600 and Km 6.520 to km 8.610 and from Km 14.070 to km 14.470 of Vadhkal Alibag road (including construction of Major Bridge Flyover VUP) for design length 3.77 Km in Raigad district in the State of Maharashtra on EPC Mode

2024_MoRTH_800110_1 178.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/03/2024
Time 14:0Hrs
26/04/2024
Time 17:0Hrs
85 Construction of Shopian Bypass on NH-444 taking off from existing chainage Km 36.500 and re-joining at Km 47.588 of existing chainage (New Design Chainage from Km 28.000 to Km 36.925) as 2-lane with paved shoulder (Length 8.925 Km) in the UT of Jammu and Kashmir on EPC mode.

NIT 34 168.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 15:0Hrs
22/04/2024
Time 15:0Hrs
86 BALANCE WORK OF WIDENING OF 4 NOS EXISTING 2 LANE MAJOR BRIDGE OF SIX LANING OF KOZHIKODE BYPASS (CALICUT BYPASS) (I.E. VENGALAM JN. TO RAMANATTUKARA JN.) SECTION OF NH 66 FROM DESIGN CHAINAGE KM 230.400 TO DESIGN CHAINAGE KM 258.800 (TOTAL LENGTH 28.400 KM) IN THE STATE OF KERALA

2024_NHAI_188052_1 102.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 18:20Hrs
22/04/2024
Time 11:0Hrs
87 Special Repair on NH 05 Km 254 to 368 excluding Km 284 to 329 SH Restoration to Mettaling and Tarring work C o R Wall in PCC C o R wall and B wall in wire crate and Reconstruction of damaged W metal beam crash barrier in various reaches between km 254 to 284 and km 329 to 368 in the State of Himachal Pradesh

2024_MoRTH_799340_1 7.740 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 18:0Hrs
22/04/2024
Time 11:0Hrs
88 Special Repair on Theog Kotkhai-Hatkoti Road on NH 705 from Km 31 to 69 Construction of R wall in Wire crates R wall in PCC B walls in PCC Wire crates U Shape drain in PCC and Strengthening of damaged portion between Km 31 to 69 in the State of Himachal Pradesh

2024_MoRTH_799350_1 16.300 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/03/2024
Time 18:0Hrs
22/04/2024
Time 11:0Hrs
89 Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH-761 from Design Ch. Km 0.000 to KM 37.970 Design length 37.970 Km in the State of Maharashtra on EPC Mode

2024_MoRTH_796098_1 266.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/03/2024
Time 11:5Hrs
15/04/2024
Time 17:5Hrs
90 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 474.710 TO KM 474.850 & KM 475.565 TO KM 475.625 ON RISHIKESH – JOSHIMATH - MANA ROAD (NH-07) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 02 NOS) ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_642675_1 21.430 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 15:0Hrs
13/04/2024
Time 15:0Hrs
91 CONSTRUCTION IMPROVEMENT OF ROAD SINGTHAMDIKCHU FROM CL 9 TO NHDL SPECIFICATIONS THROUGH EPC MODE BETWEEN KM 10.00 (KM 0.00) TO KM 32.700 (EXISTING) (KM 32.110 PROPOSED) (NET DESIGN LENGTH22.110 KM) UNDER 87 RCC764 BRTF UNDER PROJECT SWASTIK IN SIKKIM STATE

1 212.350 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
13/04/2024
Time 15:0Hrs
92 Performance based Maintenance Contracts (PBMC) Estimate of Rehabilitation and up gradation of Nandgaon peth Morshi Warud MH MP border section of Nh353 K (Design km. 0.000 to 95.390 ) to Two Four Lane with Paved shoulders Configuration of NH353 K for 5 year Maintenance Period in the state of Maharashtra.

2024_MoRTH_798041_1 41.510 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 10:0Hrs
12/04/2024
Time 17:30Hrs
93 Realignment and curve improvement near Deulgaon Mahi town from design chainage Km. 105.300 to Km. 106.185 (length- 0.885 Km) near on NH 753A to Four lane with paved Shoulder configuration in the state of Maharashtra on EPC mode

2024_MoRTH_797415_1 10.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2024
Time 13:0Hrs
11/04/2024
Time 17:30Hrs
94 Rehabilitation and upgradation of Viaragarh (Mohadi) From Design Ch. 73.830 to Ch.76.00 (Length 2.17Km) in Chikhli Khamgaon section of NH 548CC to two lane with paved shoulder Configuration in the state of Maharashtra on EPC Mode.

2024_MoRTH_797418_1 16.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/02/2024
Time 15:0Hrs
11/04/2024
Time 17:30Hrs
95 Construction of Interchange Loop with underpass at Beas on Amritsar- Jalandhar section of NH-03 in the State of Punjab on EPC Mode

2024_NHAI_191449_1 21.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2024
Time 15:0Hrs
08/04/2024
Time 15:0Hrs
96 Widening and Strengthening to two lane with Paved Shoulder of NH 81 from Km 30.250 to 55.400 in the State of Bihar on EPC mode

2024_MoRTH_797354_1 87.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2024
Time 15:0Hrs
06/04/2024
Time 15:0Hrs
97 Strengthening of Banda -Amboli Sankeshvar Road NH 548H fom Km 0.000 to 52/600 ( khambdev Naka to Sindhudurg -Kolhapur Border) in Sindhudurg District in the state of Maharashtra

2023_MoRTH_796578_1 36.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2024
Time 16:30Hrs
04/04/2024
Time 17:30Hrs
98 Maintenance of Lokhandi Sawargaon to Renapur Latur highway from existing Km 32.225 to Km 66.688 of NH548B and Ambajogai Bypass from existing Km 0.000 to Km 3.820 2LPS 4L configuration road) in the State of Maharashtra under Performance Based Maintenance Contract PBMC

2024_MoRTH_798260_1 18.650 MoRTH Maintenance Project OTHERS 29/02/2024
Time 15:0Hrs
03/04/2024
Time 17:30Hrs
99 Widening and strengthening of Gangakhed to Kingaon section of NH 752K in jn 38.750 to 72.304 Flexible Pavement Length 33.554 km. to 2Lane configuration on EPC mode in the state of Maharashtra

2023_MoRTH_750386_1 117.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/04/2023
Time 10:0Hrs
03/04/2024
Time 17:30Hrs
100 Rehabilitation and upgradation of Section of NH 361F from Shivaji Maharaj Chowk to Barshi Naka Ch.47.00 to 49.500 to 4 lane confifuration in Beed City on EPC Mode in the state of Maharashtra Length 2.5 km

2023_MoRTH_782378_1 37.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2023
Time 18:55Hrs
03/04/2024
Time 17:30Hrs
101 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 482.070 TO KM 482.170, , KM 493.970 TO KM 494.115, KM 494.450 TO KM 494.600, KM 495.320 TO KM 495.540 & KM 486.100 TO KM 486.170 ON RISHIKESH - JOSHIMATH - MANA ROAD (NH-07) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 05 NOS) ON ENGINEERING PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_641702_1 65.700 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2024
Time 18:0Hrs
03/04/2024
Time 11:0Hrs
102 Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54.000 to 82.300 and Design chainage km 54.000 to 82.120 Shikrapur to Nhavara Section to 2L.PS.4L Configuration in the State of Maharashtra on EPC mode

2024_MoRTH_796084_1 276.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/02/2024
Time 10:5Hrs
01/04/2024
Time 15:0Hrs
103 RFP for [Balance work of Rehabilitation & Upgradation of Indapur to Veer (Wadpale) Section of NH-17 (New NH-66) from existing Km 84/000 to Km 108/400 [Design Ch. 84.000 to 110.750] to 4-lane with paved shoulder in the State of Maharashtra through EPC Mode under NHDP Phase-IV (PACKAGE-I) Project Length=26.75 km, Balance Length=12.35 Kmsection of NH-66 in the state ofMaharashtra on EPC mode]

2023_MoRTH_780259_1 556.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/11/2023
Time 16:0Hrs
28/03/2024
Time 17:0Hrs
104 Construction of Major Bridge on Wardha River at Ch 28/362.50 on Talegaon Warud Gonapur road section of NH 347A on EPC Mode in the state of Maharashtra

20/EENH/AMT/2023-24,Dt.05/01/2024 24.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
27/03/2024
Time 17:30Hrs
105 DEVELOPMENT OF 4 LANING OF BARASAT-BARAJAGULI SECTION OF NH-34 (NEW NH-12) FROM KM. 31.000 TO KM. 48.679 IN THE DISTRICT OF NORTH 24-PARGANAS IN THE STATE OF WEST BENGAL ON EPC MODE UNDER NH(O)

2024_NHAI_188060_1 275.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2024
Time 15:0Hrs
27/03/2024
Time 15:0Hrs
106 DEVELOPMENT TO FOUR LANING OF THE DESCOPED STRETCHES FROM KM. 115.342 TO KM. 191.700 OF NH-34 IN THE DISTRICT OF NADIA (3.962 KM.) & MURSHIDABAD (5.538) PERTAINING TO KRISHNAGAR – BEHRAMPORE SECTION OF NH-34 (NEW NH-12) SECTION IN THE STATE OF WEST BENGAL

2024_NHAI_188022_1 155.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/03/2024
Time 11:0Hrs
27/03/2024
Time 11:30Hrs
107 Upgradation of Bramhapuri town section from design km 448/670 to km 451/370 (Length 2.70 km) of NH 543 Section of Gondia Amgaon Deori Korchi Kurkheda Wadsa Bramhapuri road in the state of Maharashtra on EPC Mode

2024_MoRTH_799810_1 40.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2024
Time 10:0Hrs
27/03/2024
Time 10:0Hrs
108 Maintenance works and activities on section from Gangakhed to Kingaon section of NH-752K in km.38/750 to km.72/304 (Total Length- 33.55 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783435_1 3.920 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
26/03/2024
Time 17:30Hrs
109 Construction of 11 Nos of Standalone safety structures/works (Package -III) at different locations on various NHs in the state of Maharashtra on EPC Mode (3rd Call).

2024_NHAI_191727_1 357.220 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:0Hrs
26/03/2024
Time 11:0Hrs
110 Construction of 07 Nos. of Standalone safety Structures/ works (Package V) at different locations on 4 different NHs (NH-44, 47, 53 & 353J) in the state of Maharashtra on EPC Mode. (3rd Call)

2024_NHAI_191737_1 194.553 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:10Hrs
26/03/2024
Time 11:0Hrs
111 Construction of 9 Nos. of Standalone Safety Structures/Works at different Locations on various NHs in the State of Maharashtra on EPC mode

2024_NHAI_191731_1 261.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 16/03/2024
Time 13:0Hrs
26/03/2024
Time 11:0Hrs
112 BALANCE WORK OF REHABILITATION AND UPGRADATION TO 4-LANING OF NH-31D FROM KM 113.200 TO KM 154.854 (PKG-IIA) FALAKATASALSALABARI SECTION IN THE STATE OF WEST BENGAL ON EPC BASIS”

2023_NHAI_190199_1 766.670 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2024
Time 15:0Hrs
22/03/2024
Time 15:0Hrs
113 RECTIFICATION WORK OF ACCIDENT PRONE AREA AT GAYGHAT FROM CH. 211.500 TO 212.000 OF NH-730 IN THE STATE OF UTTAR PRADESH

2024_MoRTH_799481_1 1.060 MoRTH Maintenance Project OTHERS 07/03/2024
Time 18:55Hrs
21/03/2024
Time 17:0Hrs
114 Short Term Maintenance of Tohana (Punjab/Haryana Border) to Moonak-Jakhal-Budhlada Road section of NH-148B from km. 226.370 to 236.600, 239.400 to 241.500 and km. 243.300 to 244.750 (13.780 kms.) in the State of Punjab

2024_MoRTH_800198_1 0.710 MoRTH Maintenance Project OTHERS 12/03/2024
Time 15:0Hrs
19/03/2024
Time 15:0Hrs
115 CONSTR OF RD NIDDER KYUN TSO PUNGUK BET KM 0.00 TO KM 27.00 (NET LENGTH 27.00 KM) NHSL SPECS OF UNDER 93RCC 755BRTF PROJECT HIMANK ON EPC MODE

2024_BRO_637177_1 130.490 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 18:0Hrs
19/03/2024
Time 11:0Hrs
116 Construction of RCC Drains at various villages Towns location from Km 1 050 to Km 143 870 for length of 17 818 Km on NH-753 F Chh Sambhajinagar Aurangabad Jalgaon Road in the state of Maharashtra

2024_MoRTH_790098_2 21.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 15:0Hrs
18/03/2024
Time 17:30Hrs
117 Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 (total length is 51 km) on RKCTC NH(701) road Project Beacon in the UT of JK Border Roads Organization (BRO) on EPC mode.

2024_MoRTH_794554_1 743.970 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 15:0Hrs
18/03/2024
Time 15:0Hrs
118 REHABILITATION and UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH-161A (AKOLA AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.

2023_MoRTH_786760_2 50.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 10:0Hrs
14/03/2024
Time 17:30Hrs
119 New Construction of Damaged Major Bridge RCC T-Beam bridge and its approaches at Ch. 147.547 (LHS) on Yamuna Nagar-Saha -Barwala-Panchkula section of NH-73 (New NH-344) from Km. 115.400 to km. 157.192 (Package-2) in the State of Haryana

2024_NHAI_188047_1 5.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 19:0Hrs
14/03/2024
Time 11:0Hrs
120 Short Term Maintenance on Jalandhar Kapurthala Sultanpur Lodhi Road from RD 23 400 to 29 000 Km and from RD 36 250 to 37 680 Km of NH 703A

2024_MoRTH_795422_1 8,193,484.000 MoRTH Maintenance Project OTHERS 14/02/2024
Time 12:30Hrs
13/03/2024
Time 17:0Hrs
121 Construction of Flyover at Kawas Patiya at Km 14.400 and VUP at Reliance at Km 11.220 on NH 53 of Surat Hazira section in the state of Gujarat on EPC Mode

2024_NHAI_185819_1 122.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 18:0Hrs
13/03/2024
Time 11:0Hrs
122 Construction of 12 Nos. of Standalone safety Structures (Package I) on NH-3 in the state of Maharashtra on EPC Mode

2024_NHAI_188572_1 642.830 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 9:10Hrs
13/03/2024
Time 11:0Hrs
123 Design and Construction using Thin White Topping (TWT) including routine maintenance and balance works of Khed-Sinnar section from km.42.000 to km.177.000 on NH-60 in the state of Maharashtra as Standalone project on EPC Mode.

2024_NHAI_188567_1 430.640 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2024
Time 9:0Hrs
13/03/2024
Time 11:0Hrs
124 Construction of Major Bridge on Chargad River at Ch.27.650 with approaches From Km. 27.427 to Km. 27.782 and Minor Bridge on Khar Nallah at Ch.47.020 with approaches From Km.46.905 to Km.47.101 on Nandgaonpeth. Morshi Road NH.353 K Tal. Morshi, Dist. Amravati on EPC mode in the state of Maharashtra.( 2nd Call)

2023_MoRTH_786773_2 13.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 10:0Hrs
12/03/2024
Time 17:30Hrs
125 Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km. 133.025 to Km. 133.875 on on Jalna- Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon, Dist. Washim on EPC mode in the state of Maharashtra (2nd Call)

2023_MoRTH_786778_2 30.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/02/2024
Time 10:0Hrs
12/03/2024
Time 17:30Hrs
126 Rehabilitation of 02 Nos. of existing Bridges at Km. 132 km (Saryu river) & Km. 133 (Gomati River) and IRQP work from Km. 130.00 to Km. 134.00 of NH 309A in the State of Uttarakhand

2024_MoRTH_798553_1 4.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/03/2024
Time 15:0Hrs
11/03/2024
Time 15:0Hrs
127 Short Term Maintenance of Kiratpur Sahib- Anandpur Sahib -Nangal upto Himachal Pradesh Border section of NH-503 (Extn.) in the state of Punjab.

2024_MORTH_797369_1 1.980 MoRTH Maintenance Project OTHERS 24/02/2024
Time 1:55Hrs
11/03/2024
Time 12:0Hrs
128 Construction of bypass Road to Daspalla town from KM. 195/250 to K.m 200/635 of NH-57 in the State of Odisha on EPC Mode (Bid Ref. No. 24 CE NH of 2023-24)

2023_MoRTH_759732_1 94.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
11/03/2024
Time 12:0Hrs
129 STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 18.450 TO KM 18.500 ON RISHIKESH - DHARASU ROAD (NH-94) ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE – 01 NOS) ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2024_BRO_638741_1 4.040 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/02/2024
Time 10:0Hrs
08/03/2024
Time 11:0Hrs
130 Rehabilitation and Uppradation of Shewali Fata to Kalambhir Section i.e km 0.443 to km 4.500 & Nizampur to Chadwel section i.e.km 13.485 to 26.265 (Length=16.107km) (excluding 2 major Bridges with approaches km 13.735 to 14.095 & km 19.660 to 20.030) of NH-753B 2 Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode.

2024_MoRTH_788973_1 120.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
07/03/2024
Time 17:30Hrs
131 Construction of Vehicular Underpass (VUP) at Daman Ganga ( Ch. 368.850 km) including Service road, Culverts and Minor bridge between Daman Ganga river and Mohan Gam railway for rectification of blackspots id GJ-(02)-066 on Surat-Vapi section of nh-8 (new NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Damanganga/2023 31.140 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 29/08/2023
Time 18:55Hrs
07/03/2024
Time 15:0Hrs
132 Construction of VUP (Talkere Hand Post-KA-(02)-057), LVUP (Agrahara Junction- KA (02) - 273) and VUP (Tippasandra Hand Post- KA (02) - 015) of MORT&H Identified Black Spots on Devihalli-Hassan section of NH-75 to be executed on Engineering Procurement and Construction (EPC) mode

2024_NHAI_187721_1 99.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
133 Construction of Long Term Remedial Measures for Blackspot Locations at VOP at Yelachagere Bore gate Km 177.348, VUP at Kalale Gate Km 184.100, LVUP at Hoshalli Gate Km 185.510, VUP at Kadakola junction 198.210, VUP at APMC Gate Km 206.360 and 206.535 VUP at Sachidanada Ashrama Km 208.254 and VUP at Kempaiahnahundi Km. 232.493 along Kerala Border to Kollegal Section of NH766 and VUP at Bannikuppe Km 181.637 along Mysore to Madikeri section of NH275 in the State of Karnataka under EPC mode

2024_NHAI_188138_1 189.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
134 Permanent Rectification of Blackspots by i.Construction of VOP at Basaveshwara Circle at Ilkal Town ID No. KA-02-199 at Km.330.275 ii Construction of VOP at Metagal Cross ID KA-02-430 at Km.38.930 along with Slip road from Km.387.500 to Km.388.460 on both sides iii Flyover at Hulgi at Km.412.530 iv VUP At Hosahalli at Km.409.600 v LVUP at Shahapur Cross at Km.406.040 along with Slip road from Km.405.640 to Km.406.500 on both sides and SVUP at ROB Approach at Km. 407.130 along with Service road from Km.406.550 to Km.407.200 on both sides in Hungund to Hospet Section of NH50

2024_NHAI_188180_1 176.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2024
Time 15:0Hrs
07/03/2024
Time 11:0Hrs
135 Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli Kota section in the State of Rajasthan on EPC Mode

2024_NHAI_188054_1 79.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2024
Time 17:0Hrs
07/03/2024
Time 11:0Hrs
136 Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47 723 to Km 54 405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar

2024-NHAI-180689-1 180.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 9:0Hrs
07/03/2024
Time 11:0Hrs
137 Construction of 4 Nos of Standalone safety structures/works at different locations on various NHs in the State of Maharashtra on EPC Mode

2024_NHAI_188568_1 169.860 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 28/02/2023
Time 15:0Hrs
06/03/2024
Time 15:0Hrs
138 Construction of new bridge over Sagada river at Ch-192.030 km on NH-26 including approaches in the state of Odisha on EPC mode. (Bid Ref No. 47 CE NH of 2023-24)

2024_MoRTH_791662_1 19.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 18:55Hrs
06/03/2024
Time 15:0Hrs
139 Construction of Vehicular Underpass (VUP) at Km. 487.324 (Black Spot No. TG-02-002 (Nandikandi outskirts)) and Construction of Flyover (Black Spot No.KA-02-323 (Chidri Bypass) for Four Laning of MH-KNT Border- Sangareddy from KM.348.800 to KM.493.000 in the State of Karnataka and Telangana of NH-09 (New NH-65) Under NHDP-III to be executed on EPC mode

2024_NHAI_181503_1 74.190 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
06/03/2024
Time 11:0Hrs
140 Short Term Maintenance Of Tarn Taran Kapurthala Road (NH-703AA) At Km 0.00 To 50.25 In Dist. Tarn Taran And Kapurthala.

2024_MoRTH_792248_2 3.630 MoRTH Maintenance Project OTHERS 27/02/2024
Time 12:50Hrs
06/03/2024
Time 11:0Hrs
141 Construction of balance work of four laning with paved shoulder of Bellary Bypass from Design Ch 254 750 to Junction at Ch 266 837 (Length 12 087 Kms) and 1 Km Stretch from Ch 277 690 to Ch 278 690 at D Hirehal Village of NH 150A of Bellary Byrapura Section in Karnataka on EPC Mode under NH(O)

2023_NHAI_179479_1 425.490 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 11:0Hrs
05/03/2024
Time 11:0Hrs
142 Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode.

2023_MoRTH_786505_1 608.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 18:55Hrs
04/03/2024
Time 17:0Hrs
143 Construction of Light Vehicular Underpass (LVUP) at Km. 112.917 (Blackspot location Nagathihalli KA-02-269) and Construction of FOB @ Dodderi Gate Blackspot location KA-(02)-223 with Median grill for 4 Lanning of Devihalli-Hassan km.110.00 to Km.189.500of NH-48 (New NH No. 75) in state of Karnataka to be executed on EPC mode

2024_NHAI_181509_1 25.690 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
04/03/2024
Time 15:0Hrs
144 Long term rectification work at 4 Nos of MoRTH Blackspots i Bhumkar Pull MH 04 27 ii Navale Bridge MH 04 26 iii Bavdhan MH 04 42 iv Wakad MH 04 41 and Design and Construction of FOB at Km 842 680 near NDA Chowk on Pune Satara Section of NH 48 on EPC Mode

2024_NHAI_186063_1 36.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
04/03/2024
Time 11:0Hrs
145 Design and Construction of Vehicular Underpass as Long-term rectification work at MoRTH Blackspot Dongarbaba Temple MH 04 192 at Ch 425 510 on Pimpalgaon Nashik Gonde Section of NH 3 in the State of Maharashtra on EPC Mode

2024_NHAI_186081_1 50.890 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
04/03/2024
Time 11:0Hrs
146 Construction of Two Lane with Paved Shoulder from Design Km 89.900 Near Roshni Village at (NH-347B SH-26 Existing Km 97.886) to Design Km 114.000 (347B SH-26 Existing Km 121.300) near Ashapur Village section of Betul to Khandwa Package 3 in the State of Madhya Pradesh on EPC Mode

179662 138.250 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 18:0Hrs
02/03/2024
Time 18:0Hrs
147 Construction of ROB at LC 115B (near Nastanpur) at Km 126/150 of Nandgaon-Chalisgaon section of NH 753J in the state of Maharashtra on EPC mode

2024_MoRTH_790693_1 79.310 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 16/01/2024
Time 17:0Hrs
01/03/2024
Time 17:30Hrs
148 Work of road safety Improvement by means of widening of Existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 Borbhatha Ankleshwar Section under Road Safety Annual Plan 2023-24 Total Length 4.4km

2024_MoRTH_793110_1 4.100 MoRTH Normal Highway Project OTHERS 31/01/2024
Time 18:15Hrs
01/03/2024
Time 12:0Hrs
149 Construction of Additional Structures including approaches in Vadodara Surat section of NH48 between existing Km 108.00 to Km 250.00 in the State of Gujarat on EPC mode

2023_NHAI_154237_1 639.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/05/2023
Time 15:0Hrs
29/02/2024
Time 15:0Hrs
150 Widening and Strengthening of existing S/L, I/L,& D/L to 2 Lane with PS from Km 256/455 to 256/503, 256/820 to 256/960, 265/760 to 266/010, 266/010 to 266/800, 268/610 to 268/710, 270/975 to 271/055, 276/460 to 276/560, 276/560 to 276/700, 276/700 to 277/480, 285/780 to 288/290, 288/290 to 291/050 and Construction of 3 Nos. of Bypass from Km 266/800 to 267/300, 270/025to 270/975, & 284/700 to 285/780 onNH-53 inthe State of Odisha under EPC mode. (BID Ref. No.-46 CE NH of 2023-24)

2024_MoRTH_789771_1 73.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 18:55Hrs
29/02/2024
Time 12:0Hrs
151 Strengthening work of stretch of Khanapara to Jagiroad from Km. 163.400 to Km. 205.000 (Balance Portion of Guwahati Bypass, Package no. AS-03 & AS-20) of NH 37 in the State of Assam

2023_NHAI_178741_1 62.480 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/01/2024
Time 17:15Hrs
29/02/2024
Time 11:0Hrs
152 Maintenance works and activities on section (1.) NH-703A Section Gidderpindi to Makhukm 60.860 to 76.150 with slip Road, (2.) Railway Over Bridge at L.C. No. A-54/Eon NH-05 from km 13.170 to 14.520 (3.) Railway Over Bridge at L.C. No. C-57on NH-754 from km 72.597 to 73.680 at Jalalabad. in the State of Punjab.

2024_MoRTH_794897_1 22.680 MoRTH Maintenance Project OTHERS 09/02/2024
Time 18:30Hrs
29/02/2024
Time 11:0Hrs
153 Construction of Major Bridges Service Road Bridges at Krishna River including approaches for Rectification of Black Spot MH 04 218 on both sides at Km 756 395 Krishna River Bridge and Construction of Flyover including a LVUP and Approaches for Rectification of Black Spot MH 04 216 on both sides at Km 770 550 Vele Village of Pune Satara Section of NH 48 in the State of Maharashtra on EPC Mode

2024_NHAI_185556_1 56.940 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 14:0Hrs
29/02/2024
Time 11:0Hrs
154 Design and Construction of New Service Road from Km 835 780 to Km 836 600 Linear length km 1 605 including Minor Bridges And New Major Bridges on Both sides Service Road on Mutha River Ch 837 063 along with its approaches for NH-4 Pune Satara Section Km725 000 to Km 865 000 in the State of Maharashtra on EPC Mode

2024_NHAI_185668_1 36.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2024
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
155 Construction of 6 laning flyover at Km. 178.250 (Baba Bal Nath Samadhi Sthal) on Gurgaon Kotputli Jaipur section of NH 48 in the state of Rajasthan on EPC Mode

2024_NHAI_185547_1 45.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2024
Time 18:55Hrs
29/02/2024
Time 11:0Hrs
156 Four Laning of existing road section of NH-30 (Old NH-24B) from km 162.000 (Lalgopalgunj) to km 179.500 (Nawabgunj) of Raebareli to Prayagraj Section in the state of Uttar Pradesh (Total length-17.500km) on EPC Mode

2023_NHAI_179435_1 112.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2023
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
157 Rehabilitation and Up-gradation from design Km 0.000 to Km. 69.280 of NH-931 (Pratapgarh - Amethi - Gauriganj - Musafirkhana) to two lane with paved shoulder on Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2023_MoRTH_769274_1 582.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
29/02/2024
Time 11:0Hrs
158 Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K under the Short Term Maintenance Contract in the State of Uttar Pradesh

2024_MoRTH_796820_1 0.670 MoRTH Maintenance Project OTHERS 21/02/2024
Time 6:55Hrs
28/02/2024
Time 15:0Hrs
159 Construction of flyovers at (i) Major junction between NH-77 (NH-22) & SH-49 (Y-Junction) at Mahua Chowk & (ii) intersection between NH-77 (NH-22) & MDR (Lalganj to Muzaffarpur) (Y Junction) at Fakuli in 4 laning of Hajipur – Muzaffarpur Section of NH-22 (old NH-77) in the state of Bihar on EPC mode.

2024_NHAI_182663_1 93.440 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 15:0Hrs
28/02/2024
Time 11:30Hrs
160 Construction of Twin 2-Lane (4-Lane) ROB at Km 406 of NH-730 and approaches under EPC mode in the State of Uttar Pradesh.

2024_MoRTH_794207_1 79.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2024
Time 15:0Hrs
28/02/2024
Time 11:0Hrs
161 Balance works of Rehabilitation and Up-gradation of Digras - Darwha – Karanja Section in (km 0/00 to 74/351) NH 361C two lane with paved shoulder configuration in the state of Maharashtra.

2023_MoRTH_770839_1 114.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/09/2023
Time 18:30Hrs
27/02/2024
Time 17:30Hrs
162 Repair of rehabilitation and upgradation of Digras Darwha Karanja section in (km 0.000 to 74.351) NH 361C two lane with paved shoulder configuration in the state of Maharashtra.

NIT42/EENH/AKL/2023-24 2.400 MoRTH Normal Highway Project OTHERS 09/09/2023
Time 9:0Hrs
27/02/2024
Time 17:30Hrs
163 Construction of Descoped works like Construction of Service Road, new culverts, Drains, widening and repair of existing culverts, and Construction of Toll Plaza along with Toll Management System cum Toilet Blocks of 2 lane with paved shoulder from Km.195.100 to 418.000 of Bijapur Gulbarga Humnabad section of NH218 New NH50 in state of Karnataka

2024_NHAI_184633_1 49.910 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/02/2024
Time 15:0Hrs
27/02/2024
Time 11:0Hrs
164 Rehabilitation & Up-Gradation to 2 -Lane with paved shoulder Configuration of Velapur -Mahud section of NH-965G Design Chainage from Km 10/500 to Km 32/300 in the state of Maharashtra on EPC Mode

2024_MoRTH_788316_1 84.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2024
Time 2:0Hrs
26/02/2024
Time 17:30Hrs
165 Four laning of Dhrol Greenfield section from Km 0.000 (Ex Ch.53.151 of SH-25) to Km 3.286 and Widening to four lane from Km3.286-Km6.000 and Widening of Amran section to 4 lane from Km 42.180-Km48.580 of NH-151A under NH(O) in Gujarat on EPC mode

2023_NHAI_179003_1 415.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 15:0Hrs
26/02/2024
Time 15:0Hrs
166 Permanent rectification of 4 Nos. of black spots on NH-27 (old NH-28) of Kotwa - Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) 4 nos. of black spot on NH-27 of Muzaffarpur- Darbhanga - Purnia section (km. 0.00 to km 148.550 and km. 159.357 to km. 287.860) (total length 277.053 km.) & Removal of 1 No of at-grade junction near Satanpur Junction in Satanpur Village on NH-122 in the State of Bihar on EPC Mode.

2024_NHAI_181445_1 295.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/01/2024
Time 15:0Hrs
26/02/2024
Time 15:0Hrs
167 Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod,Bhojlawa, Hadota, Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode

2023_NHAI_177214_1 255.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/12/2023
Time 15:0Hrs
26/02/2024
Time 14:0Hrs
168 Construction widening of Service Road and Installation of street Lights on Solapur Yedeshi Section of NH 52 on EPC Mode

2024_NHAI_180937_1 68.410 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2024
Time 11:0Hrs
26/02/2024
Time 11:0Hrs
169 RFP for the work of Rehabitation and Upgradation of NH931A from Design Ch. 0.000 to Design Ch.53.500. (Design length 53.50 Km) to 2L / 4L plus PS of Jagdishpur-Jais-Salon of NH931A on EPC Mode in the State of Uttar Pradesh.

2023_MoRTH_770297_1 461.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 18:55Hrs
26/02/2024
Time 11:0Hrs
170 KHAI BYEPASS SECTION KM 44.900 TO 47.270

2024_MoRTH_796236_1 1.680 MoRTH Maintenance Project OTHERS 20/02/2024
Time 16:0Hrs
24/02/2024
Time 15:0Hrs
171 Kangar Byepass 53.800 to 57.035

2024_MoRTH_796236_2 1.320 MoRTH Maintenance Project OTHERS 20/02/2024
Time 15:0Hrs
24/02/2024
Time 15:0Hrs
172 Short Term Maintenance (STMC) of the left over portion of NH-254 at Rampura Phul Bypass section from Km 72.935 to 82.270 (Length 9.335 KM) in the state of Punjab.

2024_MoRTH_796236_3 3.910 MoRTH Maintenance Project OTHERS 20/02/2024
Time 16:30Hrs
24/02/2024
Time 15:0Hrs
173 Short Term Maintenance (STMC) of the left over portion of NH-254 at Raman Bypass section from Km 138.500 to 143.400 (Length 4.90 KM) in the state of Punjab

2024_MoRTH_796236_4 3.900 MoRTH Maintenance Project OTHERS 20/02/2024
Time 15:0Hrs
24/02/2024
Time 15:0Hrs
174 Construction of 6-lane Flyover at Ainthapali junction and a 2-Lane ROB (LHS) on NH-53 (Earlier NH-6) in Sambalpur, on EPC mode in Odisha under NH(O)

2023-NHAI-151714-1 280.640 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2023
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
175 Construction of 2 lane 386 Mtr Long Extradosed bridge over river Siang at design Km 2plus908 and 63pt50 Mtr span major bridge at design Km 2plus590 in between Km 118pt8 junction of NH 513 with Yingkiong to Moying village junction at Km 93pt50 on Ditte Dimme Migging road under 761 BRTF of Project Brahmank in Arunachal Pradesh State on EPC Mode

2023_BRO_625932_1 dated 31 Oct 2023 139.650 BRO Special Project EPC (Lump Sum/Item Rate Contract) 03/02/2024
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
176 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) basis.

2023_MoRTH_749787_1 808.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
22/02/2024
Time 11:0Hrs
177 Construction of RCC Drains at various villages Towns location from Km 1 050 to Km 143 870 for Length of 17 818 Km on NH 753 F Chhatrapati Sambhajinagar Aurangabad Jalgaon Road in the state of Maharashtra

2024_MoRTH_790098_1 21.070 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 15:0Hrs
21/02/2024
Time 17:30Hrs
178 Rehabilitation and Up gradation to 2 lanes with paved shoulder 4 laning configuration of Rajur Chanegaon Chikhali section of NH 752H from Km 188 280 to Km 179 430 Design Chainage from Km 0 000 to Km 8 850 Length 8 850 km in the State of Maharashtra on EPC Mode

2024_MoRTH_790091_1 65.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 15:0Hrs
21/02/2024
Time 17:30Hrs
179 Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak - Patan - Karad section km 85.000 to 133.417 of NH -166 E in the State of Maharashtra on EPC mode

2024_MoRTH_789271_1 135.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2024
Time 14:0Hrs
21/02/2024
Time 17:0Hrs
180 Widening of existing road to two lane with paved shoulder configuration from Km 0.000 to Km 26.000 and Km 45.200 to Km 59.622 of NH 365BB in the state of Andhra Pradesh under Annual Plan 2023-24 through EPC mode

SENHVJA/19/2023-24 Dated.28.12.2023 293.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 17:0Hrs
21/02/2024
Time 17:0Hrs
181 Construction of 2-lane VOP at Basamba junction at Km 120.309 on Washim- Pangare section of NH-161 in the State of Maharashtra on EPC Mode

2024_NHAI_182809_1 14.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2024
Time 18:45Hrs
21/02/2024
Time 11:0Hrs
182 Construction of 2 lane paved shoulder in 4.122 Km Balance Length with rigid Pavement and ROB ON Karnataka Border Km 70/682 to Akkalkot Km 106/526 on NH 150E in the State of Maharashtra on EPC Mode.

2024_MoRTH_789099_1 72.710 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 15:0Hrs
20/02/2024
Time 17:30Hrs
183 Rehabilitation and Up gradation of Pathri Selu Deogaon Phata from Borgavhan to Selu Design Ch km 47 900 to km 62 800 and from Digras Phata to Deogaon Phata Design Ch km 68 700 to km 83 700 section of Injegaon Sonpeth Pathri Selu Deogaon Phata road NH 548B to 2 lane 4 lane with paved shoulder Rigid Pavement Configuration on EPC Mode in the State of Maharashtra Total Project Length 29.90 km

EENH/Jalna/Tender/NIT No-02/32 254.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 20:0Hrs
20/02/2024
Time 17:30Hrs
184 Construction of RCC Drains at various villages towns location from km 28 000 to km 67 600 on Dhad Bhokardan road section of NH 753M in the state of Maharashtra on EPC Mode

EENH/Jalna/Tender/NIT No-01/17 10.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 20:0Hrs
20/02/2024
Time 17:30Hrs
185 Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K under the Short Term Maintenance Contract in the State of Uttar Pradesh

2024_MoRTH_793363_1 0.670 MoRTH Maintenance Project OTHERS 02/02/2024
Time 9:0Hrs
20/02/2024
Time 15:0Hrs
186 Construction of Service road Foot Over Bridge Development of Junctions in the Meerut to Bulandshahr section of NH 235 (New NH 334) from km. 8.800 (Design Chainage.8.800) to km. 66.482 (Design Chainage.73.512) in the State of Uttar Pradesh on EPC mod

2023_NHAI_177750_1 9.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2023
Time 17:40Hrs
20/02/2024
Time 13:0Hrs
187 Maintenance of NH-727H in total length of 16.220 Km Under Short Term Maintenance Contract on percentage rate basis for the financial year 2023-24 in jurisdiction of NH Division Lakhimpur-Kheri in the state of Uttar Pradesh.

2024_MoRTH_793638_1 0.910 MoRTH Maintenance Project OTHERS 01/02/2024
Time 12:0Hrs
20/02/2024
Time 12:0Hrs
188 Improvement of Major Junction at ch. 152.000 (at Madhapur) on NH-57 in the state of Odisha on EPC mode”BID Ref. No.-48 CE NH of 2023-24

2024_MoRTH_791635_1 2.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 18:55Hrs
20/02/2024
Time 12:0Hrs
189 Construction of 4 lane Elevated corridor of Kalimandir Dimna Chowk Baliguma (Jamshedpur) Section of NH 33 (New NH 18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in the State of Jharkhand

2023_NHAI_179694_1 690.050 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 29/12/2023
Time 15:0Hrs
20/02/2024
Time 11:0Hrs
190 One Time Improvement of existing town portions of Rari, Lapwaha, Bichhondana, Morena, Lahar and Daboh on NH-552 Extn in the State of Madhya Pradesh on EPC mode

2024_MoRTH_789195_1 25.590 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 10:30Hrs
19/02/2024
Time 17:30Hrs
191 Improvement to Two lane with Paved Shoulder from Junction of NH-22 near Hajipur to Junction of NH-122 at Bachhwara via Mahnar and Mohiuddin Nagar from Km 0.00 to Km 29.730 of NH 122 B in the State of Bihar

2024_MoRTH_789247_1 203.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 17:0Hrs
19/02/2024
Time 17:0Hrs
192 Upgradation of Davualapally to Mallapalem Section Design Ch. Km 133.922 to Km 154.216 Existing Ch. Km 133.922 to Km 154.900 of NH 565 to 2 Lane with Paved shoulder in the State of Andhra Pradesh mode under Annual Plan 2023 24

2023_MoRTH_787815_1 312.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 17:50Hrs
19/02/2024
Time 17:0Hrs
193 One Time Improvement work with white topping in Km 90.970 to 99.775 length 8.805 km on Katni-Shahdol Road New NH-43 (Old NH-78) for Birsingpur Bypass in the State of Madhya Pradesh

2024_MoRTH_791028_1 17.790 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/01/2024
Time 15:0Hrs
19/02/2024
Time 15:0Hrs
194 Up-gradation and strengthning of chenanni to Nashri section of NH-244 from Km 0.00 to Km 39.100 in the UT of Jammu and Kashmir

2023_NHAI_178976_1 431.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 16:0Hrs
19/02/2024
Time 11:0Hrs
195 Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh

2023_MoRTH_771974_1 829.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
19/02/2024
Time 11:0Hrs
196 Construction of New 2Lane Bridge over Purna River at Ch. 18.100 (605.545) including approaches from 17.575 to 19.011 in Shegaon Deori fata section of NH548C in the Sate of Maharashtra on EPC mode

2023_MoRTH_784717_1 76.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 10:0Hrs
16/02/2024
Time 17:30Hrs
197 Constructing VUP With RE Wall Approaches at Chainage Km.319.960 and Service Road Chainage Km.319.560 Km.320.840 On NH 66 At Ambalpaddy For Rectification of Blackspot KA 02 373 In The State of Karnataka Under EPC Mode.

2023_NHAI_178884_1 33.506 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 17:0Hrs
16/02/2024
Time 11:0Hrs
198 Widening and strengthening to 2LPS of Balikuda Mulakani from Km 318.970 Start of Balikuda By Pass to Km 353.450 Mulakani of NH 55 in the State of Odisha on EPC mode

2024_MoRTH_788259_1 402.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/01/2024
Time 15:0Hrs
15/02/2024
Time 15:0Hrs
199 Strengthening work of NH 01 from km 24.32 to Km 33.76 and 47.02 to Km 56.72 in under project Beacon in UT of J&K Through EPC Mode

2023_MoRTH_784861_1 30.820 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 15:0Hrs
15/02/2024
Time 12:0Hrs
200 Construction of 4 – lane Kotdwar Bypass of NH – 119 in the State of Uttar Pradesh and Uttarakhand on EPC Mode

2023_NHAI_170330_1 382.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/10/2023
Time 15:30Hrs
15/02/2024
Time 11:0Hrs
201 Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH 566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa

2023_NHAI_146949_1 367.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
15/02/2024
Time 11:0Hrs
202 One time improvement from km 26.350 to km 29.900 of NH-43 length 3.55 km in Badwara village on Katni-Shahdol section in the State of Madhya Pradesh under EPC mode

2024_MoRTH_790775_1 6.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/01/2024
Time 17:30Hrs
14/02/2024
Time 17:30Hrs
203 Rectification of MoRTH Identified Blackspot No. JK02023 SIDCO at KM 69.135 to KM 69.980 on NH44 by taking Longer Term Measures in the UT of Jammu and Kashmir

02023 33.860 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 15:0Hrs
14/02/2024
Time 15:0Hrs
204 6 Laning of Pune-Hyderabad section of NH-65 from km 493.000 to 524.000 from Sangareddy X roads to Madinaguda (excluding BHEL flyover from km 520.000 to 521.650) in the State of Telangana on EPC Basis

2023_MoRTH_775198_1 1,011.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 15:0Hrs
14/02/2024
Time 15:0Hrs
205 Widening of existing road to two lane with paved shoulder configuration from Km 0.000 to Km 26.000 and Km 45.200 to Km 59.622 of NH 365BB in the state of Andhra Pradesh under Annual Plan 2023-24 through EPC mode

SENHVJA/19/2023-24 Dated.28.12.2023 293.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2023
Time 15:0Hrs
12/02/2024
Time 15:0Hrs
206 Landslide treatment work of 12 locations on NH 58 from Km. 235.420 (Shivpuri) to Km. 266.130 (Kodiyala) under EPC mode(As per DPR submitted by THDC) in the State Of Uttarakhand

2024_MoRTH_790373_1 71.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2024
Time 15:0Hrs
12/02/2024
Time 12:0Hrs
207 Widening to 2-lane with hard shoulder configuration of Kalimandir (Chainage Km 133.078) and Lipulekh (Chainage Km 159.476) road of NH-09 under Bharatmala Pariyojna in the state of Uttarakhand on EPC mode

2023_MoRTH_764115_2 216.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 12:0Hrs
08/02/2024
Time 15:0Hrs
208 Construction of the 6-lane Flyover including approaches from existing PUP of Nandori Flyover (Kalode Square) at Km.74.745 to Hospital Square at Km.76.020 (Total Design Length- 1.275 km) Section of Nagpur – Hyderabad NH-44 in the state of Maharashtra on EPC mode

2023_NHAI_156635_1 101.590 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 16:30Hrs
08/02/2024
Time 11:0Hrs
209 Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo-Solan section of NH 22 (now NH 5) on EPC mode in the State of Himachal Pradesh (HP)

2023_NHAI_146839_1 121.750 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 15:0Hrs
08/02/2024
Time 11:0Hrs
210 CONSTRUCTION OF NEW MAJOR BRIDGE OVER BAGHMATI AND LAKHANDEI RIVER ALONG WITH APPROACHES FROM DESIGN KM. 16 500 TO KM 21 500 ON NH 527C IN THE STATE OF BIHAR ON EPC MODE

2023-NHAI-172896-1 362.150 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 15:0Hrs
07/02/2024
Time 17:0Hrs
211 Widening with 3 additional Lane abetting Existing two lane Chhapra Bypass Section of NH-19 from Km.143.200 to Km.159.255 on NH-19 (Total Length 16.055 Km) in the state of Bihar

2023_NHAI_171728_1 376.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2023
Time 15:0Hrs
07/02/2024
Time 15:0Hrs
212 One Time improvement of existing bypassed section of NH-52 in Bhojpur town in the state of Madhya Pradesh under EPC mode

2023_MoRTH_787917_1 4.010 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 01/01/2024
Time 17:30Hrs
06/02/2024
Time 17:30Hrs
213 OR DPP to AS Club Vaijapur Kopargaon Road Km. 00.000 to Km. 50.000 section of NH 752 I in the state of Maharashtra

2024_MoRTH_790475_1 4.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/01/2024
Time 15:0Hrs
06/02/2024
Time 17:30Hrs
214 LONG TERM RECTIFICATION OF MORTH IDENTIFIED BLACKSPOTS (17 NOS) and REMOVAL OF 2 AT GRADE JUNCTIONS AND ALLIED WORKS ON EXISTING 4/6LANE HYDERABAD VIJAYAWADA SECTION OF NH65 FROM KM.40.000 TO KM.221.500 IN THE STATE OF TELANGANA

2023_NHAI_176416_1 325.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/12/2023
Time 16:0Hrs
06/02/2024
Time 11:0Hrs
215 Construction of Balance Works in descoped section in the Village Amboda, Hiwara Sangam, Lonbehal, Dattarampur & Kinhi in four laning of Mahagaon-Yavatmal section of NH-361 from Km 320.580 to Km 400.575 (design length 80.195 km) in the state of Maharashtra on EPC mode

2024_NHAI_180487_1 60.040 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2024
Time 19:0Hrs
05/02/2024
Time 11:0Hrs
216 REHABILITATION UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH161A (AKOLA AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.

2023_MoRTH_786760_1 50.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 15:0Hrs
03/02/2024
Time 17:50Hrs
217 Construction of Major Bridge on Chargad River at Ch. 27.650 with approaches From Km.27.427 to Km. 27.782 and Minor Bridge on Khar Nallah at Ch. 47.020 with approaches From Km.46.905 to Km.47.101 on Nandgaon peth Morshi Road NH53 K Tal. Morshi Dist. A

2023_MoRTH_786773_1 13.930 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 10:0Hrs
03/02/2024
Time 17:50Hrs
218 Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km.133.025 to Km.133.875 on on Jalna Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon Dist. Washim on EPC mode in the

2023_MoRTH_786778_1 30.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2023
Time 10:0Hrs
03/02/2024
Time 17:50Hrs
219 Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar

2024_MoRTH_789177_1 234.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2024
Time 15:0Hrs
03/02/2024
Time 17:0Hrs
220 Construction of proposed R.O.B and its Approaches in replacement of existing Level Crossing No.21X at Ch 107/500 in the State of Gujarat on EPC mode of NH-64 District Anand Job No. 64 GJ/2021 2022/673

2023_MoRTH_783833_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 11:35Hrs
01/02/2024
Time 11:0Hrs
221 Construction of 4 Lane LVUP at Sector-26 Panchkula Junction at Km. 170.335 of Yamunanagar - Panchkula Section of Old NH-73 (New NH-07) from Km. 169.700 to Km. 170.950 on EPC basis in the State of Haryana

2023_NHAI_174596_1 18.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2023
Time 15:0Hrs
01/02/2024
Time 11:0Hrs
222 New Construction of Major Bridge with approaches from km 0.000 to 1.200 (Madhopur-Badabanta section) of NH-20 in the state of Odisha. (Bid Ref No. 32 CE NH of 2023-24)

2023_MoRTH_773921_1 167.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2023
Time 18:55Hrs
31/01/2024
Time 12:0Hrs
223 Construction of Elevated Structure at Raniwara Circle Sanchore town of Gandhav – Sanchore Section of NH-68 in the state of Rajasthan on EPC mode under NH(O) Scheme

NHAI/Rajasthan/Sanchore Elevated/2023/ 270.210 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 15:0Hrs
30/01/2024
Time 11:0Hrs
224 STMC to NH 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160 Section Km 27.800 to 29.000 and repairing work of parapet retaining wall in 44.200 to 47.160 in the state of Maharashtra

2024_MoRTH_791582_1 1.280 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 22/01/2024
Time 11:5Hrs
29/01/2024
Time 17:0Hrs
225 Execution of Balance work for the work of Widening from existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the State of Gujarat under NH (O) on EPC mode

2024_MoRTH_789324_1 12.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2024
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
226 Construction of Baghamari By-pass on NH-57 from Km 281/700 to Km 285/330in the state of Odisha on EPC Mode (Bid Ref No.-44 CE NH of 2023-24)

2023_MoRTH_785528_1 41.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
227 Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode. (Bid Ref No.-45 CENH of 2023-24)

2023_MoRTH_785537_1 43.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 18:55Hrs
29/01/2024
Time 12:0Hrs
228 Construction of Approaches of RUB at LC-21 at Kokisare near Vaibhavwadi village on new alignment (design length 1.770 Km) on Talere - Gaganbawada - Kolhapur NH-166G in the State of Maharashtra on EPC mode

2023_MoRTH_783327_1 22.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2023
Time 10:0Hrs
25/01/2024
Time 17:30Hrs
229 RFP Strengthening And Widening of existing road to 2 lane bituminous road configuration from Owale to Rajewadi Fata (Upto Junction of NH-66) section of NH-965DD (Ch . 55.300 TO 75.100 ) in the state of Maharashtra on EPC Mode under NH (O)

2023_MoRTH_786283_1 58.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2023
Time 10:0Hrs
24/01/2024
Time 17:30Hrs
230 Construction of Major Bridges at Ch 8 00 Ch 35 488 on Wadigodri Ambad Jalna section and Ch 3 300 of Jalna Bypass road section of NH 753H on EPC Mode in the State of Maharashtra

2023_MoRTH_783137_1 53.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2023
Time 6:55Hrs
24/01/2024
Time 17:30Hrs
231 RFP for Second Call for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 91.300 to km 96.800 (Mangaon City) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode.

2023_MoRTH_786079_2 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 10:0Hrs
24/01/2024
Time 17:0Hrs
232 RFP for Second Call for Construction of Vehicular underpass with Service road at Parshuram Ghat in Km 202.280 on National Highway No.66 under Annual Plan 23-24 in Ratnagiri District in the State of Maharashtra on EPC mode

2023_MoRTH_786109_2 19.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2024
Time 10:0Hrs
24/01/2024
Time 17:0Hrs
233 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 148.00 to km 161.600 under Annual Plan in Raigad and Ratnagiri District in the State of Maharashtra on EPC mode

2024_MoRTH_788486_1 19.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/01/2024
Time 13:0Hrs
24/01/2024
Time 17:0Hrs
234 Rectification of 4 Nos Blackspots/Accident Spots in Thiruvanthapuram Bypass section of NH-66 under Annual Road Safety Plan for 2023-24 in state of Kerala on EPC Mode

NHAI/Kerala/4Nos Blackspots (PIU Trivendrum)/EPC/2023 98.050 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 11:0Hrs
24/01/2024
Time 11:30Hrs
235 Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140.960 (Patranga) to Km 160.200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh

2023_MoRTH_769510_1 688.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
23/01/2024
Time 11:0Hrs
236 Improvement and up-gradation of newly declared National Highways NH-227B(84 Kosi Parikrama Marg)Package II Design Km29.000 (Sarpur) to Km47.878/47.800 (Gosaiganj)in the state of Uttar Pradesh on Engineering, Procurement and Construction(EPC) basis.

2023_MoRTH_758308_1 591.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 17:0Hrs
23/01/2024
Time 11:0Hrs
237 Rehabilitation and upgradation to two lane with paved shoulder of Barshi-Yedshi-Murud-Latur-Ashtamode-Udgir-Degloor road NH 63 in km. 118.600 to 125.000 section Kharola to Bamni project length-6.4 km with flexible pavement on EPC mode in the state of Maharshtra

2023_MoRTH_782440_1 26.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2023
Time 18:55Hrs
22/01/2024
Time 17:30Hrs
238 CONSTRUCTION OF BALANCE WORKS OF TWO NUMBER OF INTERCHANGES AT JAIPUR RING ROAD (NH-148C) FROM TONK ROAD (NH-52) TO AJMER ROAD SECTION (NH-48) IN THE STATE OF RAJASTHAN ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

2023_NHAI_165778_1 135.970 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 15:0Hrs
22/01/2024
Time 15:0Hrs
239 Construction of Canal Bridge RCC Twin Box 2x 4.25m x 4.15m as a Deposit work at Canal Chainage Km 51.400 Main Canal of Pkg No 16 in Kaleshwaram Project by Box Pushing Method at NH Km 51.520 on Hyderabad Yadgiri Section of NH163

2023_NHAI_176929_1 3.770 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/12/2023
Time 18:55Hrs
22/01/2024
Time 11:0Hrs
240 CONSTRUCTION OF SIX LANE FLYOVER WITH APPROACHES AND SERVICE ROAD IC ACCELERATIONDECELERATION LANE AS PER MANUAL ON BAREILLY BYPASS OF NH24 MORADABADBAREILLY SECTION FROM KM259690 TO KM261105 IN THE STATE OF UTTAR PRADESH

2023_NHAI_176277_1 44.960 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 01/12/2023
Time 12:0Hrs
18/01/2024
Time 11:0Hrs
241 Upgradation of the section from Sironcha to Major Bridge across Godavari River from Design Chainage km 321.000 to Km322.700 and Km 323.500 to Km 327.00 (Length 5.20 Km) of NH-353C Section of Sakoli Wadsa Armori Gadchiroli Ashti Alapalli Sironcha Road

2023_MoRTH_787441_1 38.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2023
Time 17:0Hrs
17/01/2024
Time 17:55Hrs
242 Construction of Major Bridges at ch 8 00 35 488 on wadigodri Ambad Jalna section and ch 3 300 of Jalna Bypass road section of NH 753H on EPC Mode in the State of Maharashtra

EENH/Jalna/Tender/NIT No-01/1703 53.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2024
Time 15:0Hrs
15/01/2024
Time 15:0Hrs
243 Short Term Maintenance Cost Estimate from Km. 154.00 to 172.230 of NH-28B and Km 566.650 to Km 579.500 of NH- 730 in the state of Uttar Pradesh

2023_MoRTH_784379_1 4.890 MoRTH Maintenance Project OTHERS 07/12/2023
Time 15:0Hrs
15/01/2024
Time 15:0Hrs
244 STMC for providing safety measures and repairs of Shegaon Sangrampur from km 55.00 to 88.00 on NH 161G in the state of Maharashtra.(2nd Call)

2023_MoRTH_783065_2 1.620 MoRTH Maintenance Project OTHERS 05/01/2024
Time 10:0Hrs
12/01/2024
Time 17:30Hrs
245 Short Term Maintenance from Km 154.000 to Km 173.600 on NH-72B(New NH-707)

2023_MoRTH_785655_1 3.900 MoRTH Maintenance Project OTHERS 15/12/2023
Time 15:0Hrs
11/01/2024
Time 15:0Hrs
246 Short Term Maintenance from Km 133.150 to Km 154.000 on NH-72B(New NH-707)

2023_MoRTH_785648_1 3.550 MoRTH Maintenance Project OTHERS 15/12/2023
Time 15:0Hrs
11/01/2024
Time 12:0Hrs
247 “Widening and strengthening to NH-26 from km 367/480 to 376/480 km in the State of Odisha under EPC mode (Bid Ref No- 43 CE NH of 2023-24)”

2023_MoRTH_785287_1 37.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/12/2023
Time 9:0Hrs
11/01/2024
Time 12:0Hrs
248 Construction of 175.60 M Span PSC Box Bridge Over Panod Nala Ramnagar to Buwakhal Motor Road Near Km Stone no. 44 NH 309 Ramnagar, Distt- Nainital under Annual Plan 2023-24

2023_MoRTH_777768_1 22.480 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/11/2023
Time 14:0Hrs
10/01/2024
Time 15:0Hrs
249 Improvement of Major Junction at ch. 152.000 (at Madhapur) on NH-57 in the state of Odisha on EPC mode”BID Ref. No.-40 CE NH of 2023-24

2023_MoRTH_782599_1 2.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2023
Time 18:55Hrs
08/01/2024
Time 15:0Hrs
250 Short Term Maintenance from km 60.00 to 65.00 and road property maintenance from km 41.00 to 111.00 on NH-123(507) in the state of Uttarakhand

2023_MoRTH_784959_1 3.750 MoRTH Maintenance Project OTHERS 13/12/2023
Time 15:0Hrs
08/01/2024
Time 15:0Hrs
251 Construction of new bridge over Ret river at Ch-149.753km on NH-26 including approaches in the state of Odisha on EPC mode.BID Ref. No.-41 CE NH of 2023-24

2023_MoRTH_782617_1 17.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2023
Time 18:55Hrs
08/01/2024
Time 12:0Hrs
252 “Construction of New Minor Bridge across Jeriguda Nallah at Km 297.520 (Design Chainage) of NH-326 including approaches in the state of Odisha on EPC Mode (Bid Ref No 42 CE NH of 2023-24)”

2023_MoRTH_784881_1 7.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/12/2023
Time 18:55Hrs
08/01/2024
Time 12:0Hrs
253 Strengthening work of NH 444 from km 186.61 to Km 220.70 under project Beacon in UT of J&K Through EPC Mode

2023_MoRTH_783281_1 33.630 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2023
Time 15:0Hrs
08/01/2024
Time 12:0Hrs
254 CONSTR OF RD MUDH TSAKA BETWEEN KM 0.00 TO KM 29.00 (NET LENGTH 29.00 KM) NHSL SPECS OF UNDER 112RCC 755BRTF PROJECT HIMANK ON EPC MODE

2023_BRO_627023_1 113.800 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/11/2023
Time 18:0Hrs
06/01/2024
Time 11:0Hrs
255 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 91.300 to km 96.800 (Mangaon City) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode.

2023_MoRTH_786079_1 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
256 RFP for Road Maintenance Work by executing one-time bituminous improvement treatment to Existing Road of Panvel-Mahad-Panji Road NH 66 in Km 84.000 to km 87.00 (Indapur village) under Annual Plan in Raigad District in the State of Maharashtra on EPC mode..

2023_MoRTH_786091_1 5.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
257 RFP for Construction of Vehicular underpass with Service road at Parshuram Ghat in Km 202.280 on National Highway No.66 under Annual Plan 23-24 in Ratnagiri District in the State of Maharashtra on EPC mode

2023_MoRTH_786109_1 19.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/12/2023
Time 10:0Hrs
05/01/2024
Time 17:0Hrs
258 Construction of Service Roads in stretches, pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332.200 to 406.030, on Panvel Mahad Panali Road NH.66 under Road Safety Annual Plan 2022.23 in the state of Maharashtra

2023_MoRTH_752283_2 14.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2023
Time 10:0Hrs
04/01/2024
Time 17:30Hrs
259 Short Term Maintenance from 78.00 to Km 100.00 including Protection work (R/wall) on NH-309(Old No. 121)

2023_MoRTH_784945_1 3.710 MoRTH Maintenance Project OTHERS 12/12/2023
Time 15:0Hrs
04/01/2024
Time 15:0Hrs
260 “Construction of bypass to Titlagarh town from km 45.162 to km 52.678 including widening and strengthening from single lane/double lane to double lane with paved shoulder from km 44.000 to km 45.162 (missing link) of NH-59 in the state of Odisha on EPC mode (Bid Ref No.39 CE NH of 2023-24)”

2023_MoRTH_781638_1 92.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2023
Time 18:55Hrs
01/01/2024
Time 12:0Hrs
261 Strengthening to Pune Nashik Road NH 60 in km 201.350 to 202.080 and 203.080 to 208.649 section Nashik Road to Dwarka Junction in the State of Maharashtra State on EPC mode.

2023_MoRTH_779748_1 15.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 17:0Hrs
30/12/2023
Time 17:30Hrs
262 Strengthening to Kalyan Ahmednagar Pathardi Nanded Nirmal Road in Ch. 232.150 to km 255.280 in stretchs in 10.84 km length of NH61 the State of Maharashtra State on EPC mode.

2023_MoRTH_771018_1 13.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 17:30Hrs
30/12/2023
Time 17:30Hrs
263 Maintenance work and activities on section from Sinnar to Ghoti Km.0.00 to 0.500 and 8.500 to 54.00 of Sinnar Pandhurli Dhamangaon Ghoti Trimbakeshwar Road NH160A in the State of Maharashtra

2023_MoRTH_780393_1 3.820 MoRTH Maintenance Project OTHERS 09/11/2023
Time 17:0Hrs
30/12/2023
Time 17:30Hrs
264 Short Term Maintenance from Km 35 to Km 44 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782947_1 3.800 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
265 Short Term Maintenance from Km 59 to Km 72 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782950_1 3.500 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
266 Short Term Maintenance from Km 23 to Km 28 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782946_1 3.800 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
267 Short Term Maintenance from Km 73 to Km 80 including Protection work (R/wall) on NH-534(Old No. 119)

2023_MoRTH_782951_1 2.970 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
268 Short Term Maintenance From Km 198.00 to Km 204.00 Including Road Property Maintenance From Km 195.00 to Km 217.425 of NH -94 (134).

2023_MoRTH_782892_1 3.850 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
269 Short Term Maintenance from Km 243 to Km 250 including Protection work (R/wall) on NH-534 (119)

2023_MoRTH_782939_1 2.340 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
270 Short Term Maintenance from 158.00 to Km 164.00 and km 210.00 to Km 218.00 including Protection work (Rwall) on NH-309(Old No. 121)

2023_MoRTH_782827_1 2.750 MoRTH Maintenance Project OTHERS 29/11/2023
Time 15:0Hrs
29/12/2023
Time 15:0Hrs
271 “Construction of Two Lane Bypass road at Rairangpur on Ranchi-Vijayawada Corridor of NH-220 in the state of Odisha on EPC mode. (Bid Ref No. 38 CE NH of 2023-24)”

2023_MoRTH_781225_1 59.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2023
Time 18:55Hrs
29/12/2023
Time 12:0Hrs
272 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 110/2 – 142/0 of NH 38 (Old NH 234)

2023_MoRTH_782048_1 3.140 MoRTH Maintenance Project OTHERS 22/11/2023
Time 15:0Hrs
28/12/2023
Time 15:0Hrs
273 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 0/00 – 65/00 of NH 38 (Old NH 234) Mangalore – Villupuram Road

2023_MoRTH_782044_1 3.890 MoRTH Maintenance Project OTHERS 24/11/2023
Time 15:0Hrs
28/12/2023
Time 15:0Hrs
274 Overlay or strengthening proposal for Pindwara Sawroopganj section, Pindwara Udaipur section, Pratapnagar Debari section, Balicha Kaya section of Existing Udaipur Bypass

2023_NHAI_164387_1 119.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/08/2023
Time 15:0Hrs
28/12/2023
Time 11:0Hrs
275 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.106/2- 133/200 of NH 136 Thanjavur – Thiruvaiyaru – Perambalore – Krishnapuram – Athur Road of NH 136 under (OR) under M&R during 2023-24

2023_MoRTH_782037_1 2.620 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
276 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.139/0 – Km.141/0, 143/0 – 154/875 of NH 181 (Coimbatore-Mettupalayam – Ooty-Gudaloor) under (OR) under M&R during 2023-24

2023_MoRTH_782038_1 1.220 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
277 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.1/2-3/0, 8/350-13/9, 17/2-18/350, 22/6-23/6, 56/2-57/0 & Km.57/6-58/7 of NH 81 (Coimbatore – Chidambaram road) and Km. 6/0-6/4, 21/6- 23/0, 25/7-26/350, 29/2- 29/790, 31/555-37/5 and Km.42/0-47/0 of NH-181 (Coimbatore – Gundlupet road) under (OR) M&R during 2023-24

2023_MoRTH_782039_1 2.900 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
278 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.303/8-329/4 of NH 948 Bangalore – Coimbatore Road

2023_MoRTH_782042_1 1.140 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
279 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.0/0-68/900 of NH 381A (Vellakovil to Sankagiri road)

2023_MoRTH_782043_1 3.870 MoRTH Maintenance Project OTHERS 22/11/2023
Time 10:0Hrs
26/12/2023
Time 15:0Hrs
280 RFP Balance Work for Rehabilitation and upgradation of Kashedi Ghat section of NH-17 [New NH No. 66] to four-lanes with paved shoulders from existing km 148/0 to km 161/600 including construction of twin-tube six-lane tunnel in the State of Maharashtra on Engineering, Procurement & Construction( EPC) Mode under NHDP- IV

2023_MoRTH_780261_1 79.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/11/2023
Time 16:0Hrs
23/12/2023
Time 17:0Hrs
281 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from km 1570 km160 5 161 884 169 484 km 190 550 195 050 of NH 87 km 156 5 160 0 161 4 169 0 188 2 192 7 of NH 49

2023_MoRTH_782010_1 2.460 MoRTH Maintenance Project OTHERS 21/11/2023
Time 18:0Hrs
22/12/2023
Time 15:0Hrs
282 Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 65/00 – 110/200 of NH 38 (Old NH 234) Mangalore – Villupuram Road

05_2023_24_dt_22.11.23 3.900 MoRTH Maintenance Project OTHERS 22/11/2023
Time 9:0Hrs
22/12/2023
Time 15:0Hrs
283 Balance work of Widening of existing 2 lane to 4 lanes with service road between Km. 329/600 to 334/100 (Tharad City) on NH-68 in the state of Gujarat

2023_Morth_779388_1 32.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2023
Time 15:0Hrs
21/12/2023
Time 16:0Hrs
284 Short Term Maintenance Contract Ordinary Repairs on selected stretches from km 0/0 - km 3/2 of NH 87 and Km 276/400 -279/400, Km 209/0 -210/150 & Km 167/600 -187/600 of NH 85 (Old NH 49E) (Madurai-Cochin Road) and km 333/275 - 335/280 of NH 85 (Old NH 230) (Madurai - Thondi Road) in the State of Tamil Nadu

2023_MoRTH_781773_1 3.140 MoRTH Maintenance Project OTHERS 20/11/2023
Time 15:0Hrs
21/12/2023
Time 15:0Hrs
285 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km 78/2-Km.106/2 of NH 136 Thanjavur –Thiruvaiyaru –Perambalore -Krishnapuram –Athur Road of NH 136 under (OR) Under M&R during 2023-24

2023_MoRTH_781840_1 3.060 MoRTH Maintenance Project OTHERS 20/11/2023
Time 15:0Hrs
21/12/2023
Time 15:0Hrs
286 Short Term Maintenance Contract Ordinary Repairs from Km 33/610 –Km 44/010 of NH 336 (Old NH 210) Pudukottai –Tirchirappalli road

2023_MoRTH_781850_1 0.630 MoRTH Maintenance Project OTHERS 20/11/2023
Time 18:55Hrs
21/12/2023
Time 15:0Hrs
287 Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km6/0 –Km 10/320 and Km 16/274-19/200 of Thanjavur –Thiruvaiyaru –Perambalore-Krishnapuram-Athur Road of NH 136 under (OR) under M&R during 2023-24

2023_MoRTH_781857_1 0.770 MoRTH Maintenance Project OTHERS 20/11/2023
Time 18:55Hrs
21/12/2023
Time 15:0Hrs
288 Rectification of 12Nos Blackspots Accident spots under Annual Road Safety plan for 2023 2024 in the stretch of Walayar Angamaly Section of NH 544 in the state of Kerala on EPC mode

NHAI/Kerala/12Nos Blackspots (PIU Palakkad)/EPC/2023 445.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2023
Time 15:0Hrs
21/12/2023
Time 11:0Hrs
289 Maintenance works and activities on section from Naldurg to Akkalkot KM 30.884 to 70.709 of NH 652 i.e.Tuljapur Naldurg Akkalkot Total Length 10.800 KM under Short Term Maintenance Contract STMC in the State of Maharashtra.

2023_MoRTH_780964_1 3.910 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
18/12/2023
Time 17:30Hrs
290 For Construction of 4 Lane ROB and its approaches at the level crossing LC No 29 B of Km 29 Ekangarsarai at NH110 New NH 33 and Railway Km 32.63 of Fatwa FUT Islampur IPR section with Utility Shifting in the state of Bihar on EPC mode.

2023_MoRTH_768403_1 109.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/08/2023
Time 10:0Hrs
18/12/2023
Time 15:0Hrs
291 P.R work from Km. 134.00 to Km. 154.00, Km. 155.00 to Km. 159.00, Km. 161.00 to Km. 164.00, Km. 169.00 and Km. 172.00 to 175.00 (Yamuna Pull to Bataghat) on NH-707A in the State of Uttarakhand under Annual Plan 2023-24

2023_MoRTH_780251_1 12.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2023
Time 15:0Hrs
18/12/2023
Time 12:0Hrs
292 Widening to 2 lane with paved shoulder of Jareikela Jharkhand/Odisha Border Dhabaleswarsection from km 0.00 to km 25.450 of section of NH-320D in the state of Odisha on EPC Mode

2023_MoRTH_753089_1 163.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/05/2023
Time 9:0Hrs
18/12/2023
Time 12:0Hrs
293 Strengthening and Improvement of Bareilly Sitapur section of NH 24 New NH 30 from Km 262000 to Km 419590 in the State of Uttar Pradesh on item rate contract Single percentage basis

2023_NHAI_174915_1 251.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2023
Time 15:0Hrs
18/12/2023
Time 11:0Hrs
294 STMC for providing railing and safety measures to Purna bridge on NH 161H in the state of Maharashtra.

2023_MoRTH_783159_1 0.800 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
295 STMC for maintenance of Buldhana Khamgaon section from ch 52.450 to 99.950 on NH753E in the state of Maharashtra.

2023_MoRTH_783160_1 0.470 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
296 STMC to Mahan Akola from Km 107.500 to Km 136.809 on NH 161A in State of Maharashtra .

2023_MoRTH_783151_1 1.080 MoRTH Maintenance Project OTHERS 30/11/2023
Time 13:0Hrs
16/12/2023
Time 17:0Hrs
297 STMC for providing safety measures and repairs of Sangrampur MP Border from km 88.00 to 118.00 on NH161G in the state of Maharashtra.

2023_MoRTH_783101_1 1.260 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
298 STMC for providing safety measures and repairs of Balapur Shegaon from km 37.980 to 53.340 on NH 161G in the state of Maharashtra.

2023_MoRTH_783133_1 0.740 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
299 STMC for providing safety measures and repairs of Patur Balapur from km 0.00 to 33.200 on NH 161G in the state of Maharashtra.

2023_MoRTH_783147_1 0.270 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 17:0Hrs
300 STMC for providing railing and safety measures to Purna bridge and repairs of its approaches on NH 548C in the state of Maharashtra.

2023_MoRTH_783154_1 0.150 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
16/12/2023
Time 15:0Hrs
301 Work of Reconstruction of Box Culvert and Other road safety measures on Baridpada Laskariya Ahwa Borkhal Section of NH953 from ch. Km 22/800 to 69/900 in the State of Gujarat under Road safety Annual Plan 2023 24

2023_MoRTH_779263_1 13.810 MoRTH Normal Highway Project OTHERS 02/11/2023
Time 17:45Hrs
16/12/2023
Time 12:0Hrs
302 Work of Construction of Protection work at ch. km 36/600 to 36/800 Bardipada Mahal Laskariya road of NH953 in Dang District in the state of Gujarat under Road Safety Annual Plan 2023 24

2023_MoRTH_779274_1 5.500 MoRTH Normal Highway Project OTHERS 02/11/2022
Time 15:0Hrs
16/12/2023
Time 12:0Hrs
303 Maintenance works and activities on section from Kolgaon to Borgaonkale section of NH-63 in km.43/350 to km.61/800 (Total Length- 18.45 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783428_1 1.790 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
304 Maintenance works and activities on section from Ganjur to Aashtamode section of NH-63 in km.132/800 to 133/800 (Total Length- 1.00 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783448_1 0.520 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
305 Maintenance works and activities on section from Gharola to Gharni section of NH-752K in km.102/700 to 104/700 (Total Length- 2.00 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_783461_1 0.290 MoRTH Maintenance Project OTHERS 01/12/2023
Time 10:0Hrs
15/12/2023
Time 17:30Hrs
306 Repair and Rehabilitation of 11 Nos of Major and Minor Bridges identified on NH-56 at KM 357/905 to 434/805 ,Under road safety Annual Plan 2023-24 Under state of Gujarat Job No.Br/GJ/2023-24/707

2023_MoRTH_783854_1 10.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/12/2023
Time 12:0Hrs
15/12/2023
Time 11:0Hrs
307 Strengthing of Pune - Solapur Road NH 65 in km 8/800 to km 12/500 Section Ravidarshan , Hadapsar to Manjari stud farm Pune in the State of Maharashtra Under EPC Mode

2023_MoRTH_779367_1 16.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/11/2023
Time 6:50Hrs
14/12/2023
Time 17:0Hrs
308 Rehabilitation, Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane-2 Lane with Paved Shoulder of NH 965DD from Lonand –Shirval-Bhor –Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border from Km 33.550 to 92.550 (Design Ch 33.550 to 91.003) in the state of Maharashtra.

2023_MoRTH_736700_1 496.135 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 13:5Hrs
14/12/2023
Time 17:0Hrs
309 “Strengthening of the stretch from Rairangpur to Jashipur (35/840 to 71/120) except from 59/594 to 60/042 & 60/292 to 63/400 of NH-220 in the state of Odisha on EPC Mode. (BID Ref. No.-37 CE NH of 2023-24)”

2023_MoRTH_781205_1 52.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/11/2023
Time 18:55Hrs
14/12/2023
Time 12:0Hrs
310 Periodic Renewal of Six laned Pimpalgaon – Nashik – Gonde (Ch.380.00 to Ch. 439.038) in the State of Maharashtra using Thin White-topping (TWT) excluding EPC –II works & proposed EPC structures

2023_NHAI_169125_1 276.710 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 15:0Hrs
13/12/2023
Time 11:0Hrs
311 Work of road safety Improvement by means of widening of Existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 Borbhatha Ankleshwar Section under Road Safety Annual Plan 2023-24 Total Length 4.4km

2023_MoRTH_782637_1 4.100 MoRTH Normal Highway Project OTHERS 24/11/2023
Time 18:55Hrs
12/12/2023
Time 12:0Hrs
312 Periodical Renewal on NH 351K Bagasara Hamapur bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

779372 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2023
Time 16:0Hrs
12/12/2023
Time 12:0Hrs
313 Providing Service Road on PanvelMahadPanji Road NH 66 Km. 406/030 to 450/170, Road Safety Panvel MahadPanji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EPC mode (2nd Call)

2023_MoRTH_751367_2 3.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2023
Time 15:0Hrs
11/12/2023
Time 15:30Hrs
314 Rectification of accident prone area with widening of curve & Re-alignment to the road of Jeypore ghat area at ch. 349/000 and ch. 347/800 of NH-26 in the State of Odisha” (BID Ref. No.-33 CE NH of 2023-24)

2023_MoRTH_778023_1 6.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 18:55Hrs
11/12/2023
Time 12:0Hrs
315 CONSTR OF RD CHUMATHANG CHUSUL BETWEEN KM 0.00 TO KM 25.00 (NET LENGTH 25.00 KM) NHSL SPECS OF UNDER 111RCC 753BRTF PROJECT HIMANK ON EPC MODE

2023_BRO_624938_1 90.690 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/10/2023
Time 18:0Hrs
08/12/2023
Time 11:0Hrs
316 STMC for maintenance of Buldhana Khamgaon section from ch 52.450 to 99.950 on NH753E in the state of Maharashtra.

2023_MoRTH_783160_1 0.470 MoRTH Maintenance Project OTHERS 30/11/2023
Time 10:0Hrs
07/12/2023
Time 17:30Hrs
317 Road Maintenance work to Helwak Karad Road NH166E in km 85/000 to 102/200 under Short Term Maintenance Contract

2023_MoRTH_ 782441_1 1.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 3:50Hrs
07/12/2023
Time 17:0Hrs
318 STMC to N H 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160.Section Km 29.000 to 65.000 in the state of Maharashtra

2023_MoRTH_782444_1 1.470 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 15:5Hrs
07/12/2023
Time 15:0Hrs
319 STMC to N H 160 Starting from its junction with NH965 near Phaltan Ahilya devi chowk Phaltan, Dahiwadi, Mayani to Satara Sangli District Border N.H.160. Section Km 65.000 to 107.100

2023_MoRTH_782450_1 3.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2023
Time 15:0Hrs
07/12/2023
Time 15:0Hrs
320 Construction of balance works (VUP, Service Road, Drain, Junction development, Bus Bay and FOB) for four laning of Tuljapur - Ausa section of NH-361 from Km0.000 to Km 55.835 (including Tuljapur Bypass Km 0.000 to Km 11.593) under Bharatmala Pariyojna in the State of Maharashtra on EPC Mode

2023_NHAI_168860_1 46.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 16:30Hrs
07/12/2023
Time 11:0Hrs
321 Construction of 220.90 M. Span PSC Box Bridge over Dhangadi Nala Ramnagar to Buwakhal Motor Road Near Km stone No. 46 NH-309 Ramnagar, Distt Nainital, under Annual plan 2023-24

2023_MoRTH_777695_1 22.020 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/11/2023
Time 14:0Hrs
06/12/2023
Time 15:0Hrs
322 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_782725_1 3.120 MoRTH Normal Highway Project OTHERS 25/11/2023
Time 18:55Hrs
05/12/2023
Time 12:0Hrs
323 Balance works of 4 lane divided carriageway of Missing Link section of NH-39 (Rewa Bypass) from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH 9 (design length 13.100 km) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh

2023_NHAI_169607_1 238.540 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 15:0Hrs
05/12/2023
Time 11:0Hrs
324 Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode

2023_NHAI_157666_1 449.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2022
Time 17:55Hrs
01/12/2023
Time 11:0Hrs
325 Construction of additional major Bridge with 4-lane configuration of length 1.55 km on NH-60 (NH-14) over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4-lane configuration of length 0.900 km on NH-60 (NH-14) over River Shilabati from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode.

2023_MoRTH_776657_1 210.327 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 15:0Hrs
30/11/2023
Time 15:0Hrs
326 Construction of Jharsuguda Bypass on NH-49 from CH 258/636 km to CH 283/300 km design chainage from Km 258/636 to Km 289/876 in the state of Odisha under EPC mode

2023_MoRTH_755909_1 253.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
30/11/2023
Time 12:0Hrs
327 Construction of 2 flyovers of 4lanes at Chhatauni Chowk and Awadesh Chowk 2. Reconst of 3no. of gantry girder gates.3 Const. of Service Road and Drain near Piprakothi on NH27 (Under TOT) in the district of East Champaran in Bihar on EPC Mode

2023_NHAI_166441_1 63.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 11:0Hrs
30/11/2023
Time 11:0Hrs
328 Repair and Rehabilitation of 11 Nos of Major and Minor Bridges identified on NH-56 at KM 357/905 to 434/805 ,Under road safety Annual Plan 2023-24 Under state of Gujarat Job No.Br/GJ/2023-24/707

2023_MoRTH_778939_1 10.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 13:10Hrs
29/11/2023
Time 11:0Hrs
329 Construction of Vehicular Underpass at km 229.500 including Widening of New Service road, Exit-Entry, Dismantling, Reconstruction of Drain and Relocating of Highway Lighting on Panipat-Jalandhar section of old NH-1 (new NH 44) in the State of Punjab on EPC Mode

2023_NHAI_170497_1 24.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 15:0Hrs
29/11/2023
Time 11:0Hrs
330 2nd Attempt Widening of existing 2 lane road to 4 lane from km. 92/320 to 115/320 (Vav chokdi, Satlasana to Vrundavan chokdi, Kheralu) of NH58 in the state of Gujarat under EPC mode

2022_MoRTH_687248_2 122.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 17:0Hrs
28/11/2023
Time 12:0Hrs
331 Construction of Trumpet Interchange connecting Bangalore – Chennai Greenfield Express way from Km 261 to Km 262 with Maduravoyal to Wallajapet Section of NH48 near Sriperumbudur toll plaza at Km 35 in state of Tamil Nadu under Bharatmala on EPC Mode - 2nd call

2023-NHAI-172344-1 122.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2023
Time 11:0Hrs
28/11/2023
Time 11:30Hrs
332 Rehabilitation/Upgradation from Lagam to Alapalli section (km 199/400 to km 227/400) (Length = 28 km) to 2L-PS / 4 lane configuration section of NH-353 C (Sakoli - Wadsa - Armori - Gadchiroli - Ashti - Alapalli - Sironcha Road) in Gadchiroli District in the state of Maharashtra on EPC mode

2023_MoRTH_734259_1 324.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
24/11/2023
Time 17:0Hrs
333 Maintenance works and activities on section from Kuslamb to Yedashi ( KM 0.00 to 21.500) of NH 63 i.e.Barshi Yedshi Sagron ( Total Length 21.500 KM) under Short Term Maintenance Contract (STMC) in the State of Maharashtra.

2023_MoRTH_780920_1 0.460 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
23/11/2023
Time 17:30Hrs
334 Maintenance works and activities on section from Maharashtra Karnataka Border to Akkalkot km.73.600 to 73.880 77.100 to 78.600 83.508 to 83.610 84.300 to 85.800 86.300 to 86.550 87.790 to 87.890 88.620 to 88.660 and 98.050 to 98.500)of NH 150E under Short Term Maintenance Contract (STMC) in the State of Maharashtra

2023_MoRTH_780953_1 1.430 MoRTH Maintenance Project OTHERS 16/11/2023
Time 10:0Hrs
23/11/2023
Time 17:30Hrs
335 Work of Design, Procurement, Installation, Operation and Maintenance of Bridge Health Monitoring system on Narmada Bridge at Ch. 248.428 km of Vadodara-Mumbai expressway in the state of Gujarat

2023_NHAI_160065_2 9.150 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 19/09/2023
Time 18:15Hrs
23/11/2023
Time 16:0Hrs
336 Construction of by-pass road on NH-26 for Nabarangpur town in the state of Odisha on EPC Mode (Bid Ref No 21 CE NH of 2023-24

2023_MoRTH_759285_1 75.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/07/2023
Time 18:55Hrs
22/11/2023
Time 12:0Hrs
337 Construction of proposed R.O.B and its Approaches in replacement of existing Level Crossing No.21X at Ch 107/500 in the State of Gujarat on EPC mode of NH-64 District Anand Job No. 64 GJ/2021 2022/673

2023_MoRTH_778849_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/11/2023
Time 12:0Hrs
22/11/2023
Time 11:0Hrs
338 Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode

2023_MoRTH_767971_1 334.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 15:0Hrs
20/11/2023
Time 17:30Hrs
339 Upgradation To Two Lane Four lane With Paved Shoulders of Newly Declared NH 440 Vempalli to Chagalamarri Via Yerraguntla and Proddatur Design Ch from Km 55.00 to Km 106.52 And Km 109.65 to Km.137.08 Design length 78.95 Km in the state of AP2022 23

2023_MoRTH_768131_1 1,059.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
20/11/2023
Time 17:0Hrs
340 Rehabilitation and Up gradation of Newly Declared National Highway Nandyala Kadapa Kurnool Border of Nh 167K to 2 lane with paved shoulders from Km 186.0 To Km 250.0 Design Ch.186.000 To Ch. 248.010 in Kurnool District in the State of Andhra Pradesh

2023_MoRTH_766050_1 514.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 10:0Hrs
20/11/2023
Time 17:0Hrs
341 RFP for Rehabilitation and Up-gradation from Km. 0.000 to Km. 51.600 of NH-321G (Agra (Junction on NH-509 at Tedhi Baghia) to Nuhkhas) to two lane with paved shoulder configuration in the state of Uttar Pradesh on (EPC) Basis Contract .

2023_MoRTH_740519_1 394.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
20/11/2023
Time 17:0Hrs
342 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_779393_1 3.120 MoRTH Normal Highway Project OTHERS 03/11/2023
Time 14:0Hrs
20/11/2023
Time 11:0Hrs
343 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_779399_1 8.500 MoRTH Normal Highway Project OTHERS 03/11/2023
Time 14:0Hrs
20/11/2023
Time 11:0Hrs
344 Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 in the state of Himachal Pradesh Sh Formation cutting from Km 347 250 to 347 520 C o R wall and edge wall with steel dowels from km 347 250 to 347 270 and 347 600 to 347 690 C o artificial tunnel from km 347 270 to 347 520 MT work and thrie beam crash barriers from km 347 250 to 347 690 and C o drain from km 347 250 to 347 720 in the state of Himachal Pradesh

2023_MoRTH_774551_1 36.070 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 18:0Hrs
20/11/2023
Time 11:0Hrs
345 DESIGN AND CONS OF UNI-DIRECTIONAL TWIN TUNNELS AT SHINKUN LA PASS OF LENGTH 4.1 KM (APPROX LENGTH) INCL CIVIL AND ELEC/ MECHANICAL WORK ALONG WITH APPROACHES CONNECTING DARCHA-PADAM HIGHWAY TO NHDL SPECS IN HIMACHAL PRADESH AND THE UT OF LADAKH

2023_BRO_619623_1 1,504.640 BRO Special Project EPC (Lump Sum/Item Rate Contract) 20/09/2023
Time 11:0Hrs
18/11/2023
Time 11:0Hrs
346 Providing & fixing/installation of Metal Beam Crash Barrier at high embankment location & also locations as per Engineer decision for Project Highway of Durg bypass from Km. 308.600 to Km. 323.600 of Old NH-6 (New NH-53) in the State of Chhattisgarh on EPC Mode.

2023_NHAI_167277_1 5.990 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 18:0Hrs
16/11/2023
Time 15:0Hrs
347 Major Maintenance of Chennai Bypass (NH-32) from km 0-000 to km 32-600 in the State of Tamil Nadu

2023-NHAI-169411-1 90.020 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/10/2023
Time 11:0Hrs
16/11/2023
Time 11:30Hrs
348 Strengthening/ improvement including regular maintenance work from the ch. Km 69.200 to 120.200 of the project Two Lane with paved shoulders configuration in Jowai-Meghalaya Assam Border Section of NH-44 from Km 69.200 to Km 173.200 (design Ch 171.455) in the state of Meghalaya

2023-NHAI-170507-1 77.810 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 15:0Hrs
16/11/2023
Time 11:0Hrs
349 “Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km. 39.000 (Design ch. 7.250 ) of NH-157 in the state of Odisha on EPC Mode (Bid Ref No - 20 CE NH of 2023-24)”.

2023_MoRTH_759284_1 123.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 18:55Hrs
15/11/2023
Time 12:0Hrs
350 Construction of Flyover at chainage Km 165.020 (Pastikudi) on NH-26 including approaches in the state of Odisha on EPC Mode.

2023_MoRTH_759698_1 26.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 18:55Hrs
15/11/2023
Time 12:0Hrs
351 Construction of HL Major Bridge across Dahuka River at Km. 226.377(Design Chainage) of NH-57 including approaches in the state of Odisha on EPC mode

2023_MoRTH_755528_1 23.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 12:0Hrs
15/11/2023
Time 12:0Hrs
352 Strengthening/ improvement including regular maintenance work from the ch. Km 120.200 to 171.455 of the project Two Lane with paved shoulders configuration in Jowai-Meghalaya Assam Border Section of NH-44 from Km 69.200 to Km 173.200 (design Ch 171.455) in the state of Meghalaya

2023-NHAI-170389-1 122.990 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 10/10/2023
Time 18:50Hrs
15/11/2023
Time 11:0Hrs
353 Widening and strengthening to 2 lane with paved shoulder from Existing Ch Km 56.720 to Km 100.820 and Design Ch From Km 62.600 to Km 106.360 (Total Length 43.760 Km) on SRINAGAR BARAMULA URI (NH01) in the UT of JK under Project BEACON on EPC Mode

2023_MoRTH_776733_1 449.140 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/10/2023
Time 15:0Hrs
15/11/2023
Time 11:0Hrs
354 Widening of Edamon Kollam section from Km 0000 to Km 52 200 Edamon to Kollam of NH 744 to 2 lane with paved shoulder in the state of Kerala on EPC mode

NHAI/Kerala/ Edamon-Kollam/EPC/2023 293.170 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2023
Time 15:0Hrs
15/11/2023
Time 11:0Hrs
355 Construction of additional 2 lane Bow-String ROB adjacent to the existing 2 lane Bow string ROB at km 56/2 of NH-234 (new NH-75) (Mangalore-Villupuram Road) on EPC mode under Annual Plan 2022-23 in the State of Tamil Nadu.

2023_MoRTH_773380_1 24.970 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 25/09/2023
Time 15:0Hrs
10/11/2023
Time 15:0Hrs
356 One Time Improvement In Bhoura Town Portion, Shahpur Town Portion and Padhar Town Portion on NH 69 (Old) NH 46 (New) Itarsi Betul Road in the State of Madhya Pradesh on EPC mode

2023_MoRTH_770427_1 14.690 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 06/09/2023
Time 17:30Hrs
07/11/2023
Time 17:30Hrs
357 Construction of Vehicular Under pass with Service Road in Km 178.787 For Khed Railway Station , Gunde phata and construction of vehicular over pass at kashedi and nadgaon villages on National Highway No.66 in Ratnagiri District in the State of Maharashtra On EPC mode. ( IIIrd Call )

2023_MoRTH_749749_3 49.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2023
Time 17:0Hrs
07/11/2023
Time 17:0Hrs
358 Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km 180-000 to km 209-827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode

2023_NHAI_163016_1 526.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 15:0Hrs
07/11/2023
Time 11:0Hrs
359 Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode. (Bid Ref No.- 31 CE NH of 2023-24)”

2023_MoRTH_772151_1 64.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2023
Time 18:55Hrs
06/11/2023
Time 12:0Hrs
360 Widening and Strengthing of Existing Highway 2L PS (10M) in Km 0/00 to 21/500 ( NH 548 C Kuslamb to Nh 52 Yedshi) section of NH 63 ie Barshi - Yedshi - Murud - Latur - Renapur - Udgir - Deglur - Sargoli ) in the state of Maharashtra through (EPC) Contract

2023_MORTH_772305_1 55.570 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/09/2023
Time 15:0Hrs
03/11/2023
Time 15:0Hrs
361 Rehabilitation and Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 and km.35.400toKm.52.345(Design len.-24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to Bihar Border and Bihar Border to Majhauli)on EPC mode in the State of UP

2023_MoRTH_771732_1 338.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/09/2023
Time 15:0Hrs
03/11/2023
Time 11:0Hrs
362 Repair & Maintenance at various locations from Km 0/00 to 39/700 on Mehkar-Chikhli Road Section of NH 548CC in Buldhana District in the state of Maharashtra.(At risk & cost of contractor)

2023_MoRTH_774491_1 5.430 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/10/2023
Time 9:0Hrs
02/11/2023
Time 17:30Hrs
363 Short term maintenance work btn km 1/084 to 119/0 Mahuva Savarkundla Amreli Bagasara road and Km 0/0 to 9/350 Savarkundla Bypass of NH351 in the state of Guajrat

2023_MoRTH_775901_1 4.460 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 12/10/2023
Time 13:0Hrs
02/11/2023
Time 12:0Hrs
364 Construction of Dharmagarh Bypass on NH-130C in the State of Odisha on EPC Mode

2023_MoRTH_758179_1 88.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 12:0Hrs
02/11/2023
Time 12:0Hrs
365 Upgradation of MP/RJ border-Sheopur-Goras road section of NH-552E from Design Chainage 0.000 to 48.400 Km (Total length 48.40 km) to two Lane with paved shoulder configuration along with OTI of 16.6 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768222_1 326.200 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
01/11/2023
Time 17:30Hrs
366 Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode

2023_MoRTH_768349_1 308.830 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/08/2023
Time 17:30Hrs
01/11/2023
Time 17:30Hrs
367 Construction of Four Lane Deulgaon raja Bypass with CC Pavement on Malkapur-Chikhali-Jalna-Aurangabad road section of NH 753A of Buldhana district in the state of Maharashtra. (Risk and Cost of Contractor)

2023_MoRTH_774289_1 2.900 MoRTH Normal Highway Project OTHERS 03/10/2023
Time 9:0Hrs
01/11/2023
Time 16:0Hrs
368 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23 (5th Trial)

2023_MoRTH_777626_1 4.810 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 26/10/2023
Time 9:0Hrs
01/11/2023
Time 16:0Hrs
369 2nd Attempt Short Term Maintenance works and activities on section from Narol to Ujala Ch Km 0.000 to 12.000 Total length 12.00 KM of NH 47 Narol-Vishala-Juhapura-Sarkhej-Ujala 0.000 to 12.000 in the State of Gujarat

2023_MoRTH_773835_2 4.110 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/10/2023
Time 18:59Hrs
01/11/2023
Time 12:0Hrs
370 2nd Attempt Short Term Maintenance works and activities on section from Vrundavan chokdi Kheralu to Palanpur RTO junction (Ch. Km 115/320 to 160/320) Total length 45.00 KM of NH 58 Khokhara Gujarat Border Vijayanagar-Palanpur 0/000 to 160/320

2023_MoRTH_772620_2 3.930 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 12:0Hrs
01/11/2023
Time 12:0Hrs
371 Widening of 2L to 2LPS from Km.86/040 to 91.770 and 103/260 to 107/870Km. Of NH-0n EPC mode in the State of Odisha (Bid Ref. No. 28 CE NH of 2023-24

2023_MoRTH_763217_1 24.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
01/11/2023
Time 12:0Hrs
372 Construction of Balance 03 nos of Bridges at Km 327 545 Km 411 105 and Km 415 865 01 no of VUP at 416 685 and 2 lane Cross flyover at km 413 830 on existing 4 laning of Bareilly Sitapur of NH 24 on EPC basis in the state of Uttar Pradesh

Brly NH 24 2022 23 129 Structures E 151380 91.500 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2023
Time 15:0Hrs
31/10/2023
Time 15:0Hrs
373 Repair and Rehabilitation of Mayurakshi Bridge at Sainthia at km 91.200 of NH 2B (New NH-114) in the district of Birbhum, West Bengal in the year 2023-24 in EPC Mode (Job No. 114/WB/2023-24/…..)

2023_MoRTH_769178_1 10.650 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 30/08/2023
Time 9:0Hrs
31/10/2023
Time 14:0Hrs
374 Balance Works of Four laning of Nerchowk- Pandoh section of NH-21 from Km 190.000 to Km 211.035 (Design Chainage) in the State of Himachal Pradesh under residual NHDP on EPC Mode

2022_NHAI_138129_1 404.920 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
31/10/2023
Time 11:0Hrs
375 REHABILITATION & UPGRADATION OF EXISTING ROAD BETWEEN KM 29.725 TO KM 60.550 (SURAITHOTA - MALARI) NHSL TO DOUBLE LANE SPECIFICATION ON JOSHIMATH – MALARI (NH-107B) ROAD ON EPC MODE IN THE STATE OF UTTARAKHAND (Length 30.825 Km).

2022_BRO_562362_2 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 18:0Hrs
30/10/2023
Time 11:0Hrs
376 Construction of Paderu bypass Km 0.000 to Km 13.000 of 2 lane with paved shoulder on NH 516E in the state of Andhra Pradesh under NH O on EPC mode.

2023_MoRTH_766895_1 179.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/08/2023
Time 16:0Hrs
27/10/2023
Time 17:0Hrs
377 Construction of four-lane with paved shoulder of Darbhanga (Dilli More) – Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the state of Bihar.

2023_MoRTH_764394_1 285.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 12:30Hrs
27/10/2023
Time 15:0Hrs
378 Short Term maintenance of Existing road between Km Digas-Vadoli Kadrama Rd Section Scattred Length 27.40km,km Delad to Vasvari Rd Section,Between km Dindoli-Kharwasa Rd Section Between km Hojiwalakapletha Rd Sectionof NH64 in Bharuch Surat DistSoG

2023_MoRTH_777607_1 4.030 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 17:50Hrs
26/10/2023
Time 12:0Hrs
379 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat

2023_MoRTH_777411_1 3.120 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 7:0Hrs
26/10/2023
Time 11:0Hrs
380 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_777425_1 8.500 MoRTH Normal Highway Project OTHERS 20/10/2023
Time 7:0Hrs
26/10/2023
Time 11:0Hrs
381 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_776286_1 4.280 MoRTH Maintenance Project OTHERS 13/10/2023
Time 15:0Hrs
23/10/2023
Time 17:0Hrs
382 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_776520_1 4.400 MoRTH Normal Highway Project OTHERS 14/10/2023
Time 17:50Hrs
20/10/2023
Time 12:0Hrs
383 Short Term maintenance of Existing road between Km Digas-Vadoli Kadrama Rd Section Scattred Length 27.40km,km Delad to Vasvari Rd Section,Between km Dindoli-Kharwasa Rd Section Between km Hojiwalakapletha Rd Sectionof NH64 in Bharuch Surat DistSoG

2023_MoRTH_775623_1 4.030 MoRTH Normal Highway Project OTHERS 10/10/2023
Time 16:45Hrs
18/10/2023
Time 12:0Hrs
384 Short Term maintenance of Km. 22/2 to 35/7 (Nanapondha - Kaprada Section) of N.H.- 848 and Km. 0/0 to 8/200 (Karambeli - Mohangam- Moti Daman Section) of NH-848B in the State of Gujarat.

2023_MoRTH_775660_1 6.730 MoRTH Normal Highway Project OTHERS 10/10/2023
Time 17:45Hrs
18/10/2023
Time 12:0Hrs
385 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

2023_MoRTH_775689_1 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2023
Time 9:0Hrs
17/10/2023
Time 16:0Hrs
386 WIDENING IMPROVEMENT OF ROAD KAYING TATO FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS FROM KM 47.850 TO KM 66.600 (DESIGN CHAINGE KM 45.800 TO KM 62.850 TOTAL LENGTH 17.05 KM) UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG III

2023_bro_616900_1 144.340 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/09/2023
Time 18:0Hrs
17/10/2023
Time 11:0Hrs
387 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

2023_MoRTH_775213_1 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 07/10/2023
Time 17:0Hrs
16/10/2023
Time 16:0Hrs
388 EPC MODE FOR WIDENING IMPROVEMENT OF KAYING TATO ROAD BETWEEN KM 66.600 TO KM 86.600 (DESIGN CHAINGE KM 62.850 TO KM 78.367 TOTAL LENGTH 15.517 KM) FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PKG-IV

2023_BRO_616781_1 99.580 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 15:0Hrs
16/10/2023
Time 15:0Hrs
389 Work of road safety Improvement bymeans of widening of Existingcarriageway from 3.0mt to 5.50mtbetween km 234/00 to 238/400Borbhatha Ankleshwar Section underRoad Safety Annual Plan 2023-24Total Length 4.4km

2023_MoRTH_772343_1 4.100 MoRTH Normal Highway Project OTHERS 19/09/2023
Time 18:0Hrs
16/10/2023
Time 12:0Hrs
390 Short Term Improvement and Routine maintenance work between KM 388/00 to KM 405/305 Ferkuva Chhotaudepur Bodeli Naswadi Road of NH 56 in State of Gujarat.

2023_MoRTH_772480_1 3.120 MoRTH Normal Highway Project OTHERS 20/09/2023
Time 16:30Hrs
16/10/2023
Time 11:0Hrs
391 Short Term Maintenance works and activities on section 1 Nadiad-Uttaranda-Bhumel 2 Anand city 3 Napa to Borsad 4 KGN circle to Ras 5 ras to kankapura 6 Nadiad railway station loop Total length 31.810km of NH64 in the SoG

2023_MoRTH_772526_1 8.500 MoRTH Normal Highway Project OTHERS 20/09/2023
Time 17:30Hrs
16/10/2023
Time 11:0Hrs
392 Construction of Four Lane at existing road section of NH-30 (Old NH-24B) from km 82.650 to 83.880 (length-1.150 km), 84.635 to 98.750 (length-14.290 km), 103.660 to 107.260 (length-3.6 km), 111.390 to 115.425 (length-4.025 km), 124.345 to 130.445 (length-6.050 km), 133.155 to 161.450 (length-27.9 km) and Link road from 161.450 to 641.350 (length-6.156 km) of NH-2 for Raebareli to Prayagraj section in the State of Uttar Pradesh (Total length - 63.171 km) on EPC mode.

2023_NHAI_143873_1 981.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
16/10/2023
Time 11:0Hrs
393 Construction of Six Lane Flyover at the Junction of Nilam Hotel (Ch. 261.500) ,Chalthan Chokdi (Ch. 263.400) and Service road at Palod (Ch. 235.600) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the state of Gujarat

NHAI/RO-GNR/NH-48/Blackspots/Nilam-Chalthan/2023 61.500 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 06/09/2023
Time 16:55Hrs
13/10/2023
Time 12:0Hrs
394 Development of 4 lane with paved shoulders for the road section Talwandi Sabo-Raman to Refinery Road Junction with Bathinda-Dabwali road of NH-254 from existing Km 131.600 to 155.650 (Design Km 131.600 to Km 152.600) in the State of Punjab under EPC

2023_MoRTH_762465_1 227.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 17:0Hrs
12/10/2023
Time 11:0Hrs
395 Rehabilitation and Up-gradation to 2 lane with paved shoulders of Patto Jawahar Singh Wala to Dina Village Kangar road section of NH-254 Design Ch. From Km 38.00 to 51.200 in the state of Punjab. (Package-III) (Length 13.200 Km).

2023_MoRTH_753556_1 72.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 18:30Hrs
12/10/2023
Time 11:0Hrs
396 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_774701_1 6.080 MoRTH Normal Highway Project OTHERS 04/10/2023
Time 18:55Hrs
11/10/2023
Time 12:0Hrs
397 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_774708_1 4.400 MoRTH Normal Highway Project OTHERS 04/10/2023
Time 18:55Hrs
11/10/2023
Time 12:0Hrs
398 Periodical Renewal Between Km 0 00 to 10 200 on NH351K Bagasara Hamapur road in the state of Gujarat under EPC mode for year 2022 23

774285 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/09/2023
Time 18:30Hrs
09/10/2023
Time 16:0Hrs
399 Construction of ROB with approaches on NH 848 B at Udvada, Railway crossing LC No 87 at Km 181/18/20 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_770645_1 22.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2023
Time 9:0Hrs
09/10/2023
Time 12:0Hrs
400 Construction of Borigumma Bypass on NH-26 from Km 317.400 to Km 320.700 design chainage 317.400 to Km 321.415 in the state of Odisha on EPC Mode

2023_MoRTH_753578_1 62.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/05/2023
Time 9:0Hrs
07/10/2023
Time 12:0Hrs
401 Strengthening from Km. 44/700 to Km. 62/200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat for the year 2022-23 (Length = 17.50 Km.) based on SOR 2022-23. (Job No. 168G/GJ/2022-23/684)

2022_MoRTH_712216_1 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 14:0Hrs
06/10/2023
Time 12:0Hrs
402 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2023_MoRTH_769588_1 11.460 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/09/2023
Time 17:30Hrs
05/10/2023
Time 17:30Hrs
403 IRQP work from km 0.00 to 9.300 of NH 133 on EPC mode in state of Bihar (Job No.- NH-133/BR/2023-24/81)

2023_MoRTH_768081_1 9.557 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/08/2023
Time 17:0Hrs
05/10/2023
Time 17:0Hrs
404 short term maintenance work btn km 0/0 to 45/400 on NH151K Porbandar Bhanvad Tranpatiya section in the state of Gujarat under ordinary repair under MandR head during 2023/2024

2023_MoRTH_773796_1 2.200 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
405 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

2023_MoRTH_773775_1 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
406 Short term maintenance work btn km 0/0 to 66/0 on Khambhaliya Advana Porbandar of NH151AD in the state of Gujarat

2023_MoRTH_773783_1 3.970 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 17:0Hrs
05/10/2023
Time 12:0Hrs
407 Short Term maintenance work on section from Km. 629/400 to 642/400 of NH 56 Unai Vansda Section in the State of Gujarat under STMCM and R scheme

2023_MoRTH_771087_1 3.310 MoRTH Normal Highway Project OTHERS 11/09/2023
Time 18:55Hrs
04/10/2023
Time 12:0Hrs
408 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section Btn Km 0.0 to 21.5 and Km 27.9 to 30.9 and Km 46.8 to 61.5 under EPC mode in the state of Gujarat

771726 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2023
Time 18:55Hrs
04/10/2023
Time 12:0Hrs
409 RFP for the work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_765017_1 121.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/08/2023
Time 15:0Hrs
04/10/2023
Time 11:0Hrs
410 Maintenance work (Short Term) on section from Gaduli to Jara (km. 19/900 to km. 32/200) and Hajipir to Dhordo (km. 54/00 to km. 86/500) on NH-754 k in the state of Gujarat.

2023_MoRTH_771496_1 4.280 MoRTH Maintenance Project OTHERS 13/09/2023
Time 15:0Hrs
03/10/2023
Time 17:0Hrs
411 Rectification of accident prone area with widening of curve & Re-alignment to the road of Govindpalli ghat area at ch.348/900 and ch.350/400 km of NH-326 in the State of Odisha for the year 2022-23 (BID Ref. No.-29 CE NH of 2023-24)

2023_MoRTH_767711_1 7.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/08/2023
Time 18:55Hrs
03/10/2023
Time 12:0Hrs
412 Construction of Service Road between Aena & Palsana from km 48.950 to 53.550 (LHS), Vanesha from km 57.700 to 58.050 (BHS), Nandida Village BHS from km 59.300 to 60.470 and Mandal Village LHS from km 101.800 to 102.300 on Hazira Port- Surat- Gujarat Maharashtra Border Section of NH-53 (Old NH-06) in the State of Gujarat on EPC Mode

2023_NHAI_165846_1 7.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/08/2023
Time 16:15Hrs
03/10/2023
Time 11:0Hrs
413 Construction of Balance work of 8 nos. of Elephant Underpasses (EUPs), 1 no. of Vehicular Underpass (VUP), 1 nos. of Light Vehicular Underpass (LVUP), 1 nos. of Pedestrian Underpass (PUP), 1 nos. of Foot Over Bridge (FOB) and A2 side approach of Jharpokharia Flyover at km.215.270 in Baharagora-Singhara Section of NH-49 in the state of Odisha.

2022_NHAI_138816_1 254.980 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 12:20Hrs
03/10/2023
Time 11:0Hrs
414 Construction of 6-lane flyover Size-40 Nos of 25m Span x 6m Height including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul- Sambalpur section of NH-42 (New NH-55) at Km. 202.533 on EPC Mode in the State of Odisha.

2022-NHAI-139953-1 116.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/12/2022
Time 19:44Hrs
03/10/2023
Time 11:0Hrs
415 Construction of 4 lane Raniganj Bypass from km 273.000 of NH 60 (new NH 14) to km 478.18 of NH-2 (New NH 19) in Paschim Bardhaman, West Bengal in EPC Mode. (Job No. 014- WB-2022-23/514)

2023_MoRTH_745163_1 278.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 14:0Hrs
02/10/2023
Time 14:0Hrs
416 Periodical Renewal on NH 351K bet Km 0 0 to 10 200 length 10 200 in the State of Gujarat under EPC mode for the year 2022 23

772936 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2023
Time 13:0Hrs
29/09/2023
Time 16:0Hrs
417 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(3rd call)

Tender Notice No. 54/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 13:0Hrs
29/09/2023
Time 14:0Hrs
418 Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 Songadh Bardipada Section of NH 953 in the State of Gujarat

2023_MoRTH_773027_1 3.930 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
419 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_773035_1 6.080 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
420 Short Term maintenance work between Km. 535/500 to 566.900 of NH 56 Kelikuva Zankhwav Mandvi Section in the State of Gujarat

2023_MoRTH_773049_1 6.800 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
421 Short Term maintenance work between Km. 572.000 to 604.000 (Tarsada - Kanja - Vyara - Kapura Section) of N.H.-56 in the State of Gujarat.

2023_MoRTH_773055_1 6.790 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
422 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_773059_1 4.400 MoRTH Normal Highway Project OTHERS 22/09/2023
Time 18:30Hrs
29/09/2023
Time 12:0Hrs
423 Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on EPC Mode

2023_NHAI_163935_1 640.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/08/2023
Time 15:0Hrs
27/09/2023
Time 15:0Hrs
424 Construction of Fly Over Including Junction Improvements @ km 348/6 – 349/8 of NH 67 (km 15/6 To 16/8 New NH 181) (Nagapattinam – Gudalur – Mysore Road) At Saibaba Colony Junction In Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_766679_1 46.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/08/2023
Time 10:0Hrs
26/09/2023
Time 15:0Hrs
425 Short term maintenance work and activities on NH927D Jamnagar Dhoraji road Km 4/700 to 107/600 in the state of Gujarat under ordinary repairs under MandR head during 2023/2024

766501 25.730 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
426 Short term maintenance work btn km 0/0 to 66/0 on Khambhaliya Advana Porbandar of NH151AD in the state of Gujarat

766509 3.970 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
427 Short term maintenance work btn km 45/400 to 134/690 on Tran patiya Jamjodhpur Kalavad road on NH151K in the state of Gujarat under ordinary repairs under MandR during 2023/2024

766507 7.360 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 15:0Hrs
428 short term maintenance work btn km 0/0 to 45/400 on NH151K Porbandar Bhanvad Tranpatiya section in the state of Gujarat under ordinary repair under MandR head during 2023/2024

766512 2.200 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
26/09/2023
Time 12:0Hrs
429 Design and Construction of 6 lane Standalone single span Grade Separated structure at Km. 532.552 on Gonde Vadape section of NH-3 New NH-848 in the state of Maharashtra balance work on EPC Mode

2023_NHAI_165326_1 49.510 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/08/2023
Time 15:0Hrs
26/09/2023
Time 11:0Hrs
430 Widening and strengthening of existing alignment from Km 64.70 to Km 72.119 and from Km 78.600 to Km 81.800 to 2L PS and construction of 2L PS Ramnagar By Pass from Km 72.119 to Km 78.600 of NH 116B in the District of Purba Medinipur in the State of West Bengal under Annual Plan 2022 23 in EPC Mode Job No 116B WB 2022 23 515

2023_MoRTH_745759_1 286.473 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:0Hrs
21/09/2023
Time 11:0Hrs
431 PR Btn Km 0/0 to 10/200 on NH351K Bagasara Hamapur road in the state of Gujarat under EPC mode for year 2022/2023

766494 4.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/09/2023
Time 15:0Hrs
20/09/2023
Time 12:0Hrs
432 Short Term maintenance work between Km. 459/500 to 483/500 of NH 56 Devaliya Rajpipla Section in the State of Gujarat.

2023_MoRTH_770644_1 4.400 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 21:0Hrs
433 Short Term maintenance work between Km. 507/300 to 535/500 of NH 56 (Movi Netrang Kelikuva Section) in the State of Gujarat.

2023_MoRTH_770638_1 6.080 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 15:0Hrs
18/09/2023
Time 15:0Hrs
434 Improivement/ Construction of 2-lane with hard shoulder of Askote-Lipulekh road from Tawaghat Village to Budhi Village (Design Km 56.935 to Km 95.748) and from end of tunnel portal to Kali Mandir (Design Km 113.828 to Km 133.078) (Total Design Length = 58.063 Km) under Project Hirak of BRO in the state of Uttarakhand under Bharatamala Pariyojna on EPC mode

2023_MoRTH_740109_2 274.960 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 11:0Hrs
18/09/2023
Time 15:0Hrs
435 Short Term maintenance work between Km. 535/500 to 566.900 of NH 56 Kelikuva Zankhwav Mandvi Section in the State of Gujarat

2023_MoRTH_770641_1 6.800 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
436 Short Term maintenance work between Km. 572.000 to 604.000 (Tarsada - Kanja - Vyara - Kapura Section) of N.H.-56 in the State of Gujarat.

2023_MoRTH_770643_1 6.790 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
437 Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 Songadh Bardipada Section of NH 953 in the State of Gujarat

2023_MoRTH_770633_1 3.300 MoRTH Normal Highway Project OTHERS 08/09/2023
Time 9:0Hrs
18/09/2023
Time 12:0Hrs
438 Construction of FOB at 24 locations relating to six laning of Bangalore to Mysore Section from Km.18.000 to Km.135.304 of NH-275 in the State of Karnataka (Package-I &2) to be executed on EPC mode

NIT No.09/NHAI/RO-BNG/22016/Tender/2023-24 dated 16.08.2023 46.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2023
Time 15:0Hrs
18/09/2023
Time 11:0Hrs
439 Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800) (PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode

2023_MoRTH_767176_1 531.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/09/2023
Time 15:0Hrs
15/09/2023
Time 15:0Hrs
440 REHABILITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 (EXISTING CHAINAGE 136.00 TO KM 169.00) OF NH-309A IN THE STATE OF UTTARAKHAND.

2023_MoRTH_764734_1 349.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/08/2023
Time 18:35Hrs
15/09/2023
Time 11:0Hrs
441 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar.J0b No NH 327E BR 2022 23 67.

2023_MoRTH_766582_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 17:0Hrs
14/09/2023
Time 17:0Hrs
442 Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 of NH 309B (Almora-Panar-Ghat) Under Annual Plan 2020-21 in the State of Uttarakhand(Balance work)

2023_MoRTH_763260_1 21.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 15:0Hrs
14/09/2023
Time 15:0Hrs
443 Construction of new Four-lane Sambalpur Ring Road from Km. 0.000 to Km. 35.384 under Bharatmala Pariyojna on Hybrid Annuity Mode in the state of Odisha.

2022-NHAI-139947-1 947.310 NHAI Normal Highway Project HAM 29/12/2022
Time 18:44Hrs
14/09/2023
Time 11:0Hrs
444 DEVELOPMENT OF SIX LANE GREEN FIELD RING ROAD (PACKAGE-III) STARTS FROM DESIGN CH.51.200 TO DESIGN CH. 68.650 (LENGTH=17.450 KMS) AROUND KANPUR CITY AND CONSTRUCTION OF 4-LANE AIRPORT LINK ROAD (LENGTH = 1.45 KM) AT CHAINAGE 62.090 OF KANPUR RING ROAD IN THE STATE OF UTTAR PRADESH

2023_NHAI_142633_1 844.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 15:33Hrs
13/09/2023
Time 11:0Hrs
445 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode. 2ND CALL

2023_MoRTH_763783_1 10.640 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:30Hrs
11/09/2023
Time 17:30Hrs
446 Construction of Fly Over Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction in Coimbatore City and including Accident Prone Spot Near Bala Hospital (Km 337) & Jai Shanthi Theatre (Km 335/8 ) & Shanthi Petrol Bunk (Km 335/10) in Coimbatore City on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_763746_1 110.803 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 10:0Hrs
11/09/2023
Time 15:0Hrs
447 Improvement of Lucknow Ayodhya Section of NH-28 New NH 27 from Existing km 8000 to km 68900 in the state of Uttar Pradesh on EPC ModePkgI

2023_NHAI_163075_1 237.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 14:0Hrs
11/09/2023
Time 15:0Hrs
448 Improvement & Rehabilitation of Lucknow Ayodhya Section of NH-28 New NH27 from Existing km 68900 to km 121600 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_163089_1 208.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
11/09/2023
Time 15:0Hrs
449 Treatment of 04 no. of Landslide Location (Location Ch. Km to 0.150 to km 0.310, Location Ch. Km 49.395 to km 49.535, Location Ch. 53.160 to km 53.500 and Location Ch. Km 66.860 to Ch. Km 67.020 on NH-134) from Dharasu to Yamnotri on NH-134 (Old NH-94)

2023_MoRTH_765806_1 43.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/08/2023
Time 15:0Hrs
11/09/2023
Time 12:0Hrs
450 Slope Stabilization Scheme at location of landslide at km 52.240 km of NH-110 (Old NH-55) at Tindharia, West Bengal & Permanent Restoration of damaged Road bench at km 42.80 of NH -110 (Old NH-55) under NH Division-IX in the district of Darjeeling West Bengal during the year 2022-2023. (Job No.110/WB/2022-23/ 517).

2023_MoRTH_748021_1 22.176 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/09/2023
Time 17:0Hrs
451 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_757254_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:0Hrs
07/09/2023
Time 15:0Hrs
452 Construction of Bypass to Madurai - Achambathu - Viratipathu in between km 6/850 to 10/382 of NH 49 Extn. (New NH 85) including Land Acquisition on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.

2023_MoRTH_762850_1 113.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/07/2023
Time 15:0Hrs
05/09/2023
Time 15:0Hrs
453 Realignment from Km 227.770 to 227.970, Km 233.260 to 233.980 Km, Km 234.090 to 234.860 Km, Km 235.980 to 236.770 Km of NH-26(Missing section of Bhawanipatna- Koksara Stretch) on EPC mode in the state of Odisha(Bid Ref.No. 27CE of 2023-24).

2023_MoRTH_763207_1 16.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 18:55Hrs
05/09/2023
Time 12:0Hrs
454 Widening and Strengthening to four lane of Gorantla Hindupur section of NH 716G from km 120 300 Design Chainage to km 153 880 Design Chainage Package 03 under NH O under Annual Plan 2022 23 on EPC mode in the State of Andhra Pradesh A P 2022 23

2023_MoRTH_762341_1 540.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 10:0Hrs
04/09/2023
Time 17:0Hrs
455 Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locationsunder EPC mode.(Asper DPR submitted by THDC) under AnnualPlan2022-23in the State Of Uttarakhand

2023_MoRTH_763547_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
456 Treatment of sinking zone in Kaladhungi-I(69.880 to 69.980),Kaiadhungi- II (70.540 to 70.610) and Rampur (71.440 to 71.520) of NH-109(New NH-107) in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_765040_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2023
Time 15:0Hrs
04/09/2023
Time 12:0Hrs
457 Rehabilitation Upgradation and reconstruction of existing intermediate lane to 2-lane with paved shoulders configuration Barna River to Ken River length 34.000 km on Gulganj-Amanganj-Pawai-Katni NH-43 Ext. in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751230_1 234.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 15:0Hrs
01/09/2023
Time 17:30Hrs
458 Rehabilitation and Upgradation of existing intermediate lane to 2 lane with paved shoulders from Km 0.600 Gulganj Bypass on NH-34 to Km 43.000 Barna River, length 42.400 Km on Gulganj- Amanganj- Pawai-Katni NH-43 Ext. in the State of Madhya Pradesh

2023_MoRTH_751224_1 190.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
01/09/2023
Time 17:30Hrs
459 Slope Protection and Landslide Mitigation at 5 Vulnerable Locations (km 6.20 to km 6.95 (Hill and Valley side), km 7.10 to km 7.25, km 21.40 to km 21.65, km 22.20 to km 22.300) within Sevoke-Rangpoo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (JobNo.010/WB/2022-23/519).

2023_MoRTH_748031_1 65.080 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 15:0Hrs
31/08/2023
Time 17:0Hrs
460 Slope Protection and Landslide Mitigation at 8 Vulnerable Locations (km 3.75 to km 3.90 km 8.21 to km 8.36, km 11.393 to km 11.628, km 33.35 to km 33.70, km 38.95 to 39.220, to km 44.903 to km 45.078, km 48.490 to km 48.560 and km 49.310 to km 49.570) within Sevoke-Rangpo Section of NH-10 (old NH-31A) in the district of Kalimpong in West Bengal during FY 2022-23 on EPC Mode. (Job No.010/WB/2022-23/520).

2023_MoRTH_748011_1 89.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2021
Time 18:0Hrs
31/08/2023
Time 17:0Hrs
461 CONSTR OF RD HANLE ZURSAR IMISLA FROM KM 0.00 TO KM 48.002(ESISTING RD OF 20.800 KM AFTER KM 38.955 AND NEW RD OF 9.047 KM STARTS AFTER EXISING RD ON 20.800 KM) ESISTING TRACK TO NHSL SPECS OF EPC MODE (NET LENGTH 48.002 KMS)

2023_BRO_607681_1 162.200 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 18:0Hrs
31/08/2023
Time 11:0Hrs
462 2-lane with paved shoulder of Ashapur to Rudhy (Betul – Khandwa Pkg – IV) from Design CH. km 114.000 to km 149.000 in State of MP on EPC mode

2023_NHAI_159721_1 264.800 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/07/2023
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
463 Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha

Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha 1,381.330 NHAI Normal Highway Project HAM 18/10/2022
Time 15:0Hrs
31/08/2023
Time 11:0Hrs
464 IRQP work of NH131A from Km 1.900 to 29.120 Existing Portion for the year 2023 24 on EPC mode in the state of Bihar.

2023_MoRTH_760380_1 30.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
28/08/2023
Time 17:0Hrs
465 PR work from km 193 to 233 (41 km) and Provision of “THRIE” Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 EPC

2023_MoRTH_764275_1 19.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 15:0Hrs
28/08/2023
Time 12:0Hrs
466 RFP for the work of Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Package I, Design Km 228.920 (Jagarnathpur) to Km 235.960/0.000 (Makhauda Dham) to Km 29.000 (Sarpur) in the State of Uttar Pradesh

2023_MoRTH_764348_1 384.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/07/2023
Time 15:0Hrs
28/08/2023
Time 11:0Hrs
467 Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC

157225 485.060 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 18:0Hrs
28/08/2023
Time 11:0Hrs
468 Construction of proposed ROB and its approaches in replacement of existing Level Crossing No 21X at Ch 107/500 in the State of Gujarat on EPC mode under NH O

2023_MoRTH_760920_1 35.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/07/2023
Time 10:0Hrs
28/08/2023
Time 11:0Hrs
469 Widening Carriageway width along with construction of footpath from km 69.00 to km 71.40, Permanent Restoration of depressed road bench at km 60.480 and Restoration of Valley side protection wall at km 60.950 in between km 60 to km 61 & Repair & Rehabilitation of Panchanai bridge at km 75.030 of NH-110 (Old NH-55) in the district of Darjeeling West Bengal during the year 2022-2023 (Job No.110/WB/2022-23/ 521) – 2nd call.

2023_MoRTH_763903_1 16.686 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/07/2023
Time 17:0Hrs
26/08/2023
Time 17:0Hrs
470 Short Term Maintenance Ordinary Repairs from km 396/2 – 404/7, km 428/0 – 430/8 & km 431/4 – 434/4 of NH 181 (old NH-67) under OR (DPP) 2022-23- in the State of Tamil Nadu

2023_MoRTH_763497_1 1.610 MoRTH Maintenance Project OTHERS 24/07/2023
Time 10:0Hrs
25/08/2023
Time 15:0Hrs
471 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode.

2022_NHAI_139085_1 972.120 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
472 Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 (design length 14.980 km) (Package 3 under Phase I) in the state of UP on EPC mode under Bharatmala Pariyojna

2022_NHAI_139094_1 600.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
24/08/2023
Time 11:0Hrs
473 Widening to two lane with paved shoulder from Km 34/250 to Km 71/675 of Khammam-Kurvi section of NH365A in the State of Telangana

2023_MoRTH_757978_1 322.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
22/08/2023
Time 15:0Hrs
474 Widening to 4 Lane with paved shoulder Configuration of Vodarevu Chilakaluripet Section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh under Annual Plan 2022 23

2023_MoRTH_759123_1 825.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2022
Time 17:0Hrs
21/08/2023
Time 17:0Hrs
475 Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 (Green Field Alignment) of NH-930P in the State of Telangana

2023_MoRTH_758290_1 405.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
476 Widening to 2 lane with paved shoulders from 0.00 to 32.970 of Adilabad-Bela section of NH-353B in the State of Telangana

2023_MoRTH_757888_1 360.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/06/2023
Time 15:0Hrs
21/08/2023
Time 15:0Hrs
477 Permanent Improvement of Black Spot (TN-(02)-635) at New Cinema junction @ Km 62/4-63/0 by Providing additional high level bridge @

2023_MoRTH_759739_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
21/08/2023
Time 11:0Hrs
478 Construction Of Six Lane Flyover at the Junction Of Kandari Chokdi (Ch. 149.440) And Luvara Patiya (Ch. 186.640) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode

NHAI/RO-GNR/NH-48/Blackspots/Kandari-Luvara/2023 57.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/07/2023
Time 18:55Hrs
19/08/2023
Time 17:0Hrs
479 RFP for the work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH-730S (Maharajganj , Nichloul , Thuthibari) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_744967_1 543.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 18:0Hrs
18/08/2023
Time 11:0Hrs
480 Widening from Two Lane Paved Shoulder to Four Lane with Paved Shoulder Km 81/300 - 86/630, Km 88/600 - 90/550, Km 90/550 - 90/850 (RHS) Km 90/850 - 96/300 & 97/600 - 110/700 of NH-81 (Old NH-67 - Km 221/600 - 234/700, Km 236/000 - 241/450, Km 241/450 - 241/750(LHS), Km 241/750 - 243/700 & Km 245/670 - 251/000) and Strengthening from Km 81/300 - 86/500 and Km 87/600 - 96/300 of NH-81 (Old NH-67 Km 236/000 - 244/700 and Km 245/800 - 251/000) of NH-81 (Coimbatore - Chidambaram Section) (Old NH- 67) (Nagappattinam-Guddalur-Mysore Road) on EPC mode in the State of Tamil Nadu

2023_MoRTH_762713_1 103.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/07/2023
Time 15:0Hrs
17/08/2023
Time 15:0Hrs
481 Six Laning and Strengthening of km 340.000 to km 403.400 of Hubli Haveri section of NH 48 Old NH 4 in the State of Karnataka to executed on EPC Standard mode - Construction of LVUP at Kursapur Km.361.900, Service road at Varur Km.391.760 and Structure of VOP at Chabbi Km.392.600 on EPC mode.

7/NHAI/RO-BNG/14016/Tender/2023-24 dated 28.06.2023 24.840 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 18:0Hrs
16/08/2023
Time 11:0Hrs
482 Construction of I ROB with approaches at Bhaiyachowk and SR on Sangli Solapur II VUP at Yawali incl SVUP on Pune Solapur PkgII III VUP with street light work on SolapurYedshi IV SR and widening of Box culvert on Akkalkot Solapur in Maharashtra on EPC

2023_NHAI_158889_1 102.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/06/2023
Time 11:0Hrs
16/08/2023
Time 11:0Hrs
483 PR Work from ch.93.612 to ch.98.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760578_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
484 PR Work from Ch.98.00 to ch.112.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.

2023_MoRTH_760579_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2023
Time 15:0Hrs
14/08/2023
Time 17:0Hrs
485 CONSTR OF RD LUKUNG CHARTSE NEW TO NHSL SPECS INCDL LA FA WLC FM KM 0.000 TO KM 37.398 UNDER 51RCC 50TF PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 37.398 KM)

2023_BRO_601696_1 153.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 18:0Hrs
11/08/2023
Time 11:0Hrs
486 Construction of Dubrajpur Bypass with 4 lane configuration of length 5.676 km on NH 60 (new NH 14) from design chainage 0.00 (existing km 316.135 on NH 60) to design chainage 5.676 (existing km 320.980 on NH 60) in the district of Birbhum, West Bengal in EPC Mode.(JobNo014-WB-2022-23/518)

2023_MoRTH_747726_1 278.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 16:0Hrs
10/08/2023
Time 14:0Hrs
487 New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752381_1 199.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/05/2023
Time 17:30Hrs
09/08/2023
Time 17:30Hrs
488 Widening to two lane with paved shoulders of Sangameswaram Nallakaluva Velugodu Nandyal section from Km. 93.819 to 124.530 141.700 to 173.560 of NH 167K in the State of Andhra Pradesh under Annual Plan 2022 23 on EPC mode under NH O

2023_MoRTH_759155_1 550.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/06/2023
Time 11:55Hrs
09/08/2023
Time 17:0Hrs
489 One time Improvement of existing bypass road from Km 64/000 to 65/620 (Bhojpur) (Total length 1.62 Km) of NH 52 in the state of Madhya Pradesh under EPC mode under NH (O)

2022_MoRTH_726216_1 4.220 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 17:30Hrs
07/08/2023
Time 17:30Hrs
490 Widening of Kondamodu to Perecherla Section Design Ch. Km 0.00 to Km 49.917 of NH 167AG to 4 Lane with paved shoulder Configuration on EPC Mode in the state of Andhra Pradesh under AnnuaI Plan 2022 23

2023_MoRTH_757082_1 699.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 10:0Hrs
03/08/2023
Time 17:0Hrs
491 HILL SLOPE STABILIZATION AT KM 28.990, KM 29.500, KM 30.800,KM 31.900, KM 32.300, KM 32.500, KM 33.500, KM 34.400 & KM 35.600 ON MELYAL-PHARKIYAN GALI-DATT BRIDGE ROAD IN THE SECTOR OF 109 RCC32BRTF PROJECT BEACON IN J&K UT EPC MODE

CE (P) BCN/EPC/07/2023-24 26.770 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 17:30Hrs
03/08/2023
Time 12:0Hrs
492 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 0.00 TO KM 30.00 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.00 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT)

2023_BRO_604241_1 112.100 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
493 CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 30.00 TO KM 60.540 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.540 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT) PACKAGE II

2023_BRO_604288_1 104.190 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/06/2023
Time 18:0Hrs
03/08/2023
Time 11:0Hrs
494 Long Term Rectification Construction Of Three Lane River Bridge At Bhukhi Khadhi Ch. 176.420 And Amravati Khadi Ch. 202.845 Additionally Construction Of Service Road From Chainage 114.470 To 116.180 Vadodara Bharuch And Chainage 186 885 To 190.675 Bharuch Surat For Blackspots On Vadodara - Surat Section Of Nh-8 New Nh-48 In The State Of Gujarat on EPC Mode

NHAI/RO-GNR/Bhukhi-Amravati/NH-48/June/2023 52.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/06/2023
Time 16:55Hrs
02/08/2023
Time 17:0Hrs
495 Short term maintenance under OR (DPP) works for Supplying of machineries as hire basis with drivers, cleaners staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along with Cutting of road side Jungle and clearance of drain & Blockage of Culverts from km 591.00 to km 598.00 of NH-31 (New NH-10 & 17) under NH Division - IX in the Districts of Darjeeling and Kalimpong - (Job No. TA/10-17/WB/2023-24/815).

2023_MoRTH_762403_1 0.670 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 18/07/2023
Time 13:45Hrs
01/08/2023
Time 17:0Hrs
496 Beautification works of Highway Stretch from Km 199.660 to 210.350 of Agra- Etawah (NH-19) on EPC Mode

2023_NHAI_162169_1 5.240 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 24/07/2023
Time 18:0Hrs
01/08/2023
Time 11:0Hrs
497 Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_751238_1 299.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
31/07/2023
Time 17:30Hrs
498 Periodical renewal work in km 8/540 to 10/340 on NH-86 Extn. in the state of MP under EPC mode

2023_MoRTH_752483_1 4.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 17:30Hrs
28/07/2023
Time 17:30Hrs
499 Construction of an additional two lane bridge with approaches at km 249/6 of NH-948 (old NH-209) (Bangalore-Coimbatore section) on Engineering, Procurement & Construction (EPC) basis contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757443_1 7.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
500 Improvements to existing paver block carriageway from Km 429/2 – 430/8 and Km 433/2 (Selected Stretches), providing safety measures at vulnerable locations at Km 397/2, 397/4, 398/4, 398/6, 399/4, 399/6, 399/10, 400/2, 400/4 & 400/10 including CD works & protective works, Construction of Box Culverts at Km 428/003, 428/392, 432/284, 432/325 and improvements to Charring Cross Junction (Udhagamandalam) from Km 430/8 – 431/4 of NH 67 (New NH-181) on EPC Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_757466_1 32.690 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 10:0Hrs
28/07/2023
Time 15:0Hrs
501 Short term maintenance under OR (DPP) works for supplying of machineries on hire basis with drivers, cleaners’ staffs including traffic control arrangement etc for removal of land slide materials and soft rock cutting etc in hilly region along road & cutting of road side Jungle and clearance of drain & blocked culverts from km 0.00 (Sevoke) to km 52.10 (Rangpoo) of N H -10 (Old NH 31A) under NH Division No. IX, P. W. (Roads) Directorate during the year 2022-2023 (Job No. TA/10/WB/2022-23/813) - (3rd call).

2023_MoRTH_760452_1 4.437 MoRTH Maintenance Project OTHERS 05/07/2023
Time 15:5Hrs
27/07/2023
Time 17:0Hrs
502 Shifting and Fixing of 24.00 M. Span Steel Girder Bailey Bridge in Km 220 Ch. 219.400 with Widening of Existing Road in Km. 219.200 To 219.600 and including Widening of Railway Crossing 1 - BRR at Shyampur Near Rishikesh on NH - 58 (New No.-34 ) in The State of Uttarakhand Under Annual Plan 2023-24

2023_MoRTH_761276_1 4.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2023
Time 15:0Hrs
27/07/2023
Time 12:0Hrs
503 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode - 2nd call

2023_NHAI_157520_1 620.350 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 15:0Hrs
27/07/2023
Time 11:0Hrs
504 HILL SLOPE STABILIZATION AT KM 32.500 KM 34.770 KM 35.090 AND KM 35.250 ON KASTWAR NILDORI LOKUT BUNGUS DRANGARI ROAD IN THE SECTOR OF 109 RCC 32 BRTF PROJECT BEACON IN J AND K UT EPC MODE

CE (P) BCN/EPC/08/2023-24 41.340 BRO Special Project EPC (Lump Sum/Item Rate Contract) 13/07/2023
Time 15:0Hrs
26/07/2023
Time 15:0Hrs
505 Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

2023_MoRTH_752770_1 272.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
25/07/2023
Time 17:30Hrs
506 Strengthening from km 0/000 to 1/500 & km 30/830 – 32/230 of NH 383 (Kottampatti – Thiruppathur Section) on Engineering, Procurement & Construction (EPC) Basis Contract in the State of Tamil Nadu

2023_MoRTH_756828_1 9.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 15:0Hrs
25/07/2023
Time 15:0Hrs
507 Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode

2023_NHAI_148546_1 125.300 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:0Hrs
25/07/2023
Time 15:0Hrs
508 Construction of 4 Lane With PS Pattan Bypass From Existing Km 24.320 To Km 33.760 nd Dsgn Km 24.400 To Km 35.300 Length 10.900 Km On Road SBU NH01 in Ut JK Under Project Beacon Bro on EPC Mode

2023_MoRTH_756891_1 432.910 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 15:0Hrs
25/07/2023
Time 9:0Hrs
509 Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode

2023_MoRTH_751211_1 81.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:30Hrs
24/07/2023
Time 17:30Hrs
510 Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode

2023_MoRTH_756989_1 111.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/06/2023
Time 17:0Hrs
24/07/2023
Time 17:0Hrs
511 Rehabilitation and upgradation to 2 lane with paved shoulders from Design Ch. Km 248/010 to 269/900 i.e., Kurnool/Kadapa border Jammalamadugu. Section of NH167K in the state of Andhra Pradesh on EPC mode under Annual Plan

2023_MoRTH_755438_1 244.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 15:0Hrs
512 Construction of Baghamari By-pass on NH-57 from Km 281/700 to Km 285/330 in the state of Odisha on EPC Mode (Bid Ref No.-10 CE NH of 2023-24)

2023_MoRTH_756892_1 41.170 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/06/2023
Time 18:55Hrs
24/07/2023
Time 12:0Hrs
513 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_759010_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/06/2023
Time 15:0Hrs
24/07/2023
Time 12:0Hrs
514 Construction of 37 50 mtr span Bridge at Karian RD 113 550 on NH 154A and Construction of 14 mtr span Bridge at Kalsuin RD 125 400 on NH 154A in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755491_1 12.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 15:0Hrs
24/07/2023
Time 11:0Hrs
515 Construction of two Lane RUB in lieu of existing railway level Crossing No 96 C 2 E at Railway Km 119 3 4 on NH 503A at Km 20 690 in the state of Himachal Pradesh on EPC Mode

2023_MoRTH_755545_1 14.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/05/2023
Time 18:0Hrs
24/07/2023
Time 11:0Hrs
516 Design and construction of crossing facility of VUP at 4 locations viz i Kikvi Village Km 801 080 ii Harischandri Km 806 020 iii Shivare km 817 360 iv Khedshivapur km 820 340 and FOB at 863 200 on Pune Satara Section of NH 4 from km 725 000 to 865 350 in the State of Maharashtra on EPC Mode

2023_NHAI_155058_1 52.070 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 9:0Hrs
24/07/2023
Time 11:0Hrs
517 Construction of 2-lane with paved shoulder configuration of Shujalpur Bypass, from Km 33/100 to 43/570, design length 10.47 Km section of NH-752C in the State of Madhya Pradesh under EPC mode

2023_MoRTH_752714_1 101.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 17:30Hrs
21/07/2023
Time 17:30Hrs
518 Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project BEACON BRO on EPC Mode

2023_MoRTH_756528_1 456.550 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 16:0Hrs
20/07/2023
Time 15:0Hrs
519 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_760041_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/07/2023
Time 15:0Hrs
19/07/2023
Time 14:0Hrs
520 Improvements to Riding Quality at km 32 000 33 400 km 35 640 37 000 km 47 000 57 400 km 59 200 64 400 km 68 800 77 200 km 83 600 84 000 km 84 400 95 000 km 95 400 96 200 Tuticorin Tiruchendur Kanyakumari section of NH 32

2023_MoRTH_758113_1 39.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/06/2023
Time 17:35Hrs
19/07/2023
Time 11:0Hrs
521 Maintenance of NH-76E Km.400.878 to 450.00 and NH-96 Km 153.330 to 154.010 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Prayagraj in the State of Uttar Pradesh

2023_MoRTH_761147_1 1.310 MoRTH Normal Highway Project OTHERS 10/07/2023
Time 17:0Hrs
18/07/2023
Time 17:0Hrs
522 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana (2nd call)

NHAI/Tech/BM/Pathankot Link Road/ 2nd Call/ 2023 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/06/2023
Time 11:0Hrs
18/07/2023
Time 11:0Hrs
523 Construction of 6-lane Flyover at Km.518.440 (Mouda Y-Junction) on Nagpur-Wainganga Bridge Section of NH-53 from Km.517.655 to Km.519.100 in the State of Maharashtra on EPC Mode

2022_NHAI_141737_1 62.590 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
18/07/2023
Time 11:0Hrs
524 One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode

2023_MoRTH_751766_1 10.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/05/2023
Time 17:30Hrs
17/07/2023
Time 17:30Hrs
525 Geometric Improvement of NH327E at Bhargama and Sukela More Including Provision of Raniganj Bypass in State of Bihar

2023_MoRTH_756199_1 61.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 17:0Hrs
17/07/2023
Time 17:0Hrs
526 Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 from Km 0.000 to Km 15.972 (Total length 15.972 km) of NH 333C in the State of Bihar (Job No- NH-333C-BR-2022-2023-72)

2023_MoRTH_750242_1 101.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/04/2023
Time 15:0Hrs
17/07/2023
Time 15:0Hrs
527 Construction of Six Lane VUP at Karan (Ch. 263.350) [GJ-(02)-24] and Sarodhi (Ch. 330.500) (GJ-(02)-29) for Rectification of Blackspots on Surat- Dahisar Section of NH-8 (New NH- 48) in the State of Gujarat on EPC Basis

NHAI/RO-GNR/NH‐48/Blackspot/VUP/June-2023/ 55.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 11:30Hrs
14/07/2023
Time 12:0Hrs
528 Widening to Two lane with paved shoulders from Km 106/830 to 158/496 of Yellareddy-Rudrur Section of NH-765D in the State of Telangana on Engineering, Procurement and Construction (EPC) Basis

[2023_MoRTH_755359_1 402.530 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/05/2023
Time 15:0Hrs
13/07/2023
Time 15:0Hrs
529 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_756893_1 5.260 MoRTH Maintenance Project OTHERS 08/06/2023
Time 18:30Hrs
12/07/2023
Time 15:0Hrs
530 Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I- Package-VIII)

NHAI/BM/VME/2023/Pkg8 1,403.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
531 Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I-Package IX)

NHAI/BM/VME/2023/Pkg9 970.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
12/07/2023
Time 11:0Hrs
532 Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode.

2023_MoRTH_752196_1 474.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/05/2023
Time 17:0Hrs
10/07/2023
Time 17:0Hrs
533 Widening to 2 lane with paved shoulders from Km 62/920 to Km 106/830 of Medak - Yellareddy Section of NH-765D in the state of Telangana on Engineering, Procurement and Construction (EPC) Basis

2023_MoRTH_755197_1 307.180 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2023
Time 15:0Hrs
10/07/2023
Time 15:0Hrs
534 STRENGTHENING AND WIDENING OF NH-251 FROM KM 11.000 TO KM 22.770 IN DIU. (5th Call)

Tender Notice No. 19/RFPNH251DIUan/2023-24 73.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/05/2023
Time 18:45Hrs
06/07/2023
Time 16:0Hrs
535 Construction of Tadipatri Bypass (Km 0/000 to Km 6/285) of 4 Lane on NH67 in Anantapuramu district of Andhra Pradesh state under NH(O).

2023_MoRTH_752843_1 122.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 15:40Hrs
06/07/2023
Time 15:0Hrs
536 Shifting & fixing of 24.00 M span Steel Girder Bailey Bridge in km 220 Ch. 219.400 with widening of existing road from km. 219.200 to 219.600 including widening of Railway Crossing 1- BRR at Shyampur new Rishikesh on NH-58 (New No. 34) in the State of Uttarakhand under Annual Plan 2023-24.

2023_MoRTH_758580_1 4.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/06/2023
Time 15:0Hrs
06/07/2023
Time 12:0Hrs
537 Balance work of rehabilitation and construction of Barela Mandla section of NH-30 from km 22/8 to 89/6 (length - 63.55 Km) two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2023_MoRTH_745062_1 53.940 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/03/2023
Time 17:30Hrs
05/07/2023
Time 17:30Hrs
538 Rehab and upgradation work for double lane with paved shoulder on Gangotri Dharasu road between Km 95.287 to Km 100.30 on NH 34

2023_BRO_583664_1 54.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
539 REHABILITATION & UP GRADATION OF EXISTING ROAD BETWEEN KM 86.120 TO KM 95.287 (DESIGN CHAINAGE KM 73.730 TO KM 81.800) SINGLE LANE TO DOUBLE LANE WITH PAVED SHOULDER SPECIFICATION ON GANGOTRI-UTTARKASHI-DHARASU ROAD (NH-34) ON EPC MODE IN THE STATE OF UTTARAKHAND (DESIGN LENGTH 8.07 KM)

2023_BRO_587942_1 134.440 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/03/2023
Time 15:0Hrs
04/07/2023
Time 17:0Hrs
540 Construction of Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH-26 in the state of Odisha on EPC mode

2023_MoRTH_753072_1 115.010 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/05/2023
Time 18:55Hrs
04/07/2023
Time 12:0Hrs
541 Upgradation/Strengthening of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch. 161.000 (Existing Km. 484.300) in Jitnagar Village in Nandod Taluka to Ch. 179.780 (Existing Km. 506.660) in Bitada/Movi Village in Netrang Taluka (Length 18.780 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode [Package IV (B)]

2023_NHAI_154362_1 971.850 NHAI Normal Highway Project HAM 17/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
542 Construction of Underpass at Sohal Town on Pathankot - Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode

2023_NAHI_153883_1 28.860 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 15:0Hrs
04/07/2023
Time 11:0Hrs
543 Providing Service Road on Panve lMahad Panji Road NH 66 Km. 406/030 to 450/170, Road Safety PanvelMahadPanji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EPC mode

2023_MoRTH_751367_1 3.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
544 Panvel-Mahad-Panji Road NH-66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Construction of vehicular underpass in km existing ch 466/650 at Khamdeo Naka in the village Insuli, Construction of vehicular underpass in km existing ch 450/370 at Zarap - Sawantwadi Junction, in Sindhudurg district in the State of Maharashtra on EPC Mode

2023_MoRTH_751635_1 67.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
545 Construction of Service Roads in stretches, pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332/200 to 406/030, on Panvel Mahad Panali Road NH-66 under Road Safety Annual Plan 2022-23 in the state of Maharashtra on EPC mode

2023_MoRTH_752283_1 14.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
546 Panvel-Mahad-Panji Road NH66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) Whitetoping work in stretches from Km. 450/170 to Km. 52/000 and Km. 455/330 to Km. 460/000 and Service Road of 4.09 Km. in Sindhudurg istrict in the State of Maharashtra on EPC mode.

2023_MoRTH_751715_1 38.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/06/2023
Time 15:0Hrs
03/07/2023
Time 17:30Hrs
547 Widening to 2-lane with Paved shoulders of Dornala to Kunta Junction from Design Chainage Km 244.000 to Km 267.990 (Existing Km.244.000 to 268.700) section of NH-765 (Package-2) in the State of Andhra Pradesh on EPC mode for the year 2022-23

2023_MoRTH_750753_1 180.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/04/2023
Time 15:0Hrs
03/07/2023
Time 15:0Hrs
548 Widening & strengthening to two lane with paved shoulder from Km 59/594 to 60/042 & Km 60/292 To 63/400 (Missing section of Rairangpur to Jashipur section) of NH-220 in the State of Odisha on EPC basis.(Bid Ref No 02 CE NH of 2023-24)

2023_MoRTH_752792_1 27.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/05/2023
Time 18:55Hrs
03/07/2023
Time 12:0Hrs
549 Const of 4L EC and atgrade improve from 0.0 to 19.87 of Danapur Bihta with connectivity to existing RoB 1.35 Km ramps and atgrade improvements to 4L and Upgrade of existing 2L-4L from 19.87-23.5 of Bihta Koilwar in Bihar on EPC (2nd Call)

2023_NHAI_153034_1 3,146.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/05/2023
Time 17:10Hrs
03/07/2023
Time 11:0Hrs
550 Rehabilitation -Upgradation of Karanja - Kherda - Murtizapur Section to 4 LPS from Design km 74.351 to km 102.331 (Excluding overlapping portion with Samruddhi Mahamarg from Design Km 76.380 to 78.280) section of NH 361C

2023_MoRTH_750199_1 594.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/04/2023
Time 15:0Hrs
30/06/2023
Time 17:0Hrs
551 Four Laning with paved shoulders from Km 29 00 to Km 36 25 Section of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu Road NH 703A 7 25 Kms under NH Division Jalandhar on EPC Mode in the State of Punjab for the year 2022 23

2023_MoRTH_745933_1 48.270 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 15:30Hrs
30/06/2023
Time 11:0Hrs
552 Short term maintenance under OR (DPP) works for removal of land slide materials and soft rock cutting etc in hilly region & cutting of road side Jungle and clearance of drain & blocked Culvert from km 0.00 to km 77.00 of NH 110(Old NH-55) under NH Division -IX during the year 2022-2023 (Job No. TA/110/WB/2022-23/814). (2nd Call).

2023_MoRTH_756527_1 2.292 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/06/2023
Time 9:5Hrs
28/06/2023
Time 17:0Hrs
553 Widening to two lane with paved shoulder of Chintoor to Motu section of NH326 from km 0 to Km 9.6 Design Chainage KM 0 to Km 8.345 in the state of AP on EPC mode under Annual Plan 2022-23

SENHVJA/27/2023-24 Dated.28.02.2023 84.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
28/06/2023
Time 15:0Hrs
554 Construction of Dadwindi realignment starting from existing Km 36 250 and terminating at existing Km 38 650 including 2 lane ROB on NH 703A on EPC mode in the State of Punjab

2023_MoRTH_748334_1 67.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 1:0Hrs
28/06/2023
Time 11:0Hrs
555 PR Work FROM K.M. 139 TO 157/6 ON NH-934 SAGAR-BINA ROAD (TOTAL LENGTH 17.320 KM) EXCEPTING 1.22 KM. ROB PORTION in the State of Madhya Pradesh on EPC Mod

2023_MoRTH_739573_1 13.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
556 P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode

2023_MoRTH_739570_1 7.050 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 17:30Hrs
27/06/2023
Time 17:30Hrs
557 Rehabilitation and upgradation of existing road between Km 29.725 to Km 60.55 Suraithota Malari NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_562362_1 191.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 17:0Hrs
26/06/2023
Time 18:0Hrs
558 HILL SLOPE STABILIZATION AT KM 14.00,17.50,17.700,76.00 & KM 76.300 ON ROAD BANDIPORA-GUREIZ UNDER PROJECT BEACON IN J&K (UT) (EPC MODE)

CE (P) BCN/05/2023-24 23.120 BRO Special Project EPC (Lump Sum/Item Rate Contract) 17/06/2023
Time 10:0Hrs
24/06/2023
Time 15:0Hrs
559 Construction of ROB at Railway in line of LC165B km 921.450 Between Chondi Basmat Bhendegaon Stations Chainage at 60.780 Length from Km 60.179 to 61.278 1.099 km in the State of Maharashtra on EPC Mode

2023_MoRTH_749558_1 44.620 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:0Hrs
23/06/2023
Time 17:30Hrs
560 Maintenance of NH NH 28B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758180_1 1.520 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
561 Maintenance of NH 227A, NH 727A and NH 727B under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758190_1 1.900 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
562 Maintenance of NH 328 and NH 730S under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Gorakhpur in the State of Uttar Pradesh

2023_MoRTH_758197_1 1.960 MoRTH Maintenance Project OTHERS 17/06/2023
Time 15:0Hrs
23/06/2023
Time 15:0Hrs
563 Treatment of sinking zOne in Kaladhungi-I(69.880 to 69.980),Kaiadhungi-II (70.540 to 70.610) & Rampur(71.440 to 71.520) of NH-109(New NH-107)in the State of Uttarakhand under Annual Plan 2022-23

2023_MoRTH_753584_1 55.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
22/06/2023
Time 12:0Hrs
564 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from Design Ch 0/0 to 58/115 to two lane with paved shoulder configuration in the state of Gujarat total length 58/115 Km

754715 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/05/2023
Time 16:0Hrs
22/06/2023
Time 12:0Hrs
565 One Time Improvement of existing carriageway in Deoli Town with white topping (Length 3.200 Km.) on Yavatmal to Wardha Section of NH-361 in the State of Maharashtra on EPC Mode

2023_NHAI_152877_1 24.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/06/2023
Time 13:0Hrs
20/06/2023
Time 11:0Hrs
566 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_751503_1 35.374 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/05/2023
Time 18:15Hrs
20/06/2023
Time 11:0Hrs
567 Construction of Four Lane Greenfield National Highway in the State Of Bihar Starting From NH-30 Near Saristabad (Patna) To Nathupur (Project End Point of Patna-Gaya-Dobhi Section of NH-83) [2.8km] To Connect Missing Link of Patna-Gaya-Dhobi Corridor in the State of Bihar on EPC Mode

2023_NHAI_148546_1 124.180 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 10/03/2023
Time 18:55Hrs
19/06/2023
Time 17:0Hrs
568 providing Road safety and flood damage repair from Km 54 00 to 60 800 on Jalandhar Kapurthala Sultanpur Lodhi Dadwindi Lohian Makhu Road NH 703A in the state of Punjab on EPC Mode

2023_MoRTH_747129_1 13.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 12:30Hrs
19/06/2023
Time 11:0Hrs
569 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat

2023_MoRTH_754522_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 16:0Hrs
17/06/2023
Time 16:0Hrs
570 Strengthening of NH 68 from Km 297.100 to 307.515, 328.257 to 329.600, 346.700 to 369.700 and 387.700 to 407.700 Section Khoda border- Mesra road, Budhanpur-Tharad road, Vav-Suigam road and Uchosan-Bhabhar-Ujjanwada Road in the State of Gujarat.

2023_MoRTH_755199_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/05/2023
Time 15:0Hrs
17/06/2023
Time 15:0Hrs
571 MAINTENANCE OF SELECTED STRETCHES OF JALGAON – BHADGAON-CHALISGAON ROAD OF NH 753 J FROM KM 04/000 TO 103/000 WHERE LA IS DELAYED ON REALIGNMENT PORTIONS ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747066_1 8.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
16/06/2023
Time 17:30Hrs
572 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand

2023_MoRTH_749211_1 4.210 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/05/2023
Time 15:0Hrs
15/06/2023
Time 12:0Hrs
573 Rehabilitation & Upgradation of Risod Town to Four Lane with Paved Shoulders standards from Km. 36/845 to Km. 39/340 & Km. 41/520 to Km. 44/220 (Total Length = 5.2 KM) of NH 461B in the state of Maharashtra on EPC mode.

2023_MoRTH_749282_1 82.950 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/04/2023
Time 10:30Hrs
14/06/2023
Time 17:30Hrs
574 Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode

2023_NHAI_143889_1 46.470 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 9:0Hrs
14/06/2023
Time 11:0Hrs
575 (2nd Attempt) Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH-47 in the State of Gujarat

2023_MoRTH_747875_2 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/06/2023
Time 12:0Hrs
13/06/2023
Time 12:0Hrs
576 Strengthening of existing 2-Lane road from Km 24.00 to 41.00 of NH-144 of Domail – Katra – Reasi – Bhambla road in District Reasi in UT of Jammu & Kashmir on EPC mode LENGTH 17.00 KMS.

Bid/Job No. NH-144-J&K-2022-23-116 dated 22.05.2023 23.185 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
577 Improvement of Riding Quality Programme IRQP of existing 2-Lane road from Km 41.000 to 67.500 of NH-144 of Domail – Katara – Reasi – Bhambla road in District Reasi in UT of Jammu Kashmir on EPC mode under Annual plan for the year 2022-23 LENGTH 26.50 KMS

Bid/Job No. NH-144-J&K-2022-23-117 dated 22.05.2023 26.218 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/05/2023
Time 10:0Hrs
12/06/2023
Time 16:0Hrs
578 Maintenance of NH 730B, NH 730A, NH 731K under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 in the State of Uttar Pradesh

2023_MoRTH_754356_1 1.580 MoRTH Maintenance Project OTHERS 22/05/2023
Time 15:0Hrs
12/06/2023
Time 15:0Hrs
579 Rehabilitation Upgradation to 4 lane with paved shoulder of Existing Section in Sillod Town with Design Ch. Km. 54.500 to Km. 60.679 Length 6.179 Km. Section of NH.753 F Aurangabad Jalgaon road on EPC Mode in the state of Maharashtra.

2023_MoRTH_748054_1 112.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
09/06/2023
Time 17:30Hrs
580 Rehabilitation of the distressed Bridge at Gandhigram across Purna river on Akola Akot Road NH 161 A in the state of Maharashtra

2023_MoRTH_748892_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2023
Time 10:30Hrs
08/06/2023
Time 17:30Hrs
581 Upgradation and Widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(2nd call)

Tender Notice No. 01/RFP848BDaman/2023-24 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 12:0Hrs
08/06/2023
Time 14:0Hrs
582 Upgradation and widening of NH-848B From Ch. 8 plus 180 to Ch. 12 plus 000 and Ch. 14 plus 100 to Ch. 20 plus 300 at Daman.(EPC MODE)

Tender Notice No.126/2022-23 56.020 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/02/2023
Time 17:30Hrs
08/06/2023
Time 14:0Hrs
583 Balance works of Rampur-Kathgodam Section of NH-87 from km 42.791 (Design Chainage km 43.446) to km 88.00 (design Chainage km 93.226) (Package-II) in the State of Uttarakhand on EPC Mode

NHAI/Tech/UKD/BW/RK-II/2022 273.090 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/06/2022
Time 17:30Hrs
08/06/2023
Time 11:0Hrs
584 Construction of ROB with approaches from km 79.400 to 81.200 of Rampur - Kathgodam section of NH-87 [New NH No. 109 [Package-II] in the state of Uttarakhand under NHDP Phase-III on EPC Mode

NHAI/Tech/UKD/BW/RK-II/ROB/2023 58.320 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 18:0Hrs
08/06/2023
Time 11:0Hrs
585 Construction of (i) White Topping on the existing bituminous carriageway & service Road from km. 381.000 to km 502.000 (ii) VUP with service road at Delhi Darbar Km.499.150 (20m x 5.5m) (iii) VUP with service road at Panduranwadi Km 501.250 (20m x 4.5m) (iv) LVUP with service road at Sativali Km.454.180 (12m x 4.0m) & (v) Safety measures on Surat-Dahisar Section of NH-48 in the State of Maharashtra on EPC Mode

2023_NHAI_146145_1 621.260 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
08/06/2023
Time 11:0Hrs
586 Construction of Major Bridge on Painganga River at design chainage from Km. 52/685 to 52/785 on NH 548CC along with approaches of 1130m (Total Length = 1230m) of National Highway Mehkar-Chikhli-Khamgaon (Section Chikhli -Khamgaon) Road on EPC mode in the state of Maharashtra

2023_MoRTH_747294_2 26.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 10:30Hrs
07/06/2023
Time 17:30Hrs
587 CONSTR OF RD TANGTSE TO KELA TSO KM 0.000 TO KM 12.500 (TAKEN TANGTSE AS KM 0.000) TO NHDL SPECS INCDL MINOR BRS AND THEIR APPROACH UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 12.500 KM)

2023_BRO_590969_1 82.880 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/04/2023
Time 18:0Hrs
07/06/2023
Time 11:0Hrs
588 CONSTRUCTION OF 01 MAJOR BRIDGE & 05 MINOR BRIDGE ON MANGALWEDHA UMDAI SECTION ( FROM SC.96/00 TO 123/100) IN SANGALI DISTRICT IN THE STATE OF MAHARASHTRA ON EPC MODE

2023_MoRTH_749885_1 43.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 10:0Hrs
05/06/2023
Time 17:30Hrs
589 STRENGTHENING AND WIDENING TO SECTION KUSUMBA TO DONDAICHA OFNH-160H IN KM 42/00 TO 97/00 DESIGN CHAINAGE KM 43/375 TO 98/241 (LENGTH=54.866 KM) ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747115_1 92.500 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
590 STRENGTHENING TO MALEGAON KUSUMBA DONDAICHA TO JUNCTION OF NH 752G NEAR SHAHADA ROAD NH 160H IN KM. 98/00 TO 125/00 ON EPC MODE IN THE STATE OF MAHARASHTRA

2023_MoRTH_747138_1 29.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:30Hrs
05/06/2023
Time 17:30Hrs
591 Construction of New 2 lane Major bridge length 144 m. on Terna River at km. 227.311 design ch. 20.890 along with approaches on Mantha Latur Omerga Nagansur section of Nh 548B on EPC mode in the state of Maharashtra

2023_MoRTH_746703_1 26.800 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
592 Widening and Strengthening to Borgaon Kale to Murud Akola Section 1 from km. 61.800 to 72.900 length 11.10 km. section on NH 63 to 2 lane configuration and Latur Airport Junction to Mahila Polytechnic section 2 from km. 78.900 to 86.850 length 7.95 km. section of Nh 63 to 4 lane configuration total project length 19.05 km. in the state of Maharashtra

2023_MoRTH_746673_1 72.450 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
593 Rehabilitation and Upgradation of Kopra to Gharola km. 76.350 to 102.350 section of NH 752K Total project length 26.00 km. to 2Lane 4Lane configuration on EPC mode in the state of Maharashtra

2023_MoRTH_746653_1 105.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
594 Widening and Strengthening to Yedshi to Jawale section of NH 63 from km 20.350 to 24.350 length 4.00 km. to 2lane confifuration in the state of Maharashtra

2023_MoRTH_746804_1 8.004 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 16:0Hrs
05/06/2023
Time 17:30Hrs
595 DESIGN AND CONS OF UNI-DIRECTIONAL TWIN TUNNELS AT SHINKUN LA PASS OF LENGTH 4.1 KM (APPROX LENGTH) INCL CIVIL AND ELEC/ MECHANICAL WORK ALONG WITH APPROACHES CONNECTING DARCHA-PADAM HIGHWAY TO NHDL SPECS IN HIMACHAL PRADESH AND THE UT OF LADAKH

2023_BRO_582500_1 1,504.640 BRO Special Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 17:30Hrs
03/06/2023
Time 11:0Hrs
596 SLOPE REHABILITATION WORKS (SRW) AT KM 96.000 ON ROAD BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_590218_1 29.510 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/04/2023
Time 15:0Hrs
02/06/2023
Time 15:0Hrs
597 Providing and laying Crash Barrier for Road Safety in Nagrota Bagwan Ranital Mubarikpur road Km 5 to 18 of NH 20A New NH 303 in the State of H.P

2023_MoRTH_749523_1 6.760 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/04/2023
Time 18:0Hrs
02/06/2023
Time 11:0Hrs
598 OR(DPP) to Pathri-Sonpeth-Injegaon Road NH-548 B from km.58/200 to 83/700 (Length 25.5km) in the State of Maharashtra. (Filling pot hole by MPM & OGC)

2023_MoRTH_753065_1 2.800 MoRTH Maintenance Project OTHERS 12/05/2023
Time 17:0Hrs
01/06/2023
Time 17:0Hrs
599 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh (3rd call)

2022_MoRTH_720387_3 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/04/2023
Time 15:0Hrs
31/05/2023
Time 17:30Hrs
600 Maintenance of NH 730 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Division, PWD, Siddharthnagar in the State of Uttar Pradesh.

2023_MoRTH_753205_1 1.570 MoRTH Normal Highway Project OTHERS 15/05/2023
Time 15:0Hrs
31/05/2023
Time 15:0Hrs
601 Construction of LVUP Design Ch.117.920, LVUP and other related works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana on EPC Mode

2023_NHAI_151140_1 17.940 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 15:0Hrs
31/05/2023
Time 11:0Hrs
602 Repair/ Rehabilitation of 6 (Six) number Bridges i.e Leesh bridge, Gheesh bridge, Chell bridge, Mal bridge, Newra bridge, New Zarda bridge at km 607.151, km 611.920, km 614.775, km 628.720, km 630.895 & km 672.830 respectively on NH-17 (Old NH-31) under NH Division-IX in the district of Jalpaiguri West Bengal during the year 2022-2023. (Job No. 17/WB/2022-23/ 516).

2023_MoRTH_748126_1 12.119 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 10:0Hrs
30/05/2023
Time 17:0Hrs
603 4/6 Lane of Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from Km.70.830 to Km.115.400 – Treatment of 2 Nos. of Potential Blackspot locations (1) Karera Khurd, Yamunanagar at km.78.520 and (2) Thana Chapper, Yamunanagar at km.101.228 in the State of Haryana on EPC mode

2023_NHAI_150330_1 33.210 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
30/05/2023
Time 11:0Hrs
604 Construction of 2 new ROBs in parallel in lieu of LC-6 at Km 284/3-4 along with LA for approaches on Daund Manmad railway line (DD-MNR) Crossing at Ch 116/700 of NH-548D near Limpangaon on Talegaon Shikrapur Nhavara Shrigonda Jamkhed Road in Ahmednagar District in the State of Maharashtra on EPC Mode.

2023_MoRTH_743698_1 73.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
605 Construction of Major Bridge including construction of approach road & RCC gutter on Sina River at km 214.180 Kalyan Ahmednagar Pathardi road NH-61 (Old NH-222) in the State of Maharashtra

2023_MoRTH_748428_1 23.420 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2023
Time 17:30Hrs
29/05/2023
Time 17:30Hrs
606 Construction of Mariahu bypass with four lane with paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_743986_1 210.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 18:30Hrs
27/05/2023
Time 15:0Hrs
607 SLOPE REHABILITATION WORKS (SRW) FROM KM 56.490 TO KM 56.600 ON ROAD ON BALIPARA – CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE

2023_BRO_589058_1 34.060 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 9:0Hrs
26/05/2023
Time 12:0Hrs
608 CONSTRUCTION OF ROAD MANALI-SARCHU-LEH TO NHDL SPECIFICATIONS FROM DESIGN CHAINAGE KM 244.000 TO KM 268.670 ON NH-03 (TAKEN MANALI AS KM 0.000) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 24.670 KM)

2023_BRO_586320_1 346.400 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 18:0Hrs
26/05/2023
Time 11:0Hrs
609 Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH 2 from Km 215 to Km 230 and from Km 280 to 295 as per Crash Vulnerability Audit Report on EPC Mode

2022_NHAI_138534_1 95.870 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 9:0Hrs
24/05/2023
Time 11:0Hrs
610 Construction of 4laning of Kishanganj Bahadurganj rd sec starting from NH (NH31) near Uttar Rampur (Km. 0.000) and terminating at NH327E near Satal Istamarar Bahadurganj (Km. 22.719) under BMP in Bihar on HAM

2022_NHAI_122794_1 747.480 NHAI Special Project HAM 18/07/2022
Time 18:5Hrs
22/05/2023
Time 17:0Hrs
611 CONSTRUCTION OF 50 MTR CAVERN AND 21M APPROACH TUNNEL WITH PORTAL AT ONE END AT GENERAL AREA HANLE UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_589608_1 20.250 BRO Special Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 18:0Hrs
22/05/2023
Time 12:0Hrs
612 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat.

2023_MoRTH_752674_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/05/2023
Time 18:55Hrs
22/05/2023
Time 11:0Hrs
613 Construction of Balance Works (i) Pedestrian Underpass at Km.514.960 including approaches, both side service road, (ii) Bus lay bay, bus shelter, (iii) Drain from Km.514.660 to Km.515.087 on both sides and (iv) Junction at Km.514.960 on 4-laned Wardha - Butibori section of NH-361 [Km.465.500 to Km.524.690 in the state of Maharashtra on EPC Mode

2023_NHAI_150589_1 15.150 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 18:30Hrs
22/05/2023
Time 11:0Hrs
614 CONS OF ROAD K-N-S FROM EXISTING TRACK TO NHSL SPECS FROM DESIGN CHAINAGE KM 20.000 TO KM 38.765 (TAKEN KARZOK AS KM 0.000) INCL TWO MAJOR BRIDGES OF SPAN 400 MTR (50 MTR x 8) AND 275 MTR (55 MTR x 5) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 18.765 KM)

2023_BRO_588309_1 148.550 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 18:0Hrs
20/05/2023
Time 11:0Hrs
615 Construction of ROB and their Approaches at Km 99 4 LC Gate No 503 Spl A 3 E of NH 744 Old NH 208 of Kollam Thirumangalam Road

2023_MoRTH_747027_1 35.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 17:25Hrs
19/05/2023
Time 11:0Hrs
616 Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul- Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra on EPC Mode

2023_MoRTH_747270_1 14.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/04/2023
Time 15:0Hrs
17/05/2023
Time 17:0Hrs
617 Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode

2023_NHAI_143784_1 347.640 NHAI Maintenance Project EPC (Lump Sum/Item Rate Contract) 02/02/2023
Time 15:0Hrs
17/05/2023
Time 11:0Hrs
618 Road Safety work from Km 0.000 to Km 38.600 of NH-124C (Tarighat-Bara Road) on EPC Mode in the State of Uttar Pradesh under Road Safety 2022-2023(2nd Call)

2023_MoRTH_749250_1 4.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
619 Oridinary repairs from Km 158/0 -160/4 & Km 167/850 -168/785 of NH 209 (Dindugal – Bangalore Road ) under OR (DPP) in the state of Tamil Nadu

2023_MoRTH_748941_1 0.320 MoRTH Maintenance Project OTHERS 12/04/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
620 Periodical Renewal from Km 27/6 – 29/2 of NH 181 (Coimbatore to Gundlupet Road) under Annual Renewal Programme (ARP) for year 2022-23 in the State of Tamil Nadu

2023_MoRTH_747472_1 4.480 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
15/05/2023
Time 15:0Hrs
621 Rehabilitation of Sabarmati Major Bridge (Shastri Bridge) between Km. 4/800 to 5/318 on NH No.47 in the state of Gujarat.

2023_MoRTH_747875_1 5.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 9:0Hrs
15/05/2023
Time 12:0Hrs
622 Protection of Embankment with Toe Wall and concrete drain in Nagzari Village portion from km 7.300 to 8.200 Length 900m on MehkarChikhali Road of NH 548 CC in the state of Maharashtra.

2023_MoRTH_747328_1 1.340 MoRTH Normal Highway Project OTHERS 29/03/2023
Time 10:30Hrs
12/05/2023
Time 17:30Hrs
623 Treatment of landslide zone 11 location from km 101.01 to km 191.365 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_747123_1 26.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/03/2023
Time 13:0Hrs
11/05/2023
Time 11:0Hrs
624 Stabilisation of 09 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_586685_1 61.600 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/03/2023
Time 18:0Hrs
10/05/2023
Time 18:0Hrs
625 Construction to Two laning with paved shoulder of Daudnagar Bypass Nasriganj Bypass and Dawath Bypass of NH 120 in the State of Bihar on EPC Mode.

2023_MoRTH_747561_1 47.130 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/03/2023
Time 15:0Hrs
10/05/2023
Time 15:0Hrs
626 Construction of Steel Truss Bridge at Km. 1.700, 2.450, 3.300 and 3.900 over Sidhwan Canal on 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.000 to Km 17.041 in the State of Punjab on EPC mode

2023_NHAI_150025_1 19.130 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/03/2023
Time 15:0Hrs
10/05/2023
Time 11:0Hrs
627 Construction Of Balance Works Of Four Laning Of Vijayawada – Machilipatnam Section of NH-65 And Overlay On Existing Bypassed Sections (Old NH-9) In The State Of AP On EPC Mode

NHAI/NH-65/ VIJ-Machilipatnam/Bal Works/2023 30.030 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/03/2023
Time 11:0Hrs
09/05/2023
Time 11:0Hrs
628 Up-gradation to four lane- two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15.200 to Km 38.00 and from Km. 58.00 to Km 84.00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra.

2023_MoRTH_737532_1 625.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 14:0Hrs
08/05/2023
Time 17:0Hrs
629 RFP for the Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH- 76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of Uttar Pradesh

2023_MoRTH_742875_1 174.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:55Hrs
08/05/2023
Time 15:0Hrs
630 Construction to 2 lanes with Paved Shoulder of Jandaha Bypass of NH 103 NH 322 in CH 0.000 existing km 30 of NH 103 to CH 4.800 existing Km 35 of NH 103 in the State of Bihar for the Year 2022 23.

2023_MoRTH_746266_1 41.750 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/03/2023
Time 17:0Hrs
04/05/2023
Time 17:0Hrs
631 Improvement of the stretch from km 597.00 to km 598.00 of NH-31 by providing Mastic Asphalt wearing course, Construction of New Five Numbers of Culverts including valley / hill side protective work & Restoration of rain damaged embankment by Construction of guard wall at km 598.900 under NH Division No-IX in the District of Kalimpong in the State of West Bengal during the year 2022-23 in EPC Mode (Job No.17/WB/2022-23/513).

2023_MoRTH_747286_1 7.196 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/03/2023
Time 15:0Hrs
04/05/2023
Time 17:0Hrs
632 Short term maintenance from Km 0/0 0/8, 60/200 60/450, 64/280 64/695 and 110/942 111/152 of Cuddalore Vridhachalam Salem Road (NH 532) under OR (DPP) in the state of Tamilnadu

2023_MoRTH_749382_1 2.000 MoRTH Maintenance Project OTHERS 17/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
633 Maintenance of NH 730B, NH 730A, NH 731K , NH 334DD , NH 730H, NH 727H under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Bareilly in the State of Uttar Pradesh

2023_MoRTH_749181_1 1.920 MoRTH Maintenance Project OTHERS 13/04/2023
Time 15:0Hrs
04/05/2023
Time 15:0Hrs
634 Geometric improvement of NH 327E at Bhargama and Sukela More including Provislon of Raniganj Bypass in the State of Bihar for the Year 2022 23.

2023_MoRTH_745855_1 60.254 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
03/05/2023
Time 17:0Hrs
635 Construction of Trumpet Interchange Connecting Bangalore Chennai Green Field Expressway from Km 261/705 to Km 263/010 with Maduravoyal to Wallajapet Section of NH48 near Sriperumbudur toll plaza at Km 35/700 in state of Tamil Nadu under Bharatmala on EPC Mode

147642 122.030 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/03/2023
Time 15:0Hrs
03/05/2023
Time 11:0Hrs
636 Design and Construction of Vehicular Underpass with approaches at Khodad Junction Km 78 600 and Ambikhalsa Junction Km 113 150 on Khed Sinnar section of NH 60 Old NH 50 in the State of Maharashtra as Standalone project on EPC Mode

2023_NHAI_148149_1 40.900 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/03/2023
Time 9:0Hrs
03/05/2023
Time 11:0Hrs
637 Construction of 3 Nos. of standalone structures at 3 nos. of locations (i.e. (i) Flyover at 10th Mile Junction at Ch. 401.730 (ii) VUP at DRDO at Ch. 403.600 (iii) VUP at Ambebahula Junction at Ch. 429.120) on Pimpalgaon-Nashik-Gonde (Km 380.000 - Km 440.000) section of NH-3 in the state of Maharashtra on EPC Mode

2023_NHAI_147395_1 161.370 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 18:0Hrs
03/05/2023
Time 11:0Hrs
638 Construction of bypass to Bagalur town branching from Km.3/0 (Kothapalli) and joining at km 9/350 (Jee Mangalam) including Shifting of Utilities of NH 207 (New NH 648) on Engineering, Procurement & Construction (EPC) Basis Contract in the state of Tamilnadu

2023_MoRTH_744221_1 47.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
639 Widening from two lane with paved shoulder to four lane with paved shoulder and improvements from km 26/5 - 34/2, Km 35/6 - 40/2, Km 42/2 - 53/2, Km 55/8 - 56/2, Km 58/7 - 61/2, Km 76/6 - 81/3 and widening from two lane with paved shoulder to four lane with paved shoulder from Km 40/2 - 42/2, Km 53/2 - 55/8, Km 61/2-66/7, Km 67/2 - 72/4, improvements from Km 34/2 – 35/6 including CD works of NH 81 (Coimbatore – Chidambaram) (Old NH-67) (Nagapattinam – Trichy -Coimbatore - Gudalur) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the state of Tamil Nadu

2023_MoRTH_744953_1 206.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 10:0Hrs
02/05/2023
Time 15:0Hrs
640 Work of PR IRQP between km 14/130 to km 16/930 Nadiad Bypass section of NH 848K and and km 104/920 to 108/200 in selected length of NH 64 under NH division Vadodara,Road and Building department in the state of Gujarat

2023_MoRTH_748110_1 9.229 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/04/2023
Time 15:0Hrs
02/05/2023
Time 15:0Hrs
641 Strengthening work from Km. 37 to 70 on NH107(A) under Annual Plan of NH(O) 2022-2023 in the State of Uttarakhand

2023_MoRTH_748291_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
642 Slope Protection Measures (CH.7.590 Km to 7.690 Km Near Medanpur and CH.35.210 km to 35.265 km near Kund Barrage Along Rudraprayag - Gaurikund Road, NH-107) Under Annual Plan 2022-23 in the state of uttarakhand

2023_MoRTH_748300 20.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/04/2023
Time 15:0Hrs
02/05/2023
Time 12:0Hrs
643 Up-gradation to 4 lane configuration for the work of Peth Naka to Sangli Road (Km 0.000 to 41.250 Km) (Length = 41.250 km) section of NH-166H in the state of Maharashtra on EPC mode.

2023_MoRTH_735470_1 596.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 17:0Hrs
27/04/2023
Time 17:0Hrs
644 Repair and rehabilitation work of Major Bridge over Ghaghra River and its approaches in Km.- 56.000 and Km.57.000 and Major Bridge over Kuwano river in Km. 42.000 on NH 328A in Uttar Pradesh under Road Safety 2022 2023.

2023_MoRTH_748498_1 3.800 MoRTH Normal Highway Project OTHERS 07/04/2023
Time 14:0Hrs
27/04/2023
Time 12:0Hrs
645 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 593 on EPC mode under Bharatmala Pariyojana in the State of TamilNadu Package 1 Km 0 342 to Km 4 604

122527 987.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:35Hrs
26/04/2023
Time 11:0Hrs
646 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0 342 to Km 20 223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 2 Km 4 604 to Km 9 700 on EPC mode

122532 1,179.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:0Hrs
26/04/2023
Time 11:0Hrs
647 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 3 km 9.700 to Km 14.185

122540 946.370 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
648 Construction of New Double Tier 4 lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu Package 4 km 14.185 to Km 20.223

122542 823.090 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 16:20Hrs
26/04/2023
Time 11:0Hrs
649 Strengthening of NH 68 Bet. Km 297/100 to 307/515, 328/257 to 329/600, 346/700 to 369/700 and 387/700 to 407/700

2022_MoRTH_719704_1 73.640 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 11:0Hrs
25/04/2023
Time 16:0Hrs
650 Improvement of existing alignment of Pandharpur Town (Part bypassed section) from Wakhari to Lord Vitthal Temple (Length – 8 km) in the State of Maharashtra on EPC Mode

NHAI/RO/MUM/PANDR/TOWN/OTI/26 114.750 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 11:0Hrs
25/04/2023
Time 11:0Hrs
651 Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH-136) under OR (DPP) 2022-23 in the State of Tamilnadu.

2023_MoRTH_745731_1 5.260 MoRTH Normal Highway Project OTHERS 17/03/2023
Time 15:0Hrs
24/04/2023
Time 15:0Hrs
652 Upgradation and strengthening to 2 lane PS from Km. 95.500 to km. 129.775 of NH 168G Idar Bhiloda Samlaji Section in the State of Gujarat Length 34.275 Km Job No. 168 GJ 2022 23 687

2022_MoRTH_732387_1 177.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 12:0Hrs
24/04/2023
Time 12:0Hrs
653 Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125 (New NH-09) in the State of Uttarakhand under EPC mode

2023_MoRTH_744572_1 53.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
654 Treatment of landslide zone 11 location from km 168.605 to km 191.970 on NH-125 (New NH-09) in the State of Uttarakhand

2023_MoRTH_744588_1 42.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 11:0Hrs
24/04/2023
Time 11:0Hrs
655 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_748247_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/04/2023
Time 17:30Hrs
24/04/2023
Time 11:0Hrs
656 Construction/Widening of Structures i.e., MJB, MNB, ROBs, LVUP etc. rectification of drainage and rain cuts and other works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.

2023_NHAI_148697_1 551.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/03/2023
Time 15:0Hrs
24/04/2023
Time 11:0Hrs
657 OR DPP Renapur - Ashtamode (NH - 361) - Udgir - Degluí (NH101) - Adampur phata (NH101) - khatgaon - Sagroli - Bodhan - Nizamabad (NH63) Telgana State Border Section from Raavi to Gojegaon of NH- 63 km 208/700 to km 221/700 in the State of Maharashtra. 3rd call.

2023_MoRTH_749201_1 1.450 MoRTH Maintenance Project OTHERS 13/04/2023
Time 9:0Hrs
22/04/2023
Time 17:30Hrs
658 WIDENING FROM TWO LANE WITH PAVED SHOULDER TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 0/8 – 17/6, 18/0 – 25/0, 25/500 – 27/900, 29/6 – 34/0 & KM 39/0 – 50/570 AND STRENGTHENING IN KM 17/6 – 18/0, 25/0 – 25/5, 27/9 – 29/6, AND WIDENING FROM FOUR LANE TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHENING IN KM 34/0 – 39/0 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF STORM WATER DRAIN INCLUDING WIDENING AND RECONSTRUCTION OF CD WORKS AND ADDITIONAL BRIDGE AT KM 39/8 OF NH 532 (CUDDALORE – VRIDHACHALAM – SALEM ROAD) ON ENGINEERING, PROCUREMENT &CONSTRUCTION (EPC) BASIS CONTRACT IN THE STATE OF TAMIL NADU

2023_MoRTH_743817_1 206.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 19:15Hrs
19/04/2023
Time 15:0Hrs
659 CONSTRUCTION OF NELYA – PT 4340 – RING CONTOUR ROAD FROM KM 0.000 (STARTING POINT MANDIR TIKRI) TO KM 16.275 (RC POST) (APPROX NET LENGTH 16.275 KMS) AND ADDITIONAL LINK TO PT 4340 OF 0.950 KM TO NHSL SPECIFICATION UNDER 42 BRTF/PROJECT VARTAK IN ARUNACHAL PRADESH STATE IN EPC MODE

2023_BRO_584467_1 147.090 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/03/2023
Time 11:30Hrs
19/04/2023
Time 12:0Hrs
660 Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Lambasingi to Paderu section (Km 205.000 to Km 253.010) of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode

2023_WBRTH_740575_1 282.880 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
661 Rehabilitation and Upgradation to 2-lane configuration of Karnohal-Kalwahn section (Km 181.000 to Km 208.950) of NH-70 in the State of Himachal Pradesh under GNHCP on EPC Mode

2023_WBRTH_740593_1 196.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 18:0Hrs
18/04/2023
Time 17:0Hrs
662 Stabilisation of 04 Nos land slides on Rishikesh Joshimath Mana road NH 107

2023_BRO_584359_1 50.380 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:30Hrs
17/04/2023
Time 18:0Hrs
663 Stabilisation of 08 Nos land slides on Rishikesh Dharasu road NH 34

2023_BRO_583075_1 70.170 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/03/2023
Time 15:0Hrs
17/04/2023
Time 18:0Hrs
664 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_1 7.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 17:30Hrs
17/04/2023
Time 17:30Hrs
665 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/808).

2023_MoRTH_742772_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 16:0Hrs
17/04/2023
Time 14:0Hrs
666 CONSTRUCTION OF SEVEN FOBS BETWEEN KM. 307.700 AND KM. 364.000 ALONG WITH RCC CRASH BARRIER OF 600M LENGTH AT KM. 336.550 ON SURAT VAPI SECTION OF NH 48 IN THE STATE OF GUJARAT

2023_NHAI_141852_1 14.070 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/01/2023
Time 11:0Hrs
17/04/2023
Time 11:0Hrs
667 Periodic Renewal Work in km. 21.627 to km. 34.000 of NH-328A in the State of Uttar Pradesh on EPC Mode.

2023_MoRTH_746541_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/03/2023
Time 17:0Hrs
11/04/2023
Time 12:0Hrs
668 IRQP to newly declared NH151K btn km 67.60 to 83.60 and km 88.60 to 112.8 and km 124.8 to 134.69 section Tran Patiya Jamjodhpur Kalavad road and road safety items btn km 45.4 to 134.69 in the state of Gujarat for the year 2022.23 total length 50.09 km

2023_MoRTH_745852_1 29.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/03/2023
Time 9:0Hrs
11/04/2023
Time 12:0Hrs
669 Construction of LVUP of size 12m x 4m for full width of ROW between two parcels of land allotted for IISER, Tirupati campus at km 504.850 in Penchalkona to Yerpedu section from km 425.400 to km. 509.400 of NH-565 in the State of Andhra Pradesh on EPC Mode

NHAI/RO-VJA/PIU-TPT/NH-565/P-Y/IISER/Works/2023 4.430 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/02/2023
Time 19:0Hrs
11/04/2023
Time 11:0Hrs
670 Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh

2022_MoRTH_720387_2 7.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/03/2023
Time 17:30Hrs
10/04/2023
Time 17:30Hrs
671 RFP for the Construction of Gilaula bypass with two lane with paved shoulder configuration starts near km. 281.930 of NH-730 and ends near Km. 284.900 of NH-730 (Design length- 3.510 km) on EPC mode in the State of Uttar Pradesh.

2023_MoRTH_742093_1 24.260 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 15:0Hrs
10/04/2023
Time 15:0Hrs
672 PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 20221-23 EPC Mode

2023_MoRTH_739775_1 23.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
673 Work of reconstruction of 2 no minor bridge in place of old weak narrow and minor bridge identified at km 69 900 and at km 130 521 of NH51 and construction of diversion road for major bridge at km 81 400 in the state of Gujarat under road safety annual plan 2022 23

739283 6.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/04/2023
Time 12:0Hrs
674 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER OF SARAIGARH ON NH 327A LALGANJ GANPATGANJ UPTO NH 106 NEW NH 131 FROM KM 0.000 TO KM 10.672 TOTAL LENGTH 10.672 KM OF NH 327AD ON EPC MODE IN THE STATE OF BIHAR

NIT NO 02EPC/NH-MADHEPURA/2022-23 NO 02EPC/NH-MADHEPURA/2022-23 83.100 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/02/2023
Time 19:0Hrs
10/04/2023
Time 11:0Hrs
675 Rehab existing road between Km 0 to Km 29.30 on Gangotri Dharasu road NH 34

2023_BRO_581993_1 235.080 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/02/2023
Time 18:0Hrs
05/04/2023
Time 11:0Hrs
676 Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode

2023_MoRTH_744116_1 4.740 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/03/2023
Time 15:0Hrs
04/04/2023
Time 12:0Hrs
677 Widening to 2 Lane with Hard shoulder configuration of Mana Ch 0.00 to Mana Pass Ch 50.987 road on NH-07 under Bharatmala Pariyojana in the State of Uttarakhand Length 50.987 on EPC mode

2023_MoRTH_740815_1 423.610 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/02/2023
Time 10:0Hrs
03/04/2023
Time 17:0Hrs
678 IRQP Work of NH 131A from km 1.900 to km 29.120 Existing Portion in the State of Bihar for the year 2022 23.

2023_MoRTH_733725_1 31.520 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
679 PR Work from ch.98.00 to ch.112.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733729_1 9.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
680 PR Work from ch.93.612 to ch.98.00 of NH 327E in the State of Bihar for the year 2022 23.

2023_MoRTH_733727_1 6.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
31/03/2023
Time 17:0Hrs
681 CONSTRUCTION OF ADVANCE LANDING GROUND AND ALLIED SERVICES FOR DEVELOPMENT OF BASIC INFRASTRUCTURE AT NYOMA LADAKH

2022_BRO_572375_1 214.090 BRO Special Project EPC (Lump Sum/Item Rate Contract) 31/12/2022
Time 18:0Hrs
31/03/2023
Time 12:0Hrs
682 Reconstruction of a box culvert at Km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at Km 13.872 of NH-35 (New NH-112) under NH Division No. V, P.W. (Roads) Directorate (iii) Reconstruction of bow string girder type minor bridge at Km 16.567 of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, in the district of North 24-Parganas, West Bengal during the year 2022-23 in EPC mode

2023_MoRTH_736044_1 35.424 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/01/2023
Time 18:0Hrs
30/03/2023
Time 11:0Hrs
683 Permanent rectification of 4 Nos of black spots on NH-27 (old NH-28) of Kotwa - Mehsi- Muzaffarpur Section from km 440 00 to km 520 00 (Total Length 80 Km) 4 nos of black spot on NH-27 of Muzaffarpur- Darbhanga - Purnia section (km 0 to km 148-550 and km 159-357 to km 287-860) (total length 277-053 km) & Removal of 1 No of at-grade junction near Satanpur Junction in Satanpur Village on NH-122 in the State of Bihar on EPC Mode

2023_NHAI_147142_1 295.293 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 18:5Hrs
29/03/2023
Time 11:0Hrs
684 Construction of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the State of Uttar Pradesh

2023_MoRTH_737151_1 286.960 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/01/2023
Time 9:0Hrs
28/03/2023
Time 15:0Hrs
685 Improvement and Rehabilitation of Existing Ayodhya Bypass from Design km 121.600 to Design km 144.020 (Design Length 22.420 km) of NH28 (New NH27) on EPC Mode under Bharatmala Pariyojana in the State of Uttar Pradesh

2023_NHAI_144047_1 382.340 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
28/03/2023
Time 11:0Hrs
686 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
687 BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh

2023_MoRTH_738844_1 25.040 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/02/2023
Time 17:30Hrs
27/03/2023
Time 17:30Hrs
688 Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23

2023_MoRTH_743234_1 40.970 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
27/03/2023
Time 12:0Hrs
689 Construction of Pratapgarh Bypass (Extension) connecting NH-31 to NH-330 on EPC mode in the state of Uttar Pradesh

2023_MoRTH_736338_1 99.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
690 Construction of Amethi Bypass (Part-II) at km 30.050 of NH-931 (Design Length-8.178 km) on EPC mode in the state of Uttar Pradesh

2023_MoRTH_737658_1 126.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 19:0Hrs
24/03/2023
Time 15:0Hrs
691 Work of Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 (Km 42.0 to Km 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the state of Uttar Pradesh

2023_MoRTH_737668_1 205.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 18:0Hrs
24/03/2023
Time 15:0Hrs
692 Construction of four-lane Concrete Road from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on section from Kohmara- Goregaon- Police Headquarter (Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi- Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra. Total Length of the project 15.781 Km

2023_MoRTH_735288_1 230.790 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
23/03/2023
Time 17:0Hrs
693 Construction of 4 lane/2 lane Major/Minor bridges and 2 lane ROBs in the Stretch from km 251 (Golawali) to km 352.000(Rajapur) section of NH- 66(Erstwhile NH-17) in the State of Maharashtra under NHDP-IV on Package II (Balance Work).

2023_MoRTH_737918_1 11.660 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/03/2023
Time 18:30Hrs
21/03/2023
Time 15:30Hrs
694 Short Term Maintenance from Km 96 800 to 97 600 Km 113 000 to 113 440 and Km 119 000 to 131 400 of NH744

2023_MoRTH_741293_1 1.240 MoRTH Maintenance Project OTHERS 17/02/2023
Time 18:20Hrs
21/03/2023
Time 15:0Hrs
695 Improvement works of Agra Bypass section from km. 0.00 to km. 32.800 connecting km. 176.800 of NH-2 to km. 13.030 of NH-3 in Uttar Pradesh.

2023_NHAI_142808_1 125.680 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
21/03/2023
Time 11:0Hrs
696 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_2 7.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/02/2023
Time 17:30Hrs
20/03/2023
Time 17:30Hrs
697 Upgradation to two lane with paved shoulder configuration from km 0.0 to 47.0 of NH351 Mahuva to Badhada section in the state of Gujarat length 47 km

732154 153.490 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
20/03/2023
Time 17:0Hrs
698 Periodical Renewal between km. 0/00 to 17/600, km. 117/00 to 138/500 and 269/700 to 278/00 of NH-754K in the State of Gujarat.

2023_MoRTH_744504_1 11.890 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 15:0Hrs
20/03/2023
Time 16:0Hrs
699 Short Term Maintenance from Km 1/4 - 2/4, Km 10/350 – 15/6, Km 16/8 – 17/0, Km 20/860 – 21/6, Km 40/4 – 41/2 and Km 58/3 – 63/2 of NH-181 (Coimbatore to Gundlupet Road) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740683_1 1.020 MoRTH Maintenance Project OTHERS 15/02/2023
Time 10:0Hrs
20/03/2023
Time 15:0Hrs
700 Short Term Maintenance from km 212/0 – 223/8, 252/8 – 258/6 & 268/4 – 273/8 of NH 948 of Bangalore – Coimbatore Road (Km 256/0 – 267/8, 222/0 – 227/8 and 206/0 – 211/4 old NH-209) under OR (DPP) 2022-23 in the State of Tamil Nadu

2023_MoRTH_740688_1 1.680 MoRTH Maintenance Project OTHERS 15/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
701 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2023_MoRTH_742794_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/02/2023
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
702 Widening from 2lane to 4lane of km 92.935 start point of old NH82 to 99.685 km End Point of Gaya Bypass of NH83 of NH120 Total Length 6.750 km on EPC mode in the State of Bihar.

2022_MoRTH_730025_1 54.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/12/2022
Time 15:0Hrs
20/03/2023
Time 15:0Hrs
703 Hill side treatment of Lambagarh Land Slide Zone at km 504.371 to km 504.871 on NH-58 (New NH-07) under Annual Plan 2022-23 in the State of Uttarakhand

2023_MoRTH_737934_1 47.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
704 Land slide treatement work on NH-58 from Kodiyala km. 266.130 to Devprayag km. 296.925 (10 locations) based on DPR submitted by THDC India Ltd. in the State of Uttarakhand on EPC mode.

2023_MoRTH_739247_1 142.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
20/03/2023
Time 12:0Hrs
705 CONS OF 110 MTR MAJ PMT BRIDGE AT KM 1PT825 (55MTR X 2) AND MINOR PMT BRS AT KM 8PT625 (30 MTR) AND KM 16PT925 (30 MTR) ON SASER BRANGASA GAPSHAN RD (STARING POINT KM 0PT00 AT GAPSAN) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE

2023_BRO_581660_1 20.940 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 18:0Hrs
20/03/2023
Time 11:0Hrs
706 Construction of four laning with paved shoulder from Hassan to Adihalli EC-20 Ch. Km 00.000 Hassan to Ch. Km 37.000 Adihalli Village under Bharatmala Pariyojana on EPC Mode in the state of Karnataka (Package-I)

2022_NHAI_139398_1 899.540 NHAI Normal Highway Project HAM 23/12/2022
Time 11:0Hrs
20/03/2023
Time 11:0Hrs
707 Construction of Minor Bridge 1X30.00 mtr. at Km 214.704 on NH 730 under EPC mode in the state of Uttar Pradesh.

2023_MoRTH_737359_1 6.220 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 15:0Hrs
17/03/2023
Time 12:0Hrs
708 Construction of Six Lane Elevated Kona Expressway from Km 0.145 to Km 7.337 of NH-117 in the state of West Bengal on EPC mode

2023-NHAI-143743-1 839.460 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/02/2023
Time 15:0Hrs
17/03/2023
Time 11:0Hrs
709 Construction of flyover at Sanatnagar Junction including its Approaches Km 290.784 to Km 291.516 of four lane with paved shoulders of NH44 at Srinagar in the UT of Jammu and Kashmir on Engineering Procurement and Construction EPC mode.

NIT 131 41.820 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/02/2023
Time 11:0Hrs
16/03/2023
Time 16:0Hrs
710 Short Term Maintenance Contract of Khairipalli-Talbeda Section from Km 246/100 to 321/000 Km

2023_MoRTH_742553_1 3.230 MoRTH Maintenance Project OTHERS 28/02/2023
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
711 Construction of (i) RUB with service road at Km. 357.450 (Tukwada) (ii) PUP at Km. 362.864 (Chharwada) on Surat-Dahisar Section of NH-48 in the State of Gujarat.

2022_NHAI_105962_1 17.460 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/02/2022
Time 15:0Hrs
16/03/2023
Time 15:0Hrs
712 Strengthening work from Zero Point (junction of Lal Bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (ch. 160.00 to 161.50 km) in the section of NH-707A (Tyuni- Chakrata- Mussoorie- Dhanaulti- New Tehri) in the State of Uttrakhand under NH Division Doiwala

2023_MoRTH_741314_1 4.280 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
16/03/2023
Time 12:0Hrs
713 Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280/080 (Design Chainage) to Km 375/450 (Design Chainage) of NH 63 in the State of Karnataka on EPC Mode

2022_NHAI_138951_1 1,055.000 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
16/03/2023
Time 11:0Hrs
714 Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 km 27.9 to 30.9 and km 46.8 to 61.5 under EPC mode in the state of Gujarat

743191 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/03/2023
Time 13:0Hrs
15/03/2023
Time 12:0Hrs
715 Construction of New Additional 4 lane Major Bridge besides Existing bridge over the Sabarmati River and its approaches at 5/400 Km of NH-8C (147), under NH Division Ahmedabad in the state of Gujarat.

2023_MoRTH_737656_1 59.120 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/03/2023
Time 18:0Hrs
15/03/2023
Time 12:0Hrs
716 OR-DPP to Akluj Velapur Mahud Sangola of NH 965G Km from 160.400 to 185.400 ( Part Mahud Sangola) in the state of Maharashtra

203MoRTH_742712_1 2.290 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
717 OR DPP to Deogon Phata Parali Latur Omerga Murum Mode Murum Alur Wagdari Akkalkot Indi Vijapur Road NH 548 B Km. 296/300 to 315/500 ( Section Wagdari to Akkalkot) and 337/700 to 340/700 ( Nagansur Tolanur) in the state of Maharashtra.

2023_ MoRTH_742705_1 1.350 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 10:0Hrs
14/03/2023
Time 17:30Hrs
718 Widening to four lane with paved shoulder from Design Km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh

2022_MoRTH_682564_1 367.990 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/04/2022
Time 17:0Hrs
14/03/2023
Time 17:0Hrs
719 Strengthening of Existing 2Lane4Lane NH501 Khanabal Pahalgam Road CH 0.000 To 19.050 and CH. 47.000 To 49.500 AlStop to Seer and Police Station Pahalgam To Sumo Stand after Crossing Pahalgam Bridge in the UT of Jammu Kashmir on Engineering Procurement and Construction EPC mode

NIT 128 39.120 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
14/03/2023
Time 16:0Hrs
720 Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413 700 and ends near ch. 419 000) under Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.

2022_MoRTH_728515_1 101.560 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/12/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
721 OR DPP to Tuljapur Naldurge Akkalkot road NH 652 KM 0.00 to 8.00 and 20.00 to 28.00 in the state of Maharashtra

2023_MoRTH_742708_1 0.500 MoRTH Normal Highway Project OTHERS 28/02/2023
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
722 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg III, Design Km 47 800 (Gosaiganj) to Km 73 300 (Bikapur)in the state of Uttar Pradesh on (EPC) basis in the State of Uttar Pradesh.

2022_MoRTH_705660_1 243.060 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/08/2022
Time 15:0Hrs
14/03/2023
Time 15:0Hrs
723 Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing Km 420.000 to Km 454.000(Design length Km 420.000 to Km 454.643, Design length 32.543 Km)of NH730(Shohratgarh to Uska Bazar)in the state of U.P. on(EPC)basis.

2022_MoRTH_680682_1 247.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/03/2022
Time 18:55Hrs
14/03/2023
Time 15:0Hrs
724 Strengthening work from km 37 to km 70 on NH 107(A) under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740377_1 32.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
725 Strengthening and improvement of NH-58(New NH-07) in Chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109(New NH-107) in Chainage km. 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand

2023_MoRTH_740380_1 8.900 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/02/2023
Time 15:0Hrs
13/03/2023
Time 12:0Hrs
726 DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA – CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE

2023_BRO_577386_1 104.500 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/01/2023
Time 9:0Hrs
13/03/2023
Time 12:0Hrs
727 Design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length – 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode

2022_NHAI_139388_1 760.760 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/12/2022
Time 15:0Hrs
13/03/2023
Time 11:0Hrs
728 Rehabilitation Upgradation of Newly Declared National Highway Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 Design Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in Kurnool District in the State Of Andhra Pradesh on EPC Mode

2023_MoRTH_736785_1 505.630 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/01/2023
Time 17:0Hrs
10/03/2023
Time 17:0Hrs
729 Rehabilitation and Upgradation of Existing Road to 2 Lane with Paved Shoulder Configuration from Seetharamapuram to Duttaluru Section of NH-167 BG From Km. 0.000 To Km. 36400 36.400 Km in the State Of Andhra Pradesh

2023_MoRTH_736418_1 309.320 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/01/2023
Time 15:0Hrs
10/03/2023
Time 17:0Hrs
730 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_741116_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
731 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_741139_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 17/02/2023
Time 15:0Hrs
10/03/2023
Time 15:0Hrs
732 Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 [Effective Length – 5.16 km] on EPC Mode in the state of Tamil Nadu on EPC mode

2022_NHAI_136793_1 164.820 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
10/03/2023
Time 11:0Hrs
733 REHABILITATION OF 2.5 KM LONG JAWAHAR TUNNEL (TWIN TUBE SINGLE LANE TUNNEL) ON NH-44 IN THE STATE OF JAMMU-KASHMIR NOW UT ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE

CE (P) BCN/14/2022-23 76.000 BRO Special Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 17:0Hrs
09/03/2023
Time 15:0Hrs
734 CONS OF ROAD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEI FROM KM 0PT00 TO KM 56PT240 (INCDL MAJ BRIDGE OF 140 MTR SPAN AT KM 55PT800) FROM EX TRACK TO NHSL SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 56PT240 KM)

2023_BRO_576733_1 162.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
735 CONS OF RD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEIII FROM KM 82PT340 TO KM 128PT740 (INCDL TWO MINOR BRIDGES) FROM EXISTING TRACK TO NH SINGLE LANE SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 46PT40 KM)

2023_BRO_576745_1 161.540 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/01/2023
Time 18:0Hrs
09/03/2023
Time 12:0Hrs
736 Repair and Rehabilitation of Balisai Bridge Chaddyamile at Km 75.300 of NH-116B in the district of Purba Medinipur in the State of West Bengal during the year 2022-2023 in EPC Mode. Job No. 116B-WB-2022-23-503.

2023_MoRTH_735329_1 7.542 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:45Hrs
09/03/2023
Time 11:0Hrs
737 Construction of 4 lane Greenfield North - East side Gorakhpur bypass (26.616 kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode

2022_NHAI_139214_1 819.710 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 15:0Hrs
09/03/2023
Time 11:0Hrs
738 Four Laning of left over works including Additional Structures in Kerala Tamil Nadu Border Kanyakumari from Km 43.000 to Km 96.714 of NH 47 in the State of Tamil Nadu on EPC Mode

135473 1,141.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 17:5Hrs
09/03/2023
Time 11:0Hrs
739 Rehabilitation and Upgradation of Hoshiarpur to Una up to PB-HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage km 15.200 to Design Chainage km 30.348) & construction of 4 lane Hoshiarpur Bypass (from Design Chainage km 2.425 to Design Chainage km 15.200) (Total Length 27.923 Kms) in the State of Punjab (Package-IV) under NH(O) on EPC mode

2023_NHAI_141491_1 332.160 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/01/2023
Time 11:0Hrs
06/03/2023
Time 11:0Hrs
740 Upgradation of existing 4 lane Ismailabad Ambala section of NH 152 - Km. 0.000 to Km 42.500 - Part of Ambala-Kotputli Corridor to 4-lane access controlled stretch by providing grade separated structures and service-Slip roads under Bharatmala Pariyojana–I in state of Haryana on EPC mode

2023_NHAI_140614_1 446.620 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 05/01/2022
Time 15:0Hrs
06/03/2023
Time 11:0Hrs
741 Strengthening of Existing 2-Lane 4-Lane road with paved shoulders of NH-254 from KM 82.400 to 104.200 KM from Rampura to Maur in the State of Punjab (21.80 km) on EPC Mode.

2022_MoRTH_732296_1 30.000 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
742 Periodical repairs(PR) of NH-44 Srinagar Bypass 4 Lane from Km 0.00 to Km 0.950 , Km 2.400 to Km 4.50 and Km 11.500 to Km 17.80 in the UT of Jammu & Kashmir on Engineering, Procurement & Construction (EPC) mode

NIT 127 10.160 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 03/02/2023
Time 15:0Hrs
03/03/2023
Time 15:0Hrs
743 Construction of ROB at Km 202.992 of NH-76 including approaches in the state of Uttar Pradesh

2022_MoRTH_719462_1 38.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 16:0Hrs
01/03/2023
Time 15:0Hrs
744 Construction of Six Lane Ring road around Kanpur in the state of Uttar Pradesh under NHDP phase VII on EPC Mode (Package-I).

2022_NHAI_135667_1 846.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
01/03/2023
Time 11:0Hrs
745 Strengthening and widening of NH-251 from Km. 11.000 to Km.22.770 in Diu on EPC mode 3rd Call.

2023_MoRTH_740429_1 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 12:20Hrs
28/02/2023
Time 16:0Hrs
746 Construction of 4-Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road, Package-2) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode.

2022_NHAI_133516_1 633.650 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/10/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
747 Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH 4 from AP Tamil Nadu Border Km 134.890 to Nalagampalli village Km. 172.000 under EPC mode in the state of Andhra Pradesh

184.45 184.450 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 02/12/2022
Time 15:0Hrs
28/02/2023
Time 11:0Hrs
748 Balance Works of Four Laning of Udhampur- Ramban Section of NH-1A (now NH-44) from Km 67.00 to Km 89.00, Km 130.00 to Km 151.00 on Engineering Procurement & Construction (EPC) Mode in the Union Territory of Jammu & Kashmir under NHDP Phase-II

NHAI/Balance Work of U-R/J&K/EPC/2021 550.450 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/09/2021
Time 19:0Hrs
28/02/2023
Time 11:0Hrs
749 Balance work of Rehabilitation and Up gradation of existing carriageway to Two Lane with paved shoulder standard in Arvi to Talegaon section of NH347A in the state of Maharashtra on Engineering, Procurement and Construction mode. Total Length of the project 13.700 Km

2023_MoRTH_735025_1 99.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/01/2023
Time 15:0Hrs
27/02/2023
Time 15:0Hrs
750 Development of Six lane green field Ring Road (Package-IV) starts from Design Ch.68.650 to Design Ch. 93.209 (Length 24.559 kms) around Kanpur City in the state of Uttar Pradesh.

2022_NHAI_136422_1 734.330 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 17:0Hrs
27/02/2023
Time 11:0Hrs
751 Rehabilitation and upgradation of existing road between Km 0.00 to Km 29.725 Joshimath Suraithota NHSL to NHDL specification on Joshimath Malari Road

2022_BRO_558726_1 213.040 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:40Hrs
27/02/2023
Time 11:0Hrs
752 Construction of Flyover/Underpass at Vizag Airport Junction to ensure Flow of container trailers to/from MMLP setup at NH-16 in the State of Andhra Pradesh on EPC mode

NHAI/PC/MMLP VIZAGAIRPORT/2022 44.040 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:0Hrs
27/02/2023
Time 11:0Hrs
753 Periodic renewal work of NH-121 (New-309) from Km.3.000 to Km. 13.000 & Km 27, 28 under Annual Plan 2022-23 in the state of Uttarakhand

2023_MoRTH_735321 4.510 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
21/02/2023
Time 15:0Hrs
754 Construction of 4-Laning of Kushner to Amjhar Road from km 75.480 to Km 98.950 (Jabalpur Ring Road, Pkg – 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_133148_1 418.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 15:0Hrs
21/02/2023
Time 11:0Hrs
755 Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana

NHAI/Tech/BM/Pathankot Link Road/2021 344.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 26/12/2022
Time 11:20Hrs
21/02/2023
Time 11:0Hrs
756 Road Safety work from Km. 77.000 to Km. 105.170 of NH-135C (Prayagraj - Koraon - Dramandganj - Halia - Awadhdham - Pipra - Manigadha - UP/MP Border) on EPC mode in the State of Uttar Pradesh in Year 2022-23

2023_MoRTH_733363_1 4.090 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 12:0Hrs
20/02/2023
Time 15:0Hrs
757 Treatment of landslide zone from location no. 01 to 28 (km 62.860 to km 152.750) on NH-125(09) in the state of Uttarakhand under EPC mode

2022_MoRTH_731620_1 147.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/12/2022
Time 17:0Hrs
20/02/2023
Time 11:0Hrs
758 Construction of VUP at Km 51.300 (Baghola) of Delhi-Agra Section from Km 20.500 to 200.000 of National Highway No.2 (New NH-19) in the state of Haryana on EPC mode

2023_NHAI_140161_1 26.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 02/01/2023
Time 10:43Hrs
20/02/2023
Time 11:0Hrs
759 Construction of Katihar Bypass on NH 81 to four lanes with paved shoulders standard in State of Bihar Total length 4.7 Km through an Engineering Procurement and Construction EPC Contract.

2023_MoRTH_733995_1 169.140 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2023
Time 15:0Hrs
20/02/2023
Time 11:0Hrs
760 Rehabilitation & Up- gradation for Talere – Gaganbawda– Kolhapur Road (NH- 166G) stretches start from Ch. 6.00 Km to Ch. 11.00 Km and Ch.19.300 Km (Start of Karul Ghat) to Ch. 35.300 Km (End of Gaganbawda) of NH- 166G, length 21.00 Km in the State of Maharashtra on EPC Mode

2022_MoRTH_727201_1 183.720 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
761 Rehabilitation & Up-Gradation To 2-Lanes with Paved Shoulder Configuration of Mahud-Sangola of NH-965G Chainage From km.159.400 to 161.900 & 162.400 to 183.960 km (Design Chainage from km 32.300 to km 34.800 & km35.300 to km56.860) In the State of Maharashtra on EPC Mode

2022_MoRTH_726627_1 189.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 01/12/2022
Time 15:0Hrs
17/02/2023
Time 17:30Hrs
762 Rehabilitation and Upgradation of Chorma – Bairgania section of National Highway No 227F to 2 lane with paved shoulders from Design Ch 0 000 to Ch 34 566 in the state of Bihar through Hybrid annuity mode (HAM) Basis

2022-NHAI-124214-1 391.610 NHAI Normal Highway Project HAM 30/07/2022
Time 15:0Hrs
15/02/2023
Time 17:0Hrs
763 Construction of Major Bridge on Shivani River at design chainage from km 122.080 to km 123.100 on NH353C along with approaches of 940m (Total Length 1020m) of National Highway Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Ashti Alapalli Sironcha Road on EPC mode in the state of Maharashtra

2023_MoRTH_732615_1 14.760 MoRTH Normal Highway Project BOT 04/01/2023
Time 12:0Hrs
15/02/2023
Time 17:0Hrs
764 Construction of seven minor bridges at design chainage km 2.400, km9.200, km14.200, km32.600, km34.200, km43.400 and km 46.400 on NH130D section (Total length of the project is 1.645 km with approaches) from Alapalli Bhamragad Narayanpur in Gadchiroli district on EPC mode in the state of Maharashtra

2023_MoRTH_732611_1 28.300 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/01/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
765 Widening and Strengthening Upgradation of 2 lane with PS from Existing Chainage km192 980 to km229 820(DC km162 800 to km198 180)(PackageVIII) under 31TF on AKHNOOR POONCH road (NH144A) in the UT of JK Under Project Sampark(BRO) on EPC

2022_MoRTH_731914_1 382.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/02/2023
Time 15:0Hrs
15/02/2023
Time 15:0Hrs
766 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode (3rd call)

2022_MoRTH_710564_3 6.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/01/2023
Time 15:0Hrs
14/02/2023
Time 15:0Hrs
767 Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under Bharatmala Pariyojana in the UT of J&K (Phase II-Package XVIII)

NHAI/BM/DAK Expressway/2022/Pkg XVIII 777.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/12/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
768 Rehabilitation and Up-gradation to Four Lane Road from km. 70.500 to km. 78.600 of NH-92 under EPC mode in the State of Uttar Pradesh

2022_MoRTH_667462_1 213.590 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/01/2022
Time 11:0Hrs
14/02/2023
Time 11:0Hrs
769 Construction Of New 6-Lane Major Bridge In Lieu Of Existing Old Bridge On Nakti Creek At Km 7.170 On NH- 141 In The State Of Gujarat.

2023_MoRTH_73756_1 23.920 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/01/2023
Time 15:0Hrs
13/02/2023
Time 16:0Hrs
770 Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh.

2022_NHAI_138409_1 152.950 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/12/2022
Time 18:0Hrs
09/02/2023
Time 11:0Hrs
771 Rectification of MORTH Identified Black Spots JK .02.020 GOLE MELA and Construction of Service Road to existing VUP at SINGOOR on Jammu UDHAMPUR section of NH44 Km 14.200 in UDHAMPUR Jammu and Kashmir on EPC mode.

2022_NHAI_138938_1 44.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
08/02/2023
Time 15:0Hrs
772 Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode.

133905 765.320 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 18:0Hrs
01/02/2023
Time 11:0Hrs
773 Remaining work of periodic renewal (PR) work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode on Engineering Procurement Construction (EPC) basis.

2023_MoRTH_733300_1 6.050 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 05/01/2023
Time 15:0Hrs
31/01/2023
Time 15:0Hrs
774 Construction Of 4 Lane Rob At Level Crossing No. S-25/E-2 Old (A-25) On NH-15(54) At Km 0.800 In District Tarn Taran (Punjab)

2022_MoRTH_731522_1 68.230 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 27/12/2022
Time 14:0Hrs
30/01/2023
Time 15:0Hrs
775 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_2 6.540 MoRTH Maintenance Project OTHERS 07/01/2023
Time 16:0Hrs
30/01/2023
Time 12:0Hrs
776 Improvement and Up-gradation of NH-734 section of Moradabad - Thakurdwara - Kashipur including Moradabad and Kashipur bypasses on EPC basis in the state of Uttar Pradesh and Uttarakhand- Package-III- Kashipur Bypass -Length-14.490 km Starts from Ch- 38.770 near UP-UK Border and ends at Ch- 53.260 -existing Ch-05.560 of NH 309

2022_NHAI_128979_1 392.420 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/09/2022
Time 15:0Hrs
30/01/2023
Time 11:0Hrs
777 Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77.100 to Km 170.580 Total length 93.48km to 2-lane with PS configuration along with OTI in 04 nos of bypasses in a total length of 7.23 km in the state of Madhya Pradesh

2022_MoRTH_691497_1 376.380 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2022
Time 17:30Hrs
28/01/2023
Time 17:30Hrs
778 Slope Protection works for Treatment of Landslide zone near Khat Village from Ch. 54.750 to 54.950 (based on DPR submitted by THDC India Ltd.) and Strengthening of existing road from Ch. 53.425 to 55.335 on NH-107 (Old NH-109) in the State of Uttarakhand

2022_MoRTH_730786_1 33.860 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 14:0Hrs
27/01/2023
Time 12:0Hrs
779 Construction of 59 mtr Span PSC Segmental Box Girder bridge over Tirthan River at km 83 780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of Himachal Pradesh on EPC Mode.

2022_MoRTH_728833_1 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 18:0Hrs
27/01/2023
Time 11:0Hrs
780 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (3rd Call).

2022_MoRTH_730710_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 22/12/2022
Time 10:10Hrs
25/01/2023
Time 17:0Hrs
781 Strengthening from Km. 44.700 to Km. 62.200 of NH-168G under NH Division, Ahmedabad in the State of Gujarat.(3rd Attempt)

2022_MoRTH_728211_2 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 15:0Hrs
25/01/2023
Time 15:0Hrs
782 Construction Of 2 Nos Of Major Bridge, 4 Nos. Minor Bridge And 8 Nos. Of Box Culverts Along With Road Safety Improvement Works Between Km 122.00 To Km 290.200 Of NH 41 In The State Of Gujarat.

2023_MoRTH_734111_1 40.820 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/01/2023
Time 16:0Hrs
24/01/2023
Time 16:0Hrs
783 IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand

2022_MoRTH_725679_1 38.600 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/11/2022
Time 15:0Hrs
24/01/2023
Time 15:0Hrs
784 Upgradation and widening of NH-848B From Ch. 8/180 to Ch. 12/000 and Ch. 14/100 to Ch. 20/300 at Daman

2022_MoRTH_731986_1 81.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 16:0Hrs
24/01/2023
Time 14:0Hrs
785 Construction of 4lane Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6lane elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojna in Odisha State on EPC Mode

NHAI/PC/BM/ Gopalpur PC /2022 165.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/09/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
786 Construction of Four-Laning of NH-45 to Kushner from km 38.400 to km 74.700 (Jabalpur Ring Road, Pkg – 3) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode

2022_NHAI_127469_1 580.850 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 15:0Hrs
24/01/2023
Time 11:0Hrs
787 Improvement of 4 lane road to 6 lane road and 4 lane dedicated Port Roads for the Port connectivity road from Convent junction to Sheelanagar Junction in the State of Andhra Pradesh on EPC mode (2nd Call)

NHAI/PC/Convent-SheelaNagar/2021 506.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/11/2022
Time 15:15Hrs
24/01/2023
Time 11:0Hrs
788 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2023_MoRTH_733883_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
789 Rehabilitation and Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32 00 to km 79 650 Puttaparthi Koduru Section of NH342 in Sri Satyasai District in the State of AP on EPC Mode under Annual Plan 2022 23

2022_MoRTH_725788_1 909.190 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/11/2022
Time 15:0Hrs
23/01/2023
Time 15:0Hrs
790 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2023_MoRTH_733924_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/01/2023
Time 17:55Hrs
23/01/2023
Time 11:0Hrs
791 Design and Construction of standalone 6-lane Purmepada VUP Balance work at Km 282.800 in Dhule - Pimpalgaon section of NH-3 New NH-60 in the State of Maharashtra on EPC Mode

2022_NHAI_139705_1 42.140 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/01/2023
Time 18:0Hrs
19/01/2023
Time 15:0Hrs
792 Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli- Prayagraj section of NH- 30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd )

2022_NHAI_136309_1 70.270 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/11/2022
Time 17:0Hrs
18/01/2023
Time 11:0Hrs
793 Upgradation of Jharkheda- Berasia - Dholkhedi from km 0.000 to km 87.900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode

2022_MoRTH_722759_1 252.700 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/11/2022
Time 17:30Hrs
17/01/2023
Time 17:30Hrs
794 Periodic Renewal work from Km 198 to Km 217.425 (Paligad to Foolchatti) on NH 94(134) under NH Division Barkot in the state of Uttarakhand under Annual Plan 2022-23

2022_MoRTH_729860_1 4.840 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/12/2022
Time 12:0Hrs
17/01/2023
Time 12:0Hrs
795 RFP for the work of Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.

2022_MoRTH_666965_1 330.540 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/01/2022
Time 9:0Hrs
16/01/2023
Time 17:0Hrs
796 Widening and StWidening to 2 lane with paved shoulders of Jareikela (Jharakhand/Odisha border)-Dhabaleswara section from km 0.000 to 36.000 km of NH-320D in the State of Odisha on EPC Mode

2022_MoRTH_706981_1 156.290 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/08/2022
Time 15:0Hrs
16/01/2023
Time 12:0Hrs
797 Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC

2022_MoRTH_683448_1 81.164 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/04/2022
Time 15:0Hrs
12/01/2023
Time 17:30Hrs
798 Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 (Design length 9.630 Km) on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_686528_2 85.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 21/11/2022
Time 17:30Hrs
12/01/2023
Time 17:30Hrs
799 Widening of existing road of Kalinga Ghat in Valley Side for elimination of Black spot using innovative Reinforced Earth Composite Hybrid system from Km 86.330 to Km 86/615 including Reconstruction of Minor Bridge at 86.700 of N.H. 157 in the state of Odisha on EPC mode

2022_MoRTH_713461_2 27.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/11/2022
Time 13:30Hrs
10/01/2023
Time 12:0Hrs
800 Permanent rectification of 3 nos. of black spots in NH-27 of U.P border - Dewapur - Kotwa section from km. 360.915 to km. 440.000 (total length of 79.085 km) & 5 nos. of black spots of project Highway NH-27 of Kotwa - Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) in the State of Bihar

2022_NHAI_130142_1 276.650 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 26/09/2022
Time 18:0Hrs
10/01/2023
Time 11:0Hrs
801 Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-Dabwali section of old NH-10 (new NH-09) at Chainage-218.276 in the State of Haryana on EPC Mode

2022_NAHI_134967_1 17.380 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/11/2022
Time 15:0Hrs
09/01/2023
Time 11:0Hrs
802 Construction of proposed Bypass at Reamal on NH -53 in the state of Odisha on EPC Mode. (Bid Ref No 26 CE NH of 2022-23)

2022_MoRTH_725530_1 17.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 24/11/2022
Time 18:55Hrs
07/01/2023
Time 12:0Hrs
803 Strengthening work of NH 107 (Old 109) (Kakdagad-Kund-Guptkashi) from Km. 33.130 to Km. 41.260 and Treatment of sinking zones in village Semi and Bhainsari from Kund to Guptkashi under Annual Plan 2022-23 in the state of Uttarakhand under EPC mode

2022_MoRTH_720508_1 71.427 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
06/01/2023
Time 12:0Hrs
804 Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH-19 Km 26.530) near Hinotiya Village to Design Km 75.700 (of existing SH-19 Km 74.820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode.

127462 392.810 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 18:0Hrs
05/01/2023
Time 11:0Hrs
805 Design and Construction of Standalone 4-lane Vehicular Underpass with approaches at Sangamner Bypass End Junction (Km.150.200) and Wavi Junction (Km.163.900) on Khed Sinnar section of NH-60 (Old NH-50) in the State of Maharashtra on EPC Mode

2022_NHAI_136814_1 41.720 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
806 Design and construction of crossing facility (VUP/VOP) at 4 locations viz. (i) Bhandgaon Jn (Km 47.920) (ii) Varkute Jn(Km 126.735) (iii) Indapur bypass Entry (km 135.675) (iv) Indapur Bypass Exit (Km 142.735) on Pune-Solapur (Pkg-I) (Km 40/000 to Km 144/400) section of NH-65 in the State of Maharashtra on EPC Mode

2022_NHAI_136845_1 139.780 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/11/2022
Time 15:0Hrs
05/01/2023
Time 11:0Hrs
807 Periodic Renewal work from Km. 72.505 to Km 91.075 of NH-727H under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_728285_1 6.490 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
808 Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.

2022_MoRTH_728321_1 6.530 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 15:0Hrs
04/01/2023
Time 11:0Hrs
809 Construction of 3 no of Bypasses at Sheikhpura Jamui Khaira alongwith 1 no of realignment at Sikandra with pre construction activity total length 13 472 Kmto two lane with PS standard along with U/S in N H 333A under EPC mode in State of Bihar

2022_MoRTH_721471_1 148.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 15:0Hrs
03/01/2023
Time 15:0Hrs
810 Six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun EC in Uttar Pradesh and Uttarakhand on EPC under BMP Phase- 1, Package 1- Saharanpur Bypass.

NHAI/BM/Delhi-Dehradun/Saharanpur-Ganeshpur-P1/2022 69.880 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 15:0Hrs
03/01/2023
Time 11:0Hrs
811 Upgradation and reconstruction of Jabalpur to Kundam Section of NH-45 from Km 40.500 (Design) to Km 68.100 (Design) including Kundam bypass Total length 27.60 km to Two lane with paved shoulder in the state of Madhya Pradesh

2022_MoRTH_720465_1 96.030 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/10/2022
Time 15:0Hrs
02/01/2023
Time 17:30Hrs
812 Upgradation and reconstruction of shahpura-Dindori section of NH 45 from Km 103.700 (Design) to Km 164.580 (Design) including 3 bypasses (Total length 60.88km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode

2022_MoRTH_682465_1 185.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 30/04/2022
Time 17:30Hrs
02/01/2023
Time 17:30Hrs
813 Strengthening from km 44.700 to 62.200 of NH168G NH168G under NH Division Ahmedabad in the state of Gujarat

728211 16.330 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 13/12/2022
Time 15:0Hrs
30/12/2022
Time 15:0Hrs
814 Widening from two lane to four lane with service roads from km 1.050 to km 3.470 of existing link road connecting NH-67 to NH-16 in Kovur town on EPC mode in the state of Andhra Pradesh

SENHVJA/22/2022-23 Dated.05.11.2022 50.680 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/11/2022
Time 17:0Hrs
29/12/2022
Time 17:0Hrs
815 Strengthening of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

728194 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 09/12/2022
Time 13:0Hrs
29/12/2022
Time 16:0Hrs
816 Construction of proposed Half Clover Leaf interchanges cum ROB at Yerramanchi and Gudipalli villages across NH-44 at KM 416.005 in the state of Andhra Pradesh on EPC Mode.

2022_NHAI_122586_1 82.850 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 15/07/2022
Time 15:0Hrs
29/12/2022
Time 11:0Hrs
817 “Improvement of Road Budhal-Mahore-Gul from Km 0.000 to Km 22.72 (net length 21.00 km) (Pkg –I) to NHDL specification under Project Sampark in UT of J&K

CE(P)SPK/BMG/PKG-I/2022-23 210.670 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/12/2022
Time 15:0Hrs
28/12/2022
Time 15:0Hrs
818 Widening and strengthening of Dhoraji Jamkandorana Kalavad section of NH927D from design chainage km 0.0 to 58.115 to two lane with paved shoulder configuration under EPC mode in the state of Gujarat.

2022_MoRTH_720468_1 189.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 20/12/2022
Time 18:45Hrs
28/12/2022
Time 12:0Hrs
819 Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode

2022_NHAI_123842_1 4,994.790 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 27/07/2022
Time 18:0Hrs
27/12/2022
Time 11:0Hrs
820 Medium Term maintenance (03 Years) from Km 256.880 to KM 296.515 of NH-59 in the state of Odisha under OR (DPP) scheme

2022_MoRTH_720184_1 6.540 MoRTH Maintenance Project OTHERS 28/10/2022
Time 10:55Hrs
26/12/2022
Time 12:0Hrs
821 Up-gradation to 4-lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under BMP on EPC Mode

2022_NHAI_134593_1 676.930 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 19:0Hrs
26/12/2022
Time 11:0Hrs
822 “Widening of Existing Road from Intermediate Lane/2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A (Rakholi-Khadoli-Velugam Section) in U.T. of Dadra & Nagar Haveli and Daman & Diu on EPC mode.”

E-Tender Notice No. 15 of 2022-23 172.810 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/10/2022
Time 13:0Hrs
24/12/2022
Time 12:0Hrs
823 Widening and strengthening to 4LPS 2LPS from km 0.000 to 35.800 Kuakhia Mangalpur Section of NH 20 in the State of Odisha on EPC mode. Bid Ref No.-01 ROBBSR 2022 23

2022_MoRTH_702919_1 341.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 25/07/2022
Time 15:0Hrs
22/12/2022
Time 12:0Hrs
824 Improvement from Km 94 0 96 0 96 2 96 8 97 6 101 0 102 0 103 0 138 0 139 3 142 0 151 4 including Protective works and CD works of Thirumangalam Kollam road NH 744 Old No 208 on EPC Basis

2022_MoRTH_721844_1 29.240 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:15Hrs
21/12/2022
Time 11:0Hrs
825 One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode

2022_MoRTH_710564_2 6.310 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 16/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
826 One Time improvement of existing bypass road from Km 278 plus 650 to 281 plus 850 obedullaganj and Km 272 plus 200 To 269 plus 000 Goharganj Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode

2022_MoRTH_721813_1 5.070 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
827 One time improvement of existing bypass road from Km 161.700 to 163.100 ( Udaipura) Km 141.200 to 142.000 (Deori) and Km 181.200 to 184.900 (Khargone) Total length 5.09 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721814_1 4.330 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
19/12/2022
Time 17:30Hrs
828 Balance Work of Four laning of Panvel - Indapur section of NH-66 (Old NH-17) from km 0.000 (Panvel) to km 42.300 (Kasu) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode

2022_NHAI_133672_1 239.580 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/10/2022
Time 15:35Hrs
19/12/2022
Time 11:0Hrs
829 Periodic Renewal Work in Km. 0.000 to 39.000 of NH-730S in the State of Uttar Pradesh

2022_MoRTH_714209_1 16.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 15:0Hrs
16/12/2022
Time 15:0Hrs
830 Periodic Renewal Work in Km. 112.000 to 130.400 and 152.600 to 154.000 of NH-28B in the State of Uttar Pradesh on (EPC) basis

2022_MoRTH_714093_1 8.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
16/12/2022
Time 15:0Hrs
831 Construction of Six Lane VUP (Single box 12x5.5 m with approach) at Sachendi (Ch. 454.460) on Etawah-Chakeri (Kanpur) Section of NH-19 (Old NH-2) in the State of Uttar Pradesh on EPC Mode

2022_NHAI_132046_1 32.560 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 11:0Hrs
15/12/2022
Time 11:0Hrs
832 Construction of VUP at Km 1224.054 (Nagulauppalapadu/Growth centre) with Blackspot Id AP-(02)-038 and VUP at Km 291.646 of NH-16 (Rajupalem Junction) with Blackspot Id AP-(02)-033 on NH16 for rectification of Blackspots in the State of Andhra Pradesh

2022_NHAI_133564_1 70.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/11/2022
Time 16:40Hrs
13/12/2022
Time 11:0Hrs
833 Construction of twin tube tunnels on Jammu Ring Road NH244A between Design Ch.50.600 to 51.700 and Design Ch. 53.535 to 55.700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase

NHAI/J&K/Jammu Ring Road/Tunnel/2022 698.100 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 21/06/2022
Time 15:0Hrs
13/12/2022
Time 11:0Hrs
834 strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand

2022_MoRTH_722210_1 6.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/11/2022
Time 16:30Hrs
07/12/2022
Time 12:0Hrs
835 4-Laning of Khandwa bypass from Rudhi to Deshgaon, Km 149.000 to Km 177.680 section of SH-71/NH-347B/NH-753L (Betul – Khandwa Pkg-V) in State of MP on EPC Mode

2022_NHAI_126175_1 356.080 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
07/12/2022
Time 11:0Hrs
836 Periodic Renewal Work in Km. 21.627 to Km. 34.000of NH-328A in the State of Uttar Pradesh on EPC Mode. Job No. CE-RO/LKO/PR/NH-328A/22-23/653 dt 20.09.2022

2022_MoRTH_723925_1 4.360 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/11/2022
Time 18:0Hrs
05/12/2022
Time 11:0Hrs
837 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 122.200 near Guddehosur at start of Kushalnagara Bypass to Ch. Km 144.900 at Near Hemming Village/ SH-21 Hassan - Periyapatna Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-II)

2022_NHAI_129471_1 694.870 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
838 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 144.900 Near Hemmige Village/ SH-21 Hassan - Periyapatna Road Junction to Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-III)

2022_NHAI_129444_1 666.970 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
839 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 169.000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur to Ch. Km 195.550 at Yalachahalli Near SH-117 Yelawala – KR Nagara Road Junction on Hybrid Annuity Mode under NH (O) in the state of Karnataka (Package-IV)

2022_NHAI_129474_1 842.930 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
840 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Ch. Km 195.550 at Yalachahalli near SH-117 Yelawala – KR Nagara road junction to Ch. Km 214.535 joining (at ch. Km 131.180 approx) to Srirangapatna bypass near Paschima Vahini under NH (O) in the state of Karnataka (Package-V)

2022_NHAI_129475_1 735.270 NHAI Normal Highway Project HAM 19/09/2022
Time 11:30Hrs
05/12/2022
Time 11:0Hrs
841 One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode

2022_MoRTH_721812_1 7.846 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 04/11/2022
Time 17:30Hrs
03/12/2022
Time 17:30Hrs
842 Improvement of road Budhal-Mahore-Gul from Km 22.72 to Km 62.94 (net length 29.080 Km) (Package-II) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_527228_1 307.900 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
03/12/2022
Time 15:0Hrs
843 Rehabilitation and upgradation of existing road between Km 480.95 to Km 489.35 Joshimath Marwari on Joshimath - mana road

2022_BRO_558360_1 45.730 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/10/2022
Time 15:0Hrs
01/12/2022
Time 11:0Hrs
844 Work of IRQP from Km 222/00 to Km.230/300 Derol Bharuch Section, and between Km 238/400 to 252/200 Ankleshwar- Modinagar- Sajod-Digas Section, Km. 182/00 to Km.184/150Amod-Nahiyer Section, Km 204/00 to Km.204/700Sudi Patiya to Samni Section of NH64

2022_MoRTH_718265_1 36.730 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 9:0Hrs
30/11/2022
Time 12:30Hrs
845 Construction of Rail Over Bridge in Lieu of Railway Crossing No. E/2 On Ferozepur- Fazilka Rail Section at Km. 2/4-5 &On NH-95 (New NH-05) Section Ferozepur to Indo Pak Border at Km 205.320 (Near Ferozepur City &Village Madhre) In the state of Punjab on EPC Mode (Job No. NH-95 (New NH-05)-PB- 2021-22/550 Dated 27.12.2021

2022_MoRTH_719231_1 33.580 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 19/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
846 Upgradation of Road Budhal-Mahore-Gul from km 65.880 to km 86.725 (net length 34.950 km) (Package-III) to NHDL specification under Project Sampark in UT of J&K

2022_BRO_557550_1 249.260 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 15:0Hrs
29/11/2022
Time 15:0Hrs
847 4- Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode.

123351 468.790 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/07/2022
Time 18:0Hrs
29/11/2022
Time 11:0Hrs
848 Construction of 59 mtr. Span PSC Segmental Box Girder bridge over Tirthan River at km 83.780 design chainage Dhaman on Sainj Luhri Anni Jalori Banjar Aut Road on NH 305 in the State of HP.

2022_MoRTH_717515 6.250 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 12/10/2022
Time 15:0Hrs
28/11/2022
Time 15:0Hrs
849 Strengthening & widening of NH-251 from Km. 11.000 to Km.22.770 in Diu (on EPC mode)

Tender Notice no.21/NH-251-Diu/2022-23 73.110 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 15/10/2022
Time 16:59Hrs
28/11/2022
Time 11:0Hrs
850 Development of existing 2 Lane NH1 from km 8.660 to km 33.775 Sumbal to Wayul to 4 lane dual carriageway NH standard as part of Srinagar Ring Road Phase II Design Ch 41907 to Ch 66609 under Bharatmala Pariyojna Phase I in the Union Territory of Jammu and Kashmir on EPC mode

2022_NHAI_127505_1 617.730 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 31/08/2022
Time 11:0Hrs
28/11/2022
Time 11:0Hrs
851 Rehabilitation and Upgradation of Parli to Sirsala section of NH 361F km 136.700 to 115.000 Length 21.70 km to Two Lanes with paved shoulder Four lane configurations on EPC in the state of Maharashtra

2022_MoRTH_710782_1 229.160 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
852 Rehabilitation and Upgradation of Shirapur Junction to Shivaji Chowk Design Chainage km. 130.00 to 144.500 section of NH 561 and Barshi Naka to Jarud Phata Design chainage km 49.500 to 59.500 section of NH 361F to Two lanes with paved shoulders Four lanes configuration on EPC Mode in the State of Maharashtra Total porject Length 24.5 km.

2022_MoRTH_711028_1 212.610 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
25/11/2022
Time 17:30Hrs
853 Widening to 4 lane in Km 40/510 to 41/450 and Strengthening from Km 15/600 to 19/800, km 36/000 to 54/500, km 55/375 to 57/400, km 58/600 to 59/600, km 60/200 to 61/900, km 62/600 to 64/000, km 74/000 to 75/126, km 76/373 to 76/450 & Km 77/600 to 90/275 including Geometrical Improvement at Km 37/400 & 46/800, Construction of Retaining wall & Breast wall, Construction of storm water drain, Reconstruction & Widening of culverts and Foot over bridge at km 78/900 of NH 85 (Old NH 49 Extn) on Engineering, Procurement & Construction (EPC) Basis Contract under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_717031_1 73.350 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 10/10/2022
Time 16:0Hrs
25/11/2022
Time 15:0Hrs
854 Periodical Renewal work from km 221.00 to km 225.00, IRQP from km 225.00 to km 232.00, PR from km 232.00 to km 260.00 & 266.00 to km 271.00 (Except km 247.066 to km 248.040, From km 269.067 to km 269.598, From km 258.226 to km 258.990 & From km 267.060 km to km 267.440 km) of NH-60 (new NH-14) under NH Division No- III in the District of Bankura, West Bengal during the year 2022-23. (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715219_1 41.340 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:55Hrs
24/11/2022
Time 14:0Hrs
855 Periodical Renewal work from km 181.00 to km 205.20 (Except km 181.636 to km 182.132, from km 193.25 to km 195.406 & From km 203.255 to km 203.45) of NH-60, under NH Div No - III in the District of Bankura, West Bengal during the year 2022-23 (Job No. TA/14/WB/2022-23/…….)

2022_MoRTH_715356_1 22.780 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 29/09/2022
Time 15:30Hrs
24/11/2022
Time 14:0Hrs
856 Widening and Strengthening to 2L with PS of Kandarpur- Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode

2022_MoRTH_699999_1 290.980 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
24/11/2022
Time 12:0Hrs
857 DESIGN AND CONSTR OF MULTISTORY BUILDING (G PLUS 2) WITH MI ROOM IN N AREA (PRESENT LOCATION OF HAD) BY 3D CONCRETE PRINTING TECHNOLOGY FOR ESTABLISHMENT OF AIR DISPATCH UNIT FOR PROJECT HIMANK AND VIJAYAK IN CHANDIGARH

2022_BRO_555867_1 33.130 BRO Special Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
858 Demolition and Re-construction of Deck Slab of Minor Bridge at km. 60.682 LHS on Patiala bypass Section of NH-07 on EPC Mode

2022_NAHI_131166_1 1.740 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 11:0Hrs
24/11/2022
Time 11:0Hrs
859 Four laning of Ottanchatram to Palani section from km 30/700 to km 55/000 of NH 209 (New NH-83) including footpath for pedestrian and way side amenities except from km 37/870 to 38/130, from km 39/200 to km 41/000, from km 43/400 to km 44/100, from km 47/400 to km 51/000 and from km 52/200 to km 52/965 on EPC mode under Annual Plan 2022-23 in the State of Tamil Nadu.

2022_MoRTH_716364_1 127.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
23/11/2022
Time 15:0Hrs
860 Construction of HL bridges at CH 377/420 km, CH 423/800km , CH 433/750 km and CH 484/500 km in Malkangiri - Motu road on NH-326 in the state of Odisha on EPC mode

2022_MoRTH_701321_1 46.410 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/07/2022
Time 18:55Hrs
23/11/2022
Time 12:0Hrs
861 Periodical renewal work from km. 0.165 to 17.756 on NH-11 Agra-Jaipur-Bikaner road Under EPC mode in the State of Uttar Pradesh.

2022_MoRTH_718253_1 7.920 MoRTH Maintenance Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 15:0Hrs
22/11/2022
Time 15:0Hrs
862 Periodical Renewal work on NH 503 Extn. in km.19.00 to 28.00 in the State of Himachal Pradesh on EPC mode.

2022_MoRTH_716413_1 4.230 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
863 PERIODICAL RENEWAL FOR KALA AMB PAONTA SAHIB DEHRADUN ROAD KM 52.00 TO 83.00 ON NH 07 IN THE STATE OF HIMACHAL PRADESH ON EPC MODE.

2022_MoRTH_716423_1 18.440 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 15:0Hrs
22/11/2022
Time 11:0Hrs
864 PERIODICAL RENEWAL WORK ON SELECTED STRETCHES KM 0/00 TO 69/00 (ON SELECTED STRETCHES FROM KM 0/0 TO 9/670, 9/800 TO 17/070,18/380 TO 21/032,21/580 TO 23/015,23/220 TO 23/630,24/980 TO 26/100,26/267 TO 28/648,28/850 TO 29/680,29/720 TO 30/400,30/480 TO 3100,30/480 to 31/150,31/270 to 31/800,37/400 to 37/485,41/350 to 59/240,59/280 to 62/790,62/900 to 64/642,64/780 to 69/00) of Theog-Kotkhai-Hatkoti Road NH-705 under annual renewal program(ARP) for year 2022-23 in the state of Himachal Pradesh On EPC Mode

2022_MoRTH_716447_1 34.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 06/10/2022
Time 18:0Hrs
22/11/2022
Time 11:0Hrs
865 Slope Protection and Landslide Mitigation at 4 Vulnerable Locations (km 1.950 to 2.100, km 11.100 to 11.450, km 22.435 to 22.485 and km 22.610 to 22.680) within Sevoke - Rongpoo Section of NH-10 (old NH-31A) in Kalimpong district in the state of West Bengal on EPC mode. [Job No.10/ WB/ 2021-22/493.] (2nd Call).

2022_MoRTH_711036_1 82.860 MoRTH Special Project EPC (Lump Sum/Item Rate Contract) 08/09/2022
Time 10:0Hrs
21/11/2022
Time 17:0Hrs
866 Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis

2022_MoRTH_714105_1 20.670 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 22/09/2022
Time 18:55Hrs
21/11/2022
Time 15:0Hrs
867 Construction of Shikaripura bypass starting at existing Km 146.150 and ending at existing Km 154.00 (design chainage from Km.0.00 to Km 6.576) of NH 766C in the State of Karnataka

RW/BNG /NH-766C/Km.146.15 to 154.00/21/2022 50.850 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/10/2022
Time 15:0Hrs
21/11/2022
Time 15:0Hrs
868 Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137/080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh on EPC Mode

2022_MoRTH_716585_1 15.250 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 18:0Hrs
21/11/2022
Time 11:0Hrs
869 Balance work for construction of approach slabs-wing wall and return wall along with approach roads for newly constructed bridge at Km 146.709 of NH-60 new NH-l4 in the district of Paschim Medinipur in the State of West Bengal on EPC Mode under Annual Plan 2022-23. Job No. 14-WB-2022-23-500.

2022_MoRTH_716662_1 6.562 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 07/10/2022
Time 17:0Hrs
21/11/2022
Time 11:0Hrs
870 Rehabilitation work for Damaged road sections AS27 KM 40.000 to KM 60.500 , AS25 KM 83.400 to KM 111.000, AS24 KM 111.000 to KM 126.450 and AS23 KM 126.450 to 140.700 in the State of Assam

2022_NHAI_128187_1 105.510 NHAI Special Project EPC (Lump Sum/Item Rate Contract) 07/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
871 Strengthening of Pavement Including Improvement of Road Safety Work Construction of Retaining Wall Breast Wall Thrie Beam Crash Barriers Road Side Drains Slab Culverts Solid Cause Way etc in Km 286 00 to 329 00 on NH05 in the State of HP

2022_MoRTH_712867_1 80.650 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 16/09/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
872 Stabilisation of land slide and slope protection between Km 28.60 to Km 142.00 on Rishikesh Dharasu road on NH 34 state Uttarakhand on EPC mode No of slide locations 12 Nos

2022_BRO_555763_1 81.640 BRO Normal Highway Project EPC (Lump Sum/Item Rate Contract) 03/10/2022
Time 15:0Hrs
21/11/2022
Time 11:0Hrs
873 PR work from km 36.000 to km 37.500, km 38.593 to km 39.460, km 40.500 to km 41.000, km 47.000 to km 47.807, km 48.819 to km 49.407, km 50.427 to km 51.000, km 52.000 to km 52.179, km 53.234 to km 55.000, km 56.000 to km 56.309, km 57.409 km 62.400, km 64.000 to km 64.802, km 65.862 to km 67.974 and km 70.000 to km 71.000 including Road furniture’s on N.H.- 512 (Job No. TA/512/WB/2022-23/…….)

2022_MoRTH_714864_1 17.150 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:30Hrs
17/11/2022
Time 14:0Hrs
874 Widening and Strengthening to 2 lane with PS from 0.00 to 40.00 (Dhaugaon – Podamari section ) of NH 326 in the in the state of Odisha on EPC Mode.

2022_MoRTH_700046_1 155.770 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 11/07/2022
Time 18:55Hrs
17/11/2022
Time 12:0Hrs
875 PR of existing carriageway of NH-60 new NH-14 stretches from Km 173 to Km 181 Except 173.5 Km to 173.880 Km under NH Div No-II P.W.Rds Direct in the dist. of Paschim Medinipur WB under ARP 2022-2023. Job No. TA-14-WB-2022-23-807.

2022_MoRTH_714952_1 10.376 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/09/2022
Time 18:0Hrs
17/11/2022
Time 11:0Hrs
876 Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (Package-1)

2022_NHAI_126172_1 480.230 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 18/08/2022
Time 15:0Hrs
17/11/2022
Time 11:0Hrs
877 Road safety works in different stretches from (km 35.545 to km 36.20, km 38.97 to km 39.22, km 42.01 to km 42.32 & km 44.78 to km 45.04) for improvement of sharp turning & narrow road bench and construction of Over Head Gantry signs at 51.3 km of NH-10 (old NH-31A) under NH Division-IX in the District of Kalimpong in the State of West Bengal under Road Safety Annual Plan 2022-23 (Job No.-NH-10/KOL/2022-23/RSCE-08).

2022_MoRTH_717906_1 8.846 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 14/10/2022
Time 10:0Hrs
16/11/2022
Time 17:0Hrs
878 Stregthning of NH927K Ranavav Bhanvad Khambhaliya road section btn km 0.0 to 21.5 and km 27.9 to 30.9 and Km 46.8 61.5 under EPC mode in the state of Gujarat

718413 24.370 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 16:0Hrs
879 Balance work for construction of Fulahar Bridge approach on NH 131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode Job No. 131A/WB/2022-23/494

2022_MoRTH_715166_1 38.870 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 18:30Hrs
16/11/2022
Time 14:0Hrs
880 IRQP to newly declared NH151K Porbandar Bhanvad Tranpatiya road section btn km 0.0 to 18.4 and km 39.3 to 43.2 under EPC mode in the state of Gujarat

718402 17.310 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 17/10/2022
Time 17:0Hrs
16/11/2022
Time 12:0Hrs
881 Construction of VOP at Nanthoor Junction KA 02 135 at Km. 375.300 on NH 66 falls under completed four lane highway stretch of new Mangalore Port Road Connectivity stretch from Surathkal Nantoor of NH66 and Nantoor Talapady of NH73 developed under SPV to be executed on EPC mode

NIT No.22/NHAI/RO-BNG/15016/Tender/2022-23 dated 27.09.2022 60.290 NHAI Normal Highway Project EPC (Lump Sum/Item Rate Contract) 28/09/2022
Time 15:0Hrs
16/11/2022
Time 11:0Hrs
882 Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, From Km 82.300 to 89.880,Total design length 7.580 Kml section of NH-752C in the State of Madhya Pradesh under EPC mode

2022_MoRTH_691384_1 48.390 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 27/05/2021
Time 15:0Hrs
14/11/2022
Time 17:30Hrs
883 Periodical Renewal work from km 598.00 to km 641.00 of NH-31(New NH-17 and 717) under NH Division IX in the District of Jalpaiguri, P.W Roads Directorate, West Bengal, under ARP 2022-2023. [Job No. TA/17&717/WB/2022-23/809].

2022_MoRTH_714300_1 47.392 MoRTH Normal Highway Project EPC (Lump Sum/Item Rate Contract) 23/09/2022
Time 17:10Hrs